Loading...
HomeMy WebLinkAboutContract 35541 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARR�Tt�ofc Diocese of Contract No.� a WHEREAS, Fort worth , hereinafter called "Developer", desires to make certain improvements to Our Mother of Mercy , an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant, Denton and Wise Counties, Texas,hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended, is hereby incorporated into this Community Facilities Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. Developer acknowledges that there shall be no reduction in the amount of financial security prior to project completion and acceptance by the City. E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. ICI I \ yy 1 F. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. G. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. H. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. 1. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). J. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed(Article 104.100, Ordinance 7234). K. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. L. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to 2 construct current and future improvements provided for in this agreement. M. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain(B-1) Attached; Street Lights and Signs (C) Attached. N. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B,B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $ 17,352.20 . 3 SUMMARY OF COST OUR MOTHER OF MERCY Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $10,690.00 10,690.00 2. Storm Drainage $5,680.00 5,680.00 3. Street Lights $ - 4. Street Name Signs $B. Engineering Design $C. Construction Engineering and Management by DOE $ $ 4% 654.80 654.80 D. Materials Testing by DOE $ $ 2% 327.40 1 1 327.40 TOTALS 17,352.20 $ - 17,352.20 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Developer's column for Item D represents two percent(2%) of paving and storm drain costs for materials testing. 4 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, an aid lop has executed this instrument in triplicate, at Fort Worth,Texas this the ay o .2007. Approval Recommended: Transportation and Public Works Department Robert oode,P. E. Director Fort / VA4 arc Ott NO M&C REQUIRED Assistant City Manager ATTEST: CY\C�'� Marty Hendrix City Secretary Appr ed s to Fo . �• Kevin W. Vann,J.C.D.,D.D.,Bishop of the Catholic Diocese of Fort Worth Assistant ty ttorney ATTEST: DEVELOPER By: Corporate Secretary 04z, Rev. es Hart,Attorney-in-Fact for K in W.Vann,J. D.D Bishop `''�' of the Catholic Diocese of Fort Worth HAMILTON DUFFY, P.C. 601 HARWOOD ROAD HURST,TEXAS 76054 PAVING IMPROVEMENTS TO SERVE OUR MOTHER OF MERCY CITY OF FORT WORTH,TEXAS DOE#5619 ENGINEER'S PROJECT NO 067-015 STATEMENT OF PROBABLE CONSTRUCTION COST 3/22/2007 ITEM ITEM DESCRIPTION UNIT PLAN UNIT TOTAL NO. QTY. PRICE COST Paving Improvements 1 4"Concrete Sidewalk incl. Ramps SF 115 $6.00 $690.00 2 6" Concrete Driveway Approach SY 120 $65.00 $7,800.00 3 Saw-cut Remove and Replace Concrete Curb& Gut. LF 25 $30.00 $750.00 4 Saw-cut Remove and Replace Concrete Roadway SY 6 $75.00 $450.00 5 ITraffic Control EA 1 $1,000.00 $1,000.00 6 IMaintenance Bond LS 1 $1,800.00 $T 78 UOY00 7 Material Testing LS 1 $750.00 $750.00 8 4%inspection fee LS 1 $363.60 $387.60 Total Paving Improvements $13,627.60 ESTIMATED SUBTOTAL $13,627.60 CONTINGENCY (0%) $0.00 TOTAL CONSTRUCTION $13,627.60 Notes: 1. This estimate was prepared utilizing standard cost estimate practices. It is understood that this is an estimate only and that the engineer is not liable to owner or to a third party for any failure to accurately estimate the cost of the project,or any part thereof. D n D RECEIVED P APR 19 HAMILTON DUFFY, P.C. 601 HARWOOD ROAD HURST,TEXAS 76054 STORM DRAIN IMPROVEMENTS TO SERVE OUR MOTHER OF MERCY CITY OF FORT WORTH,TEXAS DOE#5619 ENGINEER'S PROJECT NO 067-015 STATEMENT OF PROBABLE CONSTRUCTION COST 3/22/2007 ITEM ITEM DESCRIPTION UNIT PLAN UNIT TOTAL NO. CITY. PRICE COST Storm Drain Improvements 1 Tie to exist. Curb inlet EA 1 $1,500.00 $1,500.00 2 18"RCP LF 53 $60.00 $3,180.00 3 Traffic Control EA 1 $1,000.00 $1,000.00 Subtotal Storm Drain Improvements 1 $5,680.00 4 Material Testing LS 1 $750.00 5 4%inspection fee LS 1 $357.00 $187.20 Total Storm Drain Improvements $6,617.20 ESTIMATED SUBTOTAL $6,617.20 CONTINGENCY(0%) $0.00 TOTAL CONSTRUCTION $6,617.20 Notes: 1. This estimate was prepared utilizing standard cost estimate practices. It is understood that this is an estimate only and that the engineer is not liable to owner or to a third party for any failure to accurately estimate the cost of the project,or any part thereof. D� CMG . EC'EIIED j APR 19 CONTINUED ON MAP 63 O armon Field Park \o 70 N .aii'- N fad p SQoftwo \ ! T �'•., a�t1'el r �7,, Jam` )f EAST �r►. FR1N`l S v sns t1 / sl 15 LAN ITEIE E Memor q� LTRF. u o b 17 ,ti v 18U 21 3 180 12 13 = 5 z m ST FR VICK Y 8LV s EL PASD\ 1 o ' � z DA G 2 JARVIS o ETS Z '+ 8 AG DAGGEIT - DAGGEf \ =1 BR OW Y Bfl Y a BR OWAY OAO AY w B OAO A:,'+� `s TELLA z :,7 STELES SY - Cree R P f S 1 _. BESSIE Muni SMI E V Zartdtu �C SMl W H TUCKER z z NN (k ANNINI TUCKERGoff 7 E E NIE NNIE E''n h Course ZA m HA I gN1A AVE E b an r dt ¢13 IE 287 HA E w ui P o 0 N N-01, CANNO N LIEU x a 3 9 14 Q 0 rn OD o HUMBOLT � Z HUM{LT HIJM T HUMBOLT a B �E OA os¢ HG� PULA I 1 Y Glenw°°d �; AVE C Z OY f ` R� ED E T V VERBENA _ flBEN PULASKIPark�s q p°C Z r z i mo 6 ' JlifL.' VVH AVE E¢ 0 A ❑I� d o so I OSE E S G A u 49 :I IPMA o ®Mspsm,Im.f''7 87 5 7 n UIEUG(I MAGNOLIA E c RMA ` a m M c AGNO 0 W19 AVE G z H8� =MORPH O PL "'~ m Park - a Iva KELL m 4c O a a n eter x Q .A13 MAD OK Smith Hospital 0 MADDOX n '_` �F/ T DOSE 5 6 m 6 I3 14 D AVE z z 49 ALLEN AVE b ALLEN b 1 y Z UO CHA CT > } I `cd. 10 �� ELMN/Q00 0^ cz4, O i JEFF SON ¢ L 6 7 Peak E J FFERSON H � ra RI Hq y RICHMOND ICH ON 9 AA NG BALTIMORE .gV1' 4ALI El ' IWT ORE I ¢ a "'s' N '>•t°' `�" WORLINGTO E DAVIS N DAMS ti 19 Y m a HARVEY Hanst HARVEY I 7-54 f'OVVELL * �W 17 JONES C�N JESSAMINE E S JESS INE 6 MA MSEY "g � RAMS 6 s N Po E C/qS PAGE 4 MARIOPI MAAION ULKEY MULKEYI 8 x._ z MULICEY J q 3 MULXEY W Cohb ROBEATI ROBEAT, Momingsi fl08ERT r"L ROBEPT , Park RNI G ID v~i H R COLVIN COLYIN COLVIN a COLVIN C SIDE j MORNINGSI sJd 17 NGSIOE c, a• z a o ® JUDD N 'Mornfn JUDD LT iA ON y �A w W LANT CANTEY Mr&or&Vsida Bnsc a ANTEY ORNIN Q� HGLEN GAI DEN JAR L& S RA ESTATE TAAiI 1 LO N LOVUDEN � a ¢ S� CNAMA _ s WIE Z BOWIE a Q OYA 0 5 ings 3 0 'VICKI �' GAWNA RAIL Lain P 7 b GE 1 Pa i< 3_ DEVITT � 14 to I b C H Lft4TT o `n DEVM o 2„ o i DIV!]7 O S HI VIEW y 6 N TH GLEN HAW SH2�BRWRO ROBERT (IgNS SCALE IN MILES SCALE IN FEET C CONTINUED ON MAP 91 O 0 /s 1A COPYRIGHT 2006 6y MAPSCO,INC.-ALL RIGHTS RESERVED 0 1000 2000 3000 BOOK PAGE 1077 1 1 1 1 1 1 1 1 1 1 I 1 1 I 1 1 f 1 I I 1 1 1 I I 1 1 1 1 I I 1 1 1 1 1/2'CIRS 5�t 0` I1AV[RF BEW 5�t r S89, 56' 40° W 1 ��oIgl 4x i/2'C1RS s. 8° w N CONSTRUCT 20 L.F. CONCRETE CURB AND GUTTER - MATCH HEIGHT OF EXISTING CURB CONSTRUCT DRIVEWAY AND SIDEWALKS PER CITY OF FORT WORTH DRIVEWAY DETAIL SCALE 1" - 20' D 10 20 PAVOG LEGEND 6•r EpKW' i�VE1(INI t/•S Wt5 •NrNpo.IuEp■1.CNlv[c�(Cal orr roil.�o Im$ UT1 C. '�:7PZE OF mot:' '•.,t 1 ? KEITH M: HAMILTON OUR MOTHER OF MERCY<8 EN80..��`��' PAROCHIAL SCHOOL it���IONA1 ENG� COMMUNITY FACILITIES AGREEMENT �Q���U�� FORT WORTH, TEXAS b zaug 'g gDo PAVING PLAN - EXHIBIT B C O N 5 U L T N N O [I II MIM-4wt 14MM•Rwq•�{tl�tla wwQ�{ Al-wnwOC 4p.�qt.INwf tom-.),{I 5-E E T 1 OR 3 nq�Mitt NA•M w t�lt�At•M CFA PAVE PLAN 2.dgn 3/22/2007 5:44:10 PM I I o of STEPS ASPHAL i MOD LAR ' RME MODULE BLDG. i N SHED BLDG. 32.3' STEPS CONC. 5 T 52 41 " W 360 o 07' � z 4a w r R N CONSTRUCT DRIVEWAY F o TERREL AVFNUE AND SIDEWALKS PER CITY OF FORT WORTH DRIVEWAY DETAIL SCALE 1" - 20' 6-0� � 0 TO 20 PAYING l[GETO 6-TH K t PAVE RT w -J M �PZE DF TEI�ZT, R i 9 R T6-o.c.t.w t i OTT oar FORT WORTxT �►c� 95, �, 4-rHCic�p1 W E SOtw11�R Tu 17 BARS R T6'O.C.E t.1PER CITY Of FORT 11011110 / KEITH M. HAMILTON / 873 ...........................•'`vim� 84 OUR MOTHER OF MERCY ..<I o.. PAROCHIAL SCHOOL COMMUNITY FACILITIES AGREEMENT �Q�,gg�©� FORT WORTH, TEXAS mUUGsvn pc PAVING PLAN - EXHIBIT B C ONSUL TING CIVIL&9MI80"-t I16"CM•t—q.5•@6,tt,IP wl..�6m.o.6�wa,.nr ws.•nsl CFA PAVE PLAN.dgn 3/22/2007 67 09 PM U U - 12,0� �. ' MODJAR AME MODULAR i BLDG. SHED BLDG. i 32.3' 64.2' I STEPS STEPS i i CONSTRUCT 53 L.F\ 18 DIA. RCP ! \ STORM DRAIN i \ (PUBLIC) • u J2 r I 1 " 19 360 o 0 1 I TIE TO BACK OF EX IU. EXISTING CURB INLET CUNB INLET TERREL AVENUE TIC- 608.75 (80` R.O.W. ) FL: 604.25 N SCALE 1" - 40' 0 20 40 �- RECEIVED, RI � - *'........................... '. / KEITH M. HAMILTON / '•••.••.••.•••••..••......•.. r� OUR MOTHER OF MERCY 87384 i 'mow' PAROCHIAL SCHOOL i 1�>>jONALENG�I COMMUNITY FACILITIES AGREEMENT FORT WORTH, TEXAS STORM DRAIN PLAN - EXHIBIT B-1 C O N 5 U L T 1 N G Cirlt t cwlmowq 1t{.0I190f•tm[4 coomc.10.�.R4 •1•.�pW qp•4/41..M1y rw0..)IN CFA STORM PLAN.dan 3/22/2007 5:46:03 PM