crryoFFORrwUR ®� Change Order Request
S�RFTARy1N ProjectNamel 2016 CIP Concrete Restoration-Contract 5 City Sec 11 1 52329
Client Projectll(s)[ CPN#101570
Project Description Replacement of damaged concrete panels.
Contractor[ Omega Contracting Inc. Change Order# I`J Date 1/17/2020
City Project Mgr.I Maged III _� City inspector FKdilda Cazorla
Dept, 5 wee TPW Contract Time
Totals � (WD)`
Original Contract Amount $0.00 $1,618,196.00 $1,616,196.00 360
Extras to Date $0.00 $18,000.00
Credits to Date $0.00
Pending Change Orders(in M&C Process)
Contract Cost to Dale _ $0.00 $1,636,196,00 $1,636,196.00 360
Amount of Proposed Change Order $31,900.00 0.00 $31,900.00
Revised Contract Amount $31,900.00 1,636,196.00 $1,668,096.00 360�
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00 $0.00
Additional Funding(if necessary) $31,900,00 $31,900.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT
MAXALLOWABLECONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $2,022,745.00
JUSTIFICATION(REASONS)FOR CHANGE ORDER
This Change order is required to add a new bid item to adjust the sanitary sewer manhole covers. Water Department has requested to adjust
all exisiting 24"sanitary sewer manholes covers within the Identified projects limits to satisfy the current Texas Commission of Environmental
Quality of 30-inch manhole cover.M&C 20.0016 has been approved on 01/14/2020. .,
Attested 6yo
b `' `s� t .sue.•`w�t`{�s[,
Allison Tidwell,Assistant to the City Secretary���
It is understood and agreed that the acceptance of[his Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project./Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and admintslration of this contract,including ensuring all performance and
reporting requirements. j
Contractor's Company Name Contractor(Name) Con acl Signature Da e
Omega Contracting Inc. I i L C. ,'2fl aoao
Inspectorllnspectlon.Su prvlsor Date Project Manager/Prog►am Manager Date
✓tr t_P2-wza T Z2 ?e
I
-Assist nt Dlrecto pt) Date Director,Contracting Department(Dept) Date
-ZT ?®
As s t GI or Dale J Assistant City Manager Date
Council Action(If required)
M&C Number � _� M&C Date Approved
Change Order Additions Page 1 of 1 � ���
0V SECRETARY
Fr. WORTH, TX
Four Wourt.r City of Fort Worth
Change Order Additions
Project Name 2018 CIP Concrete Restoration-Contract 5 Clly sec t1 52329
Client Project If CPNI1101570
Project Description Replacement of damaged concrete panels.
Contractor Omega Contracting Inc. Change Ordertl 0 Date 111 712 0 20
City Project Mgr, Maged Zakl City Inspector Adilda Cozorla
ADDITIONS
n n os —Total
an ro a us men,Major a er �1'06 F1C'——7Utl . 'rMM
i
I
i
i
i
I
I
I
i
Water 1,00.D0 1
TPW $0.00
buD Totalons
Change OrderAdditions Page 1 of 1
1
rc�`Wa3rH City of Fort Worth
Change Order Deletions
Project Name 2010 CIP Concrete Restoration-Contracl5 City sec it 52329
Client Project It CPN 11101570
Projecl Descriplion Replacement of damaged concrete panels.
Contractor Omega Contracting Inc, Change Order It E= Date 1/1712020
City Projecl Mgr. Maged Zakt City Inspector Adilda Cazoda
DELETIONS
fTEM— b PTI y n t— fill-c-0SF Total
f
k
C
i
I
I
1
Water $0,00
TPW $0.00
Sub Total Deletions $0.00
Change Order Additions Page i of 1
MMBE Breakdown For this Change Order
;M.W��.. .�a �' i ' TYPeSof Service, a � 1 ,:Amount.fo>;,fhiSCO> ;
NIA
Total
Previous Change Orders
D`:T
None
Total
l
I
Change Order Additions Page 1 of 1
I
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, January 14, 2020 REFERENCE NO.: **M&C 20-0016
LOG NAME: 202018 CIP CONC RESTOCOS CONTRACTS 3, 4 AND 5
SUBJECT:
Adopt Appropriation Ordinance in the amount of$78,050.00 to Fund Change Orders to Three 2018 CIP
Concrete Restoration Contracts and Update the FY 2020-24 CIP (COUNCIL DISTRICTS 3, 6 and 8)
RECOMMENDATION:
It is recommended that the City Council adopt the attached appropriation ordinance increasing estimated
receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of$78,050.00
transferred from available funds within the Water& Sewer Fund.
DISCUSSION:
It is necessary to conduct adjustments to all existing 24-inch sanitary sewer manhole covers
within the identified projects limits to satisfy the current Texas Commission of Environmental
Quality of 30-inch manhole cover. The total cost to the Water Department for the three change
orders is $78,050.00.
On May 7, 2019, (M&C C-29114) the City Council authorized a contract in the amount of
$1,574,312.85 with Omega Contracting, Inc., for 2018 CIP Concrete Restoration - Contract
3, City Secretary Contract No. 52345, for the concrete street restorations on Martin Street (Foard ;
Street to Shackleford Street) and Alta Mesa Boulevard (S. Hulen Street to Whitman 1
Avenue). The contract must be adjusted by Change Order No. 1 in the amount of$31,900.00 to
thereby increasing the contract amount to $1,606,212.85 (City Project No. 101587). I
I
On April 16, 2019, (M&C C-29093) the City Council authorized a contract in the amount of
$1,618,196.00 with Omega Contracting, Inc., for 2018 CIP Concrete Restoration — Contract
5, City Secretary Contract No. 52329, for concrete restorations on W. Vickery Boulevard (S.
Hulen Street to City Limits). The contract was subsequently revised by Change Order No. 1 in
the amount of$18,000.00 administratively authorized August 26, 2019. Change Order No. 2, in
the amount of$31,900.00, will increase the contract amount to $1,650,096.00 (City Project No. ;
101570).
On September 25, 2018, (M&C C-28872) the City Council authorized a contract in the amount of i
$1,699,200.00 with Westhill Construction, Inc., for 2018 CIP Concrete Restoration — Contract
4, City Secretary Contract No. 51534, for concrete restorations on Granbury Road (Belden
Avenue to Dan Danciger Road) and Wentworth Street (South of South Drive to Westhaven
Drive). The contract must be adjusted by Change Order No. 1 in the amount of$14,250.00
thereby increasing the contract amount to $1,713,450.00 (City Project No. 101571).
Appropriations for Concrete Restorations Contracts 3, 4 and 5 as depicted below:
Existing IrAddifional Project
Logname: 202018 CIP CONC RESTOCOS CONTRACTS 3, 4 AND 5 Page 1 of 2
(Fund IlAppropriations IlAppropriations Total*
W&S Capital Projects —
Fund 56002 $0.00 $78,050.00 $78,050.00
2018 Bond Program $7,971,287.00 $0.00 $7,971,287.00
34018
Project Total $7,971,287.00 $78,050.00 $8,049,337.00
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds will be available in the FY20 Water and Sewer Fund, and upon
approval of the above recommendations and adoption of the attached appropriation ordinance, funds will
be available in the current capital budget, as appropriated, in the Water and Sewer Capital Projects Fund
(W&S Capital Projects Fund). Prior to any expenditure being incurred, the Water Department has
the responsibility to validate the availability of funds.
FUND IDENTIFIERS (FIDs):
TO
Fund Department ccoun Project Program ctivity Budget Reference # �mountl
ID ID Year Chartfield 2
FROM
Fund Department ccoun Project Program ctivity Budget Reference # mount
ID ID Year (Chartfield 2
CERTIFICATIONS:
Submitted for City Manager's Office by: Dana Burghdoff (8018)
Originating Department Head: William Johnson (7801)
Additional Information Contact: Monty Hall (8662)
ATTACHMENTS
1. 202018 CIP CONC RESTOCOS CONTRACTS 3, 4 AND 5 FID Table (NN 11.04.2019).....docx
(CFW Internal)
2. 202018 CIP CONC RESTOCOS CONTRACTS 3, 4 AND 5 56002 A020.docx (Public)
3. M & C Map -202018CIPCONCRESTOCOSCONTRACTS3,4AND5(2).pdf (Public)
4. M & C Map- 202018CIPCO NCR ESTOCOSCONTRACTS3,4AND5(3).pdf (Public)
5. M & C Map- 202018CIPCO NCR ESTOCOSCONTRACTS3,4AND5.pdf (Public)
Logname: 202018 CIP CONC RESTOCOS CONTRACTS 3, 4 AND 5 Page 2 of 2
CD
CD C 0 -
0 -
-n
. . . TI • • . . • • O • • • • • • O
• •
• (D • • • • • • (p
• • • (p • • • • • - • • • • • O
D ; 0 •
D ; ; n n
n n . . • . O
o '� • • • • • • O - • • • • • O •
• • • - • • • • • O • • 7
m • • • • • •
o
CD
•. (D •. h • • -
• CD •
"n
• o
• z - - - v
° oo c o
Q7 c G) Q
x cQ
o . . • • • • cQ r • • • • • • CD
CD L-
CD
•
• • • • • • • • • -< (D
CD .Q CD m
v
T CA
v
TI 1
�D 1
1
O
M CA O .... (Q
(o (D (Q
M 3
3 Q
D D
D - o
3 O
c �
• • • • • • • • • • • • • • •
a O
_0 O (n
O (n m
(n CD --
CD --
CD
CD
3
O
N
(D
Contract Compliance Manager:
By signing, I acknowledge that I am the person
responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Maged Zaki
Professional Engineer.