Construction Allowance Request
Construction FOA# Date 1 1/17/202 City Sec# 1 52345
Client Project#(s)l 101587
FAC#(s)l 3401818010199 0200431
Project Name Concrete panel replacmenet project on Martin Street(Foard Street to Shackleford Street)and Alta Mesa Boulevard(S
Description Hulen Street to Whitman Avenue)
Contractorl Omega Contracting,Inc. City Inspector John Robinson
Funding TPW Select Day
Allocation Account Totals Type
Original Contract Amount $1,574,312.85 $1,574,312.85 350
Extras to Date $0.00
Credits to Date $0.00
Current Contract Amount $1,574,312.85 $1,574,312.85 350
Amount of Proposed Allocation $29,850.00 $29,850.00
Original Allowance Available for Allocation $70,000.00 $70,000.00
Allowance Funds Previously Allocated $0.00
Remaining Funds Available for this Allocation $70,000.00 $70,000.00
JUSTIFICATION SUMMARY
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Fumish all labor and
material as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request: New Bid Item
37 was added to account for extra effort required by the contractor in placing flex base in two lifts,which was not expected based on the bid
item description in the original bid proposal. This new bid item will allow for 8"flex base to be placed and compacted in two lifts as required for
residential collectors where new subgrade is needed.
it is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on
the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary.
Con ac or's Representative Datp Project Architect Date
P`9ject Wriager Date Program Manager Date
1/22/2020
Director,Contracting Department(Dept) Date Director,Sponsoring Department(Dept) Date
FEB 2 7
J 2020 j CITY SECRETARY
m�scA1 rAaY� FT. WORTH,TX
e .�.�
d / k
!10 u
cr
■
/ #
§ I
0 k
k � � B �
I
0LL, 2
o a �
/2 ) Ln
/
� k
\ /\ & /
\ « A£ $
U �a a
\ k
a
} � �
§ ! %
k �
2 , �
7 ■ §
41
LU
j u }
uZ S
»2
° � §
k k
k � d k
Q JU
Ll
$ > f f |3 $
i^
/ $ k
MIWBE Breakdown for this Construction Allowance Request
MWBE Sub Typeof Service Amount far this FOA
Total
Previous Construction Allowance Requests
Co DATE AMQUNT
Total $Q.OQ
AUTODESW BIM 360 fortworthgov>101587-2018 CIP Concrete Restoration-Contract 3- A IA
=:= Document Management FOLDERS REVIEWS TRANSMITTALS ISSUES
Reviews > Review detail
CLOSED #24 Construction Allowance Approval Workflow v2
Export Report - This review is closed.
Names Description Version Markup Comments PROGRESS
Construction Allowance-Flex Base.pdf -- VI 0 No comment
Initiator Initial Review n
GR Greg Robbins ]an 28,9:36 AM
•• , <gregory.robbins@fortworthtexas.gov>
•• Submitted to Reviewer 1
•• �' Reviewer 1 Initial Review 1 n
ivta�c� xWiet
J. (Feb 2� �., LZ Lane Zarate Tan 29,io:o3 AM
Mary
Y�f ', <lane.zarate@fortworthtexas.gov>
4�i •'•� �� Submitted to Reviewer
t.@ tEs'•. Approved.FYl...the contractor did
confirm no additional time will be
needed to perform the extra work-
Reviewer 2 Initial Review 2 n
® Jennifer Roberts Feb 2,10:14 PM
<jennifer,roberts@fortworthtexas.g ov>
Submitted to Reviewer 3
Construction Allowance reviewed and
approved by Snr CPO.
Reviewer 3 Initial Review 3
LP Lauren Prieur Feb 3,6:33 PM
<lauren.prie u r@fortworthtexas.gov>
Submitted to Reviewer 4
No comments
Reviewer 4 Initial Review 4 n
WJ William Johnson Feb 4,10:48 AM
<wiltiam.joh nson @fortwort htexas.gov>
Submitted to Reviewer
Okay
Reviewer S Initial Review 5 n
DB Douglas Black Feb 4,5:04 PM
<d oug.black@fortwort htexas.gov>
Submitted to Approver
approved
Approver Final Review n
DB Dana Burghdoff Feb 4,7:09 PM
<da na.bu rg hdoff@fortwort htexas.gov>
Review ended
Review closed
OFFICIAL RECORD
CITY SECRETARY
< FT:f WORTH,TX
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
obb '
Greg RbSbins(Feb 24,2020)
Project Manager
Title
❑ This form is N/A as No City Funds are associated with this Contract