HomeMy WebLinkAboutContract 37014 (2) AMENDMENT NO. 1 TO
COMMUNITY FACILITIES AGREEMENT
STATE OF TEXAS § CITY SECRETARY CONTRACT NO. �370
COUNTY OF TARRANT § AUTHORIZING M&C NO. C
WHEREAS, the City of Fort Worth (City) and the Keller Independent School
District (Developer) entered into Community Facility Agreement, City Secretary Contract
No. 33444, wherein Developer is to make certain improvements to Keller Hicks Road
within the City; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the CFA
to increase City participation by $1,071,577 (City Participation) for the costs associated
with construction, inspection, and materials testing for the paving and storm drain
improvements for the creation of two additional lanes of Keller Hicks Road as shown on
Exhibit "A"attached hereto.
NOW THEREFORE, City and Developer, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends the CFA:
1.
Section II. Street and Storm Drain Facilities, is amended to be and read:
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer and the City shall share the costs of the street,
storm drainage, street lighting, and street name sign construction. City shall
cause the construction of the improvements as shown on Exhibits B, 131, and
C attached to Amendment No. 1. The estimated total cost of current
improvements and related support services specified in this Agreement,
including design, construction and inspection is estimated to be $2,282,206.
The Developer shall deposit$795,247 ($1,210,629 less drainage
improvements already constructed) with the City prior to the date the City
issues the notice to proceed. The Developer and City shall proportionately
share the actual cost in excess of the estimated cost. The City will submit an
invoice to the Developer for its share of the actual cost in excess of the
estimated cost and Developer shall submit payment for same to the City
within 30 days of the invoice date. If upon completion the actual cost is less
than the estimated cost, the City shall refund to Developer its proportional
share of the savings.
AMENDMENT NO.1
•r CFW&KISD CFA KELLER HICKS
Page 1 of 3 lu,
2.
The Summary of Cost table shall be replaced to be and read:
SUMMARY
OF COST
Item Developer City Cost Total Cost
Cost
A. Construction
1. Streets $602,881 $788,817 $1,391,698
2. Storm Drainage $519,977 $222,105 $742,082
Street Lights $17,600 $17,600
3.
4. Street Name Signs
B. Engineering Design $2,800 $2,800
C. Construction $44,914 $40,437 $85,351
Engineering and
Management by DOE
4%
D. Materials Testing by $22,457 $20,218 $42,675
DOE 2%
$1,210,629 $1,071,577 $2,282,206
TOTALS
3.
Exhibits B, 131, and C to the CFA shall be replaced with those attached hereto
and incorporated herein by this reference.
4.
All other provisions of the CFA, which are not expressly amended herein, shall
remain in full force and effect.
(Remainder of Page Intentionally Left Blank)
AMENDMENT NO.u1
CFW S KISD.CFA KELL.,;R HICKS
Page 2 of 3 --_I
EXECUTED on this the day of , 2007, in
Fort Worth, Tarrant County, Texas.
ATTEST: CITY OF FORT WORTH:
Marty HendriZ Fernando Costa
City Secretary Assistant City Manager
AP OVAL RECOMMENDED:
Contract- huthorisatios �-
Robe ode, .E., Director
Date Trans on and Public Works
APPRO D AS TOM
AND ALITY: y-
G
Amy J agei-'---
Assi nt Attorney DEVELOPER
Keller Independent School District
David Farmer
President, Board of Trustees
ATTEST:
�1
Randy Pugh �—
Secretary, Board of Trustees
C' ]KELLER
CFW&KISD CFS
Page 3 of 3
>
S > >
J
Ir i i I I I
II i ; N17H 2l"H RCP
i 27'X7
27'RCP i ' 2-24' N17H
MI>H 27'HEADWALL I I 2-24' WALL
$$ 5'ARCap INLET 15'LX/RB NYCET 2O'��MK£T 15'Q/RB!NL£T
9 i MI)H 21'RCP SDAIFI i i w7H 11'RCP 1 NI7H 11"RQ° SOWH
II 3J.RCP i
• �- ° 20'CURB tiI 15'am AYLET I 4--
PROP ROW
NTH 211� I it NTH 21'RCP
EX. ROW Co AIrCT TO M SD Ifi
2-24' N17H
4'DR(P KEr p t't
NTH NfW SWY p Iil =�—' i + 2-24'WA wALL
• J \� `, . -- .i-- if
91 if
it
WEST PORTION EAST PORTION
g CITY VS. K.I.S.D. STORM DRAINAGE
y PROPOSED KISD STORM DRAINAGE PROPOSED CITY STORM DRAINAGE
GRAPHIC SCALE
100 0 50 100
i I
J
!
!
i
I I I
1 -
Im OEM
Fn
o j
N -- - -- — ,
:
r�
m
00
(n ol
m ( N
m \ i
� i
_ II
cn \
rn
\
r RIECEIVED
\\ v`✓ x — —
cn
N
O
z
C) N.
m
�7 N. — —
0 \*
V) p
-4 —
m U)
rn
�
C p m
N =:a:•^^o�1 �� --
M, Mll l
11 r
SCALE CITY OF FORT WORTH, TEXAS lw
PROZM
,• � MGUENAU AND PERKINS LIGHT IMPROVEMENTS FOR
ELLER HICKS ROAD '
DATE For Worth,con Street K
Texas 76102
/NC. Phone:(8171330-0773•Fsx:(8171330-2013 EXHIBIT C
APR 2007 w.w.r.tnp-oniino.com
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 5/29/2007 - Ordinance No. 17574-05-2007
DATE: Tuesday, May 29, 2007
LOG NAME: 20KELLER-HICKS REFERENCE NO.: C-22152
SUBJECT:
Authorize Execution of Amendment No. 1 to Community Facilities Agreement with Keller
Independent School District for Improvements to Keller-Hicks Road and Adopt Appropriation
Ordinance
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the City Manager to execute Amendment No. 1 to Community Facilities Agreement, City
Secretary Contract No. 33444, with the Keller Independent School District for improvements to Keller-Hicks
Road to include estimated City participation costs of$1,071,577;
2. Authorize the City Manager to accept $1,210,629 from the Keller Independent School District for
improvements to Keller-Hicks Road; and
3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the 2007
Critical Capital Projects Fund by $795,247.
DISCUSSION:
On April 24, 2006, the City executed a Community Facilities Agreement (CS 33444) with Keller Independent
School District (KISD) for the construction of three lanes of an ultimate five-lane roadway in front of its new
intermediate and middle schools from just west of Ridgeview Circle to Alta Vista Road.
On January 9, 2007, (M&C G-15571) the City Council authorized the sale of $42,325,000 Certificates of
Obligation for the purpose of funding part of the Critical Capital Needs Program. That amount included
$1,200,000 to supplement the KISD project and provide for the construction of the ultimate five-lane section
as a single project.
The estimated total construction cost for the five-lane project is $2,282,206. The subject amendment calls
for $1,210,629 participation from KISD, which is the estimated cost for the three-lane section that it
previously agreed to build, and $1,071,577 City participation. KISD has already constructed drainage
improvements in the amount of $415,382 and the City will collect $795,247 from KISD prior to the date the
City issues notice to proceed on the street construction.
Transportation and Public Works is responsible for the collection and deposit of these funds.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that upon approval of the above recommendations and adoption of the
attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of
the 2007 Critical Capital Projects Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
C295 488100 202230065383 $795,247.00
C295 541200 200230065383 $795,247.00
Submitted for City Manager's Office by: Marc Ott (8476)
Originating Department Head: Robert Goode (7913)
Additional Information Contact: Tom Leuschen (2442)