HomeMy WebLinkAboutOrdinance 7066 ORDINANCE NO. , �2
AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE-
MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF
RUBY PLACE
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE
CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE
OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING
THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE
CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE
CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING
THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE
CITY; AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the
hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im-
proved by raising, grading and filling same and by constructing thereon the following, to-wit:
UNIT 1: RUBY PLACE From Bonnie Drive to Ramona Drive, known and
designated as Project No. 104-24000-242, Unit
1, a six-inch thick hot-mix asphaltic concrete
pavement on a six-inch thick lime stabilized
subgrade with seven-inch high concrete curb and
eighteen-inch wide concrete gutter on a forty
foot roadway. Six-inch thick concrete drive-
ways will be constructed where specified.
UNIT 2: CALMONT AVENUE From 60' west of Marquita Drive to I-20 Service
Road, known and designated as Project No. 104-
24000-242, Unit 2, a seven-inch thick hot-mix
asphaltic concrete pavement on a six-inch thick
lime stabilized subgrade with seven-inch high
concrete curb and eighteen-inch wide concrete
gutter on a forty-four foot roadway. Six-inch
thick concrete driveways will be constructed
where specified.
UNIT 3: CURTIS DRIVE From Highway 80W to West Elizabeth Lane, known
and designated as Project No. 104-24000-242,
Unit 3, a seven-inch thick hot-mix asphaltic
concrete pavement on a six-inch thick lime
stabilized subgrade with seven-inch high concrete
curb and eighteen-inch wide concrete gutter
on a forty-foot roadway. Six-inch thick concrete
driveways will be constructed where specified.
together with concrete curbs, gutters, driveways and incidentals to such improvements
on proper grade and line where same are not already so constructed, together with storm
sewers' and drains and other necessary incidentals and appurtenances; all of said im-
provements to be constructed as and where shown on the Plans and in strict accordance
with the Plans and Specifications therefor; contract therefore has been made and
entered into with AUSTIN ROAD COMPANY ;
and
WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public
Works Director to prepare and file estimates of the cost of such improvements and
estimates of the amount per front foot proposed to be assessed against abutting property
and the owners thereof, and such estimates have been examined, NOW, THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT:
I.
Such estimates be, and they are hereby adopted and approved.
II.
It is hereby found and determined that the cost of improvements on each portion of
streets, avenues, and public places hereinafter described, with the amount or amounts
per front foot proposed to be assessed for such improvements against abutting pro-
perty and the owners thereof, are as follows, to-wit:
UNIT 1: RUBY PLACE From Bonnie Drive to Ramona Drive, known and
designated as Project No. 104-24000-242, Unit 1.
The estimated cost of improvements is $_ 15,248.47 the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ 3-88 ; the estimated amount per front foot to
be assessed against abutting property and the owners thereof for pavement is $ 13.53 ;
the estimated amount per front foot to be assessed against abutting property and the
owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated
amount per square foot to be assessed against abutting property and the owners thereof for
six-inch thick concrete driveway is $ 1.22 per square foot; the total
estimated amount per front foot to be assessed against abutting property and the owners
thereof is $ 17.41 plus the cost incurred for concrete driveway construction
where specified.
III.
A hearing be given and held by and before the City Council of the City
of Fort Worth, Texas, to all owning or claiming any property abutting upon said
portions of highways, streets, avenues and public places, as well as to all
owning or claiming any interest in any such property. Such hearing shall be
given and held on the 21st day of October , 19 74 , at 9:30 A.M.
in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and
the City Secretary is hereby directed to give or cause to be given notice ,of the
time and place of such hearing and of other matters and facts in accordance with
the terms and provisions of an Act passed at the First Called Session of the
Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts
of said Session, now being known as Article 1105b of Vernon's Texas Civil Statutes
as amended by Acts 1967, 60th Legislature, Page 365, Chapter 176, Section 1,
emergency effective May 12, 1967. Such notice shall be. by advertisement-inserted
at least three (3) times in a newspaper published in the City of Fort Worth,
Texas, the first publication to be made at least twenty-one (21) days before
the date of said hearing. Said notice shall comply with and be in accordance with
the terms and provisions of said Act as amended. The City Secretary is further
directed to give or cause to be given personal notice of the time and place of
such hearing to all owning or claiming any property abutting on said portions of
highways, streets, avenues and public places, as well as to all owning or claiming
any interest in any such property. Such personal notice shall be in writing and
shall be given or caused to be given by the City Secretary by depositing such
written notice in the United States Mail at least fourteen (14) days before the
date of the hearing, postage prepaid, in envelopes addressed to all persons
owning or claiming any interest in the respective properties abutting the high-
ways, streets, avenues and public places or portions thereof to be improved, as
the names bf such persons are shown on the current rendered tax rolls of the City
of Fort Worth and at the addresses so shown, or if the name of such respective
owners do not appear on such rendered tax rolls, then address to ,such owners as
their names are shown on the current unrendered tax rolls of the City of Fort Worth
at the addresses shown thereon. In those cases in which an owner of property
abutting a highway, street, avenue or public place or portion or portions there-
of which is to be ,improved is listed as "unknown" on the then current City of
Fort Worth tax rolls, or the name of an owner is shown on the City of Fort Worth
tax rolls .but no address for such owner is shown,' no notice need be mailed. In
those cases where the owner is shown to be an estate, the mailed notice may be
addressed to such estate. In this connection, the City Secretary shall prepare
and file or cause to be prepared and filed with these proceedings a list of the.-
properties to be as,sessed,, the names of those persons owning or claiming any
interest in said properties to whom the notice was mailed, together with the last
known addresses determined as aforesaid of the respective owners and those perms
sons owning or claiming any interest in said property.
The City Secretary shall certify that each of the parties in said list whose
address is shown on the then current rendered or unrendered tax rolls of the City
of Fort Worth was mailed a copy .of the notice of hearing and shall further certify
the date or dates on which said notice was mailed. A copy of each notice shall be
attached to such certificate. The certificate of the City Secretary will be con-
clusive evidence of the facts therein recited.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance
by copying the caption of same in the Minute Book of the City Council and by
filing the complete ordinance in the appropriate Ordinance Records of this City.
V.
This ordinance shall take effect and be in full force and effect from and
after the date of its passage.
Passed and approved this day of 19�.
APPROVED AS TO FORM AND LEGALITY:
• � t
City Attorney
UNIT 5: SAPPINGTON PLACE From Z. Boaz Place to West Elizabeth Lane,
known and designated as Project No. 104-
24000-242, Unit 5.
The estimated cost of improvements is $ 37,970.35 the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ 3.90 ; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is S 9.88 ;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for -0- _ wide concrete sidewalk is $ -0- ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ 1.22 per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 13.78 plus the cost incurred for concrete drivewav con-
struction where specified.
The estimated cost of improvements is $ the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ ; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ ;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for _ wide concrete sidewalk is $ ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ _ per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ plus the cost incurred for concrete driveway con-
struction where specified.
The estimated cost of improvements is $ the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ _; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ ;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for wide concrete sidewalk is $ ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ ` per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ plus the cost incurred for concrete driveway con-
struction where specified.
UNIT 2: CALMONT AVENUE From 60' west of Marquita Drive to I-20 Service
Road, known and designated as Project No. 104-
24000-242, Unit 2.
The estimated cost of improvements is $ 502704.72 ; the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ 4.02 ; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ 15.14;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for -0- _ wide concrete sidewalk is $ -0- ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $_1.22 per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 1216 plus the cost incurred for concrete driveway con-
struction where specified.
UNIT 3: CURTIS DRIVE From Highway 8OW to West Elizabeth Lane, known
and designated as Project No. 104-24000-242,
Unit 3.
The estimated cost of improvements is $ 29,946.30_ the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ 3.96 ; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $15.36 ;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for -0- _ wide concrete sidewalk is $_-_0- ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is S 1.22 per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 19.32 plus the cost incurred for concrete driveway con-
struction where specified.
UNIT 4: Z. BOAZ PLACE From Lackland Road to Olive Place, known and
designated as Project No. 104-24000-242,
Unit 4.
The estimated cost of improvements is $ 34,512.78 the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ 3.84 _; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ 9.44 ;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for -0- wide concrete sidewalk is $ -�- the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ 1-22— per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 13_28 _, plus the cost incurred for concrete driveway con-
struction where specified.
UNIT 4: Z. BOAZ PLACE From Lackland Road to Olive Place, known and
designated as Project No. 104-24000-242, Unit 4,
a six-inch thick hot-mix asphaltic concrete
pavement on a six-inch thick lime stabilized
subgrade with seven-inch high concrete curb and
eighteen-inch wide concrete gutter on a thirty
foot roadway. Six-inch thick concrete driveways
will be constructed where specified.
UNIT 5: SAPPINGTON PLACE From Z. Boaz Place to West Elizabeth Lane, known
and designated as Project No. 104-24000-242, Unit
5, a six-inch thick hot-mix asphaltic concrete
pavement on a six-inch thick lime stabilized
subgrade with seven-inch high concrete curb and
eighteen-inch wide concrete gutter on a thirty
foot roadway. Six-inch thick concrete driveways
will be constructed where specified,
City of Fort Worth, Texas
uNF
SAILIFF
Mayor and Council Communication
DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE
NUMBER Paving at 5 Locations on the West Side
9/23/74 C-2922 1 0f
Council action is requested on Project No. 104-24000-242,,. as described below:
ROADWAY R.O.W.
UNIT STREET LIMITS WIDTH-FEET WIDTH-FEET
1 Ruby Place Bonnie Drive to 40 50
Ramona Drive
Calmont Avenue 60' W. of Marquita Dr. 44 62
to I.H. 80 Service Rd.
Curtis Street U.S. 80 - 180 West to 40 60
W. Elizabeth Lane
4 Z. Boaz Place Lackland Road to 30 50
Olive Place
5 Sappington Place Z. Boaz Place to 30 50
West Elizabeth
Paving in this project is under the City's Assessment Paving Program in the
1973-75 Capital Improvement Program (Page A-113) .
Initiation of Project
Units 1, 3 and 4 were initiated by paving petitions from adjacent property
owners. Unit 2 was initiated by Community Facilities Contract No. 7424
(M&C C-2482, 3/26/73) . Unit 5 was initiated by a poll-card-survey and
approved by the City Council (M&C G-2458, 7/8/74).
Improvements
Units 1, 4 and 5 will be improved by construction of residential grade hot-mix
asphaltic concrete pavement with concrete curb and gutter, whereas Units 2 and
3 will be improved with commercial and/or collector grade hot-mix asphaltic
concrete pavement with concrete curb and gutter. All Units will be complete
with required concrete driveway approaches and necessary storm drain pipe
and appurtenances.
F
it
DATE rNUMBEREFEREcE SUBJECT: Award of Contract - Assessment PAGE
9/23/74C-2922 Paving at 5 Locations on the West Side _2_ of
Submission of Bids
The following bids have been. received:
Bidder Amount
Austin Road Company $153,075.11
Glade, Inc. 162,330.60
Texas Bitulithic Company 170,813.15
S.R.O. Asphalt, Inc. 175,161.82
L. Grimes & Co. , Inc. 177,676.20
The following contractors took plans and specification but did not submit bids:
Lewis & Lewis, Inc.
R. W. Gibbins, Inc.
Bids Received: August 29, 1974
Working Days Allotted: 117
Project Cost and Financing
Based on the low bid, approximately $56,375.86 will be assessed against
abutting properties under standard policy, to be provided for by a Bond
Fund Transfer from the Revolving Fund Unspecified Account. Total con-
struction, design engineering, inspection engineering, administration and
miscellaneous costs to the City is approximately $112,006.76, which will
require a Bond Fund transfer of $109,000.00 from the 104-24000-901 Up-
specified Assessment Paving Account to supplement the original $3,000.00
in Project Account No. 104-24000-242.
Recommendations
It is recommended that: ,
1) The following bond fund transfers be approved:
Amount From To Reason
$56,375.86 Unspecified Revolving 5 Locations on To provide Funds
Fund, 042-09724-901 West Side Revol- for property
ving Fund owner's share of
042-10424-242 construction cost
for Assessment
Paving at 5 Loca-
tions on the West
Side, Project
No. 104-24000-242
s
DATE REFERENCE SUBJECT: PAGE
NUMBER Award of Contract - Assessment
9/23/74 C--2922 Paving at 5 Locations on the West Side Sot 3
Amount From To Reason
$109,000.00 Unspecified Assessment 5 Locations on To provide for
Paving, 104-24000-901 West Side Assess- City's share of
men.t Paving, construction
104-24000-242 cost, design
engineering,
inspection, en-
gineering sal-
aries, adminis-
tration and mis-
cellaneous ex-
penses to supple-
menting the
original $3,000.00
in the project
account.
2) An ordinance be adopted:
a) Declaring the necessity for and ordering the improvement@;
b) Making provisions for levying assessments;
c) Directing the Public Works Department to prepare estimates
of-costs and amounts to be assessed;
d) Awarding the contract to Austin Road Company, in the
amount of $153,075.11;
and
e) Making appropriations to cover the indebtedness thereby
incurred for improvements of the project named above.
3) An ordinance be adopted:
a) Approving the estimates of costs and amounts proposed
to be assessed; and
b) Setting October 21, 1974, as the date for the Benefit Hearing.
RNL/fk
Attachment
SUBMITTED BY: DISPOSITIO Y COUNCIL: PRO SE Y
N. APPROVED y� THER (DESCRIBE)
dngted Oxd*nanra NnJdk t TY SECRET RY
KfLrfor & Ordering Improvements; Adopted Ord. No./* DATE
CITY MANAGER ettin 10/21/74 ad date for Benefit Hearing
PROJECT NO. 104 -24000 -242
5 LOCATIONS on the WEST SIDE
! , 24 N
A L
3 22 23 e F 22 o U
4 21 c 21 0 1 18
D 20
5 20 a E 19 x 2 17
6 19 Ga 5 18 Ga 3 6 L0
7 18 w 6 t 17 z '4
S 17 z`— 7 1� s la 1
9 If0 p 8 IS
10 15 x'^9 14 7 12
11 14 10 13 ' 8 11 1200'
12 13 I II 12 9 10 j4 64 / 2 456
H
A 1 -14O
L 313 Cr W 4
2 27 a -a 31 21 21 // ? 71819 //12o
R 3 3 . 20 '
Unit I : RUBY PLACE Unit 2: CALMONT AVE .
00 1a 0 6 7.R-! TRACT "A* IJ J
b -5 4 3 2 1 4 3 2 1 O 9c 7-R-2 Ik
ES 0
a 8 V 1 `� eo ,R� IL
aai a 19 5 7 1 Jo r I A T H 6'10 0
9 " 9 A % IA 1D i o
I c G
t/ 19 3S 4 43st1 13 2 2 T
Is .4Ib 0 x �
W13
Id a 1 2 3 3 /7 3 3A 3e G
T ELIZABETH LAME 10 4 �4 4 4
�a N z
V 3
Is 4 s 6 7 8 1 )o I-A
4567g qlo
3 7 6 5 4 3 2 /
HIGHWAY 80 !
� & 180
b
Unit 3 : CURTIS DRIVE Unit 4 : Z. BOAZ PL .
Unit 5 : SAPPINGTON PL .
1 ` 1
CITY OF FORT WORTH
PUBLIC WORKS DEPARTMENT
ENGINEERING DIVISION
ASSESSMENT PAVING AT 5 LOCATIONS ON THE WEST SIDE - PROJECT NO. 104-24000-242
On Monday, September 9, 1974, a Neighborhood Meeting was scheduled by the Engineer-
ing Division of the Public Works Department at the West Ridglea Elementary School,
for Assessment Paving at 5 Locations on the West Side, Project No. 104-24000-242.
Odell Schmidt explained the procedures concerning proposed improvements, owner
participation in costs and methods of payment to the six persons attending.
There were no questions on Unit 1.
Unit 2; Mr. Gordon D. Johnston, owner of Lots 5 and 6, Block 2, Alta Mere Addition,
asked why the City was paving a street that was already paved. Mr. Schmidt explain-
ed that the surface on Calmont was not permanent paving and the property owners were
receiving credit on their assessment.
Unit 3; Mr. Bailey, owner of Lot 4, Block 33, Alta Mere Addition, said that he
welcomed the improvements since it will help keep their car-wash cleaner.
Mr. Robert Colston, owner of Lot 10, Block 34, Alta Mere, opposed the improvements.
He said it would serve no purpose to pave a dead end street.
Mr. Fancher, owner of Lots 11, 12 and 13, Block 34 and Lots 1, 2 and 3, Block 33,
Alta Mere Addition, said that he had carried on a successful business for three years
without the street and could not see where the improvements would benefit him in any-
way.
Mr. Clark, representing the Fancher Enterprises, said that Mr. Fancher was not aware
that he had signed a petition for paving when he applied for his permit to build.
Mr. Clark stated that he joined Mr. Fancher in opposing the improvements.
Mr. Schmidt explained that the short petition form that Mr. Fancher signed was in
lieu of a Developers' Contract, which is the normal procedure followed in developing
new areas. It should be noted that both Mr. Colston and Fancher Enterprises are
using the street for parking areas and to back boats into the warehouses and do not
want to be restricted to approved driveways.
There were no questions on Units 4 and 5.
After a short general discussion, the meeting was adjourned.
FORT WORTH, TEXAS
September 23 , 1974
TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS.
Gentlemen and Mrs. Rimmer:
In accordance with the proceedings of your Honorable Body, I have prepared
estimates of the cost of street improvements as shown below:
Estimates of the total cost of improvements on a portion of Ruby Place ,
and portions of sundry other streets, avenues and public places in the City of Fort
Worth, Texas, and estimated amounts per front foot to be assessed against abutting
property and the owner thereof, on each portion of street, avenue and public place
are as follows, to-wit:
_PROJECT NO 104-24000-242 UNIT 1: RUBY PLACE. FROM BONNIE DRIVE TO RAMONA DRIVE, to be
improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-
inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-
inch wide concrete gutter on a forty foot roadway. Six-inch thick concrete driveways
will be constructed where specified.
The following assessment rates have been established:
Six-inch hot-mix asphaltic concrete pavement
Apartment. zoning... # ** . .. . ..$13.53/L.Fe
Residential 'zoning. . . .. . . . . 2.62/L.F.
Seven-inch curb and eighteen-inch gutter... . .. . .. . ........ 3.88/L.F.
Six-inch thick concrete driveways. . . . .. . ... . 1.22/S.F,
The assessments result in the following division of cost:
TOTAL COST TO PROPERTY OWNERS. .. . .. . .. . . . .. .. . . . . . .$ 4.9878.80
TOTAL COST TO CITY OF FORT WORTH. ..... . ... .. ... ... .$10,369,67
TOTAL ESTIMATED CONSTRUCTION COS'.i. . . . . . .. ... . ..I . . .$15,248.47
PROJECT NO, 104-24000-242, UNIT 2: CALMONT AVENUE FROM 60' [NEST OF MARQUITA DRIVE TO I-20
SERVICE ROAD, to be improved with a seven-inch thick hot-mix asphaltic concrete pavement
on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eight-
een-inch wide concrete gutter on a forty-four foot roadway. Six-inch thick concrete drive-
ways will be constructed where specified.
The following assessment rates have been established:
Seven-inch hot-mix asphaltic concrete pavement
Commercial zoning less .27 credit for existing
penetration.. ...........$14,87/L.F.
Residential zoning less .27 credit for existing
penetration.. ... ........$ 2,21/L.F.
Seven-inch curb and eighteen-inch gutter.. .. ..........$ 4.02/L.F.
Six-inch thick concrete driveways. . .. $ 1.22/S.F.
The assessments result in the following division of cost:
TOTAL COST TO PROPERTY OWNERS...................... .$14,256.37
TOTAL COST TO CITY OF FORT WORTH. ..... ......... .....$36,448.35
TOTAL ESTIMATED CONSTRUCTION COST....... . ... ...... ..$50,704.72
PROJECT NO. 104-24000-242 UNIT 3: CURTIS DRIVE FROM HIGHWAY 80W TO W. ELIZABETH LANE,
to be improved by constructing a seven-inch thick hot-mix asphaltic concrete pavement on
a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-
inch wide concrete gutter on a forty foot roadway. Six-inch thick concrete driveways will
be constructed where specified.
The following assessment rates have been established:
Seven-inch hot-mix asphaltic concrete pavement
Industrial zoning... . so.* ... @ *.**.* #d*** . . 0##*$15.36/L.F.
Seven-inch curb and eighteen-inch gutter,,., . , ..,.., 3.96/L,F.
Six-inch thick concrete driveways.... . . .. .. ... ...... 1.22/S.F.
The assessments result in the following division of cost:
TOTAL COST TO PROPERTY OWNERS. ......... .............$15,628,72
TOTAL COST TO CITY OF FORT WORTH.. . .... .. ........ ...$14,317.58
TOTAL ESTIMATED CONSTRUCTION COST.. .................$29,946.30
PROTECT NO, 104-24000-242, UNIT 4: Z. BOAZ PLACE FROM IACKIAND ROAD TO OLIVE PLACE to be
improved by constructing a six-inch thick hot mix asphaltic concrete pavement on a six-inch
thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide
concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be con-
structed where specified.
The following assessment rates have been established:
Six-inch hot-mix asphaltic concrete pavement
Commercial zoning.................. ..... .......... ...$9,44/L.F.
Residential zoning.. . . 2.66/L.F.
Seven-inch curb and eighteen-inch gutter........................ 3.84/L,F,
Six-inch thick concrete driveways............... ................ 1.22/S.F.
The assessments result in the following division of cost:
TOTAL COST TO PROPERTY OWNERS.... ...... ...... .......... ........$11,255.69
TOTAL COST TO CITY OF FORT WORTH. .. ............................$23,257.09
TOTAL ESTIMATED CONSTRUCTION COST... .......... .................$34,512.78
PROJECT 10. 104-24000-242 UNIT 5: SAPPINGTON PLACE FROM Z BOAZ PLACE TO WEST ELIZABETH
LANE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement
on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eight-
een-inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways
will be constructed where specified.
The following assessment rates have been established:
Six-inch hot-mix asphaltic concrete pavement
Apartment & commercial zoning,,,,, ,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,, ,,$9.88/L,F,
Residential zoning............. . ......... .. ..... . .................. 2.60/L.F.
Seven-inch curb and eighteen-inch gutter... . .. ..... .... ............ 3.90/L.F.
Six-inch thick concrete driveways... ................ ... . . .... . ..... 1.22/S.F,
The assessments result in the following division of cost:
TOTAL COST TO PROPERTY OWNERS. .. . .. .. ..... ...... .. ............ . .$10,356.28
TOTAL COST TO CITY OF FORT WORTH... ...oo.o$27*614.07
TOTAL ESTIMATED CONSTRUCTION COST. ....... .. ........... ..........$37,970.35
TOTAL COST TO PROPERTY OWNERS (ALL UNITS).............. .$ 56,375086
TOTAL COST TO CITY OF FORT WORTH (ALL UNITS). ......0..0.$112,006.76
TOTAL ESTIMATED CONSTRUCTION COST (ALL UNITS),,... ...,..$168,382.62
-'W1 , fa'4"
JACK M. GRAHAM, P.E.
CITY ENGINEER
PROJECT NO 104-24000-242 UNIT 1: RUBY PLACE FROM BONNIE DRIVE TO RAMONA DRIVE, to be
improve by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch
thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide
concrete gutter on a forty-foot roadway. Six-inch thick concrete driveways will be con-
structed where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE HIGHIAND HOMES ADDITION
Beginning at the northeast corner of Ruby Place and Bonnie Drive.
Ft. Worth Congregation 11 8' 180' Side lot adjusted to:
of SW United Jehovahs Res, 100' Pavement $ 2.62 $ 262.00
Witnesses
3541 Bonnie Drive $ 262.00
76116
Roy A. Hogan 12 8' 180' Side lot adjusted to:
7500 Ruby Place Res, 100' Pavement $ 2.62 $ 262.00
76116 100' Curb & Gutter 3.88 388.00
68 Sq. Ft. Driveway 1.22 82.96
$ 732.96
SOUTH SIDE
Ramona Drive intersects.
Georgia Purselley 34 17 180' Pavement $13.53 $21,435.40
1205 Sproles Drive Apt. 180' Curb & Gutter 3.88 698.40
76126 41 Sq. Ft. Driveway 1.22 50.02
$3,183.82
M. H. Purselley 1 17 180' Side lot adjusted to:
8004 Ferndale Res. 100' Pavement $ 2.62 $ 262.00
76116 100' Curb & Gutter 3.88 388.00
41 Sq. Ft. Driveway 1.22 50.02
$ 700.02
L.
PROJECT NO, 104-24000-242, UNIT 1: RUBY PLACE FROM BONNIE DRIVE TO RAMONA, Continued:
Total Cost to Property Owners (Unit 1)..... .......$ 4,878980
Total Cost to City of Fort Worth (Unit 1) . . ......$10,369.67
Total Estimated Construction Cost (Unit 1) . ......$15,248.47
2.
PROJECT NO. 104-24000-242, UNIT 2: CALMONT AVENUE FROM 60' WEST OF MARQUITA DRIVE TO 1-20
SERVICE ROAD, to be improved by constructing a seven-inch thick hot-mix asphaltic concrete
pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and
eighteen-inch wide concrete gutter on a forty-four foot roadway. Six-inch thick concrete
driveways will be constructed where specified.
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE LOFFLAND ADDITION
Beginning at the southwest corner of Lot 1, Block 1, Loffland Addition.
Dollar Inns of America 1 1 561' Pavement $14.87 $8,342.07
9995 Monroe Drive Comm. 609 Sq. Ft. Driveway 1.22 742.98
Suite 209
Dallas, Texas, 75220 $9,085.05
Attn: Mr. Lyndon Sanders
"gighway 183 Exit Ramp intersects.
SOUS SIDE ALTA MERE ADDITION
Vorelco Inc. 1-A 4 120' Pavement $14.87 $1,784.40
600 Sylvan Ave. Comm. 120' Curb & Gutter 4.02 482.40
Englewood Cliffs, N.J. 162 Sq. Ft. Driveway 1.22 197.64
07632 $2,464.44
Joyce Drive intersects
Manor Investment Co. 4,5 & 3 180' Pavement $ 2.21 $ 397.80
3053 University Dr. 6 Res. 180' Curb & Gutter 4.02 723,60
76109 $1,121.40
Norman L. Rubin 1,2, & 3 _3 180' Pavement $ 2.21 $ 397.80
4412 Overton Crest Res. 180' Curb & Gutter 4.02 723.60
76109 $1,121.40
3.
PROJECT NO. 104-24000-242, UNIT 2; CALMONT AVENUE FROM 60' WEST OF MARQUITA DRIVE TO I-20
SERVICE ROAD, Continued;
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE ALTA MERE ADDITION
Marquita Drive intersects.
Gordon D. Johnston 5 & 6 2 60' Pavement $2.21 $132.60
7401 Calmont Res, 60' Curb & Gutter 4.02 241.20
76116 74 Sq. Ft. Driveway 1.22 90.28
$464.08
Total Cost to Property Owners (Unit 2)...... .. ... .....$14,256.37
Total Cost to City of Fort Worth (Unit 2).... ..... ....$36,448.35
Total Estimated Construction Cost (Unit 2).. . .........$50,704.72
4,
PROJECT NO, 104-24000-242, UNIT 3; CURTIS DRIVE FR U. S. HIGHWAY OW TO W. ELIZABETH 1ANE
to be improved by constructing a seven-inch thick hot-mix asphaltic concrete pavement on a
six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch
wide concrete gutter on a forty foot roadway. Six-inch thick concrete driveways will be
constructed where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST_SIDE ALTA MERE ADDITION
Beginning at the southeast corner of Lot 10, Block 34, Alta Mere Addition.
Robert B. Colston 10 34 188' Pavement $15.36 $2,887.68
1013 Park Center Ind. 188' Curb & Gutter 3,96 744.48
76126 338 Sq. Ft. Driveway 1.22 412.36
$4,044.52
Fancher Enterprises, Inc. 34 181.2' Pavement $15.36 $2,783.23
P.O. Box 12692 11, 12 & Ind 171.2" Curb & Gutter 3.96 677.95
76116 13 124 Sq, Ft, Driveway 1.22 151.28
$3,612.46
West Elizabeth Lane intersects.
EAST SIDE.
Fancher Enterprises, Inc, 33 181.2' Pavement $15036 $2,783.23
P.O. Box 12692 1,2 & 3 Ind. 171.2' Curb & Gutter 3.96 677.95
76116 108 Sq. Ft. Driveway 1.22 131.76
$3,592.94
National Pride
Equipment, Inc. 4 33 188' Pavement $15.36 $2,887.68
4118 Mansfield Hwy. Ind. 188' Curb & Gutter 3.96 744.48
76119 612 Sq. Ft, Driveway 1.22 746.64
$4,378.80
5.
PROJECT NO, 104-24000-242 UNIT 3; CURTIS DRIVE FROM U. S. HIGHWAY 80W TO W. ELIZABE`- Y
1ANE, Continued:
Total Cost to Property Owners (Unit 3). .............$15,628.72
Total Cost to City of Fort Worth (Unit 3).... .. .....$14,317.58
Total Estimated Construction Cost (Unit 3)..........$29,946.30
7.
PROJECT NO, 104-24000-242 UNIT 4: Z, BOAZ PLACE FROM IACKIAND ROAD TO OLIVE PLACE, to be
improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch
thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide
concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be con-
structed where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE Z,BOAZ COUNTRY PLACE ADDITION
Beginning at the southeast corner of Lot 5, Block 12, Z Boaz Country Place Addition.
N.E. Archie, Sr. 5 12� 286.4' Side lot adjusted to:
P.O. Box 12314 Res, 186.4' Pavement $2.66 $ 495.82
76116 186.4' Curb & Gutter 3.84 715.78
140 Sq. Ft. Driveway 1.22 170.80
$1,382.40
Sappington Place intersects
N.E. Archie & Son 5 22 375' Pavement $9.44 $3,540.00
P.O. Box 12314 Comm. $3,540.00
76116
Olive Place intersects
SOdJTH SIDE
C.W. Rowlett &
Alden E. Wagner 1 11 100' Adjusted to (depth factor)
4054 McKinney Ave. Comm. 95.3' Pavement $9.44 $ 899.63
Dallas, Texas 75204 $ 899.6:3
C.W. Rowlett &
Alden E. Wagner 2 11 100' Pavement $9.44 $ 944.00
4054 McKinney Ave. Comm.
Dallas, Texas 75204 $ 944.00
8.
PROJECT NO. 104-24000-242, UNIT 4: Z. BO&Z PLACE FROM LACKIAND ROAD TO OLIVE PLACE,
Continued:
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE Z. BOAZ COUNTRY PLACE ADDITION
C.W. Rowlett &
Alden E. Wagner 3 11 100' Pavement $9.44 $944.00
4054 McKinney Ave. Comm. $ 944.00
Dallas, Texas 75204
C.W. Rowlett &
Alden E. Wagner 4 11 100' Pavement $9.44 $944.00
4054 McKinney Ave. Comm. $ 944.00
Dallas, Texas 75204
C.W. Rowlett &
Alden E. Wagner 5-A 11 67.4' Irregular lot adjusted to:
4054 McKinney Ave. Comm. 40' Pavement $9.44 $377.60
Dallas, Texas 75204 $ 377.60
S.D.L. Land Co. 5-B & 6 11 235.6' Pavement $9,44
c/o Shop-Rite Foods,Inc. Comm. $2,224.06
P.O. Box 5055
Dallas, Texas 75222 $29224.06
Total Cost to Property Owners (Unit 4).. . . . . q .. . . . . e . .*$11,255.69
Total Cost to City of Fort Worth (Unit 4). . .. . ... . # .. . @$239257.09
Total Estimated Construction Cost (Unit 4). . .... .... ...$34,512.78
9 ,
PROJECT NO. 104-24000-242, UNIT 5: SAPPINGTON PLACE FROM Z BOAZ PLACE TO W. ELIZABETH LANE,
to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a
six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch
wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be
constructed where specified,
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE Z.BOAZ COUNTRY PLACE ADDITION
Beginning at the southeast corner of Lot 5, Block 12, Z Boaz Country Place Addition,
N.E. Archie, Sr. 5 12 100' Pavement $2.60 $260.00
P.O. Box 12314 Res, 100' Curb & Gutter 3.90 390,00
76116 194 Sq. Ft, Driveway 1.22 236.68
$886.68
Archie Realty Co. E.150' of 12 100' Pavement $2.60 $260.00
6700 Camp Bowie Blvd. 4 Res. 90' Curb & Gutter 3,90 351.00
76116 85 Sq. Ft. Driveway 1.22 103.70
$714.70
N.E. Archie, Sr. S.75' of 12 75' Pavement $2.60 $195.00
& Jr. 3 Res. 75' Curb & Gutter 3.90 292.50
P.O. Box 12314 85 Sq. Ft. Driveway 1.22 103.70
76116 $591.20
Harold E. Hainer 2 & N.25' 12 125' Pavement $2.60 $325.00
3310 Sappington P1, of 3 Res. 125' Curb & Gutter 3.90 487.50
76116 85 Sq. Ft. Driveway 1.22 103.70
$916.20
Milton B, Broyles 1-C & 1-B 12 100' Pavement $2.60 $260.00
2529 E. Lancaster Res. 100' Curb & Gutter 3.90 390.00
76103 $650.00
10,
PROJECT NO, 104-24000-242, UNIT 5: SAPPINGTON PIACE FROM Z. BOAZ PIACE TO W. ELIZABETH LANE
Continued:
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
W, Elizabeth Lane intersects
EAST SIDE Z.BOAZ COUNTRY PIACE ADDITION
Milton B. Broyles 1 & 2 22 200' Pavement $9.88 $1,976.00
2529 E. Lancaster Apt. 190' Curb & Gutter 3.90 741.00
76103 $2,717.00
N.E. Archie & Son 3-A, 4, 22 300' Pavement $9.88 $2,964.00
P.O. Box 12314 & 5 Comm. 235' Curb & Gutter 3.90 916.50
76116 $3,880.50
Total Cost to Property Owners (Unit 5)... . ... .... ..... .$10,356,28
Total Cost to City of Fort Worth (Unit 5) . .. . .... . .... .$27,614.07
Total Estimated Construction Cost (Unit 5).. .. . .... . . . .$37,970.35
TOTAL COST TO PROPERTY OWNERS (ALL UNITS) . . . . . $ 56,375.86
TOTAL COST TO CITY OF FORT WORTH (ALL UNITS) . . $112,006. 76
TOTAL ESTIMATED CONSTRUCTION COST (ALL UNITS) . .$168,382.62
li .