Loading...
HomeMy WebLinkAboutOrdinance 6804 ORDINANCE NO. - AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF BEATY STREET AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im- proved by raising, grading and filling same and by constructing thereon the following, to-wit: UNIT I: BEATY STREET From 40' west of Warren Lane to 20' east of Muse Street, known and designated as Unit I, Project No. 104-24000- 232, a six-inch thick hot-mix asphaltic concrete pavement on a sit-inch thick cement stabilized subgrade, seven- inch high concrete curb and eighteen-inch wide concrete gutter on a forty foot roadway. Six-inch thick concrete driveways will be constructed where specified. UNIT II: MUSE STREET From Beaty Street to 240' north, known and designated as Unit II, Project No. 104-24000-232, a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway, and by constructing seven-inch high concrete curb and eighteen-inch wide concrete gutter on the west side only for an additional 424.41' north. UNIT III: WARREN LANE From Beaty Street to Norma Street, known and designated as Unit III, Project No. 104-24000-232, a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty-six foot roadway. .i. t r together with concrete curbs, gutters, driveways and incidentals to such improvements on proper grade and line where same are not already so constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of said im- provements to be constructed as and where shown on the Plans and in strict accordance with the Plans and Specifications therefor; contract therefore has been made and entered into with FIRST PAVING CORP. ; and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amount per front foot proposed to be assessed against abutting property and the owners thereof, and such estimates have been examined, NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. Such estimates be, and they are hereby adopted and approved. II. It is hereby found and determined that the cost of improvements on each portion of streets, avenues, and public places hereinafter described, with the amount or amounts per front foot proposed to be assessed for such improvements against abutting pro- perty and the owners thereof, are as follows, to-wit: UNIT I: BEATY STREET From 40' west of Warren Lane to 20' east of Muse Street, known and designated as Unit I, Project No. 104-24000-232. The estimated cost of improvements is $ 13,203.19 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2_7 ' ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 9.28 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for six-inch thick concrete driveway is $ 1.48 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 12.04 , plus the cost incurred for concrete driveway construction where specified. III. A hearing be given and held by and before the City Council of the City of Fort Worth, Texas, to all owning or claiming any property abutting upon said portions of highways, streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such hearing shall be given and held on the 2nd day of April , 19 73 , at 9:30 A.M. , in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and the City Secretary is hereby directed to give or_'cause to be given notice ,of the time and place of such hearing and of. other matters and facts in accordance with the terms and provisions of an Act passed at the First Called Session-of the Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts of said Session, now being known as Article 1105b of Vernon's Texas Civil Statutes as amended by Acts 1967, 60th Legislature, Page 365,_ Chapter 176, Section 1, emergency effective May 12, 1967. Such notice shall be.by advertisement inserted at least three (3) times in a newspaper published in the -City of Fort Worth, Texas, the first publication to be made at least twenty-one (21) days before the date of said hearings Said notice shall comply with and be in accordance with the terms and provisions of said Act as amended. The City Secretary is further directed to give or cause to be given personal notice of the time and place of such hearing to all owning or claiming any property abutting on said portions of highways, streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such personal notice shall be in_writing and shall be given or caused to be given by the City Secretary by depositing such written notice in the United. States Mail at least fourteen (14) days before the date of the hearing, postage prepaid, in envelopes addressed to all persons owning or claiming any interest in the respective properties abutting the high- ways, streets, avenues and public places or portions thereof to be improved, as the names `of such persons are shown on the current rendered tax rolls of the City of Fort Worth and at the addresses so shown, or if the name of such respective owners do not appear on such rendered tax rolls, then address to such owners as their names are shown on the current unrendered tax rolls of the City of Fort Worth at the addresses shown thereon. In those cases in which an owner of property abutting a highway, street, avenue or public place or portion or portions there- of which is to be,improved is listed as "unknown" on the' then current City of Fort Worth tax rolls, or the name of an owner is shown on the City of Fort Worth tax rolls but no address for such owner is shown, no notice need be mailed. In those cases where the owner is shown to be in estate, the mailed notice may be addressed to such estate, In this connection, the City Secretary shall prepare and file or cause to be prepared , the- properties filed with these proceedings a list of th properties to be assessed., the names of those persons owning or claiming any interest in said properties to whom the notice was mailed, together with the last known addresses determined as aforesaid of the respective owners and those per-% sons owning or claiming any interest in said property. The City Secretary shall certify that each of the parties in said list whose address is shown on the then current rendered or unrendered tax rolls of the City of Fort Worth was mailed a copy ,of the notice of hearing and shall further certify the date or dates on which said notice was mailed. A copy of each notice shall be attached to such certificate. The certificate of the City Secretary will be con- clusive evidence of the facts therein recited. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. Passed and approved this -544 day of 2*-�1610 19 _. APPROVED AS TO FORM AND LEGALITY: *6�t" City Tttorney f UNIT II: MUSE STREET From�Beety` Street to 240' north, known and' ' designated as Unit II, Project No. 104-24000- 232. The estimated cost of improvements is $ 7,068.16 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.76 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $6.76 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $_ -0- per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 9.52 , plus the cost incurred for concrete driveway con- struction where specified. UNIT III: WARREN LANE From Beaty Street to Norma Street, known and designated as Unit III, Project No. 104- 24000-232. .The estimated cost of improvements is $ 32,270.15 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.76 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 8.26 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ -0. per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 11.02 plus the cost incurred for concrete driveway con- struction where specified. The estimated cost of improvements is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ , plus the cost incurred for concrete driveway con- struction where specified. City of Fort Worths Texas UNE Mayor -and Council Communication DOBBS DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE GRAHAM NUMBER Paving and Storm Drain in East 1 ut ar.a B. 3 375/73 C-2456 Greenhill -eouncil action is requested on Project No. 104-24000--232, as described below: Project Description Roadway Width R.O.W. Width Unit Street Limits Feet Feet I. Beaty Street 40' West of Warren Lane 40 60 to 20' East of Muse Street II. Muse Street Beaty Street to 240' North 30 50 and curb and gutter on the West side only for an additional 424.51' North III. Warren Lane Beaty Street to Norma 36 56 Street This project will provide improved traffic and drainage facilities around East Handley Elementary School area. Improvements The improvements in this project are City initiated in conjunction with Developer's Contract No. 7319, being border streets of a new development (1973 CIP A-193). All units will be improved by the construction of six- inch thick hot-mix asphaltic concrete pavement, seven-inch high concrete curb and eighteen-inch wide concrete gutter, on a six-inch cement stabilized subgrade, along with six-inch thick concrete driveways and necessary storm sewer appurtenances. A new storm drain system will also be constructed in the existing Muse Street from Norma Street to Meadowbrook Drive, all in existing and/or dedicated right-of-way. Submission of Bids The following bids have been received: Bidder Amount First Paving Corp. $90,529.95 Texas Bitulithic Company 92,264.55 L. Grimes & Company 93,365.95 S.R.O. Asphalt, Inc. 101,966.25 Austin Road Company 102,321.28 Glade, Inc. 109,456.30 The following contractors took plans and specifications but did not submit a proposal: Walt Williams Construction Company R. W. Gibbins, Inc. DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE NUMBER 3/5/73 C-2456 Paving and Storm Drain in East 2 cf 3 Green Hill Addition Bids received: February 8, 1973 Working Days Allotted: 45 Protect Cost and Financing Based on the low bid, $20,387.35 will be assessed against abutting property owners, to be provided for by a bond fund transfer from Revolving Fund Unspecified. Total construction, inspection engineering and administra- tive salaries and miscellaneous costs to the City will be approximately $79,195.60. Approximately $900 remains in the project account. A bond fund transfer of* $78,300 from Assessment Paving Streets Unspecified, Account No. 104-24000-901 is required to provide sufficient funds for the City's total cost. Recommendations It is recommended that: 1) The following Bond Fund Transfers be approved: AMOUNT FROM TO REASON $20,387.35 Unspecified Revolving Assessment Paving To provide funds Fund 042-09724-901 in East Green Hill for property owners Addition share of construc- 042-10424-232 tion cost of Beaty Street, Muse Street and Warren Lane. $780300.00 Assessment Paving Assessment Paving To provide funds Streets Unspecified in East Green Hill sufficient for 104-24000-901 Addition City's cost of 104-24000-232 construction, inspection engi- neering and admini- strative salaries and miscellaneous expenses for Beaty Street, Muse Street Warren Lane and Storm Drainage in East Green Hill Addition 2) An ordinance be adopted: a) Declaring the necessity for and ordering the improvements; b) Making provisions for levying assessments; c) Directing the Public Works Department to prepare estimates fo costs and amounts to be assessed; d) Awarding the contract to First Paving Corp. , in the amount of $90,529.95; DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE NUMBER 3/5/73 C-2456 Paving and Storm Drain in East 3 or 3 Green Hill Addition e) Making appropriations to cover the indebtedness thereby incurred for improvements of the project named above. 3) An ordinance be adopted: a) Approving the estimates of costs and amounts proposed to be assessed; and, b) Setting April 2, 1973, as the date for the Benefit Hearing, RNL:m3 SUBMITTED BY: DISPOSITION BY COUNCIL: PROCESSED BY `A3 APPROVED ❑ OTHER (DESCRIBE) f-vv-1-4 Adopted Ordinance No.6 V� g Declaring CI SECRETARY and Ordering Paving & Ordinance No. DATE CITY MANAGER Setting Date of Benefit Hearing