Loading...
HomeMy WebLinkAboutContract 35474-A3 AMENDMENT NO.3 TO AGREEMENT FOR ARCHITECTURAL DESIGN SERVICES NEW POLICE AIR SUPPORT HELICOPTER HANGAR STATE OF TEXAS CITY SECRETARY CONTRACT NO. 354-14-1% COUNTY OF TARRANT WHEREAS, The City of Fort Worth and GRW Engineers, Inc. (Architect) made and entered into City Secretary Contract No. 35474 (The Contract) which was authorized by the City Council by M&C C-22190, the 19th day of June, 2007; and WHEREAS, further amendment is necessary to reimburse the Architect's for additional design services relative to the new Police Air Support Helicopter Facility; and NOW THEREFORE, City and Architect, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article 1.1, SECTION I —SERVICES OF THE ARCHITECT, a new paragraph is added to read as follows: "Provide additional design services to evaluate and prepare a draft report with conceptual drawings for the adaptive re-use of one Phazar Hangar located at Meacham Airport as an alternate location for the proposed new Police Air Support Helicopter Facility at Meacham Airport. The cost of this additional service is $7,068.00 plus up to $2,000.00 in reimbursable expenses. The scope of services is described more fully in the GRW Engineers, Inc.'s letter dated February 8, 2010, subject: Additional Services for Preliminary Feasibility Analysis Phazar Hangar Modifications for Fort Worth Police Department, Project No. 03480-02 which is attached hereto as Attachment"A" and made a part of this Agreement." 2. Paragraph 1 of SECTION V- COMPENSATION TO ARCHITECT, is amended as follows: "The total compensation for all of the assignments to be performed by Architect as described in CHARACTER of ARCHITECT'S SERVICES (Section III hereof) shall be $138,393.00, hereinafter referred to as the"total fee", plus up to $5,200.00 in reimbursable expenses." 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED this the_ I V-day of 2010, in Fort Worth, Tarrant County, Texas. n� GR n 'Weer , APPROVED: C0000000 IFO aid 0 %00 By: By: ~oo ° d Charles A. Willis, AIA, NCARB Fernando Costa �o $.�d Principal in Charge Assistant City Manager 0 0 0 A c 0 APPROVAL RECOMMENDED: RECOR D: Qa Ooo0O5 o° � By: ' By: William A. V rkest, P Marty Hendrix Director, Transportation & City Secretary Public Works Dept. APPROVED AS O O M AN EGALITY: M&C NOT REQUIRED i By: Amy J. ey Date: OFFICIAL RECORD Assistant Attorney CITY SECRETARY FT. WORTH, TX 1161 Corporate Dr West Engineering Arlington,TX Arlington,TX 75050 Architecture Lexington,KY Suite 170 Planning Louisville,KY Tel 817/543-1100 GIS Indianapolis,IN Fax817/274-8878 Aviation Consultants Nashville,TN GRW Engineers,Inc. Dalton K. Murayama AIA February 8, 2010 City of Fort Worth Transportation and Public Works Department 401 West 13th Street Fort Worth,TX 76102-4616 RE: Additional Services Preliminary Feasibility Analysis Phazar Hangar Modifications for Fort Worth Police Department Dear Dalton, We have measured the Phazar Hangar buildings and have looked at a couple of options for conversion to FWPD use. We will require about 15 working days to prepare a draft report with conceptual drawings. We will include at least two schematics of possible hangar/office/shop layouts. Existing mechanical and electrical systems will be considered in terms of adequacy for future use by the Police Department, but new systems will not be designed. We will also consider: — Security of facilities,equipment,public and police parking etc. — Operational security,including day and night helicopter operations,aircraft parking,hot fueling etc. — Apron/taxiway/airfield functions,including helipad location,approach surfaces etc. — We will evaluate basic physical characteristics of the buildings,hardening requirements, hangar door configurations,etc. — We will prepare order of magnitude costs for basic improvements such as shop and office space,overhead crane and other known program requirements. We will assume that space for four(4) Bell 407 Helicopters and one(1)Cessna 182 aircraft will be the long term development requirement. OFFICIAL RECORD CITY SECRETARY FT WORTH,TX Our proposal for a preliminary development study and order of magnitude cost estimate is as follows: Labor Types # Hours Rate Total Principal 16 $140 $2,240.00 Architect 16 $104 $1,664.00 Structural Engineer 4 $104 $416.00 Designer/Technical 18 $90 $1,620.00 CAD Tech 12 $64 $768.00 Clerical 8 $45 $360.00 TOTAL_ $7,068.00 Reimbursables(see below) $2,000.00 Reimbursable Expenses are expenses not included in compensation for Basic Services and Additional Services and include the following expense incurred in the performance of the Services: Expense of transportation in connection with the Project;expense in connection with authorized out-of-town travel;long-distance communications;and fees paid for securing approval of authorities having jurisdiction over the project, beyond those contemplated and included in Basic Services. Expense of reproductions,postage and handling of Drawings,Specification and other documents beyond those included in Basic Services. — If authorized in advance by the OWNER,expense of overtime work requiring rates in excess of those stated in the table above. Expense of renderings, models and mock-ups requested by the OWNER. Reimbursable Expenses paid as a part of this Agreement shall be billed by the CONSULTANT as a separate line item on monthly invoices for Basic Services. If the OWNER and the CONSULTANT agree that the scope of the Project or of the CONSULTANT's Services is changed materially,the amounts of compensation shall be renegotiated. Any change in the amount of the compensation shall be subject to approval by the OWNER and the CONSULTANT. Amount not to exceed$2,000.00 without authorization by the OWNER. Sincerely, Charles A.Willis,AIA, NCARB GRW Engineers, Inc. Vice President OFFICIAL RECORD CITY SECRETARY FT.WORTH, TX