HomeMy WebLinkAboutOrdinance 7107 ORDINANCE NO.
AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE-
MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF
NORTH CQ41ERCE STREET
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE
CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE
OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING
THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE
CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE
CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING
THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE
CITY; AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the
hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im-
proved by raising, grading and filling same and by constructing thereon the following, to-wit:
UNIT 1A: NORTH CaKHERCE STREET From NE 28th Street to NE 29th Street, known
and designated as Project No. 104-24000-238,
Unit lA, a seven-inch thick hot-mix asphaltic
concrete pavement on a four-inch thick crushed
lime flexible base, with seven-inch high con-
crete curb and eighteen-inch wide concrete
gutter on a forty foot roadway. Six-inch thick
concrete driveways will be constructed where
specified.
UNIT 1B: NE 38TH STREET From 628' east of N. Main Street to N. Grove
Street, known and designated as Project No.
104-24000-238, Unit 1B, a seven-inch thick hot-
mix asphaltic concrete pavement on a six-inch
thick lime stabilized subgrade with seven-inch
high concrete curb and eighteen-inch wide con-
crete gutter on a forty foot roadway. Six-inch
thick concrete driveways and four-foot wide
concrete sidewalk will be constructed where
specified.
together with concrete curbs, gutters, driveways and incidentals to such improvements
on proper grade and line where same are not already so constructed, together with storm
sewers' and drains and other necessary incidentals and appurtenances; all of said im-
provements to be constructed as and where shown on the Plans and in strict accordance
with the Plans and Specifications therefor; contract therefore has been made and
entered into with Austin Road Company ;
and
WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public
Works Director to prepare and file estimates of the cost of such improvements and
estimates of the amount per front foot proposed to be assessed against abutting property
and the owners thereof, and such estimates have been examined, NOW, THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT:
I.
Such estimates be, and they are hereby adopted and approved.
II.
It is hereby found and determined that the cost of improvements on each portion of
streets, avenues, and public places hereinafter described, with the amount or amounts
per front foot proposed to be assessed for such improvements against abutting pro-
perty and the owners thereof, are as follows, to-wit:
UNIT IA: NORTH COMMERCE STREET From NE 28th Street to NE 29th Street, known
and designated as Project No. 104-24000-238,
Unit 1A.
The estimated cost of improvements is $ 34,994.25 the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ 4.19 ; the estimated amount per front foot to
be assessed against abutting property and the owners thereof for pavement is $ 14.51
the estimated amount per front foot to be assessed against abutting property and the
owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated
amount per square foot to be assessed against abutting property and the owners thereof for
six-inch thick concrete driveway is $ 1 .33 per square foot; the total
estimated amount per front foot to be assessed against abutting property and the owners
thereof is $_18_70_ , plus the cost incurred for concrete driveway construction
where specified.
III.
A hearing be given and held by and before the City Council of the City
of Fort Worth, Texas, to all owning or claiming any property abutting upon said
portions of highways, streets, avenues and public places, as well as to all
owning or claiming any interest in any such property. Such hearing shall be
given and held on the/31� day of January , 19 75 , at 9:30 ABM,,
in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and
the City Secretary is hereby directed to give or cause to be given notice ,of the
time and place of such hearing and of other matters and facts in accordance with
the terms and provisions of an Act passed at the First Called Session of the
Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts
of said Session, now being known as Article 1105b of Vernon's Texas Civil Statutes
as amended by Acts 1967, 60th Legislature, Page 365, Chapter 176, Section 1,
emergency effective May 12, 1967. Such notice shall be by advertisement inserted
at least three (3) times in a newspaper published in the pity of Fort Worth,
Texas, the first publication to be made at least twenty-one (21) days before
the date of said hearing. Said notice shall comply with and be in accordance with
the terms and provisions of said Act as amended. The City Secretary is further
directed to give or cause to be given personal notice of the time and place of
such hearing to all owning or claiming any property abutting on said portions of
highways, streets, avenues and public places, as well as to all owning or claiming
Any interest in any such property. Such personal notice shall be in writing and
shall be given or caused to be given by the City Secretary by depositing such
written notice in the United States Mail at least fourteen (14) days before the
date of the hearing, postage prepaid, in envelopes addressed to all persons
owning or claiming any interest in the respective properties abutting the high-
ways, streets, avenues and public places or portions thereof to be improved, as
the names 'of such persons are shown on the current rendered tax rolls of the City
of Fort Worth and at the addresses so shown, or if the name of such respective
owners do not appear on such rendered tax rolls, then address to such owners as
their names are shown on the current unrendered tax rolls of the City of Fort Worth
at the addresses shown thereon. In those cases in which an owner of property
abutting a highway, street, avenue or public place or portion or portions there-
of which is to be .improved is listed as "unknown" on the then. current City of
Fort Worth tax rolls, or the name of an owner is shown on the City of Fort Worth
tax rolls .but no address for such owner is shown,' no notice need be mailed. In
those cases where the owner is shown to be an estate, the mailed notice may be
addressed to such estate. In this connection, the City Secretary shall prepare
and file or cause to be prepared and filed with these proceedings a list of the.-
properties
to be assessed, the names of those persons owning or claiming any
interest in said properties to whom the notice was mailed, together with the last
known addresses determined as aforesaid of the respective owners and those perms
sons owning or claiming any interest in said property.
The City Secretary shall certify that each of the parties in said list whose
address is shown on the then current rendered or unrendered tax rolls of the City
of Fort Worth was mailed a copy .of the notice of hearing and shall further certify
the date or dates on which said notice was mailed. A copy of each notice shall be
attached to such certificate. The certificate of the City Secretary will be con-
clusive evidence of the facts therein recited.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance
by copying the caption of same in the Minute Book of the City Council and by
filing the complete ordinance in the appropriate Ordinance Records of this City.
V.
This ordinance shall take effect and be in full force and effect from and
after the date of its passage. p'
Passed and approved this day of �(LIL��Z�2�CC�� 19 .
APPROVED AS TO FORM AND LEGALITY:
y
City Attorney
UNIT 1B: NE 38TH STREET From 628' east of N. Main Street to
N. Grove Street, known and designated
as Project No. 104-24000-238, Unit 1B.
The estimated cost of improvements is $ 103.776.01 ; the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ 4,22 ; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is S 15.65;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for 4 footwide concrete sidewalk is $ 3.82 ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $_ 1.33 per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 23,79 plus the cost incurred for concrete driveway con-
struction where specified.
The estimated cost of improvements is $ the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ ; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ ;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for _ wide concrete sidewalk is $ ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ — per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ , plus the cost incurred for concrete driveway con-
struction where specified.
The estimated cost of improvements is $ the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ _; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ ;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for wide concrete sidewalk is $ ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ _ per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ plus the cost incurred for concrete driveway con-
struction where specified.
L City o,f Fort Worth, Texas
Uwt� Mayor and Council Communication
BAwdR"
QUAHM DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE
-A NUMBER Paving at Two Locations; Reconstruction 4
--12/9/74 C-2973 at Two Locations;.-and Monterrey Drive i °f
Storm Drain Construction
Council action on the projects described below is requested.
Project Description
Roadway R.O.W.
Unit Street Limits Width Width
Project No. 104-24000-238
IA North Commerce Street N.E. 28th to N.E. 29th 40 feet 58 feet
IB N.E. 38th Street G.C.&S.F. Railroad to 40 feet 55 feet
North Grove
Project No. 104-27000-165
IIA Stadium Drive Bilglade to Fuller 30 feet 50 feet
IIB Monterrey Drive Weiler to Oakhill Road 30 feet 60 feet
Project No. 104-24000-238
III Monterrey Drive Vicinity Monterrey Drive,
Storm Drain Danciger Drive and N/A In
Yolanda Drive Street
Initiation of Projects
Unit IA was initiated by a short-form paving petition in lieu of a Community
Facilities Contract; Unit IB was initiated by Community Facilities Contract
No. 7198, M&C C-2285, 7/24/72; Units IIA and IIB are included in the 1973-75
C.I.P. , Page A-143; and Unit III is City initiated in conjunction with the
reconstruction of Monterrey Drive to correct flooding conditions in the
general area (M&C C-2526, 5/7/73).
Improvements
Units IA and IB will be improved by construction of commercial and/or collec-
tor grade hot-mix asphaltic concrete pavement with concrete curb and gutter
and required storm drain pipe and appurtenances to include a multiple box
culvert in Unit IB. Units IIA and IIB will be reconstructed by cement sta-
bilizing the existing gravel base and constructing a new 2" hot-mix asphaltic
concrete surface course. Defective concrete curb, gutter and driveway
approaches will be replaced. Unit III is an extension of an existing storm
drain line which begins at the Meadowbrook Golf Course and ends at the Weiler,
a
DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE
NUMBER Paving at Two Locations; Reconstruction
12/9/74 C-2973 at Two Locations; and Monterrey Drive 2 4
°f
Storm Drain Construction
Monterrey, Danciger intersection. This project will consist of 48-inch to
18-inch storm drain pipe which will extend the system from the above inter-
section east in Monterrey Drive to Oakhill Road; northeast in Danciger Drive
to Yolanda Drive; and east in Yolanda Drive to Aztecs Drive.
Submission of Bids
Amount by Unit
Bidder IA IB IIA IIB III
Austin Road Co. $31,812.95 $94,341.83 $19,222.69 $43,103.59 $117,039.97
Total Bid: $305,521.03
First Paving
Corporation $32,108.34 $10210178.49 $20,170.29 $57,371.21 $129,628.25
Total Bid: $341,456.58
Texas Bitulithic
Company $34,580.25 $107,547.80 $23,447.00 $59,164.10 $129,956.70
Total Bid: $354,695.85
L. Grimes
& Co., Inc. $36,006.39 $112,805.85 $22,836.65 $57,472.31 $151,063.85
Total Bid: $380,185.05
The following contractors took plans and specifications but did not submit
bids:
Lewis and Lewis, Inc.
Navarro Construction Co.
Glade, Inc.
Bids Received: November 14, 1974
Working Days Allotted: 180
Project Cost and Financing
Based on the low bid for Units IA and IB, approximately $49,539.56 will be
assessed against abutting property owners, to be provided for by a bond
fund transfer from the Revolving Fund Unspecified Account. The Developer,
who is developing the property on the north side of Unit IB and also owns
all the property on the south side of the street, has signed Mechanics' and
Materialmans' Contracts and Promissory Notes for his portion of the cost and
DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE
NUMBER Paving at Two Locations; Reconstruction
12/9/74 C-2973 at Two Locations; and Monterrey Drive I 3
Storm Drain Construction
has requested that the Benefit hearing be waived for Unit IB. The request
is based on the immediate need of storm drain improvements included in the
contract. Total construction, inspection engineering, administration and
miscellaneous costs to the City, for Units IA and IB is approximately
$89,230.70, of which $38,251.10 will be refunded to the City by the Devel-
oper of Unit IB for his portion of the storm drain costs. A bond fund
transfer of $89,500 from the. Unspecified (Future Sales) Account No. 104-
24000-901 is needed.
In accordance with standard City policy, no assessments will be levied on
Units IIA, IIB, and III.
Total reconstruction, inspection, administration and miscellaneous costs to
the City for Units IIA and IIB is approximately $67,312.38, to be provided
for by a bond fund transfer of $64,500 from the Unspecified Account No. 104-
27000-901 to supplement the $3,000 presently available in the project account.
Approximately $177,600 in funds are available in Project Account No. 104-
28000-739 to finance the City's cost of construction, inspection, admini-
stration and miscellaneous expenses, estimated to be $128,743.97 for Unit
III.
Recommendations
It is recommended that:
1) The following bond fund transfers be approved:
Amount From To Reason
$49,539.56 Unspecified Revolving Two. Locations North To provide
Fund - 042-09724-901 Side - 042-10424-238 funds for
property
owners' share
of construc-
tion costs.
$89,500.00 Unspecified Assessment Two Locations North To provide
Paving 104-24000-901 Side - 104-24000-238 for City's
(Future Sales) share of con-
struction,
inspection,
administra-
tion and mis-
cellaneous
expenses.
.,r
DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE
NUMBER Paving at Two Locations; Reconstruction
12/9/74 C-2973 at Two Locations; and Monterrey Drive 4 °f 4
torn in Construction
Amount From To Reason
$64,500.00 Unspecified Recon- Various Locations To supplement
struction - 104- Reconstruction the $3,000 i
27000-901 104-27000-165 Project Ac-
count for
City's share
of reconstruc-
tion, inspec-
tion, admini-
stration, an
miscellaneous
expenses.
2) The need for a Benefit Hearing on Unit IB (N.E. 38th Street) be
waived;
3) An ordinance be adopted (Unit IA only):
a) Declaring the necessity for and ordering the improvements;
b) Making provisions for levying assessments;
c) Directing the Public Works Director to prepare estimates
of costs and amounts to be assessed;
d) Awarding the contract to Austin Road Company, in the amount
of $3.05,521.03, based on the combined low bid for all units;
and
e) Making appropriations to cover the indebtedness thereby
incurred for improvement of the project named above.
4) An ordinance be adopted (Unit IA only) :
a) Approving the estimates of costs and amounts proposed to
be assessed; and
b) Setting January 6, 1975, as the date for the Benefit Hearing.
5) Authorization be' granted to proceed immediately with construction
on Unit IB, Reconstruction Units IIA and IIB, and on the Storm
Drain Unit III since the Benefit Hearing has been waived and/or
there are no assessments involved in these units.
RNL:ai
Attachment
SUBMITTED BY: DISPOSIT COUNCIL: P AESS D BY
APPROVED OTHER (DESCRIBE)
a
CITY SECRETARY
DATE
CITY MANAGER (SLl1l�