Loading...
HomeMy WebLinkAboutContract 53429 CITY SECRETARY C'-,MACT NO. Received Date: Received Time: Developer and Project Information Cover Sheet: Developer Company Name: Crowley ISD Address, State,Zip Code: 512 Peach St.,Crowley, Texas 76036 Phone& Email: 817.297.5389 1 randy.reaves@crowley.kl2.tx.us Authorized Signatory, Title: Randy Reaves, Executive Director of Operations Project Name: Crowley ISD Career and Technology Education Center Brief Description: Water, Sewer, Paving, and Storm Drain Project Location: 1900 Longhorn TR Plat Case Number: FS-18-211 Plat Name: Crowley CTE Addition Mapsco: 1 17K— 1 17P Council District: 6 CFA Number: CFA 19-0016 City Project Number: 101964 For CFA Of Use Only: Received bv: R Dale: ' fp s`.ECEIVED JAN 2 3 2020 �,q CITYOFFOTWOR CITYSE,CRE* City of Fort Worth,Texas " Governmental Entity/ISD Community Facilities Agreement ®FFIC9AL ERE OW, CFA Official Release Date:09.22.2016 CITY SECRETARY' Page 1 of 11 FT 'WORTH, TX GOVERNMENTAL ENTITY/ISD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, the undersigned Governmental Entity, Crowley ISD, ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Crowley ISD Career and Technology Education Center ("Project") within the City of Fort Worth, Texas ('City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement(`CFA" or"Agreement") in connection with the Improvements and the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy or by providing written certification from the Developer's Chief Financial Officer(or equivalent position regardless of title)that the Developer(Crowley ISD) has appropriated sufficient funds to pay its contractor for all work to be performed under this Agreement. Developer recognizes that there shall be no reduction in the any financial security held by the City until the Project has been completed City of Fort Worth,Texas Governmental Entity/ISD Community Facilities Agreement CFA Official Release Date:09 22.2016 Page 2 of l l and the City has officially accepted the Improvements. Developer further acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally,the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer(A-1) ®, Paving (B) ®, Storm Drain (13-1) ®, Street Lights& Signs (C). E. If there is City financial participation in the Project, the Developer shall award all contracts for the construction of the Improvements in accordance with Section 11, paragraph 7 of the Policy, subject to any limitations in Texas Local Government Code Chapter 212, Subchapter, or under statutes governing Developer's award of public works contracts. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section 11, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent(100%)of the contract price of the Improvements valid for a period of two(2)years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before City of Fort Worth,Texas Governmental Entity/ISD Community Facilities Agreement CFA Official Release Date:09.22.2016 Page 3 of 11 work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain,or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Governmental Entity/ISD Community Facilities Agreement CFA Official Release Date:09.22 2016 Page 4 of l l J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify,and hold harmless the City for any losses,damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner,free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer City of Fort Worth,Texas Governmental Entity/ISD Community Facilities Agreement CFA Official Release Date:09.22.2016 Page 5 of 11 with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%)for a total of 4%of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%)and material testing fees equal to two percent(2%)for a total of 6%of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2)years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the City of Fort Worth,Texas Governmental Entity/ISD Community Facilities Agreement CFA Official Release Date:09.22.2016 Page 6 of 11 Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it:(l)does not boycott Israel;and (2)will not boycott Israel during the term of the contract. The terms"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2)will not boycott Israel during the term of the contract. IMMIGRATION AND NATIONALITY ACT R. Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Governmental Entity/ISD Community Facilities Agreement CFA Official Release Date:09.22.2016 Page 7 of l l Cost Summary Sheet Project Name: Crowley ISD Career and Technology Education Center CFA No.: CFA19-0016 IPRC No.: IPRC18-0123 City Project No.: 101964 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 141,165.89 2.Sewer Construction $ 37,572.50 Water and Sewer Construction Total $ 178,738.39 B. TPW Construction 1.Street $ 445,653 93 2.Storm Drain $ 1.424.438.10 3.Street Lights Installed by Developer $ - TPW Construction Cost Total $ 1,870,092.03 Total Construction Cost(excluding the fees): $ 2,048,830.42 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 3,574.77 D. Water/Sewer Material Testing Fee(2%) $ 3,574.77 Sub-Total for Water Construction Fees $ 7,149.54 E. TPW Inspection Fee(4%) $ 74,803.68 F. TPW Material Testing(2%) $ 37,401.84 G. Street Light Inspsection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 112,205.52 Total Construction Fees: $ 119,355.06 Choice Financial Guarantee O bons,choose one Amount Mark one' Bond=100% $ 2,048,830.42 Completion Agreement=100%/Holds Plat $ 2,048,830.42 Cash Escrow Water/Sanitary Sewer=125% $ 223,422.99 Cash Escrow Paving/Storm Drain=125% $ 2,337,615.04 Letter of Credit=125%w/2 r expiration period I $ 2,561,038.03 Statement of Appropriated Funding For Governmental EntitYIISDs ONLY) X City of Fort Worth,Texas Governmental Entity/ISD Community Facilities Agreement CFA Official Release Date:09 22.2016 Page 8 of 11 ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER CROWLEY ISD Dana Burghdoff Randy eaves Interim Assistant City Manager Executive Director of Operations Date: ��2Z�2� Date: //— 7 Zd/ I ATTEST: (Only if required by Developer) Recommended by: elyn "Verts/Jenriffer Ezemack Signature Project Assistant Name: Planning and Development ATTEST: : F0kT . Approved as to Form & Legality: C� 1` ary J. Ka r U •• ........ City Secreta yet"":ca.�f Ric and A. McCracken Assistant City Attorney Contract Compliance Manager: M&C No. ri By signing, I acknowledge that I am the Date: person responsible for the monitoring and administration of this contract. including ensuring all performance and reporting requirements. i ame: Janie S. Morales Title: Development Manager City of Fort Worth,Texas Governmental Entity/ISD Community Facilities Agreement OFFUAL REC;f�F3 CFA Official Release Date:09.22 2016 RY Page 9 of It �� �� C WORT H,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A: Water Improvements ® Water Cost Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ® Exhibit 13: Paving Improvements ® Paving Cost Estimate ® Exhibit 13-1: Storm Drain Improvements ® Storm Drain Cost Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Governmental Entity/ISD Community Facilities Agreement CFA Official Release Date:09.22.2016 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Governmental Entity/ISD Community Facilities Agreement City Project No. 101964 None. City of Fort Worth,Texas Governmental Entity/ISD Community Facilities Agreement CFA Official Release Date:09.22.2016 Page 11 of 11 004243 DAP-BID PROPOSAL Page I of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal -T Bidlist Description Specification Section No. Unit of Bid Unit Price Bid Value Item No. Measure Quantity UNIT I:WATER IMPROVEMENTS 1 0241.1118 4"-12"Pressure Plug 0241 14 EA 1 $3,015.00 $3,015.00 2 3305.0005 12"Waterline Lowering 3305 12 EA 1 $4,685.00 $4,685.00 3 3305.0109 Trench Safety 3305 10 LF 950 $0.50 $475.00 4 3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 TON 2 $4,678.00 $9,356.00 5 3311.0161 6"PVC Water Pipe 33 11 12 LF 80 $30.13 $2,410.40 6 3311.0457 12"DIP Water,CLSM Backfill 33 11 10 LF 115 $69.00 $7,935.00 7 3311.0461 12"PVC Water Pipe 3311 12 LF 835 $44.04 $36,773.40 8 3312.0001 Fire Hydrant 33 1240 EA 4 $4,175.00 $16,700.00 9 3312.2203 2"Water Service 33 12 10 EA 2 $2,995.00 $5,990.00 10 3312.2803 6"Water Meter and Vault 33 12 11 EA 1 $12,171.11 $12,171.11 11 13312.3002 6"Gate Valve 33 12 20 EA 4 $1,546.94 $6,187.76 12 3312.3003 8"Gate Valve 33 1220 EA 1 $2,142.22 $2,142.22 13 3312.3005 12"Gate Valve 33 12 20 EA 1 $3,060.00 $3,060.00 14 3312.4313 36"x12"Tapping Sleeve&Valve 33 12 25 EA 1 $30,265.00 $30,265.00 TOTAL UNIT I:WATER IMPROVEMENTS $141.165.89 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Fomi Version Febroary 16,2018 00 42 43_Bid Proposal_DAP_TNP Bid Form_SFI.xls 00 42 43 DAP-BID PROPOSAL Page 2 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bmdlist Description Specification Section No. Unit of Q Bid Unit Price Bid Value Item No. Measure UNIT II:SANITARY SEWER IMPROVEMENTS 1 0241.2014 Remove 10"Sewer Line 0241 14 LF 5 $15.00 $75.00 2 3231.0113 6'Chain Link,Steel 3231 13 LF 116 $4.50 $522.00 _ .__....._._ _....... .........._. __ . ... .........._... _...__ ._.._ _..... 3 3231.0302 6'Gate,Steel 3231 26 EA 2 $250.00 $500.00 4 3301.0002 Post-CCTV Inspection 3301 31 LF 46 $13.00 $598.00 5 3301.0101 Manhole Vacuum Testing 33 01 30 EA 2 $450.00 $900.00 ........ ........ ......... _... ..... 6 3305.0112 Concrete Collar 33 05 17 EA 1 $3,288.00 $3,288.00 7 3305.0113 Trench Water Stops 33 05 15 EA 1 $2,407.50 $-2,407.50 8 3305.1103 20"Casing By Other Than Open Cut 33 05 22 LF 46 $465.00 $21,390.00 .... ...... __......... ____.... ._......... _... .. .--- . _. 33 11 10 ... .......__...__..._ 9 3331.4201 10"Sewer Pipe 33 31 12 LF 46 $43.00 $1,978.00 3331 20 10 3339.1001 4'Manhole ..._. 33 39 1033 39 20 _ EA 1 $3,982.00 $3,982.00 33 39 10 11 3339.1003 4'Extra Depth Manhole _____33 39 20 VF 5.6 $345.00 $1,932.00 TOTAL UNIT 11.SANITARY SEWER IMPROVEMENTS $37,572.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECQ7CA77ON DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Vcnion Febmery 16,2018 00 42 43_Bid Proposal_DAP_TNP Bid Forr_SFl.xls 00 42 43 DAP-BID PROPOSAL Page 3 or 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Description Specification Section No. Unit of Query Unit Price Bid Value Item No. Measure UNIT III:DRAINAGE IMPROVEMENTS 1 0241.4401 Remove Headwall/SET 0241 14 EA 1 $1,000.00 $1,000.00 2 3123 0101 Unclassified Excavation by Plan 31 23 16 LS 1 $15,000.00 $15,000.00 _ ....... ......_.... ......... 3 3125.0101 SWPPP 2 1 acre 31 25 00 LS 1 $5,000.00 $5,000.00 _. 4 3137 0104 Medium Stone Rlprap dry 31 3700 SY 370 $28 00 $10 360 00 5 3137.0110 Special Riprap(Concrete Flume) 31 3700 SY 3605 $18.00 $64,890.00 .. 6 3292.0400 Seeding,Hydromulch 3291 13 LS 1 $15,000.00 $15,000.00 7 3305.0109 Trench Safety 33 05 10 LF 431 $0.50 $215.50 8 3305 0112 Concrete Collar 33 05 17 EA 1 $3,684.00 $3,684.00 9 3341.0205 24"RCP,Class Ill 33 41 10 LF 120 $92.88 $11,145.60 10 3341.1302 6x3 Box Culvert 33 41 10 LF 86 $320.60 $27,571.60 11 3341.2002 10x5 Box Culvert 33 41 10 LF 1135 $635.50 $721,292.50 12 3349.5001 10'Curb Inlet 33 49 20 EA 2 $.5,642.0.0 $11,284.00 13 0169 6005 Soil Retention Blankets(CL 2)(TY E) TxDOT Item 169 SY_ 2695 $20.11 $54,196.45 14 0450 6042 Rail(TY PR 1) TxDOT Item 450 LF 727 $71.35 $51,871.45 15 0466 6194 Wingwall PW 2 HW 5FT TxDOT Item 466 EA 6 $69 847 00 $419 082 00 16 0467 6006 SET(TY I)(24 IN)(4 1)(C) TxDOT Item 467 EA 2 $3 600.00 $7 200.00 17 0467 6205 SET(TY p(S 6 FT)(HW-3 FT)(4 1)(C) TxDOT Item 467 EA 1 $5,645.00 $5,645.00 TOTAL UNIT Ill:DRAINAGE IMPROVEMENTS $1,424,438.10 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECQ7CATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Fame Vasion Febmery 16,2019 00 42 43_Bid Proposal DAP_TNP Bid Form_SFI.xIs 00 42 43 DAP-BID PROPOSAL Page 4 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Description Specification Section No. Unit of Bid Unit Price Bid Value Item No. Measure Quantity UNIT IV:PAVING IMPROVEMENTS 1 0241.0401 Remove Concrete Drive 0241 13 SF 675 $5.19 $3,503.25 2... 0241.0500 Remove Fence 0241 13 LF 1844 $1.07 $1,973.08 3 0241.1100 Remove Asphalt Pvmt 0241 15 SY 4162 $5.93 $24,680.66 4 3211.0400 Hydrated Lime 32 11 29 TON 141 $77.08 $10,868.28 5 3211.0502 8"Lime Treatment 32 11 29 SY 6520 $2.28 $14,865.60 6 3212.0302 2"Asphalt Pvmt Type D 33 12 16 SY 680 $16.75 $11,390.00 7 3212.0504 7"Asphalt Base Type B 32 12 16 SY 680 $56.50 $38,420.00 8 3213.0103 8"Conc Pvmt 32 13 13 SY 5545 $44.75 $248,138.75 9 3213.0302 4"Conc Sidewalk 32 1320 SF 8741 $4.36 $38,110.76 10 3213.0401 6"Concrete Driveway 32 1320 SF 675 $4.09 $2,760.75 11 3217.0001 4"SLD Pvmt Marking HAS(UV) 32 1723 LF 1788 $5.42 $9,690.96 12 3217.0002 4"SLD Pvmt Marking HAS(Y) 32 1723 LF 4280 $2.68 $11,470.40 13 3217.0005 4"DOT Pvmt Marking HAS(W) 32 1723 LF 2338 $2.88 $6,733.44 14 3217.0202 8"SLD Pvmt Marking HAS(Y) 33 17 23 LF 186 $6.00 $1,080.00 15 3217.0501 24"SLD Pvmt Marking HAE(W) 34 17 23 LF 39 $18.00 $702.00 16 3217.2102 REFL Raised Marker TY I-C 32 1723 LF 120 $7.00 $840.00 17 13217.2103 REFL Raised Marker TY II-A-A 32 1723 LF 68 $7.00 $476.00 18 3441.4002 Furnish/install Alum Sign Ground Mount 3441 30 EA 9 $750.00 $6,750.00 TxDOT Std. 19 3441.4108 Remove Sign Panel and Post 3441 30 EA 2 $250.00 $500.00 20 3441.4110 Remove and Reinstall Sign Panel and Post 3441 30 EA 2 $350.00 $700.00 21 3471.0001 Traffic Control 3471 13 LS 1 $12,000.00 $12,000.00 TOTAL UNIT IV:PAVING IMPROVEMENTS $445,653.93 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Fomi Version Feb-y 16,2018 00 42 43_Bid Proposal_DAP_TNP Bid Fonn_SFI.xls 00 42 43 DAP-BID PROPOSAL Page 5 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlis[ Description Specification Section No. Unit of Bid Unit Price Bid Value Item No. Measure Quantity CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Forni Version February 16,2018 00 42 43_Bid Proposal DAP_TNP Bid Forn_SFI.xls 00 421s DAP-BID PROPOSAL Page 6 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Description Specification Section No. Unit of Bid Unit Price Bid Value Item No. Measure Quantity CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Forui Version February 16,2019 00 42 43_Bid Proposal_DAP_TNP Bid Fonn_SFl.xls uo 4243 DAP-BID PROPOSAL Page 7 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bldllst Description Specification Section No. Unit of Bid Unit Price Bid Value Item No. Measure Quantity Bid Summary UNIT I:WATER IMPROVEMENTS $141,165.89 UNIT II:SANITARY SEWER IMPROVEMENTS $37,572.50 UNIT III:DRAINAGE IMPROVEMENTS _ $1,424,438.10 UNIT IV:PAVING IMPROVEMENTS $445,653.93 UNIT Vi STREET LIGHTING IMPROVEMENTS Total Construction Bid $2,048,830.42 This Bid is submitted by the entity named below: BIDDER: BY: ,131'C(I dO1 z, Sttele&Freeman,Inc. 1301 I,m,on Road Fart%)rtlr,"CX 76131 TITLE: 4enior Project NIauagtr DATE: 06!25^0111 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 240 calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS F.—Version Feb—, 16,2018 00 42 43_Bid Proposal_DAP_TNP Bid Form_SFI xls . . . .. . . . . . . . . .. . . .. . . . . . . . . . . .. .. .. . . . . . . . . .. .. . . . . . . . . .. .. .. .. .. .. . . . . . . .. . . .. .. . . . . .. .. . . .. . . . . . . . . . . .. . . . . ...... .. .. .... .. . i-( — I ( f1 ,, y0 i O r _ i r W RISI_NGER.! j . p...� ,,; � c4,.. �; � I w N CROWLEY CLEBURNE fI y 4 � W REBURj J Z F—: L� a�U 1 , Ld Q — — m t W CLEBURNE x !. I R LONGHORN i - r ` a-- PROJECT LOCATION FM 1187 ............I T Mapsco No. 1 17-K/1 17-P . . . .... . . .. .. .. . . .. .. . . . . . . .. . . . . . . . . . . . . . . ... . . . . . . . . . . .. . . . . . . . . . . . .. .. .... .. . . . . .. .. .. . . . . . . . . . . . . . . .. . . . . . . .. .. . .. . .. . . . . . Water, Sewer, Paving & teague nail & perkins a Draina Improvements 5237 N.Riverside Drive,Suite 100 Crowley I.S.D. g p Fort Worth,Texas 76137 512 Peach Street to Serve Crowley I SD 817.336.5773 ph 817.336.2813 Fx N Crowley,Tx 76036 TBPE Registration No.F-230 o I soon Career & Technology www.tnpinc.com Education Center (SHEET 1 OF 5) DATE: JULY 2, 2019 ........................... .. .................................................. ........ ....................................... Wj r1 / - t � yy ' 1 I i i ( i ire Sery ce / 1 4--,-- as is Service Irri lion S r46ss„ i LONGHORN TRAIL ...----.—.._....... .._._--—r-_—___.....................� w z LEGEND: PROPOSED WATER LINES EXHIBIT A EXISTING WATER LINES PROPOSED FIRE HYDRANT WATER PROPOSED GATE VALVE ............................... Water, Sewer, Paving & teague nail & perkins Crowley I.S.D. Drainage Improvements 5237 N.Riverside Drive,Site 100 Fort Worth,Texas 76137 512 Peach Street to serve Crowley ISD 817.336.5773 ph 817.336.2813 fx N Crowley,Tx 76036 TBPE Registration No.F-230 0 1 150 Career & Technology www.fnpinc.com Education Center (SHEET 2 OF 5) DATE: JULY 2. 2019 . .. . . . .. . . . .. .. . . . ... . . . . .. .. . .. . .. . . . . . . . . . . . . .. . ... . . . . .. .. . . . ... .. . . . . . . . . . . . . . . . . .. .. . . . . . . . . .. . . . . . ... . . . ... ... . .. .. .. ... I ............. I f o!' w I E-1 : _..._ E- E- x i U E-1 NOT EXISTING INFRASTRUCTURE SOUTHFORK ESTATES PH.1 CPN:101051 __.....�_.___.._. i i i i i LEGEND: PROPOSED SEWER LINES EXHIBIT Al — — — — EXISTING SEWER LINES PROPOSED SEWER MANHOLE SEWER 0 EXISTING SEWER MANHOLE .. . . .. . . . . . .. .. . . . . . .. . .. .. .. . . ... . . . . . . . . . . .. . . . . . .. .. .. . . . . . . . . . . ... . . . . . . . . . . . .. . . . . . . . . . .. . . . . . . . . . . . ... . . . . . . . . .. . . . . . . . . Water, Sewer, Paving & teague nail & perkins Crowley I.S.D. Drainage Improvements 5237 N.Riverside Drive,Site 100 Fort Worth,Texas 76137 512 Peach Street to Serve Crowley ISD 817.336.5773 ph 817-336.2813 fx N Crowley,Tx 76036 TBPE Registration No.F-230 o 1 100 Career & Technology www.tnpinc.com Education Center (SHEET 3 OF 5) DATE: JULY 21 2019 ............................................................... .................... ...... ..................................... > { S fa ............J � ....... i �r• I '�? c, „w t// �} f _ 044 FCI a;'IJl ' ' ' HINk9• j Cat=}409 PRO tc >�• l€lt���� �'lfTl,'Tlll - L �-�----�---�'� __.. I � E ,"j„ 3"{Ift IiE'IE:I liii.:lf:1: 1 A W f_ _ tfr � i 1 1 I x F l NOT EXISTING INFRASTNUCTU E tz 4 cn SOUTHFORK ESTATES PH.1 iF CPN:101051 0 LEGEND: 24'WIDE CONC PAVEMENT CONCRETE SIDEWALK EXHIBIT B ASPHALT PAVEMENT ASPHALT DRIVEWAY PAVING ................... Water, Sewer, Paving & teague nail & perkins Crowley I.S.D. Drainage Improvements 5237 N.Riverside Drive,Suite 100 Fort Worth,Texas 76137 512 Peach Street to serve Crowley ISD 817.336.5773 ph 817.336.2813 fx N Crowley,Tx 76036 TBPE Registration No.F-230 Career & Technology www.tnpinc.com 0 300 Education Center (SHEET 4 OF 5) DATE: JULY 2, 2019 ............................................................................. .... ............................................. WSJ A�UC I 3 > P< ')( G . &H 41 1 . . �_ oC� / _...._..... _ ..j Multiple BO% Culverts i ! Multiple Box Culverts / A 11 11Y � Concrete Flume 3 / t — — IF Public Storm Drain vPublic Storm Drain .. 41 — I— C ;1 a o rA i W � . ! E 1 LEGEND: UNLESS OTHERWISE NOTED,ALL STORM PROPOSED STORM DRAIN IMPROVEMENTS ON THIS SHEET DRAIN INLET ARE CONSIDERED PRIVATE AND MAINTAINED BY OWNER.HOWEVER, _c PROPOSED STORM DEVELOPER REQUESTS CITY TO INSPECT DRAIN HEADWALL EXHIBIT B 1 AND PROVIDE MATERIAL TESTING UNDER EXISTING STORM DRAIN THIS CFA PROPOSED CONCRETE STORM DRAIN IMPROVEMENTS CALLED OUT AS'PUBLIC' FLUME ARE TO BE OWNED AND MAINTAINED BY THE CITY OF FORT WORTH ........ ... ... ........................ Water, Sewer, Paving & teague nail & perkins CrowleyI.S.D. Drainage Improvements 5237 N.Riverside Drive,Suite 100 Fort Worth,Texas 76137 512 Peach Street to serve Crowley ISD 817.336.5773 ph 817.336.2813 fx N Crowley,Tx 76036 TBPE Registration No.F-230 Career & Technology wwwAnpinc.com o 300 Education Center (SHEET 5 OF 5) DATE: JULY 2, 2019