HomeMy WebLinkAboutContract 35551-A4r
AMENDMENT NO. 4
STATE OF TEXAS S CITY SECRETARY CONTRACT NO. JSS� v, 9
(No M&C Needed)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and Dannenbaum
Engineering Corporation, (Engineer) made and entered into City
Secretary Contract No. 35551, (the Contract) which was authorized
by the City Council by M&C C-22178 on the 12th day of June 2007,
and
WHEREAS, the Contract involves engineering services for the
following project:
Storm Water Utility Project - Linda Lane
Dottie Lynn Parkway Culvert Improvements,
Drainage Improvements, Project No. 00474;
Drainage
Improvements,
and Oakridge Terrace
WHEREAS, it has become necessary to execute Amendment No. 4
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated May 31, 2011, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $2,645.00.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work ruL- vices shall not
exceed the sum of $196,257.00.
City of Fort Worth, Texas
Amendment to Engineering Agreement
PMO Official Release Date: 10.01.2010
Page 1 of 2
OFFICIAL RECOR
CITY SECiRETAR�
s'fu WORTK TX
3.
All other provisions of the Contract and previously approved
amendments which are not expressly amended herein shall remain in full
force and effect.
EXECUTED on this the �f
Tarrant County, Texas.
ATT
�lart`y Hendrix
City Secretary
APPROVAL RECOMMENDED:
.s�
day of
DouglasGW. Wiersig, P.E V- Director,
Transportation and Public Works
Dannenbaum Engineering Corporation
ENGINEER
By:
APPROVED:
2011, in Fort Worth,
Fernando Costa
Assistant City Manager
Name: Wayne G. Ahrens, P.E.
Principal
6401 Camp Bowie Blvd., Suite 400
Fort Worth, Texas 76116-5421
AS TO FORM AND LEGALITY:
Assistant City Attorney
G' rw MOM- t 1J'9
City of Fort Worth, Texas
Amendment to Engineering Agreement
PMO Official Release Date: 6.18.2010
Page 2 of 2
DANNENBAUM ENGINEERING COMPANY = FT. WORTH LLC
6421 CAMP BOWIE BLVD,, SUITE 400 Ff, WORTH, TEXAS 76116 (817) 763-8883
May 31, 2011
Mr. Michael Owen, P.E.
City of Fort Worth
1000 Throckmorton Street
Fort Worth, Texas 76102-6311
RE: 4278-32; COFW Storm Water Utility Project
Linda Lane & Oakridge Terrace Drainage Improvements
Supplemental Agreement No. 4
City Project No. 00474
Mr. Owen:
We were requested to perform services outside of the above referenced project scope
including, preparing project proposal using Bid Builder software; uploading contract
documents onto Buzzsaw; and maintaining plan holders list and plans distribution during
bidding process.
The fees summary for this additional work is as follows:
Buzzsaw Upload/Bid Builder 1,735.00
Plans Distribution/Plan Holders List 910.00
Total Supplemental Agreement No. 4 $ 2,645.00
If you are in agreement with this Supplemental Agreement Number 4, our authorized
compensation will increase by $2,645.00, for a total of $ I ",257.00. A further summary
of contract amendments is shown below:
Original Contract Amount: $ 97,138.00
Amendment U. 1 19,601.00
Amendment No. 2 139308.00
Amendment No. 3 63,565.00
Amendment No. 4 2,645.00
Revised Contract Amount $ 1965257.00
Please do not hesitate to call if you have any questions or require any additional
information.
Sincerely,
is Caldwell, P.E.
xc: Ms. Linda Young, P.E.
G:\1210\4278-32\Adnlin\Agreement\SA#4\Letter Olden 2010-5-31.docs