Loading...
HomeMy WebLinkAboutContract 35551-A4r AMENDMENT NO. 4 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. JSS� v, 9 (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Dannenbaum Engineering Corporation, (Engineer) made and entered into City Secretary Contract No. 35551, (the Contract) which was authorized by the City Council by M&C C-22178 on the 12th day of June 2007, and WHEREAS, the Contract involves engineering services for the following project: Storm Water Utility Project - Linda Lane Dottie Lynn Parkway Culvert Improvements, Drainage Improvements, Project No. 00474; Drainage Improvements, and Oakridge Terrace WHEREAS, it has become necessary to execute Amendment No. 4 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated May 31, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $2,645.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work ruL- vices shall not exceed the sum of $196,257.00. City of Fort Worth, Texas Amendment to Engineering Agreement PMO Official Release Date: 10.01.2010 Page 1 of 2 OFFICIAL RECOR CITY SECiRETAR� s'fu WORTK TX 3. All other provisions of the Contract and previously approved amendments which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the �f Tarrant County, Texas. ATT �lart`y Hendrix City Secretary APPROVAL RECOMMENDED: .s� day of DouglasGW. Wiersig, P.E V- Director, Transportation and Public Works Dannenbaum Engineering Corporation ENGINEER By: APPROVED: 2011, in Fort Worth, Fernando Costa Assistant City Manager Name: Wayne G. Ahrens, P.E. Principal 6401 Camp Bowie Blvd., Suite 400 Fort Worth, Texas 76116-5421 AS TO FORM AND LEGALITY: Assistant City Attorney G' rw MOM- t 1J'9 City of Fort Worth, Texas Amendment to Engineering Agreement PMO Official Release Date: 6.18.2010 Page 2 of 2 DANNENBAUM ENGINEERING COMPANY = FT. WORTH LLC 6421 CAMP BOWIE BLVD,, SUITE 400 Ff, WORTH, TEXAS 76116 (817) 763-8883 May 31, 2011 Mr. Michael Owen, P.E. City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102-6311 RE: 4278-32; COFW Storm Water Utility Project Linda Lane & Oakridge Terrace Drainage Improvements Supplemental Agreement No. 4 City Project No. 00474 Mr. Owen: We were requested to perform services outside of the above referenced project scope including, preparing project proposal using Bid Builder software; uploading contract documents onto Buzzsaw; and maintaining plan holders list and plans distribution during bidding process. The fees summary for this additional work is as follows: Buzzsaw Upload/Bid Builder 1,735.00 Plans Distribution/Plan Holders List 910.00 Total Supplemental Agreement No. 4 $ 2,645.00 If you are in agreement with this Supplemental Agreement Number 4, our authorized compensation will increase by $2,645.00, for a total of $ I ",257.00. A further summary of contract amendments is shown below: Original Contract Amount: $ 97,138.00 Amendment U. 1 19,601.00 Amendment No. 2 139308.00 Amendment No. 3 63,565.00 Amendment No. 4 2,645.00 Revised Contract Amount $ 1965257.00 Please do not hesitate to call if you have any questions or require any additional information. Sincerely, is Caldwell, P.E. xc: Ms. Linda Young, P.E. G:\1210\4278-32\Adnlin\Agreement\SA#4\Letter Olden 2010-5-31.docs