project Gordon Swift HVAC Renovations City Sec No. M 138
Description
Funding(FID)30100-0210410-5740010-101250-CAPEXP-9999 City Proj.No. 100643
No.(s)
Contractor.METCO Engineering Inc. Change Order#F1 Date: 11312020
City Project Mgr.Ronnie Clements City Inspector: IMike Milan
Phone Number:(817)392-8014 Phone Number: (817)392-2297
Contract Time
(CD)
Original Contract Amount------------------------ ---- $2,146,976.00 180
Extras to Date----- --_.__ —.---------..........----------_-- $0.00 0
Credits to Date--____--_-----------_---.._-----—_____---------------------- $0.00 0
Pending Change Orders(n M&C Process)------------ --------- ---- $0.00 0
Contract Cost to Date-------------------- ---------------------- ----• $2,146,976.00 180
Amount of Proposed Change Order--•---------------------- —------- --- $34,137.31 30
Revised Contract Amount---- -----------•---- ---------------------- $2,181,113.31 210
Original Funds Available for Change Orders------------------_—_--____.._..__ $0,00
Remaining Funds Available for this CO--------------------- ---------- $0.00
Additional Funding(if necessary)-------------------------- $0.00
CHANGE ORDERS to DATE IINCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.59
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,683,720.00
'i111STIF10ATION(9I:ASONS)FOlkd#A4GEORDEg-
The purpose of Change Order#1 is to demo and refinish casework where the FCU's are to be installed,add FCU enclosures,Install
backilow preventers that were required by code,and wireless controllers for the FCU's. These items were not on the original plans and are
needed to complete the project.The total of Change Order 1($34,137.31)results in an increase to the original contract($2,146,976.00)for
a total revised contract amount of$2,181,113,31 A increase in the original contract amount by 1.59%. There are 30 days added to the { `o
contract for this Change Order. A tws a by:
r
a
U; o-C
Ni J. Ka er, Ci Secretary
It is understood and agreed that the acceptance of this Change Order by the contractor consitutes an accord and satisfaction and represents ,���r`
payment in full(both time and money)for all costs arising out of,or incindental to the above Change Order.
Contractor's Company Name Contractor Name o tra r Signature
METCO Engineering,Inc. syq/t�f' J"-Ud,,,'eZ ` 01/03/20
PMDln—— r s"`Date �ProjectMa660r'"
I i 6 Dzo i2y%-Q,
PMD S erintendent Date Architecural Services Manager : Date
ject A. Date irector/Property Managem epartm
01/06/2020
�-
Date Assistant ityManager
M&C Number M&C Date Approved
Contract Compliance Manager: ''��// EFT.
"'L RECORD
$
By signing I acknowledge that I am the person responsible �iK �JV"�J�J CITY SECRETARY
forthe monitoring and adminstration of this contract,including Brian R.Glass,AIA
ensuring all performance and reporting requirements. Architectural Services Manager WORTH,TX
Change Order 11
Date 12-Dec-2019
Garet Mclnroe
METCO Engineering Inc. Co# 11
3333 Lee Parkway Suite 600 Project# CoFW-GS-HVAC-2017
Dallas,TX 75219
Rareti lmetcoengineering com
Gordon Swift HVAC Project
thange Order D.
James Diestel FCU Wireless Programming
City of Fort Worth
401 West 13th Street • Order:
Fort Worth,Texas 76102 Request
James.DiestelE@fortworthtexas.j4ov
Design Cost
Wireless Controllers and Programming for FCUs - 7CI $9,917.60
METCO Mark UP $991.76
• Subtotal $10,909.36
Discount -
Tax Rate $0
Total $10,909.36
Garet Mclnroe 12/12/19
Signature Print Name Date
METCO Engineering
972.740.0361
www.i-netcoengineering.com
MIN E CHANGE ORDER REQUEST
Refi-igerarion&RVC,Inc.
145 S State Collese Blvd.Ste.200
Brea:CA 93831 C/O DATE: 1 211 11201 9
Ph:(893)473-3715
Bill To: Metco Engineering PROJECT NAME: Gordon Swift
Attn: PROJECT ADDRESS: 900 Monroe St
0 City, State: Fort Worth,TX
M7818-
0 Source Project#: 009H
Source CONTACT: Michael Leewright C/O#: 11
PHONE: 253-426-0901
Email: mleewright@sourcerefrigeration.co
Email competed change orders to:
EMAIL: CionstructionChangeOrdersBtsourcerefriaeration.com
JCI Metasys System-Fan Coil Unit Zone Temperature(14)Controls installed and wired per the following: -Furnish and install
DESCRIPTION:(14)New wireless zone temperature sensors.
System:
Model#:
Serial#:
Descri Lion Quanity UOM Unit Price Total Amount
!Labor Hours 0.00 Hourly $ -
List Material
Wireless controllers and programming 14.00 Each $ 644.00 $ 9,016.00
I
i
I
Freight/Rentals
I
,Subcontractors:
I
Per Diem: Hotel per day 0.00 Days
Food per day 0.00 Days
Subtotal Costs: $ 9,016.00
0% Overhead: $
10% Profit: $ 901.60
Tax(only If applicable): S -
GRAND TOTAL: $ 9,917.60
Customer Signature Date
SDufce(SRC Signature Date
4 'MYM M ■Y -
.f Change Order 12
• Date 16-Dec-2019
Garet Mclnroe
METCO Engineering Inc. CO# 12
3333 Lee Parkway Suite 600 Project#COFW-GS-HVAC-2017
Dallas,TX 75219
garetametcoenizineering,com
Gordon Swift HVAC Project
IRION1174 Change Order D-
James Diestel Backflow Preventers-Domestic Water
City of Fort Worth
401 West 13th Street Reason for Change Order:
Fort Worth,Texas 76102 Design
James.Diestel(a)fortworthtexas.eov
Design Cost
Labor
Backflow Preventers - Domestic Water - 2 ea
$3,514.50
METCO Mark UP $351.45
NotesjSpecial Subtotal $3,865.95
Discount -
Tax Rate $0
Total $3,865.95
Garet Mclnroe 12/16/19
Signature Print Name Date
METCO Engineering
972.740,0361
www.nietcoengineering.com
Refrigeration 8 NU C,Inc. CHANGE ORDER REQUEST
145 S State College Blvd.Ste.200
Brea,CA 92521 CIO DATE: 14 2/6112 0 1 9
Ph:(SSS)473-3715
Bill To: 0 PROJECT NAME: Gordon Swift
Attn: Metco Engineering PROJECT ADDRESS: 900 Monroe St
0 City, State: Fort Worth,TX
M7818-
0 Source Project#: 009H
Source CONTACT: Michael Leewright C!O#: 49
PHONE: 253-426-0901
Email: mleewright@sourcerefrigeration.co
Email competed change orders to:
ENTAIL: ConstrucllonC anoeOrders(MsourcerefOoera6on corn
Drawings Entitled:M2.1,M2.6-Make uip water Detail M5.2 Furnish all materials and labor to install(2)Backflow preventors
DESCRIPTION: per code requirements per the city of fort worth.Includes Re-routing piping to make valve assembly accessible for annual
inspection and testing.These are shown to be existing but they in fact do not exist.
System:
Model#:
Serial#:
Description Quanity UOM Unit Price Total Amount
Labor Hours 35.00 Hourly $ 56.00 $ 1,960.00
List Material
;Backflow preventors,-Domestic water 2.00 ea $ 617.50 $ 1,235.00
I
i
i
I
I Freight/Rentals
Subcontractors:
I
I
!Per Diem: Hotel per day 0.00 Days
Food per day 0,00 Days
Subtotal Costs: $ 3,195.00
0% Overhead: $ -
10% Profit: $ 319.50
Tax(only If applicable): $ -
GRAND TOTAL: $ 3,514.50
Customer Signature Date
Source/SRC Signature Date
fY@ '�IIII I�
Ar `
�tr
�& Change Order 09
Date 16-Dec-2019
Garet Mclnroe
METCO Engineering Inc. cc# 09
3333 Lee Parkway Suite 600 Project# CoFW-GS-HVAC-2017
Dallas,TX 75219
aret ,metcoen ineering com
Gordon Swift HVAC Project
• D-
James Diestel FCU Enclosures
City of Fort Worth
401 West 13th Street • •
Fort Worth,Texas 76102 Requested
James.Diestel(&fortworthtexas.gov
"Design Cost Hours (38 Total)
ETI - OEM FCU Enclosures, indluding all parts and mounting brackets - 5 each
$12,102
METCO Mark UP $1,210
Subtotal $13,312
Discount -
Tax Rate $0
Total $13,312
Garet Mclnroe 12/16/19
Signature Print Name Date
METCO Engineering
972.740.0361
www.metcoengineering.com
WSOLJ Refi-iger-ation&RE, CHANGE ORDER REQUEST
145 S State College Blvd.Ste.200
Brea,CA 92521 C/O DATE: 12/11/2019
Ph:(SSS)473-3715
Bill To:0 PROJECT NAME: Gordon Swift
Attn:Metco Engineering PROJECT ADDRESS: 900 Monroe St
0 City. State: Fort Worth,TX
M7818-
0 Source Project#: 009H
Source CONTACT: Michael Leewright C/O#: 10
PHONE: 253-426-0901
Email: mleewright@sourcerefrigeration.co
Email competed change orders to:
EAAAIL:ConstructionChanaeOrders(Msourceretriaeraaan.corn
7 FCUs need Casing enclosure due to molding/Trim changes made onsite.These will include mounting hardware and brackets.
DESCRIPTION:Service will expedite shipping of these items to our warehouse.These items will be received&inventoried to ensure am
components are on hand.They will then be transported to the jobsite as the units are being installed.Before and after pictures
will be provided to Mateo Engineering for record.'Tax is not included.
System:
Model#:
Serial#:
Quanity UOY knit Price Total Amount
Labor Hours 38.00 Hourly $ 56.00 $ 2,128.00
Ust Material
IETI-OEM FCU Enclosurers,Parts lot-including hardware 5.00 Each $ 1,703.00 $ 8,515.00
land mounting brackets.Includes casing and rear coverings.
Expedited Shipping to Service Warehouse. 1.00 Each $ 359.00 $ 359.00
i
FreightlRentals
Subcontractors:
i
Per Diem: Hotel per day 0.00 Days
Food per day 0.00 Days
i
Subtotal Costs: $ 11,002.00
0% Overhead: $ -
10% Profit: $ 1,100.20
Tax(only if applicable): $
GRAND TOTAL: $ 12,102.20
Customer Signature Date
source/SRC Signature Dale
V #NAME?
C„�r
Change Order 15
Date 16-Dec-2019
Garet Mclnroe
METCO Engineering Inc. co# 15
3333 Lee Parkway Suite 600 Project#COFW-GS-HVAC-2017
Dalias,TX 75219
Raret metcoengineerin .commetcoengineerin .com a
Gordon Swift HVAC Project
UT
+ b.
James Diestel FCU Casework Demo&Refinish
City of Fort Worth
401 West 13th Street +
Fort Worth,Texas 76102 Requested
James.Di estel�fortworthtexas�
Design Cost
FCU Casework Demo & Refinish - 6 ea $5,500.00
METCO Mark UP _ $550.00
Subtotal $6,050.00
Discount -
Tax Rate $0
Total $6,050.00
Garet Mclnroe 12/16/19
Signature Print Name Date
METCO Engineering
972.740,0361
www.metcoengineering.com
PO Box 1032
Waxahachie,Tx 75168
Prod usal' saidivarconstruction86@gmaiI.com
12/10/19 214-769-1941
Gordon Swift
900 Monroe St
Fort Worth, TX 76102
i -
Casework Demo at FCU locations
3 i
Refinish Area around FCU Locations and removed Casework
6 ea location. Work to be done after hours