Loading...
HomeMy WebLinkAboutContract 46924-A2 4W AMENDMENT NO. 2 TO AGREEMENT STANDARD AGREEMENT FOR PROFESSIONAL SERVICES G A.D. MARSHALL PUBLIC SAFETY & MUNICIPAL COURTS BUILDING First Floor Remodel & Accessibility Ramp STATE OF TEXAS CITY SECRETARY CONTRACT NO. qa -Aa COUNTY OF TARRANT WHEREAS, The City of Fort Worth and Arthur Weinman Architect (Consultant) made and entered into City Secretary Contract No. 46924 (The Contract) which was authorized administratively, the 13th day of August, 2015, for first floor remodel, including an addition of an accessible ramp entrance, in the existing A.D. Marshall Public Safety & Municipal Courts Building; and WHEREAS, further amendment is necessary to reimburse the Consultant as part of the design services agreement for additional design services to modify the structural construction documents due to unforeseen site location of an existing electrical service conduit. NOW THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I — Scope of Services, Paragraph (3) shall be added to read as follows. (3) Provide additional design services and detailing of existing Construction Documents to modify the structural drawings of the exterior accessible ramp including additional site inspection of structural components. The cost of this additional service is $4,871.25 with no additional reimbursable expenses. The scope of services is described more fully in Arthur Weinman, Architect Letter dated July 29, 2019, subject: "Municipal Courts Building, Fort Worth, Texas, AWA Project# 17-009". 2. Article II — Compensation, first paragraph, is amended as follows: "Consultant shall be compensated in accordance with the Fee Schedule shown in Attachment "B". Payment shall be considered full compensation for all labor, materials, supplies, and equipment necessary to complete the services described in Attachment "B". However the total fee paid by the City shall not exceed a total of $42,568.25 unless the City and the Consultant mutually agree upon a fee amount for additional services and amend this Agreement accordingly." 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. °OFFICIAL RECURD CITY SEC MCMARY FT. W AT PMD Std.Architectural Services AMENDMENT(Rev. 1 July 2019) Palo&T 2 A.D. Marshall PS&Municipal Crts. Bldg.—First Floor Remodel&Accessibility Ramp—Amendment Nlo.2 EXECUTED this the *2/" day of Van 2020, in Fort Worth, Tarrant County, Texas. Arthur Weinman Architect APPROVED.- By.- By. Ahh einman Kevin Gun , Principal Interim Assistant City Manager APPROVAL COMMENCED: RECORDED: By; 6 BY Director 6" Mary J1 K er �j Prop rty Management Department City Se toty (J: APPROVED AS TO FORM AND LEGALITY: M&C Not Required Contract Authorization By: `- John B. trong Assistant C Attorney Form1295 Certification: N/A CONTRACT COMPLIANCE MANAGER: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. By: f"dY I W4�' `'� &(rrt 40 Brian R. Glass, AIA Architectural Services Manager OFFICIAL RECOR1 CITY SECRETARY° FT WORTH,TX PMD Std.Architectural Services AMENDMENT(Rev. 1 July 2019) Page 2 of 2 A.D. Marshall PS&Municipal Crts. Bldg.—First Floor Remodel&Accessibility Ramp—Amendment No.2 January 2020 Attachment "B" ARTHURWEINMAN A R C H I T E C T July 29, 2019 Mr. AJfonzo Meza Municipal Courts Building City of Fort Worth Fort Worth, Texas 401 West 13t" Street Fort Worth, Texas 76102 AWA Project# 17-009 Dear Alfonzo, Thank you for the opportunity to present you with our proposal for additional services by Frank W. Neal &Assoc, Structural Engineer, for Remodel of the Public Safety and Municipal Court Building at 1000 Throckmorton Street, Fort Worth, Texas. These services have included the following additional site visits beyond those covered in the contact.: New ramp and landing Miscellaneous structural issues Please see attached Breakdown sheet from Neal &Associates. The value of this proposal is based on a flat fee for services as itemized above: Structural Engineer $ 4,871.25 Time will be billed on a monthly basis or at the completion of the drawings. Payment of all invoices will be due upon receipt of invoice. Payment not received within thirty days of invoice date shall bear interest at the rate prevailing at the principal place of business of the Architect. I appreciate the opportunity to assist you with this project. If this proposal is acceptable it may be regarded as an Addendum to the contracts already signed for this project. Please return a copy of this proposal with confirming signatures for our records. If you have any questions please do not hesitate to contact me. Sincerely, A-Lt - /I Arthur W, Weinman, A.I.A. AWW:ew Cc: Brian Glass FWN &Assoc. Enclosure 3717 Stoney Crock Road, Fort Worth Texas 76116 817-737-0977 817-319-9081 cell www.weinmanarchitms.com FWN4A Structural Engineering 1015 W. Broadway Avenue Date: 07/19/2019 Fort Worth,TX 76104 Invoice number: 316820 Arthur Weinman Architect 3717 Stoney Creek Road Fort Worth,TX 76116 215.048.06 Renovation of Public Safety and Municipal Court Building -New ramp and landing. -Miscellaneous structural issues. Additional-Hourly Site visits during construction beyond the site visit during construction in the contract. Contract Percent Prior Total Current Description Amount Complete Billed Billed Billed 215.048.06 Professional Services 2,500.00 85.50 2,137.50 2,137.50 0.00 Total 2,500.00 $5.50 2,137.50 2,137.50 0.00 Professional Fees Billed Date Hours Rate Amount Erlinda C.Hemandez CAD Technician 1 06/06/2019 4.00 100.00 400.00 06/10/2019 1.50 100.00 150.00 06/11/2019 2.60 100.00 2%00 06/19/2019 0.25 100.00 25.00 Subtotal 8.25 825.00 Frank W.Neal,P.E. Principal Engineer 1 06/10/2019 0.25 200.00 50.00 07/18/2019 0.25 200.00 50.00 Subtotal 0.50 100,00 If you prefer to pay by Credit Card please fill out the following information and either mail,fax or e-mail to our office: Charge to Credit Card: MasterCard Visa American Express Credit Card#. CCS Code: Billing Address for Card: Expiration Date: Signature: Name as appears on Card: Amount of Remittance: (The Invoke Total will be charged unless otherwise noted) Arthur Weinman Architect Invoice number 316820 Invoice date 07/19/2019 Pan&7 of 2 Arthur Weinman Architect Invoice number 316UO P mjw 21i.MA Renovation of t ublk$delft and MuntcIW Court 6ulldkV Date 07/192019 Professional Fees Billed Date Hours Rate Amount Janice G.Dugan CAD Technician III 06/11/2019 0.50 75.00 37.50 Raymundo Hemandez CAD Technician III 06/112019 0.50 75.00 37.50 06/122019 0.25 75.00 18.75 Subtotal 0.75 56.25 Richard A.Williams Design Engineer 1 0529/2019 1.50 115.00 172.50 05/302019 2.00 115.00 230.00 06/04/2019 2.00 115.00 230.00 06/0512019 3.00 115.00 345.00 06/06/2019 4.50 115.00 517.50 06/072019 4.00 115.00 460.00 06/10/2019 3.00 115.00 345.00 D6/11/2019 1.50 115.00 172.50 06/12/2019 1.50 116.00 172.50 06/142019 0.50 115.00 57.50 06/19/2019 1.00 115.00 115.00 07/152019 0.50 115.00 57.50 07/162019 4.50 115.00 517.50 07/172019 0.50 115.00 57.50 07/182019 3.50 115.00 402.50 Subtotal 33.50 3,852.50 Professional Fees subtotal 43.50 4,871.25 Invoice total 4,871,25 Approved by T , Frank W.Neal,P.E. Principal Engineer If you prefer to pay by Credit Card please fill out the following Information and either mail,fax or e-mail to our office: Charge to Credit Card: MasterCard Visa American Express Credit Card 0: CCS Code: Billing Address for Card: Expiration Date: Signature: Name as appears on Card: Amount of Remittance: (The Invoice Total will be charged unless otherwise noted) Arthur Weinman Architect Invoice number 31SUO Invoice date 07/1912019