Loading...
HomeMy WebLinkAboutContract 52345-AR1 FORT'WORTH City of Fort Worth CSC No.52345-ARl Construction Allowance Request Construction FOA# Date 1 1/17/202 City Sec# 1 52345 Client Project#(s)l 101587 FAC#(s)l 3401818010199 0200431 Project Name Concrete panel replacmenet project on Martin Street(Foard Street to Shackleford Street)and Alta Mesa Boulevard(S Description Hulen Street to Whitman Avenue) Contractorl Omega Contracting,Inc. City Inspector John Robinson Funding TPW Select Day Allocation Account Totals Type Original Contract Amount $1,574,312.85 $1,574,312.85 350 Extras to Date $0.00 Credits to Date $0.00 Current Contract Amount $1,574,312.85 $1,574,312.85 350 Amount of Proposed Allocation $29,850.00 $29,850.00 Original Allowance Available for Allocation $70,000.00 $70,000.00 Allowance Funds Previously Allocated $0.00 Remaining Funds Available for this Allocation $70,000.00 $70,000.00 JUSTIFICATION SUMMARY IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Fumish all labor and material as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request: New Bid Item 37 was added to account for extra effort required by the contractor in placing flex base in two lifts,which was not expected based on the bid item description in the original bid proposal. This new bid item will allow for 8"flex base to be placed and compacted in two lifts as required for residential collectors where new subgrade is needed. it is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary. Con ac or's Representative Datp Project Architect Date P`9ject Wriager Date Program Manager Date 1/22/2020 Director,Contracting Department(Dept) Date Director,Sponsoring Department(Dept) Date FEB 2 7 J 2020 j CITY SECRETARY m�scA1 rAaY� FT. WORTH,TX e .�.� d / k !10 u cr ■ / # § I 0 k k � � B � I 0LL, 2 o a � /2 ) Ln / � k \ /\ & / \ « A£ $ U �a a \ k a } � � § ! % k � 2 , � 7 ■ § 41 LU j u } uZ S »2 ° � § k k k � d k Q JU Ll $ > f f |3 $ i^ / $ k MIWBE Breakdown for this Construction Allowance Request MWBE Sub Typeof Service Amount far this FOA Total Previous Construction Allowance Requests Co DATE AMQUNT Total $Q.OQ AUTODESW BIM 360 fortworthgov>101587-2018 CIP Concrete Restoration-Contract 3- A IA =:= Document Management FOLDERS REVIEWS TRANSMITTALS ISSUES Reviews > Review detail CLOSED #24 Construction Allowance Approval Workflow v2 Export Report - This review is closed. Names Description Version Markup Comments PROGRESS Construction Allowance-Flex Base.pdf -- VI 0 No comment Initiator Initial Review n GR Greg Robbins ]an 28,9:36 AM •• , <gregory.robbins@fortworthtexas.gov> •• Submitted to Reviewer 1 •• �' Reviewer 1 Initial Review 1 n ivta�c� xWiet J. (Feb 2� �., LZ Lane Zarate Tan 29,io:o3 AM Mary Y�f ', <lane.zarate@fortworthtexas.gov> 4�i •'•� �� Submitted to Reviewer t.@ tEs'•. Approved.FYl...the contractor did confirm no additional time will be needed to perform the extra work- Reviewer 2 Initial Review 2 n ® Jennifer Roberts Feb 2,10:14 PM <jennifer,roberts@fortworthtexas.g ov> Submitted to Reviewer 3 Construction Allowance reviewed and approved by Snr CPO. Reviewer 3 Initial Review 3 LP Lauren Prieur Feb 3,6:33 PM <lauren.prie u r@fortworthtexas.gov> Submitted to Reviewer 4 No comments Reviewer 4 Initial Review 4 n WJ William Johnson Feb 4,10:48 AM <wiltiam.joh nson @fortwort htexas.gov> Submitted to Reviewer Okay Reviewer S Initial Review 5 n DB Douglas Black Feb 4,5:04 PM <d oug.black@fortwort htexas.gov> Submitted to Approver approved Approver Final Review n DB Dana Burghdoff Feb 4,7:09 PM <da na.bu rg hdoff@fortwort htexas.gov> Review ended Review closed OFFICIAL RECORD CITY SECRETARY < FT:f WORTH,TX Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. obb ' Greg RbSbins(Feb 24,2020) Project Manager Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature LWORTH ORD ARY TX