HomeMy WebLinkAboutContract 46924-A2 4W AMENDMENT NO. 2 TO AGREEMENT
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES
G A.D. MARSHALL PUBLIC SAFETY & MUNICIPAL COURTS BUILDING
First Floor Remodel & Accessibility Ramp
STATE OF TEXAS
CITY SECRETARY CONTRACT NO. qa -Aa
COUNTY OF TARRANT
WHEREAS, The City of Fort Worth and Arthur Weinman Architect (Consultant) made
and entered into City Secretary Contract No. 46924 (The Contract) which was
authorized administratively, the 13th day of August, 2015, for first floor remodel,
including an addition of an accessible ramp entrance, in the existing A.D. Marshall
Public Safety & Municipal Courts Building; and
WHEREAS, further amendment is necessary to reimburse the Consultant as part of the
design services agreement for additional design services to modify the structural
construction documents due to unforeseen site location of an existing electrical service
conduit.
NOW THEREFORE, City and Consultant, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the
Contract:
1.
Article I — Scope of Services, Paragraph (3) shall be added to read as follows.
(3) Provide additional design services and detailing of existing Construction
Documents to modify the structural drawings of the exterior accessible ramp
including additional site inspection of structural components. The cost of this
additional service is $4,871.25 with no additional reimbursable expenses. The
scope of services is described more fully in Arthur Weinman, Architect Letter
dated July 29, 2019, subject: "Municipal Courts Building, Fort Worth, Texas,
AWA Project# 17-009".
2.
Article II — Compensation, first paragraph, is amended as follows:
"Consultant shall be compensated in accordance with the Fee Schedule shown
in Attachment "B". Payment shall be considered full compensation for all labor,
materials, supplies, and equipment necessary to complete the services
described in Attachment "B". However the total fee paid by the City shall not
exceed a total of $42,568.25 unless the City and the Consultant mutually agree
upon a fee amount for additional services and amend this Agreement
accordingly."
3.
All other provisions of this Contract which are not expressly amended herein shall
remain in full force and effect. °OFFICIAL RECURD
CITY SEC
MCMARY
FT. W AT
PMD Std.Architectural Services AMENDMENT(Rev. 1 July 2019) Palo&T 2
A.D. Marshall PS&Municipal Crts. Bldg.—First Floor Remodel&Accessibility Ramp—Amendment Nlo.2
EXECUTED this the *2/" day of Van 2020,
in Fort Worth, Tarrant County, Texas.
Arthur Weinman Architect APPROVED.-
By.- By.
Ahh einman Kevin Gun ,
Principal Interim Assistant City Manager
APPROVAL COMMENCED: RECORDED:
By; 6 BY
Director 6" Mary J1 K er �j
Prop rty Management Department City Se toty (J:
APPROVED AS TO FORM AND LEGALITY: M&C Not Required
Contract Authorization
By: `-
John B. trong
Assistant C Attorney Form1295 Certification: N/A
CONTRACT COMPLIANCE MANAGER:
By signing I acknowledge that I am the person responsible for the monitoring and administration of this
contract, including ensuring all performance and reporting requirements.
By: f"dY I W4�' `'� &(rrt 40
Brian R. Glass, AIA
Architectural Services Manager
OFFICIAL RECOR1
CITY SECRETARY°
FT WORTH,TX
PMD Std.Architectural Services AMENDMENT(Rev. 1 July 2019) Page 2 of 2
A.D. Marshall PS&Municipal Crts. Bldg.—First Floor Remodel&Accessibility Ramp—Amendment No.2 January 2020
Attachment "B"
ARTHURWEINMAN
A R C H I T E C T
July 29, 2019
Mr. AJfonzo Meza Municipal Courts Building
City of Fort Worth Fort Worth, Texas
401 West 13t" Street
Fort Worth, Texas 76102 AWA Project# 17-009
Dear Alfonzo,
Thank you for the opportunity to present you with our proposal for additional services by Frank
W. Neal &Assoc, Structural Engineer, for Remodel of the Public Safety and Municipal Court
Building at 1000 Throckmorton Street, Fort Worth, Texas.
These services have included the following additional site visits beyond those covered in the
contact.:
New ramp and landing
Miscellaneous structural issues
Please see attached Breakdown sheet from Neal &Associates.
The value of this proposal is based on a flat fee for services as itemized above:
Structural Engineer $ 4,871.25
Time will be billed on a monthly basis or at the completion of the drawings. Payment of all
invoices will be due upon receipt of invoice. Payment not received within thirty days of invoice
date shall bear interest at the rate prevailing at the principal place of business of the Architect.
I appreciate the opportunity to assist you with this project. If this proposal is acceptable it may
be regarded as an Addendum to the contracts already signed for this project. Please return a
copy of this proposal with confirming signatures for our records. If you have any questions
please do not hesitate to contact me.
Sincerely,
A-Lt - /I
Arthur W, Weinman, A.I.A.
AWW:ew
Cc: Brian Glass
FWN &Assoc.
Enclosure
3717 Stoney Crock Road, Fort Worth Texas 76116
817-737-0977 817-319-9081 cell
www.weinmanarchitms.com
FWN4A
Structural Engineering
1015 W. Broadway Avenue Date: 07/19/2019
Fort Worth,TX 76104 Invoice number: 316820
Arthur Weinman Architect
3717 Stoney Creek Road
Fort Worth,TX 76116
215.048.06 Renovation of Public Safety and Municipal Court Building
-New ramp and landing.
-Miscellaneous structural issues.
Additional-Hourly
Site visits during construction beyond the site visit during construction in the contract.
Contract Percent Prior Total Current
Description Amount Complete Billed Billed Billed
215.048.06 Professional Services 2,500.00 85.50 2,137.50 2,137.50 0.00
Total 2,500.00 $5.50 2,137.50 2,137.50 0.00
Professional Fees
Billed
Date Hours Rate Amount
Erlinda C.Hemandez
CAD Technician 1
06/06/2019 4.00 100.00 400.00
06/10/2019 1.50 100.00 150.00
06/11/2019 2.60 100.00 2%00
06/19/2019 0.25 100.00 25.00
Subtotal 8.25 825.00
Frank W.Neal,P.E.
Principal Engineer 1
06/10/2019 0.25 200.00 50.00
07/18/2019 0.25 200.00 50.00
Subtotal 0.50 100,00
If you prefer to pay by Credit Card please fill out the following information and either mail,fax or e-mail to our office:
Charge to Credit Card: MasterCard Visa American Express
Credit Card#. CCS Code:
Billing Address for Card:
Expiration Date: Signature:
Name as appears on Card: Amount of Remittance:
(The Invoke Total will be charged unless otherwise noted)
Arthur Weinman Architect Invoice number 316820 Invoice date 07/19/2019
Pan&7 of 2
Arthur Weinman Architect Invoice number 316UO
P mjw 21i.MA Renovation of t ublk$delft and MuntcIW Court 6ulldkV Date 07/192019
Professional Fees
Billed
Date Hours Rate Amount
Janice G.Dugan
CAD Technician III
06/11/2019 0.50 75.00 37.50
Raymundo Hemandez
CAD Technician III
06/112019 0.50 75.00 37.50
06/122019 0.25 75.00 18.75
Subtotal 0.75 56.25
Richard A.Williams
Design Engineer 1
0529/2019 1.50 115.00 172.50
05/302019 2.00 115.00 230.00
06/04/2019 2.00 115.00 230.00
06/0512019 3.00 115.00 345.00
06/06/2019 4.50 115.00 517.50
06/072019 4.00 115.00 460.00
06/10/2019 3.00 115.00 345.00
D6/11/2019 1.50 115.00 172.50
06/12/2019 1.50 116.00 172.50
06/142019 0.50 115.00 57.50
06/19/2019 1.00 115.00 115.00
07/152019 0.50 115.00 57.50
07/162019 4.50 115.00 517.50
07/172019 0.50 115.00 57.50
07/182019 3.50 115.00 402.50
Subtotal 33.50 3,852.50
Professional Fees subtotal 43.50 4,871.25
Invoice total 4,871,25
Approved by
T ,
Frank W.Neal,P.E.
Principal Engineer
If you prefer to pay by Credit Card please fill out the following Information and either mail,fax or e-mail to our office:
Charge to Credit Card: MasterCard Visa American Express
Credit Card 0: CCS Code:
Billing Address for Card:
Expiration Date: Signature:
Name as appears on Card: Amount of Remittance:
(The Invoice Total will be charged unless otherwise noted)
Arthur Weinman Architect Invoice number 31SUO Invoice date 07/1912019