HomeMy WebLinkAboutOrdinance 5963 a
ORDINANCE NO,
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF 11; Ls A►�.yy e
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH
TEXAS BITULITHIC COMPANY FOR THE CONSTRUCTION OF SAID
IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE,
EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL
ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN
AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING
THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING
THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF
FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPRO-
PRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE
DATE,
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with TEXAS BITULITHIC COMPANY for the making and construction of certain
street improvements on the hereinafter described portions of streets, avenues and
public places in .said City, to-wit:
1. SOUTH HILLS AVENUE: From the west line of Lot 11, Block 3, I. H.
Burney Addition to Stadium Drive, Project No.
104-27000-137, Unit 1.
WHEREAS, by sundry proceedings heretofore passed by the City Council of the
City of Fort Worth, Texas, including Ordinance No, 5936 , a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real an6 true owners thereof; and,
WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review,
found and determined that, ira some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 5936 and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
herefor;
NOW, TFSREFORE,
BE IT ORDAINED BY ME CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
IIo
The Mayor, be, and he is hereby, directed to issue and execute in the name
oaf the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered., shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows-
•
IIz.
When each of the certifiactes has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the .caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the. appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage. ^
PASSED AND APPROVED THIS day of 19 0 f
APPROVED AS TO FORM AND LEGALITY:
.�a Y
City tturney
Page 1
UNIT NO. 1: SOUTH HILLS AVENUE FROM THE WEST LINE OF LOT 11, BLOCK 3, I. H. BURNEY
ADDITION TO STADIUM DRIVE to be improved by removing the existing asphalt surface,
`adding additional gravel to the base to provide a minimum thickness of 7• inche's in
depth, stabilizing the gravel base with cement, placing a 2-inch Hot Mix Asphaltic
Concrete Surface, removing and re-aligning concrete curbs and gutters where necessary,
constructing standard 7-inch high concrete curbs and 2-foot wide concrete gutters
where same do not presently exist, constructing 6-inch thick concrete driveways and
4-foot wide concrete sidewalks where specified, so that the finished street will
provide a 40-foot roadway section.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT 130' WEST OF NORTHWEST CORNER OF KELL AVENUE AND SOUTH HILLS AVENUE
NORTH SIDE OF STREET I. H. BURNEY ADDITION
Grace Kell Jung 11 3 125. 5' Adjusted to
3624 Kell Avenue Res. 110.5 L.F. Walk $2. 12 $234.26
$234. 26
KELL AVENUE INTERSECTS
Margaret Finn 11 2 132.5 L.F. Walk $2.12 $280. 90
4820 Staples Res. $280.90
James S. LaDue 12 2 132.5' Adjusted to
3624 Winston Res. 114.5 L.F. Walk $2. 12 $242.74
157. 5 S.F. Drive .64 100.80
$343.54
WINSTON AVENUE INTERSECTS
Granville S. Tunstill 1 132.5' Adjusted to
3623 Winston 11 Res. 117. 5 L.F. Walk $2. 12 $249.10
$249. 10
Mrs. Lewis Winter 12 1 132.5 L.F. Walk $2.12 $280.90
620 Westwood Res. $280.90
STADIUM DRIVE INTERSECTS
SOUTH SIDE OF STREET ST. AUGUSTINE ADDITION
Joy F. Stacy 1 1 132. 5' Side Lot
3700 Stadium Drive Res. Adjusted to
100' Curb & Gutter $2. 50 $250.00
114. 5 L.F. Walk 2. 1.2 242.74
$492.74
T. B. TAYLOR SURVEY
I. H. Burney, Estate Pt. of 474.8' Adjusted to
c/o F. F. Nelson Tr. 4 458.8' Curb & Gutter $2. 50 $1,147.00
1219 W. T. Waggoner Bldg. Res. 474.8 L.F. Walk 2. 12 1,006.58
$2,153.58
Page 2
Continuation of
UNIT NO. 1: SOUTH HILLS AVENUE FROM THE WEST LINE OF LOT 11, BLOCK 3, I.H. BURNEY
ADDITION TO STADIUM DRIVE
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
T. B. TAYLOR SURVEY
City of Fort 150 ft. square out 150' Adjusted to
Worth Fire of N. W. Corner of 90 L. F. Walk $2.12 $190.80
Department Tract 4 Res. $ 190.80
TOTAL PROPERTY OWNERS COST $ 4,225.82
TOTAL CITY OF FORT WORTH COST 9,659.81
TOTAL CONSTRUCTION COST $13,885.63
MCM*M City of Dort Worth, Texas
LINE MORPHIS Mayor and Council Communication
GRAHAM
DATE REFERENCE SUBJECT: Final Payment - Reconstruction PAGE
R.&B. NUMBER of South Hills Avenue 1 of 1
7/1/68 _-546
BUILDING Final Council action on the project described below is requested.
Project Description
Name: Reconstruction of South Hills Avenue from 130' West
of Kell Street to Stadium Drive
Contractor: Texas Bitulithic Company
Contract Awarded: March 4, 1968 (M&C .C-1175)
Work Order Issued: March 5, 1968
Work Order Effective: March 15, 1968
Date of Final Inspection and Approval: May 17, 1968
Working Time Bid: 20 Working Days
Working Time Used: 20 Working Days
Project Cost and Financing
Original Bid Price: $13,132.50
Final Contract Cost: 12,623.30
Partial Payments Previously Made: 2 Amount: 11,072.07
Final Payment Due: 1,551.23
Payment to be made from Project Account Number: 104-27000-137
Deviation from Bid Price: Minor variations between quantities estimated in
the contract specifications and actual quantities measured and used at
the job site resulted in an under-run of $509.20.
Compliance with Specifications
During testing on this project, three corings were made with the following
results :
Exceeds Even with Under Specs but Below
Paving Specs Specs Within Tolerance Tolerance
Surface 3 0 0 0
Base 3 0 0 0
On this project, the average thickness of the base is 7.10 inches as compared
to 7 inches specified and the average thickness of hot-mix asphaltic concrete
surface is 2.66 inches as compared to the 2 inches specified. Tests made dur-
ing construction of base and pavement indicate that materials used were in
compliance with contract specifications.
Recommendation UI"I;,�;; � ��
It is recommended that the above project be accepted an -th t final pa'�m nt
of $1,551.23 be authorized to Texas Bitulithic Company jj `4� TA y
HDM:ms FT. WORTH, TEX.
SUBMITTED BY: DISPOSITIO BY COUNCIL: PROCESSED BY
❑ OTHER (DESCRIBE) CITY SECRETARY
--
DATE
CITY MANAGER