Loading...
HomeMy WebLinkAboutContract 37085 CST ti' SECRETARY NO FIRST AMENDMENT TO CITY SECRETARY CONTRACT NO. 20141 KENNEDALE WHOLESALE WASTEWATER CONTRACT WHEREAS, on the 8 h day February, 1994, the City of Fort Worth and the City of Kennedale entered into City of Fort Worth City Secretary Contract No. 20141 (the "Contract"), providing for the treatment of wastewater for the area described in exhibit "A" to the contract at the point of connection described in Exhibit`B"to the contract, said exhibits being attached to this First Amendment for reference; and WHEREAS, the City of Kennedale desires to obtain a second point of wastewater connection to serve the Oak Crest neighborhood thereby amending the service area in the contract to include the area described in Exhibit "C" to this First Amendment at Exhibit "D" to this First Amendment; and WHEREAS, City of Fort Worth and the City of Kennedale have entered into a Memorandum of Understanding("MOU") known as City Secretary Contract No. 35488 setting out the terms and conditions for the provision of a wastewater service for the second point of connection by Fort Worth in consideration of Kennedale's cooperation and withdrawal of objection to Fort Worth's applications for a permit modification to its Southeast Landfill; WHEREAS, the parties have acknowledged and confessed that a second point of connection should be made to serve the Oak Crest neighborhood pursuant to the terms and conditions contained herin. NOW THEREFORE,KNOW ALL BY THESE PRESENTS: 1. City of Fort Worth City Secretary Contract No. 20141 is hereby amended by the addition of paragraph 32,which shall be and read as follows: 32. Additional Points of Connection and Removal of a Point of Connection 32.1 Customer is granted a second point of connection to the Fort Worth System at the location as shown on Exhibit "C" attached hereto and made a part hereof for all purposes. Fort Worth agreed to accept all wastewater generated from customer's service area described in Exhibit "C" attache here to and made a part hereof for all purposes at the second point of connection as shown in Exhibit"D". 32.2 Customer,at its sole cost and expense, shall: • Provide an inline manhole on the M-257-C sewer main • Ensure private sewer backflow devices are installed at Kennedale properties fronting on and south of Oak Crest Drive and at any sewer plumbing connection that is below elevation 578'; • Construct a sewer metering station and provide electrical power to the sewer metering station. 32.3 Customer shall be responsible for the design and contruction of the metering facility and the installation of all metering equipment and backflow devices, which shall be subject to the review and approval of Fort Worth. Customer shall also pay a 2% inspection fee of the total meter construction cost to Fort Worth. 32.4 Upon completion of the meter vault and metering equipment, Fort Worth shall inspect the meter vault and metering equipment. If Fort Worth determines that the meter vault and metering equipment is in compliance with paragraph 3 of the contract, Fort Worth shall accept the same and shall be responsible for the operation and maintenance of the equipment. The cost of such operation and maintenance shall be a System Cost. 32.5 In the event Customer desires to have a larger metering station installed, Customer shall make written request to Fort Worth for its consideration. If Fort Worth, in its sole discretion, gives its written approval of the installation of the larger station, Customer,at its sole cost and expense, shall be responsible for the design and installation of the improvements. VL�00 2. All other terms, conditions, and covenants contained in City of Fort Worth City Secretary Contract 20141 not amended herein continue in full force and effect. CITY OF FORT WORTH CITY OF KENNEDALE �Z�----- 1' Fernando Costa B b Hart Assistant City Manager CITY MANAGER DATE: �'����—D J� DATE: APPROVED AS TO FORM AND APPROVED AS TO FORM AND LEGALITY LEGALITY xtCwv� , Ulu , ,r F, JA)IC0 00, �F KE�,A, ASSIST NT CITY AT RNEY CITY ATTORNEY ° ;7" ATTEST ATTEST o r � C MA TY HENDRIX KATHY TURN CITY SECRETARY CITY SECRETARY C-Cqal 9 � Contract huthorizatioa 'I (eIo� Date Kennedale Amendment Final Page 3 of 3 .....�,..�._... u ::Yi'.'.• _._::._:=:aL. �'r"`.-_spa- _ .... ..._.� ..�Y•M� `. "' _ _- -`: '=T"-- ----.... __r.::._:__+.—.ems_ 3=:aa_r..:��:�-r �M1Epsi'1` :.'.:.r 6 - ___•i-�-r- '"':11°m .rnoa•�mw " r�,..� 1`i- � iris•._ ____ -;z,a�,�_•.�'—�---�.—+--fit—•--''�ir—_� wa.ro w � •w+uP1 w.w. ` I O EEd 1 wr.er+ it Y YY r mow- A SURVEY OF ST ACRES �„�_--__. ^:^•^^ - IN THE DAVID STRICKLAND ca SURVEY, A•1376, CITY OF KENNEDALE,TARRANT CO.,TEX. tnri] Ir-1 ; ' �- EXHIBIT A-1 Lc�) kfg �`"'GQ,K C� i. ad �(so� �`��� ��• Q��'bet "�'1H��tar➢_wrtr"�'r;"",� ;e.,°wr C2 .'i�'i n�=�alj`i',•4ty���41`,,. rill , l / �� �� � }li I�a���.b��77777C70� OI�ri/�1SS�i, �f��ll� .ii,rW�l ®;919i' . ``t {'�P�CpSa�l�!6�t1 `ar:?,t�—r�� ��c►vl•� w �^I I piiea jii �% 9 mmmamctC9p 1��vOtll7osomooDp�Anmou�a� G �b® � u nQiva�6hmm vafio e" � ®��Q,®�3 �61°°� �arEr45gd� ®Hood o � •� � �� p.P d�E7 ab : e�.v�vellM6n� °e a ,�, A la7�a®� z -+® � 13A �I 1 � �u P:orP3�p i 17:it-p ll�IN .�C�0 aP�6 - IS9 6 I1 T w�' 3 iig J T1�n J .I.'+�� y ��� �I�q � iri ��oai li tEt a�f w. 2nf�dE:�L s"l�hJ �� �soale`t Szo� =7 vs.aa,, e'er.:-:�, E 1 I! IMl C.,�F:iIC'��a�C �.. L S 4:c ctl z, '` qc� I�E4. �.0 r°�Je�ewaeao®i�ll�ii�' �11`HIoyI •� i s�adC7—'ELF COI+IEd7i Q� 1 �:��ti�__�a� 1 L��r. ?ao�tl�IF�4� .I_ Bt � 1 � �►, — �al...� _� —•=��1 III CITY OF KENNEDALE J� 1S SN3d1 i PM\ PROPO D " Co. PCTI FORT yy � IN M-2 -C 57 %,Y i_ OAK CREST Y_ __� A /�• 4 SS m q —t J = LLIMUS EXHIBIT C PROPOSED CONNECTION POINT TO FORT WORTH MAIN M 257-C r � �4' .l 1:.5 L7G�:J✓ j� • (�1 y�I Jl�p �y2��(,J City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 5/6/2008 DATE: Tuesday, May 06, 2008 LOG NAME: 60KENNEDALE REFERENCE NO.: **C-22799 SUBJECT: Authorize Execution of the First Amendment to the Wholesale Wastewater Contract with the City of Kennedale (City Secretary Contract No. 20141) to Designate a Second Point of Connection RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute the first amendment to the Wholesale Wastewater Contract with the City of Kennedale (City Secretary Contract No. 20141) to allow for a second point of wastewater connection. DISCUSSION: The City of Kennedale is currently a wholesale wastewater customer of the City and has requested a second point of wastewater connection to serve the Oak Crest neighborhood thereby amending the service area identified in the original Contract. On or about July 2, 2007, the City of Fort Worth and the City of Kennedale entered into a Memorandum of Understanding known as City Secretary Contract No. 35488 setting out the terms and conditions for the provision of a wastewater service for the second point of connection by Fort Worth in consideration of Kennedale's cooperation and withdrawal of objection to Fort Worth's applications for a permit modification to its Southeast Landfill. The First Amendment entails the details of the agreement for the provision of wastewater at the second point of connection. Under the First Amendment, Fort Worth agrees to accept all wastewater generated from the new service area described in the exhibits and made a part of the agreement, at the second point of connection. Kennedale, at its sole cost and expense, shall: • provide an inline manhole on the M-257-C sewer main; • ensure private sewer backflow devices are installed at Kennedale properties fronting on and south of Oak Crest Drive and at any sewer plumbing connection that is below elevation 578% • ensure that the sewer main connection to M-257-C shall have an air gap in the inline manhole; and • construct a sewer metering station and provide electrical power to the sewer metering station. Kennedale shall be responsible for the design and construction of the metering facility and the installation of all metering equipment and backflow devices, which shall be subject to the review and approval of Fort Worth. Kennedale shall also pay a 2 percent inspection fee of the total meter construction cost to Fort Worth. Logname: 60KENNEDALE Page 1 of 2 FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that this action will have no material effect on City funds. TO Fund/Account/Centers FROM Fund/Account/Centers Submitted for City Manager's Office by: Fernando Costa (8476) Originating Department Head: S. Frank Crumb (8207) Additional Information Contact: S. Frank Crumb (8207) Logname: 60KENNEDALE Page 2 of 2