Loading...
HomeMy WebLinkAboutOrdinance 5808 ORDINANCE NO. �JB� AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF DTCKSON STREET AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth,Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im- proved by raising, grading and filling same and by constructing thereon the following, to-wit: 1. DICKSON STREET: From the east line of Merida Street to the west line of McCart Strebt,known and designated as Unit 1, Project No. 104-24000-172, a 6-inch hot-mix asphaltic concrete pavement on'a 301 roadway. 2. STANLEY AVENUE: From the south line of Cantey Street to the north line of McPherson Street, known and designated as Unit 2, Project No, 104-24000-172, a 6-inch hot-mix asphaltic concrete pavement on a 301 roadway. 3. CANTEY STREET: From the east line of Livingston Street to the west line of Stanley Avenue, known and designated as Unit 3, Project No. 104-24000-172, a 6-inch hot-mix asphaltic concrete pavement on a 301 roadway. 4. E.-di=jff AVENUE: From 5701 east of Beverly Street to the west line of Beverly Street, known and designated( as Unit 4, Project No. 104-24000-172, a'6-inch hot-mix asphaltic concrete pavement on a 301 roadway. 5. DEVITT STREET: From the east line of St. Louis Avenue to the west, line of May Street, known and designated as Unit 5, Project No. 104-24000-172, a 6-inch hot-mix asphaltic concrete pavement on a 40t roadway. 6. DEVITT STREET: From the east line of Main Street to the west line of Bryan, known and designated as Unit 6, Project No. 104- 24000-172, a 6-inch hot-nix asphaltic concrete pavement on a 401 roadway. 7. W. JEFFERSON STREET: From 250 feet west of 8th Avenue to the west line of $th Avenue, known and designated as Unit 7, Project No. 104-24000-172, a 6-inch hot-mix asphaltic concrete pavement on a 261 roadway. 8. WORTH STREET: From the east line of Forest Park Boulevard to the west line of Buck Avenue, known and designated as Unit g, Project No. 104-24000-172, a 6-inch hot mix asphaltic concrete pavement on a 301 roadway. 9. BUCK AVENUE: From the north line of Rosedale Street to the north line, of Worth Street, known and designated as Unit 9, Project No. 104-24000-172, a 6-inch hot-mix asphaltic concrete pavement on a 361 roadway. together with combined concrete curbs and gutters on proper grade and line where same are not already so constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of said improvements to be constructed as and where shown on the Plans and in strict accordance with the Plans and Specifications therefor; and contract therefor has been made and entered into with Austin Road Company & Worth Construction Co ; and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amounts per front foot proposed to be assessed against abutting property and the owners thereof, and such estimates have been ex- amined. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. Such estimates be, and they are hereby adopted and approved. II. It is hereby found and determined that the cost of improvements on each portion of street,avenue and public place hereinafter described, with the amount or amounts per front foot proposed to be assessed for such improvements against abutting property and the owners thereof, are as follows, to-wit: DICKSON STREET From the east line of Merida Streetto the west line of McCart Street, known and designated as Unit 1, Project No. 104-24000-172. The estimated cost of improvements is $11,205,37 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $_2.0 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $-4.21 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.26 STANLEY AVENUE From the south line of Cantey Street to the north line of McPherson Street, known and designated as Unit 2, Project No. 104-24000-172. The estimated cost of improvements is $B,�15.Q the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.05 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $_4,27.-_. the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6-26 _ CANTEY STREET From the east line of Livingston Street to the west line of Stanley Street, known and designated as Unit 3, Project No. 104-24000-172, The estimated cost of improvements is $ 3,;$55..89 the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $9 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 4.21 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.26 E. RAMSEY AVENUE From 570t east of Beverly Street to the west line of $bveily.St., known and designated as Unit 4, Project No. 104-24000-172. The estimated cost of improvements is $-14o374.87 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.05 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 4.21 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.26 W. DEVITT STREET From the east line of St. Lows Avenue to the west line of May Street, known and designated as Unit 5, Project No. 104-24000- 172. The estimated cost of improvements is $ 4,883.12 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.05 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 5.83 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 7.88 DEVITT STREET From the east line of Main Street to the west line of Bryan, known and designated as Unit 6, Project No. 104-24000-172. The estimated cost of improvements is the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $2.05 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 5.83 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 7-g W. JEFFERSON STREET From 250 feet west of 8th Avenue to the west line of 8th Avenue, known and designated as Unit 7, Project No. 104-24000- 172. The estimated cost of improvements is $ �,532.21 the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.05 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 3-56 —; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 5.61 WORTH STREET From the east line of Forest Park Boulevard to the west line of Buck Avenue, known and designated as Unit 8, Project No. 104-24000-172. The estimated cost of improvements is $ 7,930.18 the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $2.W ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 4.34 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.42 BUCK STREET From the north line of Rosedale Street to the north line of Worth Street, known and designated as Unit 9, Project No. 104-24000-172. The estimated cost of improvements is $ 4,807.39 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.05 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $5--18 the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $743 The estimated cost of improvements is $ the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ - ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is ti III. A hearing be given and held by and before the City Council of the City of Fort Worth,Texas,to all own- ing or claiming any property abutting upon said portions of streets,avenues and public places,as well as to all owning or claiming any interest in any such property.Such hearing shall be given and held on the 14 day of August 19 67,at 9830 in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and the City Secretary is hereby directed to give notice of the time and place of such hearing and of other matters and facts in accordance with the terms and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts of said Ses- sion, now benig shown as Article 1105b of Vernon's Texas Civil Statutes.Such notice shall be by advertisement at least three times in a newspaper published in the City of Fort Worth,Texas,the first publication to be made at least ten days before the date of said hearing.Said notice shall comply with and be in accordance with the terms and provisions of said Act. The City Secretary is further directed to'give personal notice of the time and place of such hearing to all owning or claiming any property abutting on said portions of streets,avenues and public places,as well as to all owning or claiming any interest in any such property. Such personal notice shall be given by the City Secretary mailing said notice postage prepaid, to the respective owners of record of the properties to be assessed, and to any person owning or claiming any interest in said properties,to the last known address of said owner or persons. It shall not be necessary for the City Secretary to mail said notices to any owner or other person claiming an interest in the property to be assessed when the addess of such owner or other person claiming an interest in the property to be assessed is unknown to the City Secretary and cannot be determined by the City Secretary after reasonable investigation. In this connection the City Secretary shall prepare and file with these proceedings a list of the properties to be assessed, the names of those persons own- ing or claiming any interest in said properties to whom the notice was mailed, together with the last known address of the respective owners and those persons owning or claiming any interest in said property. The City Secretary shall certify that each of the parties named in said list whose address was known to him, was mailed a copy of the notice of hearing and shall further certify the date or dates on which said notice was mailed. A copy of the notice shall be attached to such certificate. The certificate of the City Secretary will be conclusive evidence of the facts therein recited. Failure of the City Secretary to give notice of hearing by mail as herein provided for, or failure of the owners or other persons interested to receive said notice,shall in nowise invalidate said hearing or any assessments levied pursuant to said hearing, but notice of hearing shall be sufficient, valid and binding upon all owning or claiming such abutting property or any interest therein when same shall have been given by newspaper advertisement as first hereinabove provided. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. V. This ordinance shall take effect and be in full fort nd effect from and after the date of its passage. Passed and approved this_1 _day of____ APPROVED AS TO FORM AND LEGALITY: City Attorney . i City of Fort Worth, Texas MCMAHAA LINE Mayor and Council Communication MORPHI$ GRAHAM DATE REFERENCE suBJEcT: Contract Award - Assessment PAGE NUMBER Paving at 9 Locations on the South Side 2 7/17/67 C-1004 Project No. 104-24000-172 1of Council action on the project described below is requested. Project Descriation Nature of work: Assessment Paving of, 9 Locations on the South Side UNIT STREET LIMITS ROADWAY WIDTH R.O.W. 1 Dickson Street Merida to McCart 30 feet 50 feet 2 Stanley Avenue McPherson to West Cantey 30 feet 50 feet 3 Cantey Street Livingston to Stanley 30 feet 50 feet 4 East Ramsey Ave. Beverly to Turn-around 30 feet 50 feet 5 Devitt Street St. Louis to May 40 feet 60 feet 6 Devitt Street Main to Bryan 40 feet 60 feet 7 West Jefferson Eighth Avenue to Railroad 26 feet 40 feet 8 Worth Street Buck Street to Forest Park 30 feet 50 feet Blvd. 9 Buck Avenue Rosedale to Worth Street 36 feet 54 feet Petitions have been received for the paving of all units except Unit 3 (Cantey Street from Livingston to Stanley), and Unit 6 (Devitt Street from Main to Bryan). Unit 3 was initiated by the City to provide paved access to Unit 2 (Stanley Avenue, McPherson to Cantey Street). Unit 6 closes a one block pav- ing gap on Devitt Street between two streets recently improved by petition of adjacent property owners. Paving of the City initiated units will improve traffic circulation and reduce maintenance costs on unimproved streets. BIDDER AMOUNT OF BID WORKING DAYS Austin Road and Worth $53,320.90 66 Construction Company R. W. Gibbins, Inc. 53,322.20 66 SRO Asphalt, Inc. 53,528.60 66 O�F1�Iq� RECORD Texas Bitulithic Company 53 550.05 66 tillt^^-' ►�!v General Construction Company 54,678.55 66 Glade, Inc. 59,151.76 66 Project Cost and Financing Based on the low bid, approximately $43,591.22, will be paid by abutting property owners. The cost to the City-at-large will be approximately $15,061.77, including engineering and miscellaneous expenses. V DATE REFERENCE SUBJECT: Contract Award - Assessment PAGE NUMBER Paving at 9 Locations on the South Side 2 2 7/17/67 C-1004 Project No. 104-24000-172 of Recommendations It is recommended: 1) That the following bond fund transfers be approved: AMOUNT FROM TO PURPOSE $40,052.78 Revolving Fund 042-104-24-172 Property owners ' portion of construction cost. $15,061.77 Unspecified 9 Locations on City's portion of construction 104-24000-901 South Side - Pro- and engineering. ject 10411!24000- 172 2) That an ordinance be adopted: a) Declaring the necessity for and ordering the improvements; b) Making provisions for levying of assessments; c) Ordering the Public Works Department to prepare estimates of cost and amounts proposed to be assessed; d) Awarding the contract to Austin Road Company and Worth Construction Co. on its low bid of $53,320.90; and, e) Making appropriations to cover the indebtedness thereby incurred for improvements to the project named above. 3) That an ordinance be adopted: a) Approving the estimates of costs and amounts proposed to be assessed; and, b) Setting August 14, 1967, as the date of the Benefit Hearing. HDM:lp OFF�CIa RECORD The following summaries are attached: We* . SECRETARY "A" - Resume of the paving project FT. WORTH, TER. "B" - Distribution of costs and assessments, and results of post card survey. SUBMITTED BY: DISPOSITION 13Y COUNCIL: PROCESSED BY ❑ APPROVED ❑ OTHER (DESCRIBE) /,�/`1A14h CITY SECRETARY DATE CITY MANAGER