Loading...
HomeMy WebLinkAboutOrdinance 6166 1 ORDINANCE NO_G_L��_ ORDINANCE CLOSING HEARING AND LEVYING ASSESSMENTS FOR PART OF THE COST OF IMPROVING A PORTION OF GRAFTON STREET __ AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS: FIXING CHARGES AND LIENS AGAINST ABUTTING PROPERTY THEREON, AND AGAINST THE OWNERS THEREOF: PROVIDING FOR THE COLLECTION OF SUCH ASSESSMENTS AND THE ISSUANCE OF ASSIGNABLE CERTIFI- CATES IN EVIDENCE THEREOF: RESERVING UNTO THE CITY COUNCIL THE RIGHT TO ALLOW CREDITS REDUCING THE AMOUNT OF THE RESPECTIVE ASSESSMENT TO THE EXTENT OF ANY CREDIT GRANTED: DIRECTING THE CITY SECRETARY TO EN- GROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTES OF THE CITY COUNCIL OF FORT WORTH, AND BY FILING THE ORDINANCE IN THE ORDINANCE RECORDS OF SAID CITY: AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth,Texas,be improved by raising, grading, or filling same and by constructing thereon to-wit: UNIT 1 : GRAFTON STREET From East Lancaster to Bomar Avenue, known and designated as Unit 1, Project No. 104-24000-- 188, to be improved with seven-inch khick. hot- mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and two-foot wide concrete gutter, so that the finished roadway will be thirty feet wide, and by constructing six-inch thick concrete driveways where specified. UNIT 2: PURSELLEY STREET From I.H. 820 Service Road to Morris Avenue, known and designated as Unit 2, Project No. 104-24000-188, to be improved with six-inch thick hot mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and two-foot wide concrete gutter , so that the finished roadway will be thirty feet wide and by con- structing six-inch thick concrete driveways where specified. UNIT 3: VINSON STREET From Lloyd Avenue to Edgewood Terrace, known and designated as Unit 3, Project No. 104 24000-188, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six- inch thick cement stabilized subgrade, seven- inch high concrete curb and two-foot wide concrete gutter so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. UNIT 4: LA14GSTON STREET From Katy Street to East Rosedale Avenue, known and designated as Unit 4, Project No. 104-24000- 188, to be improved with six-inch thick hot mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and two-foot wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. UNIT 5: EFFIE STREET From Willie Street to Calumet 4reet, known and designated as UFA 5, Project No. 104-24000-188, to be improved with six-inch thick hot mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and two-foot wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. UNIT 6: WILLIE STREET From 150' west of Dillard Street to Birdell Street, known and designated as Unit 6, Project No. 104- 24000-188, to be improved with six-inch thick hot- mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and two-foot wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. UNIT 7: FORT WORTH AVENUE From I.H.820 to Rosser Avenue - DELETED UNIT g: MT. VER11ON AVENUE From the west line of Lot7, Block 54 to the east line of Lot g, Block 54, Sycamore Addition, known and designated as Unit g, Project No. 104-24000- 188, to be improved by constructing four-foot wide concrete sidewalks, and to improve that portion abutting Lot 7, Block 54 by constructing six-inch thick hot-nix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with eight- inch high concrete curb and two-foot wide concrete gutter, so that the finished roadway will be thirty feet wide. UNIT 9: 1"T. VERNON AVENUE From the west line of Lot 5, Block 9 to the east line of Lot 6, Block 9, Turner Subdivision, known and designated as Unit 9, Project No. 104-24000-188, to be improved by replacing existing three-foot wide sidewalk and to improve that portion abutting Lot 5, Block 9 by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade,eight-inch high concrete curb and two-foot wide concrete gutter, so that the finished roadway will be thirty feet wide. UNIT 10: PURINGTON AVENUE From the west line of Lot E-7, Block 8 to the east line of Lot 8, Block 8, Tandy Addition, known and designated as Unit 10, Project No. 104-24000-188, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, eight-inch high concrete curb and two-foot wide gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. UNIT 11 : TAIL?DY AVENUE From the west line of Lot9, Block 8 to the east line of Lot 9, Block 8, Tandy Addition, known and design- ated as Unit 11 , Project No. 104-24000-188, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, eight-inch high concrete curb and two-foot ,ride concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six- inch thick concrete driveways and four-foot wide concrete sidewalks where specified. UNIT 12: ROSSER AVENUE From Spur 303 to 50' north of Fort Worth Avenue- DELETE] Y � f The above,together with combined concrete curbs and gutter on proper grade and line where same are not already so constructed, together with storm drains and other necessaiy incidentals and appurtenances; all of said improve- ments are to be so constructed as and where shown on the plans and in strict accordance with the Plans and Specifications therefor: and contract has been made and entered into with Austin Road Company. and Worth Construction Company for the making and construction of such improvements on the above said portion of streets, avenues and public places. WHEREAS, estimates of the cost of the improvements of each such.portion of streets, avenues and public places were prepared and filed and approved and adopted by the City Council of the City, and a time and place was fixed for a hearing and the proper notice of the time, place and purpose.of said hearing was given and said hearing was had and held at the time and place fixed therefor, to-wit, on the 22 P—Aday of S6ptember , 1962, 9:30 A.M. , in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and at such hearing the following protests and objections were made, to-wit: protested that protested that protested that protested that _protested that --protested that - -------- --- -----__----protested that — — ------ ----- ---—-- ----------protested that — protested that .____protested that a x ` and said hearing was continued to the present time in order to more fully accomplish the purposes thereof, and all desiring to be heard were given full and fair opportunity to be heard, and the City Council of the City having, fully considered all proper matter, is of the opinion that the said hearing should be closed and assessments should be made and levied as herein ordered: NOW THEREFORE: BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. Said hearing be, and the same is hereby, closed and the said protest and objections, and any and all other Protests and objections, whether herein enumerated or or not, be and the same are hereby, overruled. II. The City Council, from the evidence, finds that the assessments herein levied should be made and levied against the respective parcels of property abutting upon the said portions of streets, avenues and public places and against the owners of such property, and that such assessments and charges are right and proper and are substantially in proportion to the benefits to the respective parcels of property by means of the improvements in the unit for which such assessments are levied, and establish substantial justice and equality and uniformity between the respective owners of the respective properties, and between all parties concerned, considering the benefits received and burdens imposed, and further finds that in each case the abutting property assessed is specially benefited in enhanced value to the said property by means of the said improvements in the unit upon which the particular property abuts and for which assessment is levied and charge made, in a sum in excess of the said assessment and charge made against the same by this ordinance, and further finds that the apportion- ment of the cost of the improvements is in accordance with the law in force in this City, and the proceedings of the City heretofore had with reference to said improvements, and is in all respects valid and regular. III. There shall be, and is hereby, levied and assessed against the parcels of property herein below mentioned, and against the real and true owners thereof (whether such owners be correctly named herein or not) the sums of money itemized below opposite the description of the respective parcels of property and the several amounts assessed against the same, and the owners thereof, as far as such owners are known, being as follows: IV. Where more than one person, firm or corporation owns an interest in any property above described, each said person, firm or corporation shall be personally liable only for its, her or his pro rata of the total assessment against such property in proportion as its, his or her respective interest bears to the total ownership of such property, and its, his or respective interest in such property may be released from the assessment lien upon pay- ment of such proportionate sum. V. The several sums above mentioned and assessed against the said parcels of property, and the owners thereof, and interest thereon at the rate of six per cent (6�') per annum, together with reasonable attorney's fees and costs of collection, if incurred, are hereby declared to be and are made a lien upon the respective parcels of property against which the same are assessed, and a personal liability and charge against the real and true owners of such property, whether such owners be correctly named herein or not, and the said liens shall be and constitute the first enforceable lien and claim against the property on which such assessments are levied, and shall be a first and paramount lien thereon, superior to all other liens and claims, except State, County, School District and City ad valorem taxes. The sums so assessed against the abutting property and the owners thereof shall be and become due and payable as follows, to-wit: in five (5) equal installments, due respectively on or before thirty (30) days, one (1), two (2), three (3), and four (4) years from the date of completion and acceptance of the improvements in the respective unit, and the assessments against the property abutting upon the remaining units shall be and become due and payable in such installments after the date of the completion and acceptance of such respective units, and shall bear interest from said date at the rate of six per cent (61,-(' ) per annum, payable annually with each install- ment, except as to the first installment, which shall be due and payable at the maturity thereof, so that upon the completion and acceptance of the improvements in a particular unit, assessments against the property abutting upon such completed and accepted unit shall be and become due and payable in such installments, and with interest from the date of such completion and acceptance. Provided, however, that any owner shall have the right to pay the entire assessment, or any installment thereof, before maturity by payment of principal and accrued interest, and provided further that if default shall be made in the payment of principal or interest promptly as the same matures, then the entire amount of the assessment upon which such default is made shall, at the option of said City of Fort Worth, or its assigns, be and become immediately due and payable, and shall be collectable, together with reasonable attorneys fees and cost of collection, if incurred, PROVIDED, however, that acting through its duly authorized Director of Public Works the City of Fort Worth retains the right to authorize payment of the sums assesed against abutting property upon such completed and accepted unit in not more than forty-eight (48) equal regular monthly installments of not less than $0.00 each, the first of such installments to become due and payable not more than thirty (30) days after the completion and acceptance by the City of the particular unit. PROVIDED FURTHER, that the City Attorney is hereby empowered to authorize payments of said sums of lesser installments and/or over a longer period of time in cases in which the Director of Public Works has previously determined that an extreme financial hardship upon the property owner will otherwise result; and PROVIDED FURTHER, that such method of payments shall be authorized only in instances where the owner or owners of property abutting upon such completed and accepted unit shall have executed and delivered to the City of Fort North a lawful, valid and binding note and mechanic's and materialman's contract upon forms supplied by the City granting a mechanic's lien upon and conveying the said abutting property in trust to secure the payment by said owner or owners according to the terms thereof of the sums assessed against such property. If default shall be made in the payment of any assessment, collection thereof shall be enforced either by the sale of the property by the Assessor and Collector of Taxes of said City as near as possible in the same man- ner provided for the sale of property for the non-payment of ad valorem taxes, or at the option of the City of Fort Worth, or its assigns, payment of said sums shall be enforced by suit in any court of competent jurisdic- tion, or as provided in any mechanic's or materialman's contract as aforesaid, and said City shall exercise all of its lawful powers to aid in the enforcement and collection of said assessments. Al ^ ` ♦ 6 i VII. The total amount assessed against the respective parcels of abutting property, and the owners thereof, is in accordance with the proceedings of the City relating to said improvements and assessments thereof, and is' less than the proportion of the cost allowed and permitted by the law in force in the City. VIII. Although the aforementioned charges have been fixed, levied, and assessed in the respective amounts hereinabove stated, the City Council does hereby reserve unto itself the right to reduce the aforementioned assessments by allowing credits to certain property owners where deemed appropriate. Notwithstanding the City Council has herein reserved the right to issue credits, it shall not be required to issue credits, and will not do so, if same would result in any equity and/or unjust discrimination. The principal amount of each of the several assessment certificates to be issued the City of Fort Worth, Texas, as hereinafter provided, shall be fixed and determined by deducting from the amount of any assessment hereinabove levied such amount or amounts, if any, as may hereafter be allowed by the City Council as a credit against the respective assessments. IX. For the purpose of evidencing the several,sums assessed against the respective parcels of abutting prop- erty and the owners thereof, and the time and terms of payment, and to aid in the enforcement and collection thereof, assignable certificates in the principal amount of the respective assessments less the amount of any re- spective credit allowed thereon, shall be issued by the City of Fort Worth, Texas, upon completion and accept- ance by the City of the improvements in each unit of improvement as the work in such unit is completed and accepted, which certificates shall be executed by the mayor in the name of the City and attested by the City Secretary, with the corporate seal of the City impressed thereon, and shall be payable to the City of Fort Worth, or its assigns, and shall declare the said amounts, time and terms of payment, rate of interest, and the date of the completion and acceptance of the improvements abutting upon such property for which the certificate is issued, and shall contain the name of the owner or owners, if known, description of the property by lot and block number, or front feet thereon, or such other desciption as may otherwise identify the same; and if the said property shall be owned by an estate, then the description of same as so owned shall be sufficient and no error or mistake in describing any property, or in giving the name of the owner, shall invalidate or in anywise impair such certificate, to the assessments levied. The certificates shall provide substantially that if same shall not be paid promptly upon maturity, then they shall be collectable, with reasonable attorney's fees and costs of collection, if incurred, and shall provide substantially that the amounts evidenced thereby shall be paid to the Assessor and Collector of Taxes of the City of Fort Worth, Texas, who shall issue his receipt therefor, which shall be evidence of such payment on any demand for the same, and the Assessor and Collector of Taxes shall deposit the sums so received by him forth- with with the City Treasurer to be kept and held by him in a separate fund, and when any payment shall be made in the City the Assessor and Collector of Taxes upon such certificate shall, upon presentation to him of the certificate by the holder thereof endorse said payment thereof. If such certificate be assigned then the holder thereof shall be entitled to receive from the City Treasurer the amount paid upon the presentation to him of such certificate so endorsed and credited; and such endorsement and credit shall be the Treasurer's Warrant for making such payment. Such payments by the Treasurer shall be receipted for the holder of such certificate in writing and by surrender thereof when the principal, together with accrued interest and all costs of collection and reasonable attorney's fees, if incurred, have been paid in full. Said certificates shall further recite substantially that the proceedings with reference to making the improvements have been regularly had in compliance with the law, and that all prerequisites to the fixing of the assessment lien against the property described in such certificate and the personal liability of the owners thereof have been performed, and such recitals shall be prima facie evidence of all the matters recited in such certificates, and no further proof thereof shall be required in any court. Said certificates may have coupons attached thereto in evidence of each or any of the several installments thereof, or may have coupons for each of the first four installments, leaving the main certificate to serve for the fifth installment, which coupons may be payable to the City of Fort Worth, or its assigns may be signed with the facsimile signatures of 'tile Mayor and City Secretary. ' � b Said certificates shall further recite that the City of Fort Worth, Texas shall exercise all of its lawful powers, when requested so to do, to aid in the enforcement and collection thereof, and may contain recitals sub- stantially in accordance with the above and other additional recitals pertinent or appropriate thereof, and it shall not be necessary that the recitals be in the exact form above set forth, but the substance thereof shall be sufficient. The fact that such improvements may be omitted on any portion of any of said units adjacent to any premises exempt from the lien of such assessments shall not in anywise invalidate, affect or impair the lien of such assessments upon other premises. X. Full power to make and levy reassessments and to correct mistakes, errors, invalidities or irregularities, either in the assessments or in the certificates issued in evidence thereof,is,in accordance with the law in force in this City,vested in the City. XI. All assessments levied are a personal liability and charge against the real and true owners of the premises described, notwithstanding such owners may not be named, or may be incorrectly named. XII. The assessments so levied are for the improvements in the particular unit upon which the property described abuts, and the assessments for the improvements in any unit are in nowise affected by the improve- ments or assessments in any other unit, and in making assessments and in holding said hearing, the amounts assessed for improvements in any one unit have been in nowise connected with the improvements or the assess- ments therefor in any other unit. XIII. The assessments levied are made and levied under and by virtue of the terms, powers and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas, known as Chapter 106 of the Acts of said Session and now shown as Article 1105b of Vernon's Texas Civil Statutes, which Act has been adopted as an amendment to and made a part of the Charter of the City of Fort Worth, Texas. XIV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete Ordinance in the appro- priate Ordinance Records of said City. XV. This ordinance shall take effect and be in full force and effect from and after the date of its passage and it is so ordained. PASSED AND APPROVED this '�Q' day of 61 r!�$ APPROVED AS TO FORM AND LEGALITY: 7eeeoe City Attorney FORT WORTH, TEXAS 19 TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS. Gentlemen: In accordance with the proceedings of your Honorable Body,, I have prepared estimates of the cost of street improvements as shown below: Estimates of the total cost of improvements on a portion of GRAFTON STREET and portions of sundry other streets, avenues, and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue, and public place are as follows, to-wit: PROTECT NO. 104-24000-188, UNIT 1: GRAFTON STREET FROM EAST LANCASTER TO BOMAR AVENUE, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by con- structing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter . . . . . . . . . . . . . . . $3.20 per L.F. Seven-inch hot-mix asphaltic concrete pavement (Industrial Zoning) . . . . . . $7.76 per L.F. Six-inch thick concrete driveway . . . . . . . . . . . . . . . . .$ .85 per Sq. Ft. PROJECT NO. 104-24000-188,- UNIT 2: PURSELLEY STREET FROM I.H. 820 SERVICE ROAD TO MORRIS AVENUE, to be improved with six-inch thick asphaltic concrete pavement on a six- inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by con- structing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter . . . . . . . . . . . . . $2.98 per L.F. Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) . . . . . . $2.42 per L.F. I PROJECT NO. 104-24000-188, UNIT 3: VINSON STREET FROM LLOYD AVENUE TO EDGEWOOD TERRACE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by constructing six- inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter . . . . . . . . . . . . . . . . . . . . . . . . $2.98 per L.F. Two-foot gutter. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1.49 per L.F. Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) . . . . . . . $2.42 per L.F. Six-inch thick concrete driveway $ .85 per Sq. Ft. PROJECT NO. 104-24000-188, UNIT 4: LANGSTON STREET FROM KATY STREET TO EAST ROSEDALE AVENUE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . . . . . . . . . . . . . . . . . $2.98 per L.F. Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) . . . . . . . $2.42 per L.F. Six-inch hot-mix asphaltic concrete pavement (Commercial Zoning) . . . . . . . . $7.18 per L.F. Six-inch thick concrete driveway. . . . . . . . . . . . . . . . . . . . . . . . . . . . $ .85 per Sq. Ft. PROJECT NO. 104-24000-188, UNIT 5: EFFIE STREET FROM WILLIE STREET TO CALUMET STREET, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by constructing six- inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . . . . . . . . . . . . . . . . . $2.98 per L.F. Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) . . . . . . . $2.42 per L.F. Six-inch thick concrete driveway. . . . . . . . . . . . . . . . . . . . . . . . . . . . $ .85 per Sq. Ft. II PROJECT NO. 104-24000-188, UNIT 6: WILLIE STREET FROM 150' WEST OF DILLARD STREET TO BIRDELL STREET, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high con- crete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . . . . . . . . . . . . $2.98 per L.F. Six-inch hot-mix asphaltic concrete pavement (Residential Zoning). . . . $2.42 per L.F. Six-inch hot-mix asphaltic concrete pavement (Commercial Zoning) . . . . . $7.18 per L.F. Six-inch hot-mix asphaltic concrete pavement (Commercial Zoning less owner occupied credit) . $4.80 per L.F. Six-inch thick concrete driveway. . . . . . . . . . . . . . . . . . . . . . . $ .85 per Sq. Ft. PROJECT NO. 104-24000-188, UNIT 7: DELETED PROJECT NO. 104-24000-188, UNIT 8: PAVING SKIP ON SOUTH SIDE OF MT. VERNON AVENUE BETWEEN SANBORN STREET AND TORONTO STREET, beginning at west line of Lot 7,Block 54, and ending at east line of Lot 8, Block 54, to be improved by constructing four-foot wide concrete sidewalks and a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with eight-inch high concrete curbs and two- foot wide concrete gutters, so that the finished roadway will be thirty feet wide. The following assessment rates have been established: Eight-inch curb and two-foot gutter. . . . . . . . . . . . . . . . . . . . . .$3.32 per L.F. Six-inch hot-mix asphaltic concrete pavement (Commercial Zoning less owner occupied credit).$5.70 per L.F. Five-inch thick concrete sidewalk. . . . . . . . . . .. . . . . . . . . . . . .$2.76 per L.F. III PROJECT NO. 104-24000-188, UNIT 9: PAVING SKIP ON SOUTH SIDE OF MT. VERNON AVENUE BETWEEN CHICAGO AVENUE AND NEWARK AVENUE, beginning at the west line of Lot 5, Block 9, and ending at east line of Lot 6, Block 9, to be improved by replacing existing three- foot wide sidewalk and to improve that portion abutting Lot 5, Block 9, by constructing A six-inch thick hot-mix asphaltic concrete pavement on a six-inch lime stabilized subgrade, eight-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide. The following assessment rates have been established: Eight-inch curb and two-foot gutter . . . . . . . . . . . . . . .$3.32 per L.F. Six-inch hot-mix asphaltic concrete pavement (Commercial Zoning less owner occupied credit) . . . .$5.70 per L.F. Five-inch thick concrete sidewalk . . . . . . . . . . . . . . . . $2.76 per L.F. PROTECT NO. 104-24000-188, UNIT 10: PAVING SKIP ON SOUTH SIDE OF PURINGTON AVENUE BETWEEN TANDY AVENUE AND SANDERSON AVENUE, beginning at west line of Lot E-7, Block 8, and ending at east line of Lot 8, Block 8, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, eight-inch high concrete curbs and two' -foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Eight-inch curb and two-foot gutter . . . . . . . . . . . . . . . $3.32 per L.F. Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) . . . . . . . . . $2.08 per L.F. Six-inch thick driveway . . . . . . . . . . . . . . . . . . . . .$ .85 per Sq. Ft. PROJECT NO. 104-24000-188, UNIT 11: PAVING SKIP ON EAST SIDE OF TANDY AVENUE BETWEEN PURINGTON AVENUE AND MEADOWBROOK DRIVE, improving all property abutting on the west side of Lot 9, Block 8, with six-inch thick hot-mix asphaltic concrete pavement on a 'six-inch thick lime stabilized subgrade, eight-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalks where specified. The following assessment rates have been established: Eight-inch curb and two-foot gutter . . . . . . . . . . . . . . . $3.32 per L.F. Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) . . . . . . . . $2.08 per L.F. Five-inch thick concrete sidewalk. . . . . . . . . . . . . . . . $2.76 per L.F. Six-inch thick concrete driveway . . . . . . . . . . . . . . . . .$ .85 per Sq. Ft. IV PROJECT NO. 104-24000-188, UNIT 12: DELETED The assessments result in the following division of costs: Total Property Owners' Cost for Pavement . . . . . . . . . . . . $ 26,903.96 Total Property Owners ' Cost for Curb, Gutter, Driveways, and Sidewalks. . . . . . . . . . 24,498.76 TOTAL PROPERTY OWNERS' COST . . . . . . . . . . . . . . . . $ 51,402.72 TOTAL CITY OF FORT WORTH' COST. . . . . . . . . . . . . . . 100,773.38 TOTAL ESTIMATED COST . . . . . . . . . . . . . . . . . $152,176.10 PROJECT NO. 104-24000-188, UNIT 1: GRAFTON STREET FROM EAST LANCASTER TO BOMAR AVENUE, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF EAST LANCASTER AND GRAFTON STREET WEST SIDE OF STREET INTERURBAN ADDITION (THIRD FILING) M. L. Stroud, Jr. 16 22 130' Pavement $7.76 $1,008.80 Box 328 Ind. 130' Curb & Gutter 3:20 416.00 Waco, Texas $1,424.80 M. L. Stroud, Jr. 15 22 150' Pavement $7.76 $1,164.00 Box 328 Ind. 150' Curb & Gutter 3.20 480.00 Waco, Texas $1,644.00 BOMAR STREET INTERSECTS EAST SIDE OF STREET F. 0. & A. E. Wilemon et al c/o Marvin F. Poer & Co. 1407 Main Street 1 7 150' Pavement $7.76 $1,164.00 Suite 1411 Ind. 150' Curb & Gutter 3.20 480.00 Dallas, Texas 75202 $1,644.00 W. R. Childress, Jr. 20 7 130' Pavement $7.76 $1,008.80 P. 0. Box 7337 Ind. 130' Curb & Gutter 3.20 416.00 55 Sq. Ft. Driveway .85 46.75 $1,471.55 COST TO PROPERTY OWNERS - ASSESSMENT $6,184.35 COST TO CITY OF FORT WORTH 3,962.05 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. 1 �$10,146.40 1 PROJECT NO, 104-24000-188, UNIT 2: PURSELLEY STREET FROM I.H. 820 SERVICE ROAD TO MORRIS AVENUE, to be improved with six-inch thick asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high .concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by constructing six- inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT SOUTH LINE OF LOT 22, W. B. MONCRIEF ADDITION TO NORTH LINE OF LOT 28, W. B. MONCRIEF ADDITION WEST SIDE OF STREET W. B. MONCRIEF ADDITION Wm. E. McConnell, Jr. 22 60' Adjusted to 2500 Purselley Res. 13' Pavement $2.42 $ 31.46 $ 3T:46 Teddy C. Anthony 23 60' Pavement $2.42 $145.20 2420 Purselley Res. $ 145.20 Tannie W. Brandon 24 60' Pavement $2.42 $145.20 2416 Purselley Res. $ 145.20 Jerry Holdridge 25 60' Pavement $2.42 $145.20 2412 Purselley Res. $ 145.20 Jesse D. Tucker 26 60' Pavement $2.42 $145.20 2408 Purselley Res. $ 145.20 Jack C.Britton 27 60' Pavement $2.42 $145.20 2404 Purselley Res. $ 145.20 R. T. McDaniel 28 60' Pavement $2.42 $145.20 2400 Purselley Res. $ 145.20 MORRIS AVENUE INTERSECTS EAST SIDE OF STREET I. CARODINE SURVEY Texas Electric Service Tract 1-E 269.23' Adjusted to Company Res. 213' Pavement $2.42 $515.46 P.O. Box 970 213' Curb & Gutter 2.98 634.74 $1,150.20 COST TO PROPERTY OWNERS - ASSESSMENT $ 2,052.86 COST TO CITY OF FORT FD RTH $10,821.54 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. 2 $12,874.40 2 PROJECT NO. 104-24000-188, UNIT 3: VINSON STREET FROM LLOYD AVENUE TO EDGEWOOD TERRACE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch :thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways, where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT MSESSMENT T BEGINNING AT NORTHEAST CORNER OF LLOYD AVENUE AND VINSON STREET NORTH SIDE OF STREET MURRAY HILL ADDITION James E. Tyler S. 1/2 2/23 159' Side Lot Credit Adjusted to 5317 Hampshire Blvd. of Lotsl, Res. 100' Pavement $2.42 $242.00 North 2, & 3 100' Curb & Gutter 2.98 298.00 85 Sq. Ft. Drive- way .85 72.25 $612.25 Mable L. Fitch 4 2/23 53' Pavement $2.42 $128.26 4615 Vinson Res. 53' Gutter Only 1.49 78.97 $207.23 David G. Latham S.1/2 of 2/23 163' Side Lot Adjusted to 656 Edgewood Terrace Lots 5, Res. 100' Pavement $2.42 $242.00 6, & 7 100' Gutter Only 1.49 149.00 $391.00 EDGEWOOD TERRACE INTERSECTS SOUTH SIDE OF STREET A. R. Adkisen X 22 192.6' Side Lot Adjusted to 700 So. Edgewood Ter. Res. 100' Pavement $2.42 $242.00 100' Gutter Only 1.49 149.00 $391.00 John E. Southard 1-C 22 55' Pavement $2.42 $133.10 4608 Vinson Res. 55' Gutter Only 1.49 81.95 $215.05 3 CONT'D. PROJECT NO. 104-24000-188, UNIT 3: VINSON STREET FROM LLOYD AVENUE TO EDGEWOOD TERRACE BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET MURRAY HILL ADDITION Lucretia Small and 1-A 22 125' Side Lot Adjusted to Thelma W. Sharp Res. 100' Pavement $2.42 $242.00 701 Lloyd 100' Gutter Only 1.49 149.00 $ 391.00 COST TO PROPERTY OWNERS - ASSESSMENT $ 2,207.53 COST TO CITY OF FORT WORTH 11,105.22 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 3 $13,312.75 4 CONT'D. PROJECT NO. 104-24000-188, UNIT 4: LANGSTON STREET FROM 1CATY STREET TO EAST ROSEDALE AVENUE. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET J. L. GASSOWAY ADDITION Mrs. Bennice Humphrey and2 & 1 104' Pavement $2.42 $251.68 Vesterline McDonald Res. 104' Curb & Gutter 2.98 309.92 5510 Rocky Ridge Rd. $ 561.60 Dallas, Texas, 75241 OVER AND SPRATLING ADDITION Sam H. Reed 10 50'Pavement $2.42 $121.00 Box 314 Res. 50' Curb & Gutter 2.98 149.00 Everman, Texas 107 Sq. Ft. Driveway.85 90.95 $ 360.95 L. C. McCuren 9 50' Pavement $2.42 $121.00 1409 E. Richmond Res. 50' Curb & Gutter 2.98 149.00 96 Sq. Ft. Driveway.85 81.60 $ 351.60 C. F. Gilchrist F 50' Pavement $2.42 $121.00 319 W. T. Waggoner Bldg. Res. 50' Curb & Gutter 2.98 149.00 96 Sq. Ft. Driveway.85 81.60 $ 351.60 Mrs. Monice Minor E 50' Pavement $2.42 $121.00 c/o I. Davis Res. 50' Curb & Gutter 2.98 149.00 Rt. 3, Box 333 $ 270.00 Longview, Texas Lillie Mae Morris D 50' Pavement $2.42 $121.00 1450 Langston Res. 50' Curb & Gutter 2.98 149.00 $ 270.00 AVENUE 11G1° INTERSECTS Ella Mae White C 50' Pavement $2.42 $121.00 1416 Langston Res. 50' Curb &, Gutter 2.98 149.00 $ 270.00 Marion Walls B 50' Pavement $2.42 $121.00 1412 Langston Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway.85 72.25 $ 342.25 6 CONT'D. PROJECT NO, 104-24000-188, UNIT 4: LANGSTON STREET FROM KATY STREET TO EAST ROSEDALE AVENUE. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET OVER AND SPRATLING ADDITION Ella McGee A 50' Pavement $2.42 $121.00 1408 Langston Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway .85 72.25 $ 342.25 Isaac Bryant 2 50' Pavement $2.42 $121.00 1316 Langston Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway .85 72.25 $ 342.25 Joe A. Gomez 1 50' Pavement $2.42 $121.00 c/o C. F. Gilchrist Est. Res. 50' Curb & Gutter 2.98 149.00 319 W. T. Waggoner Bldg. 85 Sq. Ft. Driveway .85 72.25 $ 342.25 Mrs. D. L. Toby Tract 4-B 150' Pavement $7.18 $1,077.00 2608 Boyd Comm. 150' Curb & Gutter 2.98 447.00 $1,524.00 EAST ROSEDALE AVENUE INTERSECTS EAST SIDE OF STREET G. W. COONROD SURVEY Ben Rubin and Sons, Inc. Tract 5 718.5' Pavement $7.18 $5,158.83 3704 Autumn Drive Comm. 718.5' Curb & Gutter2.98 2,141.13 $7,299.96 COWAN STREET INTERSECTS J. L. GASSOWAY ADDITION Ethylene C. Cavanah W. � of 84' Pavement $2.42 $203.28 1501 Langston 23 Res. 84' Curb & Gutter 2.98 250.32 $ 453.60 Donald C. Cavanah 22 52' Pavement $2.42 $125.84 1501 Langston Res. 52' Curb & Gutter 2.98 154.96 $ 280.80 Clytis Morris 21 52' Pavement $2.42 $125.84 4804 Avenue G ems. 52' Curb & Gutter 2.98 17 :25 85 Sq. Ft. Driveway 85 $ 353.05 7 CONT'D. PROJECT NO. 104-24000-188, UNIT 4: LANGSTON STREET FROM KATY STREET TO EAST ROSEDALE AVENUE. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET J. L. GASSOWAY ADDITION Pauline Hill Porter 20 & 104' Pavement $2.42 $251.68 1511 Langston 19 Res. 104' Curb & Gutter 2.98 309.92 85 Sq. Ft. Driveway .85 72.25 $633.85 Guessena Hill Filgo 18 & _ 104' Pavement $2.42 $251.68 1511 Langston 17 Res. 104' Curb & Gutter 2.98 309.92 $561.60 A. J. Herndon 16 & _ 104' Pavement $2.42 $251.68 6619 Lockheed 15 Res. 104' Curb & Gutter 2.98 309.92 Dallas, Texas $561.60 Milton Hill 14 & _ 104' Pavement $2.42 $251.68 1531 Langston 13 Res. 104' Curb & Gutter 2.98 309.92 171 Sq. Ft. Driveway .85 145.35 $706.95 COST TO PROPERTY OWNERS - ASSESSMENT $18,978.11 COST TO CITY OF FORT WORTH 17,397 .79 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 4 $36,375.90 8 PROJECT NO. 104-24000-188, UNIT 5: EFFIE STREET FROM WILLIE STREET TO CALUMET STREET, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a aix-inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHWEST CORNER OF WILLIE STREET AND EFFIE STREET WEST SIDE OF STREET STALLCUP 1st ADDITION W. C. Ellis 6 14 65' Pavement $2.42 $157.30 4910 Willie Res. 65' Curb & Gutter 2.98 193.70 $ 351.00 Hilda L. Horton 5 14 65' Pavement $2.42 $157.30 1707 Haysworth Avenue Res. 65' Curb & Gutter 2.98 193.70 Los Angeles, Calif. $ 351.00 90035 DAN DULANEY SURVEY Clifford McCoy Tract 25 55.5' Pavement $2.42 $134.31 2001 Danner Res. 55.5' Curb & Gutter2.98 165.39 85 Sq. Ft. Driveway .85 72.25 $ 371.95 Grant Peoples Tract 24-A 105.5' Pavement $2.42 $255.31 2411 Scott Street and 23 105.5' Curb & Gutter2.98 314.39 Dallas, Texas Res. 85 Sq. Ft. Driveway .85 72.25 $ 641.95 Willie Murray Tract 22 61' Pavement $2.42 $147.62 4750 Ramey Res. 61' Curb & Gutter 2.98 181.78 $ 329.40 GOINS SUBDIVISION Charles Barnes B 55.5' Pavement $2.42 $134.31 909 Ross Trail Res. 55.5' Curb & Gutter2.98 165.39 Arlington, Texas 85 Sq. Ft. Driveway .85 72,25 $ 371.95 B. A. Barnes A 55.5' Pavement $2.42 $134.31 1504 W. Abram Res. 55.5' Curb & Gutter2.98 165.39 Arlington, Texas 85 Sq. Ft. Driveway .85 72.25 $ 371.95 9 CONT'D. PROJECT NO. 104-24000-188, UNIT 5: EFFIE STREET FROM WILLIE STREET TO CALUMET STREET BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET DAN DULANEY SURVEY D. A. Dansby Tract 20 111' Pavement $2.42 $268.62 1712 Effie Res. 111' Curb & Gutter 2.98 330.78 116 Sq. Ft. Driveway .85 98.60 $ 698.00 Moates and Graham Tract 18 87.5' Pavement $2.42 $211.75 200 Houston Street Res. 87.5' Curb & Gutter2.98 260.75 $ 472.50 KATY STREET INTERSECTS Wesley Walker and Tract 12 95' Pavement $2.42 $229.90 Denzil Lee Walker Res. 95' Curb & Gutter 2.98 283.10 4517 Quail Lane $ 513.00 JOHNNIE PULLIAM SUBDIVISION Greater Canaan 5 101' Pavement $2.42 $244.42 Baptist Church Res. 101' Curb & Gutter 2.98 300.98 c/o Rev. L. E. Lawson $ 545.40 4813 Fitzhugh CALUMET STREET INTERSECTS EAST SIDE OF STREET STALLCUP'S 1st ADDITION Elizabeth Walker 1 3 74' Pavement $2.42 $179.08 4648 Lois Res. 74' Curb & Gutter 2.98 220.52 $ 399.60 Willie Prince 2 3 50' Pavement $2.42 $121.00 P.O. Box 983 Res. 50' Curb & Gutter 2.98 149.00 13158 Del Sur St. 85 Sq. Ft. Driveway .85 72.25 San Fernando, Calif. $ 342.25 Frank Petty 3 3 50' Pavement $2.42 $121.00 1609 Effie Street Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway .85 72.25 $ 342.25 10 • f CONT'D PROJECT NO. 104-24000-188, UNIT 5, EFFIE STREET FROM WILLIE STREET TO CALUMET STREET BLACK OWNER LOT ZONING FONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET STALLCUP'S 1st ADDITION I. B. Jackson 4 3 50' Pavement - $2.42 $]21.00 808 North Chandler Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway .85 72.25 $342.25 Bennie J. Butler 5 3 50' Pavement $2.42 $121.00 1701 Effie Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway .85 72.25 $342.25 Tom Cook Scott, Jr. 6 3 50' Pavement $2.42 $121.00 1707 Effie Street Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway .85 72.25 $342.25 Clarence Russell 7 3 50' Pavement $2.42 $121.00 c/o Fort Worth Res. 50' Curb & Gutter 2.98 149.00 Savings and Loan 85 Sq. Ft. Driveway .85 72.25 $342.25 City of Fort Worth W. 85' of 3 115' No Assessment Lots 8 & 9 e s. $ - 0 _ KATY STREET INTERSECTS Georgia Thomas 1 4 45' Pavement $2.42 $108.90 1801 Effie Street Res. 45' Curb & Gutter 2.98 134.10 85 Sq. Ft. Driveway .85 72.25 $315.25 James Womack 2 4 50' Pavement $2.42 $121.00 1805 Effie Street Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway .85 72.25 $342.25 F. M. Coleman 3 4 50' Pavement $2.42 $121.00 1811 Effie Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway .85 72.25 $342.25 11 CONT'D. PROJECT NO. 104-•24000-188, UNIT 5s EFFIE STREET FROM WILLIE STREET TO CALUM T STREET BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET STALLCUP'S 1st ADDITION Estate of Sallie Ward 4 4 50' Pavement $2.42 $121.00 Address Unknown Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway.85 72.25 $342.25 Margin R. Richardson 5 4. _ 50' Pavement $2.42 $121.00 1817 Effie Street Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway.85 72.25 $342.25 Mamie Polk 6 4 50' Pavement $2.,42 $121.00 4805 Willie Res. 50' Curb & Gutter 2.98 149.00 $270.00 William Burnett 7 & 8 4 100' Pavement $2.42 $242.00 1428 Stafford Drive Res. 100' Curb & Gutter 2.08 298.00 540.00 COST TO PROPERTY OWNERS - ASSESSMENT $9,965.45 COST TO CITY OF FORT WORTH $18,344.15 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 5 $28,309.60 12 PROJECT NO. 104-24000-188, UNIT 6: WILLIE STREET FROM 150' WEST OF DILLARD STREET TO BIRDELL STREET, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curbs and two- foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-feet wide concrete sidewalks where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT 150' WEST OF INTERSECTION OF DILLARD AND WILLIE STREETS NORTH SIDE OF STREET WALTER WILLI ADDITION Caroline Owens 6 1 140' Owner Occupied 1740 Dillard Comm. 140' Pavement $4.80 $672.00 124' Curb & Gutter 2.98 369.52 $1,041. 52 DILLARD STREET INTERSECTS Fred Patterson 6 4 140' Owner Occupied 1745 Dillard Comm. 140' Pavement $4.80 $672.00 140' Curb & Gutter 2.98 417.20 $1,089.20 City of Fort Worth 6 13 200' No Assessment Res. Mrs. Loma Inskeep 4-B 13 87.5' Pavement $2.42 $211.75 533 Bolt Res. 87.5' Curb & Gutter 2.98 260.75 85 Sq. Ft. Driveway .85 72.25 $ 544.75 Nora Cooper 4-A 13 87.-? Pavement $2.42 $211.75 5223 Willie Res. 87.5' Curb & Gutter 2.98 260.75 85 Sq. Ft. Driveway .85 72.25 $ 544. 75 Roosevelt Washington 3 13 150' Side Lot Adjusted to 1744 Birdell Res. 100' Pavement $2.42 $242.00 100' Curb & Gutter 2.98 298.00 85 Sq. Ft. Driveway .85 72.25 $ 612.25 13 CONT°D. PROJECT NO. 104-24000-188, UNIT 6: WILLIE STREET FROM 150' WEST OF DILLARD STREET TO BIRDELL STREET. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BIRDELL STREET INTERSECTS SOUTH SIDE OF STREET WALTER WILLI ADDITION Willie M. & 1 14 150' Side Lot Adjusted to Pauline Fields Res. 100' Pavement $2.42 $242.00 1804 Birdell 100' Curb & Gutter 2.98 298.00 $ 540.00 J. C. Cook and 7-B & 7-A 14 175' Pavement $$.42 $423.50 Ben McClure Res. 175' Curb & Gutter 2.98 521.50 702 Burk Burnett Bldg. 85 Sq. Ft. Driveway .85 72.25 $1,017.25 Christ Holy Sanctified N. 100' of 14 200' Adjusted to Church 8-A, 8-B, Res. 160' Pavement $2.42 $387.20 5208 Willie 8-C & 8-D 144' Curb & Gutter 2.98 429.12 233 Sq. Ft. Driveway.85 198.05 $1,014.37 Estella Davis 1,2 & 3 5 140' Owner Occupied 1809 Dillard Comm. 140' Pavement $4.80 $672.00 140' Curb & Gutter 2.98 417.20 $1,089.20 DILLARD STREET INTERSECTS FORT WORTH IND. SCHOOL DIST. 2 140' Pavement $7. 18 $1,005.20 3210 W. Lancaster Street Comm. 124' Curb & Gutter 2.98 369.52 1 374.72 COST TO PROPERTY OWNERS - ASSESSMENT $ 8,868.01 COST TO CITY OF FORT WORTH $30,394.62 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 6 $39,262.63 14 PROJECT NO, 104-24000-188, UNIT 8: PAVING SKIP ON SOUTH SIDE OF MT, VERNON AVENUE BETWEEN SANBORN STREET AND TORONTO STREET, beginning at west line of Lot 7, Block 54, and ending at east line of Lot 8, Block 54, to be improved by constructing four-foot wide concrete sidewalks and a six inch thick hot-mix asphaltic concrete pavement on a six-inch lime stabilized subgrade with eight-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT EAST LINE OF LOT 8, BLOCK 54 SOUTH SIDE OF STREET SYCAMORE HEIGHTS ADDITION Thelma Belew 8 54 50' Sidewalk $2.76 $138.00 2924 Mt . Vernon Avenue Comm. $ 138.00 Thelma Belew 7 54 50' Owner Occupied 2924 Mt. Vernon Avenue Comm. 50' Pavement $5.70 $285.00 50' Curb & Gutter 3.32 166.00 50' Sidewalk 2. 76 138.00 $ 589.00 COST TO PROPERTY OWNERS - ASSESSMENT $ 727.00 COST TO THE CITY OF FORT WORTH 981.03 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 8 $1,708.03 17 PROJECT NO. 104-24000-188, UNIT 9s PAVING SKIP ON SOUTH SIDE OF MT. VERNON AVENUE BETWEEN CHICAGO AVENUE AND NEWARK AVENUE, beginning at the west line of Lot 5, Block 9, and ending at east line of Lot 6, Block 9, to be improved by replacing existing three- foot wide sidewalk and to improve that portion abutting Lot 5, Block 9, by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch lime stabilized subgrade, eight-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT WEST LINE OF LOT 5, BLOCK 9 - MT. VERNON AVENUE SOUTH SIDE OF STREET TURNER SUBMVISION Louis M. Pipkin 6 9 50' Sidewalk Adjusted to No assessment 2528 N. Edgewood Res. 0' (Existing facility replaced at no cost) $ -0- Louis M. Pipkin 5 9 50' Sidewalk Adjusted to 2528 N. Edgewood Res. 0' (Existing facility replaced at no cost) 50' Pavement $2,08 $104.00 50' Curb & Gutter 3.32 166.00 270.00 COST TO PROPERTY OWNERS - ASSESSMENT $ 270.00 COST TO CITY OF FORT WORTH 11,350.03 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 9 1 620.03 18 PROJECT NO. 104-24000-188, UNIT 10: PAVING SKIP ON NORTH SIDE OF PURINGTON AVENUE BETWEEN TANDY AVENUE AND SANDERSON AVENUE, beginning at west line of Lot E-7, Black 8, and ending at east line of Lot 8, Block 8, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, eight=inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT WEST LINE OF LOT Ei7, BLOCK 8, OF PURINGTON AVENUE NORTH SIDE OF STREET TANDY ADDITION Arvel T. Mayo E-7 8 50' Pavement $2.08 $104.00 3411 Purington Res. 50' Curb & Gutter 3.32 166.00 85 Sq. Ft. Driveway .85 72.25 $ 342.25 Anna Lee Simpson 8 8 105' Pavement $2.08 $218.40 3417 Purington Res. 105' Curb & Gutter 3.32 348.60 85 Sq. Ft. Driveway .85 72.25 $ 639.25 COST TO PROPERTY OWNERS - ASSESSMENT $ 981.50 COST TO CITY OF FORT WORTH $2,738.81 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 10 $3,720.31 19 PROJECT NO. 104-24000-188, UNIT 11: PAVING SKIP ON EAST SIDE OF TANDY AVENUE BETWEEN PURINGTON AVENUE AND MEADOWBROOK DRIVE, improving all property abutting on the west side of Lot 99 Block 8, with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, eight-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalks where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHEAST CORNER OF PURINGTON AVENUE AND TANDY AVENUE EAST SIDE OF STREET TANDY ADDITION J. C. Stevenson 6 8 192' Side Lot Adjusted to 3403 Purington Res. 100' Pavement $2.08 $208.00 100' Curb & Gutter 3.32 332.00 181' Sidewalk 2.76 499.56 151 Sq. Ft. Driveway .85 128.35 1 167.91 COST TO PROPERTY OWNERS - ASSESSMENT $1,167.91 COST TO CITY OF FORT WORTH 3,678.14 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 11 4 846.05 20 City of Dort Worth, Texas Mayor and Council Communication DATE REFERENCE SUBJECT: Adjustment of Assessments for PAGE 0 NUMBER Paving - 12 Locations on the East Side Unit 4 2 11/30/70 G-1663 1of On September 22, 1969, the Benefit Hearing was closed and assessments levied for paving at 12 Locations on the East Side, Project No. 104-24000-188 (M&C G-1430) . This project included property along Langston Street (Unit 4) , which at the time was zoned "E" Commercial and "D" Apartment. However, the south 500 feet was in the process of being replatted and rezoned to "A" One- Family. This property was vacant and had never been used for Commercial and/or Apartment purposes. On November 9, 1970, the City Council adopted Ordinance No._ 6384 changing the zoning of the following property from "D" Apartment and "E" Commercial to "A" One-Family. Z-70-139 Lots 24 through 32, J. L. Gassoway Addition (1317--29 & 1401--13 Langston & 4809 Cowan) Standard Assessment Policies Under standard street construction policies, the property owner along the east side of Langston Street was assessed as follows: East -Side of Street G. W. Coonrod Survey Ben Rubin and Sons, Inc. Tract 5 718.5' Pavement $7.18 $5,158.83 3704 Autumn Drive Apt Comm 718.5' Curb & Gutter 2.98 2,141.13 $7,299 96 Re-evaluation of Enhancement The south 500 feet of Tract 5, G. W. Coonrod Survey has been replatted as Lots 24 through 32, J. L. Gassoway Addition, Volume 388-60, Page 2, September 3, 1970, and rezoned to "A" One-Family. Plans for this action were in process at the time of the Benefit Hearing. The property on the west side of the street is also zoned residential. New single family dwellings are being con- structed on the subject lots at the present time. Recommendations The following recommendations are submitted: 1) That the assessments be reduced as follows; DATE REFERENCE SUBJECT: Adjustment of Assessments for PAGE NUMBER Paving -- 12 Locations on the East 2 2 11/30/70 G-1663 Side Unit 4 of East Side ©ftStreet G. W. Coonrod Survey Ben Rubin .and Sons, Inc. Tract 5 218.5' Pavement $7.18 $1,568.83 3704 Autumn Drive Comm. 218.5' Curb & Gutter 2.98 561.13 $2,219.96 J. L. Gassoway. Addition Ben Rubin and Sons, Inc. Lots 24-31 500' Pavement $2.42 $1,210.00 3704 Autumn Drive Res. 500' Curb & Gutter 2.98 1,490.00 $2,700'.00 TOTAL $4,919.96 2) That Revolving Fund Account No. 042-10424-188 be reduced by $2,380, the difference between the original and adjusted assessments, and the City's cost be increased in Project Number 104-24000-188 by the same amount; and 3) That-$2,380 ,be appropriated from Account No. 104-24000-901, Unspecified Projects, to Account No. 104-24000-188 to finance the City's additional cost resulting from the assessment reduction. HDM:ms SUBMITTED BY: DISPOSITION BY COUNCIL: PROCESSED BY ❑ APPROVED ❑ OTHER (DESCRIBE) Jn _ CITY SECRETARY DATE CITY MANAGER