Loading...
HomeMy WebLinkAboutContract 35469 AMENDMENT NO. 2 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. q (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Dunaway Associates, L.P. , (Engineer) made and entered into City Secretary Contract No. 34093, (the Contract) which was authorized by the City Council by M&C C-21712 on the 26th day of September 2006; and WHEREAS, the Contract involves engineering services for the following project: Engineering Design Services: Street Reconstruction, Storm Drain Design on College Avenue (Page St to W. Capps St) , Orange Street (Stanley Ave to Townsend Dr) , Lipscomb Street (W. Capps St to W. Berry St) and Wayside Avenue (N. Dead End to W. Cantey St) , 2004 CIP Contract Year 4 & 5, Contract 53, Project No. 00455; DOE No. 5411 WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated April 10, 2007, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $4,440 .00. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall no#',' D exceed the sum of $228,267.00 . L0141GINAL 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the c�W& �TUU day of , 2007, in Fort Worth, Tarrant County, Texas. ATTEST: Marty HendzDlx City Secretary NO M&C REQUIRED APPROVAL RECOMMENDED: APPROVED: A. Douglas Rademaker, P.E. Marc A. Ott Director, Department of Assistant City Manager Engineering Dunaway Associates, L.P. ENGINEER By: Name: Toby R. Ford, P.E. Vice President 1501 Merrimac Circle, Suite 100 Fort Worth, Texas 76107 APPROVED AS FORM GALITY: Assistant C' y tt ney -2- CU1tiI'D CITY " Y. ! ��tio � o b Dunawa Engineers y Planners Surveyors 4V Associates, L.P. Landscape Architects DA No. 2006151 April 10, 2007 Ms. Dena Johnson, P.E. Program Manager City of Fort Worth Department of Engineering Fort Worth, Texas 76102 Reference: Amendment No. 2 2004 CIP Project Yrs 4 & 5 - College Ave, Orange St, Lipscomb St and Wayside Ave. Contract 53 Project No. 00455 Dear Ms. Johnson: Dunaway Associates, L.P. is pleased to present this Amendment No. 2 for storm drainage engineering design services that are beyond our original scope of services. The general scope of these services is as follows: As required in our contract, we prepared and submitted a Concept Report that investigated the adequacy of the existing drainage structures within the limits of the project. As a result of that investigation, it was determined that a section of Lipscomb Street had insufficient capacity to carry the 100-year runoff within the existing right-of-way as required in the Fort Worth Stormwater Management Design Manual. Our recommended solution was to construct a pair of inlets on Lipscomb Street(see attached exhibit from our Concept Report). RecausP our contract: nd b',,dget dices r-nt prc'Jrd>r f0.r the design dm-4d pi iion ( construction documents for new drainage structures, we propose to supplement our scope of services to add to following tasks. • Drainage Area Map (Lipscomb Street) — This task includes preparation of a Drainage Area Map and computations for the proposed inlets and storm drain leads. • Storm Drain Design (Lipscomb Street) — This task includes the preparation of construction documents for inlets, leads, and connection to the existing system. A summary of the proposed budget for this contract amendment is as follows: 1501 Merrimac Circle•Suite 100•Fort Worth,Texas 76107 u: :;'•;;�;�, 1 L,,,;,_ Tel:817.335.1121•Metro:817.429.2135•Fax:817.335.7437 www.dunawayassociates.com • Amendment No. 2 April 10, 2007 Page 2 Basic Fee Drainage Area Ma $ 2,000.00 Storm Drain Design $ 2,400.00 Subtotal 4,400.00 TOTAL PROPOSED AMENDMENT $ 4,400.00 A summary of the total project is as follows: Contract Description Fee Ori inal Contract Paving and Utility Reconstruction-4 Streets $208 357.0 Amendment No. 1 Geotechnical Engineering Services $15 510.0 Amendment No. 2 Storm Drain Design $4 400.0 TOTAL PROJECT $228,267.00 Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal. Sincerely, DUNAWAY ASSOCIATES, L.P. c jol w . Stephen James, P.E. Director—Public Sector Services 2006151 Amendment#2-Revised Wohnson 04-10-2007 kmc.doc ns^'�11rN �L 9U� ��l'�iU�lS�ti�uJ�11