entered into City Secretary Contract No. 31529 (the Contract) which was authorized by the City
Council by M&C C-20557 on the 8t' day of March, 2005; and
WHEREAS, the Contract involves engineering services for the following project:
Street Reconstruction, Water and Sewer Replacement on Robin-Denver Storm Drain
Reconstruction, 2004 CIP Major Storm Drain Projects,
Project No. 00086; DOE No. 4895
Water Project No. P253-6021700086
Sewer Project No. P253-7021700086
TPW Project No. C200-2024000086
WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to
include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their duly-
authorized representatives, enter into the following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the additional engineering services as
specified in a proposal letter dated November 2nd, 2007, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional services to be performed by Engineer
total $8,000.
2.
Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to
Engineer for all work and services performed under the Contract, as amended, so that the total
fee paid by the City for all work and services shall not exceed the sum of $ 151,370.
02-25-08 P03:57 IN
3.
All other provisions of the Contract, which are not expressly amended herein, shall remain in full
force and effect.
Executed on this the ( 1 day of 200& in Fort Worth, Tarrant
County, Texas.
APPROVAL RECOMMENDED: APPROVED:
A. Douglas Rademaker, P.E. Fernando Costa
Director, Department of Assistant City Manager
Engineering
Halff Associates, Inc.
ENGINEER
ATTEST:
By:
Stephen 6awford, P.E.
Team Leader
4000 Fossil Creek Blvd. Marty Hend ' , City Secretary
Fort Worth, Texas 76137
ND MacC ' is11.[I1L,.D
APPRO AS TO F 'RM ND LEGALITY:
Amy
Assistant ity Attorney
p;p HALFF
November 2,2007
AVO 23080
Joseph Bergeron,P.E.
City of Fort Worth-Department of Engineering
1000 Throclanorton
Fort Worth,Texas 76102
Ref: Amendment No. 2—2004 CIP Project—Robin-Denver Storm Drain Rehabilitation
DOE No. 4895
Dear Mr.Bergeron:
In response to your request, Halff Associates is pleased to present this Amendment for additional services for
design changes to the Robin-Denver Storm Drain Rehabilitation. Amendment No. 2 covers the following
additional services:
• Redesign of approximately 580 linear feet of storm drain per COFW request
• Redesign of approximately 580 linear feet of storm drain per gas company/electric company
request(as provided by COFW)
• Redesign of approximately 650 linear feet of M-BR* and 30 linear feet of L-899 sanitary sewer per
COFW request
• Redesign of approximately 650 linear feet of M-BR* and 30 linear feet L-899 sanitary sewer per
gas company/electric company request(as provided by COFW)
• Resubmittal of two.(2)copies of seven(7)plan and profile sheets per COFW request
• Resubmittal of three(3)copies of seven(7)plan and profile sheets per gas and electric request
A summary of the proposed budget for this revised amendment is as follows:
Storm drain and sanitary sewer redesign/submittal $8,000.00
TOTAL PROPOSED AMENDMENT NO.2 $8,000.00
In accordance with the City of Fort Worth M/WBE participation goal, the anticipated M/WBE utilization for
Amendment No. 2 is 0%; overall M/WBE participation including Amendment No. 2 is 18.6%. Attached are
Summary of Total Project Fees and Estimated Construction Costs (formatted in accordance with Exhibits B-3
and B-3A of the original contract).
Please review the enclosed information and do not hesitate to call me if you have any questions or require
additional information regarding this proposal and our proposed M/WBE utilization for the referenced project.
Sincerely,
HALFF ASSOCIATES,INC.
16,1, U/S;'4K
Ronda Visintainer,P.E. Stephen Crawford,P. .
Project Manager Team Leader
HALFF ASSOCIATES,INC. V Y Y� C v„ ,''''•
1�
4000 FOSSIL CREEK BLVD. TEL (817)847-1422 WWW.HALFF.COM ��
FORT WORTH,TX 76137 FAX (817)232-9784
EXHIBIT B-3
(SUPPLEMENT TO ATTACHMENT B)
Design Fee Cost Summary
2004 CIP ROBIN-DENVER STORM DRAIN RECONSTRUCTION
City Project No.00086
Project Description Scope of Services Total Fee
Engineering,Survey and Water,Sewer, Paving,&Drainage $ 143,370 Amendment 1 R
Special Services
Amendment 2
Engineering redesign Sewer and Drainage Redesign,reproduction $8,000 5.3%
TOTAL $8,000 79.1%
MNVBE Subconsultants Services Fees %of Total
Gorrondona&Associates Surveying/Easements $25,300 16.7%
LA Blueline Reproduction $2,900 1.9%
TOTAL $28,200 18.6%
Non-MNVBE Subconsultants Services Fees %of Total
CMJ Engineering Geotechnical $3,500 2.4%
TOTAL $3,500 2.3%
City MWBE Goal-18%
133-1 �
EXHIBIT B-3A
(SUPPLEMENT TO ATTACHMENT B)
Professional Services Fee Summary
2004 CIP Robin-Denver Storm Drain Reconstruction
City Project No.00086
WATER
ENGINEERING DESIGN
Opinion of Probable Construction Costs X Curve A X 85%
$96,000 X 7.6%X 65%X 10% $ 6,820
SURVEY DESIGN $ 3,250
REPRODUCTION $ 200
ADDITIONAL SERVICES' $ 1,200
10%FOR SUBS $ 340
SUBTOTAL $ 11,810
SEWER
ENGINEERING DESIGN
Opinion of Probable Construction Costs X Curve A X 85%
$119,325 X 7.6%X 85%X 10% $ 8,480
SURVEY DESIGN $ 3,250
REPRODUCTION $ 250
ADDITIONAL SERVICES' $ 1,500
10%FOR SUBS $ 350
SUBTOTAL $ 13,830
Amendment 2
ENGINEERING DESIGN $ 3,400
SUBTOTAL $ 17,230
DRAINAGE
ENGINEERING DESIGN
Opinion of Probable Construction Costs X Curve A X 85%
$1,234,243 X 7.6%X 85% $ 76,900
SURVEY DESIGN $ 15,000
REPRODUCTION $ 2.460
ADDITIONAL SERVICES' $ 17,100
10%FOR SUBS $ 2,090
SUBTOTAL $ 113,550
Amendment I
SURVEY DESIGN $ 3,800
10%FOR SUBS $ 380
SUBTOTAL $ 117,730
Amendment
ENGINEERING DESIGN $ 4,600
SUBTOTAL $ 122,330
TOTALFEE
WATER DESIGN FEE $ 11,810
SEWER DESIGN FEE $ 17,230
DRAINAGE DESIGN FEE $ 122,330
GRAND TOTAL $ 151,370
Based on percent of department construction cost/overall construction cost