Loading...
HomeMy WebLinkAboutOrdinance 6762 ORDINANCE NO. © `p ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF JAMAICA LINE AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH L, GRDMS CO.,INC. FOR THE CONSTRUCTION OF SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract with L. GRIIZS CO.. INC, , for the making and construction of certain street improvements on the hereinafter described portions of streets, avenues and public places in said City, to-wit: UNIT 1: JAMAICA LANE From Hampshire Boulevard to Panola Street, known and designated as Unit 1, Project No. 104-24000-219. UNIT 2: BRADL.EY STREET From Texas and Pacific Railroad to Hampshire Boulevard, known and designated as Unit 2, Project No. 104-24000-219. UNIT 3: CHAPMAN STREET From Edgewood Terrace to Amanda Street, known and designated as Unit 3, Project No. 104-24000-219. UNIT 4: SUNSHINE DRIVE From Edgewood Terrace to 582' east, known and designated as Unit 4, Project No. 104-24000-219. UNIT 5: SUNSHINE DRIVE From Langston Street to 543' west, known and designated as Unit 5, Project No. 104-24000-219. UNIT 6: EDGEWOOD TERRACE From 35' south of south line of Lot 1, Block 5, Fair Havens Addition to 28' north of north line of Lot 1, Mary A. Willig Subdivision, known and designated as Unit 6, Project No. 104-24000-219. WIMLTAS, by sundry proceedings heretofore passed by the City Council of the City of Fort Worth, Texas, including Ordinance No.6577 & 6580, a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and public places and against the real and true owners thereof; and, WH—AS, the City Council of the City of Fort Worth, Texas, has, upon re- view, found and determined that, in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance N0. 6577 & 6580 , and WHMEAS, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found t,o be in complete accordance with the contract therefor; NOW, TH7.-REFORE, BE IT ORIAAIH30 BY THE CITY COUNCIL OF TIE CITY OF FOFcT WORTH, TT,?RAS, THAT: I. The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; and the contract with re- ference thereto be, and it is hereby, found and declared fully completed and performed. I I. The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro- perty assessed and shall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on the respective certifi- cates, toF.ether with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows: zII. When each of the certifiactes has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copyinS the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the. appropriate Ordinance Records of said City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. ? PASSED AND APPROVED THIS �d day of r A 19� APPROVED AS TO FORM AND LEGALITY: City Attorney PROJECT NO, 104-24000-219, UNIT 1: JAMAICA LANE FROM HAMPSHIRE BOULEVARD TO PANOLA STREET, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide, and by constructing six- inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF HAMPSHIRE BOULEVARD AND JAMAICA LANE WEST SIDE OF STREET NORMANDY PLACE ADDITION W. H. Pursley, Sr. A 5 146.3' Frontage - Side Lot Credit 3429 Hampshire Blvd. Res. 100' Pavement $3.96 $396.00 76103 100' Curb & Gutter 2.54 254.00 93 Sq. Ft. Driveway .83 77.19 $ 727.19 T. J. Broxsom 0 5 147.8' Frontage - Side Lot Credit 3428 Hazeline Road Res. 100' Pavement $3.96 $396.00 76103 100' Curb & Gutter 2.54 254.00 $ 650.00 HAZELINE ROAD INTERSECTS Lucy M. Young 1 7 145' Frontage - Side Lot Credit 3425 Hazeline Road Res. 100' Pavement $3.96 $396.00 76103 100' Curb & Gutter 2.54 254.00 85 Sq. Ft. Driveway .83 70.55 $ 720.55 Charles P. Crocker 13 7 145' Frontage - Side Lot Credit 3424 Panola Res. 100' Pavement $3.96 $396.00 76103 100' Curb & Gutter 2.54 254.00 85 Sq. Ft. Driveway .83 70.55 $ 720.55 PANOLA STREET INTERSECTS EAST SIDE OF STREET Robert E. Green P 6 145' Frontage - Side Lot Credit 3500 Panola Res. 100' Pavement $3.96 $396.00 76103 100' Curb & Gutter 2.54 254.00 85 Sq. Ft. Driveway .83 70.55 $ 720.55 1 PROJECT NO, 104-24000-219, UNIT 1: JAMAICA LANE FROM HAMPSHIRE BOULEVARD TO PANOLA STREET - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET NORMANDY PLACE ADDITION Mrs. Jewell Godbey 13 6 145' Frontage - Side Lot Credit 3501 Hazeline Road Res. 100' Pavement $3.96 $396.00 76103 100' Curb & Gutter 2.54 254.00 $ 650.00 HAZELINE ROAD INTERSECTS Edith & Alice Bennett 26 4 145' Frontage - Side Lot Credit 3500 Hazeline Road Res. 100' Pavement $3.96 $396.00 76103 10' Curb & Gutter 2.54 25.40 $ 421.40 Frederick E. Leaman 13 4 150' Frontage - Side Lot Credit 3501 Hampshire Blvd. Res. 100' Pavement $3.96 $396.00 76103 100' Curb & Gutter 2.54 254.00 85 Sq. Ft. Driveway .83 70.55 $ 720.55 COST TO PROPERTY OWNERS - ASSESSMENTS . . . . . . . $ 5,330.79 COST TO THE CITY OF FORT WORTH . . . . . . . . . . 10j681.54 TOTAL ESTIMATED CONSTRUCTION COST, UNIT 1 $16,012.33 2 PROJECT NO. 104-24000-219, UNIT 2e BRADLEY STREET FROM TEXAS AND PACIFIC RAILROAD TO HAMPSHIRE BOULEVARD, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subg;rade, seven-inch high concrete curb and eighteen- inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RA`TE AMOUNT ASSESSMENT BEGINNING AT THE SOUTH LINE OF LOT 99 BLOCK 3, MURRAY HILL ADDITION WEST SIDE OF THE STREET MURRAY HILL ADDITION Charles R. Mulkey 9 3 6106° Frontage 3129 North Erie Res. 42' Pavement $3.96 $166.32 76112 42' Curb & Gutter 2.54 106.68 $ 273.00 J. Piner Powell 8 3 50° Frontage 500 University* Drive Res. 50' Pavement $3.96 $198.00 76107 50' Curb & Gutter 2.54 127.00 $ 325.00 Raymond C. Meals 7 3 50' Frontage 812 Bradley Street Res. 50' Pavement $3.96 $198.00 76103 50' Curb & Gutter 2.54 117.00 $ 325.00 Bobby J. Beesley 6 3 500 Frontage 808 Bradley Res. 50' Pavement $3.96 $198.00 76103 50' Curb & Gutter 2.54 127.00 $ 325.03 Clyde David Lockett 5 3 50' Frontage 804 Bradley Res. 50' Pavement $3.96 $198.00 76103 50' Curb & Gutter 2.54 127.00 $ 325.00 Mrs. Bo F. Gilbert 4 3 50' Fmntage 800 Bradley Res. 50' Pavement $3.96 $198.00 76103 .50' Curb & Gutter 2.54 127.00 $ 325.00 3 PROJECT NO. 104-24000-219, UNIT 20 BRADLEY STREET FRQM TEXAS AND PACIFIC RAILROAD TO HAMPSHIRE BOUIEVARD m CONTINUED BLOCK OWNER LOI ZONING FRONTAGE RATE AMOUNT ASSESSMENT — WEST SIDE OF THE STREET MURRAY HILL ADDITION B. F, Itschner 3 3 50' Frontage 621 Mooreside Rea, 50' Pavement $3.96 $198.00 Sang Antonio, Texas 50° Curb & Gutter 2.54 127.00 $ 325.00 B. F. Itschuer 2 3 50" Frontage 621 Mo®reside Res. 50' Pavement $3.96 $1.98.00 Saar An coBnio, Texas 50' Curb & Gutter 2.54 127.00 $ 325.00 Ba F. Itschnaer 1 3 50° Frontage 621 Mooreside Res, 50' Pavement $3.96 $198.00 Sag? Antonio, Texas 50' Curb & Gutter 2.54 127.00 $ 325.00 B. F. Itsc.hnner 50' strip 50' Adjusted to 621 Mcoreside North of Lot 1 26' Pavement $3.96 $102.96 Sanr. Antonio, Texas Block 3 261 Curb & Gutter 2�54 66�04 Res. $ 169.00 HAMPSHIRE BOULEVARD INTERSECTS EAST SIDE OF THE STREET HAMPSHIRE HEIGHTS ADDITION Arthur Ducarn Wilkerson 1 6 155' Frontage m Side Lot Credit 4300 Hampshire Blvd. Res. 100' Pavement $3.96 $396,00 76103 100' Curb & Gutter $2.54 $254.00 $ 650.00 Helen S. Rumph 17 6 50' Frontage 1411 Choctaw Res, 50' Pavement $3.96 $198.00 Temple, Texas 76501 50' Curb & Gutter 2�54 127.00 $ 325.00 W. J. Oliver 16 6 50' Frontage 809 Bradley Res. 50' Pavement $3.96 $198.00 76103 50' Curb & Gutter 2.54 127.00 $ 325.00 4 PROJECT NO, 104-24000-219, UNIT 2: BRADLEY STREET FROM TEXAS AND PACIFIC RAILROAD TO HAMPSHIRE BOULEVARD - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET HAMPSHIRE HEIGHTS ADDITION W. J. Oliver 15 6 50' Frontage 809 Bradley Res. 50' Pavement $3.96 $198.00 76103 50' Curb & Gutter 2.54 127.00 $ 325.00 E. V. Clower 14 6 50' Frontage 813 Bradley Res. 50' Pavement $3.96 $198.00 76103 50' Curb & Gutter 2.54 127.00 $ 325.00 E. V. Clower N. 25' of 6 25' Frontage 813 Bradley Lot 13 Res. 25' Pavement $3.96 $ 99.00 76103 25' Curb & Gutter 2.54 63.50 $ 162.50 J. B. McDonald S. 75.8' of 6 75.8' Adjusted to 817 Bradley Lot 13 Res. 62' Pavement $3.96 $245.52 76103 62' Curb & Gutter 2.54 157.48 $ 403.00 COST TO PROPERTY OWNERS - ASSESSMENTS . . . . . . . $ 5,557.50 COST TO THE CITY OF FORT WORTH . . . . . . . . . . 6,510.39 TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . $12,067.89 5 PROJECT NO. 104-24000-219, UNIT 3; CHAPMAN STREET FROM EDGEWOOD TERRACE TO AMANDA STREET, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide, and by constructing six- inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF EDGEWOOD TERRACE AND CHAPMAN STREET NORTH SIDE OF STREET W. R. HOWARD ADDITION Grant Peoples, Jr. 23 1 50' Adjusted to 2307 Maryland St. Res. 50' Pavement $3.93 $196.50 46407 45' Curb & Gutter 2.57 115.65 $ 312.15 Robert H. Watts 22 1 50' Pavement $3.93 $196.50 4703 Chapman Res. 50' Curb & Gutter 2.57 128.50 76105 15 Sq. Ft. Driveway .83 12.45 $ 337.45 Sherman King 21 1 50' Pavement $3.93 $196.50 4705 Chapman Res. 50' Curb & Gutter 2.57 128.50 76105 30 Sq. Ft. Driveway .83 24.90 $ 349.90 Mrs. Andrew Chapman 20 1 50' Pavement $3.93 $196.50 4707 Chapman Res. 50' Curb & Gutter 2.57 128.50 76105 30 Sq. Ft. Driveway .83 24.90 $ 349.90 Edward Masa 19 1 50' Pavement $3.93 $196.50 903 E. Rosedale Res. 50' Curb & Gutter 2.57 128.50 76104 30 Sq. Ft. Driveway .83 24.90 $ 349.90 Mrs. Will Harris 18 1 50' Pavement $3.93 $196.50 2004 Langston Street Res. 50' Curb & Gutter 2.57 128.50 76105 $ 325.00 6 PROJECT NO. 104-24000-219, UNIT 3: CHAPMAN STREET FROM EDGEWOOD TERRACE TO AMANDA STREET - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET W. R. HOWARD ADDITION Geraldine Martin 17 1 50' Pavement $3.93 $196.50 1317 E. Allen Res. 50' Curb & Gutter 2.57 128.50 76105 $ 325.00 Geraldine Martin 16 1 44' Pavement $3.93 $172.92 1317 E. Allen Res. 44' Curb & Gutter 2.57 113.08 76104 $ 286.00 Clifford McCoy 15 1 50' Pavement $3.93 $196.50 2001 Danner Res. 50' Curb & Gutter 2.57 128.50 76105 30 Sq. Ft. Driveway .83 24.90 $ 349.90 Irene Woods 14 1 50' Pavement $3.93 $196.50 4801 Ramey Res. 50' Curb & Gutter 2.57 128.50 76105 30 Sq. Ft. Driveway .83 24.90 $ 349.90 Willie Robinson 13 1 50' Pavement $3.93 $196.50 4763 Chapman Res. 50' Curb & Gutter 2.57 128.50 76105 30 Sq. Ft. Driveway .83 24.90 $ 349.90 Royal Tatnull 12 1 50' Pavement $3.93 $196.50 2037 Langston Res. 50' Curb & Gutter 2.57 128.50 76105 30 Sq. Ft. Driveway .83 24.90 $ 349.90 LANGSTON STREET INTERSECTS Willis Mays Lot 10 1 70' Pavement $3.93 $275.10 4511 Vinson St. & W. Res. 70' Curb & Gutter 2.57 179.90 76103 20' of $ 455.00 Lot 9 Sallie T. Jordan E. 30' 1 74' Pavement $3.93 $290.82 4712 Windowmere of Res. 63' Curb & Gutter 2.57 161.91 76105 Lot 9 30 Sq. Ft. Driveway .83 24.90 & all $ 477.63 of Lot 8 7 PROJECT NO, 104-24000-219, UNIT 3: CHAPMAN STREET FROM EDGEWOOD TERRACE TO AMANDA STREET - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET W. R. HOWARD ADDITION Lillie Allen Johnson 7 1 50' Pavement $3.93 $196.50 4801 Chapman Res. 50' Curb & Gutter 2.57 128.50 76105 30 Sq. Ft. Driveway .83 24.90 $ 349.90 Melvin Glover 6 1 50' Pavement $3.93 $196.50 6208 Truman Drive Res. 50' Curb & Gutter 2.57 128.50 76112 $ 325.00 Elmo Anderson 5 1 50' Pavement $3.93 $196.50 2004 Amanda Res. 50' Curb & Gutter 2.57 128.50 76105 30 Sq. Ft. Driveway .83 24.90 $ 349.90 Mary Ellison 4 1 50' Pavement $3.93 $196.50 4932 Chapman Res. 50' Curb & Gutter 2.57 128.50 76105 $ 325.00 J. A. Moreland 3 1 150' Pavement $5.37 $805.50 1930 Amanda Comm. 150' Curb & Gutter 2.57 385.50 76105 30 Sq. Ft. Driveway .83 24.90 $1,215.90 AMANDA STREET INTERSECTS SOUTH SIDE OF STREET Ed L. Pointer Estate 1 2 175' Pavement $5.37 $939.75 c/o Miss Stella Pointer Comm. 175' Curb & Gutter 2.57 449.75 2114 Langston 69 Sq. Ft. Driveway .83 57.27 76105 $1,446.77 Lillie Johnson 20 2 175' Side Lot Credit 2001 Danner Res. 100' Pavement $3.93 $393.00 76105 100' Curb & Gutter 2.57 257.00 $ 650.00 8 PROJECT NO. 104-24000-219, UNIT 3: CHAPMAN STREET FROM EDGEWOOD TERRACE TO AMANDA STREET - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT DANNER STREET INTERSECTS SOUTH SIDE OF STREET W. R. HOWARD ADDITION Clifford McCoy 1 5 175' Side Lot Credit 2001 Danner Res. 100' Pavement $3.93 $393.00 76105 100' Curb & Gutter 2.57 257.00 $ 650.00 Maxine Tisby 20 5 175' Side Lot Credit 2001 Langston Res. 100' Pavement $3.93 $393.00 76105 100' Curb & Gutter 2.57 257.00 $ 650.00 LANGSTON STREET INTERSECTS Hattie McMillian 1 6 175' Side Lot Credit 2000 Langston Street Res. 100' Pavement $3.93 $393.00 76105 100' Curb & Gutter 2.57 257.00 30 Sq. Ft. Driveway .83 24.90 $ 674.90 Charles Harris 20 6 175' Side Lot Credit 1425 West llth Res. 100' Pavement $3.93 $393.00 Port Arthur, Texas 100' Curb & Gutter 2.57 257.00 $ 650.00 COST TO PROPERTY OWNERS - ASSESSMENTS . . . . . . . $12,254.90 COST TO CITY OF FORT WORTH . . . . . . . . . . . . 13,207.11 TOTAL ESTIMATED CONSTRUCTION COST, UNIT 3 $25,462.01 9 PROJECT NO. 104-24000-219, UNIT 4: SUNSHINE DRIVE FROM EDGEWOOD TERRACE TO 582 FEET EAST, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide, and by constructing six- inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF EDGEWOOD TERRACE AND SUNSHINE DRIVE NORTH SIDE OF STREET TKACZ ADDITION Westex Land Co., Inc. 9 140.1' P.O. Box 16050 Res. 140.1' Curb & Gutter $2.57 $360.06 76133 $ 360.06 Westex Land Co., Inc. 10 106.5' Pavement $3.93 $418.55 P.O. Box 16050 Res. 106.5' Curb & Gutter 2.57 273.71 76133 $ 692.26 SUNSHINE COURT INTERSECTS Westex Land Co., Inc. 11 125' Pavement $3.93 $491.25 P.O. Box 16050 Res. 125' Curb & Gutter 2.57 321.25 76133 $ 812.50 Aaron Robinson, Jr. 12 140' Adjusted to c/o Katherine Jennings Res. 105' Pavement $3.93 $412.65 2409 Rattikin Road 105' Curb & Gutter 2.57 269.85 76105 30 Sq. Ft. Driveway .83 24.90 $ 707.40 CUL-DE-SAC SOUTH SIDE OF STREET Aaron Robinson, Jr. 21 125' Adjusted to c/o Katherine Jennings Res. 105' Pavement $3.93 $412.15 2409 Rattikin Road 105' Curb & Gutter 2.57 269.85 76105 $ 682.50 10 PROJECT NO, 104-24000-219, UNIT 4: SUNSHINE DRIVE FROM EDGEWOOD TERRACE TO 582 FEET EAST, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET TKACZ ADDITION Jeff Wood 22 140' Pavement $3.93 $550.20 1130 E. Hattie Res. 140' Curb & Gutter 2.57 359.80 76104 $ 910.00 Bertie Mae Robinson 23 140' Pavement $3.93 $550.20 2705 S. Edgewood Terrace Res. 140' Curb & Gutter 2.57 359.80 76105 30 Sq. Ft. Driveway .83 24.90 $ 934.90 Charles E. Woodson 24-A 141.9' Side Lot 1921 Melissa Street Res. 30 Sq. Ft. Driveway $ .83 $ 24.90 Arlington, Texas $ 24.90 76011 COST TO PROPERTY OWNERS - ASSESSMENTS . . . . . . . $ 5,124.52 COST TO CITY OF FORT WORTH . . . . . . . . . . . . . 7,594.98 TOTAL ESTIMATED CONSTRUCTION COST, UNIT 4 . . . $12,719.50 11 PROJECT NO. 104-24000-219, UNIT 5; SUNSHINE DRIVE FROM LANGSTON STREET TO 543 FEET WEST, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHEAST CORNER OF LANGSTON STREET AND SUNSHINE DRIVE SOUTH SIDE OF STREET TKACZ ADDITION Violet Jones A-1 140' Side Lot Credit 2600 Langston Res. 100' Pavement $3.93 $393.00 76105 100' Curb & Gutter 2.57 257.00 $ 650.00 Arthur N. Johnson W. 90' 140' Pavement $3.93 $550.20 4712 Sunshine & E. Res. 140' Curb & Gutter 2.57 359.80 76105 50' of 60 Sq. Ft. Driveway .83 49.80 Lot 18 $ 959.80 Betty M. Baker 19-B 50' Pavement $3.93 $196.50 4708 Sunshine Res. 50' Curb & Gutter 2.57 128.50 76105 30 Sq. Ft. Driveway .83 24.90 $ 349.90 Elijah Holt 19-A 90' Pavement $3.93 $353.70 4704 Sunshine Res. 90' Curb & Gutter 2.57 231.30 76105 30 Sq. Ft. Driveway .83 24.90 $ 609.90 Mrs. Aaron Robinson 20 140' Adjusted to c/o Katherine Jennings Res. 98' Pavement $3.93 $385.14 2409 Rattikin Road 98' Curb & Gutter 2.57 251.86 76105 30 Sq. Ft. Driveway .83 24.90 $ 661.90 12 PROJECT NO, 104-24000-219, UNIT 5: SUNSHINE DRIVE FROM LANGSTON STREET TO 543 FEET WEST, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT CUL-DE-SAC NORTH SIDE OF STREET TKACZ ADDITION Aaron Robinson, Jr. 13 140' Adjusted to c/o Katherine Jennings Res. 105' Pavement $3.93 $412.65 2409 Rattikin Road 105' Curb & Gutter 2.57 269.85 76105 30 Sq. Ft. Driveway .83 24.90 $ 707.40 SHERATON SUBDIVISION Westex Land Co., Inc. 10 2 115' Side Lot Credit P.O. Box 16050 Res. 100' Pavement $3.93 $393.00 76133 100' Curb & Gutter 2.57 257.00 $ 650.00 SHERATON DRIVE INTERSECTS Westex Land Co., Inc. 10 1 114' Side Lot Credit P.O. Box 16050 Res. 100' Pavement $3.93 $393.00 76133 100' Curb & Gutter 2.57 257.00 $ 650.00 TKACZ ADDITION Calvin Baker S. 100' 140' Side Lot Credit 2428 Langston of Lot Res. 100' Pavement $3.93 $393.00 76105 16 100' Curb & Gutter 2.57 257.00 30 Sq. Ft. Driveway .83 24.90 $ 674.90 COST TO PROPERTY OWNERS - ASSESSMENTS . . . . . . . $ 5,913.80 COST TO CITY OF FORT WORTH . . . . . . . . . . . . 6,988.85 TOTAL ESTIMATED CONSTRUCTION COST, UNIT 5 . . . . . . $12,902.65 13 r PROJECT NO, 104-24000-219, UNIT 6a EDGEWOOD TERRACE FROM 35 FEET SOUTH OF THE SOUTH LINE OF I,CT I BBLOCIK 5, FAIR HAVENS ADDITION TO 28 FEET NORTH OF THE NORTH LINE OF LOT 1A MARY A, WILLIG SUBDIVISION, to be improved with six-inch thick hot-mix asphaltic concrete pave- ment on�a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide, and by constructing six-inch thick concrete driveways where specified, BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTH PROPERTY LINE OF LOT 1, BLOCK 5, FAIR HAVENS ADDITION WEST SIDE OF STREET FAIR HAVENS ADDITION Roosevelt Jackson 1 5 120' Pavement $3.93 $471.60 4000 S. Edgewood Res 120' Curb & Gutter 2057 308.40 76119 118 Sq� Ft, Drive 83 97.94 $877.94 Roosevelt Jackson 2 5 60' Pavement $3,93 $235�80 4000 S. Edgewood Res, 60' Curb & Gutter 2057 154a20 76119 $390,00 MARY A WILLIG SUBDIVISION Mary A. Willig 2 50' Pavement $3,93 $196..50 3825 Westcliff Rd, South Res, 50' Curb & Gutter 2,57 128050 76109 118 Sq, Ft, Drive a83 97094 $422.94 Mary Ao Willig 1 50' Pavement $3093 $196.50 3825 Westcliff Rd, South Res, 50' Curb & Gutter 2,57 128.50 76109 118 Sq, Ft, Drive o83 97�94 $422094 STATION 234-68 EAST SIDE OF STREET HOMEACRES ADDITION Poly Church of Christ 4 1 100' Existing Facilities 3501 Avenue I Res, No Assessment 761.05 14 PROJECT NO, 104-24000-219, UNIT 6: EDGEWOOD TERRACE FROM 35 FEET SOUTH OF THE SOUTH LINE OF LOT 1, BLOCK 5. FAIR HAVENS ADDITION TO 28 FEET NORTH OF THE NORTH LINE OF LOT 1, MARY A. WILLIG SUBDIVISION, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET HOMEACRES ADDITION L. B. Woods 5 1 100' Pavement $3.93 $393.00 4009 S. Edgewood Terrace Res. 100' Curb & Gutter 2.57 257.00 76119 237 Sq. Ft. Driveway .83 196.71 $ 846.71 Connie Scott 6 1 100' Pavement $3.93 $393.00 4017 S. Edgewood Terrace Res. 100' Curb & Gutter 2.57 257.00 76119 118 Sq. Ft. Driveway .83 97.94 $ 747.94 T. V. Martin N. 75' 1 75' Pavement $3.93 $294.75 4025 S. Edgewood Terrace of Lot Res. 75' Curb & Gutter 2.57 192.75 76119 7 118 Sq. Ft. Driveway .83 97.94 $ 585.44 COST TO PROPERTY OWNERS - ASSESSMENTS . . . . . . . . $4,293.91 COST TO CITY OF FORT WORTH . . . . . . . . . . . . . 2,274.68 TOTAL ESTIMATED CONSTRUCTION COST, UNIT 6 . . . . . 6 568.59 15 City of Fort Worth, Texas Mayor and Council Communication DATE REFERENCE SUBJECT: Final Payment - Assessment Pav- PAGE NUMBER ing at Six Locations on the East 11/13/72 FP-914 Side i or 2 Final Council action on the project described below is requested. -- Project Description Name: Assessment Paving at 6 Locations on the East Side, Proj. No. 104-24000-219 Contractor: L. Grimes and Co.., Inc. Contract Awarded: September 27, 1971 (M&C C-2084) Work Order Issued: April 10, 1972 Work Order Effective: April 20, 1972 Work Began: April 19, 1972 Date of Final Inspection and Approval: September 19, 1972 Working Time Bid: 125 Working Days Working Time Used: 82 Working Days Project Cost and Financing Original Bid Price: $85,199.55 Final Contract Cost: $77,939.06 Partial Payments Previously Made: 6, Amount: $70,145.15 Final Payment Due: $7,793.91 Final Payment to be made from Project Number 104-24000-219. A bond fund transfer is needed in the amount of $99.60 for property owners share of con- struction cost. Deviation from Bid Price: The final contract cost of this project is $7,260.49 under the bid price. A major portion of the savings, $2,817.31, resulted because it was not necessary to adjust as many utilities as antici- pated and a savings of $3,781.05 was realized° because 6" metal pipe subdrain was found to be unnecessary on five of the units. The remaining cost dif- ference, $662.13, is attributed to minor variations between quantities esti- mated in the contract documents and quantities measured and used at the job site. Compliance with Specifications Tests made during construction show that materials used and required thicknes- ses were in compliance with contract specifications. Recommendations It is recommended that 1) A bond fund transfer be approved in the amount of $99.60 from account number 042-09724-901, Revolving Fund Unspecified, to account number 042-10424-219, Assessment Paving at Six Locations East Side Revolving Fund to provide additional funds needed, and, DATE REFERENCE NUMBER suEuEcT. Final Payment - Assessment Pav- PAGE 11/13/72 ing at Six Locations on the Eas FP-914 d 2 0� z 2) That the project described be accepted by the adoption of an ordi- nance and that final payment of $7,793.91 be authorized to L. Grimes and Co. , Inc. RNL:syc SUBMITTED BY: DISPOSITION BY COUNCIL: PROCESSED BY e'APPROVED ❑ OTHER (DESCRIBE) 1d A 7� Z 4dSECR 1 DATE/ CITY MANAGER