HomeMy WebLinkAboutOrdinance 7104 J 1
ORDINANCE NO.
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF BRIDGE STREET
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH
.T, T.- RFR3:RAM FOR THE CONSTRUCTION OF
SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE
ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF
SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS
HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS;
DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE
BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY
COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE
IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN
EFFECTIVE DATE.
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with J. L. BERTRAM, CONSTRUCTION & ENGINEERING, INC. , for the making and construction of
certain street improvements on e hereinafter described portions of streets, avenues and
public places in said City, to- it:
BRIDGE STREET, UNIT I From Oakland Boulevard to Weiler Boulevard,
known and designated as Project No. 104-
23000-131, Unit I.
WHEREAS, by sundry proceedings heretofore passed by the City Council of the
City .of Fort Worth, Texas, including Ordinance No. 6834`, a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues,,,and, public places and against
the real and true owners thereof; and,
WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 68_34 - , and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOW, THEREFORE,
BE IT ORDAINED BY THE ',CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT:
I.
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
II.
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the' true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the ,assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on'the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows:
III.
When each of the certificates has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVED THIS day of �2 �%Y'�GG��I� , 19,
APPROVED AS TO FORM AND LEGALITY:
ea
• 1
City Attorney
2OJECT NO. 104-23000-131, BRIDGE STREET, UNIT Ia FROM OAKIAND BOULEVARD TO WEILER
BOULEVARD, to be improved by widening existing street to forty-four feet and constructing
thereon a seven-inch thick reinforced concrete pavement on a six-inch thick lime
stabilized subgrade with seven-inch high superimposed concrete curb. Six-inch thick
concrete driveways will be constructed where specified along with necessary storm drain
appurtenances.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING A POINT 213' EAST OF OAKLAND BOULEVARD
,FORTH SIDE J, BIACKWELL SURVEY
Old Ocean Fuel Co. Tract 3 19041 No Assessment
(TESCO) Comm. Due to depth
P.O. Box 970 factor
J, W. HAYNES SURVEY
Old Ocean Fuel Co. Tract 2 1080' No Assessment
(TESCO) C. F. Due to depth
P.O. Box 970 factor
Fort Worth Water Dept. 3531 No Assessment
Contains City
Water Storage
Tanks
W. Lt IANDY SURVEY
Old Ocean Fuel Co. Tract 5 16641 No Assessment
(TESCO) Apt. Due to depth
P.O. Box 970 factor
E, JONES SURVEY
Tommy Moore Tower Co. Tract 1F 6601 Pavement
5201 Bridge Street Comm. widening $10.31 $6,804.60
6601 Curb .83 547.80
310 Sq. Ft. Drive .88 272.80
$7,625.20
PROJECT NO. 104-23000-131, BRIDGE STREET, UNIT I. CONTINUED:
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
E. JONES SURVEY
Tommy Moore Tower Co., Tract 1F 379.4' No Assessment
Incorporated Comm. Due to Slope
Differential
W. J. BAKER SURVEY
Woodhaven Country Tract IA 160' No Assessment
Club Estates Comm. Due to Slope
P.O. Box 8593, 76112 Differential
Attn: Janet Rodman
Woodhaven Country Tract IA 675' Pavement $10.31
Club Estates Comm. Widening $6,959.25
P.O. Box 8593, 76112 675' Curb .83 560.25
Attn: Janet Rodman $79519,50
Woodhaven Country Tract lA 330' No Assessment
Club Estates Comm. Drainage Easement
P.O. Box 8593, 76112 & Future Street
Attn: Janet Rodman
TOTAL COST TO PROPERTY OWNERS. . . . . . . . . .$ 159144.70
TOTAL COST TO CITY OF FORT WORTH. . . . . . . . $572,367.27
TOTAL CONSTRUCTION COST. . . . . . . . . . . . .$587,511.97
u) City of Fort Worth, Texas
UN:i Mayor and Council Communication
NNUFS
DATE REFERENCE SUBJECT: Final Payment - Construction of PAGE
NUMBER
Bridge St, Unit 1 Oakland Blvd to Weile , 2
12/9/74 FP-1055 Street Project anA 12" Water Supply Main iot
in Street
Final Council action on the Project described below is requested.
Project Description
Name: Construction of Bridge St, Unit 1, Oakland Blvd to Weiler, Street
Project and 12" Water Supply Main in Street, Project Nos. 104-
23000-131 and 109-14000-430.
Contractor: J. L. Bertram Const. and Engr. , Inc.
Contract Awarded: April 9, 1973 (M&C C-2505)
Work Order Issued: June 4, 1973
Work Order Effective: June 18, 1973
Work Began: June 18, 1973
Date of Final Inspection and Approval: September 11, 1974
Working Time Bid: 206 Working Days
Working Time Used: 204 Working Days
Project Cost and Financing
Original Bid Price: $659,223.67
Change Order No. 1: $4,853.00
Change Order No. 2: 296.56
Revised Bid Price: $664,373.23
Final Contract Cost: $640,236.92
Partial Payments Previously Made: 15, Amount $603,960.52
Final Payment Due: $36,276.40
Sufficient funds are available for the final payment to be made from
Project Numbers 104-23000-112 and 109-14000-430.
Deviation from Bid Price: The final contract cost of this project
is 3.63% under the revised bid price. The major portion of the savings
resulted because it was not necessary to construct as much subdrain as
estimated, considerably less hot mix asphaltic transition was used and
fewer utility adjustments were necessary than anticipated. Also minor
variations between quantities estimated in the contract documents and
quantities measured and used at the job site contributed to the savings.
Compliance with Specifications
Tests made during construction show that materials used and required
thicknesses were in compliance with contract specifications with the
exception of one minor area and the contractor was penalized for this
DATE REFERENCE SUBJECT: Final Payment - Construction Of PAGE
NUMBER
Bridge St, Unit 1, Oakland B vd to Weile , 2
12/9/74 FP-1055 Street Project and 12" Water Supply Main of 2
in Street
area as provided in the contract specifications.
Recommendations
It is recommended that the project described be accepted by the adoption
of an ordinance and final payment of $36,276.40 be made to J. L. Bertram
Construction and Engineering Inc.
RNL:mm
SUBMITTED BY: DISPOSITION BY COUNCIL: PROCESSED BY
6►4PROVED ❑ OTHER (DESCRIB
le. 74 I - kY t-��C] �f� /Ij�/l/t�� &,,o, / !_D G�SECRETARY
DATE
CITY MANAGER lc2lgl2