HomeMy WebLinkAboutContract 37085 CST ti' SECRETARY
NO
FIRST AMENDMENT TO
CITY SECRETARY CONTRACT NO. 20141
KENNEDALE WHOLESALE WASTEWATER CONTRACT
WHEREAS, on the 8 h day February, 1994, the City of Fort Worth and the City of
Kennedale entered into City of Fort Worth City Secretary Contract No. 20141 (the "Contract"),
providing for the treatment of wastewater for the area described in exhibit "A" to the contract at
the point of connection described in Exhibit`B"to the contract, said exhibits being attached to this
First Amendment for reference; and
WHEREAS, the City of Kennedale desires to obtain a second point of wastewater
connection to serve the Oak Crest neighborhood thereby amending the service area in the contract
to include the area described in Exhibit "C" to this First Amendment at Exhibit "D" to this First
Amendment; and
WHEREAS, City of Fort Worth and the City of Kennedale have entered into a
Memorandum of Understanding("MOU") known as City Secretary Contract No. 35488 setting out
the terms and conditions for the provision of a wastewater service for the second point of
connection by Fort Worth in consideration of Kennedale's cooperation and withdrawal of
objection to Fort Worth's applications for a permit modification to its Southeast Landfill;
WHEREAS, the parties have acknowledged and confessed that a second point of
connection should be made to serve the Oak Crest neighborhood pursuant to the terms and
conditions contained herin.
NOW THEREFORE,KNOW ALL BY THESE PRESENTS:
1.
City of Fort Worth City Secretary Contract No. 20141 is hereby amended by the addition
of paragraph 32,which shall be and read as follows:
32.
Additional Points of Connection and Removal of a Point of Connection
32.1 Customer is granted a second point of connection to the Fort Worth System at the location
as shown on Exhibit "C" attached hereto and made a part hereof for all purposes. Fort
Worth agreed to accept all wastewater generated from customer's service area described in
Exhibit "C" attache here to and made a part hereof for all purposes at the second point of
connection as shown in Exhibit"D".
32.2 Customer,at its sole cost and expense, shall:
• Provide an inline manhole on the M-257-C sewer main
• Ensure private sewer backflow devices are installed at Kennedale properties fronting on
and south of Oak Crest Drive and at any sewer plumbing connection that is below
elevation 578';
• Construct a sewer metering station and provide electrical power to the sewer metering
station.
32.3 Customer shall be responsible for the design and contruction of the metering facility and
the installation of all metering equipment and backflow devices, which shall be subject to
the review and approval of Fort Worth. Customer shall also pay a 2% inspection fee of the
total meter construction cost to Fort Worth.
32.4 Upon completion of the meter vault and metering equipment, Fort Worth shall inspect the
meter vault and metering equipment. If Fort Worth determines that the meter vault and
metering equipment is in compliance with paragraph 3 of the contract, Fort Worth shall
accept the same and shall be responsible for the operation and maintenance of the
equipment. The cost of such operation and maintenance shall be a System Cost.
32.5 In the event Customer desires to have a larger metering station installed, Customer shall
make written request to Fort Worth for its consideration. If Fort Worth, in its sole
discretion, gives its written approval of the installation of the larger station, Customer,at its
sole cost and expense, shall be responsible for the design and installation of the
improvements.
VL�00
2.
All other terms, conditions, and covenants contained in City of Fort Worth City
Secretary Contract 20141 not amended herein continue in full force and effect.
CITY OF FORT WORTH CITY OF KENNEDALE
�Z�-----
1'
Fernando Costa B b Hart
Assistant City Manager CITY MANAGER
DATE: �'����—D J� DATE:
APPROVED AS TO FORM AND APPROVED AS TO FORM AND
LEGALITY LEGALITY
xtCwv� , Ulu , ,r
F, JA)IC0 00, �F KE�,A,
ASSIST NT CITY AT RNEY CITY ATTORNEY
° ;7"
ATTEST ATTEST o r
� C
MA TY HENDRIX KATHY TURN
CITY SECRETARY CITY SECRETARY
C-Cqal 9 �
Contract huthorizatioa
'I (eIo�
Date
Kennedale Amendment Final Page 3 of 3
.....�,..�._... u ::Yi'.'.• _._::._:=:aL. �'r"`.-_spa-
_ .... ..._.� ..�Y•M� `. "' _ _- -`: '=T"-- ----.... __r.::._:__+.—.ems_ 3=:aa_r..:��:�-r
�M1Epsi'1` :.'.:.r 6 - ___•i-�-r-
'"':11°m .rnoa•�mw " r�,..� 1`i- � iris•._ ____
-;z,a�,�_•.�'—�---�.—+--fit—•--''�ir—_� wa.ro w
� •w+uP1 w.w.
` I
O
EEd 1 wr.er+
it
Y YY
r mow- A
SURVEY OF ST ACRES
�„�_--__. ^:^•^^ - IN THE DAVID STRICKLAND ca
SURVEY, A•1376, CITY OF
KENNEDALE,TARRANT CO.,TEX.
tnri] Ir-1 ;
' �- EXHIBIT A-1
Lc�)
kfg
�`"'GQ,K
C� i.
ad �(so� �`��� ��• Q��'bet "�'1H��tar➢_wrtr"�'r;"",� ;e.,°wr C2 .'i�'i n�=�alj`i',•4ty���41`,,. rill
, l
/ �� �� � }li I�a���.b��77777C70�
OI�ri/�1SS�i, �f��ll� .ii,rW�l ®;919i' . ``t {'�P�CpSa�l�!6�t1 `ar:?,t�—r�� ��c►vl•�
w
�^I I piiea jii �% 9 mmmamctC9p 1��vOtll7osomooDp�Anmou�a� G
�b® � u nQiva�6hmm vafio e" �
®��Q,®�3 �61°°� �arEr45gd� ®Hood o �
•� � �� p.P d�E7 ab : e�.v�vellM6n� °e
a ,�, A
la7�a®� z -+® � 13A �I 1 �
�u P:orP3�p
i 17:it-p ll�IN .�C�0 aP�6 - IS9 6 I1 T
w�' 3 iig J T1�n J .I.'+�� y ��� �I�q � iri ��oai li tEt a�f
w. 2nf�dE:�L s"l�hJ �� �soale`t Szo� =7
vs.aa,, e'er.:-:�, E 1 I! IMl
C.,�F:iIC'��a�C �..
L S 4:c ctl
z, '` qc� I�E4. �.0
r°�Je�ewaeao®i�ll�ii�'
�11`HIoyI
•� i s�adC7—'ELF COI+IEd7i Q� 1 �:��ti�__�a� 1 L��r. ?ao�tl�IF�4� .I_
Bt �
1 �
�►, — �al...� _� —•=��1 III
CITY OF KENNEDALE
J� 1S SN3d1
i PM\
PROPO D "
Co. PCTI
FORT yy
� IN M-2 -C
57 %,Y
i_
OAK CREST Y_ __� A /�• 4 SS m
q
—t
J =
LLIMUS
EXHIBIT C
PROPOSED CONNECTION POINT TO
FORT WORTH MAIN M 257-C
r � �4' .l 1:.5 L7G�:J✓
j� • (�1 y�I Jl�p �y2��(,J
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 5/6/2008
DATE: Tuesday, May 06, 2008
LOG NAME: 60KENNEDALE REFERENCE NO.: **C-22799
SUBJECT:
Authorize Execution of the First Amendment to the Wholesale Wastewater Contract with the City of
Kennedale (City Secretary Contract No. 20141) to Designate a Second Point of Connection
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute the first amendment to the
Wholesale Wastewater Contract with the City of Kennedale (City Secretary Contract No. 20141) to allow for
a second point of wastewater connection.
DISCUSSION:
The City of Kennedale is currently a wholesale wastewater customer of the City and has requested a
second point of wastewater connection to serve the Oak Crest neighborhood thereby amending the service
area identified in the original Contract.
On or about July 2, 2007, the City of Fort Worth and the City of Kennedale entered into a Memorandum of
Understanding known as City Secretary Contract No. 35488 setting out the terms and conditions for the
provision of a wastewater service for the second point of connection by Fort Worth in consideration of
Kennedale's cooperation and withdrawal of objection to Fort Worth's applications for a permit modification
to its Southeast Landfill. The First Amendment entails the details of the agreement for the provision of
wastewater at the second point of connection.
Under the First Amendment, Fort Worth agrees to accept all wastewater generated from the new service
area described in the exhibits and made a part of the agreement, at the second point of connection.
Kennedale, at its sole cost and expense, shall:
• provide an inline manhole on the M-257-C sewer main;
• ensure private sewer backflow devices are installed at Kennedale properties fronting on and south of Oak
Crest Drive and at any sewer plumbing connection that is below elevation 578%
• ensure that the sewer main connection to M-257-C shall have an air gap in the inline manhole; and
• construct a sewer metering station and provide electrical power to the sewer metering station.
Kennedale shall be responsible for the design and construction of the metering facility and the installation of
all metering equipment and backflow devices, which shall be subject to the review and approval of Fort
Worth. Kennedale shall also pay a 2 percent inspection fee of the total meter construction cost to Fort
Worth.
Logname: 60KENNEDALE Page 1 of 2
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that this action will have no material effect on City funds.
TO Fund/Account/Centers FROM Fund/Account/Centers
Submitted for City Manager's Office by: Fernando Costa (8476)
Originating Department Head: S. Frank Crumb (8207)
Additional Information Contact: S. Frank Crumb (8207)
Logname: 60KENNEDALE Page 2 of 2