Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 36748
AMENDMENT NO. 3 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. � (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Dunaway Associates, L.P. , (Engineer) made and entered into City Secretary Contract No. 34093, (the Contract) which was authorized by the City Council by M&C C-21712 on the 26th day of September 2006; and WHEREAS, the Contract involves engineering services for the following project: Engineering Design Services: Street Reconstruction, Storm Drain Design on College Avenue (Page St to W. Capps St) , Orange Street (Stanley Ave to Townsend Dr) , Lipscomb Street (W. Capps St to W. Berry St) and Wayside Avenue (N. Dead End to W. Cantey St) , 2004 CIP Contract Year 4 & 5, Contract 53, Project No. 00455; DOE No. 5411 WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated October 31 , 2007 , a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $10,570. 00. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services exceed the sum of $238,837 .00 . K,D 03-13-0 8 P03: 09 Jwj 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of 11 , 2008, in Fort Worth, Tarrant County, Texas . ATTEST: Marty Hendrix City Secretary NO M&C REQUIRED APPROVAL RECOMMENDED: APPROVED: A. Douglas Rademaker, P.E. Fernando Costa, Acting Director, Department of Assistant City Manager Engineering Dunaway Associates, L.P. ENGINEER By: Name: obyy K. Ford, P.E. Vice President 1501 Merrimac Circle, Suite 100 Fort Worth, Texas 76107 APPROVED AS,,TO FORM AND �LEGALITY: 4"" 1 Assistant i Attorney -2- DUNAWA y DA No. '2006151 October 31, 2007 Ms. Dena Johnson, P.E. Program Manager City of Fort Worth Department of Engineering Fort Worth, Texas 76102 Reference: Amendment No. 3 2004 CIP Project Yrs 4 & 5 - College Ave., Orange St, Lipscomb St and Wayside Ave. Contract.53 Project No. 00455 Dear Ms. Johnson: Dunaway Associates, L.P. is pleased to present this Amendment No. 3'for additional water line engineering design services that are beyond our original scope of services.The general scope of these services is as follows, Per water department 60°Io submittal review meeting held on Wednesday October 17, 2007, and confirmation email received from David Cooper on Thursday October 18, 2007, it was determined that the, City would like to loop the water lines between Lipscomb Ave and College Ave via an 8 water line in W.Capps St. Additionally, because the land use adjacent to Lipscomb is commercial/industrial north of Cantey St,the City feels it maybe necessary to upsize that portion of the line from the proposed 8"to 12". This would require preparation of a profile for that length of line. Because our contract and budget does not provide for the design and preparation of construction documents for this additional water line design, we propose to supplement our scope of services to add to following tasks. • 625 LF of re-design to upsize the proposed water line from 8" to 12" (plan and profile preparation required per City's standard) on Lipscomb St between Cantey St and W. Capps St. • 300 LF of additional design and survey for 8" water line in W. Capps between Lipscomb Ave and College St. 1.501.Merrimoc Circle,Salle 100- Forl Worth.Texas 76107 3 Tel;817,335.1121-& Metro;817.429.2135.-- Fax;81 7.335,7437 r www.duncrwcrycissoclates.com • Amendment No. 3 October 31, 2007 Page 2 A summary of the proposed budget for this contract amendment is as follows: Basic Fee 625 LF Re-design of 12"Water Line Plan and Profile Preparation) $ 6,250.00 300 LF of 8"Water Line Des' n $ 3,000.00 MANBE Survey $ 1,200.00 SubConsultant Coordination 10% $ 120.00 Subtotal $ 10 570.00 TOTAL PROPOSED AMENDMENT $ 10,570.00 A summary of the total project is as follows: Contract Description Fee Original Contract Paving and Utility Reconstruction-4 Streets $208,357.00 Amendment No. 1 Geotechnical En ineerin Services $15 510.00 Amendment No. 2 Storm Drain Design $4 400.00 Amendment No. 3 Additional Water Line Design $10,570.001 TOTAL PROJECT $238,837.00 Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal. Sincerely, DUNAWAY ASSOCIATES, L.P. 4 Stephen James, P.E. Director—Public Sector Services 2006151 Amendment#3 DJohnson 07-10-31 kmc.doc AMENDMENT # 3 CONTRACT53 LolRZTiW0RAT# LIPSCOMB ST AND W CAPPS ST MAPSCO 76V,Z COUNCIL DISTRICT 9 0 ftw AW bM Du WAY 200 0 200 400 1b01 Me*noo CYde•Suft 100•Rd Worft TX 76107 SCALE: 1'.200' Tel:817-335-1121 •Fac 817-335-7437 _ — 6" — _ EXISTING WATERLINE PROPOSED WATERLINE SMITH ELL , 0 / CD _ a / P / / L WL CANTEYAVE Ytl. �:v`"iUNI Y�6U Date: 'VA/l WA.- APPLICATION FOR PIPE LINE CROSSING OR LONGITUDINAL Staubach Global Services-RR, Inc. APPLICANT'S TAX I.D. ATTN: Permit Services NO./SS# 3017 Lou Menk Drive Fort Worth, TX 76131-2800 We submit for your approval the following specifications for a pipe line we propose to build across THE BURLINGTON NORTHERN AND SANTA FE RAILWAY COMPANY right-of-way,as shown on enclosed sketch. Legal name of company/municipality who will own the pipeline: Is this a condemning authority? Yes No State in which Incorporated: If not incorporated, please attach name of owners or partners. Name of contact for ownership entity: Telephone: Fax: Correct Mailing Address: Zip Code: Type of Encroachment: Crossing_Longitudinal Location of Encroachment: 1/4 Section Twsp Range Mile Post + Name of nearest town on Railroad: County State Name of nearest roadway crossing: Width of public road or street: ft Within limits of public road or street: Yes No If yes, distance form center line of road: ft Contents to be handles through pipe: CARRIER CASING Length Of pipe On RR property(plastic pipe must be encased full width of R-O-W) ft. ft. Inside diameter of pipe in. in. Pipe Material Specification &grade (Minimum yield strength casing 35,000 psi.) Wall Thickness (min,wall thickness of casing pipe under 14 in-0.188 in E-80 Loading) Actual working pressure psi Type of Joint(mechanical or welded type) Coating Distance-Base of rail to top of pipe (Flammable,contents,steam,water or non-flammable-min. 5Y2 ft.under main track) (Uncased,gaseous products-min.10'under track) Minimum ground cover on Railroad property (minimum 3 feet) Cathodic protection casing- (flammable substance) Type of insulators or support: Size Space Number Of Vents(flammable substances require 2 vents) Size Height above ground Method of Crossing: Jacking Trench Dry Bore Only (if trenched-Railroad to fumish flagman at applicant's expense) (If bored or Jacked-Jacking pit location min.30 feet from centerline of track.Pit must not be open more than 48 hrs,and must be protected when not in use) Does pipeline support oil or gas well? Yes No If yes, distance from Railroad property ft. Name of well: Is applicant a Railroad Shipper? Yes_ No If yes,BNSF Marketing Rep name and number: Was this service requested by BNSF? Yes_No_ If yes,who requested? Requestor Telephone Number: Is this installation in conjunction with a track or track expansion project? Yes^No_ If yes,BNSF contact name and number: Attached to this sheet is location plan and detail sketch. Sketch shows tie-down measurement to centerline of nearest road crossing, bridge or other railroad structure. Please authorize us to proceed with this installation or advise what changes are necessary to meet your specifications, Signed: If you would like confirmation of your application, Print Name: please print your email address: Title: Telephone: Fax I[ D If you need additional assistance, please contact the Staubach Company/Permits Department A - ' ' J — — —CONTROL POINT /57 G&A NAIL = CAU770N.L \ ELEV- 700..30 n «s OVERHEAD CABLE N 18395.37 A CONTRACTOR TO COORDINATE \ E 30283 41 WORK IN THIS AREA WITH �o TXU AND Ar&r \ STA: 24+84.57 \ INSTALL: MA TCH \\ \ 1 - 12"45'R17 BEND ROTATED VERACALLY N 18622.82 \\ STA- 22+7X £30287,24 BEGIN BY OTHER 00 THAN OPEN CUT \ 1 N 18415.7/ \ 5�. £ 30289.08 EX 6" WL ' -TO ABANDONED µq'37 z rRr PLACE \ T • A {HApL�T/ Al � LONCR£IE tl�vT: + ( L oRR 7GNAL `� y,•j TEMPORARY ASPHALT i STA: 22+65.65 �� VED PAVE�ENT REPAIR INSTALL: ~ STA: 24+98.99 STA: 24+72.55 INSTALL: I - lTE 4VE 77CA END BY OTHER I - 12"45•BEND I ROTATED VERnCALGY 8,50 N 1840392 1il< OPEN CUT ROTATED VERTICAL VD SALVAGE X FFI E 30289.lB ` N 18610.81 CL/T dt PLUG EX 6 PZ�GATE VALVE I �,Tk287,35 (SOUTH) STA: 22+49.98 a N /B63333 41E VALVE 3� ; INSTALL: E 30297.l3 Y AND LIDS_- { 1 - 12" 45'SEND \ 6"ANCHOR TEE � s� I ROTATED VERTICALLY TE VALVE �XN CUT&PLUG EX 6" K PR 12—INCH WAI0�? NE r AND LID s � (NORTH) w7H 24--INCH S7EEL CASING'�RIPE -f RANT ASSEMBLY g �� ! N /02992 \\ ss E 30299.29 I _—.,_. _. -............__..._........_.... — - _ _ _'7tfu ....-_. _ : - _.._........... "` ::..=='-3::__+-r.:::arr----7__'•_.:-..:"-r.:_i__=.. -.:_-:........i=;- - - _ - -_ - - _ ---- - . —t ... $—— - -i. _.. -_'�-_--�—�?�-_;r--:_.._ - - � - - - t s i' __- r -1— r - _ - - t - - - _ ,.. _ _ __ - ---• _ ;..�:.-„� -i---•--7-- �:r--_: Yam. .. -.-.. -._.._ . �..._..._....a.._.._..--- »_..._,...__ _._.... -- - - - _......__..._.. ._..----.... __......�......__._......._.,_...._.__...a.._._...__...... ...._...._.._ ........._._.....__.._....__ — -2-..... -,_ .. ._ - -'.__.�_=__:.��-,--•- ----•- � .. --- - --:ram-�:..._.."---.,.- -- -- - r ! r x__..:... = f . ......._.._... =-._... _.._.._.: ..._ .._.__................_.._.......__...._...._..__ .._......._....._ - _ -_ _ _ _ .....,.__ - --�-. --_--:__•_ ------�-•-'-.- =__�_-=ram:--*-- _- _ -�-.._� -- --.__- •_--..- -. - _... .. - - .............. . r. ._L-•- -i El.... k �K, h r a i yz m — ' f � ics2 x� r x 22+00 23+00 24+00 25 0 0 My j pn' TEX. �� ,_ CONTINUED ON MAP 62 � 1 __ �97 22'00" 7 2l 00' -97'20'00" 1 Sin 6m O H KA FZ` `n3sa 4` c N 61h i VyEST B4NK Sib '( g LANDING. Ph ST p r Narl Texas 4 © 29 tD 0 24 ti 23 !6 2 ur umett c <„•.� t `�' Heahh cience Q gZ .GROG p �. E �'-.. - a .� -h arkl �� 1 The Went 1a.y entei DAMus f ORTO y T AS W vx z zgj l EDSD M C -.•r.:s'� o Z c' s � �:�4 o 9 �.. CASTELU R s NhoG S z Z `a 1 _ o m. AVE YV AYaN '29:. Z8 CANER A VJ s � �� ESI01 i _ Ces � Fieldl u p � �k 3 t Iftn na V P K k :ate.2 B T DY, 3 qyF, n s' RI f ICKERY BLVD Mlrstatm and Did .* it is £ Hanold Par AR14S :#fir J i c tia6 of fameC� DAGGETi z F7T JAR S tl BARLEY Trinity Park BRO / ✓ D. — 22 r 'B ANIC' rn X. �✓ .B ADWAYg . BRYCE ft EN-NO PK x ;%'` - T B G � KEA NNS�LY NIA VE¢7611 7 �`,. ITI .75 14 Hard 1O 9 y - , ,2 RMGS. �. �' `h "� CON PRl1C kl M . pAN. NS � ri l Fort o 8 JMANFSE. Botanic '�. . Medi ll IT2chrZ GAROEN Gardens / <s bP M cae r � T13i ELl EAR W MBOLToWORT sH A. DA H SD:ROSEDALE 5� 17PS LE T 3A N L S r �� v• IRWIN..dl Park l _ SAND 5 13 Z. - NtANE w zF It ucan m MAGN W OL W Baylor All Sout LI A E Ce ter n — Q - HARK AflAI N �Madcal Conte J y - - ^ MDR . STLETOE NE ♦' S O F i o f �' z Sri .A ^ T ai Our u a ,t Mid EI1Vt9 MYRTLE - p h- Forest Park B ^o I ton ate LUN H a t9 Mapsco,Inc. y^ 'r S ow a A41.EiJ..-. fu S lion 011 DnIl4L PARF PLACE ® g xa OO E rL . C U RNERFR M- ,.y:� - i� U ¢ E SON t3 N 12 JEF EAS N `L - +� Q s o PEN H RICH ON 19� - ' N� PAT 0 BAI MO 1 - OCOLON - ;2-0 WINDSOR. RLI TON J Log Cabin Fort Wo7h y n N Colonial Village 1 7Ao; a NUN INGTDN HA H NEH MT y Country Club 2- OR 0L0 NL t:P91N v 2 a $m W HA; WE '• o RpIT fFiL OLAC 3 LI G ? ' LL 9 9 N /Eti. c - V D o .., L E � l) - C OL'k z (aggen 2 ro rC► 23 �" t Gr - g JES IN D gaff JESS 1AI Eh1 tessari p . �. STADIUM 33 .T,l 1E 9T7 y- o IRP nr t . g rt:. rn v a aZt AR HILL D - 9 � w P� 3 ELI B L- Park P. E °' - M, 31W 28 $ ti Park Hill' � z 14 v - �. a a s N BCH ERT' ',r ... BOBPIT - T ner Bid c o v 4911 1 € m .A1 b C,•il on o<7 t= a N z z 10 J- _ t` Y pa AP boo w... " _ I N N y m MCPHERSON ,—a r CAXF " _ Le urns g tenterGIL 35'' CANTEY I v _ C FLY o o S p CA EY CA 4TEY NTI Iu3 A atO S N = ro ( 0 Ca Mir , � xas Ch sUanw L m y o F01'DEN ¢ LOK Dame)M ` Z' Co1(�g of Q Q Coliseum Wr ht D: em'E., —B 41E a 3 d 4 oW p Paschal WIE $ELLAI N -ua �v Q on n 0�-r• E Y T P m ER S ' 327ZI HI<rH 10,E aeJ "r` EE : e z 2 'sa y app.. 7 . f)E4 coo "s g uQi ;D_ Tis z. DES 17 OEVOT a o Pork 18 LOWS P. t h r FA SH ' AVrr B�RRY:ST 12- __ .97 22 00 97 21 00 - - 9 r 1 � v SCALE IN MILES U CONTINUED ON.MAP 90 1. ICJ _ SCALE I fE '4"(. � t� `. 0 Va V. 3/6 V. COPYRIGHT 2007 by MAPSCO,INC.-ALL RIGHTS RESERVED p 1000 2 9 q?pQpJ(q BOOK PAGE 1076 for Central Bu ne istt (Irr�'1 j coverage,see ages e0 bn 7.