Loading...
HomeMy WebLinkAboutOrdinance 5963 a ORDINANCE NO, ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF 11; Ls A►�.yy e AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH TEXAS BITULITHIC COMPANY FOR THE CONSTRUCTION OF SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPRO- PRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE, WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract with TEXAS BITULITHIC COMPANY for the making and construction of certain street improvements on the hereinafter described portions of streets, avenues and public places in .said City, to-wit: 1. SOUTH HILLS AVENUE: From the west line of Lot 11, Block 3, I. H. Burney Addition to Stadium Drive, Project No. 104-27000-137, Unit 1. WHEREAS, by sundry proceedings heretofore passed by the City Council of the City of Fort Worth, Texas, including Ordinance No, 5936 , a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and public places and against the real an6 true owners thereof; and, WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review, found and determined that, ira some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No. 5936 and WHEREAS, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance with the contract therefor; herefor; NOW, TFSREFORE, BE IT ORDAINED BY ME CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; and the contract with reference thereto be, and it is hereby, found and declared fully completed and performed. IIo The Mayor, be, and he is hereby, directed to issue and execute in the name oaf the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered., shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro- perty assessed and shall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on the respective certificates, together with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows- • IIz. When each of the certifiactes has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the .caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the. appropriate Ordinance Records of said City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. ^ PASSED AND APPROVED THIS day of 19 0 f APPROVED AS TO FORM AND LEGALITY: .�a Y City tturney Page 1 UNIT NO. 1: SOUTH HILLS AVENUE FROM THE WEST LINE OF LOT 11, BLOCK 3, I. H. BURNEY ADDITION TO STADIUM DRIVE to be improved by removing the existing asphalt surface, `adding additional gravel to the base to provide a minimum thickness of 7• inche's in depth, stabilizing the gravel base with cement, placing a 2-inch Hot Mix Asphaltic Concrete Surface, removing and re-aligning concrete curbs and gutters where necessary, constructing standard 7-inch high concrete curbs and 2-foot wide concrete gutters where same do not presently exist, constructing 6-inch thick concrete driveways and 4-foot wide concrete sidewalks where specified, so that the finished street will provide a 40-foot roadway section. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT 130' WEST OF NORTHWEST CORNER OF KELL AVENUE AND SOUTH HILLS AVENUE NORTH SIDE OF STREET I. H. BURNEY ADDITION Grace Kell Jung 11 3 125. 5' Adjusted to 3624 Kell Avenue Res. 110.5 L.F. Walk $2. 12 $234.26 $234. 26 KELL AVENUE INTERSECTS Margaret Finn 11 2 132.5 L.F. Walk $2.12 $280. 90 4820 Staples Res. $280.90 James S. LaDue 12 2 132.5' Adjusted to 3624 Winston Res. 114.5 L.F. Walk $2. 12 $242.74 157. 5 S.F. Drive .64 100.80 $343.54 WINSTON AVENUE INTERSECTS Granville S. Tunstill 1 132.5' Adjusted to 3623 Winston 11 Res. 117. 5 L.F. Walk $2. 12 $249.10 $249. 10 Mrs. Lewis Winter 12 1 132.5 L.F. Walk $2.12 $280.90 620 Westwood Res. $280.90 STADIUM DRIVE INTERSECTS SOUTH SIDE OF STREET ST. AUGUSTINE ADDITION Joy F. Stacy 1 1 132. 5' Side Lot 3700 Stadium Drive Res. Adjusted to 100' Curb & Gutter $2. 50 $250.00 114. 5 L.F. Walk 2. 1.2 242.74 $492.74 T. B. TAYLOR SURVEY I. H. Burney, Estate Pt. of 474.8' Adjusted to c/o F. F. Nelson Tr. 4 458.8' Curb & Gutter $2. 50 $1,147.00 1219 W. T. Waggoner Bldg. Res. 474.8 L.F. Walk 2. 12 1,006.58 $2,153.58 Page 2 Continuation of UNIT NO. 1: SOUTH HILLS AVENUE FROM THE WEST LINE OF LOT 11, BLOCK 3, I.H. BURNEY ADDITION TO STADIUM DRIVE BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT T. B. TAYLOR SURVEY City of Fort 150 ft. square out 150' Adjusted to Worth Fire of N. W. Corner of 90 L. F. Walk $2.12 $190.80 Department Tract 4 Res. $ 190.80 TOTAL PROPERTY OWNERS COST $ 4,225.82 TOTAL CITY OF FORT WORTH COST 9,659.81 TOTAL CONSTRUCTION COST $13,885.63 MCM*M City of Dort Worth, Texas LINE MORPHIS Mayor and Council Communication GRAHAM DATE REFERENCE SUBJECT: Final Payment - Reconstruction PAGE R.&B. NUMBER of South Hills Avenue 1 of 1 7/1/68 _-546 BUILDING Final Council action on the project described below is requested. Project Description Name: Reconstruction of South Hills Avenue from 130' West of Kell Street to Stadium Drive Contractor: Texas Bitulithic Company Contract Awarded: March 4, 1968 (M&C .C-1175) Work Order Issued: March 5, 1968 Work Order Effective: March 15, 1968 Date of Final Inspection and Approval: May 17, 1968 Working Time Bid: 20 Working Days Working Time Used: 20 Working Days Project Cost and Financing Original Bid Price: $13,132.50 Final Contract Cost: 12,623.30 Partial Payments Previously Made: 2 Amount: 11,072.07 Final Payment Due: 1,551.23 Payment to be made from Project Account Number: 104-27000-137 Deviation from Bid Price: Minor variations between quantities estimated in the contract specifications and actual quantities measured and used at the job site resulted in an under-run of $509.20. Compliance with Specifications During testing on this project, three corings were made with the following results : Exceeds Even with Under Specs but Below Paving Specs Specs Within Tolerance Tolerance Surface 3 0 0 0 Base 3 0 0 0 On this project, the average thickness of the base is 7.10 inches as compared to 7 inches specified and the average thickness of hot-mix asphaltic concrete surface is 2.66 inches as compared to the 2 inches specified. Tests made dur- ing construction of base and pavement indicate that materials used were in compliance with contract specifications. Recommendation UI"I;,�;; � �� It is recommended that the above project be accepted an -th t final pa'�m nt of $1,551.23 be authorized to Texas Bitulithic Company jj `4� TA y HDM:ms FT. WORTH, TEX. SUBMITTED BY: DISPOSITIO BY COUNCIL: PROCESSED BY ❑ OTHER (DESCRIBE) CITY SECRETARY -- DATE CITY MANAGER