Contract 26720
C F� T PY - C CITY SE -.:,..,� � � �' � %4TRACT DOCUMENTS � DONDN4 C6. AND CONSTpUCTION'S CCpVSPECIFICATIONS LIE � ��' #27 FOR TY SECRETARY � � CONTRACT NO 2001 SANITARY SEWER REHABILITATION CONTRACT XLIX (49) SEWER PROJECT NO. PS58-070580174310 D.O.E. PROJECT NO. 2115 CITY OF FORT WORTH, TEXAS KENNETH BARR BOB TERRELL MAYOR CITY MANAGER DALE FISSELER, P.E. DIRECTOR, WATER DEPARTMENT HUGO A. MALANGA, P.E. DIRECTOR OF TRANSPORTATION AND PUBLIC WORKS A. DOUGLAS RADEMAKER, RE, DIRECTOR, DEPARTMENT OF ENGINEERING PREPARED BY Hof & ASSOCIATES, INC. FORT WORTH, TEXAS 2001 -` ' 1 ��® j CHRIS ERM BROOKS City of Fort Worth, Texas "agor and Council Communication DATE REFERENCE NUMBER LOG NAME PAGE 4/24/01 **C-18566 30SEWER 1 of 2 SUBJECT APPROPRIATION ORDINANCE AND AWARD OF CONTRACT TO JACKSON CONSTRUCTION, LTD. FOR SANITARY SEWER REHABILITATION CONTRACT XLIX 49 RECOMMENDATION: It is recommended that the City Council: 1. Authorize the City Manager to transfer $1,014,867.30 from the Water and Sewer Operating Fund to the Sewer Capital Project Fund; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Projects Fund in the amount of$1,014,867.30 from available funds; and 3. Authorize the City Manager to execute a contract with Jackson Construction, Ltd. in 'the amount of $921,867.30 for Sanitary Sewer Rehabilitation Contract XLIX (49). DISCUSSION: On March 24, 1998 (M&C C-16691), the City Council authorized the City Manager to execute an engineering agreement with Wade & Associates, Inc. to prepare plans and specifications for the reduction of inflow/infiltration in the sanitary sewer Main M-390 drainage area, which included the design of Sanitary Sewer Rehabilitation Contract XLIX (49). The project consists of the replacement of the following sanitary sewer laterals: • L-1771 Generally bounded on the north by 32nd Street, on the south by 29th Street, on the west by Long Avenue, and on the east by Loving Avenue; and • L-7213 Beginning from the Woodhaven Boulevard/Boca Raton Boulevard intersection, easterly on Boca Raton Boulevard for 3,471 feet. The proposed improvements consist of the replacement of approximately 6,300 linear feet of 12-inch sewer pipe and 2,100 linear feet of an 8-inch sewer pipe. The project is located in COUNCIL DISTRICTS 2 and 4, Mapsco 61 D, 62A and 65U. IN ect was advertised for bid on January 18 and 25, 2001. On February 15, 2001, the following bids were received: City of Fort Worth, Texas "agar and cou"ll"'I comnsunicalflon DATE REFERENCE NUMBER LOG NAME PAGE 4/24/01 **C-18566 30SEWER 2 of 2 SUBJECT APPROPRIATION ORDINANCE AND AWARD OF CONTRACT TO JACKSON CONSTRUCTION, LTD. FOR SANITARY SEWER REHABILITATION CONTRACT XLIX 49 BIDDER AMOUNT TIME OF COMPLETION Jackson Construction, Ltd. $ 921,867.30 160 Calendar Days Hall-Albert Construction Company, Inc. $ 979,973.40 William J. Schultz, Inc. d/b/a Circle "C" $ 986,844.00 Construction Company Kebo Services, Inc. $1,058,928.13 Tri-Tech Construction, Inc. $1,060,895.30 Mid-State Utilities, Inc. $1,110,921.90 Cleburne Utility Construction Company, Inc. $1,204,621.50 Texas-Sterling Construction, Inc. $1,222,280.00 In addition to the contract cost, $65,000 is required for inspections and survey, and $28,000 is provided for project contingencies. Jackson Construction, Ltd. is in compliance with the City's M/WBE Ordinance by committing to 16% C M/WBE participation. The City's goal on this project is 16%. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval and completion of recommendation No. 1, and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. MG:k Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) hopma 1&2)PS58 472045 070580174310 $1,014,867.30 C"�'®/ !I Mike Groomer 6140 2)PS58 541200 070580174310 $ 949,867.30 ADD�0 00 Originating Department Head: 2)PS58 531350 030580174310 $ 65,000.00 AM 24 2W A.Douglas Rademaker 6157 (from) 0�- 3)PS58 541200 070580174310 $ 921,867.30 Additional Information Contact: 1)PE45 538070 0709020 $1,014,867.30 CKY 1 p T of> 1Ike a A.Douglas Rademaker 6157 f MOW Ordinance Nd. ��`� CONTRACT DOCUMENTS AND SPECIFICATIONS FOR 2001 SANITARY SEWER REHABILITATION CONTRACT XLIX (49) SEWER PROJECT NO. PS58-070580174310 D.O.E. PROJECT NO. 2115 CITY OF FORT WORTH, TEXAS KENNETH BARR BOB TERRELL MAYOR CITY MANAGER DALE FISSELER, P.E. DIRECTOR, WATER DEPARTMENT HUGO A. MALANGA, P.E. DIRECTOR OF TRANSPORTATION AND PUBLIC WORKS A. DOUGLAS RADEMAKER, RE, DIRECTOR, DEPARTMENT OF ENGINEERING PREPARED BY IflnuE & ASSOCIATES, INC. FORT WORTH, TEXAS 2001 TABLE OF CONTENTS PART A Notice to Bidders Detailed Notice to Bidders Special Instructions to Bidders PART B City of Fort Worth Minority/Women Business Enterprise Specifications Proposal PART C _ General Conditions Supplementary Conditions PART D Special Conditions Additional Special Conditions _ State Revolving Fund (SRF) Requirements PART E Specifications Easements Permits PART F Certificate of Insurance Contractor Compliance with Worker's Compensation Law Bonds a. Payment Bond b. Performance Bond C. Maintenance Bond PART G Contract — PART H Plans (Details) Figures r ■ PART A - NOTICE TO BIDDERS DETAILED NOTICE TO BIDDERS SPECIAL INSTRUCTIONS TO BIDDERS NOTICE TO BIDDERS Sealed Proposals for the following: Sanitary Sewer Rehabilitation Contract XLIX (49) Sewer Project No. PS58-070580174310 D.O.E. Project No. 2115 Including: The construction of 1,183 L.F. 8-Inch PVC Sanitary Sewer, 425 L.F. 8-Inch CL 51 DI Sanitary Sewer Pipe, 142 L.F. 8-Inch C900 (DR18) Sanitary Sewer, 119 L.F. 8-Inch CL 51 DI Sanitary Sewer By Other Than Open Cut, 232 L.F. 6-Inch to 8-Inch HDPE Sanitary Sewer by Pipe Enlargement, 4,367 12-Inch PVC Sanitary Sewer, 1,679 12-Inch C900 (DR18) Sanitary Sewer, 187 L.F. 8-Inch to 12-Inch HDPE Sanitary Sewer by Pipe Enlargement, 40 L.F. 12-Inch CL 51 DI Sanitary Sewer, 54 Manholes, 59 Service Reconnects. Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Office until 1:30 p.m., February 15, 2001, and then publicly opened and read aloud at 2:00 p.m. Drawings, Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. A fifty dollar ($50.00) refundable deposit is required for the first set of documents and additional sets may be purchased for a non-refundable basis for fifty dollars ($50.00). These documents contain additional information for prospective bidders. A pre-bid conference will not be held. For additional information,contact Chris E. Brooks, P.E., at the offices of Wade &Associates, Inc., (817)451-2820 or Mike Domenech, DOE Project Manager at the City of Fort Worth, (817) 871-6826. Advertising Dates: January 18, 2001 January 25, 2001 Fort Worth,Texas DETAILED NOTICE TO BIDDERS Sealed Proposals for the following: Sanitary Sewer Rehabilitation Contract XLIX (49) Sewer Project No. PS58-070580174310 D.O.E. Project No. 2115 Including: The construction of 1,183 L.F. 8-Inch PVC Sanitary Sewer, 425 L.F. 8-Inch CL 51 DI Sanitary Sewer Pipe, 142 L.F. 8-Inch C900 (DR18) Sanitary Sewer, 119 L.F. 8-Inch CL 51 DI Sanitary Sewer By Other Than Open Cut, 232 L.F. 6-Inch to 8-Inch HDPE Sanitary Sewer by Pipe Enlargement, 4,367 12-Inch PVC Sanitary Sewer, 1,679 12-Inch C900 (DR18) Sanitary Sewer, 187 L.F. 8-Inch to 12-Inch HDPE Sanitary Sewer by Pipe Enlargement, 40 L.F. 12-Inch CL 51 DI Sanitary Sewer, 54 Manholes, 59 Service Reconnects. Included in the above will be all other items of construction as outlined in the Drawings and Specifications. Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Office until 1:30 p.m., February 15, 2001, and then publicly opened and read = aloud at 2:00 p.m. Drawings, Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. A fifty dollar ($50.00) refundable deposit is required = for the first set of documents and additional sets may be purchased on a non-refundable basis for fifty dollars ($50.00). These documents contain additional information for prospective bidders. All bidders will be required to comply with provision 5159 of "Vernon's Annotated Civil Statutes"of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278,as amended by City Ordinance No. 7400 (Fort Worth City Code Sections = 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. A pre-bid conference will not be held. AWARD OF CONTRACT: The City reserves the right to reject any and/or all bids and waive any and/or all irregularities. No bid may be withdrawn until the expiration of sixty (60) days from the date bids are opened. The award of the contract, if made, will be within sixty (60)days after the opening of bids, but in no case will the award be made until all necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the contract. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the PROPOSAL form. Bids that do not acknowledge receipt of all addenda may be rejected as being non-responsive. Information regarding the status of addenda may be obtained by contacting the Department of Engineering at (817) 871-8100. Bidders shall not separate,detach or remove any portion,segment or sheets from the contract document at any time. Bidders shall submit the complete specifications book or risk rejection of bid. In accordance with City of Fort Worth Ordinance,No. 13471, as amended by Ordinance No. 13 78 1,the City of Fort Worth has goals for the participation of Disadvantaged Enterprise in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The Bidder shall submit the M/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM,and/or the GOOD FAITH EFFORT FORM("Documentation")as appropriate. The Documentation must be received by the contracting department no later than 5:00 PM, five(5) business days after bid opening date. The bidder shall obtain a receipt from the appropriate employee of the contracting department to whom the delivery was made. Such receipt shall be evidence that the Documentation was received by the City. The Contracting Department for this project is the Engineering Department. Any contract or contracts awarded under this Notice to Bidders are expected to be funded in part by a loan from the Texas Water Development Board. This contract is contingent upon release of funds from the Texas Water Development Board. Neither the State of Texas nor any of its departments, agencies,or employees is or will be a party to this Detailed Notice to Bidders or any resulting contract. T For additional information contact Chris E. Brooks, Wade&Associates, Inc.,at(817)451-2820, or Mike Domenech, DOE Project Manager, at(817) 871-6826. Bob Terrell Gloria Pearson City Manager City Secretary Advertisement Dates: Department of Engineering January 18, 2001 A. Douglas Rademaker, P.E., Director January 25, 2001 By: _ Rick Trice, P.E., Manager — Consultant Services Division Fort Worth,Texas SPECIAL INSTRUCTIONS TO BIDDERS (WATER DEPARTMENT) 1. PRE-QUALIFICATION REQUIREMENT: All contractors submitting bids are required to be pre- qualified by the Fort Worth Water prior to submitting bids. This pre-qualification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation: a current financial statement, an acceptable experience record, an acceptable equipment schedule and any other documents the Department may deem necessary, to the Director of the Water Department at least seven (7) calendar days prior to the date of the opening of bids. (a) The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status of the submitting company. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. (b) For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which the bids are to be received. (c) The Director of the Water Department shall be the sole judge as to the acceptability for qualification to bid on any Fort Worth Water Department project. (d) Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as such. (e) The City, in its sole discretion, may reject any bid for failure to demonstrate experience and/or expertise. (f) Any proposals submitted by a non-pre-qualified bidder shall be returned unopened,and if inadvertently opened,shall not be considered. (g) The City will attempt to notify prospective bidders whose qualifications (financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a waiver of any necessary pre-qualification. 2. BID SECURITY: A cashier's check or an acceptable bidder's bond payable to the City of Fort Worth in an amount of not less than five percent (5%) of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten (10) days after the contract has been awarded. To be an acceptable surety on the bond, (1) the name of the surety shall be included on the current U.S. Treasury, or (2) the surety must have capital and surplus equal to ten times the limit of the bond. The surety must be licensed to do business in the state of Texas. The amount of the bond shall not exceed the amount shown on the treasury list or one-tenth(1/10)the total capital and surplus. 3. BONDS: A performance bond and a payment bond each for one hundred percent (100%) of the contract price will be required,Reference C 3-3.7. 4. WAGE RATES: Not less than the prevailing wage rates established by the City of Fort Worth,Texas,and as set forth in the Contract Documents must be paid on this project. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6 BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDER: Pursuant to Article 601g, Texas Revised Civil Statutes, the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. "Nonresident bidder" means a bidder whose principal place of business is not in the State of Texas, but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in the State of Texas. This provision does not apply if this contract involves Federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: If the contract amount is$25,000 or less, the contract amount shall be paid within forty-five (45)calendar days after completion and acceptance by the City. 9. AGE: In accordance with the policy ("Policy") of the Executive branch of the Federal Government, Contractor covenants that neither it nor any of its officers, members, agents, employees, program participants or subcontractors, while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate against persons because of their age except on the basis of a bona fide occupational qualification,retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory ' requirement. Contractor warrants it will fully comply with the policy and will defend, indemnify, and hold City harmless against any claims or allegations asserted by third parties or subcontractor against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement. 10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"),Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with,or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with ADA's provisions and any other applicable federal, state, and local laws concerning disability and will defend, indemnify and hold City _ harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement, 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accordance with City of Fort Worth Ordinance, No. 13471, as amended by Ordinance No. 13781, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the M/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM, ("Documentation") as appropriate. The documentation must be received no later than 5:00 PM, five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non- responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise(MBE) and/or a Women Business Enterprise(WBE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three(3)years. PART B - PROPOSAL i i i Sanitary Sesser Rehabilitation Contract XLIX (49), D.O.E. 2115 City of Fort Worth Minority and Women business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS ., APPLICATION OF POLICY If the total dollar value of the contract is $25,000 or more, the M/WBE goal is applicable. If the total dollar value of the contract is less than $25,000,the M/WBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority/Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. The objective of the Policy is to increase the use of M/WBE firms to a level comparable to the availability of M/WBEs that provide goods and services directly or indirectly to the City. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. M/WBE PROJECT GOALS The City's MBE/WBE goal on this project is 16%of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated M/WBE goal, or; 2. Good Faith Effort documentation, or; 3. Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. M/WBE Utilization Form, if goal received by 5:00 p.m.,five(5)City business days after the is met or exceeded: bid opening date, exclusive of the bid opening date. 2. Good Faith Effort Form and M/WBE received by 5:00 p.m., five(5)City business days after the Utilization Form, if participation is bid opening date, exclusive of the bid opening date. less than stated goal: 3. Good Faith Effort Form if no received by 5:00 p.m.,five(5)City business days after the participation: bid opening date,exclusive of the bid opening date. 4. Prime Contractor Waiver Form: received by 5:00 p.m.,five(5)City business days after the bid opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE, WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS. .. Any questions, please contact the M/WBE Office at(817) 871-6104. Rev.6/19/00 Sanitary Seicer Rehabilitation Contract XLIX (49), U.Q.E. 2115 ATTACHMENT 1A City of Fort Worth NE FT IF Page 1 of 2 Minority and Women Business Enterprifi§ 'ifWa'ftffs MBE/WBE UTILIZATION$ FEB 22 PM 1 45 „ Jackson Construction, Ltd. February 15, 2001 IME COMPANY NAME BID DATE .anitary Sewer Rehabilitation Contract XLIX (49) PS58-070580174310 ROJECT NAME PROJECT NUMBER TY'S Ji/WBE PROJECT GOAL: 16% NI/WBE PERCENTAGE ACHIEVED: 17% eailure to complete this form, in its entirety with supporting documentation, and received by the Managing Department or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid eing considered non-responsive to bid specifications. e undersigned bidder agrees to enter into a formal agreement with the MBE and/or WBE firms for work listed in this cnedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing isrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered n-responsive to specifications. Company Name, Contact Name, certified Specify All Contracting Specify All Items to be Dollar Amount o Address,and Telephone No. Scope of Work(`) Supplied(*) .. ac ad U X N F- Z ~_ J/M Materials P. 0. Box 496 Rock & Hauling ■Alvord, TX 76225 X by Dump Truck 1 $41250.00 300-856-8733 Judy Brown 7bel Materials 2. 0. Box 771 Sand 1 $20460.00 Mansfield, TX 76063 X ■R17-478-2141 tanet Field juropace, Inc. ). 0. Box 44 Sand 1 $20460.00 -Dallas, TX 75247 X 940-440-2933 " ,'odd Harkey M/WBEs must be located in the 9(nine)county marketplace or currently doing business in the marketplace at the time of bid. Specify all areas in which MWBE's are to be utilized and/or items to be supplied: FRA complete listing of items to be supplied is required in order to receive credit toward the MAYBE goal. Identify each Tier level. Tier: Means the level of subcontracting below the prime contractor/consultant,i.e.,a direct payment from the prime contractor to a subcontractor is considered 1S1 tier,a payment by a subcontractor to its supplier is considered 2"d tier. THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE (5)CITY BUSINESS DAYS AFTER BID OPENING, EXCLUSIVE OF THE BID OPENING DATE Rev.6/2/98 Pages 1 and 2 of Attachment 1A must be received by the Managing Department r. Sanitary Sewer Rehabilitation Contract XLIX (49), D.O.E. 2115 ATTACHMENT 1A Page 2 of 2 City of Fort Worth Minority and Women Business Enterprise Specifications MBE/WBE UTILIZATION Company Name,Contact Name, Certified Specify All Contracting Specify All Items to be Dollar Amount Address, and Telephone No. a Scope of Work(') Supplied(') O o d CL.0 U XX N F Z ~_ ^'S & S Supply, Inc. 1579 Cedar Elm Manhole Coating Euless, TX 76039 X & TV Inspection 1 $41870.00 �817-267-0783 Sue Brown ,Cen-Tex Seeding 3312 Joyce Drive Hydromulch & Fort Worth, TX 7611 X Sod 1 $ 700.00 817-244-6024 —Gayle Jurachek Brenda Price Trucki g MR152 W. Main Azle, TX 76020 Hauling by 1 $24750.00 817-444-0836 X Dump Truck Brenda Price ne bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding dual work performed by all subcontractors, including MBE(s) and/or WBE(s) arrangements submitted with this bid. bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that f.- substantiate the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized officer or mployee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the Pntract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, to or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material reach of contract may result in a determination of an irresponsible offeror and barred from participating in City work w,a period of time not less than one(1) year. MBFs and WBEs MUST BE CERTIFIED BY THE CITY BEFORE CONTRACT AWARD �4 Larry H. Jackson PresiddeiR!Vt16rp JCI Partners, Printed Signature Inc. , en _rat ParfnPr it�le Contact Name and Title (if different) Jackson Construction, Ltd. 817-572-3303 .ompany Name Telephone Number(s) ,--6112 Sun Valley Drive 817-478-0443 fress Fax Number Fort Worth, Texas 76119 February 22, 2001 77i/State/Zip Code Date THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE(5)CITY BUSINESS DAYS AFTER BID OPENING, EXCLUSIVE OF THE BID OPENING DATE Rev.6/2/98 Pages 1 and 2 of Attachment 1 A must be received by the Managing Department Part B PROPOSAL THIS PROPOSAL MUST NOT BE REMOVED FROM THIS BOOK OF CONTRACT DOCUMENTS. TO: Mr. Bob Terrell City Manager s Fort Worth, Texas 2001 Sanitary Sewer Rehabilitation Contract XLIX (49) Sewer Project No. PS58-070580174310 D.O.E. Project No. 2115 Pursuant to the foregoing "Notice to Bidders," the undersigned bidder has thoroughly examined the Contract Documents, including Plans, special Contract Documents, the General Contract Documents, and General Specifications for Water Department Projects, and the site of the project, understands the amount of work to be done, and hereby proposes to do all the work, furnish all labor, equipment and materials necessary to complete all the work as provided in the plans and specifications, and subject to the inspection and approval of the Engineering Department Director of the City of Fort Worth, Texas. The contractor must be pre-qualified in -- accordance with the Water Department of the City of Fort Worth requirements. Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, approved by the City of Fort Worth for the performing and completing of said work within the time stated and for the following sums, to wit: T Contract 49 (1) P" BID - Sanitary Sewer Rehabilitation �. PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL ITEM QUANTITY WRITTEN IN WORDS UNIT PRICE AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) "4 1 1,183 L.F. * 8-Inch PVC Sanitary Sewer Pipe, All Depths Dollars Cents $ 30 b $ 35 L4 Qn ME 2 425 L.F. 8-Inch CL 51 DI Sanitary Sewer Pipe, All Depths -j Dollars am t 4tLe—' Cents $ I a5 $ 3 142 L.F. 8-Inch DR 18 PVC (C900) Sanitary Sewer Pipe, All Depths Dollars Cents $ .35*— $ g9700; 4 119 L.F. 8-Inch CL 51 DI Sanitary Sewer By Other Than Open Cut wf - ollars 1 �J1$ p Cents $PM 5 232 L.F. **6-Inch to 8-Inch HDPE Sanitary Sewer by Pipe Enlargement +_ Dollars l ' w Cents $ J0440 6 4,367 L.F. *12-Inch PVC Sanitary Sewer Pipe, All Depths Dollars do Uf; Cents $ $ 1 �V *,** Contractor must complete City Approved Product and Method Form on Page Contract 49-(11) Contract 49 - (2) PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL ITEM QUANTITY WRITTEN IN WORDS UNIT PRICE AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) 7 1,679 L.F. *12-Inch C900(DR 18) PVC Sanitary Sewer Pipe, All Depths + -� Dollars 2 0Cents $ -7�- $ 7O g1-3c� �. 8 187 L.F. **8-Inch to 12-Inch HDPE Sanitary Sewer by Pipe Enlargement r if J, Dollars bf y� Cents $ 5✓ $ 0000.5`� 9 40 L.F. 12-Inch CL 51 DI Sanitary Sewer Pipe, All Depths � r Dollars o b,in Cents $ $ �`J 10 492 L.F. * 4-Inch PVC Sanitary Sewer Service Pipe Dollars �0 181Q9� Cents 11 610 L.F. 4-Inch CL 51 DI Sanitary Sewer Service Pipe J*+ Dollars lip Cents $ 12 34 EA. 4-Inch Sewer Service Connection llars Cents $ ���, $ / �✓ *,** Contractor must complete City Approved Product and Method Form on Page Contract 49-(11) w Contract 49 - (3) w PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL ITEM QUANTITY WRITTEN IN WORDS UNIT PRICE AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) 13 6 EA. 4-Inch Sewer Service Connection to HDPE r Dollars / Cents $ $ 14 125 L.F. Sag Adjustment for Pipe Enlargement Method Dollars Cents $ LAJ 1 _$ too 15 2 EA. Install 6" Double Wye Sanitary Sewer Service Cleanout AA4 , ,) Dollars _ V Cents $ 16 3 EA. 6-Inch Sewer Service Connection (, r Dollars W Cents $ O� $ 17 180 L.F. 6-Inch PVC Sanitary Sewer Service Pipe LAN—ta Dollars k4 Cents $ L1 1 $ ` 18 16 EA. 8-Inch Sewer Service Connection Dollars Cents $ $ w * Contractor must complete City Approved Product Form on Page Contract 49-(11) wr w Contract 49 - (4) PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL ITEM QUANTITY WRITTEN IN WORDS UNIT PRICE AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) 19 51 EA. Construct Standard 4-Foot Diameter Manhole, 6' Depth ry 0�f Dollars Cents $ 53�J 20 138 V.F. Extra Depth, 4-Foot Diameter Manhole 11M. l . Dollars kAo Cents $ 110 $ /5 a 21 2 EA. Construct 4-Foot Diameter Drop Manhole, 6' Depth Dollars P Cents $ SAono $ '4n- 22 23 V.F. Extra Depth, 4-Foot Diameter Drop Manhole � r Dollars � ^ Dv /LU Cents $ _ ,r $ 23 1 L.F. Construct Standard 5-Foot Diameter Manhole, 6' Depth �O������011ars Cents $ AM'—'$ a���✓ 24 6 L.F. Extra Depth, 5-Foot Diameter Manhole pq ikuL ollars Cents $ ✓ $ ���✓ Contract 49 - (5) PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL ITEM QUANTITY WRITTEN IN WORDS UNIT PRICE AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) 25 54 EA. Install Watertight Manhole Insert r Dollars Cents $ 26 54 EA. Install Concrete Collar Dollars 1 Cents $ ✓$ / 7SDU .. 27 54 EA. Manhole Vacuum Testing Dollars 75 li/l�ac/ Cents $ $ `v 28 105 V.F. Interior Manhole Coating for Manholes -b)p 6f � Dollars Cents $ aV$ CQ`U��� 29 30 EA. e ove Existing Ma hole Dollars h n Cents $ 3Q5,,, $ q,,7 30 1 EA. Abandon Existing Manhole � 1I11 1 11 Dollars ✓�.Q Cents $ _$ '—rC0 Contract 49 - (6) PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL ITEM QUANTITY WRITTEN IN WORDS UNIT PRICE AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) 31 40 EA. Install 4" Double Wye Sanitary Sewer Service Cleanou�1�� �J�� / Dollars Cents $ �� ✓ $ `� 32 10 EA. Cut and Plug Existing Sanitary Sewer Pipe -6 )r) Dollars Cents C� ,.. $ $ 33 2 TON Ductile-Iron/Grey Iron Fittings 4q ' Lk", llars AD Cents 34 7,733 L.F. Trench Safety System For Depths Greater Than 5 Feet l 1 � Dollars Cents $ $ rl 73,3 w 35 7,012 L.F. Pavement Replacement, Per Figure 4 44tu� dv;� Dollars 'uL w Cents $ $ q-570�/ 36 1,090 L.F. Concrete Curb and Gutter Replacement Dollars Cents $ $ lLl3-�� Contract 49 - (7) P PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL ITEM QUANTITY WRITTEN IN WORDS UNIT PRICE AMOUNT "* BID (Furnish and install complete in place, including all appurtenant work, the following items.) 37 90 S.Y. Concrete Sidewalk and Driveway Replacement 1IM Dollars 0--. a�o� Cents $ � � $ 38 96 S.Y. Sodding (Bermuda or St. Augustine) �,�1Qy11 Dollars has i Cents $ $ 39 85 S.Y. Hydro-Mulch Seeding Dollars Cents 40 710 S.Y. Top Soil �,. L I ILU Dollars Cents $ 40' $ o�U 7V 41 2,858 L.F. Pre-Construction Cleaning and Television Inspection Dollars 6� c,,,°Cents $ $ `f57 42 8,374 L.F. Post-Construction Television Inspection Dollars JPjq Cents $ $ /(Y&7 w w r Contract 49 - (8) PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL UNIT PRICE AMOUNT ITEM QUANTITY WRITTEN IN WORDS BID (Furnish and install complete in place, including all appurtenant work, the following items.) mR 43 18 EA. Exploratory Excavation(s) (D-Hole) As Noted on P ins Dollars Cents $ $ �r 44 1 EA. Install 5' x '5' x 6' Storm Sewer Junction Box ollars Cents $C7��$ � � 45 270 L.F. Concrete Encasement Dollars ZJ w Cents $ l o $ 46 8 EA. Storm Drain Lateral Adjustment, As Needed w Dollars F�V) — / o` Cents $ $ 47 17 L.F. 6" PVC C900 (DR14) Water Pipe .bkxo� Dollars D P✓ u.J Cents $ �$ �V w 48 1 EA. 6" Gate Valve and Box Jw ' Dollars 'tK1 Cents $ CJ ` $ o�•�J c� w Contract 49 - (9) PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL w ITEM QUANTITY WRITTEN IN WORDS UNIT PRICE AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) 49 1 EA. Install Standard Fire Hydrant, 3-Foot 6-Inch Bury Depth liars Cents $ }� 50 1 EA. Fire Hydrant Barrel Extension ]�" ' Dollars Cents $ C><-5 51 1 L.S. Remove Existing Valve Box and Salvage Existing Fire �Hydrant L4-&Dollars Cents $ SANITARY SEWER REHABILITATION TOTAL BID: $ l�[,, 6 Y Contract 49 - (10) CITY APPROVED PRODUCT AND APPROVED METHOD FOR * AND ** * CONTRACTOR SHALL SELECT TYPE OF PIPE TO BE USED: STANDARD SPEC NO. SIZE E1-31 4" thru 30" E1-25 4" thru 15" E1-27 4" thru 15" E1-28 18" thru 27" E100-2 18" thru 48" = Consult the"City of Fort Worth Standard Product List"to obtain the Generic/Trade Name and the Manufacturer for the pipes listed above. ** CONTRACTOR SHALL SELECT PIPE ENLARGEMENT METHOD TO BE USED AND PROVIDE NAME OF CONTRACTOR FOR INSTALLATION: y;, ✓/ PIM Method Q.Q wt� (�Mta 1��,G( b Name of Subcontractor if Applicable T.R.S. System Name of Subcontractor if Applicable McConnell Method Name of Subcontractor if Applicable Expanded System ri Name of Subcontractor if Applicable F Failure to provide the information required above may result in rejection of bid as non-responsive. Only products or methods listed above will be allowed for use in this project. Any substitution shall result in rejection of bid as non-responsive. w Contract 49(11) R Within ten (10) days after notification by City, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract '~ Documents, for the faithful performance of this Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the _ contract and bond or bonds are not executed and delivered within the time above set forth as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certifies that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents, and the specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by the City Ordinance No. 7400. The Bidder agrees to begin construction within ten (10) calendar days after issue of the work order, and to complete the contract within one hundred sixty(160) calendar days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of Non-resident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non-resident bidders in the State of , our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. Receipt is acknowledged of the following addenda: �. Addendum No. 1 Addendum No. 2 Addendum No. 3 Contract 49(12) tr w Respectfully submitted, By _ -Z - P -X CI eJ Title Address (SEAL) If Bidder is Corporation OR Date: R R *, Contract 49(13) PART C - GENERAL CONDITIONS PART C - GENERAL CONDITIONS TABLE OF CONTENTS NOVEMBER, 1, 1987 TABLE OF CONTENTS C1-1 DEFINITIONS C1-1. 1 Definition of Terms Cl-1 (1 ) C1-1. 2 Contract Documents C1-1 ( 1) C1-1. 3 Notice to Bidders Cl-1 ( 2 ) C1-1. 4 Proposal C1-1 ( 2 ) .. C1-1.5 Bidder C1-1 ( 2 ) C1-1. 6 General Conditions C1-1 ( 2 ) C1-1. 7 Special Conditions C1-1 ( 2 ) C1-1.8 Specifications Cl-1 (2 ) C1-1.9 Bond C1-1 ( 2) C1-1.10 Contract Cl-1 ( 3 ) C1-1. 11 Plans Cl-1 ( 3 ) = C1-1.12 City Cl-1 ( 3 ) C1-1.13 City Council C1-1 ( 3 ) C1-1.14 Mayor Cl-1 ( 3 ) C1-1.15 City Manager C1-1 (3 ) C1-1.16 City Attorney C1-1 ( 3 ) C1-1.17 Director of Public Works C1-1 ( 4 ) C1-1.18 Director, City Water Department C1-1 ( 4 ) ' C1-1.19 Engineer C1-1 ( 4 ) C1-1.20 Contractor C1-1 ( 4 ) C1-1. 21 Sureties C1-1 ( 4 ) C1-1.22 The Work or Project C1-1 ( 4 ) C1-1.23 Working Day C1-1 ( 4 ) C1-1. 24 Calendar Day C1-1 ( 4 ) = C1-1.25 Legal Holiday C1-1 ( 4 ) C1-1.26 Abbreviations C1-1 ( 5) C1-1. 27 Change Order C1-1 (6 ) C1-1.28 Paved Streets and Alleys C1-1 (6 ) C1-1. 29 Unpaved Streets and Alleys C1-1 (6 ) C1-1. 30 City Streets C1-1 ( 6 ) C1-1. 31 Roadway C1-1 (6 ) = C1-1. 32 Gravel Street C1-1 ( 6 ) C2-2 INTERPRETATION AND PREPARATION = OF PROPOSAL C2-2.1 Proposal Form C2-2 (1 ) C2-2. 2 Interpretation of Quantities C2-2 (1) ' C2-2. 3 Examination of Contract documents and Site C2-2 (2) C2-2.4 Submitting of Proposal C2-2 ( 3 ) C2-2. 5 Rejection of Proposals C2-2 ( 3 ) C2-2.6 Bid Security C2-2 ( 3 ) (1) C2-2. 7 Delivery of Proposal C2-2 ( 4 ) C2-2. 8 Withdrawing Proposals C2-2 (4 ) C2-2. 9 Telegraphic Modification of Proposals C2-2 ( 4 ) C2-2.10 Public Opening of Proposal C2-2 ( 4 ) C2-2.11 Irregular Proposals C2-2 (4 ) C2-2. 12 Disqualification of Bidders C2-2 (5 ) C3-3 AWARD AND EXECUTION OF DOCUMENTS .. C3-3. 1 Consideration of Proposals C3-3 (1) C3-3. 2 Minority Business Enterpise Women-Owned Business Enterprise compliance C3-3 (1 ) C3-3. 3 Equal Employment Provisions C3-3 (1 ) C3-3. 4 Withdrawal of Proposals C3-3 (2 ) C3-3.5 Award of Contract C3-3 (2 ) C3-3. 6 Return of Proposal Securities C3-3 (2 ) C3-3. 7 Bonds C3-3 (2 ) C3-3.8 Execution of Contract C3-3 ( 4 ) .. C3-3.9 Failure to Execute Contract C3-3 (4 ) C3-3.10 Beginning Work C3-3 (4 ) C3-3.11 Insurance C3-3 (4 ) C3-3. 12 Contractor 's Obligations C3-3 (7) _ C3-3.13 Weekly Payroll C3-3 ( 7) C3-3.14 Contractor ' s Contract Administration C3-3 (7 ) C3-3.15 Venue C3-3 (8 ) C4-4 SCOPE OF WORK C4-4.1 Intent of Contract Documents C4-4 (1 ) C4-4. 2 Special Provisions C4-4 (1) C4-4. 3 Increased or Decreased Quantities C4-4 (1 ) C4-4.4 Alteration of Contract Documents C4-4 (2 ) _ C4-4.5 Extra Work C4-4 (2 ) C4-4.6 Schedule of Operations C4-4 (3) C4-4.7 Progress Schedules for Water and Sewer Plant Facilities C4-4 (4 ) C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 Authority of Engineer C5-5 (1 ) C5-5. 2 Conformity with Plans C5-5 (1 ) C5-5. 3 Coordination of Contract Documents C5-5 ( 2 ) C5-5. 4 Cooperation of Contractor C5-5 ( 2 ) C5-5. 5 Emergency and/or Rectification Work C5-5 (3) C5-5. 6 Fidld Office C5-5 ( 3 ) C5-5.7 Construction Stakes C5-5 ( 3 ) C5-5. 8 Authority and Duties of Inspectors C5-5 ( 4 ) C5-5.9 Inspection C5-5 ( 5 ) C5-5.10 Removal of Defective and Unauthorized Work C5-5 (5) C5-5.11 Substitute Materials or Equipment C5-5 ( 5) .. C5-5.12 Samples and Tests of Materials C5-5 (6 ) C5-5.13 Storage of Materials C5-5 (6 ) C5-5 .14 Existing Structures and Utilities C5-5 ( 7) C5-5.15 Interruption of Service C5-5 (7) C5-5.16 Mutual Responsibility of Contractors C5-5 (8 ) C5-5. 17 Cleanup C5-5 (8) C5-5. 18 Final Inspection C5-5 (9) (2 ) C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6. 1 Laws to be Observed C6-6 (1 ) _ C6-6. 2 Permits and Licenses C6-6 (1 ) C6-6. 3 Patented Devices, Materials and Processes C6-6 (1) C6-6. 4 Sanitary Provisions C6-6 ( 2 ) C6-6. 5 Public Safety and Convenience C6-6 ( 2 ) C6-6. 6 Privileges of Contractor in Streets, Alleys, and Right-of-Way C6-6 ( 3 ) C6-6.7 Railway Crossings C6-6 ( 4 ) C6-6. 8 Barricades, Warnings and Watchmen C6-6 ( 4 ) C6-6. 9 Use of Explosives, Drop Weight, etc. C6-6 ( 5 ) C6-6.10 Work Within Easements C6-6 ( 6 ) C6-6. 11 Independent Contractor C6-6 (8 ) C6-6.12 Contractor ' s Responsibility for Damage Claims C6-6 ( 8 ) C6-6. 13 Contractor ' s Claim for Damages C6-6 (10 ) C6-6.14 Adjustment of Relocation of Public Utilities, etc. C6-6 (10 ) C6-6.15 Temporary Sewer Drain Connections C6-6 (10 ) C6-6.16 Arrangement and Charges of Water Furnished try City C6-6 (11 ) C6-6.17 Use of a Section of Portion of the Work C6-6 (11 ) C6-6.18 Contractor ' s Responsibility for Work C6-6 (11 ) C6-6.19 No Waiver of Legal Rights C6-6 (12 ) C6-6. 20 Personal Liability of Public Officials C6-6 (12 ) C6-6. 21 State Sales Tax C6-6 (12 ) C7-7 PROSECUTION AND PROGRESS C7-7.1 Subletting C7-7 ( 1 ) C7-7. 2 Assignment of Contract C7-7 (1 ) C7-7. 3 Prosecution of the Work C7-7 (1 ) C7-7. 4 Limitations of Operations C7-7 ( 2 ) C7-7. 5 Character of Workman and Equipment C7-7 (2 ) C7-7. 6 Work Schedule C7-7 (3 ) C7-7. 7 Time of Commencement and Completion C7-7 ( 4 ) C7-7. 8 Extension of time of Completion C7-7 ( 4 ) C7-7.9 Delays C7-7 ( 4 ) C7-7.10 Time of Completion C7-7 (5 ) C7-7.11 Suspension by Court Order C7-7 (6 ) C7-7.12 Temporary Suspension C7-7 (6 ) C7-7.13 Termination of Contract due to National Emergency C7-7 (7 ) _ C7-7. 14 Suspension of Abandonment of the Work and Annulment of Contract C7-7 (7) C7-7.15 Fulfillment of Contract C7-7 (9 ) C7-7.16 Termination for Convenience of the Onwer C7-7 (10 ) C7-7. 17 Safety Methods and Practices C7-7 (13 ) C8-8 MEASUREMENT AND PAYMENT C8-8 .1 Measurement of Quantities C8-8 ( 1) C8-8 . 2 Unit Prices C8-8 (1) ( 3 ) C8-8 . 3 Lump Sum C8-8 (1 ) C8-8. 4 Scope of Payment C8-8 (1 ) C8-8. 5 Partial Estimates and Retainage C8-8 (2 ) C8-8. 6 Withholding Payment C8-8 (3 ) C8-8. 7 Final Acceptance C8-8 (3 ) C8-8. 8 Final Payment C8-8 ( 3 ) C8-8.9 Adquacy of Design C8-8 (4 ) C8-8 .10 General Guaranty C8-8 (4 ) C8-8.11 Subsidiary Work C8-8 (5 ) C8-8.12 Miscellaneous Placement of Material C8-8 (5 ) C8-8.13 Record Documents C8-8 (5 ) (4) PART C - GENERAL CONDITIONS C1-1 DEFINITIONS SECTION Cl-1 DEFINITIONS C1-1 . 1 DEFINITIONS OF TERMS : Whenever in these Contract Documents the following terms or pronouns in place of them are used , the intent and meaning shall be understood and interpreted as follows: C1-1 . 2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents , such as specifications , bonds , addenda , plans , etc . , which govern the terms and performance of the contract . These are contained in the General Contract Documents and the Special Contract Documents. a. GENERAL CONTRACT DOCUMENTS : The General Contract Documents govern all Water Department Projects and include the following items: PART A - NOTICE TO BIDDERS (Sample) White PART B - PROPOSAL (Sample) White PART C - GENERAL CONDITIONS (CITY) Canary Yellow ( Developer) Brown PART D - SPECIAL CONDITIONS Green PART E - SPECIFICATIONS El-White E2-Golden Rod E2A-White PERMITS/EASEMENTS Blue PART F - BONDS (Sample) White PART G - CONTRACT (Sample) White b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to the General Contract Documents and include the following items: PART A - NOTICE TO BIDDERS (Advertisement) Same as above PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS PART G - CONTRACT PART H - PLANS (Usually bound separately) Cl-1 (1 ) C1-1 . 3 NOTICE TO BIDDERS : All of the legal publications _ either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the notice to bidders. C1-1 . 4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the Owner desires to have done , together with the bid security, constitutes the Proposal , which becomes binding upon the Bidder when it is officially received by the Owner, has been publicly opened and read and not rejected by the Owner. C1-1 . 5 BIDDER : Any person , persons , firm , partnership , company, association, corporation, acting directly or through a duly authorized representative , submitting a proposal for performing the work contemplated under the Contract Documents , constitutes a bidder. C1-1. 6 GENERAL CONDITIONS: The General Conditions are the usual construction and contract requirements which govern the _ performance of the work so that it will be carried on in accordance with the customary procedure, the local statutes , and requirements of the City of Fort Worth ' s charter and promulgated ordinances. Wherever there may be a conflict between the General Conditions and Special Conditions , the latter shall take — precedence and shall govern. C1 -1 . 7 SPECIAL CONDITIONS : Special conditions are the specific requirements which are necessary for the particular project covered by the Contract Documents and not specifically covered in the General Conditions . When considered with the General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1-1 . 8 SPECIFICATIONS : The Specifications is that section or part of the Contract Documents which sets forth in detail the _ requirements which must be met by all materials, construction, workmanship, equipment and services in order to render a completed and useful project . Whenever reference is made to standard specifications, regulations, requirements , statutes , — etc . , such referred to documents shall become a part of the Contract Documents just as though they were embodied therein. C1-1 . 9 BOND: The bond or bonds are the written guarantee or security furnished by the Contractor for the prompt and C1-1 (2 ) faithful performance of the contract and include the following: a. Performance Bond (see paragraph C3-3. 7 ) b. Payment Bond (see paragraph C3-3 . 7 ) C. Maintenance Bond ( see paragraph C3-3. 7 ) d. Proposal or Bid Security (see Special Instructions to Bidders, Part A and C2-2 . 6 ) C1-1 . 10 CONTRACT: The Contract is the formal signed agreement between the Owner and the Contractor covering the mutual understanding of the two contracting parties about the project to be completed under the Contract Documents. C1-1 . 11 PLANS : The plans are the drawings or reproductions therefrom made by the Owner ' s representative showing in detail the location , dimension and position of the various elements of the project , including such profiles , typical cross-sections, layout diagrams, working drawings, preliminary drawings and such supplemental drawings as the Owner may issue to clarify other drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner . The plans are usually bound separately from other parts of the Contract Documents , but they are a part of the Contract Documents just as though they were bound therein. C1-1 . 12 CITY : The City of Fort Worth, Texas , a municipal corporation , authorized and chartered under the Texas State Statutes , acting by and through its governing body or its City Manger , each of which is required by charter to perform specific duties . Responsibility for Final enforcement of Contracts involving the City of Fort Worth is by Charter vested in the City Manager . The terms City and Owner are synonymous. MW C1-1 . 13 CITY COUNCIL : The duly elected and qualified governing body of the City of Fort Worth, Texas. .C1-1 . 14 MAYOR : The officially elected Mayor , or in his absence, the Mayor Pro tem of the City of Fort Worth, Texas . C1-1 . 15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort Worth , Texas , or his duly authorized representative. C1-1. 16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth , Texas , or his duly authorized representative. C1-1 (3 ) C1-1 . 17 DIRECTOR OF PUBLIC WORKS: The duly appointed official of the City of Fort Worth , referred to in the Charter as the City Engineer, or his duly authorized representative. C1-1 . 18 DIRECTOR, CITY WATER DEPARTMENT: The duly appointed Director of the City Water Department of the City of Fort Worth , Texas , or his duly authorized representative , assistant, or agents . C1-1 . 19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water Department , or their duly authorized assistants , agents , engineers , inspectors , or superintendents , acting within the scope of the particular duties entrusted to them. C1-1 . 20 CONTRACTOR : The person , persons , partnership , company, firm, association , or corporation , entering into a contract with the Owner for the execution of the work, acting directly or through a duly authorized representative . A sub-contractor is a person, firm, corporation, or others under contract with the principal contractor , supplying labor and materials or only labor, for work at the site of the project. C1-1 . 21 SURETIES : The Corporate bodies which are bound by such bonds are required with and for the Contractor . The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and .. approved changes therein. C1-1 . 22 THE WORK OR PROJECT: The completed work contemplated in and covered by the Contract Documents , including but not limited to the furnishing of all labor , materials , tools , equipment, and incidentals necessary to produce a completed and serviceable project. C1-1. 23 WORKING DAY: A working day is defined as a calendar day, not including Saturdays, Sundays , and legal holidays , in which the weather or other conditions not under the control of the Contractor permit the performance of the principal unit of work for a period of not less than seven ( 7 ) hours between 7 : 00 a . m. and 6 : 00 p .m. , with exceptions as permitted in paragraph C7-7. 6. C1-1 . 24 CALENDAR DAYS : A calendar day is any day of the week or month, no days being excepted. C1-1 . 25 LEGAL HOLIDAYS : Legal holidays shall be observed as prescribed by the City Council of the City of Fort Worth for observance by City employees as follows : C1-1 (4 ) �- 1. New Year ' s Day January 1 2. M. L. King, Jr. Birthday Third Monday in January 3 . Memorial Day Last Monday in May 4 . Independence Day July 4 5. Labor Day First Monday in September 6 . Thanksgiving Day Fourth Thursday in November 7. Thanksgiving Friday Fourth Friday in November 8 . Christmas Day December 25 9 . Such other days in lieu of •- holidays as the City Council may determine When one of the above named holidays or a special holiday is declared by the City Council , falls on Saturday, the holiday shall be observed on the preceding Friday or if it falls on Sunday, it shall be observed on the following Monday, by those employees working on working day operations . Employees working calendar day operations will consider the calendar holiday as the holiday. C1-1 . 26 ABBREVIATIONS : Wherever the abbreviations defined herein appear in Contract Documents , the intent and meaning shall be as follows: AASHTO - American Association of MGD - Million Gallons Per State Highway Transportation Day Officials ASCE - American Society of Civil CFS - Cubic Foot per Engineers Second — LAW - In Accordance With ASTM - American Society of Min. - Minimum Testing Materials Mono.- Monolithic AWWA - American Water Works % - Percentum Association R - Radius ASA - American Standards Association I.D. - Inside Diameter HI - Hydraulic Institute O . D . - Outside Diameter Asph. - Asphalt Elev. - Elevation Ave. - Avenue F - Fahrenheit Blvd. - Boulevard C - Centigrade CI - Cast Iron In. - Inch CL - Center Line Ft. - Foot GI - Galvanized Iron St. - Street Lin. - Linear or Lineal CY - Cubic Yard lb. - Pound Yd. - Yard MH - Manhole SY - Square Yard Max. - Maximum L.F. - Linear Foot D. I . - Ductile Iron C1-1 (5 ) C1 -1 . 27 CHANGE ORDER : A " Change Order" is a written _ supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and which was not specifically included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter of a Change Order unless the increase or decrease is more than 25% of the amount of the particular item or items in the original proposal. All "Change Orders " shall be prepared by the City from �. information as necessary furnished by the Contractor. C1-1 . 28 PAVED STREETS AND ALLEYS : A paved street or alley shall be defined as a street or alley having one of the following types of wearing surfaces applied over the natural unimproved surface: 1. Any type of asphaltic concrete with or without separate base material. 2. Any type of asphalt surface treatment , not including an oiled surface , with or without separate bass material. 3 . Brick, with or without separate base material. 4. Concrete, with or without separate base material. — 5. Any combination of the above. C1-1 . 29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley, •� roadway or other surface is any area except those defined above for "Paved Streets and Alleys. " C1-1 . 30 CITY STREETS : A city street is defined as that area between the right-of-way lines as the street is dedicated. C1-1 . 31 ROADWAY: The roadway is defined as the area between = parallel lines two ( 21 ) feet back of the curb lines or four ( 4 ' ) feet back of the average edge of pavement where no curb exists. — C1-1 . 32 GRAVEL STREET: A gravel street is any unpaved street to which has been added one or more applications of gravel or similar material other than the natural material found on the street surface before any improvement was made. C1-1 (6 ) i i SECTION C - GENERAL CONDITIONS i C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL i SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2 . 1 PROPOSAL FORM: The Owner will furnish bidders with proposal form, which will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices are requested. The Proposal form will state the Bidder ' s general understanding of the project to be completed, provide a space for furnishing the amount of bid security , and state the basis for entering into a formal contract . The Owner will furnish forms for the Bidder ' s " Experience Record, " "Equipment Schedule, " and "Financial Statement, " all of which must be properly executed and filed with the Director of the City Water Department one week prior to the hour for opening of bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial status . This statement must be current and not more than one ( 1 ) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification . Liquid assets in the amount of ten ( 10% ) percent of the estimated project cost will be required. i For an experience record to be considered to be acceptable for a given project , it must reflect the experience of the firm seeking qualification in work of both the same nature and magnitude as that of the project for which bids are to be received , and such experience must have been on projects i completed not more than five ( 5 ) years prior to the date on which are to be received . The Director of the Water department shall be sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water Department project. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. C2-2 . 2 INTERPRETATION OF QUANTITIES : The quantities of work and materials to be furnished as may be listed in the proposal i C2-2 (1 ) forms or other parts of the Contract Documents will be .• considered as approximate only and will be used for the purpose of comparing bids on a uniform basis . Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans . The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter provided , without in any way invalidating the unit prices bid or any other requirements of the Contract Documents . C2-2 . 3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: Bidders are advised that the Contract Documents on file with the Owner shall constitute all of the information which the .. Owner will furnish. All additional information and data which the owner will supply after promulgation of the formal contract documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. Bidders are required, prior to the filing of proposal, to read and become familiar with the Contract Documents , to visit the site of the project and examine carefully all local conditions , to inform themselves by their own independent research and investigations, tests, boring, and by such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project . They must judge for themselves the difficulties of the work and all attending circumstances affecting the cost of doing the work or the time requi4ed for .. its completion, and obtain all information required to make an intelligent proposal . No information given by the Owner or any representative of the Owner other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the Owner. Bidders shall rely exclusively and solely upon their own estimates , investigation , research, tests , explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is mutually agreed that the submission of a proposal is prima-facie evidence that the bidder has made the investigations , examinations and tests herein required . Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. The logs of Soil Borings, if any, showing on the plans are for general information only and may not be correct. Neither the C2-2 ( 2 ) Owner nor the Engineer guarantee that the data shown is representative of conditions which actually exist. C2-2 . 4 SUBMITTING OF PROPOSAL: The Bidder shall submit his Proposal on the form furnished by the Owner. All blank spaces applicable to the project contained in the form shall be correctly filled in and the Bidder shall state the prices , written in ink in both words and numerals , for which he proposes to do the work contemplated or furnishe the materials required . All such prices shall be written legibly. In case of discrepancy between the price written in words and the price written in numerals, the price most advantageous to the City shall govern. If a proposal is submitted by an individual, his or her name must be signed by him (her) or his (her) duly authorized agent. If a proposal is submitted by a firm, association , or partnership, the name and address of each member must be given , and the proposal must be signed by a member of the _ firm, association , or partnership , or by a person duly authorized . If a proposal is submitted by a company or corporation , the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. Power of Attorney authorizing agents or others to sign proposal must be properly certified and must be in writing and submitted with the proposal. C2-2 . 5 REJECTION OF PROPOSALS: Proposals may be rejected if they show any alteration of words or figures , additions not called for , conditional or uncalled for alternate bids, incomplete bids, erasures , or irregularities of any kind, or contain unbalance value of any items . Proposal tendered or delivered after the official time designated for receipt of proposal shall be returned to the Bidder unopened. MW C2-2 . 6 BID SECURITY: No proposal will be considered unless it is accompanied by a "Proposal Security" of the character and in the amount indicated in the "Notice to Bidders " and the "Proposal . " The Bid Security is required by the Owner as evidence of good faith on the part of the Bidder, and by way of a guaranty that if awarded the contract, the Bidder will within the required time execute a formal contract and furnish the required performance and other bonds. The bid security of the three lowest bidders will be retained until the contract is awarded or other disposition is made thereof . The bid security of all other bidders may be returned promptly after the canvass of bids. C2-f( 3 ) C2-2 . 7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered , accompanied by its proper Bid Security, to the City Manager or his representative in the official place of business as set forth in the "Notice to Bidders . " It is the Bidder ' s sole responsibility to deliver the proposal at the proper time to the proper place . The mere fact that a proposal was dispatched will not be considered. The Bidder must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL, " and the name or description of the project as designated in the "Notice to Bidders. " The envelope shall be addressed to the City Manager, City Hall, Fort Worth, Texas. C2-2 . 8 WITHDRAWING PROPOSALS : Proposals actually filed with the City Manager cannot be withdrawn prior to the time set for opening proposals . A request for non-consideration of a proposal must be made in writing , addressed to the City Manager , and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner , be returned unopened. C2-2 . 9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any. bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals , provided such telegraphic communication is received by the City Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time . If such confirmation is not received within forty-eight ( 48 ) hours after the proposal opening time , _ no further consideration will be given to the proposal. C2-2 . 10 PUBLIC OPENING OF PROPOSAL: Proposals which have been properly filed and for which no "Non-consideration Request" has been received will be publicly opened and read aloud by the City Manager or his authorized representative at the time and place indicated in the "Notice to Bidders. " All proposals _ which have been opened and read will remain on file with the Owner until the contract has been. awarded. Bidders or their authorized representatives are invited to be present for the opening of bids . C2-2 . 11 IRREGULAR PROPOSALS: Proposals shall be considered as be nibe g"Irregular" if they show any omissions , alterations of form, additions , or conditions not called for , unauthorized alternate bids, or irregularities of any kind. However , the C2,-2( 4 ) r. Owner reserves the right to waive any and all irregularities and to make the award of the contract to the best interest of the City . Tendering a proposal after the closing hour is an irregularity which cannot be waived. C2 - 2 . 12 DISQUALIFICATION OF BIDDERS : Bidders may be disqualified and their proposals not considered for any of , but not limited to, the following reason: a. Reasons for believing that collusion exists among bidders. b. Reasonable grounds for believing that any bidder is interested in more than one proposal for work contemplated. C. The bidder being interested in any litigation against the Owner or where the Owner may have a claim against or be engaged in litigation against the bidder. d. The bidder being in arrears on any existing contract or having defaulted on a previous contract. — e. The bidder having performed a prior contract in an unsatisfactory manner. f. Lack of competency as revealed by the financial statement , experience record, equipment schedule , and such inquiries as the Owner may see fit to make. g. Uncompleted work which , in the judgment of the Owner, will prevent or hinder the prompt completion `! of additional work if awarded. h. The bidder not filing with the Owner , one week in advance of the hour of the opening of proposals the following: 1. Financial Statement showing the financial condition of the bidder as specified in Part "A" - Special Instructions. 2 . A current experience record showing especially the projects of a nature similar to the one under consideration , which have been successfully completed by the Bidder. 3. An equipment schedule showing the equipment the bidder has available for use on the project. The Bid Proposal of a bidder who , in the judgment of the Engineer , is disqualified under the requirements stated herein, shall be set aside and not opened. C2-2( 5 ) PART C - GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS: C3-3 . 1 CONSIDERATION OF PROPOSALS: After proposals have been opened and read aloud, the proposals will be tabulated on the basis of the quoted prices , the quantities shown in the proposal , and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents. The total obtained by taking the sum of the products of unit prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. Until the award of the contract is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to re-advertise for new proposals, or to proceed with the work in any manner as maybe considered for the best interest of the Owner. C3-3 . 2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner , upon request , complete and accurate information regarding actual work performed by a Minority Business Enterprise ( MBE ) and or a a Woman-owned Business Enterprise (WBE ) on the contract and the payment therefor. Contractor further agrees , MR upon request by Owner , to allow and audit and/or an examination of any books, records, or files in the possession of Contractor that will substantiate the actual work performed by the MBE or WBE. Any material misrepresentation of any nature will be grounds for termination of the contract and for initiating any action under appropriate federal , state or local laws and ordinances relating to false statements ; further , any such misrepresentation may be grounds for disqualification of Contractor at Owner ' s discretion for bidding on future Contracts with the Owner for a period of time of not less than six (6 ) months. C3-3 . 3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall comply with Current City Ordinance prohibiting discrimination in employment practices. C3-3 (1 ) .w The Contractor shall post the required notice to that effect on the project site , and, at his request , will be provided assistance by the City of Fort Worth ' s Equal Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may be acquired from the Equal Employment Officer. C3-3 . 4 WITHDRAWAL OF PROPOSALS : After a proposal has been - read by the Owner it cannot be withdrawn by the Bidder within forty-five ( 45 ) days after the date on which the proposals were opened. C3-3 . 5 AWARD OF CONTRACT: The Owner reserves the right to withholdfinal action on the proposals for a reasonable time , not to exceed forty-five ( 45 ) days after the date of opening proposals, and in no event will an award be made until after investigations have been made as to the responsibility of the proposed awardee. - The award of the contract, if an award is made, will be to the lowest and best responsible bidder. The award of the contract shall not become effective until the Owner has notified the Contractor in writing of such award. C3-3 . 6 RETURN OF PROPOSAL SECURITIES : As soon as proposed price totals have been determined for comparison of bids , the Owner may, at its discretion, return the proposal security which accompanied the proposals which , in its judgment , would not be considered for the award . All other proposal securities, usually those of the three lowest bidders , will be retained by the Owner until the required contract has been executed and bond furnished or the Owner has otherwise disposed of the bids, after which they will be returned by the City Secretary. C3-3 . 7 BONDS : With the execution and delivery of the Contract Documents, the Contractor shall furnish to, and file with the -• Owner in the amounts herein required, the following bonds: a. PERFORMANCE BOND : A good and sufficient _ performance bond in an amount not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise , guaranteeing the full and faithful execution of the - work and performance of the contract , and for the protection of the Owner and all other persons against damage by reason of negligence of the - Contractor , or improper execution of the work or the use of inferior materials . This performance C3-3 (2 ) bond shall guarantee the payment for all labor , materials, equipment, supplies , and services used in the construction of the work , and shall remain in full force and effect until provisions as above y- stipulated are accomplished and final payment is made on the project by the City. b. MAINTENANCE BOND : A good and sufficient maintenance bond, in the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise , guaranteeing the prompt , full and faithful performance of the general guaranty which is set forth in paragraph C8-8. 10. C. PAYMENT BOND: A good and sufficient payment bond, in an amount not less than 100 percent of the amount of the contract , as evidenced by the proposal tabulation or otherwise , guaranteeing the prompt, full and faithful payment of all claimants as defined in Article 5160 , Revised Civil Statutes of Texas , 1925 , as amended by House Bill 344 Acts 56th Legislature, Regular Session, 1959 , effective April 27 , 1959 , and/or the latest version thereof, supplying labor and materials in the prosecution of the work provided for in the contract being constructed under these specifications . Payment Bond shall remain in force until all payments as above stipulated are made. d. OTHER BONDS : Such other bonds as may be required by these Contract Documents shall be furnished by the Contractor. No sureties will be accepted by the Owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against the owner . All bonds shall be made on the forms furnished by the owner and shall be executed by an approved surety company doing business in the City of Fort Worth , Texas , and which is acceptable to the owner . In order to be acceptable , the name of the surety shall be included on the current U . S . Treasury list of acceptable sureties, and the amount of bond written by any one acceptable company shall not exceed the amount shown on the Treasury list for that company. Each bond shall be properly executed by both the Contractor and Surety Company. Should any surety on the contract be determined unsatisfactory at any time by the Owner, notice will be given the Contractor to that effect and the Contractor shall immediately provide a C3-3 ( 3 ) new surety satisfactory to the Owner. No payment will be made under the contract until the new surety or sureties , as required, have qualified and have been accepted by the Owner. The contract shall not be operative nor will any payments be due or paid until approval of the bonds by the Owner. _ C3-3 . 8 EXECUTION OF CONTRACT: Within ten (10 ) days after the Owner has by appropriate resolution, or otherwise, awarded the contract, the Contractor shall execute and file with the Owner the Contract and such bonds as may be required in the Contract Documents. No contract shall be binding upon the owner until it has been attested by the City Secretary , approved as to form and legality by the City Attorney, and executed for the Owner by either the Mayor or City Manager. C3-3 . 9 FAILURE TO EXECUTE CONTRACT : The failure of the Awardee to execute the required bond or bonds or to sign the required contract within ten ( 10 ) days after the contract is awarded shall be considered by the Owner as an abandonment of his proposal, and the Owner may annul the Award. By reason of the uncertainty of the market prices of material and labor , and it being impracticable and difficult to accurately determine the amount of damages occuring to the Owner by _ reason of said awardee ' s failure to execute said bonds and contract within ten ( 10 ) days , the proposal security accompanying the proposal shall be the agreed amount of damages which Owner will suffer by reason of such failure on the part of the Awardee and shall thereupon immediately be forfeited to the Owner. The filing of a proposal will be considered as an acceptance of this provision by the Bidder. C3-3 . 10 BEGINNING WORK: The Contractor shall not commence work until authorized in writing to do so by the Owner . Should the Contractor fail to commence work at the site of the project within the time stipulated in the written authorization usually termed the "Work Order" or "Proceed Order" , it is agreed that the Surety Company will , within ten ( 10 ) days after the commencement date set forth in such written authorization, commence the physical execution of the contract. C3-3 . 11 INSURANCE: The Contractor shall not commence work '! under this contract until he has obtained all the insurance required under the Contract Documents, and such insurance has been approved by the Owner . The prime Contractor shall be responsible for delivering to the Owner the sub-contractors ' C3-3 (4 ) certificate of insurance for approval . The prime contractor shall indicate on the certificate of insurance included in the documents for execution whether or not his insurance covers sub-contractors . It is the intention of the Owner that the insurance coverage required herein shall include the coverage of all sub-contractors. a. COMPENSATION INSURANCE : The Contractor shall maintain , during the life of this contract , Workers ' Compensation Insurance on all of his employees to be engaged in work on the project under this contract, and for all sub-contractors. In case any class of employees engaged in hazardous work on the project under this contract is not protected under the Workers ' Compensation Statute, the Contractor shall provide adequate employer ' s general liability insurance for the protection of such of his employees not so protected. b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The Contractor shall procure and shall maintain during the life of this contract Contractor ' s Comprehensive General Liability Insurance (Public Liability and Property Damage Insurance ) in an amount not less than $ 500 , 0.00 covering each occurrence on account of bodily injury, including death, and in an amount not less than $ 500 , 000 covering each occurrence on account of property damage with $2,000 ,000 umbrella policy coverage. C. ADDITIONAL LIABILITY : The Contractor shall furnish insurance as separate policies or by additional endorsement to one of the above-mentioned policies, and in the amount as set forth for public liability and property damage, the following insurance: 1. Contingent Liability ( covers General .f Contractor ' s Liability for acts of sub-contractors) . 2 . Blasting, prior to any blasting being done. 3 . Collapse of buildings or structures adjacent to excavation ( if excavations are to t)e M performed adjacent to same) . 4. Damage to underground utilities for $500,000 . C3-3 (5 ) i 5. Builder ' s risk (where above-ground structures are involved) . 6. Contractual Liability ( covers all indemnification requirements of Contract) . i d� AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY DAMAGE: The Contractor shall procure and maintain , during the life of this Contract, Comprehensive WON Automobile Liability insurance in an amount not less than $ 250 , 000 for injuries including accidental death to any one person and subject to --' the same limit for each person an amount not less than $ 500 , 000 on account of one accident , and automobile property damage insurance in an amount _ not less than $100,000. e. SCOPE OF INSURANCE AND SPECIAL HAZARD : The nsurance required under the above paragraphs shall provide adequate protection for the Contractor and his sub-contractors , respectively, against damage claims which may arise from operations under this i contract, whether such operations be by the insured or by anyone directly or indirectly employed by him, and also against any of the following special — hazards which may be encountered in the performance of the Contract. f. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with satisfactory proof of coverage by insurance required in these Contract Documents in amounts and by carriers satisfactory to the Owner . ( Sample attached. ) All insurance requirements made upon the Contractor shall apply to the sub- contractor , should the Prime Contractor ' s insurance not cover the sub-contractor ' s work operations. g. LOCAL AGENT FOR INSURANCE AND BONDING : The i insurance and bonding companies with whom the Contractor ' s insurance and performance, payment, maintenance and all such other bonds are written shall be represented by an agent or agents having an office located within the city limits of the C3-3 ( 6 ) City of Fort Worth , Tarrant County, Texas . Each such agent shall be a duly qualified, one upon whom service of process may be had , and must have i authority and power to act on behalf of the insurance and/or bonding company to negotiate and settle with the City of Fort Worth , or any other claimant, any claims that the City of Fort Worth or other claimant or any property owner who has been damaged , may have against the Contractor , insurance, and/or bonding company. If the local i insurance representative is not so empowered by the insurance or bonding companies, then such authority must be vested in a local agent or claims officer residing in the Metroplex , the Fort Worth-Dallas area . The name of the agent or agents shall be set forth on all of such bonds and certificates of insurance. C3-3 . 12 CONTRACTOR ' S OBLIGATIONS : Under the Contract, the Contractor shall pay for all materials , labor and services when due. C3-3 . 13 WEEKLY PAYROLL: A certified copy of each payroll covering payment of wages to all person engaged in work on the project at the site of the project shall be furnished to the Owner ' s representative within seven ( 7 ) days after the close of each payroll period . A copy or copies of the applicable minimum wage rates as set forth in the Contract Documents shall be kept posted in a conspicuous place at the site of the project at all times during the course of the Contract . Copies of the wage rates will be furnished the Contractor, by the Owner; however, posting and protection of the wage rates shall be the responsibility of the Contractor. C3-3 . 14 CONTRACTOR' S CONTRACT ADMINISTRATION: Any Contractor, whether a person , persons , partnership , company , firm , association , corporation or other who is approved to do business with and enters into a contract with the City for construction of water and/or sanitary sewer facilities, will have or shall establish a fully operational business office within the Fort Worth- Dallas metropolitan area . The Contractor shall charge, delegate , or assign this office ( or he may delegate his project Superintendent ) with full authority to transact all business actions required in the performance of the Contract . This local authority shall be made responsible to act for the Contractor in all matters MW pertaining to the work governed by the Contract whether it be administrative or otherwise and as such shall be empowered , thus delegated and directed, to settle all material, labor or other expenditures, all claims against the work or any other i C3-3 ( 7 ) i matter associated such as maintaining adequate and appropriate insurance or security coverage for the project . Such local authority for administration of the work under the Contract shall be maintained until all business transactions executed as part of the Contract are complete. Should the Contractor ' s principal base of operations be other than in the Fort Worth-Dallas metropolitan area, notification of the Contractor ' s assignment of local authority shall be made in writing to the Engineer in advance of any work on the project , all appropriately signed and sealed, as applicable, .. by the Contractor ' s responsible officers with the understanding that this written assignment of authority to a local representative shall become part of the project Contract as though bound directly into the project documents . The intent of these requirements is that all matters associated with the Contractor ' s administration , whether it be oriented in furthering the work, or other, be governed direct by local authority. This same requirement is imposed on insurance and surety coverage. Should the Contractor 's local representative fail to perform to the satisfaction of Engineer, the Engineer, at his sole discretion , may demand that such local representative be replaced and the Engineer may, at his sole discretion , stop all work until a new local authority satisfactory to the Engineer is assigned . No credit of working time will be for periods in which work stoppages are in effect for this reason. C3-3 . 15 VENUE : Venue of any action hereinunder shall be exclusively in Tarrant County, Texas. C3-3 (8 ) PART C - GENERAL CONDITIONS C4-4 SCOPE OF WORK i SECTION C4-4 SCOPE OF WORK i C4-4 . 1 INTENT OF CONTRACT DOCUMENTS : It is the definite intention of these Contract Documents to provide for a complete , useful project which the Contractor undertakes to construct or furnish , all in full compliance with the requirements and intent of the Contract Documents . It is definitely understood that the Contractor shall do all work as provided for in the Contract Documents , shall do all extra or special work as may be considered by the Owner as necessary to complete the project in a satisfactory and acceptable manner. ,. The Contractor shall, unless otherwise specifically stated in these Contract Documents, furnish all labor, tools, materials, machinery, equipment , special services , and incidentals necessary to the prosecution and completion of the project. C4-4 . 2 SPECIAL PROVISIONS: Should any work or conditions which are not thoroughly and satisfactorily stipulated or covered by General or Special Conditions of these Contract Documents be anticipated, or should there be any additional proposed work which is not covered by these Contract Documents, then "Special Provisions" covering all such work will be prepared by the Owner previous to the time of receiving bids or proposals for such work and furnished to the Bidder in the form of Addenda. All such "Special Provisions" shall be considered to be a part of the Contract Documents just as though they were originally written therein. C4-4 . 3 INCREASED OR DECREASED QUANTITIES: The Owner reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices. Such increased or decreased quantity shall not be more than 25 percent of the contemplated quantity of such item or items . When such changes increase or decrease the original quantity of any item or items of work to be done or materials to be furnished by the 25 percent or more, then either party to the contract shall upon written request to the other party be entitled to a revised consideration upon that portion of the work above or 'below the 25 percent of the original quantity stated in the proposal ; such revised consideration to be determined by special agreement or as hereinafter provided for "Extra Work . " No allowance will be made for any changes in anticipated profits nor shall such changes be considered as ' C4-4 (1 ) waiving or invalidating any conditions or provisions of the — Contract Documents. variations in quantities of sanitary sewer pipes in depth categories , shall be interpreted herein as applying to the overall quantities or sanitary sewer pipe in each pipe size, but not to the various depth categories. C4-4 . 4 ALTERATION OF CONTRACT DOCUMENTS: By Change Order, the Owner reserves the right to make such changes in the Contract Documents and in the character or quantities of the work as •� may be necessary or desirable to insure completion in the most satisfactory manner , provided such changes do not materially alter the original Contract Documents or change the general = nature of the project as a whole . Such changes shall not be considered as waiving or invalidating any condition or provision of the Contract Documents. C4-4 . 5 EXTRA WORK: Additional work made necessary by changes and alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the — Contract Documents, shall be defined as "Extra Work" and shall be performed by the Contractor in accordance with these Contract Documents or approved additions thereto; provided , r, however , that before any extra work is begun a "Change Order" shall be executed or written order issued by the Owner to do the work for payments or credits as shall be determined by one or more combination of the following methods : a. Unit bid price previously approved. b. An agreed lump sum. C. The actual reasonable cost of ( 1 ) labor, ( 2 ) rental _ of equipment used on the extra work for the time so used at Associated general Contractors of America current equipment rental rates ; ( 3 ) materials entering permanently into the project, and ( 4 ) actual cost of insurance , bonds , and social security as determined by the Owner , plus a fixed fee to be agreed upon but not to exceed 10% of the actual cost of such extra work. The Fixed fee is not to include any additional profit to the Contractor for rental of equipment owned by him and used for the extra work. The fee shall be full and .. complete compensation to cover the cost of superintendence , overhead , other profit, general and all other :expense not included in ( 1 ) , ( 2 ) , ( 31 , and ( 4 ) above. The Contractor shall keep accurate cost records on the Form and in the method C4-4 ( 2 ) suggested by the Owner and shall give the Owner access to all accounts , bills , vouchers , and records relating to the Extra Work. No "Change Order" shall become effective until it has been approved and signed by each of the Contracting parties. No claim for Extra Work of any kind will be allowed unless ordered in writing by the Owner . In case any orders or instructions , either oral or written, appear to the Contractor to involve Extra Work for which he should receive compensation , he shall make written request to the Engineer for written orders authorizing such Extra Work , prior to beginning such work. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof , and the Engineer insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep an accurate account of the actual = reasonable cost thereof as provided under method ( Item C ) . Claims for extra work will not be paid unless the Contractor shall file his claim with the Owner within five ( 5 ) days before the time for making the first estimate after such work is done and unless the claim is supported by satisfactory vouchers and certified payrolls covering all labor and materials expended upon the said Extra Work. The Contractor shall furnish the Owner such installation records of all deviations from the original Contract Documents as may be necessary to enable the Owner to prepare for permanent record a corrected set of plans showing the actual installation. The compensation agreed upon for ' extra work' whether or not iniitiated by a 'change order ' shall be a full , complete and final payment for all costs Contractor incurs as a result or ••• relating to the change or extra work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost , or any other effect on changed or unchanged work as a result or the change or extra work. C4-4 . 6 SCHEDULE OF OPERATIONS : Before commencing any work under this contract, the Contractor shall submit to the Owner and receive the Owner ' s approval thereof , a "Schedule of Operations , " showing by a straight line method the date of = commencing and finishing each of the major elements of the contract . There shall be also shown the estimated monthly cost of work for which estimates are to be expected. Thera C4-4 ( 3 ) shall be presented also a composite graph showing the = anticipated progress of construction with the time being plotted horizontally and the percentage of completion plotted vertically. The progress charts shall be prepared on 8-1/2" x 11" sheets and at least five black or blue line prints shall be furnished to the Owner. C4-4 . 7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES: Within ten ( 10 ) days prior to submission of first monthly progress payment , the Contractor shall prepare and submit to the Owner for approval six copies of the schedule in which the Contractor proposes to carry on the work, the date of which he will start the several major activities ( including procurement of materials, plans, and equipment ) and the contemplated dates for completing the same . The schedule shall be in the form of a time schedule Critical Path Method (CPM) network diagram. As the work progresses , the Contractor shall enter on the diagram the actual progress at the end of each partial payment period or at such intervals as directed by the Engineer . The Contractor shall also revise the schedule to reflect any adjustments in contract time approved by the Engineer . Three copies of the updated schedule shall be delivered at such intervals as directed by the Owner. As a minimum, the construction schedule shall incorporate all work elements and activities indicated in the proposal and in the technical specifications. Prior to the final drafting of the detailed construction _ schedule , the Contractor shall review the draft schedule with the Engineer to ensure the Contractor ' s understanding of the contract .requirements. The following guidelines shall be adhered to in preparing the construction schedule: a. Milestone dates and final project completion dates shall be developed to conform to time constraints , sequencing requirements and completion time. b. The construction process shall be divided into activities with time durations of approximately -• fourteen ( 14 ) days and construction values not to exceed $ 50 , 000 . Fabrication , delivery and submittal activities are exceptions to this guideline. C4-4 ( 4 ) C. Durations .shall be in calendar days and normal holidays and weather conditions over the duration of the contract shall be accounted for within the duration of each activity. d. One critical path shall be shown on the construction schedule. e. Float time is defined as the amount of time between the earliest start date and the latest start date of a chain of activities of the CPM construction schedule. Float time is not for the exclusive use or benefit of either the Contractor or the Owner. f. Thirty days shall be used for submittal review unless otherwise specified. The construction schedule shall as a minimum be divided into general categories as indicated in the Proposal and Technical Specifications and each general category shall be broken down into activities in enough detail to achieve activities of approximately fourteen (14 ) days duration. For each general category, the construction schedule shall identify all trades or subcontracts whose work is represented by activities that follow the guidelines of this Section. For each of the trades or subcontracts , the construction schedule shall indicate the following procurements , construction and preacceptance activities and events in their logical sequence for equipment and materials . 1 . Preparation and transmittal of submittals. 2 . Submittal .review periods . 3 . Shop fabrication and delivery. 4 . Erection or installation. 5 . Transmittal of manufacturer ' s operation and maintenance instructions. 6 . Installed equipment and materials testing. 7 . Owner ' s operator instruction ( if. applicable) . 8 . Final inspection. C4-4 ( 5 ) 9 . Operational testing. 10 . Final inspection. If , in the opinion of the Owner , work accomplished falls behind that scheduled , the Contractor shall take such action as necessary to improve his progress. In addition, the Owner may require the Contractor to submit a revised schedule demonstrating his program and proposed plan to make up lag in scheduled progress and to insure completion of the work within the contract time . If the Owner finds the proposed plan not acceptable , tie may require the Contractor to increase the work force, the construction �- plant and equipment , the number of work shifts or the overtime operations without additional cost to the Owner. Failure of the Contractor to comply with these requirements shall be considered grounds for determination by the Owner that the Contractor is failing to prosecute the work with such diligence as will insure its completion within the time specified. C4-4 ( 6 ) PART C - GENERAL CONDITIONS C5-5 CONTROL OF WORK AND MATERIALS SECTION C5-5 CONTROL OF WORK AND MATERIALS C5-5 . 1 AUTHORITY OF ENGINEER: The work shall be performed to the satisfaction of the Engineer and in strict compliance with the Contract Documents . He shall decide all questions which arise as to the quality and acceptability of materials _ furnished , work performed, rate of progress of the work, overall sequence of the construction , interpretation of the Contract Documents, acceptable fulfillment of the contract, compensation, mutual rights between Contractor and Owner under these Contract Documents , supervision of the work, resumption of operations, and all other questions or disputes which may arise . Engineer will not be responsible for Contractor ' s means , methods , techniques , sequences or procedures of construction, or the safety precaution and programs incident thereto, and he will not be responsible for Contractor ' s failure to perform the work in accordance with the contract documents. He shall determine the amount and quality of the work completed and materials furnished , and his decisions and estimates shall be final . His estimates in such event shall be a condition to the right of the Contractor to receive money = due him under the Contract . The Owner shall have executive authority to enforce and make effective such necessary decisions and orders as the Contractor fails to carry out i promptly. In the event of any dispute between the Engineer and Contractor over the decision of the Engineer on any such matters , the Engineer must, within a reasonable time, upon written request of the Contractor, render and deliver to both the Owner and Contractor , a written decision on the matter in controversy. C5-5 . 2 CONFORMITY WITH PLANS : The finished project in all cases shall conform with lines , grades , cross-sections , finish , and dimensions shown on the plans or any other requirements otherwise described in the Contract Documents . Any deviation from the approved Contract Documents required by '- the Engineer during construction will in all cases be determined by the Engineer and authorized by the Owner by Change Order. C5-5 (1 ) C5-5 . 3 COORDINATION OF CONTRACT DOCUMENTS : The Contract Documents are made up of several sections , which , taken together , are intended to describe and provide for a complete and useful project, and any requirements appearing in one of the sections is as binding as though it occurred in all sections. In case of discrepancies , figured dimension shall .. govern over scaled dimensions , plans shall govern over specifications, special conditions shall govern over general conditions and standard specifications, and quantities shown on the plans shall govern over those shown in the proposal . .. The Contractor shall not take advantage of any apparent error or omission in the Contract Documents , and the Owner shall be permitted to make such corrections or interpretations as may be deemed necessary for the fulfillment of the intent of the Contract Documents . In the event the Contractor discovers an apparent error or discrepancy, he shall immediately call this — condition to the attention of the Engineer. In the event of a conflict in the drawings, specifications, or other portions of the Contract Documents which were not reported prior to the award of Contract , the Contractor shall be deemed to have quoted the most expensive resolution of the conflict. C5-5 . 4 COOPERATION OF CONTRACTOR : The Contractor will be — furnished with three sets of the Contract Documents and shall have available on the site of the project at all times one set of such Contract Documents. The Contract shall give to the work the constant attention necessary to facilitate the progress thereof and shall cooperate with the Engineer , his inspector , and other Contractors in every possible way. The Contractor shall at all times have competent personnel available to the project site for proper performance of the work. The Contractor shall provide and maintain at all times at the site of the project a competent , English-speaking superintendent and an assistant who are fully authorized to act as the Contractor ' s agent on the work . Such superintendent and his assistant shall be capable of reading and understanding the Contract Documents and shall receive and fulfill instructions from the Owner , the Engineer , or his authorized representatives . Pursuant to this responsibility of the Contractor , the Contractor shall designate in writing to the project superintendent, to act as the Contractor ' s agent on the work. Such assistant project superintendent shall be a resident of Tarrant County, Texas and shall be subject to call, as is the project Superintendent, at any time of the day 'or night on any day of the week on which the Engineer determines that circumstances require the presence on the project site of a representative of the Contractor to C5-5 (2 ) adequately provide for the safety or convenience of the traveling public or the owners of property across which the project extends or the safety of property contiguous to the project routing. The Contractor shall provide all facilities to enable the Engineer and his inspector to examine and inspect the workmanship and materials entering into the work. C5-5 . 5 EMERGENCY AND/OR RECTIFICATION WORK: When , in the opinion of the Owner or Engineer, a condition of emergency exists related to any part of the work, the Contractor, or the Contractor through his designated representative , shall respond with dispatch to a verbal request made by the Owner or Engineer to alleviate the emergency condition . Such a response shall occur day or night, whether the project is scheduled on a calendar-day or on a working-day basis. Should the Contractor fail to respond to a request from the Engineer to rectify any discrepancies , omissions , or corrections necessary to conform with the requirements of the project specifications or plans , the Engineer shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours , the City may take such remedial action with City forces or by contract . The City shall then deduct an amount equal to the entire costs for such remedial action, plus 25% , from any funds due the Contractor on the project. C5-5 . 6 FIELD OFFICE: The Contractor shall provide, at no extra compensation, an adequate field office for use of the Engineer , if specifically called for. The field office shall be not less than 10 by 14 feet in floor area, substantially constructed,, well heated , air conditioned , lighted, and -- weather-proof , so that documents will not be damaged by the elements. C5-5 . 7 CONSTRUCTION STAKES: The City, through its Engineer, will furnish the Contractor with all lines , grades , and measurements necessary to the proper prosecution and control of the work contracted for under these Contract Documents , and lines , grades and measurements will be established by means of stakes or other customary method of marking as may be found consistent with good practice. C5-5 ( 3 ) These stakes or markings shall be set sufficiently in advance of construction operations to avoid delay . Such stakes or markings as may be established for the Contractor ' s use or guidance shall be preserved by the Contractor until he is authorized by the Engineer to remove them. Whenever, in the opinion of the Engineer , any stakes or markings have been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees , the full cost of replacing such stakes or marks plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. C5 - 5 . 8 AUTHORITY AND DUTIES OF CITY INSPECTORS : City Inspectors will be authorized to inspect all work done and to be done and all materials furnished. Such inspection may extend to all or any part of the work, and the preparation or •� manufacturing of the materials to be used or equipment to be installed. A City Inspector may be stationed on the work to report to the Engineer as to the progress of the work and the manner in which it is being performed, to report any evidence that the materials being furnished or the work being performed by the Contractor fails to fulfill the requirements of the Contract Documents , and to call the attention of the Contractor to any such failure or other infringements . Such inspection or lack of inspection will not relieve the Contractor from any obligation to perform the work in �- accordance with the requirements of the Contract Documents. In case of any dispute arising between the Contractor and the City Inspector as to the materials or equipment furnished or _ the manner of performing the work, the City Inspector will have authority to reject materials or equipment to suspend work until the question at issue can be referred to and be decided by the Engineer . The City Inspector will not , _ however, be authorized to revoke , alter , enlarge , or release any requirement of these Contract Documents, nor to approve or accept any portion or section of the work, nor to issue any �. instructions contrary to the requirements of the Contract Documents . He will in no case act as superintendent or foreman or ,perform any other duties for the Contractor , or _ interfere with .the management or operation of the work. He will not accept from the Contractor any compensation in any form for performing any duties . The Contractor shall regard and obey the directions and instructions of the City Inspector — or Engineer when the same are consistent with the obligations of the Contract Documents , provided, however , should the Contractor object to any orders or instructions of the City .. Inspector , the Contractor may within six days make written appeal to the Engineer for his decision on the matter in controversy. C5-5 (4 ) C5-5 . 9 INSPECTION: The Contractor shall furnish the Engineer with every reasonable facility for ascertaining whether or not .� the work as performed is in accordance with the requirements of the Contract Documents . If the Engineer so requests , the Contractor shall , at any time before acceptance of the work, remove or uncover such portion of the finished work as may be directed. After examination , the Contractor shall restore said portions of the work to the standard required by the Contract Documents. Should the work exposed or examined prove acceptable, the uncovering or removing and replacing of the covering or making good of the parts removed shall be paid for as extra work, but should be work so exposed or examined prove to be unacceptable, the uncovering or removing and the replacing of all adjacent defective or damaged parts shall be at the Contractor ' s expense. No work shall be done or materials used without suitable supervision or inspection. C5-5 . 10 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK: All work, materials , or equipment which has been rejected shall be remedied or removed and replaced in an acceptable manner by the Contractor at his own expense. Work done beyond the lines and grades given or as shown on the plans , except as herein specifically provided, or any Extra Work done without written authority, will be considered as unauthorized and done at the expense of the Contractor and will not be paid for by the Owner . Work so done may be ordered removed at the Contractor ' s expense. Upon the failure on the part of the Contractor to comply with any order of the Engineer made under the provisions of this paragraph , the Engineer will have the authority to cause defective work to be remedied or removed and replaced and unauthorized work to be removed, and the cost thereof may be deducted from any money due or to become due to the Contractor . Failure to require the removal of any _ defective or unauthorized work shall not constitute acceptance of such works. C5 - 5 . 11 SUBSTITUTE MATERIALS OR EQUIPMENT : If the Specifications , law, ordinance, codes or regulations permit Contractor to furnish or use a substitute that is equal to any material or equipment specified, and if Contractor wishes to .furnish or use a proposed substitute , he shall, prior to the preconstruction conference , ;Hake written application to ENGINEER for approval of such substitute certifying in writing _ that the proposed substitute will perform adequately the functions called for by the general design, be similar and of equal substance to that specified and be suited to the same use and capable of performing the same function as that specified; and identifying all variations of the proposed *- C5-5 ( 5 ) substitute from that specified and indicating available maintenance service . No substitute shall be ordered or installed without the written approval of Engineer who will be the judge of the equality and may require Contractor to furnish such other data about the proposed substitute as he considers pertinent . No substitute shall be ordered or _ installed without such performance guarantee and bonds as Owner may require which shall be furnished at Contractor ' s expense . Contractor shall indemnify and hold harmless Owner and Engineer and anyone directly or indirectly employed by either of them from and against the claims , damages, losses and expenses ( including attorneys fees ) arising out of the use of substituted materials or equipment. C5-5. 12 SAMPLES AND TESTS OR MATERIALS: Where, in the opinion of the Engineer, or as called for in the Contract Documents , tests of materials or equipment are necessary, such tests will be made at the expense of and paid for direct to the testing agency by the Owner unless otherwise specifically provided. The failure of the Owner to make any tests of materials shall be in no way relieve the Contractor of his responsibility of furnishing materials and equipment fully conforming to the requirements of the Contract Documents. Tests and sampling of = materials , unless otherwise specified , will be made in accordance with the latest methods prescribed by the American Society for Testing materials or specific requirements of the Owner . The Contractor shall provide such facilities as the Engineer may require for collecting and forwarding samples and shall not , without specific written permission of the Engineer, use the materials represented by the samples until tests have been made and the materials approved for use. The Contractor will furnish adequate samples without charge to the Owner. In case of concrete, the aggregates , design minimum, and the mixing and transporting equipment shall be approved by the Engineer before any concrete is placed, and the Contactor shall be responsible for replacing any concrete which does not meet the requirements of the Contract Documents. Tests shall be made at least 9 days prior to the placing of concrete , — using samples from the same aggregate , cement , and mortar which are to be used later in the concrete. Should the source of supply change, new tests shall be made prior to the use of the new materials. C5-5 . 13 STORAGE OF MATERIALS: All materials which are to be used in the construction operation shall be stored so as to insure the preservation of the quality and fitness of the work. When directed by the Engineer, they shall be placed on wooden platforms or other hard, clean durable surfaces and not on the -� C5-5 ( 6 ) ground, and shall be placed under cover when directed. Stored materials shall be placed and located so as to facilitate prompt inspection. C5-5 . 14 EXISTING STRUCTURES AND UTILITIES: The location and dimensions shown on the Plans relative to existing utilities are based on the best information available . Omission from, or the inclusion of utility locations on the Plans is not to be considered as the nonexistence of, or a definite location of, existing underground utilities . The location of many gas mains , water mains , conduits , sewer lines and service lines for all utilities , etc . , is unknown to the Owner , and the Owner assumes no responsibility for failure to show any or all such structures and utilities on the plans or to show them in their exact location. It is mutually agreed that such failure will not be considered sufficient basis for claims for additional compensation for Extra Work or for increasing the pay quantities in any manner whatsoever, unless an obstruction encountered is such as to necessitate changes in the lines and grades of considerable magnitude or requires the building of special works, provision for which is not made in the Contract Documents , in which case the provision in these Contract Documents for Extra Work shall apply. It shall be the Contractors responsibility to verify locations of adjacent and/or conflicting utilities sufficiently in advance of construction in order that he may negotiate such local adjustments as necessary in the construction process to provide adequate clearances . The Contractor shall take all necessary precautions in order to protect all existing utilities , structures and service lines . Verification of existing utilities, structures and service lines shall include notification of all utility companies at least forty eight (48) hours in advance of construction including exploratory excavation if necessary . All verification of existing utilities and their adjustment shall be considered as subsidiary work. C5-5.15 INTERRUPTION OF SERVICE: a. Normal Prosecution : In the normal prosectuion of work where the interruption of service is necessary, _ the Contractor , at least 24 hours in advance, shall be required to: 1 . Notify the Water Department ' s Distribution Division as to location , time , and schedule of service interruption. C5-5 (7 ) 2. Notify each customer personally through responsible personnel as to time and schedule of the interruption of their service, or 3. In the event that personal notification of a customer cannot be made, a prepared tag form shall be attached to the customer ' s entrance door knob . The tag shall be durable in composition, and in large bold type shall say: "NOTICE" Due to Utility Improvement in .. your neighborhood, your (water) (sewer) service will be inter- rupted on between the hours of and This inconvenience will be as short as possible. Thank you, Contractor Address Phone b. Emergency: In the event that an unforeseen service interruption occurs , notice shall be as above , but immediate. CS-5 . 16 MUTUAL RESPONSIBILITY OF CONTRACTORS : If , through acts or neglect on the part of the Contractor , any other Contractor or any sub-contractor shall suffer loss or damage on the work, the Contractor agrees to settle with such other Contractor or sub-contractor by agreement or arbitration. If such other Contractor or sub-contractor shall assert any claim against the Owner on account of any damage alleged to have been sustained, the Owner will notify the Contractor , who shall indemnify and save harmless the Owner against any such claim. C5-5 . 17 CLEAN-UP: Clean-up of surplus and/or waste materials accumulated on the job site during the prosecution of the work under these Contract Documents shall be accomplished in keeping with a daily routine established to the the satisfaction of the Engineer . Twenty-fours fours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the Engineer , if the Contractor fails to correct the C5-5 (8 ) .. unsatisfactory procedure, the City may take such direct action as the Engineer deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice, and the costs of such direct action, plus 25% of such costs , shall be deducted from monies due or to become due to the Contractor. Upon the completion of the project as a whole as covered by these Contract Documents , and before final acceptance and final payment will be made, the Contractor shall clean and remove from the site of the project all surplus and discarded materials , temporary structures, and debris of every kind. He _ shall leave the site of all work in a neat and orderly condition equal to that which originally existed. Surplus and waste materials removed from the site of the work shall be disposed of at locations satisfactory to the Engineer. The Contractor shall thoroughly clean all equipment and materials installed by him and shall deliver over such materials and equipment in a bright, clean , polished and new appearing condition . No extra compensation will be made to the Contractor for any clean-up required on the project. _ C5-5 . 18 FINAL INSPECTION: Whenever the work provided for in and contemplated under the Contract Documents has been satisfactorily completed and final cleanup performed, the Engineer will notify the proper officials of the Owner and request that the Final inspection be made. Such inspection will be made within 10 days after such notification . After such final inspection, if the work and materials and equipment are found satisfactory, the Contractor will be notified in writing of the acceptance of the same after the proper resolution has been passed by the City Council . No time charge will be made against the Contractor between said date of notification of the Engineer and the date of final inspection of the work. C5-5 (9 ) PART C - GENERAL CONDITIONS C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY SECTION C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.1 LAWS TO BE OBSERVED: The Contractor shall at all times observe and comply with all Federal and State Laws and City ordinances and regulations which in any way affect the conduct of the work or his operations , and shall observe and comply with all orders, laws, ordinances and regulations which exist or which may be enacted later by bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof will be considered. The Contractor and his Sureties shall indemnify and save harmless the City and all of its officers , agents, and employees against any and all claims or liability arising from or based on the violation of any such law, ordinance, regulation, or order , whether it be by himself or his employees. C6-6 . 2 PERMITS AND LICENSES: The Contractor shall procure all permits and licenses , pay all charges , costs and fees , and give all notices necessary and incident to the due and lawful prosecution of the work. C6-6 . 3 PATENTED DEVICES , MATERIALS AND PROCESSES : If the Contractor is required or desires to use any design , device , material , or process covered by letter, patent, or copyright, he shall provide for such use by suitable legal agreement with the patentee or owner of such patent , letter, or copyrighted design . It is mutually agreed and understood that without exception the contract prices shall include all royalties or cost arising from patents , trade-marks, and copy rights in any way involved in the work. The Contractor and his sureties shall indemnify and save harmless the Owner from any and all claims for infringement by reason of the use of any such patented design , device , material or process , or any trade-mark or copy right in connection with the work agreed to be performed under these Contract Documents , and shall indemnify the Owner for any cost, expense, or damage which it may be obliged to pay by reason of such infringement at any time during the prosecution of the work or after completion of the work, provided, however , that the Owner will assume the responsibility to defend any and all suits brought for the infringement of any patent claimed to be infringed upon by the design , type of construction or material or equipment specified in the Contract Documents furnished the Contractor by the Owner , and to hold the Contractor harmless on account of such suits. C6-6 (1) C6-6 . 4 SANITARY PROVISIONS : The Contractor shall establish and enforce among his employees such regulations in regard to _ cleanliness and disposal of garbage and waste as will tend to prevent the inception and spread of infectious or contagious diseases and to effectively prevent the creation of a nuisance about the work on any property either public or private, and such regulations as are required by Law shall be put into immediate force and effect by the Contractor . The necessary sanitary conveniences for use of laborers on the work , properly secluded from public observation , shall be constructed and maintained by the Contractor and their use shall be strictly enforced by the Contractor . All such facilities shall be kept in a clean and sanitary condition, free from objectionable odors so as not to cause a nuisance. All sanitary laws and regulations of the State of Texas and the City shall be strictly complied with. C6-6 . 5 PUBLIC SAFETY AND CONVENIENCE: Materials or equipment stored about the work shall be so placed and used, and the work shall at all times be so conducted , as to cause no greater obstruction or inconvenience to the public than is considered to be absolutely necessary by the Engineer. The _ Contractor is required to maintain at all times all phases of his work in such a manner as not to impair the safety or convenience of the public, including, but not limited to, safe and convenient ingress and egress to property contiguous to the work area. The Contractor shall make adequate provisions to render reasonable ingress and egress for normal vehicular traffic, except during actual trenching or pipe installation — operations , at all driveway crossings . Such provisions may include bridging, placement of crushed stone or gravel or such other means of providing proper ingress and egress for the _ property served by the driveway as the Engineer may approve as appropriate. Such other means may include the diversion of driveway traffic, with specific approval by the Engineer . If diversion of traffic is approved by the Engineer at any — location, the Contractor shall make arrangements satisfactory to the Engineer at any location , the Contractor shall make arrangements satisfactory to the Engineer for the diversion of — traffic , and shall , at his own expense, provide all materials and perform all work necessary for the construction and maintenance of roadways and bridges for such diversion of traffic. Sidewalks must not be obstructed except by special permission of the Engineer. The materials excavated and the construction materials such as pipe used in the construction of the work shall be placed so as not to endanger the work or prevent free access to all fire hydrants, fire alarm boxes , police call boxes , water valves , .. C6-6 (2 ) _ gas valves , or manholes in the vicinity. The Owner reserves the right to remedy any neglect on the part of the Contractor as regards to public convenience and safety which may come to its attention , after twenty-four hours notice in writing to the Contractor , save in cases of emergency when it shall have the right to remedy any neglect without notice , and in either case, the cost of such work done or materials furnished by the Owner or by the City shall be deducted from monies due or to become due to the Contractor. The Contractor , after approval of the Engineer, shall notify the Fire Department Headquarters, Traffic Engineer , and Police Department, when any street or alley is requested to be closed or obstructed or any fire hydrant is to be made inaccessible , and, when so directed by the Engineer, shall keep any street, streets, or highways in condition for unobstructed use by fire _ apparatus . The Contractor shall promptly notify the Fire Department Headquarters when all such obstructed streets , alleys, or hydrants are again placed back in service. Where the Contractor is required to construct temporary bridges or make other arrangements for crossing over ditches or streams , his responsibility for accidents in connection with such crossings shall include the roadway approaches as well as the structures of such crossings. The Contractor shall at all times conduct his operation and the use of construction machinery so as not to damage or destroy trees and shrubs located in close proximity to or on _ the site of the work. Wherever any such damage may be done , the Contractor shall immediately satisfy all claims of property owners, and no payment will be made by the Owner in settlement of such claims. The Contractor shall file with the — Engineer a written statement showing all such claims adjusted. C6-6 . 6 PRIVILEGES OF CONTRACTOR IN STREETS , ALLEYS, AND RIGHT-OF-WAY: For the performance of the contract , the Contractor will be permitted to use and occupy such portions of the public streets and alleys , or other public places or _ other rights-of-way as provided for in the ordinances of the City , as shown in the Contract Documents , or as may be specifically authorized in writing by the Engineer . A reasonable amount of tools , materials , and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations . Excavated and waste materials shall be piled or stacked in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. If the street is occupied by railway tracks, the work shall be '� C6-6 (3 ) jam carried on in such manner as not to interfere with the operation of trains, loading or unloading of cars, etc . Other contractors of the Owner may, for all purposes required by the contract , enter upon the work and premises used by the Contractor and shall be provided all reasonable facilities and assistance for the completion of adjoining work . Any — additional grounds desired by the Contractor for his use shall be provided by him at his own cost and expense. C6-6 . 7 RAILWAY CROSSINGS When the work encroaches upon any .. right-of-way of any railway, the City will secure the necessary easement for the work. Where the railway tracks are to be crossed , the Contractor shall observe all the regulations and instructions of the railway company as to the methods of performing the work and take all precautions for safety of property and the public . Negotiations with the railway companies for permits shall be done by and through the City. The Contractor shall give the City notice not less than five days prior to the time of his intentions to begin work on that portion of the project which is related to the railway properties . The Contractor will not be given extra or additional compensation for such railway crossings unless specifically set forth in the Contract Documents. C6-6 . 8 BARRICADES , WARNINGS AND WATCHMEN: Where the work is carried on in or adjacent to any street , alley , or public place, the Contractor shall at his own expense furnish, erect, and maintain such barricades , fences , lights and danger signals , shall provide such watchmen, and shall take all such _ other precautionary measures for the protection of persons or property and of the work as are necessary. Barricades and fences shall be painted in a color that will be visible at night. From sunset to sunrise the Contractor shall furnish .. and maintain at least one easily visible burning light at each barricade. A sufficient number of barricades shall be erected and maintained to keep pedestrians away from, and vehicles from being driven on or into, any work under construction or being maintained. The Contractor shall furnish watchmen and keep them at their respective assignments in sufficient numbers to protect the work and prevent accident or damage. All installations and procedures shall be consistent with the provisions set forth in the "1980 Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways" , codified as Article 6701d Veron' s Civil Statutes, pertinent sections being Section Nos. 27 , 29 , 30 and 31. C6-6 ( 4 ) The Contractor will not remove any regulatory sign , instructional sign, street name sign, or other sign which has been erected by the City. If it is determined that a sign must be removed to permit required construction , the Contractor shall contact the Transportation and Public Works .. department , Signs and Markings Division ( phone number 8780-8075 ) , to remove the sign . In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above — referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the — required specifications , the permanent sign shall be left in place until the temporary sign requirements are met . When construction work is completed to the extent that the permanent sign can be re-installed, the Contractor shall again contact the Signs and Markings Division to re-install the permanent sign and shall leave his temporary sign in place until such re-installation is completed. The Contractor will be held responsible for all damage to the work or the public due to failure of barricades , signs , — fences , lights , or watchmen to protect them . Whenever evidence is found of such damage to the work the Engineer may order the damaged portion immediately removed and replaced by the Contractor at the Contractor ' s own expense . The Contractor ' s responsibility for the maintenance of barricades, signs, fences and lights, and for providing watchmen shall not cease until the project shall have been completed and accepted by the Owner. No compensation , except as specifically provided in these — Contract Documents , will be paid to the Contractor for the work and materials involved in the constructing , providing, and maintaining of barricades , signs , fences , and lights or for salaries of watchmen , for the subsequent removal and disposal of such barricades , signs , or for any other incidentals necessary for the proper protection, safety, and convenience of the public during the contract period , as this work is considered to be subsidiary to the several items for which unit or lump sum prices are requested in the Proposal. C6-6 . 9 USE OF EXPLOSIVES , DROP WEIGHT, ETC. : Should the Contractor elect to use explosives, drop weight , etc . , in the prosecution of the work, the utmost care shall be exercised at all times so as not to endanger life or property . The Contractor shall notify the proper representative of any public service corporation , any company , individual , or utility, and the Owner , not less than twenty-four hours in C6-6 (5 ) advance of the use of any activity which might damage or endanger their or his property along or adjacent to the work. Where the use of explosives is to be permitted on the project, as specified in the Special Contract Documents , or the use of explosives is requested, the Contractor shall submit notice to the Engineer in writing twenty-four hours prior to commencing and shall furnish evidence that he has insurance coverage to protect against any damages and/or injuries arising out of such use of explosives. .. All claims arising out of the use of explosives shall be investigated and a written report made by the Contractor ' s insurers to the Engineer within ten (10) days after receipt of written notice of the claim to the Contractor from either the City or the claimant. The City shall proceed to give notice _ to the Contractor of any such claim. The use of explosives may be suspended by the Engineer if any complaint is received and such use shall not be resumed until the cause of the complaint has been addressed. Whenever explosives are stored or kept, they shall be stored in a safe and secure manner and all storage places shall be _ plainly marked "DANGEROUS EXPLOSIVES" and shall be under the care of a competent watchman at all times . All vehicles in which explosives are being transported shall be plainly marked as mentioned above and shall, insofar as possible, not use heavy traffic routes. C6-6 . 10 WORK WITHIN EASEMENTS: Where the work passes over, through, or into private property, the Owner will provide such right-of-way or easement privileges as the City may deem necessary for the prosecution of the work. Any additional rights-of-way or work area considered necessary by the Contractor shall be provided by him at his own expense. Such additional rights-of-way or work area shall be acquired for the benefit of the City . The City shall be notified in writing as to the rights so acquired before work begins in the affected area. The Contractor shall not enter upon private property for any purpose without having previously obtained permission from the owner of such property. The Contractor will not be allowed to store equipment or material on private property unless and until the specified approval of the property owner has been secured in writing by the Contractor and a copy furnished to the Engineer . Unless specifically provided otherwise , the Contractor shall clear all rights-of-way or easements of obstructions which must be removed to make possible proper prosecution of the work as a part of the project construction operations . The Contractor shall be responsible for the preservation of and shall use C6-6 (6 ) every precaution to prevent damage to all trees , shrubbery, plants, lawns, fences, culverts, curbing , and all other types of structures or improvements , to all water , sewer, and gas lines, to all conduits, overhead pole lines , or appurtenances thereof , including the construction of temporary fences, and to all other public or private property along adjacent to the work. The Contractor shall notify the proper representatives of owners or occupants of public or private lands or interest in lands which might be affected by the work. Such notice shall be made at least 48 hours in advance of the beginning of the work. Notices shall be applicable to both public and private utility companies or any corporation, company, individual , or other, either as owners or occupants , whose land or interest in land might affected by the work. The Contractor shall be responsible for all damage or injury to property of any character resulting from any act , omission , neglect , or misconduct in the manner or method or execution of the work, or at any time due to defective work, material, or equipment. When and where any direct or indirect or injury is done to public or private property on account of any act, omission , neglect, or misconduct in the execution of the work, or in consequence of the non-execution thereof on the part of the Contractor , he shall restore or have restored at his own cost and expense such property to a condition at least equal to that existing before such damage or injury was done, by repairing, rebuilding, or otherwise replacing and restoring as may be directed by the Owner , or he shall make good such damages or injury in a manner acceptable to the owner of the property and the Engineer. All fences encountered and removed during construction of this project shall be restored to the original or a better than original condition upon completion of this project. When wire fencing, either wire mesh or barbed wire is to be crossed, the Contractor shall set cross braced posts on either side of permanent easement before the fence is cut . Should additional fence cuts be necessary, the Contractor shall provide cross braced posts at point of the proposed cut in addition to the cross braced posts provided at the permanent easements limits, before the fence is cut. Temporary fencing shall be erected in place of the fencing removed whenever the work is not in progress and when the site is vacated overnight , and/or at all times to prevent livestock from entering the construction area. The cost for fence removal , temporary closures and replacement shall be subsidiary to the various items bid in the project C6-6 ( 7 ) proposal . Therefore, no separate payment shall be allowed for any service associated with this work. In case of failure on the part of the Contractor to restore such property to make good such damage or injury, the Owner may, upon 48 hour written notice under ordinary circumstances, and without notice when a nuisance or hazardous condition results , proceed to repair, rebuild, or otherwise restore such property as may be determined by the Owner to be necessary, and the cost thereby will be deducted from any monies due or to become due to the Contractor under this Contract. C6-6 . 11 INDEPENDENT CONTRACTOR: It is understood and agreed by the parties hereto that Contractor shall perform all work and services hereunder as an independent contractor, and not as an officer , agent , servant or employee of the Owner . Contractor shall have exclusive control of and the exclusive •� right to control the details of all the work and services performed hereunder , and all persons performing same, and shall be solely responsible for the acts and omissions of its officers , agents , servants , employees , contractors , subcontractors , licensees and invitees . The doctrine of respondeat superior shall not apply as between Owner and Contractor, its officers , agents , employees , contractors and subcontractors , and nothing herein shall be construed as creating a partnership or joint enterprise between Owner and Contractor. •• C6-6 . 12 CONTRACTOR ' S RESPONSIBILITY FOR DAMAGE CLAIMS : Contractor covenants and agrees to, and does hereby indemnify, hold harmless and defend Owner , its officers , agents , servants, and employees from and against any an all claims or suits for property damage or loss and/or personal injury, including death, to any and all persons , of whatsoever kind or — character , whether real or asserted, arising out of or in connection with, directly or indirectly, the work and services to be performed hereunder by Contractor, its officers, agents, employees, contractors, subcontractors, licensees or invitees , whether or not caused , in whole or in part , by alleged negligence on the part of officers , agents , servants , employees , contractors, subcontractors , licensees and invitees .. of the Owner ; and said Contractor does hereby covenant and agree to assume all liability and responsibility of Owner, its officers agents, servants and employees for property damage or loss , and/or personal injuries , including death, to any and all persons of whatsoever kind or character , whether real or asserted, arising out of or in connection with , directly or .. indirectly, the work and services to be performed hereunder by Contractor , its officers , agents employees , contractors , subcontractors, licensees and invitees, whether or not caused , C6-6 ( 8 ) C6-6.121 CONTRACTOR'S RESPO`SIBILITY FOR DAMAGE CLAIMS: Contractor covenan:s and agrees to and does hereby inder::nify, hold harmless and defend, a: its own erase, Ovvner. LCS Officers, ate :ts, servants and employees, from and against any and all "'_-:rns or suits for proper:,: loss c- iamage and rersor:a! !n)U:v, including dear: . to any _-::d all persons. of whatsoever kind OC whether real Or asserted, arising Out of or in connection with, directly or indirectly, the work and services to be performed hereunder b Contractor, its Officers. ageflCS, em.—ioyees, subconcmctors. licensees or In ite.-s, whether or not caused. in whole or in part, by the alleged negligence of the officers. agents, servants. employees. contractors, subcontractors, licensees and invitees of the City. and said Contractor does hereby covenant and agree to assume all liabilit`r and responsibility of City, its off,cers, agents, servants and employees for any and all claims or shies for property loss or darnage and/or personal injury, including death. to any and all persons, of whatsoever kind or character, whether real or asserted. arising out of or in connection with, directly or indirectly, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not caused, in Nyhole or in part, by the alleged negligence of the officers, agents, servants. employees, contractors. subcontractors. licen-sees and invitees of the Citv. Contractor likewise covenanis and agrees to, and does herebv, indemnify and hold- harmless City from and against an•v and all injuries, damage, loss or destruction to property of City during the performance of any of the terms and conditions of this Contract, whether arising out of or in connection with or resulting from. in «•hole or in part. any and all alleged acts or omissions officers. agents, servants, employees, contractors, i subcontractors, licensees. invitees of Owner. _ In the event a written 'lairrn for dama_es against the contractor or i:s subcon:ractors rt.:,ains unsettled at the time all `vork on the project has beta completed to the sat:staction of the Director of the Water Depar:men:, as evidtrctd bya final inscecC ori, final '_-`:ment to the Contractor shall not be recot-lmended to the Director of the Waier Depar.rr:ent for a period of 30 days after the dart of such final inspection. unless the Contractor s;.a11 Submit `•':r;C:en eviderCe Sat:SfaC.tofv Cc trio Di -,:or tn�al the Claim has Veer, sealed and a rt!ease r �. . has been obtained from the clalzman: irivoive; If the claims concerned remains unsettled as of the expi.a:ion of the above 30-day period, t:e Contractor may be deemed to be entitled to a semi-final payment for work co,:.2leted, s :ch semi-fina! pavment to be in the arnount equal to the total dollar amount then ice less dollar value of any writ:en claims pendinz against the Conirac:or arisi. out of cerformance or such work. anu such semi-final pa`:men: may then be recomrr erdtd by the Director. ;released ;lay , 1999 C6-6 (9) The Director shall not recommend final payment to a Contractor against whom such a claim for damages is outstanding for a period of six months following the date of the acceptance of the work performed unless the Contractor submits evidence in writing satisfactory tot he Director that: 1. The claim has been settled and -a release has been obtained from the claimant involved, or 2. Good faith efforts have been made to settle such outstanding claims, and such good faith efforts have failed. If condition (1) above is met at any time within the six month period, the Director shall recommend that the final payment to the Contractor be made. If condition (2) above is met at any time within the six month period, the Director may recommend that final payment to — the Contractor be made. At the expiration of the six month period, the Director may recommend that final payment be made if all other work has been performed and all other obligations of the Contractor have been met to the satisfaction of the Director. The Director may, if he deems it appropriate, refuse to accept bids on other Water Department Contract work from a Contractor against whom a claim for damages is — outstanding as a result of work performed under a City Contract. Released May , 1999 C6-6(9)A in whole or in part , by alleged negligence of officers , agents , servants , employees , contractors , subcontractors , licensees or invitees of the Owner . Contractor likewise covenants and agrees to, and does hereby, indemnify and hold harmless Owner from and against any and all injuries,loss or damages to property of the Owner during the performance of any ,.. of the terms and conditions of this Contract, whether arising out of or in connection with or resulting from, in whole or in part , any and all alleged acts or omissions of officers , agents , servants , employees , contractors , subcontractors , licenses, or invitees of the Owner . In the event a written claim for damages against the contractor or its subcontractors remains unsettled at the time all work on the project has been completed to the satisfaction of the Director of the Water Department, as evidenced by a final inspection, final payment to the Contractor shall not be recommended by the Director of the Water Department for a period of 30 days after the date of such final inspection , unless the Contractor shall submit written evidence satisfactory to the Director that the claim has been settled and a release has been obtained from the claimant involved. If the claim concerned remains unsettled as of the expiration of the above 30-day period, the Contractor may be deemed to be entitled to a semi-final payment for work completed, such semi-final payment to be in an amount equal to the total dollar amount then due less the dollar value of any written claims pending against the Contractor arising out of the performance of such work, and such semi-final payment may then be recommended by the Director. The Director shall not recommend final payment to a Contractor ,- against whom such a claim for damages is outstanding for a period of six months following the date of the acceptance of the work performed unless the Contractor submits evidence in writing satisfactory to the Director that: 1. The claim has been settled and a release has been obtained from the claimant involved, or 2. Good faith efforts have been made to settle such outstanding claims , and such good faith efforts have failed. If condition (1) above is met at any time within the six month period, the Director shall recommend that the final payment to the Contractor be made . If condition (2 ) above is met at any time within the six month period, the Director may recommend that the final payment to the Contractor be made . At the C6-6 (9 ) expiration of the six month period the Director may recommend that final payment be made if all other work has been performed and all other obligations of the Contractor have been met to the satisfaction of the Director. The Director may, if he deems it appropriate, refuse to accept bids on other Water Department Contract work from a Contractor •� against whom a claim for damages is outstanding as a result of work performed under a City contract. C6-6 . 13 CONTRACTOR'S CLAIM FOR DAMAGES: Should the Contractor claim compensation for any alleged damage by reason of the acts or omissions of. the Owner , he shall within three days after the actual sustaining of such alleged damage, make a written statement to the Engineer , setting out in detail the nature of the alleged damage, and on or before the 25th day of the month succeeding that in which any such damage is claimed to have been sustained, the Contractor shall file with the Engineer an itemized statement of the details and amount of such alleged damage and, upon request, shall give the Engineer _ access to all books of account, receipts, vouchers, bills of lading, and other books or papers containing any evidence as to the amount of such alleged damage. Unless such statements shall be filed as hereinabove required, the Contractor ' s claim for compensation shall be waived, and he shall not be entitled to payment on account of such damages. C6-6 . 14 ADJUSTMENT OR RELOCATION OF PUBLIC UTILITIES, ETC. : In case it is necessary to change , move , or alter in any manner the property of a public utility or others, the said _ property shall not be moved or interfered with until orders thereupon have been issued by the Engineer . The right is reserved to the owners of public utilities to enter the geographical limits of the Contract for the purpose of making such changes or repairs to their property that may be necessary by the performance of this contract. C6-6 . 15 TEMPORARY SEWER AND DRAIN CONNECTIONS: When existing sewer lines have to be taken up or removed, the Contractor shall , at his own expense and cost , provide and maintain temporary outlets and connections for all private or public drains and sewers. The Contractor shall also take care of all sewage and drainage which will be received from these drains and sewers , and for this purpose he shall provide and maintain , at his own cost and expense , adequate pumping facilities and temporary outlets or diversions. The Contractor , at his own cost and expense, shall construct such troughs , pipes , or other st-ructures necessary, and be prepared at all times to dispose of drainage and sewage _ C6-6 (10 ) received from these temporary connections until such times as the permanent connections are built and are in service. The existing sewers and connections shall be kept in service and maintained under the Contract , except when specified or ordered to be abandoned by the Engineer. All water, sewage, and other waste shall be disposed of in a satisfactory manner �. so that no nuisance is created and so that the work under construction will be adequately protected. C6-6 . 16 ARRANGEMENT AND CHARGES FOR WATER FURNISHED BY THE ` CITY: When the Contractor desires to use City water in connection with any construction work, he shall make complete and satisfactory arrangements with the Fort Worth City Water Department for so doing. City water furnished to the Contractor shall be delivered to the Contractor from a connection on an existing City main . All piping required beyond the point of delivery shall be installed by the Contractor at his own expense. The Contractor ' s responsibility in the use of all existing fire hydrant and/or valves is detailed in Section E2-1 . 2 USE OF FIRE HYDRANTS AND VALVES in these General Contract Documents. When meters are used to measure the water, the charges , if any, for water will be at the regular established rates . When meters are not used , the charges , if any , will be as prescribed by the City Ordinance , or where no ordinance applies , payment shall be made on estimates and rates established by the Director of the Fort Worth Water Department. C6-6 . 17 USE OF A SECTION OR PORTION OF THE WORK: Whenever, in the opinion of the Engineer, any section or portion of the work or any structure is in suitable condition, it may be put into use upon the written order of the Engineer , and such usage shall not be held to be in any way an acceptance of said work or structure or any part thereof or as a waiver of any of the provisions of these Contract Documents . All necessary repairs and removals of any section of the work so put into use, due to defective materials or workmanship, equipment, or to deficient operations on the part of the Contractor, shall be performed by the Contractor at his own expense. C6-6 . 18 CONTRACTOR ' S RESPONSIBILITY FOR THE WORK: Until written acceptance by the Owner as provided for in these Contract Documents , the work shall be under the charge and care of the Contractor , and he shall take every necessary precaution to prevent injury or damage to the work or any part C6-6 (11 ) thereof by action of the elements or from any cause whatsoever, whether arising from the execution or nonexecution of the work. The Contractor . shall rebuild, repair, restore, and make good at his own expense all injuries or damage to any portion of the work occasioned by any of the hereinabove causes. C6-6 . 19 NO WAIVER OF LEGAL RIGHTS: Inspection by the Engineer or any order by the Owner by payment of money or any payment for or acceptance of any work, or any extension of time, or _ any possession taken by the City shall not operate as a waiver of any provision of the Contract Documents. Any waiver of any breach or Contract shall not be held to be a waiver of any other or subsequent breach. The Owner reserves the right to correct any error that may be discovered in any estimate that may have been paid and to adjust the same to meet the requirements of the Contract Documents. C6-6 . 20 PERSONAL LIABILITY OF PUBLIC OFFICIALS: In carrying out the provisions of these Contract Documents or in exercising any power of authority granted thereunder, there shall be no liability upon the authorized representatives of the Owner , either personally or otherwise as they are agents and representatives of the City. C6-6 . 21 STATE SALES TAX: On a contract awarded by the City of Fort Worth, an organization which qualifies for exemption pursuant the provisions of Article 20 . 04 ( H) of the Texas Limited Sales , excise , and Use Tax Act, the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller ' s Ruling . 007 . Any such exemption certificate issued by the Contractor in lieu of the tax shall be subject to and shall comply with the provisions of State Comptroller' s Ruling . 011 , and any other applicable State Comptroller rulings pertaining to the Texas Limited Sales, Excise, and Use _ Tax Act. On a contract awarded by a developer for the construction of a publicly-owned improvement in a street right-of-way or other easement which has been dedicated to the public and the City of Fort Worth, an organization which qualifies for exemption pursuant to the provisions of Article 20 . 04 (H) of the Texas — limited Sales , Excise , and Use Tax Act , the Contractor can probably be exempted in the same manner stated above. C6-6 (12 ) dw dM Limited Sale, Excise and Use Tax permits and information can be obtained from: '# Comptroller of Public Accounts Sale Tax Division Capitol Station Austin, TX C6-6 (13 ) PART C - GENERAL CONDITIONS C7-7 PROSECUTION AND PROGRESS i SECTION C7-7 PROSECUTION AND PROGRESS: C7-7 . 1 SUBLETTING: The Contractor shall perform with his own organization, and with the assistance of workman under his immediate super intendance, work of a value of not less than fifty (50% ) percent of the value embraced in the contract . If the Contractor sublets any part of the work to be done under these Contract Documents, he will not under any circumstances be relieved of the responsibility and obligation assumed under these Contract Documents . All transactions of the Engineer will be with the Contractor . Subcontractors will be considered only in the capacity of employees or workmen of the Contractor and shall be subject to the same requirements as to character and competency. The Owner will not recognize any subcontractor on the work. The Contractor shall at all times, when the work is in operation, be represented either in person or by a superintendent or other designated representatives. C7-7 . 2 ASSIGNMENT OF CONTRACT : The Contractor shall not assign, transfer, sublet, convey, or otherwise dispose of the contract or his rights , title, or interest in or to the same or any part thereof without the previous consent of the Owner expressed by resolution of the City Council and concurred in by the Sureties. If the Contractor does, without such previous consent, assign, transfer, sublet, convey, or otherwise dispose of the contract or his right , title, or interest therein or any part thereof, to any person or persons , partnership , company , firm , or corporation , or does by bankruptcy, voluntary or involuntary, or by assignment under the insolvency laws of any state , attempt to dispose of the contract may, at the option of the Owner be revoked and annulled , unless the Sureties shall successfully complete said contract , and in the event of any such revocation or annulment, any monies due or to become due under or by virtue of said contract shall be retained by the Owner as liquidated damages for the reason that it would be impracticable and extremely difficult to fix the actual damages. C7-7 . 3 PROSECUTION OF THE WORK : Prior to beginning any ! construction operation , the Contractor shall submit to the Engineer in five or more copies, if requested by the Engineer, a progress schedule preferably in chart or diagram form, or a brief outlining in detail and step by step the manner of C7-7 (1 ) prosecuting the work and ordering materials and equipment which he expects to follow in order to complete the project in the scheduled time . There shall also be submitted a table of ,. estimated amounts to be earned by the Contractor during each monthly estimate period. The Contractor shall commence the work to be performed under R this contract within the time limit stated in these Contract Documents and shall conduct the work in a continuous manner and with sufficient equipment, materials , and labor as is .. necessary to insure its completion within the time limit. The sequence requested of all construction operations shall be .. at all times as specified in the Special Contract Documents . Any deviation from scuh sequencing shall be submitted to the Engineer for his approval. Contractor shall not proceed with any deviation until he has received written approval from the Engineer . Such specification or approval by the Engineer shall not relieve the Contractor from the full responsibility of the complete performance of the Contract. The contract time may be changed only as set forth in Section C7-7.8 "Extension of Time of Completion" of this Agreement, ,f and a progress schedule shall not constitute a change in the contract time. C7-7 . 4 LIMITATIONS OF OPERATIONS : The working operations shall at all times be conducted by the Contractor so as to create a minimum amount of inconvenience to the public. At any time when, in the judgment of the Engineer, the Contractor has obstructed or closed or is carrying on operations in a portion of a street or public way greater than is necessary for the proper execution of the work, the Engineer may require the Contractor to finish the section on which operations are in progress before the work is commenced on any additional section or street. C7-7 . 5 CHARACTER OF WORKMEN AND EQUIPMENT: Local labor shall be used by the Contractor is available. The Contractor may bring in from outside the City of Fort Worth his key men and his superintendent. All other workmen, including equipment operators , may be imported only after the local supply is exhausted . The Contractor shall employ only such .. superintendents , foremen , and workmen who are careful , competent, and fully qualified to perforin the duties or tasks assigned to them, and the Engineer may demand and secure the summary dismissal of any person or persons employed by the Contractor in or about or on the work who, in the opinion of the Owner , shall misconduct himself or be found to be incompetent , disrespectful , intemperate , dishonest , or C7-7 ( 2 ) otherwise objectionable or neglectful in the proper performance of his or their duties, or who neglects or refuses to comply with or carry out the directions of the Owner, and such person or persons shall not be employed again thereon without written consent of the Engineer. All workmen shall have sufficient skill , ability , and experience to properly perform the work assigned to them and operate any equipment necessary to properly carry out the performance of the assigned duties. The Contractor shall furnish and maintain on the work all such equipment as is considered to be necessary for prosecution of the work in an acceptable manner and at a satisfactory rate of progress . All equipment , tools , and machinery used for handling materials and executing any part of the work shall be subject to the approval of the Engineer and shall be maintained in a satisfactory , safe and efficient working condition. Equipment on any portion of the work shall be such that no injury to the work, workmen or adjacent property will result from its use. C7-7. 6 WORK SCHEDULE: Elapsed working days shall be computed starting with the first day of work completed as defined in C1-1 . 23 "WORKING DAY" or the date stipulated in the "WORK ORDER" for beginning work, whichever comes first. Nothing in these Contract Documents shall be construed as prohibiting the Contractor from working on Saturday, Sunday or Legal Holidays , providing that the following requirements are met: a. A request to work on a specific Saturday, Sunday or = Legal Holiday must be made to the Engineer no later than the proceeding Thursday. b. Any work to be done on the project on such a �. specific Saturday, Sunday or Legal Holiday must be, in the opinion of the Engineer, essential to the timely completion of the project. The Engineer ' s decision shalt be final in response to such a request for approval to work on a specific Saturday, Sunday or Legal Holiday, and no extra compensation shall be allowed to the Contractor for any work performed on such a specific Saturday, Sunday or Legal Holiday. Calendar Days shall be defined in C1-1. 24 and the Contractor may work as he so desires. '� C7-7 ( 3 ) C7-7 . 7 TIME OF COMMENCEMENT AND COMPLETION: The Contractor shall commence the working operations within the time specified in the Contract Documents and set forth in the Work Order. Failure to do so shall be considered by the Owner as abandonment of the Contract by the Contractor and the Owner may proceed as he sees fit. — The Contractor shall maintain a rate of progress such as will insure that the whole work will be performed and the premises cleaned up in accordance with the Contract Documents and within the time established in such documents and such extension of time as may be properly authorized by the Owner. C7-7 . 8 EXTENSION OF TIME COMPLETION: The Contractor ' s request for an extension of time of completion shall be considered only when the request for such extension is submitted in — writing to the Engineer within seven days from and after the time alleged cause of delay shall have occurred . Should an extension of the time of completion be requested such request will be forwarded to the City Council for approval . In adjusting the contract time for completion of work , consideration will be given to unforseeable causes beyond the — control of and without the fault or negligence of the Contractor , including but limited to acts of the public enemy, acts of the Owner , fire , flood , tornadoes , epidemics , quarantine restrictions, strikes, freight embargoes , or delays of sub-contractors due to such causes. When the date of completion is based on a calendar day bid, a — request for extension of time because of inclement weather will not be considered. A request for extension of time due to inability to obtain supplies and materials will be — considered only when a review of the Contractor ' s purchase order dates and other pertinent data as requested by the Engineer indicates that the Contractor has made a bonafide attempt to secure delivery on schedule. This shall include efforts to obtain the supplies and materials from alternate sources in case the first source cannot make delivery. If satisfactory execution and completion of the contract should require work and materials in greater amounts or quantities than those set forth in the approved Contract Documents, then the contract time may be increased by Change Order. C7-7 . 9 DELAYS : The Contractor shall receive no compensation for delays or hindrances to the work , except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material , if C7-7 ( 4 ) .. any, which is to be furnished by the City. When such extra compensation is claimed a written statement thereof shall be presented by the Contractor to the Engineer and if by him found correct shall be approved and referred by him to the Council for final approval or disapproval ; and the action thereon by the Council shall be final and binding . If delay is caused by specific orders given by the Engineers to stop work, or by the performance of extra work, or by the failure of the City to provide material or necessary instructions for carrying on the work , then such delay will entitle the Contractor to an equivalent extension of time, his application for which shall , however , be subject to the approval of the City Council ; and no such extension of time shall release the Contractor or the surety on his performance bond from all his obligations hereunder which shall remain in full force until the discharge of the contract. i C7-7 . 10 TIME OF COMPLETION: The time of completion is an essential element of the contract. Each bidder shall indicate ,R in the appropriate place on the last page of the Proposal the number of working days or calendar days that he will require to fully complete this contract or the time of completion will be specified by the City in the Proposal section of the contract documents. The number of days indicated shall be a realistic estimate of the time required to complete the work covered by the specific contract being bid upon . The amount of time so stated by the successful bidder or the City will become the time of completion specified in the Contract Documents. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents , or the increased time granted by the Owner , or as automatically increased by additional work or materials ordered after the contract is signed, the sum per day given in the following schedule, unless otherwise specified in other parts of the Contract Documents , will be deducted from monies due the Contractor , not as a penalty, but as liquidated damages suffered by the Owner. AMOUNT OF CONTRACT Less than $ 5, 000 inclusive $ 35. 0.0 $ 5, 001 to $ 15, 000 inclusive $ 45. 00 ,r $ 15, 001 to $ 25,000 inclusive $ 63 . 00 $ 25, 001 to $ 50, 000 inclusive $ 105 . 00 $ 50,001 to $ 100 ,000 inclusive $ 154.00 $ 100, 001 to $ 500 , 000 inclusive $ 210. 00 C7-7 ( 5 ) $ 500, 001 to $1, 000 ,000 inclusive $ 315. 00 $1, 000, 001 to $2, 000 , 000 inclusive $ 420. 00 $2, 000, 001 and over $ 630. 00 The parties hereto understand and agree that any harm to the City caused by the Contractor ' s delay in completing the work hereunder in the time specified by the Contract Documents would be incapable or very difficult of accurate estimation , and that the "Amount of Liquidated Damages Per Day" , as set out above, is a reasonable forecast of just compensation due the City for harm caused by any delay. C7-7 . 11 SUSPENSION BY COURT ORDER: The Contractor shall suspend operations on such part or parts of the work ordered by any court , and will not be entitled to additional compensation by virtue of such court order . Neither will he be liable to the City in the event the work is suspended by a Court Order . Neither will the Owner be liable to the Contractor by virtue of any Court Order or action for which the Owner is not solely responsible. — C7-7 . 12 TEMPORARY SUSPENSION: The Owner shall have the right to suspend the work operation wholly or in part for such period or periods of time as he may deem necessary due to unsuitable weather conditions or any other unfavorable conditions which in the opinion of the Owner or Engineer cause further prosecution of the work to be unsatisfactory or detrimental to the interest of the project. During temporary suspension of work covered by this contract , for any reason , the Owner will make no extra payment for stand-by time of construction equipment and/or construction crews. If it should become necessary to suspend work for an _ indefinite period, the Contractor shall store all materials in such manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. Should the Contractor not be able to complete a portion of the project due to causes beyond the control of and without the fault or negligence of the Contractor as set forth in Paragraph C7-7 . 8 EXTENSION OF THE 'TIME OF COMPLETION , and should it be determined by mutual consent of the Contractor and the Engineer that a solution to allow construction to proceed is not available within a reasonable period of time, then the Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the Engineer C7-7 ( 6 ) _ that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. i No reimbursement shalt be allowed if the equipment is moved to another construction project for the City of Fort Worth. •- The Contractor shall not suspend work without written notice from the Engineer and shall proceed with the work operations promptly when notified by the Engineer to so resume operations. C7-7 . 13 TERMINATION OF CONTRACT DUE TO NATIONAL EMERGENCY: Whenever, because of National Emergency, so declared by the President of the United States or other lawful authority, it becomes impossible for the Contractor to obtain all of the necessary labor , materials, and equipment for the prosecution of the work with reasonable continuity for a period of two months , the Contractor shall within seven days notify the City in writing, giving a detailed statement of the efforts which have been made and listing all necessary items of labor , materials , and equipment not obtainable . If , after investigations , the Owner finds that such conditions existing and that the inability of the Contractor to proceed is not attributable in whole or in part to the fault or neglect of the Contract, then if the Owner cannot after reasonable effort assist the Contractor in procuring and making available the necessary labor, materials and equipment within thirty days , the Contractor may request the Owner to terminate the contract and the Owner may comply with the request, and the termination .� shall be conditioned and based upon a final settlement mutually acceptable to both the Owner and the Contractor and final payment shall be made in accordance with the terms of the agreed settlement, which shall include, but not be limited to , the payment for all work executed but no anticipated profits on work which has not been performed. C7-7.14 SUSPENSION OR ABANDONMENT OF THE WORK AND ANNULMENT OF CONTRACT: The work operations on all or any portion or section of the work under Contract shall be suspended immediately on written order of the Engineer or the Contract may be declared cancelled by the City Council for any good and sufficient cause. The following , by way of :example, but not of limitation , may be considered grounds for suspension or cancellation: a. Failure of the Contractor to commence work operations within the time specified in the Work Order issued by the Owner. C7-7 (7 ) b. Substantial evidence that progress of the work operations by Contractor is insufficient to complete the work within the specified time. C. Failure of the Contractor to provide and maintain sufficient labor and equipment to properly execute the working operations. d. Substantial evidence that the Contractor has abandoned the work. — e. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the work satisfactorily. f. Failure on the part of the Contractor to observe any requirements of the Contract Documents or to comply with any orders given by the Engineer or Owner provided for in these Contract Documents. g. Failure of the Contractor promptly to make good any defect in materials or workmanship, or any defects of any nature the correction of which has been directed in writing by the Engineer or the Owner. — h. Substantial evidence of collusion for the purpose of illegally procuring a contract or perpetrating .. fraud on the City in the construction of work under contract. i. A substantial indication that the Contractor has made an unauthorized assignment of the contract or any funds due therefrom for the benefit of any creditor or for any other purpose. j . If the Contractor shall for any cause whatsoever not carry on the working operation in an acceptable manner. k. If the Contractor commences legal action against the Owner. A copy of the suspension order or action of the City Council shall be served on the Contractor ' s Sureties . When work is suspended for any cause or causes , or when the contract is cancelled, the Contractor shall discontinue the work or such part thereof as the Owner shall designate, whereupon the .� Sureties may, at their option , assume the contract or that portion thereof which the Owner has ordered the Contractor to discontinue, and may perform the same or may, with the written C7-7 ( 8 ) consent of the Owner , sublet the work or that portion of the work as taken over, provided however , that the Sureties shall exercise their option, if at all , within two weeks after the written notice to discontinue the work has been served upon the Contractor and upon the Sureties or their authorized agents . The Sureties , in such event shall assume the Contractor ' s place in all respects , and shall be paid by the Owner for all work performed by them in accordance with the terms of the Contract Documents. All monies remaining due the Contractor at the time of this default shall thereupon 'become due and payable to the Sureties as the work progresses , subject to all of the terms of the Contract Documents. In case the Sureties do not, within the hereinabove specified time, exercise their right and option to assume the contract responsibilities , or that portion thereof which the Owner has ordered by the Contractor to discontinue, then the Owner shall have the power to complete , by contract or otherwise, as it may determine, the work herein described or such part thereof as it may deem necessary, and the Contractor hereto agrees that the Owner shall have the right to take possession of and use any materials , plants , tools , equipment, supplies , and property of any kind provided by the Contractor for the purpose of carrying on the work and to procure other tools, equipment, materials, labor and property for the completion of the work, and to charge to the account of the Contractor_ of said contract expense for labor, materials , tools , equipment, and all expenses incidental thereto. The expense so charged shall be deducted by the Owner from such monies as may be due or may become due at any time thereafter to the Contractor under and by virtue of the Contract or any part thereof . T'ne Owner shall not be required to obtain the lowest bid for the work completing the contract , but the expense to be deducted shall be the actual cost of the owner of such work. In case such expenses shall exceed the amount which would have been payable under the Contract if the same had been compl;ated by the Contractor , then the Contractor and his Sureties shall pay the amount of such excess to the City on notic. from the Owner of the excess due. When any particular part �)E the work is being carried on by the Owner by contract or otherwise under the provisions of this secl.-Aon, the Contractor shalt continue the remainder of the work in conformity with the terms of the Contract Documents and in such a manner as to not hinder or interfere with performance of the work by the Owner. C7 -7 . 15 FULFILLMENT OF CONTRACT : The Contract_ will be considered as havinq been fulfilled , save as provided in any bond or bonds or by law, when all the work and all sections or parts of the project covered by the Co.itcact Do curients have :7-7 ( 9 ) been finished and completed, the final inspection made by the Engineer, and the final acceptance and final payment made by the Owner. C7-7.16 TERMINATION FOR CONVENIENCE OF THE OWNER: A. NOTICE OF TERMINATION: The performance of the work under this contract may be terminated by the Owner in whole , or from time to time in part , in .� accordance with this section , whenever the Owner shall determine that such termination is in the best interest of the Owner . Any such termination .. shall be effected by mailing a notice of termination to the Contractor specifying the extent to which performance of work under the contract is terminated , and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Mail by the Owner . Further , it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the Owner regarding such discretionary action. B. CONTRACTOR ACTION: After receipt of a notice of termination , and except as otherwise directed by the Engineer, the Contractor shall: 1. Stop work under the contract on the date and to the extent specified in the notice of termination; 2. place no further orders or subcontracts for materials , services or facilities except as may be necessary for completion of such portion of the work under the contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of work terminated by the notice of termination; 4. transfer title to the Owner and deliver in the manner , at the times , and to the extent , if any, directed by the Engineer: C7-7 (10 ) a. the E•abricated or anfabricated parts , wort{ in process , completed work , supplies and other material produced as �. a part of , or acquired in connection with the performance of , the work terminated by the notice of termination; and b. the completed, or partially completed plans, drawings , information and other property which , if the contract had been completed , would have been required to be furnished to the Owner. . 5. complete performance of such part of the work as shall not have been terminated by the notice of termination; and 6. take such action as may be necessary, or as the Engineer may direct , for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the Owner has or may acquire the rest. At a time not later than 30 days alter the termination date specified in the notice of termination , the Contractor_ may submit to the Engineer a list , certified as to quantity and quality , of any or all items of termination inventory not previously disposed of , exclusive of .� items the disposition of which has been directed or authorized by the Engineer. Not later than 15 days thereafter , the Owner shall accept title to such items provided, that the list submitted shall be subject to verification by the Engineer upon removal of the items or , if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. C. 'rERMINATION CLAIM: Within 60 days alter notice of termination , the Contractor shall submit his termination claim to the Engineer in the form and with the certification prescribed by the Engineer . Unless one or more ext'nsions in writ- ing ar•a granted by the Owner upon request of ti13 Contractor , fnade in writing within such 60-day period :,)r authorized extension thereof , anl► and all such claims shall be conclusively deeme:i wai,.red. C7-7 (11 ) D. AMOUNTS : Subject to the provisions of Item C7-7.16 (C) , the Contractor and Owner may agree upon .. the whole or any part of the amount or amounts to be paid to the Contractor by reason of the total or partial termination of work pursuant hereto ; provided, that such agreed amount or amounts shall never exceed the total contract price as reduced by the amount of payments otherwise made and as further reduced by the contract price of work not '^ terminated . The contract shall be amended accordingly, and the Contractor shall be paid the agreed amount . No amount shall be due for lost or anticipated profits . Nothing in C7-7 . 16 ( E ) hereafter, prescribing the amount to be paid to the Contractor in the event of failure of the Contractor by reason of the termination of work pursuant to this section, shall be deemed to limit, restrict or otherwise determine or affect the amount or amounts which may be agreed upon to be paid to the Contractor pursuant to this paragraph. E. FAILURE TO AGREE : In the event of the failure of the Contractor and the Owner to agree as provided in C7-7 . 16 ( D) upon the whole amount to be paid to the Contractor by reason of the termination of work pursuant to this section the Owner shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. No amount shall be due for lost or anticipated profits. F. DEDUCTIONS : In arriving at the amount due the contractor under this section , there shall be deducted ( a ) all unliquidated advance or other payments on account theretofore made to the Contractor , applicable to the terminated portion of this contract; ( b) any claim which the Owner may have against the Contractor in connection with this contract; and ( c ) the agreed price for , or the proceeds of sale of , any materials , supplies or other things kept by the Contractor or sold , pursuant to the provisions of this clause, and not otherwise recovered by or credited to the Owner. G. ADJUSTMENT : If the termination hereunder be partial, prior to the settlement of the terminated portion of this contract , the Contractor may file with the Engineer a request in writing for an — C7-7 ( 12 ) equitable adjustment of the price or prices specified in the contract relating to the continued portion of the contract (the portion not terminated by the notice of termination ) , such equitable adjustment as may be agreed upon shall be made in such price or prices ; nothing contained herein , however, shall limit the right of the Owner and the Contractor to agree upon the amount or amounts to be paid to the Contractor for the completion of the continued portion of the contract when said contract does not contain an established contract price for such continued portion. H. NO LIMITATION OF RIGHTS: Nothing contained in this section shall limit or alter the rights which the Owner may have for termination of this contract under C7- 7 . 14 hereof entitled "Suspension of Abandonment of the work and Amendment of Contract" or any other right which Owner may have for default or breach of contract by Contractor. C7-7 . 17 SAFETY METHODS AND PRACTICES: The Contractor shall be responsible for initiating , maintaining , and supervising all safety precautions and programs in connection with the work at all times and shall assume all responsibilities for their enforcement. The Contractor shall comply with federal , state , and local laws, ordinances, and regulations so as to protect person and property from injury, including death, or damage in connection with the work. C7-7 (13 ) PART C - GENERAL CONDITIONS C8-8 MEASUREMENT AND PAYMENT SECTION C8-8 MEASUREMENT AND PAYMENT C8 -8 . 1 MEASUREMENT OF QUANTITIES : The determination of quantities of work performed by the Contractor and authorized by the Contract Documents acceptably completed under the terms of the Contract Documents shall be made by the Engineer , based on measurements made by the Engineer. These measurements will ,- be made according to the United States Standard Measurements used in common practice, and will be the actual length, area, solid contents , numbers , and weights of the materials and items installed. C8-8 . 2 UNIT PRICES: When in the Proposal a "Unit Price" is set forth, the said "Unit Price" shall include the furnishing by the Contractor of all labor , tools, materials, machinery, equipment, appliances and appurtenances necessary for the construction of and the completion in a manner acceptable to the Engineer of all work to be done under these Contract Documents. The "Unit Price" shall include all permanent and temporary protection of overhead, surface, and underground structures , cleanup, finished, overhead expense, bond, insurance, patent fees, royalties , risk due to the elements and other causes , delays , profits , injuries , damages claims , taxes , and all other items not specifically mentioned that may be required to fully construct each item of the work complete in place and in �. a satisfactory condition for operation. C8-8 . 3 LUMP SUM: When in the Proposal a "Lump Sum" is set forth, the said "Lump Sum" shall represent the total cost for the Contractor to furnish all labor , tools , materials , machinery, equipment , appurtenances , and all subsidary work necessary for the construction and completion of all the work to provide a complete and functional item as detailed in the Special Contract Documents and/or Plans. C8-8 . 4 SCOPE OF PAYMENT: The Contractor shall receive and accept the compensation, as herein provided, in full payment for furnishing all labor , tools , materials , and incidentals for performing all work contemplated and embraced under these Contract Documents, for all loss and damage arising out of the nature of the work or from the action of the elements , for any unforeseen defects or obstructions which may arise or be encountered during the prosecution of the work at any time C8-8 (1 ) before its final acceptance by the Owner, (except as provided in paragraph C5-5 . 14 ) for all risks of whatever description connected with the prosecution of the work, for all expense incurred by or in consequence of suspension or discontinuance of such prosecution of the working operations as herein specified , or any and all infringements of patents , trademarks , copyrights , or other legal reservations, and for completeing the work in an acceptable manner according to the terms of the Contract Documents. The payment of any current or partial estimate prior to final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or .. equipment, nor in any way prejudice or affect the obligations of the Contractor to repair, correct, renew, or replace at his own and proper expense any defects or imperfections in the construction or in the strength or quality of the material used or equipment or machinery furnished in or about the construction of the work under contract and its appurtenances, or any damage due or attributed to such defects , which defects , imperfection, or damage shall have been discovered on or before the final inspection and acceptance of work or during the one year guaranty period after final acceptance. The Owner shall be the sole judge of such defects , imperfections , or damage , and the Contractor shall be liable to the Owner for failure to correct the same as provided herein. C8-8 . 5 PARTIAL ESTIMATES AND RETAINAGE: Between the lst and 5th day of each month the Contractor shall submit to the Engineer a statement showing an estimate of the value of the work done during the previous month, or estimate period under the Contract Documents . Not later than the loth day of the month the Engineer shall verify such estimate, and if it is found to be acceptable and the value of work performed since the last partial payment was made exceeds one hundred dollars ( $100 . 00 ) in amount, 90% of such estimated sum will be paid to the Contractor if the total contract amount is less than $ 400 , 000 , or 95% of such estimated sum will be paid to the Contractor if the total contract amount is $400 ,000 or greater �- within twenty-five (25 ) days after the regular estimate period. The City will have the option of preparing estimates on forms furnished by the City . The partial estimate may include acceptable nonperishable materials delivered to the work which are to be incorporated into the work as a permanent part thereof , but which at the the time of the estimate have not been installed. ( such payment will be allowed on a basis of 85% of the net invoice value thereof . ) The Contractor shall furnish the Engineer such information as he may request to aid C8-8 (2 ) him as a guide in the verification or the preparation of partial estimates. It is understood that the partial estimate from month to month will be approximate only, and all partial monthly estimates and payment will be subject to correction in the estimate rendered following the discovery of an error in any previous estimate , and such estimate shall not, in any respect, be taken as an admission of the Owner of the amount of work done or of its quality of sufficiency, or as an acceptance of the work done or the release of the Contractor of any of his responsibilities under the Contract Documents . The City reserves the right to withhold the payment of any monthly estimate if the contractor fails to perform the work strictly in accordance with the specifications or provisions of this contract. C8-8 . 6 WITHHOLDING PAYMENT : Payment on any estimate or estimates may be held in abeyance if the performance of the construction operations is not in accordance with the requirements of the Contract Documents. C8-8. 7 FINAL ACCEPTANCE: Whenever the improvements provided or by the Contract Documents shall have been completed and all requirements of the Contract Documents shall have been fulfilled on the part of the Contractor , the Contractor shall notify the Engineer in writing that the improvements are ready for the final inspection. The Engineer shall notify the appropriate officials of the Owner , will within a reasonable time make such final inspection , and if the work is satisfactory, in an acceptable condition , and has been completed in accordance with the terms of the Contract Documents and all approved modifications thereof, the Engineer will initiate the processing of the final estimate and recommend final acceptance of the project and final payment therefor as outlined in C8-8 . 8 below. C8-8 . 8 FINAL PAYMENT: Whenever all the improvements provided for by the Contract Documents and all approved modifications thereof shall have been completed and all requirements of the Contract Documents have been fulfilled on the part of the Contractor , a final estimate showing the value of the work will be prepared by the Engineer as soon as the necessary measurements, computations, and checks can be made. All prior estimates upon which payment has been made are subject to necessary corrections or revisions in the final payment. C8-8 ( 3 ) The amount of the final estimate , less previous payments and any sum that have been deducted or retained under the provisions of the Contract Documents , will be paid to the _ Contractor within 60 days after final acceptance by the Owner on a proper resolution of the City Council , provided the Contractor has furnished to the Owner satisfactory evidence of payment as follows: Prior to submission of the final estimate — for payment , the Contractor shall execute an affidavit, as furnished by the City, certifying that all persons , firms , associations, corporations, or other organizations furnishing labor and/or materials have been paid in full, that the wage scale established by the City Council in the City of Fort Worth has been paid, and that there are no claims pending for personal injury and/or property damages. The acceptance by the Contractor of the last or final payment as aforesaid shall operate as and shall release the Owner from all claims or liabilities under the Contract .for anything done or furnished or relating to the work under Contract Documents or any act or neglect of said City relating to or connected with the Contract. The making of the final payment by the Owner shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. C8-8 . 9 ADEQUACY OF DESIGN: It is understood that the Owner — believes it has employed competent Engineers and designers to prepare the Contract Documents and all modifications of the approved Contract Documents . It is , therefore, agreed that the Owner shall be responsible for the adequacy of its own design features , sufficiency of the Contract Documents , the safety of the structure , and the practicability of the _ operations of the completed project , provided the Contractor has complied with the requirements of the said Contract Documents, all approved modifications thereof , and additions and alterations thereto approved in writing by the Owner. The burden of proof of such compliance shall be upon the Contractor to show that he has complied with the said requirements of the Contract Documents , approved modifications thereof, and all approved additions and alterations thereto. C8-8 . 10 GENERAL GUARANTY: Neither the final certificate of _ payment nor any provision in the Contract Documents nor partial or entire occupancy or use of the premises by the Owner shall constitute an acceptance of work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects or damages in the work and C8-8 ( 4 ) — pay for any damage to other work resulting therefrom which shall appear within a period of one year from the date of final acceptance of the work unless a longer period is specified andshall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract which shall assure the performance of the general guaranty as above outline . The Owner will give notice of observed defects with reasonable promptness . C8-8 . 11 SUBSIDIARY WORK : Any and all work specifically governed by documentary requirements for the project , such as conditions imposed by the Plans , the General Contract Documents or these Special Contract Documents , in which no specific item for bid has been provided for in the Proposal, shall be considered as a subsidiary item of work, the cost of which shall be included in the price bid in the Proposal, for each bid item. Surface restoration , rock excavation and cleanup are general items of work which fall in the category of subsidiary work. C8-8 . 12 MISCELLANEOUS PLACEMENT OF MATERIAL: Material may be allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These materials shall be used only when directed by the Engineer , depending on field conditions . Payment for miscellaneous placement of material will be made for only that amount of material used , measured to the nearest one-tenth unit . Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. C8-8 . 13 RECORD DOCUMENTS : Contractor shall keep on record a copy of all specifications , plans , addenda, modifications , shop drawings and samples at the site, in good order and annotated to show all changes made during the construction process . These shall be delivered to Engineer upon completion of the work. C8-8 ( 5 ) i i i SECTION Cl SUPPLEMENTARY CONDITIONS TO PART C i i i i i Y i SECTION C1: SLPPLEMENTaRY CONDITIONS TO PART C - GENERAL CONDITIONS *■ A. General These Supplementary Conditions amend or supplement the General Conditions of the Contract and other provisions of the Contract Documents as indicated below. Provisions which are not so amended or supplemented remain in full force and affect. B. 0-3.2 NfLVORITY BUSLNESS ENTERPRISEIWOMEN-OWN-ED BliSLNESS ENTERPRISE COMPLIANCE: Page 0-3 (1), should be deleted in its entirety and replaced with the following: ,M Upon request. Contractor agrees to provide to Owner complete and accurate information rearding actual work performed by a Minority Business Enterprise (MBE) and/or a Woman Business Enterprise (WBE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books. records or files in its possession that will substantiate the actual work performed by an MBE and/or«BE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances MM relating to false statements. further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three (3) years. C. C3-3.7 BO`-DS: Page C3-3 (3). the paragraph after subparagraph d. Change the paragraph to read as follows: -No sureties will be accepted by the owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against the Owner. All bonds shall be made on the forms furnished by the Owner and the surety shall be acceptable to the owner. In order for a surety to be acceptable to the City, (1) the name of the surety shall included the c-•--ent U.S. Treasury List of Acceptsbie Sureties {Circular 8701, or (2) the surety must have capital and surplus equal to ten times the amount of the bond. The surety must be licensed to business in the state of Texas. The amount of the bond shall not exceed the amount shown on the Treasury list or one-tenth (1/I0) of the total capital and surplus. If reinsurance is required, the company writing the reinsurance must be authorized, accredited or trusteed to do business in Texas." i D. CS-8.5 PARTIAL ESTL]IATES AND RETAEI AGE: Page CS-S (2), should be deleted in its entirety and replaced with the following: Partial pay estimates shall be submitted by the Contractor or prepared by the City on the 5th day and 20th day of each month that the work is in progress. The estimate shall be proceeded by the City on the loth day and 25th day respectively. Estimates will be paid within 25 days following the end of the estimate period, less the appropriate retainage as set out below. Partial pay estimates may include acceptable nonperishable materials delivered to the work place which are to be incorporated into the work as a permanent part thereof, but which at the time of the pay estimate have not been so installed. If such Revised P�. 1 3102/00 materials are included within a pay estimate, payment shall be based upon 85% of the net voice value thereof. The Contractor will furnish the Engineer such information as may be reasonably requested to aid in the verification or the preparation of the pay estimate. For contracts of less than $400,000 at the time of execution, retainage shall be ten per cent (10%). For contracts of$400,000 or more at the time of execution, retainage shall be five percent (517c). — Contractor shall pay subcontractors in accord with the subcontract agreement within five (5) business days after receipt by Contractor of the payment by City. Contractor's failure to make the required payments to subcontractors will authorize the City to withhold future payments from the Contractor until compliance with this paragraph is accomplished. It is understood that the partial pay estimates will be approximate only, and all partial pay estimates and payment of same will be subject to correction in the estimate rendered i following the discovery of the mistake in any previous estimate. Partial payment by Owner for the amount of work done or of its quality or sufficiency or acceptance of the work done; shall not release the Contractor of any of its responsibilities under the Contract Documents. The Citv reserves the right to withhold the payment of any partial estimate if the Contractor fails to perform the work in strict accordance with the specifications or other provisions of this contract. E. C3-3.11 MURANCE: Page C3-3 (4-7): Paragraph C3-3.I I of the General Conditions is deleted and replaced with D-12 of the Part D —Special Conditions F. C3-3.I I EI SURANCE: Page C3-3 (6): Delete subparagraph "g. LOCAL AGEN-T FOR _ D SLRANCE AND BON-D LNG " y G. C6-6.12 CONTRACTOR'S RESPONSIBLITY FOR DALIAGE CLAMS: Page C6-6 (8) should be deleted in its entirety and replaced with the following: Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees. from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such iitiurv, damage or death is caused. in whole or ii: part, by the i:eyligence or — alle.ged ne ligerece of Owner, its ofLcers, servants. or employees. Contractor likewise covenants and agrees to indemnifv and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not anv such iniury or damage is caused in whole or in part by the negligence or alleged negligence of Owner, its officers, servants or emplovees.. Revised P". 7 3/02/00 In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against wham a claim for damages is outstanding as a result of work performed under a City Contract. i i i i Wr i i Revised P.. 3 3102100 PART D SPECIAL CONDITIONS PART D - SPECIAL CONDITIONS D-1 AWARD OF CONTRACT D-2 SUBMISSION OF CONTRACT DOCUMENTS.......................................................SC-3 D-3 GENERAL..............................................................................................................SC-4 D-4 OMIT......................................................................................................................SC-5 D-5 PROJECT DESIGNATION .....................................................................................SC-6 D-6 EQUAL EMPLOYMENT PROVISIONS ..................................................................SC-6 D-7 PRE-CONSTRUCTION CONFERENCE ................................................................SC-6 D-8 COORDINATION MEETINGS................................................................................SC-6 D-9 OMIT......................................................................................................................SC-6 .. D-10 BREAKDOWN OF BID PROPOSAL.......................................................................SC-6 D-11 PROJECT CLEAN UP............................................................................................SC-6 D-12 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW.........SC-7 •. D-13 MINORITY AND WOMENS BUSINESS ENTERPRISE (M/WBE) COMPLIANCE..SC-9 D-14 CALENDAR DAY..................................................................................................SC-10 D-15 SUBSIDIARY WORK............................................................................................SC-11 .. D-16 WAGE RATES .....................................................................................................SC-11 D-17 EASEMENTS AND PERMITS ..............................................................................SC-12 D-18 COORDINATION WITH FORT WORTH WATER DEPARTMENT.......................SC-13 D-19 DAMAGE TO PRIVATE PROPERTY ...................................................................SC-13 D-20 SHOP DRAWINGS ..............................................................................................SC-13 D-21 CROSSING OF EXISTING UTILITIES.................................................................SC-14 D-22 EXISTING UTILITIES AND IMPROVEMENTS.....................................................SC-14 .. D-23 CONSTRUCTION TRAFFIC OVER PIPELINES SC-15 .................................................. D-24 TRAFFIC CONTROL............................................................................................SC-15 D-25 PAYMENT............................................................................................................SC-16 .. D-26 OMIT D-27 DETOURS............................................................................................................SC-15 D-28 BARRICADES AND WARNING SIGNS................................................................SC-15 D-29 EXAMINATION OF SITE ................. SC-16 D-30 ZONING COMPLIANCE....................................................................................... SC-16 D-31 WATER FOR CONSTRUCTION......................................... ...............................SC-16 D-32 WASTE MATERIAL..............................................................................................SC-16 D-33 CLEANUP FOR FINAL ACCEPTANCE................................................................SC-16 D-34 PROPERTY ACCESS ..........................................................................................SC-17 .. D-35 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK.........................SC-17 D-36 SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES....................SC-17 D-37 OMIT....................................................................................................................SC-17 D-38 SANITARY FACILITIES FOR WORKERS............................................................SC-17 D-39 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC.......................SC-17 D-40 RIGHT TO AUDIT ................................................................................................SC-17 D-41 INCREASE OR DECREASE IN QUANTITIES......................................................SC-18 D-42 CUTTING OF CONCRETE...................................................................................SC-18 D-43 PROJECT DESIGNATION SIGN..........................................................................SC-18 _ D-44 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT..............................SC-19 D-45 MISCELLANEOUS PLACEMENT OF MATERIAL D-46 TYPE «C" BACKFILL............................................................................................SC-19 D-47 CRUSHED LIMESTONE BACKFILL.....................................................................SC-20 .. D-48 2:27 CONCRETE .................................................................................................SC-20 D-49 TRENCH EXCAVATION, BACKFILL AND COMPACTION...................................SC-20 D-50 PAVEMENT REPAIR (E2-19)............................................................................... SC-21 D-51 TRENCH SAFETY SYSTEM FOR WATER DEPARTMENT PROJECTS ONLY..SC-22 D-52 SANITARY SEWER MANHOLES.........................................................................SC-23 D-53 SANITARY SEWER SERVICES........................................................................... SC-25 01/10/01 SC-1 PART D - SPECIAL CONDITIONS D-54 NOT USED........................................................................................................... SC-26 D-55 REMOVAL, SALVAGE AND ABANDONMENT OF EXISTING FACILITIES ......... SC-26 D-56 DETECTABLE WARNING TAPES....................................................................... SC-28 _ D-57 PIPE CLEANING D-58 BARRICADES, WARNINGS AND FLAGMEN ...................................................... SC-29 D-59 DISPOSAL OF SPOIL/FILL MATERIAL ............................................................... SC-29 D-60 MECHANICS AND MATERIALMEN'S LIEN ......................................................... SC-29 D-61 SUBSTITUTIONS.................................................................................................SC-29 D-62 PRECONSTRUCTION TELEVISION INSPECTION/SANITARY SEWER LINES. SC-30 D-63 VACUUM TESTING OF SANITARY SEWER MANHOLES.................................. SC-33 D-64 BYPASS PUMPING.............................................................................................. SC-34 D-65 POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS SC-34 D-66 SAMPLES AND QUALITY CONTROL TESTING ................................................. SC-35 - D-67 TEMPORARY EROSION SEDIMENTS AND WATER POLLUTION CONTROL..SC-36 D-68 INGRESS AND EGRESS/ ACCESS TO DRIVES................................................. SC-37 D-69 PROTECTION OF TREES, PLANTS AND SOIL.................................................. SC-37 - D-70 SITE RESTORATION........................................................................................... SC-37 D-71 STANDARD PRODUCT LIST............................................................................... SC-37 D-72 STATE REVOLVING FUND (SRF) REQUIREMENTS .........................................SC-37 D-73 TOPSOIL, SODDING, SEEDING AND HYDROMULCH SEEDING......................SC-38 D-74 CONFINED SPACE ENTRY PROGRAM.............................................................. SC-43 D-75 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION ................... SC-43 - D-76 EXCAVATION NEAR TREES .............................................................................. SC-43 D-77 CONCRETE ENCASEMENT OF SEWER PIPE ..................................................SC-44 D-78 CLAY DAM...........................................................................................................SC-44 D-79 EXPLORATORY EXCAVATION (D-HOLE) - D-80 INSTALLATION OF WATER FACILITIES............................................................SC-45 80.1 POLYVINYL CHLORIDE (PVC) WATER PIPE..................................................... SC-45 80.2 BLOCKING ..................... SC-45 -...................................................................................... 80.3 TYPE OF CASING PIPE ......................................................................................SC-45 80.4 TIE-INS ................................................................................................................ SC-45 80.5 CONNECTION OF EXISTING MAINS.................................................................. SC-46 80.6 VALVE CUT-INS .................................................................................................. SC-46 80.7 WATER SERVICES .............................................................................................SC-46 80.8 2-INCH TEMPORARY SERVICE LINE.................................................................SC-48 - 80.9 ADJUST MANHOLES AND VAULTS (UTILITY CUT)........................................... SC-49 80.10 ADJUST WATER VALVE BOXES........................................................................SC-49 80.11 PURGING AND STERILIZATION OF WATER LINES..........................................SC-49 80.12 WORK NEAR PRESSURE PLANE BOUNDARIES.............................................. SC-49 80.13 WATER SAMPLE STATION................................................................................. SC-50 80.14 DUCTILE IRON AND GRAY IRON FITTINGS...................................................... SC-50 - D-81 SPRINKLING FOR DUST CONTROL .................................................................. SC-51 D-82 DEWATERING.....................................................................................................SC-51 D-83 TRENCH EXCAVATION FOR DEEP TRENCHES...............................................SC-51 D-84 TREE PRUNING .................................................................................................. SC-51 D-85 TREE REMOVAL .................................................................................................SC-52 D-86 TEST HOLES ...................................................................................................... SC-52 D-87 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION.................. SC-53 - D-88 TRAFFIC BUTTONS ............................................................................................ SC-53 01/10/01 SC-2 PART D - SPECIAL CONDITIONS This Part D — Special Conditions is complimentary to Part C — General Conditions of the Contract. Anything contained in this Part D that is additive to any provision in Part C — General Conditions of the Contract are to be read together. Any conflict between Part C — .. General Conditions of the Contract and this Part D, Part D shall control. FOR: SANITARY SEWER REHABILITATION CONTRACT XLIX (49) DOE PROJECT NO. 2115, SEWER PROJECT NO. PS58-070580174310 FORT WORTH, TEXAS D-1 AWARD OF CONTRACT: The City reserves the right to abandon without obligation to the contractor, any part of the project, or the entire project, at any time before the contractor begins any construction work authorized by the City. Award, if made, shall be to the lowest responsible bidder. The following shall apply for contract documents with multiple units of work. Each unit represents .. a separate project, each with an individual M/WBE specification and proposal section. The proposal sections are arranged to allow prospective bidders to submit bids on one unit, some of the units, or all of the units. Award of contract(s), if made, shall be to the lowest responsible bidder for each individual unit. If a contractor is the low bidder on two units or more, a single set of contract documents consisting of all applicable units will be created and one single award of contract shall be made. The Contractor shall comply with the City's M/WBE Ordinance on each unit. Bidders shall submit individual and separate monthly M/WBE reports for each Unit included in the Contract. Construction time on all units will run concurrently. For situations involving approved contracts .. with multiple units, the total allowable construction completion time period for all the units shall be the same as the unit with the longest construction time period. ` D-2 SUBMISSION OF CONTRACT DOCUMENTS, CONSTRUCTION START TIME AND PRE-CONSTRUCTION SUBMITTALS: The contractor(s) shall E-:ecute and return the contract documents to the Department of Engineering within ten (10) working days after notification by the City. A Pre-Construction meeting date will be established and noted in the Letter to Contractor. The effective work order date will be set at the pre-construction conference. The contractor(s) shall be required to start construction on the project no later than ten (10) •. calendar working days after the pre-construction meeting date, unless a different date is established in a Notice to Proceed. The City shall begin to charge time on the project to the contractor eleven days after the pre-construction meeting date, unless a different date is .. established in a Notice to Proceed. Per City ordinance 13471, as amended by Ordinance No. 13781, the contractor(s) shall submit the letters of intent or a copy of the agreements with certified M/WBE subcontractor(s) at or before the pre-construction conference. To expedite M/WBE compliance contractors are strongly encouraged to submit the executed letters of intent (with M/WBE subcontractors) at the time of _ submittal of the UTILIZATION FORM or GOOD FAITH EFFORT FORM. The letter(s) must be signed by both parties. If the contractor(s) fails to submit the letter(s) or agreement(s), the contractor(s) will not be allowed to begin work. Time on the project will start to accumulate at the end of the ten (10) days as stipulated above. Additional submittals at time of pre-construction meeting shall include (but not limited to): 01/10/01 SC-3 - PART D - SPECIAL CONDITIONS Contractors Work Plan and Schedule Disposal Site for Waste Material Information Sub-Contractor Identification — Trench Safety Design (if required) Confined Space Entry Program Name and number of a responsible person for off hour emergencies Project schedule which must reflect a project completion date to be determined by the completion time period stipulated in the proposal section. The pre-construction conference is intended as a forum between the contractor and the appropriate City staff to go over the project in detail and to afford the contractor the opportunity to submit all the required documents listed above. .. If the contractor fails to submit any of the required documents, the contractor will not be allowed to begin work; however contract time shall begin as stipulated in this paragraph. D-3 GENERAL: The order or precedence in case of conflicts or discrepancies between various parts of the Contract Documents subject to the ruling of the Engineer shall generally, but not necessarily, follow the guidelines listed below: - 1. Plans 2. Contract Documents 3. Special Conditions — The following Special Conditions shall be applicable to this project and shall govern over any conflicts with the General Contract Documents under the provisions stated above. The — Cont,actor shall be responsible for defects in this project due to faulty materials and workmanship, or both, for a period of one (1) year from date of final acceptance of this project by the City of Fort Worth and will be required to replace at his expense any part or all of this project — whi& hecomes de`?ctive d,1P to these causes. Subject to modifications as herein contained, the Fort Worth Water Department's General .. Contract Documents and General Specifications, with latest revisions, are made a part of the General Contract Documents for this project. The Plans, these Special Contract Documents and the rules, regulations, requirements, instructions, drawings or details referred to by manufacturers — name, or identification include therein as specifying, referring or implying product control, performance, quality, or other shall be binding upon the contractor. The specifications and drawings shall be considered cooperative; therefore, work or material called for by one and not _ shown or mentioned in the other shall be accomplished or furnished in a faithful manner as though required by all. Any Contractor performing any work on Fort Worth water or sanitary sewer facilities must be pre- qualified with the Water Department to perform such work in accordance with procedures described in the current Fort Worth Water Department General Specifications, which general specifications shall govern performance of all such work. This contract and project, where applicable, may also be governed by the two following published specifications, except as modified by these Special Provisions: 01/10/01 SC-4 ON PART D - SPECIAL CONDITIONS 1. STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION - CITY OF FORT WORTH 2. STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - NORTH CENTRALTEXAS .. Any conflict between these contract documents and the above 2 publications shall be resolved in favor of these contract documents. .. A copy of either of these specifications may be purchased at the office of the Transportation and Public Works Director, 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort Worth, Texas 76102. The specifications applicable to each pay item are indicated by the call-out for the .. pay item by the designer. If not shown, then applicable published specifications in either of these documents may be followed at the discretion of the Contractor. General Provisions shall be those of the Fort Worth document rather than Division 1 of the North Central Texas document. Bidders shall not separate, detach or remove any portion, segment or sheets from the contract document at any time. Failure to bid or fully execute contract without retaining contract documents intact may be grounds for designating bids as "non-responsive" and rejecting bids or voiding contract as appropriate as determined by the City Engineer. INTERPRETATION AND PREPARATION OF PROPOSAL: A. DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the Purchasing Manager or his representative at the official location and stated time set forth in the "Notice to Bidders". It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL", and the name or description of the project as designated in the "Notice to Bidders". The envelope shall be addressed to the Purchasing Manager, City of Fort Worth .. Purchasing Division, PO Box 17027, Fort Worth, Texas 76102. B ":;THDRAW � °Rr^7SALS: Proposals actually filed with the Purchasing Manager cannot .. be withdrawn prior to the time set for opening proposals. A request for non-consideration of a proposal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non- consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner, be returned unopened. _ C. TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the Purchasing Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written .. and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. D-4 OMIT SC-5 PART D - SPECIAL CONDITIONS D-5 PROJECT DESIGNATION: Construction under these Special Documents shall be '• performed under the Project Designation: Project No. PS58-070580174310 D-6 EQUAL EMPLOYMENT PROVISIONS: Contractor shall comply with City Ordinance Number 7278 as amended by City Ordinance Number 7400 (Fort Worth City Code Sections 13- A-21 through 12-A-29) prohibiting discrimination in employment practices. The Contractor shall post the required notice to that effect on the project site, and at his request, will be provided assistance by the City of Fort Worth's Equal Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices �. may be acquired from the Equal Employment Officer. D-7 PRE-CONSTRUCTION CONFERENCE: Before the project work order is issued, a pre- construction conference shall be held with representatives of the following agencies present: City Engineering Department, City Water Department, City Public Works Department, other interested City Departments (such as Traffic), interested utility companies (such as gas, telephone, and _ electric), Design Engineer and the successful Contractor. Contractor shall submit a schedule of operations at the pre-construction conference. D-8 COORDINATION MEETINGS: For coordination purposes, weekly meetings at the job site may be required to maintain the project on the desired schedule. The Contractor shall be present at all meetings. D-9 OMIT D-10 BREAKDOWN OF BID PROPOSAL: When requested by the Engineer, the Contractor shall furnish a cost breakdown of those bid items shown in the Proposal as lump sum items. This information is for use in the preparation of a recommendation to the City for award of contract. D-11 PROJECT CLEAN UP The Contractor shall be aware that keeping the project site in a neat and orderly condition is �• considered an integral part of the contracted work and as such shall be considered subsidiary to the appropriate bid items. Clean up work shall be done as directed by the Engineer as the work progresses or as needed. If, in the opinion of the Engineer it is necessary, clean up shall be done on a daily basis. Clean up work shall include, but not be limited to: • Sweeping the street clean of dirt or debris .. • Storing excess material in appropriate and organized manner ■ Keeping trash of any kind off of resident's property Each day as work progresses, Contractor shall store materials and clean up the work site so as to minimize interruption of the use and enjoyment of private property. Additionally, as work is completed on any particular private property, the contractor shall restore that property to the _ condition it was in prior to the work, as well as make the necessary repair or replacement of any damage. If the Engineer does not feel that the jobsite has been kept in an orderly condition, on the next estimate payment (and all subsequent payments until completed) the appropriate bid item(s) will be reduced by 25%. 01/10/01 SC-6 PART D - SPECIAL CONDITIONS D-12 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW: A. Definitions: .. 1. Certification of coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance .. coverage for the person's or entity's employees providing services on a project, for the duration of the project. 2. Duration of the project - includes the time from the beginning of the work on the project .., until the contractor's/person's work on the project has been completed and accepted by the governmental entity. .. 3. Persons providing services on the project ("subcontractor" in §406.096)- includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes, without .. limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other services related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The Contractor shall provide coverage, based on proper reporting of classification codes and .. payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) or all employees of the Contractor providing services on the project, for the duration of the project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awardea the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the ,.'oration of the pr;,;ac:, o id contractor must, prior to the end of the coverage period, file a _ new certificate of coverage with the governmental entity showing that coverage has been extended. E. The Contractor shall obtain from each person providing services on a project, and provide the governmental entity: 1. A certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project: and 2. No later than seven days after receipt by the contractor, a new certificate of coverage .. showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. .. F. The contractor shall retain all required certificates of coverage for,the duration of the project and for one year thereafter. .. G. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known„ of any change oinoioi SC-7 PART D - SPECIAL CONDITIONS that materially affects the provision of coverage of any person providing services on the project. H. The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Worker's Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. I. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: 1. Provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas _ Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; 2. Provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; 3. Provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; 4. Obtain from each other person with whom it contracts, and provide to the Contractor: a.) A certificate of coverage, prior to the other person beginning work on the project; and b.) A new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 5. Retain all required certificates of coverage on file for the duration of the project and for one year thereafter. 6. Notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and 7. Contractually require each person with whom it contracts, to perform as required by paragraphs (1)-(7), with the certificates of coverage to be provided to the person for whom they are providing services. — 8. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self- insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the contractor to administrative, criminal, civil penalties or other civil actions. 01/10/01 SC-8 PART D - SPECIAL CONDITIONS 9. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the governmental entity to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. J. The contractor shall post a notice on each project site informing all persons providing services •• on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's Compensation Commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes: "REQUIRED WORKER'S COMPENSATION COVERAGE .. The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." Call the Texas Worker's Compensation Commission at (512)440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage". D-13 MINORITY AND WOMENS BUSINESS ENTERPRISE (M/WBE) COMPLIANCE: In accordance with City of Fort Worth Ordinance No. 11923, as amended by City of Fort Worth .. Ordinance No. 13471, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. The Ordinance is incorporated in these specifications by reference. A copy of the Ordinance, may be obtained from the Office of the City Secretary. Failure to comply with the ordinance shall be a material breach of contract. The M/WBE UTILIZATION FORM, M/WBE GOALS W,'.:vcr`l FORM f+,,,J GOOD FAITH _ EFFORT FORM, as applicable, must be submitted within five (5) city business days after bid opening. Failure to comply shall render the bid non-responsive. Upon request, contractor agrees to provide the City complete and accurate information regarding actual work performed by a Minority or Women Business Enterprise (M/WBE) on the contract and payment thereof. Contractor further agrees to permit an audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state, or local laws or ordinances relating to false .. statement. Further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three years. The City will consider the contractor's performance regarding its M/WBE program in the evaluation of bids. Failure to comply with the City's M/WBE Ordinance, or to demonstrate "good faith effort", shall result in a bid being rendered non-responsive to specifications. 01,.,,,01 SC-9 PART D - SPECIAL CONDITIONS Contractor shall provide copies of subcontracts or co-signed letters of intent with approved M/WBE subcontractors prior to issuance of the Notice to Proceed. Contractor shall also provide monthly reports on utilization of the subcontractors to the City's M/WBE office. The Contractor may count first and second tier subcontractors and/or suppliers toward meeting the goals. The Contractor may count toward its goal a portion of the total dollar amount of the contract with a joint venture equal to the percentage of the M/WBE participation in the joint venture for a clearly defined portion of the work to be performed. All M/WBE contractors used in meeting the goals must be certified prior to the award of the Contract. The M/WBE contractor(s) must be certified by either the North Central Texas Regional Certification Agency (NCTRCA) or Texas Department of Transportation (TxDOT), Highway Division and must be located in the nine (9) county marketplace at time of bid. The Contractor shall contact all such M/WBE subcontractors or suppliers prior to listing them on the M/WBE utilization or good faith effort _ forms as applicable. Failure to contact the listed M/WBE subcontractor or supplier prior to bid opening may result in the rejection of bid as non-responsive. Whenever a change order affects the work of an M/WBE subcontractor or supplier, the M/WBE .. shall be given an opportunity to perform the work. Whenever a change order exceeds 10% of the original contract, the M/WBE coordinator shall determine the goals applicable to the work to be performed under the change order. During the term of the contract the contract shall: 1. Make no unjustified changes or deletions in it's M/WBE participation commitments submitted with or subsequent to the bid, and, 2. If substantial subcontracting and/or substantial supplier opportunities arise during the term of the contract which the contractor had represented he would perform with his forces, the contractor shall notify the City before subcontracts or purchase orders are let, and shall be required to comply with modifications to goals as determined by the City, and , 3. Submit a REQUEST FOR APPROVAL OF CHANGE FORM, if the contractor desires to change or delete any of the M/WBE subcontractors or suppliers. Justification for change may be granted for the following: a. Failure of Subcontractor to provide evidence of coverage by Worker's Compensation .. Insurance. b. Failure of Subcontractor to provide required general liability of other insurance. c. Failure of Subcontractor to execute a standard subcontract form in the amount of the proposal used by the Contractor in preparing his M/WBE Participation plan. -� d. Default by the M/WBE subcontractor or supplier in the performance of the subcontractor. Within ten (10) days after final payment from the City, the contractor shall provide the M/WBE Office with documentation to reflect final participation of each subcontractor and .. supplier used on the project, inclusive of M/WBEs. D-14 CALENDAR DAY: Delete paragraph C1-1.24, in Part C-General Conditions, in its entirety .. and substitute the following new paragraph: 01/10/01 SC-10 PART D - SPECIAL CONDITIONS C1-1.24 Calendar Day: A Calendar day is any day of the week or month. All calendar days are counted in computing contract time and for determining liquidated damages, if any; however, the Contractor will not be allowed to work on Sundays or any holidays observed by the City of Fort Worth. D-15 SUBSIDIARY WORK: Any and all work specifically governed by documentary requirements for the project, such as conditions imposed by the Plans, the General Contract Documents or these Special Contract Documents, in which no specific item for bid has been provided for in the Proposal, shall be considered as a subsidiary item of work, the cost of which ., shall be included in the price bid in the Proposal for each bid item, including but not limited to surface restoration, removal and replacement of fencing, and cleanup. D-16 WAGE RATES: The labor classifications and minimum wage rates set forth herein have been predetermined by the City Council of the City of Fort Worth, Texas, in accordance with statutory requirements, as being the prevailing classifications and rates that shall govern on all work performed by the Contractor or any Subcontractor on the site of the project covered by these Contract Documents. In no event shall less than the following rates of wages be paid. (Attached) CITY OF FORT WORTH HIGHWAY CONSTRUCTION PREVAILING WAGE RATE FOR 2000 CLASSIFICATION RATE CLASSIFICATION RATE Air Conditioning Mechanic $15.98 Laborer Skilled $10.35 Air Conditioning Mechanic Helper $10.75 Lather $14.00 Acoustic Ceiling Installer $14.02 Lather Helper $11.00 Acoustic Ceiling Installer Helper $10.88 Metal Building Assembler $10.00 Asbestos Worker $10.50 Metal Buildin^ Assembler Helper $ 8.70 Bricklayer/Stone Mason $17.21 Painter $12.83 Bricklayer/Stone Mason Helper $10.16 Painter Helper $ 8.35 Carpenter $13.92 Pipefitter $17.60 Carpenter Helper $10.38 Pipefitter Helper $10.18 Concrete Finisher $12.68 Plasterer $16.00 Concrete Finisher Helper $ 9.73 Plasterer Helper $11.00 Concrete Form Builder $11.97 Plumber $16.91 Concrete Form Builder Helper $ 9.42 Plumber Helper $ 9.75 Drywall Taper $11.33 Reinforcing Steel Setter $10.40 Drywall Taper Helper $ 8.00 Roofer $11.87 Electrician Journeyman $17.46 Roofer Helper $ 8.33 Electrician Helper $11.30 Sheet Metal Worker $14.45 Electronic Technician $12.50 Sheet Metal Worker Helper $ 9.57 Electronic Technician Helper $ 8.50 Sheetrock Hanger $12.45 .. Floor Layer (Carpet) $17.00 Sheetrock Hanger Helper $ 9.64 Floor Layer (Resilient) $16.00 Sprinkler System Installer $16.87 Floor Layer Helper $13.50 Sprinkler System Installer Helper $10.13 Glazier $15.02 Steel Worker Structural $11.36 Glazier Helper $10.90 Steel Worker Structural Helper $ 8.80 Insulator $12.04 Welder $14.70 Insulator Helper S 9.40 Welder Helper $11.74 Laborer Common S 7.85 01/10/01 SC-1 1 PART D - SPECIAL CONDITIONS CLASSIFICATION RATE CLASSIFICATION RATE HEAVY EQUIPMENT OPERATORS Crane, Clamshell, Backhoe, Derrick $12.50 Foundation Drill Operator $13.00 Dragline, Shovel Front End Loader Operator $11.22 Forklift Operator $ 9.63 Truck Driver $10.31 HIGHWAY (HEAVY) CONSTRUCTION Asphalt Raker $10.32 Front End Loader (2 '/2 CY & Less) $ 9.94 Asphalt Shoveler $ 9.75 Front End Loader (over 2 '/2 CY) $ 9.32 Batching Plant Weigher $ 9.65 Milling Machine Operator $ 8.00 _ Carpenter(Rough) $13.64 Mixer $11.00 Concrete Finisher-Paving $10.16 Motor Grader Operator (Fine Grade) $12.31 Concrete Finisher Helper $ 9.70 Motor Grader Operator $13.75 (Paving) Pavement Marking Machine $11.00 Concrete Finisher-Structures $13.44 Roller, Steel Wheel Plant-Mix Flagger $ 7.00 Pavements $ 9.88 _ Form Builder-Structures $13.44 Roller, Steel Wheel Other Flatwhe6 Form Setter-Paving & Curbs $10.25 or Tamping $12.12 Form Setter-Structures $ 9.75 Roller, Pneumatic, Self-Propelled Laborer-Common $ 7.64 Scraper $ 8.02 Laborer-Utility $ 8.64 Traveling Mixer $10.00 Mechanic $13.25 Reinforcing Steel Setter (Paving) $ 9.75 Servicer $10.13 Truck Driver-Single Axle (Light) $ 8.00 Pipe Layer $ 7.35 Truck Driver-Tanden Axle Pipe Layer Helper $ 6.75 Semi-Trailer $10.22 Asphalt Distributor Operator $11.45 Truck Driver-Lowboy/Float $10.54 Asph:" Paving ME:";ng Truck Driver-Transit Mix $10.63 Operator $11.09 Truc;. _�nver-Winch $ 9.80 Concrete Paving Saw $10.53 Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (< 1 1/2 CY) $10.00 Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (> 1 1/2 CY) $11.52 D-17 EASEMENTS AND PERMITS: The performance of this contract requires certain temporary construction, right-of-entry agreements, and/or permits to perform work on private property. The City has attempted to obtain the temporary construction and/or right-of-entry agreements for properties where construction activity is necessary on City owned facilities, such as sewer lines or manholes. For locations where the City was unable to obtain the easement or right-of-entry, it shall be the Contractor's responsibility to obtain the agreement prior to beginning work on subject property. This shall be subsidiary to the contract. The agreements which the City has obtained are available to the Contractor for review by contacting the plans desk at the Department of 01/10/01 SC-12 PART D - SPECIAL CONDITIONS Engineering, City of Fort Worth. Also, it shall be the responsibility of the Contractor to obtain written permission from property owners to perform such work as cieanout repair and sewer service replacement on private property. Contractor shall adhere to all requirements of .. Paragraph C6-6.10 of the General Contract Documents. The Contractor's attention is directed to the agreement terms along with any special conditions that may have been imposed on these agreements, by the property owners. The easements and/or private property shall be cleaned up after use and restored to its original condition or better. In event additional work room is required by the Contractor, it shall be the .. Contractor's responsibility to obtain written permission from the property owners involved for the use of additional property required. No additional payment will be allowed for this item. �• The City has obtained the necessary documentation for railroad and/or highway permits required for construction of this project. The Contractor shall be responsible for complying with all provisions of such permits, including obtaining the requisite insurance, and shall pay any and all costs associated with or required by the permit(s). It is the Contractor's responsibility to provide the required flagmen and/or provide payment to the appropriate railroad/agency for all flagmen during construction in railroad/agency right-of-way. Any and all costs associated with compliance with permits(s) including payment for flagmen shall be subsidiary to the project price. No additional payment will be allowed for this item. _ D-18 COORDINATION WITH FORT WORTH WATER DEPARTMENT: During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. D-19 DAMAGE TO PRIVATE PROPERTY: The Contractor shall immediately repair or replace any damage to private property, including but not limited to fences, walls, pavement and water and sewer services, at no cost to the Owner. This shall be subsidiary to the contract and not a separate pay item. .. D-20 SHOP DRAWINGS: Shop drawings shall be submitted by the Contractor to the Construction Engineer, for all equipment and materials for this project. Contractor shall submit S`".cJ l (7) copies o; :.h-, ..,awings, layouts, manufacturer's data and material schedules as may be required by the Engineer for his review. Such review by the Engineer shall include checking for general conformance with the design concept of the project and general compliance with information given in the General Contract Documents. Indicated action by the Engineer, which may result from his review, shall not constitute concurrence with any deviation from the plans and specifications unless such deviations are specifically identified by the method described below, and further shall not relieve the Contractor of responsibility for errors or omissions in the submitted data. Processed shop drawing submittal are not change orders. The purpose of submittals, by the Contractor, is to demonstrate that the Contractor understands the design concept, and that he demonstrates his understanding by indicating which equipment and _ materials he intends to furnish and install, and by detailing the fabrication and installation methods he intends to use. If deviations, discrepancies or conflicts between submittals and the design drawings and/or specifications are discovered, either prior to or after submittals are processed, the design drawings and specifications shall govern. The Contractor shall be responsible for all dimensions which are to be confirmed and correlated at the job site, fabrication processes and techniques of construction, coordination of his work with that of other trades and satisfactory performance of his work. The Contractor shall check and verify all measurements and review submittals prior to submittal, and sign or initial a statement included with the submittal, which signifies compliance with the plans and specifications and dimensions suitable for the 01n0i01 SC-13 PART D - SPECIAL CONDITIONS application. Any deviation from the specified criteria shall be expressly stated in writing in the submittal. Shop drawings shall be submitted for the following items prior to installation: 1. All pipe 2. Reinforced steel fabrication for structures 3. Cast Iron structural appurtenances Shop drawings must be approved in writing by the Engineer prior to the start of work. D-21 CROSSING OF EXISTING UTILITIES: Where a proposed water line crosses over a sanitary sewer or sanitary sewer service line and/or proposed sewer line crosses over a water line and the clear vertical distance is less than 9 feet barrel to barrel, the sanitary sewer or sanitary sewer service line shall be made water tight or be constructed of ductile iron pipe. The required length of replacement shall be determined by the Engineer. The material for sanitary sewer mains and sanitary sewer laterals shall be Class 51 Ductile Iron Pipe with polyethylene wrapping. The material for sanitary sewer service lines shall be extra strength cast iron soil pipe with polyethylene wrapping. Adapter fittings shall be a urethane or neoprene coupling ASTM C-425 with series 300 stainless steel compression straps. Backfill, fittings, tie-ins and all other associated appurtenances required are deemed subsidiary work, the cost of which shall be included in the price bid in the Proposal for each bid item. D-22 EXISTING UTILITIES AND IMPROVEMENTS: The plans show the locations of all known surface and subsurface structures. However, the Owner assumes no responsibility for failure to show any or all of these structures on the Plans, or to show them in their exact location. It is mutually agreed that such failure shall not be considered sufficient basis for claims for additional compensation for extra work or for increasing the pay quantities in any manner whatsoever. The Contractor shall be responsible for verifying the locations of and protecting all existing utilities, service lines, or other property exposed by his construction operations. Contractor shall make all necessary provisions for the support, protection, relocation, and/or temporary relocation of all utility poles, gas lines, telephone cables, utility services, water mains, sanitary sewer lines, electrical cables, drainage pipes, and all other utilities and structures both above and below ground during construction. The Contractor is liable for a" Actinages durit :,) such existing facilities as a result of his operations and any and all cost incurred for the protection and/or temporary relocation of such facilities are deemed subsidiary work and the cost of same and shall be included in the cost bid per linear foot of pipe installed. NO ADDITIONAL COMPENSATION WILL BE ALLOWED. Where existing utilities or service lines are cut, broken or damaged the Contractor shall replace or repair the utilities or service lines with the same type of original material and construction, or _ better, unless otherwise shown or noted on the plans, at his own cost and expense. The Contractor shall immediately notify the Owner of the damaged utility or service line. He shall cooperate with the Owners of all utilities to locate existing underground facilities and notify the Engineer of any conflicts in grades and alignment. Any and all permanent structures such as parking lot surface, fencing, and like structures on either public or private property shall be replaced at no cost to the City by material of equal value and quality as that damaged. In case it is necessary to change or move the property of any owner of a public utility, such + property shall not be moved or interfered with until ordered to do so by the Engineer. The right is reserved to the owner of public utilities to enter upon the limits of the project for the purpose of 01/10/01 SC-14 PART D - SPECIAL CONDITIONS making such changes or repairs of their property that may be made necessary by performance of this contract. The utility lines and conduits shown on the plans are for information only and are not guaranteed by the City of the Engineer to be accurate as to extent, location, and depth; they are shown on the plans as the best information available at the time of design, from the owners of the utilities involved and from evidences found on the ground. D-23 CONSTRUCTION TRAFFIC OVER PIPELINES: It is apparent that certain construction vehicles could exceed the load bearing capacity of the pipe under shallow bury conditions. It will be the responsibility of the Contractor to protect both the new line and the existing lines from these possibly excessive loads. The Contractor shall not, at any time, cross the existing or new pipe with a truck delivering new pipe to the site. Any damage to the existing or new pipe will be repaired or replaced by the Contractor, at the Contractor's expense, to the satisfaction of the City. In locations where it is not permissible to cross the existing or proposed pipes without additional protection the Contractor may elect to provide additional protection of the pipes so that more frequent crossings of the pipes are allowed. It still is, however, the responsibility of the Contractor to repair any damage to the existing or proposed lines, if the damage results from any phase of his construction operation. D-24 TRAFFIC CONTROL: The Contractor shall be responsible for providing traffic control during the construction of this project consistent with the provisions set forth in the "1980 Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways," codified as Article 6701 d Vernon's Civil Statutes, pertinent sections being Section Nos. 27, 29, 30 and 31. In addition, the Contractor shall comply with City of Fort Worth, Texas, February 1979, Traffic Control Handbook for Construction and Maintenance Work Areas. The Contractor will not remove any regulatory sign, instructional sign, street name sign or other sign which nas been erected by the City. If it is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation/Public Works Department, Signs and Markings Division, (Phone Number 871-8100) to remove the sign. In the case of ►;;y,alatory signQ, 'he C—tractor must replace the permanent sign with a temporary sign meeting the requirements of the above-referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be reinstalled, the Contractor shall again contact the Signs and Markings Division to reinstall the permanent sign and shall leave his temporary sign in place until such reinstallation is completed. 1. The Contractor shall furnish barricades, flares, etc., for the protection of the public and the work. 2. The cost of the traffic control is subsidiary work and the cost of same shall be included in the price bid for pipe complete in place as bid in the Proposal, and no other compensation will be allowed. 3. The Contractor shall furnish a traffic control plan to the City at the pre-construction -� meeting. The cost for traffic control shall be subsidiary to the unit prices for this project. 01/10/01 SC-15 PART D - SPECIAL CONDITIONS D-25 PAYMENT: Payment for all work and material involved in salvaging, abandoning, and/or removing of existing facilities shall be included in the linear foot bid price of the pipe except as follows: 1. Separate payment will be made for removal of all fire hydrants, gate valves 16-inch and larger, and sanitary sewer manholes regardless of location. 2. Payment will be made for salvaging, abandoning, and/or removing of all other existing facilities when said facility is not being replaced in the same trench, i.e., when removal requires a separate trenching operation. ims D-26 OMIT D-27 DETOURS: The Contractor shall prosecute his work in such a manner as to create a i minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and pedestrian traffic within the project area. D-28 BARRICADES AND WARNING SIGNS: Barricades, warning and detour signs shall conform to the Standard Specifications "Barriers and Warning and/or Detour Signs," Item 524, and/or as shown on the plans. Construction signing and barricades shall conform with "1980 Texas Manual on Uniform Traffic Control Devices, Vol. No. 1" or latest edition there of. D-29 EXAMINATION OF SITE: It shall be the responsibility of the prospective bidder to visit ion the project site and make such examinations and explorations as may be necessary to determine all conditions which may affect construction of this project. Particular attention should be given to methods of providing ingress and egress to adjacent private and public properties, procedures for protecting existing improvements and disposition of all materials to be removed. Proper consideration should be given to these details during the preparation of the Proposal and all unusual conditions which may give rise to later contingencies should be brought to the attention of the Owner prior to the submission of the Proposal. D-30 ZONING COMPLIANCE: During the construction of this project, the Contractor shall -• comply with present zoning requirements of the City of Fort Worth in the use of vacant property for storage purposes. ion D-31 WATER FOR CONSTRUCTION: Water for construction will be furnished by the Contractor at his own expense. D-32 WASTE MATERIAL: All waste material shall become the property of the Contractor and shall be disposed of by the Contractor at locations approved by the Engineer. All material shall be disposed of in such a manner as to present a neat appearance and to not obstruct proper 0-0 drainage or to cause injury to street improvements or to abutting property. D-33 CLEANUP FOR FINAL ACCEPTANCE: Final cleanup work shall be done for this project _ as soon as all construction has been completed. No more than seven days shall elapse after completion of construction before the roadway, right-of-way, or easement is cleaned up to the satisfaction of the Engineer. The Contractor shall make a final cleanup of all parts of the work before acceptance by the City of Fort Worth or its representative. This cleanup shall include removal of all objectionable rocks, pieces of asphalt or concrete and other construction materials, and in general preparing the site of the work in an orderly manner and appearance. Final acceptance of the completed project work shall be given by the City of Fort Worth Department of Engineering. 01/10/01 SC-1 6 PART D - SPECIAL CONDITIONS D-34 PROPERTY ACCESS: Access to adjacent property shall be maintained at all times unless otherwise directed by the Engineer. * D-35 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK: Prior to executing the Contract, it shall be the responsibility of the Contractor to furnish a schedule outlining the anticipated time for each phase of construction with starting and completion dates, including sufficient time being allowed for cleanup. D-36 SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES: The following procedures will be followed regarding the subject item on this contract: 1. A warning sign not less than five inches by seven inches, painted yellow with black letters that are legible at twelve feet shall be placed inside and outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus. .. The warning sign shall read as follows: "WARNING - UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES." 2. Equipment that may be operated within ten feet of high voltage lines shall have insulating cage-type of guard about the boom or arm, except back hoes or dippers, and insulator links on the lift hook connections. PM 3. When necessary to work within six feet of high voltage electric lines, notification shall be given the power company (TXU) who will erect temporary mechanical barriers, de- energize the lines, or raise or lower the lines. The work done by the power company shall not be at the expense of the City of Fort Worth. The notifying department shall maintain an accurate log of all such calls to TXU, and shall record action taken in each case. 4. The Contractor is required to make arrangements with the TXU company for the temporary relocation or raising of high voltage lines at the Contractor's sole cost and } expense. 5. No person shall work within six feet of a high voltage line without r`rntection having been taken as outlined in Paragraph (3). D-37 OMIT .. D-38 SANITARY FACILITIES FOR WORKERS: Specific attention is directed to Section C6-6.4 of Part C—General Conditions of the Contract. D-39 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC: The Contractor's particular attention is directed to the requirements of Section C-6-6, "Legal Relations and Responsibilities to the Public" of Part C — General Conditions of the Contract. D-40 RIGHT TO AUDIT: A. Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this contract have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the Contractor involving transactions relating to this contract. Contractor agrees that the City shall have access during normal working hours to all necessary Contractor facilities and shall be provided adequate and 01/10/01 SC-17 PART D - SPECIAL CONDITIONS appropriate work space in order to conduct audits in compliance with the provisions of this section. The City shall give Contractor reasonable advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect — that the subcontractor agrees that the City shall, under the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subcontractor, involving �- transactions to the subcontract, and further, that City shall have access during normal working hours to all subcontractor facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (c) hereof. City shall give subcontractor reasonable advance notice of intended audits. C. Contractor and subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor and subcontractor for the costs of copies at the rate published in the Texas Administrative Code. ., D-41 INCREASE OR DECREASE IN QUANTITIES: The quantities shown in the proposal are approximate. It is the Contractor's sole responsibility to verify all pay item quantities prior to .. submitting a bid. When the quantity of the work to be done or materials to be furnished under any pay item of the contract is more than 125% of the quantity stated in the contract, whether stated by Owner or by Contractor, then either party to the contract, upon demand, shall be entitled to negotiate for revised consideration on the portion of work above 125% of the quantity in the contract. When the quantity of the work to be done or materials to be furnished under any pay item of the contract is less than 75% of the quantity stated in the contract, whether stated by Owner or by Contractor, then either party to the contract, upon demand, shall be entitled to negotiate for revised consideration on the portion of work below 75% of the quantity stated in the contract. This paragraph shall not apply in the event Owner deletes a pay item in its entirety from this ... contract. In the event Owner and Contractor are unable to agree on a negotiated price, Owner and .. Contractor agree that the consideration will be the actual field cost of the work plus 15% as described herein below, agreed upon in writing by the Contractor and Director of Department of Engineering and Contractor and Director of Department of Engineering and approved by the City _ Council after said work is completed, subject to all other conditions of the contract. As used herein, field cost of the work will include the cost of all workmen, foremen, time keepers, mechanics and laborers; all materials, supplies, trucks, equipment rental for such time as actually used on such work only, plus all power, fuel, lubricants, water and similar operating expenses; and a ratable portion of premiums on performance and payment bonds, public liability, Workers Compensation and all other insurance required by law or by ordinance. The Director of Department of Engineering will direct the form in which the accounts of actual field cost will be kept and will recommend in writing the method of doing the work and the type and kind of equipment to be used, but such work will be performed by the Contractor as an independent Contractor and not as an agent or employee of the City. The 15% of the actual field cost to be �- paid to the Contractor shall cover and compensate him for profit, overhead, general supervision and field office expense, and all other elements of cost and expense not embraced within the actual field cost as herein specified. Upon request, the Contractor shall provide the Director of Department of Engineering access to all accounts, bills and vouchers relating thereto. 01/10/01 SC-18 PART D - SPECIAL CONDITIONS D-42 CUTTING OF CONCRETE: When existing concrete is cut, such cuts shall be made with a concrete saw. All sawing shall be subsidiary to the unit cost of the respective item. D-43 PROJECT DESIGNATION SIGN: Project signs are required at all locations. It shall be in accordance with the attached Figure 30 (dated 9-18-96). The signs may be mounted on skids or posts. The exact locations and methods of mounting shall be approved by the Engineer. In addition to the 4' x 8' project signs, project signs shall be attached to barricades used where manhole rehabilitation or replacement is being conducted. Signs suspended from barricading shall be placed in such a way that signs do not interfere with reflective paint or coloring on the barricades. Barricade signs shall be in accordance with Figure 30, except that they shall be 1'-0" by 2'-0" in size. The information box shall have the following information: For Questions on this Project Call: (817) 871-8306 M-F 7:30 am to 4:30 p.m. or (817) 871-8300 Nights and Weekends Any and all cost for the required materials, labor, and equipment necessary for the furnishing of Project Signs shall be considered as a subsidiary cost of the project and no additional compensation will be allowed. D-44 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT: At locations in the project where mains are required to be placed under existing sidewalks and/or driveways, such sidewalks and/or driveways shall be completely replaced for the full existing width, between existing construction or expansion joints with 3000 psi concrete with reinforcing steel on a sand cushion in accordance with City of Fort Worth Transportation/Public Works Department Standard Specifications for Construction, Item 504. At locations where mains are required to be placed under existing curb and gutter, such curb and gutter shall be replaced to match type and geometry of the removed curb and gutter shall be installed in accordance with City of Fort Worth Public Works Department Standard Specification -� for Construction, Item 502. Payment for cutting, backfill, concrete, forming materials and all other associated appurtenances required, shall be included in the square yard price of the bid item for concrete sidewalk or driveway repair. D-45 MISCELLANEOUS PLACEMENT OF MATERIAL: Material has been allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These materials shall be used only when directed by the Engineer, depending on field conditions. _ Payment for miscellaneous placement of material will be made for only that amount of material used, measured to the nearest one-tenth unit. Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. D-46 TYPE "C" BACKFILL: Excavated material used for Type "C" backfill must be mechanically compacted unless the Contractor can furnish the Engineer with satisfactory evidence the P.I. of the excavated material is less then 8.* Such evidence shall be a test report from an independent testing laboratory and must include representative samples of soils in all involved areas, with a map showing the location and depth of the various test holes. If excavated material is obviously granular in nature, containing little or no plastic material, the Engineer may waive the test report requirement. 01n0/01 SC-19 PART D - SPECIAL CONDITIONS See E-1.24, Type "C" Backfill, and E2.11 Trench Backfill.*' ' Revised 3/20/81 Revised 4/20/81 D-47 CRUSHED LIMESTONE BACKFILL: Where specified on the plans or directed by the _ Engineer, Crushed Limestone shall be used for trench backfill on this project. The material shall conform to Public Works Standard Specifications for Street and Storm Drain Construction Division 2 Item 208.2 - Materials and Division 2 Item 208.3 - Materials Sources. Trench backfill and compaction shall meet the requirements of E2-2 Excavation and Backfill, Construction — Specifications, General Contract Documents. Payment for crushed limestone backfill in place shall be made at the unit price bid in the Proposal multiplied by the quantity of material used measured in accordance with E2-2.16 Measurement of Backfill Materials, Construction Specifications, General Contract Documents. D-48 2:27 CONCRETE: Transportation and Public Works Department typical sections for Pavement and Trench Repair for Utility Cuts Figures 1 through 5 refer to using 2:27 Concrete as base repair. Since this call-out includes the word "concrete", the consistent interpretation of the Transportation and Public Works Department is that this ratio specifies two (2) sacks of cement per cubic yard of concrete. D-49 TRENCH EXCAVATION, BACKFILL, AND COMPACTION: Trench excavation and backfill under parking lots, driveways, gravel surfaced roads, within easements, and within existing or future R.O.W. shall be in accordance with Section E1-2 Backfill and E2-2 Excavation and Backfill of the General Contract Documents and Specifications except as specified herein. A. TRENCH EXCAVATION: In accordance with Section E2-2 Excavation and Backfill, if the stated maximum trench widths are exceeded, either through accident or otherwise, and if the Engineer determines that the design loading of the pipe will be exceeded, the Contractor will be required to support the pipe with an improved trench bottom. The expense of such _ remedial measures shall be entirely the Contractor's own. All trenching operations shall be ,,onnned to the wiu,h permanent rights-of-way, perr^^rent ease—nts, and any temporary construction easements. All excavation shall be in strict compliance with the Trench Safety Systems Special Condition of this document. B. TRENCH BACKFILL: Trenches which lie outside of existing or future pavement shall be backfilled above the top of the embedment material with Type "C" backfill material. — Excavated material used for Type "C" backfill must be mechanically compacted unless the Contractor can furnish the Engineer with satisfactory evidence that the P.I. of the excavated material is less than 8. Such evidence shall be a test report from an independent testing laboratory and must include representative samples of soils in all involved areas, with a map showing the location and depth of the various test holes. If excavated material is obviously granular in nature, containing little or no plastic material, the Engineer may waive the test .. report requirement. See E1-2.3, Type "C" or "D" Backfill, and E2-2.11 Trench Backfill for additional requirements. When Type "C" backfill material is not suitable, at the direction of the Engineer, Type "B" backfill material shall be used. In general, all backfill material for trenches in existing paved streets shall be in accordance with Figure(s) A, B, C, or D. Sand material specified in Figure(s) A-D shall be obtained from an approved source and shall consist of durable particles free of thin or elongated pieces, lumps of clay, soil, loam or vegetable matter and shall meet the following gradation: 01/10/01 SC-20 PART D - SPECIAL CONDITIONS Size Sieve % Retained _ #4 0-5 #16 0-20 _ #50 0-50 #100 60-95 #200 90-100 (P.I. = 8 or less) C. TRENCH COMPACTION: All trench backfill shall be placed in lifts per E2-2.9 Backfill. Trenches which lie outside existing or future pavements shall be compacted to a minimum of 90% Standard Proctor Density (A.S.T.M. D698) by means of tamping only. Trenches which lie under existing or future pavement shall be backfilled per Figure A with 95% Standard Proctor Density by jetting, mechanical tamping, or a combination of methods. Backfill material to be mechanically tamped must be within +-4% of its optimum moisture content. The top two (2) feet of sewer line trenches and the top eighteen (18) inches of water _ line may be rolled in with heavy equipment tires, provided it is placed in lifts appropriate to the material being used and the operation can be performed without damage to the installed pipe. The City, at its own expense, will perform trench compaction tests per A.S.T.M. standards on all trench backfill. Any retesting required as a result of failure to compact the backfill material to meet the standards will be at the expense of the Contractor and will be billed at the commercial rates as determined by the City. These soil density tests shall be performed at two (2) foot vertical intervals beginning at a level two (2) feet above the top of the installed pipe and continuing to the top of the completed backfill at intervals along the trench not to exceed 300 linear feet. The Contractor will be responsible for providing access and trench safety system to the level of trench backfill to be tested. No extra compensation will be allowed for exposing the backfill layer to be tested or providing trench safety system for tests ., iducted by :•s Cit, D. MEASUREMENT AND PAYMENT: All material, including any and all Type "B" backfill, and labor costs of excavation and backfill will be included in the price bid per linear foot of water and sewer pipe. D-50 PAVEMENT REPAIR (E2-191: The unit price bid under the appropriate bid item of the proposal shall cover all cost for providing pavement repair equal to or superior in composition, thickness, etc., to existing pavement as detailed in the Public Works Department typical sections for Pavement and Trench Repair for Utility Cuts, Figures 1 through 5. All required paving cuts shall be made with a concrete saw in a true and straight line on both sides of the trench, a minimum of twelve (12) inches outside the trench walls. The trench shall be backfilled and the top nine (9) inches shall be filled with required materials as shown on paving details, compacted and level with the finished street surface. This finished grade shall be maintained in a serviceable condition until the paving has been replaced. All residential driveways shall be accessible at night and over weekends. 01/10/01 SC-21 PART D - SPECIAL CONDITIONS It has been determined by the Transportation and Public Works Department that the strip of existing HMAC pavement between the existing gutter and the edge of the trench pavement repair will not hold up if such strip of existing pavement is two (2) feet or less in width. Therefore, at the locations in the project where the trench wall is three (3) feet or less from the lip of the existing gutter, the Contractor shall be required to remove the existing paving to such gutter. The pavement repair shall then be made from a minimum distance of twelve (12) inches outside the trench wall nearest the center of the street to the gutter line. The pavement shall be replaced within a maximum of five (5) working days, providing job _ placement conditions will permit repaving. If paving conditions are not suitable for repaving, in the opinion of the Owner, the repaving shall be done at the earliest possible date. A permit must be obtained from the Department of Engineering Construction Services Section by the Contractor in conformance with Ordinance No. 3449 and/or Ordinance No. 792 to make utility cuts in the street. The Department of Engineering will inspect the paving repair after construction. _ This permit requirement may be waived if work is being done under a Performance Bond and inspected by the Department of Engineering. D-51 TRENCH SAFETY SYSTEM FOR WATER DEPARTMENT PROJECTS ONLY: A. GENERAL: This specification covers the trench safety requirements for all trench excavations exceeding depth of five (5) feet in order to protect workers from cave-ins. The requirements of this item govern all trenches for mains, manholes, vaults, service lines, and all other appurtenances. The design for the trench safety shall be Signed and sealed by a Registered Professional Engineer licensed in Texas. B. STANDARDS: The latest version of the U.S. Department of Labor, Occupational Safety and Health Administration Standards, 29 CFR Part 1926, Sub-Part P - Excavations, are hereby -w made a part of this specification and shall be the minimum governing requirements for trench safety. C. DEFINITIONS: 1. TRENCHES - A trench is referred to as a narrow excavation made below the surface of _ the ground in which the depth is greater than the width, where the width measured at the bottom is not greater than fifteen (15) feet. 2. BENCHING SYSTEM - Benching means excavating the sides of a trench to form one or a series of horizontal level or steps, usually with vertical or near-vertical surfaces between levels. 3. SLOPING SYSTEM - Sloping means excavating to form sides of a trench that are inclined away from the excavation. 4. SHIELD SYSTEM - Shields used in trenches are generally referred to as "trench boxes" or "trench shields". Shield means a structure that is able to withstand the forces imposed on it by a cave-in and protect workers within the structure. Shields can be permanent structures or can be designed to be portable and move along as the work progresses. Shields can be either pre-manufactured or job-built in accordance with OSHA standards. 5. SHORING SYSTEM - Shoring means a structure such as a metal hydraulic, mechanical or timer system that supports the sides of a trench and which is designed to prevent cave- - 01/10/01 SC-22 PART D - SPECIAL CONDITIONS ins. Shoring systems are generally comprised of cross-braces, vertical rails, (uprights), horizontal rails (wales) and/or sheeting. D. MEASUREMENT - Trench depth is the vertical measurement from the top of the existing ground to the bottom of the pipe or structures. The quantity of trench safety systems shall be based on the linear foot amount of trench depth greater than five (5) feet. E. PAYMENT - Payment shall be full compensation for safety system design, labor, tools, materials, equipment and incidentals necessary for the installation and removal of trench •. safety systems. D-52 SANITARY SEWER MANHOLES: A. GENERAL: The installation, replacement, and/or rehabilitation of sanitary sewer manholes will be required as shown on the plans, and/or as described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. All manholes shall be in accordance with sections E1-14 Materials for Sanitary Sewer Manholes, Valve Vaults, Etc., and E2-14 Vault and Manhole Construction of the General Contract _ Documents and Specifications, unless amended or superseded by requirements of this Special Condition. 1. CONCRETE COLLARS: Concrete collars will be required on all manholes specified as .. per Figure 121. 2. WATERTIGHT MANHOLE INSERTS: Watertight gasketed manhole inserts shall be installed in all sanitary sewer manholes. Inserts shall be constructed in accordance with Fort Worth Water Department Standard E100-4 and shall be fitted and installed according to the manufacturer's recommendations. Stainless Steel manhole inserts shall be ., required for all pipe diameters 18" and greater. 3. LIFT HOLES: All lift holes shall be plugged with a pre-cast concrete plug. The lift hole .. shall be sealed on the outside of the manhole with Ram-Nek or an approved equal sealant. The lift hole shall be sealed on the inside of the manhole with quick setting ,,,.,.,lent grout. 4. FINAL RIM ELEVATIONS: Manhole rims in parkways, lawns and other improved lands shall be at an elevation not more than one (1) nor less than one-half (1/2) inch above the surrounding ground. Backfill shall provide a uniform slope from the top of manhole casting for not less than three (3) feet each direction to existing finish grade of the ground. The grade of all surfaces shall be checked for proper slope and grade by string lining the entire area regarded near the manhole. Manholes in open fields, unimproved land, or drainage courses shall be at an elevation shown on the drawings or minimum of 6 inches above grade. 5. MANHOLE COVERS: All lids shall have pick slots in lieu of pick holes. Manhole frames and covers shall be McKinley, Type N, with indented top design, or equal, with pick slots. Covers shall set flush with the rim of the frame and shall have no larger than 1/8 inch gap between the frame and cover. Bearing surfaces shall be machine finished. Locking manhole lids and frames will be restricted to locations within the 100-year floodplain and .. areas specifically designated on the plans. Certainteed Ductile Iron Manhole Lids and Frames are acceptable for use where locking lids are specified. 01/10/01 SC-23 PART D - SPECIAL CONDITIONS 6. SHALLOW CONE MANHOLES: Shallow manhole construction will be used when manhole depth is four (4) feet or less. All shallow cone manholes shall be built in accordance with Figure 105. All shallow cone manholes shall have a cast iron lid and frame with pick slots. NOTE: MANHOLES PER FIGURE 106 WILL NOT BE ALLOWED. 7. MANHOLE STEPS: No manhole steps are to be installed on any sanitary sewer manhole. 8. EXTERIOR SURFACE COATING: Exterior surfaces of all manholes shall be coated with two mop coats of coal tar epoxy, Koppers "Bitumastic Super Service Black" Tnemec "46- 450 Heavy Tnemecol," or equal to, a minimum or 14 mils dry film thickness. .. 9. MANHOLE JOINT SEALING: All interior and/or exterior joints on concrete manhole sections constructed for the City of Fort Worth Water Department, excluding only the .. joints using a trapped type performed O-ring rubber gasket shall require Bitumastic joint sealants as per Figure M. This sealant shall be pre-formed and trowelable Bitumastic as manufactured by Kent- Seal, Ram-Nek, E-Z Stick, or equal. The joint sealer shall be supplied in either extruded pipe form or suitable cross-sectional area or flat-tape and shall be sized as recommended by the manufacturer and approved by the Engineer. The joint sealer shall be protected by .. a suitable removable wrapper and shall not in any way depend on oxidation, evaporation, or any other chemical action for either its adhesive properties or cohesive strength. The Joint sealer shall remain totally flexible without shrinking, hardening, or oxidizing regardless of the length of time it is exposed to the elements. The manufacturer shall furnish an affidavit attesting to the successful use of the product as a pre-formed flexible joint sealant on concrete pipe and manhole sections for a period of at least five years. B. EXECUTION: 1. INSTALLATION OF JOINT SEALANT: Each grade =djustment ring and manhole frame shall be sealed with the above specified materials. All surfaces to be in contact with the joint sealant shall be thoroughly cleaned of dirt, sand, mud, or other foreign matter. A .. primer shall be applied to all surfaces prior to installing the joint sealant in accordance with the recommendations by the manufacturer. The protective wrapper shall remain on the joint sealant until immediately prior to the placement of the pipe in the trench. After removal of the protective wrapper, the joint sealant shall be kept clean. Install frames and cover over manhole opening with the bottom of the rings resting on Bitumastic joint sealer. Frames and grade rings shall rest on two (2) rows (inside and outside) of Bitumastic joint sealer. .. 2. SEALING AND/OR ADJUSTING EXISTING MANHOLES: Excavate (rectangular full depth saw cut if in pavement) adjacent to the manhole to expose the entire manhole frame and a minimum of 6 inches of the manhole wall keeping the sides of the trench nearly vertical. Remove manhole frame from the manhole structure and observe the condition of the frame and grade rings. Any frame or grade ring that is not suitable for use as determined by the Engineer shall be replaced. Grade rings that are constructed of brick, block materials other than pre-cast concrete rings, or where necessary and approved by the Engineer, shall be replaced with a pre-cast flattop section. Pre-cast concrete rings, or a pre-cast concrete flattop section will be the only adjustments allowed. .• 01/10/01 SC-24 PART D - SPECIAL CONDITIONS .. In brick or block manholes, replace the upper portion of the manhole to a point 24 inches below the frame. If the walls or cone section below this level are structurally unsound, notify the Engineer prior to replacement of the grade rings and manhole frame. Existing brickwork, if damaged by the Contractor, shall be replaced at the Contractor's expense. Wire brush manhole frame and exposed manhole surfaces to remove dirt and loose debris. Coat exposed manhole surfaces with an approved bonding agent followed by an application of a quick setting hydraulic cement to provide a smooth working surface. �• If the inside diameter of the manhole is too large to safely support new adjustment rings or frames, a flat top section shall be installed. .. Joint surfaces between the frames, adjustment rings, and cone section shall be free of dirt, stones, debris and voids to ensure a watertight seal. Place flexible gasket joint material along the inside and outside edge of each joint, or use trowelable material in lieu of pre-formed gasket material. Position the butt joint of each length of joint material on opposite sides of the manhole. No steel shims, wood, stones, or any material not specifically accepted by the Engineer may be used to obtain final surface elevation of the .. manhole frame. In paved areas or future paved areas, castings shall be installed by using a straight edge not less than ten (10) feet long so that the top of the casting will conform to the slope and .. finish elevation of the paved surface. The top of the casting shall be 1/8 inch below the finished elevation. Allowances for the compression of the joint material shall be made to assure a proper final grade elevation. 3. EXPOSED EXTERIOR SURFACES: All exposed exterior surfaces shall be coated with two mop coats of coal tar epoxy. Kopper "Bitumastic Super Service Black"; Tnemec "46- .. 450 Heavy Tnemecol", or equal, to a minimum of 14 mils dry film thickness. 4. The exterior surface of all pre-cast section joints shall be th"roughly cleaned with a wire .. brush and then waterproofed with a 1/2-inch thick coat of trowelable bitumastic joint sealant from 6-inches below to 6-inches above the joint. The coatPri joint shall then be wrapped with 6 mil plastic to protect the sealant from uamage during backfiiling. C. MEASUREMENT AND PAYMENT: The price bid for new manhole installations shall include all labor, equipment, and materials necessary for construction of the manhole including, but .. not limited to, joint sealing, lift hole sealing and exterior surface coating and pavement repair. The price bid for reconstruction of existing manholes shall include all labor equipment and materials necessary for construction of new manhole, including, but not limited to, excavation, backfill, disposal of materials, joint sealing, lift hole sealing, exterior surface coating and pavement repair. The price bid for adjusting and/or sealing of existing manholes shall include all labor, equipment and materials necessary for adjusting and/or sealing the manhole, including but not limited to, joint sealing, lifthole sealing, and exterior surface coating. Payment for concrete collars will be made per each. Payment for manhole inserts will be made per each. D-53 SANITARY SEWER SERVICES: Any reconnection, relocation, re-routes, replacement, or new sanitary sewer service shall be required as shown on the plans, and/or as described in these 01/10/01 SC-25 PART D - SPECIAL CONDITIONS Special Contact Documents in addition to those located in the field and identified by the Engineer as active sewer taps. The service connections shall be constructed by the Contractor utilizing standard factory manufactured tees. City approved factory manufactured saddle taps may be used, but only as directed by the Engineer. The decision to use saddle taps as opposed to tees shall be made on a case by case basis. The Contractor shall be responsible for coordinating the scheduling of tapping crews with building owners and the Engineer in order that the work be performed in an expeditious manner. A minimum of 24 hours advance notice shall be given when taps will be required. Severed service connections shall be maintained as specified in section C6-6.15. A. SEWER SERVICE RECONNECTION: When sewer service reconnection is called for the Contractor shall vertically adjust the existing sewer service line as required for reconnection and furnish a new tap. The fittings used for vertical adjustment shall consist of a maximum bend of 45 degrees. The tap shall be located so as to line up with the service line and avoid any horizontal adjustment. For open cut applications, all sanitary sewer service lines shall be replaced to the property or easement line, or as directed by the Engineer. Sanitary sewer .. services on sewers being rehabilitated using pipe enlargement methods shall be replaced to the property or easement line or as directed by the Engineer. Procedures listed below for Sewer Service Replacement shall be adhered to for the installation of any sewer service line _ including the incidental four (4) feet of service line which is included in the price bid for Sanitary Sewer Taps. Payment for work such as backfill, saddles, tees, fittings incidental four (4) feet of service line and all other associated appurtenances required shall be included in the price bid for Sanitary Sewer Taps. B. SEWER SERVICE REPLACEMENT: All building sewer services encountered during construction shall be adjusted and/or replaced by the Contractor as directed by the Engineer as required for the connection of the sewer service line. If the sewer service line is in such condition or adjustment necessitates the replacement of the sewer service line, all work shall be performed by a licensed plumber. The length of the replacement shall be determined by — the Engineer. All sewer services shall be installed at a minimum of two (2) percent slope or as approved by the Engineer. Connection to the existing sewer service line shall be made with appropriate adapter fitting. The fitting shall be a urethane or neoprene coupling A.S.T.M. C-425 with series 300 stainless steel compression straps. The contractor shall utilize schedule 40 PVC for all sanitary sewer service re-routes or _ relocations located on private property. Furthermore, the contractor shall utilize the services of a licensed plumber for all service line work on private property. Permit(s) must be obtained from the City of Fort Worth Development Department for all service line work on private _ property and all service line work on private property must be approved by a City of Fort Worth Plumbing Inspector. Payment for work and materials such as backfill, pipe fittings, surface restoration on private property (to match existing), and all other associated work for service replacements in excess of four (4) linear feet shall be included in the linear foot price bid for sanitary sewer service line replacement on private property or public right of way. Payment for all work and material involving the "tap" shall be included in the price bid for sanitary sewer service taps. D-54 NOT USED D-55 REMOVAL, SALVAGE, AND ABANDONMENT OF EXISTING FACILITIES: Any removal, salvaging and/or abandonment of existing facilities will necessarily be required as shown on the plans, and/or described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. This work shall be done in accordance with 01/10/01 SC-26 PART D - SPECIAL CONDITIONS Section E2-1.5 Salvaging of Material and E2-2.7 Removing Pipe, of the General Contract Documents and Specifications, unless amended or superseded by requirements of this Special Condition. i A. SALVAGE OF EXISTING WATER METER AND METER BOX: Existing water meter and meter box shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. B. SALVAGE OF EXISTING WATER METER AND CONCRETE VAULT LID: Existing water meter and concrete vault lid shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The concrete vault shall be demolished in place to a point not less than 18 inches below final grade. The concrete vault shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. C. SALVAGE OF EXISTING FIRE HYDRANTS: Existing fire hydrants shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The void shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. D. SALVAGE OF EXISTING GATE VALVE: Existing gate valve and valve box and lid shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The void area caused by the valve removal shall be backfilled and compacted in accordance with backfill method as specified in Section �* E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. If the valve is in a concrete vault, the vault shall be uiemolishc:1 in place to a point no less than 18" below final grade. E. ABANDONMENT OF EXISTING GATE VALVE: Existing gate valve and box lid shall be abandoned by first closing the valve to the fully closed position and demolishing the valve box in place to a point not less than 18 inches below final grade. Concrete shall then be used as backfill material to match existing grade. F. ABANDONMENT OF EXISTING VAULTS: Vaults to be demolished in place shall have top slab and lid removed and vault walls demolished to a point not less than 18" below final grade. The void area caused shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with the existing surrounding grade. G. ABANDONMENT OF MANHOLES: Manholes to be abandoned in place shall have all pipes entering or exiting the structure plugged with lean concrete. Manhole top or cone section shall be removed to the top of the full barrel diameter section, or to point not less than 18 inches below final grade. The structure shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material may be either clean washed sand of clean, suitable excavated material approved by the Engineer. Surface restoration shall be compatible with surrounding service surface. Payment for work involved 01/10/01 SC-27 PART D - SPECIAL CONDITIONS in backfilling, plugging of pipe(s) and all other appurtenances required, shall be included in the appropriate bid item - Abandon Existing Sewer Manhole. H. REMOVAL OF MANHOLES: Manholes to be removed shall have all pipes entering or exiting the structure disconnected. The complete manhole, including top or cone section, all full barrel diameter section, and base section shall be removed. The excavation shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 �- Backfill. Backfill material may be with Type C Backfill or Type B Backfill, as approved by the Engineer. Surface restoration shall be compatible with surrounding surface. I. CUTTING AND PLUGGING EXISTING MAINS: At various locations on this project, it may be required to cut, plug, and block existing water mains/services or sanitary sewer mains/services in order to abandon these lines. Cutting and plugging existing mains and/or services shall be considered as incidental and all costs incurred will be considered to be included in the linear foot bid price of the pipe, unless separate trenching is required. J. REMOVAL OF EXISTING PIPE: Where removal of the existing pipe is required, it shall be the Contractor's responsibility to properly dispose of all removed pipe. All removed valves, fire hydrants and meter boxes shall be delivered to Water Department Field Operation, Storage Yard. K. PAYMENT: Payment for all work and material involved in salvaging, abandoning and/or removing existing facilities shall be included in the linear foot bid price of the pipe, except as follows: separate payment will be made for removal of all fire hydrants, gate valves, 16 inch and larger, and sanitary sewer manholes, regardless of location. Payment will be made for salvaging, abandoning and/or removing all other existing facilities when said facility is not being replaced in the same trench (i.e., when removal requires a separate trench). D-56 DETECOTABLE WARNING TAPES: Detectable underground utility warning tapes which can be located from the surface by a pipe detector shall be installed directly above non-metallic water ^ d sanitary cver pir- The detectable tape shall be "Detect Tape" manufactured by Allen Systems, Inc. or approved equal, and shall consist of ., Jnimum ti lit"..less 0.35 mils solid aluminum foil encased in a protective inert plastic jacket that is impervious to all known alkalis, acids, chemical reagents and solvents found in the soil. The minimum overall thickness of the tape shall be 5.5 mils, and the width shall not be less than two inches with a minimum unit weight of 2'/z pounds/1 inch/100'. The tape shall be color coded and imprinted with the message as _ follows: Type of Utility Color Code Legends _ Water Safety Blue Caution! Buried Water Line Below Sewer Safety Green Caution! Buried Sewer Line Below Installation of detectable tapes shall be per manufacturer's recommendations and shall be as close to the grade as is practical for optimum protection and detectability. Allow a minimum of 18 .. inches between the tape and the pipe. Payment for work such as backfill, bedding, blocking, detectable tapes, and all other associated appurtenances required shall be included in the unit price bid for the appropriate bid item(s). 01/10i01 SC-28 PART D - SPECIAL CONDITIONS D-57 PIPE CLEANING: Joints shall be wiped and then inspected for proper installation by the inspectors. Each joint shall be swept daily and kept clean during installation. A temporary night plug shall be installed on all exposed pipe ends during any period of work stoppage. D-58 BARRICADES, WARNINGS, AND FLAGMEN: Reference Part C - General Conditions, Section C6-6.8 Barricades, Warnings, and Watchmen: A. Wherever the word Watchmen appears in this paragraph, it shall be changed to the word Flagmen. B. In the first paragraph, lines five (5) and six (6), change the phrase "take all such other precautionary measures" to "take all reasonable necessary measures". D-59 DISPOSAL OF SPOIL/FILL MATERIAL: Prior to the disposing of any spoil/fill material, the Contractor shall advise the Director of Engineering Department, acting as the City of Fort •. Worth's Flood Plain Administrator ("Administrator"), of the location of all sites where the Contractor intends to dispose of such material. Contractor shall not dispose of such material until the proposed sites have been determined by the Administrator to meet the requirements of the Flood Plain Ordinances of the City of Fort Worth (Ordinance No. 10056). All disposal sites must be approved by the Administrator to ensure that filling is not occurring within a ffoodplain without a permit. A ffoodplain permit can be issued upon approval of necessary Engineering studies. No .. fill permit is required if disposal sites are not in a ffoodplain. Approval of the Contractor's disposal sites shall be evidenced by a letter signed by the Administrator stating that the site is not in a known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any expenses associated with obtaining the fill permit, including any necessary Engineering studies, .. shall be at the Contractor's expense. In the event that the Contractor disposes of spoil/fill material at a site without a fill permit or a letter from the administrator approving the disposal site, upon notification by the Director of Engineering Department, Contractor shall remove the spoil/fill material at its expense and dispose of such materials in accordance with the Ordinances of the City and this section. D-60 MECHANICS AND MATERIALMEN'S LIEN: The Contractor shall be required to execute a release of mechanics and materialmen's liens upon receipt of payment. .. D-61 SUBSTITUTIONS: The specifications for materials set out the minimum standard of quality which the City believes necessary to procure a satisfactory project. No substitutions will be permitted until the Contractor has received written permission of the Engineer to make a .. substitution for the material which has been specified. Where the term `or equal", or "or approved equal" is used, it is understood that if a material, product, or piece of equipment bearing the name so used is furnished, it will be approvable, as the particular trade name was used for .. the purpose of establishing a standard of quality acceptable to the City. If a product of any other name is proposed for use, the Engineer's approval thereof must be obtained before the proposed substitute is procured by the Contractor. Where the term "or equal", or"or approved equal" is not used in the specifications, this does not necessarily exclude alternative items or material or equipment which may accomplish the intended purpose. However, the Contractor shall have the full responsibility of proving that the proposed substitution is, in fact, equal, and the Engineer, as the representative of the City, shall be the sole judge of the acceptability of substitutions. The .. provisions of this sub-section as related to "substitutions" shall be applicable to all sections of these specifications. 01n0i01 SC-29 PART D - SPECIAL CONDITIONS D-62 PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER A. GENERAL: Prior to the reconstruction, ALL sections of existing sanitary sewer lines to be abandoned, removed (except where being replaced in the same location), or rehabilitated (pipe enlargement, cured-in-place pipe, fold and form pipe, slip-line, etc.), shall be cleaned, and a television inspection performed to identify any active sewer service taps, other sewer laterals and their location. Work shall consist of furnishing all labor, material, and equipment necessary for the cleaning and inspection of the sewer lines by means of closed circuit television. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. 1. HIGH VELOCITY JET (HYDROCLEANING) EQUIPMENT: The high-velocity sewer line cleaning equipment shall be constructed for easy and safe operation. The equipment .. shall also have a selection of two or more high-velocity nozzles. The nozzles shall be capable of producing a scouring action from 15 to 45 degrees in all size lines designated to be cleaned. Equipment shall also include a high-velocity gun for washing and scouring manhole walls and floor. The gun shall be capable of producing flows from a fine spray to a solid stream. The equipment shall carry its own water tank, auxiliary engines, pumps, and hydraulically driven hose reel. Hydraulically Propelled Equipment shall be of a movable dam type and be constructed in such a way that a portion of the dam may be collapsed at any time during the cleaning operation to protect against flooding of the sewer. The movable dam shall be equal in diameter around the outer periphery to ensure removal of grease. If sewer cleaning balls or other equipment which cannot be collapsed is used, special precautions to prevent flooding of the sewers and public or private property shall be taken. The flow of sewage present in the sewer lines shall be utilized to provide necessary fluid for hydraulic cleaning devices whenever possible. 2. CLEANING PROCEDURES: The designated sewer manholes shall be cleaned using high-velocity jet equipment. The equipment shall be capable of removing dirt, grease, rocks, sand, and other materials and obstructions from the sewer lines and manholes. If cleaning of an entire section cannot be successfully performed from one manhole, the equipment shall be set up on the other manhole and ri - ing agair _.",ampted. If, aga'n, successful cleaning cannot be performed or equipment fails to traverse the entire manhole section, it will be assumed that a major blockage exists, and the cleaning effort shall be abandoned. When additional quantities of water from fire hydrants is necessary to avoid delay in normal working procedures, the water shall be conserved and not used CEO unnecessarily. No fire hydrant shall be obstructed in case of a fire in the area served by the hydrant. Before using any water from the City Water Distribution System, the Contractor shall apply for and receive permission from the Water Department. The Contractor shall be responsible for the water meter and related charges for the setup, including the water usage bill. All expenses shall be considered incidental to cleaning. 3. DEBRIS REMOVAL AND DISPOSAL: All sludge, dirt, sand, rock, grease, and other solid or semisolid material resulting from the cleaning operation shall be removed at the downstream manhole of the section being cleaned. Passing material from manhole section to manhole section, which could cause line stoppages, accumulations of sand in wet wells, or damage pumping equipment, shall not be permitted. F 4. All solids or semisolid resulting from the cleaning operations shall be removed from the site and disposed of at a site designated by the Engineer. All materials shall be removed 01/10/01 SC-30 PART D - SPECIAL CONDITIONS from the site no less often than at the end of each workday and disposed of at no additional cost to the City. 5. UNDER NO CIRCUMSTANCE SHALL SEWAGE OR SOLIDS REMOVED THEREFROM BE DUMPED ONTO STREETS OR INTO DITCHES, CATCH BASINS, STORM DRAINS OR SANITARY SEWER MANHOLES. 6. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the camera shall be suitable to allow a clear picture of the entire periphery of the pipe. The camera shall be operative in 100% humidity conditions. The camera, television monitor, and other components of the video system shall be capable of producing picture quality to the satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection. B. EXECUTION: 1. TELEVISION INSPECTION: The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of any sewer service taps. In no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, TV cable, and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation shall be used to move the camera through the sewer line. When manually operated winches are used to pull the television camera through the line, telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between members of the crew. The importance of accurate distance measurements is emphasized. All television inspection video tapes shall have a footage counter. Measurement for location of sewer service taps shall be above ground by means of meter device. Marking on the cable, or the like, which would require interpolation for depth of manhole, will not be allowed. ^--uracy of t": distar— meter shall be checked by use of a walking meter, roll-a-tape, or other suitable device, and the accuracy shall be satisfactory to the Engineer. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at ., the option of the Contractor. The cost of retrieving the Television camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to Television inspection. 2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of each sewer service taps observed during inspection. In addition, other points of significance such as locations of unusual conditions, roots, storm sewer connections, broken pipe, presence of scale and corrosion, and other discernible features will be recorded, and a copy of such records will be supplied to the City. 3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard-size photographs of the television picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations. 01/10/01 SC-31 PART D - SPECIAL CONDITIONS 4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be replayed. Video tape recording playback shall be at the same speed that it was recorded. The television tapes shall be furnished to the City for review immediately upon completion of the television inspection and may be retained a maximum of 30 calendar days. Equipment shall be provided to the City by the Contractor for review of the tapes. Tapes will be returned to the Contractor upon completion of review by the Engineer. Tapes shall not be erased without the permission of the Engineer. _ If the tapes are of such poor quality that the Engineer is unable to evaluate the condition of the sewer line or to locate service connections, the Contractor shall be required to re- _ televise and provide a good tape of the line at no additional cost to the City. If a good tape cannot be provided of such quality that can be reviewed by the Engineer, no payment for televising this portion shall be made. Also, no payment shall be made for portions of lines not televised or portions where manholes cannot be negotiated with the .. television camera. THE TAPES SHALL BE SUBMITTED TO THE ENGINEER PRIOR TO CONSTRUCTION FOR REVIEW AND DETERMINATION OF SAGS. Upon completion of review of the tapes by the Engineer, the Contractor will be notified as to which sections of the sanitary sewer are to be corrected. Tapes will be returned to the Contractor upon completion of review by the Engineer. All costs associated with this work shall be incidental to unit prices bid for items under �• Television Inspection of the Proposal. C. PAYMENT OF CLEANING AND PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS: The cost for Pre-Construction CleRning and Television Inspection of sanitary sewers shall be per linear foot of sewer actually televised. The Contractor shall provide the Engineer with tapes of a quality that the particular piece of sewer can be readily evaluated as to existing sewer conditions and for providing appropriate means for review of the tapes by the Engineer including collection and removal, transportation and disposal of sand and debris from the sewers to a legal dump site. Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The primary purpose of cleaning is for television inspection and rehabilitation; when a portion of a line is not or cannot be televised or rehabilitated, the cleaning of that portion of line shall be incidental and no payment shall be made. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor, and the costs must be included in the bid price for TV Inspections. The cost of retrieving the TV Camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to TV Inspection. .. The item shall also include all costs of installing and maintaining any bypass pumping required to provide reliable, regular sewer service to the area residents. All bypass pumping .. shall be incidental to the project. 01/10/01 SC-32 '� PART D - SPECIAL CONDITIONS D-63 VACUUM TESTING OF SANITARY SEWER MANHOLES A. GENERAL: This item shall govern the vacuum testing of all newly constructed sanitary sewer manholes. B. EXECUTION: 1. TEST PROCEDURE: Manholes shall be tested with all connections in place. Lift holes shall be plugged, and all drop-connections and gas sealing connections shall be installed .. prior to testing. The sewer lines entering the manhole shall be plugged and braced to prevent the plugs .. from being drawn into the manhole. The plugs shall be installed in the lines beyond the drop-connections, gas sealing connections, etc. The test head shall be placed inside the frame at the top of the manhole and inflated in accordance with the manufacturer's recommendations. A vacuum of ten inches of mercury (10"Hg) shall be drawn and the vacuum pump will be turned off. With the valve closed, the level of vacuum shall be read after the required test time. The required test time shall be determined from the Table I below in accordance with ASTM C1244-93: Table I MINIMUM TIME REQUIRED FOR VACUUM DROP MW OF 1" Hg (10"Hg -9"Hg) (SEC) Depth of MH. 48-Inch Dia. 60-Inch Dia. (FT.) Manhole Manhole 0 to 16' 40 sec. 52 sec. .. 18' 45 sec. 59 sec. 20' 50 sec. 65 sec. _ 22' 55 sec. 72 sec. 24' 59 sec. 78 sec. 26' 64 sec. 85 sec. 28' 69 sec. 91 sec. 30' 74 sec. 98 sec. For Each 5 sec. 6 sec. Additional 2' 2. ACCEPTANCE: The manhole shall be considered acceptable, if the drop in the level of vacuum is less than one-inch of mercury (1" Hg) after the required test time. Any manhole which fails to pass the initial test must be repaired with a suitable material which conforms to the construction material of the manhole. The manhole shall be retested as described above until it has successfully passed the test. Following completion of a successful test, the manhole shall be restored to its nornial condition, all temporary plugs shall be removed, all braces, equipment, and debris shall be removed and disposed of in a manner satisfactory to the Engineer. C. PAYMENT: Payment for vacuum testing of sanitary sewer manholes shall be paid at the contract price per each vacuum test. This price shall include all material, labor, equipment, .. 01/10/01 SC-33 PART D - SPECIAL CONDITIONS and all incidentals, including all bypass pumping, required to complete the test as specified herein. D-64 BYPASS PUMPING: The Contractor shall bypass the sewage around the section or •• sections of sewer to be rehabilitated and/or replaced. The bypass shall be made by plugging existing upstream manhole and pumping the sewage into a downstream manhole or adjacent system or other method as may be approved by the Engineer. The pump and bypass lines shall be of adequate capacity and size to handle the flow without sewage backup occurring to facilities connected to the sewer. Provisions shall be made at driveways and street crossings to permit safe vehicular travel without interrupting flow in the bypass system. Under no circumstances will the Contractor be permitted to discharge sewage into the trenches. Payment shall be incidental to rehabilitation or replacement of the sewer line. D-65 POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER: A. GENERAL: After construction, ALL sections of sanitary sewer lines shall have a television inspection performed. Work shall consist of furnishing all labor, material, and equipment necessary for inspection of the sewer lines by means of closed circuit television. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. B. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the camera shall be operative in 100% humidity conditions. The camera, television monitor, and other components of the video system shall be capable of producing picture quality to the satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no •• payment will be made for an unsatisfactory inspection. C. EXECUTION: .. 1. TELEVISION INSPECTION: The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of any sewer service taps. In no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, TV cable, and powered rewinds or other devices that do not obstruct the camera view or interfere with proper _ documentation shall be used to move the camera through the sewer line. When manually operated winches are used to pull the television camera through the line, telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between members of the crew. The importance of accurate distance measurements is emphasized. All television inspection video tapes shall have a footage counter. Measurement for location of sewer service taps shall be above ground by means of meter device. Marking on the cable, or the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape, or other suitable device, and the accuracy shall be satisfactory to the Engineer. a The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor. The cost or retrieving the Television camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to Television inspection. 01/10/01 SC-34 '" PART D - SPECIAL CONDITIONS Sanitary sewer mains must be laced with enough water to fill all low pints. The television inspection must be done immediately following the lacing of the main with no water flow. If sewer is active, flow must be restricted to provide a clear image of sewer being inspected. 2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of each sewer service tap observed during inspection. All television logs shall be referenced •. to stationing as shown on the plans. A copy of these television logs will be supplied to the City. ., 3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard-size photographs of the television picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations. 4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be replayed. Video tape .. recording playback shall be at the same speed that it was recorded. The television tapes shall be furnished to the City for review immediately upon completion of the television inspection and may be retained a maximum of 30 calendar days. Equipment shall be provided to the City by the Contractor for review of the tapes. Tapes will be returned to the Contractor upon completion of review by the Engineer. Tapes shall not be erased without the permission of the Engineer. If the tapes are of such poor quality that the Engineer is unable to evaluate the condition of the sewer line or to locate service connections, the Contractor shall be required to re- televise and provide a good tape of the line at no additional cost to the City. If a good tape cannot be provided of such quality that can be reviewed by the Engineer, no payment for televising this portion shall be made. Als.., no payment shall be made for .. portions of lines not televised or portions where manholes cannot be negotiated with the television camera. D. PAYMENT OF POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS: The cost for post-construction Television Inspection of sanitary sewers shall be per linear foot of sewer televised. The Contractor shall provide the Engineer with tapes of a _ quality that the particular piece of sewer can be readily evaluated as to sewer conditions and for providing appropriate means for review of the tapes by the Engineer. Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The quantity of TV inspection shall be measured as the total length of new pipe installed. All costs associated with this work shall be included in the appropriate bid item - Post-Construction Television Inspection. The item shall also include all costs of installing and maintaining any bypass pumping required to provide reliable, regular sewer service to the area residents. All bypass pumping shall be incidental to the project. D-66 SAMPLES AND QUALITY CONTROL TESTING: A. The Contractor shall furnish, at its own expense, certifications by a private laboratory for all materials proposed to be used on the project, including a mix design for any asphaltic and/or 01/10/01 SC-35 .. PART D - SPECIAL CONDITIONS Portland cement concrete to be used, and gradation analysis for sand and crushed stone to sm be used along with the name of the pit from which the material was taken. The contractor shall provide manufacturer's certifications for all manufactured items to be used in the project and will bear any expense related thereto. B. Tests of the design concrete mix shall be made by the contractor's laboratory at least nine days prior to the placing of concrete using the same aggregate, cement, and mortar which are to be used later in the concrete. The Contractor shall provide a certified copy of the test results to the City. C. Quality control testing of in-place material on this project will be performed by the city at its own expense. Any retesting required as a result of failure of the material to meet project specifications will be at the expense of the contractor and will be billed at commercial rates as determined by the City. The failure of the City to make any tests of materials shall in no way relieve the contractor of its responsibility to furnish materials and equipment conforming to the requirements of the contract. D. Not less than 24 hours notice shall be provided to the City by the Contractor for operations requiring testing. The Contractor shall provide access and trench safety system (if required) for the site to be tested, and any work effort involved is deemed to be included in the unit price for the item being tested. E. The Contractor shall provide a copy of the trip ticket for each load of fill material delivered to the job site. The ticket shall specify the name of the pit supplying the fill material. D-67 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL: A. DESCRIPTION: This item shall consist of temporary soil erosion sediment and water pollution control measures deemed necessary by the Engineer for the duration of the — contract. These control measures shall at no time be used as a substitute for the permanent control measures unless otherwise directed by the Engineer and they shall not include measures taken by the CONTRACTOR to control conditions created by his construction Mr--bons. Th- 'ampo-1 measures shall include dikes, dams, berms, sediment basins, fiber mats, jute netting, temporary seeding, straw mu;„,,, asphalt muici., plastic liners, rubble liners, baled-hay retards, dikes, slope drains and other devices. .� B. CONSTRUCTION REQUIREMENTS: The Engineer has the authority to define erodible earth and the authority to limit the surface area of erodible-earth material exposed by preparing right-of-way, clearing and grubbing, the surface area of erodible-earth material exposed by excavation, borrow and to direct the CONTRACTOR to provide temporary pollution-control measures to prevent contamination of adjacent streams, other water courses, lakes, ponds or _ other areas of water impoundment. Such work may involve the construction of temporary berms, dikes, dams, sediment basins, slope drains and use of temporary mulches, mats, seeding, or other control devices or methods directed by the Engineer as necessary to control soil erosion. Temporary pollution-control measures shall be used to prevent or correct erosion that may develop during construction prior to installation of permanent pollution control features, but are not associated with permanent control features on the project. The Engineer will limit the area of preparing right-of-way, clearing and grubbing, excavation and borrow to be proportional to the CONTRACTOR'S capability and progress in keeping the finish grading, mulching, seeding, and other such permanent pollution-control measures current in accordance with the accepted schedule. Should seasonal conditions make such limitations unrealistic, temporary soil-erosion-control measures shall be performed as directed by the Engineer. 01/10/01 SC-36 PART D - SPECIAL CONDITIONS 1. Waste or disposal areas and construction roads shall be located and constructed in a manner that will minimize the amount of sediment entering streams. 2. When work areas or material sources are located in or adjacent to live streams, such areas shall be separated from the stream by a dike or other barrier to keep sediment from entering a flowing stream. Care shall be taken during the construction and removal of such barriers to minimize the muddying of a stream. .. 3. All waterways shall be cleared as soon as practicable of false work, piling, debris or other obstructions placed during construction operations that are not a part of the finished work. •• 4. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes and reservoirs with fuels, oils, bitumens, calcium chloride or other harmful materials. He shall conduct and schedule his operations so as to avoid or minimize siltation of streams, lakes .. and reservoirs and to avoid interference with movement of migratory fish. C. MEASUREMENT AND PAYMENT: All work, materials and equipment necessary to provide temporary erosion control shall be considered subsidiary to the contract and no extra pay will be given for this work. _ D-68 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES: The Contractor shall provide ingress and egress to the property being crossed by this construction and adjacent property when construction is not in progress and at night. Drives shall be left accessible at night, on weekends, and during holidays. The Contractor shall conduct his activities to minimize .. obstruction of access to drives and property during the progress of construction. Notification shall be made to an owner prior to his driveway being removed and/or rebuilt. D-69 PROTECTION OF TREES, PLANTS AND SOIL: All property along and adjacent to the Contractors' operations including lawns, yards, shrubs, trees, etc., shall be preserved or restored after completion of the work, to a condition equal to or better than existed prior to start of work. Any trees or other landscape features scarred or damaged by the Contractor's operations shall be restored or replaced at the Contractor's expense. Trimming or pruning to facilitate the work wil, oe permitted only by experienced workmen in an approved manner (No trimming or pruning without the property owners' consent). Pruned limbs of 1" diameter or larger shall be thoroughly treated as soon as possible with a tree wound dressing. D-70 SITE RESTORATION: The contractor shall be responsible for restoring the site to original grade and condition after completion of his operations subject to approval of the Engineer. The basis for approval by the Engineer will be grade restoration to plus minus one- tenth (0.1) of a foot. D-71 CITY OF FORT WORTH STANDARD PRODUCT LIST: Proposed products submitted in the bid documents must appear in the latest"City of Fort Worth Standard Product List, for the bid _ to be considered responsive. Products and processes listed in the "City of Fort Worth Standard Product List, shall be considered to meet City of Fort Worth minimum technical requirements. D-72 STATE REVOLVING FUND (SRF) REQUIREMENTS: This project, in addition to standard City of Fort Worth requirements, may involve certain State requirements. These requirements, if applicable, are provided in the following documents and should thoroughly be reviewed and completed by the contractor. They include: 1. At the Time of Contract Document Execution 01/10/01 SC-37 PART D - SPECIAL CONDITIONS • ED-103-Contractors Act of Assurance • ED-104-Resolution Work required to conform to these requirements shall be considered subsidiary and no extra payment will be made. The SRF requirements are included in Appendix A. — D-73 TOPSOIL, SODDING, SEEDING & HYDROMULCHING: This item shall be performed in accordance with the City of Fort Worth Parks and Community Services Department Specifications for Topsoil, Sodding and Seeding. 1. TOPSOIL _ DESCRIPTION: This item will consist of furnishing and placing a minimum of six (6) inches of topsoil, free from rock and foreign material, in all parkways and medians to the lines and _ grades as established by the Engineer. CONSTRUCTION METHODS: Topsoil will be secured from borrow sources as required to _ supplement material secured from street excavation. All excavated materials from streets which is suitable for topsoil will be used in the parkways and medians before any topsoil is obtained from a borrow source. Topsoil material secured from street excavation shall be stockpiled at locations approved by the Engineer, and at completion of grading and paving operations, topsoil shall be placed on parkway areas so as to provide a minimum six (6) inches of compacted depth of topsoil parkways. 2. SODDING DESCRIPTION: Sodding will consist of furnishing and planting Bermuda, Buffalo or St. .. Augustine grass in the areas between the curbs and walks, on terraces, in median strips, on embankments or cut slopes, or in such areas as designated on the Drawings and in accordance with the requirements of this Specification. Recommended Buffalo grass varieties for sodding are Prairie and 609. MATERIALS: Sod shall consist of live and growing Bermuda, Buffalo or St. Augustine grass _ secured from sources where the soil is fertile. Sod to be placed during the dormant state of these grasses shall be alive and acceptable. Bermuda and Buffalo grass sod shall have a healthy, virile root system of dense, thickly matted roots throughout a two (2) inch minimum _ thickness of native soil attached to the roots. St. Augustine grass sod shall have a healthy, virile root system of dense, thickly matted roots throughout a one (1) inch minimum thickness of native soil attached to the roots. The sod shall be free from obnoxious weeds or other grasses and shall not contain any matter deleterious to its growth or which might affect its subsistence or hardiness when transplanted. Sod to be placed between curb and walk and on terraces shall be the same type grass as adjacent grass or existing lawn. MCare shall be taken at all times to retain native soil on the roots of the sod during the process of excavating, hauling, and planting. Sod material shall be kept moist from the time it is dug until planted. When so directed by the Engineer, the sod existing at the source shall be watered to the extent required prior to excavating. Sod material shall be planted within three days after it is excavated. 01/10/01 SC-38 PART D - SPECIAL CONDITIONS .. CONSTRUCTION METHODS: After the designated areas have been completed to the lines, grades, and cross-sections shown on the Drawings and as provided for in other items of the contract, sodding of the type specified shall be performed in accordance with the requirements hereinafter described. Sodding shall be either "spot" or "block"; either Bermuda, Buffalo or St. Augustine grass. a. Spot Sodding Furrows parallel to the curb line or sidewalk lines, twelve (12) inches on centers or to the �• dimensions shown on the Drawings, shall be opened on areas to be sodded. In all furrows, sod approximately three (3) inches square shall be placed on twelve (12) inch centers at proper depth so that the top of the sod shall not be more than one-half (1/2) .. inch below the finished grade, Holes of equivalent depth and spacing may be used instead of furrows. The soil shall be firm around each block and then the entire sodded area shall be carefully rolled with a heavy, hand roller developing fifteen (15) to twenty-five (25) pounds per square inch compression. Hand tamping may be required on terraces. b. Block Sodding. At locations on the Drawings or where directed, sod blocks shall be carefully placed on the prepared areas. The sod shall be so placed that the entire designated area shall be covered, and any voids left in the block sodding shall be filled with additional sod and tamped. The entire sodded area shall be rolled and tamped to form a thoroughly compact solid mass. Surfaces of block sod, which, in the opinion of the Engineer, may slide due to the height or slope of the surface or nature of the soil, shall,. upon direction of the Engineer, be pegged with wooden pegs driven through the sod block to the firm earth, sufficiently close to hold the block sod firmly in place. When necessary, the sodded areas shall be smoothed after planting has been completed and shaped to conform to the cross-section previously provided and existing at the time sodding operations were begun. Any excess dirt from planting operations shall be spread uniformly over the adjacent areas or disposed of as directed by the Engineer so that the completed surface will present a sightly appearance. The sodded areas shall be thoroughly watered immediately after they are planted and shall be subsequently watered at such times and in a manner and quantity directed by the Engineer until completion and final acceptance of the project by the City of Fort Worth. 3. SEEDING DESCRIPTION: "Seeding" will consist of preparing ground, providing and planting seed or a .. mixture of seed of the kind specified along and across such areas as may be designated on the Drawings and in accordance with these Specifications. MATERIALS: a. General. All seed used must carry a Texas Testing Seed label showing purity and germination, name, type of seed, and that the seed meets all requirements of the Texas Seed Law. Seed furnished shall be of the previous season's crop and the date of analysis shown on each tag shall be within nine (9) months of time of delivery to the project. Each variety of seed shall be furnished and delivered in separate bags or containers. A sample of each variety of seed shall be furnished for analysis and testing when directed by the Engineer. 01/10/01 SC-39 — PART D - SPECIAL CONDITIONS The specified seed shall equal or exceed the following percentages of Purity and germination: Common Name Purity Germination Common Bermuda Grass 95% 90% Annual Rye Grass 95% 95% — Tall Fescue 95% 90% Western Wheatgrass 95% 90% Buffalo Grass Varieties -• Top Gun 95% 90% Cody 95% 90% Table 120.2.(2)a. URBAN AREA WARM-SEASON SEEDING RATE (lbs.); Pure Live Seed (PLS) Mixture for Clay or Tight Soils Mixture for Sandy Soils Dates (Eastern Sections) (Western Sections) (All Sections) Feb 1 Bermudagrass 40 Buffalograss 80 Bermudagrass 60 to Buffalograss 60 Bermudagrass 20 Buffalograss 40 May 1 Total: 100 Total: 100 Total: 100 — Table, 120.2.(2)b TEMPORARY COOL-SEASON SEEDING RATE; (lb.) Pure Live Seed (PLS) Dates (All Sections) Aug 15 Tall Fescue 50 to Western Wheatgrass 50 May 1 Annual Rye 50 Total: 100 — CONSTRUCTION METHODS: After the designated areas have been completed to the lines, grades, and cross-sections shown on the Drawings and as provided for in other items of this Contract, seeding of the type specified shall be performed in accordance with the .� requirements hereinafter described. a. Watering. Seeded areas shall be watered as directed by the Engineer so as to prevent _ washing of the slopes or dislodgment of the seed. b. Finishing. Where applicable, the shoulders, slopes, and ditches shall be smoothed after seed bed preparation has been completed and shaped to conform to the cross-section previously provided and existing at the time planting operations were begun. BROADCAST SEEDING: The seed or seed mixture in the quantity specified shall be uniformly distributed over the areas shown on the Drawings and where directed. If the sowing of seed is by hand, rather than by mechanical methods, the seed shall be sown in two directions at right angles to each other. Seed and fertilizer shall be distributed at the same time provided the specified uniform rate of application for both is obtained. "Finishing" as f specified in Section D-46, Construction Methods, is not applicable since no seed bed preparation is required. 01/10/01 SC-40 PART D - SPECIAL CONDITIONS DISCED SEEDING: Soil over the area shown on the Drawings as directed to be seeded shall be loosened to a minimum depth of three (3) inches and all particles in the seed bed shall be reduced to less than one (1) inch in diameter or they shall be removed. The area shall then be finished to line and grade as specified under "Finishing" in Section D-46, Construction Methods. - The seed, or seed mixture, specified shall then be planted at the rate required and the application shall be made uniformly. If the sowing of seed is by hand rather than by mechanical methods, seed shall be raked or harrowed into the soil to a depth of approximately one-eight (1/8) inch. The planted area shall be rolled with a corrugated roller of the "Cultipacker" type. All rolling of the slope areas shall be on the contour. ASPHALT MULCH SEEDING: The soil over the area shown on the Drawings, or as directed to be seeded, shall be loosened to the minimum depth of three (3) inches and all particles in the seed bed shall be reduced to less than one (1) inch in diameter, or they shall be removed. The area shall then be finished to line and grade as specified under "Finishing" in Section D- 46, Construction Methods. _ Water shall then be applied to the cultivated area of the seed bed until a minimum depth of six (6) inches is thoroughly moistened. After the watering, when the ground has become sufficiently dry to be loose and pliable, the seed, or seed mixture specified, shall then be planted at the rate required and the application shall be made uniformly. If the sowing of seed is by hand, rather than mechanical methods, the seed shall be sown in two directions at right angles to each other. Seed and fertilizer may be distributed at the same time, provided the specified uniform rate of application for both is obtained. After planting, the seed shall be raked or harrowed into the soil to a depth of approximately one-quarter (1/4) inch. The planted surface area and giving a smooth surface without ruts or tracks. In between the time compacting is completed and the asphalt is applied, the planted area shall be watered sufficiently to assure uniform moisture from the surface to a minimum of six (6) inches in depth. The application of asphalt shall follow the last watering as rapidly as possible. Asphalt shall be of the type and grade as shown on the Drawings and shall conform to the requirements of the item 300, "Asphalts, Oils and Emulsions". If the type yr asphalt to be used is not shown on the Drawings, or if Drawings are not included, then MS-2 shall be used. Applications of the asphalt shall be at a rate of three-tenths (0.3) gallons per square yard. It shall be applied to the area in such a manner so that a complete film is obtained and the finished surface shall be comparatively smooth. RE-SEEDING OF AREAS PLANTED WITH COOL SEASONS SPECIES: Areas where temporary cool season species have been planted may be replanted beginning February 1 with warm season species as listed in Table 120.2(2)a. The re-seeding will be achieved in the following manner. The cool season species shall be mowed down to a height of one (1) inch to insure that slit-seeding equipment will be able to cut through the turf and achieve adequate soil penetration. * Slit-seeding, is achieved through the use of an implement which cuts a furrow (slit) in the soil and places the seed in the slit which is then pressed close with a cultipacker wheel. 4. HYDROMULCH SEEDING: If hydromulch seeding is provided, seed mix shall have 95% purity of Bermuda Grass and have a germination rate of 90%. Contractor shall ensure that the grass establishes. 01/10/01 SC-41 PART D - SPECIAL CONDITIONS 5. CONSTRUCTION WITHIN PARK AREAS TURF RESTORATION OF PARK AREAS: FERTILIZER DESCRIPTION: "Fertilizer" will consist of providing and distributing fertilizer over such areas as are designated on the Drawings and in accordance with these Specifications. MATERIALS: All fertilizer used shall be delivered in bags or containers clearly labeled showing the analysis. The fertilizer is subject to testing by the City of Fort Worth in accordance with the Texas Fertilizer Law. A pelleted or granulated fertilizer shall be used with an analysis of 16-20-0 or 16-5-8 or having the analysis shown on the Drawings. The figures in the analysis represent the percent of nitrogen, phosphoric acid, and potash nutrients _ respectively as determined by the methods of the Association of Official Agricultural Chemists. In the event it is necessary to substitute a fertilizer of a different analysis, it shall be a pelleted or granulated fertilizer with a lower concentration. Total amount of nutrients furnished and applied per acre shall equal or exceed that specified for each nutrient. CONSTRUCTION METHODS: When an item for fertilizer is included in the Drawings and proposal, pelleted or granulated fertilizer shall be applied uniformly over the area specified to be fertilized and in the manner directed for the particular item of work. Fertilizer shall be dry and in good physical condition. Fertilizer that is powdered to caked will be rejected. Distribution of fertilizer as a particular item of work shall meet the approval of the Engineer. Unless otherwise indicated on the Drawings, fertilizer shall be applied uniformly at the average rate of three hundred (300) pounds per acre for all types of "Sodding" and four hundred (400) pounds per acre for all types of "Seeding". MEASUREMENT: Topsoil secured from borrow sources will be measured by the square yard in place on the project site. Measurement will be made only on topsoils secured from borrow sources. Acceptable material for "Seeding" will be measured by the linear foot, complete in place. Acceptable material for "Sodding" will be measured by the linear foot, complete in place. Acceptable material for "Fertilizer" shall be subsidiary to the price of sodding or seeding. PAYMENT: All work performed as ordered and measured as provided under "Measurement" p shall be paid for at the unit price bid for each item of work. Its price shall be full compensation for excavating (except as noted below), loading, hauling, placing and furnishing F all labor, equipment, tools, supplies, and incidentals necessary to complete work. All labor, equipment, tools and incidentals necessary to supply, transport, stockpile and place topsoil or salvage topsoil as specified shall be included in "Seeding" or "Sodding" bid items and will not be paid for directly. "Spot sodding" or "block sodding" as the case may be, will be paid for at the contract unit price per square yard, complete in place, as provided in the proposal and contract. The contract unit price shall be the total compensation for furnishing and placing all sod; for all rolling and tamping; for all watering; for disposal of all surplus materials; and for all materials, 01/10/01 SC-42 PART D - SPECIAL CONDITIONS labor, equipment, tools and incidentals necessary to complete the work, all in accordance with the Drawings and these Specifications. .. The work performed and materials furnished and measured as provided under "Measurement" shall be paid for at the unit price for "Seeding", or "Sodding", of the type specified, as the case may be, which price shall each be full compensation for furnishing all materials and for performing all operations necessary to complete the work accepted as follows: Fertilizer material and application will not be measured or paid for directly, but is considered subsidiary to Sodding and Seeding. D-74 CONFINED SPACE ENTRY PROGRAM: It shall be the responsibility of the contractor to implement and maintain a variable "CONFINED SPACE ENTRY PROGRAM" which must meet OSHA requirements for all its employees and subcontractors at all times during construction. All active sewer manholes, regardless of depth, are defined by OSHA as "permit required confined spaces". Contractors shall submit an acceptable "CONFINED SPACE ENTRY PROGRAM" for all applicable manholes and maintain an active file for these manholes. The cost of complying with this program shall be subsidiary to the pay items involving work in confined spaces. D-75 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION: 1. Prior to the final inspection being conducted for the project, the contractor shall contact the city inspector in writing when the entire project or a designated portion of the project is substantially complete. 2. The inspector along with appropriate City staff and the City's consultant shall make an inspection of the substantially completed work and prepare and submit to the contractor a list of items needing to be completed or corrected. 3. The contractor shall take immediate steps to rectify tha listed d^ficiencies and notify the owner in writing when all the items have been completed or corrected. 4. Payment for substantial completion inspection as well as final inspection shall be subsidiary to the project price. Contractor shall still be required to address all other deficiencies which are discovered at the time of final inspection. 5. Final inspection shall be in conformance with general condition item "C5-5.18 Final Inspection" of PART C - GENERAL CONDITIONS. D-76 EXCAVATION NEAR TREES: 1. The Contractor shall be responsible for taking measures to minimize damage to tree limbs, tree trunks, and tree roots at each work site. All such measures shall be considered as incidental work included in the Contract Unit Price bid for applicable pipe or structure installation except for short tunneling/tree augering. 2. Any and all trees located within the equipment operating area at each work site shall, at the direction of the Engineer, be protected by erecting a "snow fence" along the drip line or edge of the tree root system between tree and the construction area. 01/10/01 SC-43 PART D - SPECIAL CONDITIONS 3. Contractor shall inspect each work site in advance and arrange to have any tree limbs pruned that might be damaged by equipment operations. The Engineer shall be notified at least 24 hours prior to any tree trimming work. No trimming work will be permitted within private property without written permission of the Owner. 4. Nothing shall be stored over the tree root system within the drip line area of any tree. 5. Before excavation (off the roadway) within the drip line area of any tree, the earth shall be sawcut for a minimum depth of 2 feet. 6. At designated locations shown on the drawings, the "short tunnel" method using Class 51 D.I. pipe shall be utilized. 7. Except in areas where clearing is allowed, all trees up to 8" in diameter damaged during construction shall be removed and replaced with the same type and diameter tree at the contractor's expense. 8. Contractor shall employ a qualified landscaper for all the work required for tree care to ensure utilization of the best agricultural practices and procedures. 9. Short tunneling shall consist of power augering or hand excavation. The tunnel diameter shall not be larger than 1-1/2 times the outside pipe diameter. Voids remaining after pipe installation shall be pressure grouted. D-77 CONCRETE ENCASEMENT OF SEWER PIPE: Concrete encasement of sewers shall be paid for at the Contract Unit Price per linear foot of concrete encasement as measured in place -• along the centerline of the pipe for each pipe diameter indicated. The Contract Unit Price shall include all costs associated with installation and reinforcement of the concrete encasement. D-78 CLAY DAM: Clay dam construction shall be performed in accordance with the Wastewater Clay Dam Construction, figure in the Drawings in these Specifications, at locations indicated on the Drawings or as directed by the City. Clay dams shall be keyed into undisturbed soil to ---%e an impe:-,-.-+s b---;er to reduce groundwater percolation throlinh the pipeline trench. Construction material shall consist of compacted bentonize clay or 2:27 concrete. Payment for work such as forming, placing and finishing shall be subsidiary to the price bid for pipe .. installation. D-79 EXPLORATORY EXCAVATION (D-HOLE): The Contractor shall be responsible for verifying the locations of all existing utilities prior to construction, in accordance with item D-22. At locations identified on the drawings, contractor shall conduct an exploratory excavation (D- Hole), to locate and verify the location and elevation of the existing underground utility where it may be in potential conflict with a proposed facility alignment. The exploratory excavation shall be conducted prior to construction of the entire project only at locations denoted on the plans or as directed by the engineer. Contractor shall submit a report of findings (including surveyed elevations of existing conflicting utilities) to the City prior to the start of construction of the entire project. If the contractor determines an existing utility is in conflict with the proposed facility, the contractor shall contact the engineer immediately for appropriate design modifications. The contractor shall make the necessary repairs at the exploratory excavation (D-Hole) to obtain a safe and proper driving surface to ensure the safety of the general public and to meet the approval of the City inspector. The contractor shall be liable for any and all damages incurred Le due to the exploratory excavation (D-Hole). f 01/10/01 SC-44 PART D - SPECIAL CONDITIONS Payment shall not be made for verification of existing utilities per item D-22. Payment for exploratory excavation (D-Hole), at locations identified on the plans or as directed by the .. Engineer, shall include full compensation for all materials, excavation, surface restoration, field surveys, and all incidentals necessary to complete the work, shall be the unit price bid. No payment shall be made for exploratory excavation(s) conducted after construction has begun. D-80 INSTALLATION OF WATER FACILITIES 80.1 Polyvinyl Chloride (PVC) Water Pipe: POLYVINYL Chloride Plastic Water Pipe and fittings on this Project shall be in accordance with the material standard contained in the General Contract Documents. Payment for work such as backfill, bedding, blocking, detectable tapes and all other associated appurtenant required, shall be included in the linear foot price bid of the appropriate BID ITEM(S). 80.2 Blocking: Concrete blocking on this Project will necessarily be required as shown on the Plans and shall be installed in accordance with the General Contract Documents. All valves shall have concrete blocking provided for supporting. No separate payment will be made for any of the work involved for the item and all costs incurred will be considered to be included in the linear foot bid price of the pipe or the bid price of the valve. ., 80.3 Type of Casing Pipe: 1. WATER: The casing pipe for open cut and bored or tunneled section shall be AWWA C-200 Fabricated Electrically Welded Steel Water Pipe, and shall conform to the provisions of E1-15, E1-5 and E1-9 in Material Specifications of General Contract Documents and Specifications for Water Department Projects. The steel casing pipe shall be supplied as .. follows: For the inside and outside of casing pipe, coal-tar protective coating in accordance with the requirements of Sec. 2.2 and related sections in AW WA C-203. Touch-up after field welds shall provide coating equal to those specified above. C. Minimum thicki less for casing pipe used shall be 0.375 inch. Stainless Steel Casing Spacers (centering style) such as manufactured by Cascade Waterworks Manufacturing Company or an approved equal shall be used on all non- concrete pipes when installed in casing. Installation shall be as recommended by the manufacturer. .. 2. SEWER: Boring used on this project shall be in accordance with the material standard E1-15 and Construction standard E2-15 as per Fig. 110 of the General Contract Documents. 3. PAYMENT: Payment for all materials, labor, equipment, excavation, concrete grout, backfill, and .. incidental work shall be included in the unit price bid per foot. 80.4 Tie-Ins: The Contractor shall be responsible for making tie-ins to the existing water mains. It shall be the responsibility of the Contractor to verify the exact location and elevation of the existing line tie-ins. And any differences in locations and elevation of existing line tie-ins between the contract drawings and what may be encountered in the 01/i0/01 SC-45 PART D - SPECIAL CONDITIONS _ field shall be considered as incidental to construction. The cost of making tie-ins to existing water or sanitary sewer mains shall be included in the linear foot bid price of the pipe. �- 80.5 Connection of Existing Mains: The Contractor shall determine the exact location, elevation, configuration and angulation of existing water or sanitary sewer lines prior to manufacturing of the connecting piece. Any differences in locations, elevation, configuration, and or angulation of existing lines between the contract drawings and what may be encountered in the said work shall be considered as incidental to construction. Where it is required to shut down existing mains in order to make proposed connections, such down time shall be coordinated with the Engineer, and all efforts shall be made to keep this down time to a minimum. In case of shutting down an existing main, the Contractor shall notify the Manager, Construction Services, Phone 871-7813, at least 48- .. hours prior to the required shut down time. The Contractor's attention is directed to Paragraph C5-5.15 INTERRUPTION OF SERVICE, Page C5-5(5), PART C - GENERAL CONDITIONS OF THE WATER DEPARTMENT GENERAL CONTRACT DOCUMENTS AND GENERAL SPECIFICATIONS. The Contractor shall notify the customer both personally and in writing as to the location, time, and schedule of the service interruption. The cost of removing any existing concrete blocking shall be included in the cost of .. connection. Unless bid separately all cost incurred shall be included in the linear foot price bid for the appropriate pipe size. 80.6 Valve Cut-Ins: It may be necessary to cut-in gate valves to isolate the water main from which the extension and/or replacement is to be connected. This may require closing valves in other lines and putting consumers out of service for that period of time .. necessary to cut in the new valve; the work must be expedited to the utmost and all such cut-ins must be coordinated with the engineer in charge of inspection. All consumers shall be individually advised prior to the shut out and advised of the approximate length of time they may be without service. Payment for work such as backfill, bedding, fittings, blocking and all other associated _ appurtenants required, shall be included in the price of the appropriate bid items. 80.7 Water Services: The relocation, replacement or reconne-+inn of water services will be required as shown on the plans, and/or as aescribed in these Special Contract .. Documents in addition to those located in the field and identified by the Engineer. All service's shall be constructed by the contractor utilizing approved factory manufactured tap saddles (when required) and corporation stops, type K copper water tubing, curb stops with lock wings, meter boxes, and if required approved manufactured service branches. All materials used shall be as specified in the Material Standards (E1- 17 & E1-18) contained in the General Contract Documents. All water services to be replaced shall be installed at a minimum depth of 36 inches �- below final grade. All existing 3/4-inch water service fines which are to be replaced shall be replaced with 1- .. inch Type K copper, 1-inch diameter tap saddle when required, and 1-inch corporation from the main line to the meter box. All services which are to be replaced or relocated shall be installed with the service main tap and service line being in line with the service meter unless otherwise directed by the Engineer. .. 01n0/01 SC-46 F - PART D - SPECIAL CONDITIONS A minimum of 24 hours advance notice shall be given when service interruption will be - required as specified in Section C5-5.15 INTERRUPTION OF SERVICE. All water service meters shall be removed, tagged, and collected by the contractor for pickup by the Water Department for reconditioning or replacement. After installation of the water service in the proposed location and receipt of a meter from the project inspector the contractor shall install the meter. The meter box shall be reset as necessary to be flush with existing ground or as otherwise directed by the Engineer. All such work on the outlet side of the service meter shall be performed by a licensed plumber. 1. WATER SERVICE REPLACEMENTS: Water service replacement or relocation is •. required when the existing service is lead or is too shallow to avoid breakage during street reconstruction. The contractor shall replace the existing service line with Type K copper from the main to the meter, curb stop with lock wings, and corporation stop. Payment for all work and materials such as backfill, fittings, type K copper tubing, curb stop with lock wings, service line adjustment, and any relocation of up to 12-inches from center line existing meter location to center line proposed meter location shall be included in the Linear Foot price bid for Copper Service Line from Main to five (5) feet behind Meter. Any vertical adjustment of customer service line within the 5 foot area shall be subsidiary to the service installation. Payment for all work and materials such as tap saddle (if required), corporation stops, and - fittings shall be included in the price bid for Service Taps to Main. 2. WATER SERVICE RECONNECTION: Water service reconnection is required when the existing service is copper and at adequate depth to avoid breakage during street reconstruction. The contractor shall adjust the existing water service line as required for reconnection and furnish a new tap with corporation stop. The contractor will be paid for one (1) Service Tap to Main for each service reconnected plus for any copper service line used in excess of five (5) feet from Main to five (5) feet behind the Meter. 3. WATER SERVICE METER AND METER BOX RELOCATIONS: When the replacement .. and relocation of a water service and meter box is required and the location of the meter and meter box is moved more than twelve (12) inches, as measured from the center line of the existing meter to location to the center line of the proposed meter location, separate ., payment will be allowed for the relocation of service meter and meter box. Centerline is defined by a line extended from the service tap through the meter. Only relocations made perpendicular to this centerline will be paid for separately. Relocations made along the centerline will be paid of in feet of copper service line. When relocation of service meter and meter box is required, payment for all work and materials such as backfill, fittings, five (5) feet of type K copper service and all materials, labor, and equipment used by and for the licensed plumber shall be included in the price bid for the service meter relocation. All other costs will be included in other appropriate bid item(s). This item will also be used to pay for all service meter and meter box relocations as required by the Engineer when the service line is not being replaced. Adjustment of only — the meter box and customer service line within 5 feet distance behind the meter will not justify separate payment at any time. Locations with multiple service branches will be paid for as one service meter and meter box relocation. 01/10/01 SC-47 PART D - SPECIAL CONDITIONS 4. NEW SERVICE: When new services are required the contractor shall install tap saddle (when required), corporation stop, type K copper service line, curb stop with lock wings, _ and meter box. Payment for all work and materials such as backfill, fittings, type K copper tubing, and curb stop with lock wings shall be included in the Linear Foot price bid for Service Line — from Main to Meter five (5) feet behind the meter. Payment for all work and materials such as tap saddle, corporation stops, and fittings shall be included in the price bid for Service Taps to Mains. Payment for all work and materials such as furnishing and setting new meter box shall be �- included in the price bid for furnish and set meter box. 5. MULTIPLE SERVICE BRANCHES: When multiple service branches are required the — contractor shall furnish approved factory manufactured branches. Payment for multiple service branches will include furnishing and installing the multiple .. service branch only and all other cost will be included in other appropriate bid item(s). 6. MULTIPLE STREET SERVICE LINES TO SINGLE SERVICE METER: Any multiple _ service lines with taps servicing a single service meter encountered during construction shall be replaced with one service line that is applicable for the size of the existing service meter and approved by the Engineer. — Payment shall be made at the unit bid price in the appropriate bid item(s). 80.8 2-Inch Temporary Service Line: The 2-inch temporary service main and 3/4-inch — service lines shall be installed to provide temporary water servicr to all buildings that will necessarily be required to have severed water service during said work. The contractor shall be responsible for coordinating the schedule of the temporary service connections and permanent service reconnections with the building owners and the Engineer in order that the work be performed in an expeditious manner. Severed water service must be reconnected within 2 hours of discontinuance of service. — A 2-inch tapping saddle and 2-inch corporation stop or 2-inch gate valve with an appropriate fire hydrant adapter fitting shall be required at the temporary service point of .. connection to the City water supply. The 2-inch temporary service main and 3/4-inch service lines shall be installed in accordance to the attached figures 1, 2 and 3. 2" temporary service line shall be cleaned and sterilized by using chlorine gas or chlorinated — lime (HTH) prior to installation. A two-inch meter will be furnished by the Water Department Meter Shop and installed by _ the Contractor at its point of connection to the City water supply for record keeping purposes only. The out-of-service meters shall be removed, tagged and collected by the Contractor for delivery to the Water Department Meter Shop for reconditioning or replacement. Upon restoring permanent service, the Contractor shall re-install the meters at the correct location. The meter box shall be reset as necessary to be flush with the existing ground or as otherwise directed by the Engineer. The temporary service layout shall have a minimum available flow rate of 5 GPM at a dynamic pressure of 35 PSI per service tap. This criteria shall be used by the Contractor 01/10/01 SC-48 PART D - SPECIAL CONDITIONS to determine the length of temporary service allowed, number of service taps and number of feed points. When the temporary service is required for more than one location the 2-inch temporary service pipes, 3/4-inch service lines and the 2-inch meter shall be moved to the next successive project location. Payment for work such as fittings, 3/4-inch service lines, asphalt, barricades, all service connections, removal of temporary services and all other associated appurtenants required, shall be included in the appropriate bid item. 80.9 Adjust Manholes, and Vaults (Utility Cut): Contractor will be responsible for .. adjusting water valve boxes, manholes and vaults to match new pavement grade. The unit price bid will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. 80.10 Adjust Water Valve Boxes: Contractor will be responsible for adjusting water valve boxes to match new pavement grade. The water valves themselves will be .. adjusted, if necessary, by City of Fort Worth Water Department forces. Prior to the beginning of work, the Contractor shall make an inventory of the condition of existing water valve boxes. The Construction Engineer will field verify this inventory and provide the Contractor replacements for broken valve boxes. The contractor shall replace the valve boxes which are damaged during construction at no cost to the City. The unit price bid per each will be full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. 80.11 Purging and Sterilization of Water Lines: Before being placed into service all newly constructed water lines shall be purged and s`3rilized in accordance with E2-24 of the General Contract Documents and Specifications except as modified herein. The Contractor will furnish all water for INITIAL cleaning and sterilization of water lines. All materials for construction of the project, including approc,;^*ely sized cleaning pigs", chlorine gas or chlorinated lime (HTH) shall be furnished by the Contractor. Chlorinated lime (HTH) shall be used in sufficient quantities to provide a chlorine residual of fifty (50) PPM. The residual of free chlorine shall be measured after 24 hours and shall not be less than 10 parts per million of free chlorine. Chlorinated water shall be disposed of in the r. sanitary sewer system. Should a sanitary sewer not be available, chlorinated water shall be "de-chlorinated" prior to disposal. The line may not be placed in service until two successive sets of samples, taken 24 hours apart, have met the established standards of purity. Purging and sterilization of the water lines shall be considered as incidental to the project and all costs incurred will be considered to be included in the linear foot bid price of the pipe. 80.12 Work Near Pressure Plane Boundaries: Contractor shall take note that the water line to be replaced under this contract may cross or may be in close proximity to an existing pressure plane boundary. Care shall be taken to ensure all "pressure plane" valves installed are installed closed and no cross connections are made between pressure planes 01/10/01 SC-49 PART D - SPECIAL CONDITIONS 80.13 Water Sample Station: .. GENERAL: All water sampling station installations will be per attached Figure 34 or as required in large water meter vaults as per Figure 33 unless otherwise directed by the Engineer. The appropriate water sampling station will be furnished to the Contractor free of charge; however, the Contractor will be required to pick up this item at the Field Operations Warehouse. PAYMENT FOR FIGURE 34 INSTALLATIONS: Payment for all work and materials necessary for the installation of the 3/4-inch type K copper service line will be shall be included in the price bid for copper Service Line from Main to Meter. _ Payment for all work and materials necessary for the installation tap saddle (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main. Payment for all work and materials necessary for the installation of the sampling station, concrete support block, curb stop, fittings, and an incidental 5-feet of type K copper _ service line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations. PAYMENT FOR FIGURE 33 INSTALLATIONS: Payment for all work and materials necessary for the installation tap saddle, gate valve, and fittings shall be included in the price bid for Service Taps to Main. Payment for all work and materials necessary for the installation of the sampling station, modification to the vault, fittings, and all type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations. 80.14 Ductile Iron and Gray Iron Fittings: Reference Part E2 Construction Specifications, Section E2-7 Installing Cast Iron Pipe, fittings, and Specials, Sub section E2-7.11 Cast Iron Fittings: the first Paragraph shall be revised to read as follows: .. E2-7.11 DUCTILE-IRON AND GRAY-IRON FITTINGS: All ductile-iron and gray-iron fittings shall be furnished with cement mortar lining as stated in Section E1-7. The price .. bid per ton of fittings shall be payment in full for all fittings, joint accessories, polyethylene wrapping, horizontal concrete blocking, vertical tie-down concrete blocking, and concrete cradle necessary for construction as designed. All ductile-iron and gray-iron fittings, valves and specials shall be wrapped with polyethylene wrapping conforming to Material Specification E1-13 and Construction _ Specification E2-13. Wrapping shall precede horizontal concrete blocking, vertical tie- down concrete blocking, and concrete cradle. Payment for the polyethylene wrapping, horizontal concrete blocking, vertical tie-down concrete blocking, and concrete cradle shall be included in bid items for vales and fittings and no other payments will be allowed. 01/10 o1 SC-50 PART D - SPECIAL CONDITIONS .. D-81 SPRINKLING FOR DUST CONTROL: All applicable provisions of Standard Specifications Item 200, -Sprinkling for Dust Control" shall apply. However, no direct payment will be made for this item and it shall be considered to this contract. D-82 DEWATERING: The Contractor shall be responsible for determining the method of dewatering operation for the water or sewage flows from the existing mains and ground water. The Contractor shall be responsible for damage of any nature resulting from the dewatering operations. .. The DISCHARGE from any dewatering operation shall be conducted as approved by the Engineer. Ground water shall not be discharged into sanitary sewers. Dewatering shall be considered as incidental to a construction and all costs incurred will be considered to be included in the project price. _ D-83 TRENCH EXCAVATION ON DEEP TRENCHES: Contractor to prevent any water flowing into open trench during construction. Contractor shall not leave excavated trench open overnight. Contractor shall fill any trench the same day of excavation. No extra payment shall be allowed for this special condition. D-84 TREE PRUNING: A. REFERENCES: National Arborist Association's "Pruning Standards for Shade Trees". B. ROOT PRUNING EQUIPMENT 1. Vibratory Knife .. 2. Vermeer V-1550RC Root Pruner C. NATURAL RESOURCES PROTECTION FENCE 1. Steel "T' = Bar stakes, 6 feet long. 2. Smooth Horse-Wire: 14-1/2 gauge (medium gauge) or 12 gauge (heavy gauge). 3. Surveyor's Plastic Flagging: "Tundra" weight, International fluorescent orange or red color. 4. Combination Fence: Commercially manufactured combination soil separator fabric on .. wire mesh backing as shown on the Drawings. D. ROOT PRUNING 1. Survey and stake location of root pruning trenches as shown on drawings. 2. Using the approved specified equipment, make a cut a minimum of 36 inches deep in order to minimize damage to the undisturbed root zone. 01/10/01 SC-51 PART D - SPECIAL CONDITIONS 3. Backfill and compact the trench immediately after trenching. 4. Place a 3-foot wide by 4-inch deep cover of mulch over the trench as required by the Engineer. .. 5. Within 24 hours, prune flush with ground and backfill any exposed roots due to construction activity. Cover with wood chips of mulch in order to equalize soil temperature and minimize water loss due to evaporation. 6. Limit any grading work within conservation areas to 3-inch maximum cut or fill, with no roots over 1-inch diameter being cut unless cut by hand or cut by specified methods, - equipment and protection. E. MULCHING: Apply 2-inches to 4-inches of wood chips from trimming or clearing operation on areas designated by the Engineer. F. Tree Pruning shall be considered subsidiary to the project contract price. .. D-85 TREE REMOVAL: Trees to be removed shall be removed using applicable methods, including stump and root ball removal, loading, hauling and dumping. Extra caution shall be taken to not disrupt existing utilities both overhead and buried. The Contractor shall immediately repair or replace any _ damage to utilities and private property including, but not limited to, water and sewer services, pavement, fences, walls, sprinkler system piping, etc., at no cost to the Owner. All costs for tree removal, including temporary service costs, shall be considered subsidiary to the project contract price and no additional payment will be allowed. D-86 TEST HOLES: The matter of subsurface exploration to ascertain the nature of the soils, including the amount of rock, if any, through which this pipeline installation is to be made is the responsibility of any and all prospective bidders, and any bidder on this project shall submit his bid under this condition. -- Wheth_-, prospective u,,:;:e' f,,,rform this subsurface exrl `:on jointl, . ;rdependently, and whether they make such determination by the use of test holes or other means, shall be left to the discretion of such prospective bidders.If test borings have been made and are provided for bidder's information, at the locations shown on the logs of borings in the appendix of this specification, it is expressly declared that neither the City nor the Engineer guarantees the accuracy for the information or that the material encountered in excavations is the same, either in character, location, or elevation, as shown on the boring logs. It shall be the responsibility of the bidder to make such subsurface investigations .. as he deems necessary to determine the nature of the material to be excavated. The Contractor assumes all responsibility for interpretation of these records and for making and maintaining the required excavation and of doing other work affected by the geology of the site. The cost of all rock removal and other associated appurtenances, if required, shall be included in the linear foot bid price of the pipe. 01/10/01 SC-52 PART D - SPECIAL CONDITIONS D-87 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION Prior to beginning construction on any block in the project, the contractor shall, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: The notification notice or flyer shall be posted seven (7) days prior to beginning any construction activity on each block in the project area. The flyer shall be prepared on the Contractor's .. letterhead and shall include the following information: Name of Project, DOE No., Scope of Project (i.e. type of construction activity), actual construction duration within the block, the name of the contractor's foreman and his phone number, the name of the City's inspector and his phone number and the City's after-hours phone number. A sample of the 'pre-construction notification' flyer is attached. The contractor shall submit a schedule showing the construction start and finish time for each block of the project to the inspector. In addition, a copy of the flyer shall be delivered to the City Inspector for his review prior to being distributed. The contractor will not be allowed to begin construction on any block until the flyer is delivered to all residents of the block. An electronic version of the sample flyer can be obtained from the construction office at 871-8306. mob _ All work involved with the pre-construction notification flyer shall be considered subsidiary to the contract price and no additional compensation shall be made. D-88 TRAFFIC BUTTONS The removal and replacement of traffic buttons is the responsibility of the contractor and shall be considered a subsidiary item. In the event that the contractor prefers for the Signals, Signs and Markings Division (SSMD) of the Transportation/Public Works Department to install the M' markings, the contractor shall contact SSMD at (817) 871-8770 and shall reimburse SSMD for all costs incurred, both labor and material. No additional compensation shall be made to the contractor for this reimbursement. i F rM 01/10/01 SC-53 (To be printed on Contractor's Letterhead) .. Dates DOE No: xxxxx PROJECT NAME: „ MAPSCO LOCATION: <XXE> LIMITS OF CONST.: <Alpha St. between Beta Street and Gamma Ln.) k Estimated Duration of Construction on your Street : <XX>days * * NOTICE * * Construction only seven days away t THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE _ CITY OF FORT WORTH, OUR COMPANY WILL < REPLACE WATER AND/OR SEWER LINES - RECONSTRUCT THE STREET> ON OR AROUND YOUR PROPERTY. - CGNSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. F IF VOU HAVF. QUFRTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT <TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL 871-7970 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL. � f _ PART DA ADDITIONAL SPECIAL CONDITIONS PART DA - ADDITIONAL SPECIAL CONDITIONS DA-1 PIPELINE REHABILITATION CURED4N-PLACE PIPE .............................................OMITTED DA-2 PIPELINE REHABILITATION PIPE ENLARGEMENT SYSTEM ...................................... ASC-3 DA-3 PIPELINE REHABILITATION FOLD AND FORM PIPE ............................................. OMITTED DA-4 SLIPLINING ............................................................................................................... OMITTED DA-5 PIPE INSTALLED BY OTHER THAN OPEN CUT......................................................... ASC-10 DA-6 SERVICE LINE POINT REPAIR/CLEANOUT REPAIR .............................................. ASC-13 DA-7 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION .................... ASC-16 DA-8 MANHOLE REHABILITATION ITEMS ....................................................................... OMITTED DA-9 SURFACE PREPARATION FOR MANHOLE REHABILITATION............................... OMITTED DA-10 INTERIOR MANHOLE COATING - MICROSILICATE MORTAR SYSTEM................ OMITTED DA-11 INTERIOR MANHOLE COATING - QUADEX SYSTEM............................................. OMITTED DA-12 INTERIOR MANHOLE COATING - SPRAYWALL SYSTEM ........................................ ASC-18 DA-13 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM ..................................... ASC-21 DA-14 INTERIOR MANHOLE COATING - PERMACAST SYSTEM WITH EPDXY LINER... OMITTED DA-15 INTERIOR MANHOLE COATING-STRONG-SEAL SYSTEM .....................................OMITTED DA-16 RIGID FIBERGLASS MANHOLE LINERS.................................................................. OMITTED DA-17 PVC LINED CONCRETE WALL RECONSTRUCTION .............................................. OMITTED DA-18 PRESSURE GROUTING .............................................................................................. ASC-24 DA-19 VACUUM TESTING OF REHABILITATED MANHOLES............................................ OMITTED DA-20 FIBERGLASS MANHOLES........................................................................................ OMITTED DA-21 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES....................... ASC-27 DA-22 REPLACEMENT OF CONCRETE CURB AND GUTTER.............................................. ASC-28 a DA-23 REPLACEMENT OF 6" CONCRETE DRIVEWAYS...................................................... ASC-28 A DA-24 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE............................................... ASC-29 DA-25 GRADED CRUSHED STONES..................................................................................... ASC-29 DA-26 WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE.......................................................... OMITTED F ,., 310612000 Version ASC-1 F _ PART DA - ADDITIONAL SPECIAL CONDITIONS DA-27 BUTT JOINTS - MILLED............................................................................................ OMITTED DA-28 2" H.M.A.C. SURFACE COURSE (TYPE "D" MIX) .................................................... OMITTED DA-29 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER............................................... ASC-29 DA-30 NEW 7" CONCRETE VALLEY GUTTER....................................................................... ASC-30 DA-31 NEW 4" STANDARD WHEELCHAIR RAMP................................................................. ASC-31 DA-32 8" PAVEMENT PULVERIZATION .............................................................................. OMITTED DA-33 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUT) ........................... ASC-31 DA-34 RAISED PAVEMENT MARKERS............................................................................... OMITTED DA-35 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING................. OMITTED DA-36 LOADING, TRANSPORTATION, AND DISPOSAL OF CONTAMINATED SOIL ....... OMITTED DA-37 ROCK RIPRAP - GROUT- FILTER FABRIC ...............................................................OMITTED DA-38 CONCRETE PIPE FITTINGS AND SPECIALS ............................................................. ASC-33 DA-39 PIPE INSTALLED BY SHORT BORE ........................................................................... ASC-33 DA-40 SANITARY SEWER POINT REPAIR ............................................................................ ASC-35 DA-41 FLOWABLE FILL ........................................................................................................... ASC-38 310612000 Version ASC-2 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-1 PIPELINE REHABILITATION CURED-IN-PLACE PIPE: - OMITTED DA-2 PIPE ENLARGEMENT SYSTEM: A. GENERAL: 1. Description: This specification includes requirements to rehabilitate existing sanitary sewers by the pipe enlargement system herein called Pipe Bursting or Pipe Crushing (Pipe Bursting/Crushing). This system includes splitting or bursting the existing pipe to install a new polyethylene pipe and reconnect existing sewer service connections. 2. Methods: This section specifies the approved system method or process to include all labor, materials, tools, equipment and incidentals necessary to provide for the complete rehabilitation of deteriorated gravity sewer lines by the Pipe Bursting/Crushing systems. Approved methods include: the PIM Corporation (PIM System), Piscata Way, New Jersey; McLat Construction (McConnell System for _ Pipe Crushing), Houston, Texas; and Trenchless Replacement Systems, (TRS System), Calgary, Canada. Refer to Part D - SPECIAL CONDITIONS D-61 SIBSTITUTIONS for information regarding pre-approval procedures for alternative processes. 3. Definition: The Pipe Bursting/Crushing system is defined as the reconstruction of gravity sewer pipe by installing an approved pipe material, by means of one of the pre-approved methods set forth in Section A.2 of this specification. The process involves the use of a static, hydraulic or pneumatic hammer "moling" device, suitably sized to break out the old pipe or using modified boring "knife" with a flared plug that implodes and crushes the existing sewer pipe. Forward progress of the "mole" or the "knife" may be aided by ti,,.; use of "ydraulic equipment or other apparatus, as specified in the approved methods. The replacement pipe is .. either pulled or pushed into the bore. The method allows for replacement of pipe sizes from 8" through 21" and/or upsizing in varying increments up to 21". This specification is based on the precedent that the Pipe Bursting/Crushing system ., used has been pre-approved by the City of Fort Worth Department of Engineering, and Fort Worth Water Department. 4. Quality Assurance: The Contractor shall be certified by the particular Pipe Bursting/Crushing system manufacturer that such firm is a licensed installer of their system. No other Pipe ` Bursting/Crushing system other than those listed in Section A.2. of these specifications is acceptable. a. Personnel directly involved with installing the new pipe shall receive training in the proper methods for joint fusing, handling, and installing the polyethylene pipe. Training shall be performed by a qualified representative as determined by the pipe manufacturer. 5. Submittals: Submit for review and acceptance, the following Contractor's Work —• Plan and Drawings to the Department of Engineering (DOE): ... 31'06'2000 Version ASC-3 PART DA - ADDITIONAL SPECIAL CONDITIONS a. Shop drawings, catalog data, and manufacturer's technical data showing complete information on material composition, physical properties, and dimensions of new pipe and fittings. Include manufacturer's recommendation for handling, storage, and repair of pipe and fittings if damaged. b. Location and number of insertion or access pits shall be planned by Contractor and submitted in writing prior to excavation for approval by DOE.C. Method of construction and restoration of existing sewer service connections. This shall include: .• 1) Detail drawings and written description of the entire construction procedure to install pipe, bypass sewage flow and reconnection of sewer service connections. 2) Working drawings for information only showing sewage flow _ bypass, and maintenance of traffic. Contractor shall provide for continuous sewerage flow. Dewatering shall be the Contractor's responsibility. — 3) Certification of workmen training for installing pipe. 4) Television inspection reports and videotapes made after new pipe installation. 6. Delivery, Storage, and Handling: — a. Transport, handle, and store pipe and fittings as recommended by manufacturer. �- b. If new pipe and fittings become damaged before or during installation, it shall be repaired as recommended by the manufacturer or replaced as .. required by the Project Manager at the Contractor's expense, before proceeding further. C. Deliver, store and handle other materials as required to prevent damage. B. MATERIALS: — 1. Polyethylene Piping Material: The pipe and fitting material shall be high density, extra molecular weight (EHMW) polyethylene pipe material conforming to ASTM D1248, Type III, Class C, Category 5, Grade P34, and have a PPI (Plastic Pipe " Institute) recommended designation of PE3408 and cell classification 345434C per ASTM D3350. The molecular weight category shall be extra high (250,000 to 1,500,000) as per the Gel Permeation Chromatography determination procedure with a typical value of 330,000. a. The interior of the pipe shall be a light reflective color to facilitate closed .. circuit television inspection. 310612000 Version ASC-4 — PART DA - ADDITIONAL SPECIAL CONDITIONS b. The pipe material shall be listed by the Plastic Pipe Institute (PPI) in PPI TR-4. The pipe material shall have as hydrostatic design basis of 1600 psi at 73 F and 800 psi at 140 F. C. The manufacturer's certification shall state that the pipe was manufactured from one specific resin and shall state the resin used and its source. All pipe shall be made of virgin material. No rework, except that obtained from the manufacturer's own production of the same formulation, shall be used. d. Pipe supplied under this specification shall have a nominal DIP (Ductile Iron Pipe) size inside diameter of the size shown on the plans and proposal. The Standard Dimension Ratio (SDR) and minimum pressure rating of the pipe shall be SDR 21 - 80 psi. Pipe shall be Phillips 66 Driscopipe® 4000 series or City of Fort Worth Department of Engineering "approved equal". 2. Tests: The Contractor shall be required to send submittals to the City of Fort Worth on the production material. - a. The pipe manufacturer shall provide certification that samples of the production product meets these specifications. The certification will state that production product has been tested in accordance with ASTM D2837, and validated in accordance with the latest revision of PPI TR-3. b. The pipe manufacturer shall provide certification that stress regression testing has been performed on the specific product. Certification shall include a stress life curve per ASTM D2837 and testing shall have been performed in accordance with ASTM D2837. C. Rejection: Polyethylene plastic pipe and fittings may be rejected for failure ., to meet any of the requirements of this specification. C. SEWER SERVICE CONNECTIONS: 1. Sewer Service Connections: Sewer service connections shall be connected to the new pipe by mechanical or fusion methods. Once the saddle is secured, a hole shall be drilled in the pipe the full inside diameter of saddle outlet. 2. Pipe Saddles: Mechanical saddles shall be made of polyethylene pipe compound that meets the requirements of ASTM D1248, Class C, have stainless steel straps and fasteners, neoprene gasket and backup plate. Mechanical saddles shall be Strap-on-Saddle Type as manufactured by Driscopipe or Tapping Saddle manufactured by DuPont, or approved equal. Fusion saddles shall be electrofusion branch saddles as manufactured by Central Plastics Company, or approved equal. 3. Connection to Existing Service: Connections to the existing sewer service connections pipe shall be made using flexible couplings. All flexible couplings shall conform to ASTM C425 and shall be as manufactured by Fernco Joint Sealer Co., DFW Plastics, Inc. or approved equal. Backfill at service connections shall be cement stabilized sand (2 sacks per cubic yard) to a point 12 inches above the — 310612000 Version ASC-`J on PART DA - ADDITIONAL SPECIAL CONDITIONS service lateral to trench intersection and shall be in accordance with these specifications. The Contractor shall, upon request, permit the Engineer to take elevations on both the existing and new portions of the service connection pole to determine final grade and invert elevations. Elevation changes greater than 0.10 feet from the house lateral piping and shall be reconnected as directed by the Engineer. 4. Service Interruptions: Service interruptions to homes shall not exceed 18 hours. .. D. PREPARATION: 1. Bypassing Sewage: a. The Contractor shall bypass the sewage around the section or sections of sewer to be rehabilitated. The bypass shall be made by plugging existing upstream manhole and pumping the sewage into a downstream manhole or adjacent system or other method as may be approved by the Engineer. The pump and bypass lines shall be of adequate capacity and size to handle the flow without sewage backup occurring to facilities connected to the sewer. b. The Contractor shall be responsible for continuity of sanitary sewer service to each facility connected to the section of sewer during the execution of the work. If sewage backup occurs and enters buildings, the Contractor shall be responsible for clean-up, repair, property damage costs and claims. 2. Line Obstructions: If pre-installation (TV) inspection reveals an obstruction in the existing sewer (heavy solids, dropped joints, protruding service taps or collapsed pipe) which will prevent completion of the pimp '--,,-sting/cr. ' process, and cannot be removed by conventional sewer cleaning equipment, then an obstruction removal shall be made by the Contractor, with the approval of the Engineer. 3. Sags in Sewer Line: ALL SAGS AND GRADE PROBLEMS IN EXISTING SEWER LINES SHALL BE CORRECTED, AS PART OF THIS CONTRACT. If the pre- construction television inspection reveals a sag in the sewer line, the Contractor shall be responsible for bringing the proposed sewer pipe to an acceptable grade without a sag. A sag is defined as any sewer line segment more than 3 feet in length which ponds water in the absence of sewage flow. The contractor shall take appropriate measures to eliminate a sag by pipe replacement, digging a sag elimination pit and bringing the bottom of the pipe trench to a uniform grade in line k with the existing pipe invert or by other measures that shall be acceptable to the F Engineer and the City. a. Identification of Sags: Sags shall be identified by television inspection in the absence of sewage flow. If available, the Contractor shall be furnished television tapes from the City identifying the sag location. Flow shall be blocked at an upstream manhole and diverted to another sewer line or 310612000 Version ASC-6 PART DA - ADDITIONAL SPECIAL CONDITIONS downstream manhole below the segment of pipe to be inspected. TV inspection shall be performed in accordance with television inspection of sanitary sewer lines. Videotapes shall be submitted to the Department of Engineering for review. b. Correction of Sags: Sags shall be corrected by open cut and by adding additional bedding material to bring the sag back to grade where access is available. For pipe enlargement methods, all sags identified on the pre- construction videotapes shall be corrected prior to commencing with pipe enlargement. In instances where sags are located under existing structures, the existing sewer line may be relocated using open cut or boring methods. The Department of Engineering shall specifically review potential relocation's and evaluate the constructability, economics and engineering feasibility prior to construction work. C. Measurement and Payment: Measurement and payment to correct sags shall be per linear foot of pipe construction to correct the sag. For pipe bursting methods, open-cut or bore construction, the applicable bid prices in the proposal section shall apply. 4. Television Inspection: Inspection of the pipelines shall be performed by experienced personnel trained in locating breaks, obstacles and service connections by closed circuit color television. Television inspection shall be in accordance with the specifications contained herewith for "Pre- and Post- Construction Television Inspection of Sanitary Sewer Lines". E. PIPE ENLARGEMENT SYSTEM AND PIPE INSTALLATION: 1. Site Organization: a. Insertion or access pits shall be located such that their total number shall be minimized and the length of replacement pipe installed in a single pull shall be maximized. b. Existing manholes shall be utilized wherever practical. Manhole inverts and bottoms may be removed to permit access for installation equipment. C. Equipment used to perform the work shall be located away from buildings so as not to create a noise impact. Provide silencers or other devises to reduce machine noise as needed to meet requirements. 2. Finished Pipe: The installed replacement pipe shall be continuous over the entire length of each pipe segment from manhole to manhole and shall be free from visual defects such as foreign inclusions, concentrated ridges, discoloration, .. pitting, varying wall thickness, pipe separation, other deformities. Replacement pipe with gashes, nicks, abrasions, or any such physical damage which may have occurred during storage and/or handling, which are larger/deeper than 10% of the wall thickness shall not be used and shall be removed from the construction site. The replacement pipe passing through or terminating in a manhole shall be 310612000 Version ASC-7 PART DA - ADDITIONAL SPECIAL CONDITIONS carefully cut out in a shape and manner approved by the Engineer. The invert and benches shall be streamlined and improved for smooth flow. The installed pipe shall meet the leakage requirements of the pressure test specified later. 3. Pipe Jointing: a. Sections of polyethylene replacement pipe shall be assembled and joined on the job site above the ground. Jointing shall be accomplished by the heating and butt-fusion system in strict conformance with the manufacturer's printed instructions. b. The butt-fusion system for pipe jointing shall be carried out in the field by _ operators with prior experience in fusing polyethylene pipe with similar equipment using proper jigs and tools per standard procedures outlined by the pipe manufacturer. These joints shall have a smooth, uniform, double rolled back bead made while applying the proper melt, pressure, and alignment. It shall be the sole responsibility of the Contractor to provide an acceptable butt-fusion joint. All joints shall be made available for inspection by the Engineer before insertion. The replacement pipe shall be joined on the site in appropriate working lengths near the insertion pit. The maximum length of continuous replacement pipe which shall be assembled above ground and pulled on the job site at any one time shall be 600 linear feet. C. For situations where the replacement pipe is not pulled all the way to the manhole or if it is impossible to pull the missile all the way through, the following shall apply: At the direction of the Engineer, a 12"-18" full circle steel clamp shall be utilized to connect segments of the HDPE pipe. .� 4. New Pipe Installation: a. Thread winch cable or chain and associated lines through sewer section to be rehabilitated. Keep lines away from pedestrian and vehicular traffic. b. Existing manholes may be used for launch and receiving access. Remove manhole invert and bottom as required. Pull the winch chain through sewer section and attach to cutter and machine head. Lower into MMMs launching manhole, apply winch tension pulling the cutter and head into the sewer until the rear of the machine is flush with the manhole wall. Attach steel starter pipe and advance assembly until the rear of the steel starter pipe is flush with the manhole wall. Lower hydraulic jack into the manhole and align. Insert new pipe by simultaneous operation of the jack and winching the cutter and head forward. 5. Anchoring New Pipe and Sealing Manholes: a. After the new pipe has been installed in the entire length of the sewer .. section, anchor the pipe at manholes. The new pipe shall protrude in the manholes for enough distance to allow sealing and trimming. 310612000 Version ASC-8 PART DA - ADDITIONAL SPECIAL CONDITIONS b. Sealing the new pipe at manholes shall not begin for a minimum of ten (10) hours after installation. Provide a flexible gasket connector in the manhole wall at the end of the new pipe, centered in the existing manhole wall. Grout flexible connector in the manhole, filling all voids the full thickness of the manhole wall. C. Restore manhole bottom and invert. 6. Field Testing: a. Low Pressure Air Test of Replacement Pipe: After a manhole-to-manhole section of sanitary sewer main has been pipe burst/crushed and prior to any service lines being connected to the replacement pipe, the pipe shall be plugged at each manhole with pneumatic plugs. The design of the _ plugs shall be such that they will hold against the test pressure without requiring external blocking or bracing. One of the plugs shall have three air hose connections; one for the inflation of the plug, one for reading the air pressure in the sealed line, and one for introducing air into the sealed line. Low pressure air shall then be introduced into the sealed line until the internal air pressure reaches 4.0 psig greater than the average back pressure resulting from any ground water that may be over the pipe. At least two minutes shall elapse to allow the pressure to stabilize. The time required for the internal pressure to decrease from 3.5 to 2.5 psig greater than the average back pressure resulting from any ground water that may be over the pipe, shall not be less than the time shown for a given pipe diameter in the following table: Carrier Pipe Minimum Elapsed Diameter inches Time minutes 8 4 10 5 12 6 15 7 b. Post-Construction Television Inspection of New Pipe: Refer to Special Condition for Post-Construction Television Inspection of Sanitary Sewer. F. MEASUREMENT AND PAYMENT: 1. Pipe Installation: Pipe installation will be measured for payment by the linear foot w. of pipe actually installed in the various diameters of sewers measured along the centerline of the sewer from centerline to centerline of manholes. Payment will be made for the quantities measured at the unit price per linear foot for the various sewer diameters listed. 2. Service Reconnections: Installation of sewer service connections will be measured for payment by each actually reconnected to the installed pipe. Payment will be made for the quantities measured at the unit price per each listed. Payment shall include required excavation and backfill, saddles, flexible connections, and all other incidentals necessary to successfully reconnect sewer service lines to the rehabilitated sewer. Payment shall not include pavement replacement, which if required, shall be paid separately. 310612000 Version ASC-9 PART DA - ADDITIONAL SPECIAL CONDITIONS 3. Sewer Cleaning by Bucket Machine: Heavy cleaning requiring more than hydraulic jet cleaning shall be performed by bucket machines. The payment for such cleaning shall be included in the bid item for Pre-Construction Television Inspection of Sanitary Sewer Lines. 4. By-pass Pumping: The Contractor shall provide diversion for the flow of sewage around the section or sections of pipe designated for rehabilitation. The pumps and by-pass lines shall be of adequate capacity and size to handle all flows. All �- costs for by-pass pumping required during installation of the pipe shall be subsidiary to pipe enlargement. 5. Subsidiary Work: Any damage to utilities and property, resulting repairs, temporary service costs, etc. shall be borne by Contractor. Repair and/or replacement of fences, sprinkler system piping and other such restoration work resulting from Contractor activities shall be considered subsidiary to the cost of the project and no additional payment will be allowed. 6. Testing: All cost for testing the replacement pipe by a pressure method will be incidental to pipe installation. DA-3 FOLD AND FORM PIPE: - OMITTED DA-4 SLIPLINING: - OMITTED DA-5 PIPE INSTALLED BY OTHER THAN OPEN CUT: A. GENERAL: 1. Furnish materials and necessary accessories, with strengths, thickness, coatings, and fittings indicated, specified and/or necessary to complete the work. 2. All excavation shall provide an open area conforming to the outside diameter of the casing and/or carrier conduit. The excavation shall be to an alignment and grade which will allow the carrier conduit to be installed to proper line and grade as .. shown on the Plans and as established in the Specifications. 3. Work shall be performed in accordance with the requirements of the City of Fort Worth Water Department, the Texas Department of Transportation, or railroad company, as applicable. B. MATERIALS: 1. Casing Pipe: Casing pipe shall be steel conforming to ANSI B36.10 and the - following: a. Field Strength: 35,000 psi minimum. b. Wall thickness: 0.312 in. minimum (0.5 for railroad crossings). C. Diameter: As shown on the drawings (minimum size requirements). 310612000 version ASC-10 .. PART DA - ADDITIONAL SPECIAL CONDITIONS d. Joints: Continuous circumferential weld in accordance with AWS D1.1. 2. Carrier Pipe in Casing: Carrier pipe shall be as shown on drawings and as specified in the General Contract Documents. 3. Sewer Pipe without Casing Pipe: Shall be minimum Class 51 ductile iron pipe, or as designated on the plans. 4. Grout: Grout shall be Portland Cement grout of min. 2000 psi compressive strength at 28 days. Proportioned not less than 1 cu. ft. of cement to 3 cu. ft. of fine sand with sufficient water added to provide a free flowing thick slurry. C. EXECUTION 1. Where sewer pipe is required to be installed under railroad embankments or under highways, streets or other facilities in other than open cut, construction shall be performed in such a manner so as to not interfere with the operation of the railroad, street, highway, or other facility, and so as not to weaken or damage any .. embankment or structure. During construction operations, barricades and lights to safeguard traffic and pedestrians shall be furnished and maintained, until such time as the backfill has been completed and then shall be removed from the site. 2. Pits and Trenches: a. If the grade of the pipe at the end is below the ground surface, suitable pits or trenches shall be excavated for the purpose of conducting the jacking or tunneling operations and for placing end joints of the pipe. Wherever end trenches are cut in the sides of the embankment or beyond it, such work shall be sheeted securely and braced in - manne- to prevent earth from caving in. b. The location of the pit shall meet the approval of the Engineer. C. The pits of trenches excavated to facilitate these operations shall be backfilled immediately after the casing and carrier pipe installation has been completed. 3. Boring and Jacking Steel Casing Pipe: Steel casing pipe shall be installed by boring hole with the earth auger and simultaneously jacking pipe into place. a. The boring shall proceed from a pit provided for the boring equipment and workmen. The holes are to be bored mechanically. The boring shall be done using a pilot hole. By this method an approximate 2-inch hole shall be bored the entire length of the crossing and shall be checked for line and grade on the opposite end of the bore from the work pit. This pilot hole shall serve as the centerline of the larger diameter hole to be bored. Other methods of maintaining line and grade on the casing may be approved if acceptable to the Engineer. Excavated material shall be placed near the top of the working pit and disposed of as required. The use of water or other fluids in connection with the boring operation will be permitted only to 310612000 version ASC-11 PART DA - ADDITIONAL SPECIAL CONDITIONS the extent required to lubricate cuttings. Jetting or sluicing will not be permitted. b. In unconsolidated soil formations, a gel-forming colloidal drilling fluid consisting of at least 10 percent of high grade carefully processed bentonite may be used to consolidate cuttings of the bit, seal the walls of the hole, and furnish lubrication for subsequent removal of cuttings and installation of the pipe immediately thereafter. C. Allowable variation from the line and grade shall be as specified under paragraph A.2. All voids between bore and outside of casing shall be pressure grouted. 4. Installation of Carrier Pipe in Casing: a. Sanitary sewer pipe located within the encasement pipe shall be supported by "skids" or "bands" to prevent the pipe and bells from snagging on the inside of the casing, and to keep the installed line from resting on the bells. b. All skids shall be treated with a wood preservative. Skids should extend for the full length of the pipe with the exception of the bell area and spigot area necessary for assembly unless otherwise specified. C. The Contractor shall prevent over-belling the pipe while installing it through the casing. A method of restricting the movement between the assembled bell and spigot where applicable shall be provided. d. At all bored, jacked, or tunneled installations, the annular space between the carrier pipe and casing shall be filled with grout. Care must be taken that not too much water is forced into the casing so as not to float the pipe. The backfill material will not be required unless specified on the plans and specified by the Engineer. e. Closure of the casing after the pipe has been installed shall be plugged at the ends of the casing as shown on the drawings or as required by the Engineer. 5. Baring and Jacking Ductile Iron Pipe without Casing Pipe: a. As indicated on drawings and as required and directed by the Engineer sewer shall be constructed of bore and jacked ductile iron pipe. .. F b. When a casing pipe is not designated on the drawings, the contractor shall provide a casing pipe if necessary to achieve line and grade. Casing pipe shall be provided at no additional cost and shall be subsidiary to the cost bid for installation By Other than Open Cut. C. Bore and jack in accordance with paragraph C.3. above. 310612000 version ASC-12 MP PART DA - ADDITIONAL SPECIAL CONDITIONS d. Short length of sewer consisting of a single pipe section may be installed by jacking without a bore hole if permitted by the Engineer and in soft soil Me layer. All voids outside of installed pipe shall be pressure grouted. 6. Tunneling: Where the characteristics of the soil, the size of the proposed pipe, or the use of monolithic sewer would make the use of tunneling more satisfactory than jacking or boring, or when shown on the plans, a tunneling method may be used, with the approval of the Engineer or railroad/highway officials. a. When tunneling is permitted, the lining of the tunnel shall be of sufficient strength of support the overburden. The Contractor shall submit the _ proposed liner method to the Engineer for approval. The tunnel liner design shall bear the seal of a licensed professional engineer in the State of Texas. Approval by the Engineer shall not relieve the Contractor of the responsibility for the adequacy of the liner method. b. The space between the tunnel liner and the limits of excavation shall be pressure grouted or mud-jacked. w C. Access holes for placing concrete shall be space at maximum intervals of 10 feet. D. MEASUREMENT AND PAYMENT: Installation of pipe by other than open cut will be measured by the linear foot of pipe, complete in place. Such measurement will be made between the ends of the pipe along the central axis as installed. The work performed and materials furnished as prescribed by this item will be paid for at the Contract Unit Price bid per linear foot for Pipe Installed by Other Than Open Cut of the type, size, and class of pipe specified as shown on plans. The furnishing of all materials, pipe, liner materials required for installation, for all preparation, hauling and installing of same, and for all labor, tools, equipment and incidentals necessary to complete the work, including excavation, backfilling and disposal of surplus material shall be included in the Contract Unit Price as shown in the Bid Proposal. DA-6 SERVICE LINE POINT REPAIR/CLEANOUT REPAIR A. GENERAL: The work covered by this item consists of furnishing all labor, material, equipment, supervision, etc. necessary to construct a point repair on the portion of a service line located within a utility easement, street right-of-way or on private property. Point repairs on private property shall only be addressed after the Contractor has received written permission from the property owner to do the work. A blank Right-of-Entry Agreement form to be completed by the Contractor and the individual property owners is included at the end of this section. The Contractor shall keep a record copy of all Right- of-Entry forms obtained and have it on hand at all times during construction. The street addresses and approximate location of service line repairs are shown in Table_ and the Field Survey Forms in Attachment _. It shall be the Contractors ._ responsibility to accurately locate in the field the exact point of repair. B. MATERIALS: 310612000 Version ASC-13 PART DA - ADDITIONAL SPECIAL CONDITIONS The pipe replacement material shall be gasketed joint, gravity PVC sewer pipe (ASTM D- 3034, SDR 26) and have a minimum cell classification of 12454 A or B as defined in ASTM D-1784. Installation shall be in strict compliance with the manufacturer, — recommendations and the Uni-Bell Plastic Pipe Association. The method of jointing the ends of the replaced pipe with the existing pipe shall be water-tight. w C. EXECUTION: 1. After the location of the point repair is determined, the Contractor shall excavate — and remove the damaged pipe and replace with new pipe. The minimum length of pipe replaced shall be three (3) feet. All work shall be performed by a licensed lumber. Determine whether additional lengths of line beyond "minimum length" criteria need replacement. Report need for additional replacement to City and obtain approval before proceeding. 2. The Contractor shall excavate, shape the bottom of the trench and place the — required pipe bedding so that the grade of the replaced pipe matches the existing service line grade. 3. Numerous service line point repairs along with lateral line point repairs and obstruction removals are located in areas which in many instances will require the removal of existing landscaping, structures, sidewalks, driveways, etc. Items — removed or disturbed shall replaced or restored to original conditions or better. 4. Removal of Debris: Excess excavated material and debris are to be removed from — the work site daily. Cost of hauling excess excavation and debris is to be included in the price bid for"Service Line Point Repair'. 5. Roof and Yard Drains: At the locations indicated in Table _ of the Attachments. — The Contractor shall disconnect roof and yard drains from the sanitary sewer service line. For yard drains, the Contractor shall excavate and remove the drain _ from the yard and plug the line at the property lin- nor roof the Contractor shall remove the downspout from the drain line and plug the line to prevent inflow. In addition, the Contractor shall install an elbow fitting at the bottom of the downspout to direct runoff, away from the building, and a concrete splash pad to — prevent erosion. 6. Disconnected Service Lines: At the locations indicated in Table_ of Attachments to the Special Contract Documents, the Contractor shall remove the service line no longer in use by excavating at the property line and plugging the service line. — 7. Abandonment of Point Repair: If a pipe is exposed and found in good condition, not requiring a paint repair, notify City Engineer who will record abandonment of — point repair. Backfill the excavation, replace pavement or sidewalk and repair and seed or sod unpaved areas. 310612000 version ASC-14 , PART DA - ADDITIONAL SPECIAL CONDITIONS 8. Cleanout Repair: The Contractor shall make appropriate repairs to cleanouts as indicated in Table _ and as shown on the PLANS. All cleanout repair work shall be performed by a licensed plumber. a. General This special condition describes the repair of sanitary sewer cleanouts located on private property as designated on the 1/1 Elimination Repair plans. Repair of the cleanouts shall consist of replacing defective cleanout caps or installing new caps where none exist, such that inflow is eliminated. There will be no repairs made to the existing cleanouts that require ` excavation, other than what is required to expose the top of the cleanout so that the new caps can be installed. b. Materials Replacement cleanout caps shall be Dal-Caps as manufactured by Dallas ■ Specialty & Mfg. Company, or equal. The rubber caps are held down by stainless steel clamps. C. Excavation 1) The Contractor shall submit shop drawings on all materials and 14 equipment to be installed. 2) The Contractor is responsible for obtaining right of entry from the property owners prior to performing any work. Property owners should be notified 48 hours in advance of any work on their property. 3) The Contractor shall restore any disturbed surface to its original or better condition at no separate pay. D. MEASUREMENT AND PAYMENT: • 1. Payment for service line point repair shall be on a unit price basis for each repair performed on all sizes of service lines for the respective depths. The minimum length of service line point repair shall be three (3) feet. No separate pay if the work is done within the limits of a service line reconnect as defined in Special Condition, D-53, "Sanitary Sewer Services". 2. Measurements for extra length repair is on a linear foot basis for repairs in excess of the minimum 3 foot replacement length. 3. All pipe fittings, adapters, concrete collars, bedding, and removal and replacements of grass sodding required shall be considered incidental to service line point repair. 4. If no pay item is included for any work required to properly complete a service line point repair as specified, the cost to perform said work, including any required removal and replacement of materials, shall be considered incidental to the service line point repair. • 310612000 Version ASC-15 PART DA - ADDITIONAL SPECIAL CONDITIONS 5. Depth of Bury is to be measured from Natural Ground Level to the Flow Line of the Sanitary Sewer Service Line at the Point of Replacement. The minimum trench width shall be 3'-0". 6. All excavation, backfill, removal and replacement of grass sodding and landscaping, plugs, fittings, and splash pads shall be considered incidental to removal of yard drains, disconnecting roof drains and plugging disconnected service lines. 7. No separate payment will be made for the Contractor to obtain written permission to enter private property. 8. Payment will be made for Abandonment of Point Repairs at the Contract Unit Price for Excavation and Backfill Abandoned Point Repairs. 9. Payment shall be made at the Contract Unit Price for each sanitary sewer cleanout successfully repaired. Payment shall be full compensation for all materials, equipment, and labor required to perform the work. DA-7 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION: A. GENERAL: 1. Scope: This section governs all work, materials and testing required for the application of interior protective coating. Structures designated to received interior coating are listed on the construction drawings. The structures are to be coated, including interior wall, top and bench surfaces. Protective coating for corrosion protection shall meet the requirements of this Specification (and items DA-12 and DA-13) and the Manufacturers recommendations and specifications. 2. Description: The Contractor shall be responsible for the furnishing of all labor, — supervision, materials, equipment, and testing required for the completion of protective coating of structures in accordance with manufacturer's recommendations. ..,, 3. Manufacturer's Recommendations: Materials and procedures utilized for the lining process shall be in strict accordance with manufacturer's recommendations. i 4. Corrosion Protection: Corrosion protection may be required on all structures where high turbulence or high H2S content is expected. B. MATERIALS: 1. Scope: This section governs the materials required for completion of protective coating of designated structures. 2. Protective Coating: The protective coating shall be a proprietary two component, 100 percent solids, rigid polyurethane system designated as Spray Wall as manufactured by Sprayroq, Inc. or a two-part epoxy resin system using 100% solids based epoxy binder with fibrous and flake fillers, is manufactured by Raven Lining i systems and designated as Raven 405. 310612000 Version ASC-16 PART DA - ADDITIONAL SPECIAL CONDITIONS 3. Specialty Cement (If required for leveling or filling): The specialty cement-based coating material shall be either Quadex QM-1 s as manufactured by Quadex, Inc. or Reliner MSP as manufactured by Standard Cement Materials. 4. Material Identification: The protective coating material sprayed onto the surface of the structure shall be a urethane or epoxy resin system formulated for the application to a sanitary sewer environment. The spray system shall exhibit the minimum physical properties as follows: Property Standard Long Term Value Tensile Strength ASTM D-638 5,000 psi Flexural Stress ASTM D-790 10,000 psi Flexural Modulus ASTM D-790 550,000 psi 5. Mixing and Handling: Mixing and Handling of specialty cement material and protective coating material, which may be toxic under certain conditions shall be in accordance with the recommendations of the manufacturer and in such a manner as to minimize hazard to personnel. It is the responsibility of the Contractor to provide appropriate protective measures to ensure that materials are under control at all times and are not available to unauthorized personnel or animals. All equipment shall be subject to the approval of the Engineer. Only personnel thoroughly familiar with the handling of the coating material shall perform the spray �. coating operations and coating installations. C. EXECUTION: 1. General: Protective coating shall not be installed until the structure is complete and in place. 2. Preliminary Repairs: a. All foreign materials shall be removed from the interior of the structure using high-pressure water spray (3500 psi to 4000 psi at spray tip). b. All unsealed lifting holes, unsealed step holes, and voids larger than approximately one-half (1/2) inch in thickness shall be filled with patching compound as recommended by the material supplier for this application. C. After all repairs have been completed, remove all loose material. 3. Protective Coating: a. The protective coating shall be applied to the structure from the bottom of the frame to the bench, down to the top of the trough. The top of the structure shall also be coated. ., b. The protective coating shall be installed in accordance with the manufacturer's recommendations and the following procedure. 310612000 Version ASC-17 PART DA - ADDITIONAL SPECIAL CONDITIONS 1) The surface shall be thoroughly cleaned of all foreign materials and matter. ■ 2) Place covers over the invert to prevent extraneous material from entering the sewers. ■ 3) If required for filling or leveling, apply specialty cement product to provide a smooth surface for the coasting material. ■ 4) Spray the urethane or epoxy onto the structure wall and bench/trough to a minimum uniform thickness of 125 mils (0.125 inches). Thickness to be verifiable through the use of methods acceptable to the Engineer. After the walls are coated, the wooden bench covers shall be removed. 5) The final application shall have a minimum of three (3) hours cure time or be set hard to the touch, before being subjected to active flow. ' 6) No applications shall be made to frozen surfaces or if freezing is expected to occur inside the structure within 24 hours after application. 4. Testing of Rehabilitated Manholes: Testing of rehabilitated manholes for watertightness shall be performed by the Contractor after operations are complete in accordance with the Section D-63 - VACUUM TESTING OF SANITARY SEWER MANHOLES. D. MEASUREMENT AND PAYMENT: Payment shall be based on the Contract Unit Price Bid per vertical foot, measured from the bottom of the frame to the top of the bench. The Contract Unit Price shall be payment in full for performing the work and for furnishing all labor, supervision, materials, equipment and material testing required to complete the work. Pressure grouting, if necessary to stop active infiltration prior to application of the protective coating, shall be included in the above unit price. Grouting of the pipe seals, bench and trough, and lower portion of a particular structure, if required by the Engineer, shall be paid for separately, as specified in Section DA-8, MANHOLE REHABILITATION. DA-8 MANHOLE REHABILITATION: - OMITTED DA-9 SURFACE PREPARATION FOR MANHOLE REHABILITATION: - OMITTED DA-10 INTERIOR MANHOLE COATING - MICROSILICATE MORTAR SYSTEM: - OMITTED DA-11 INTERIOR MANHOLE COATING -QUADEX SYSTEM: - OMITTED DA-12 INTERIOR MANHOLE COATING - SPRAY WALL SYSTEM: _ A. GENERAL 1. Scope 310612000 Version ASC-18 PART DA - ADDITIONAL SPECIAL CONDITIONS This section governs all work, materials and testing required for the application of interior manhole coating. Manholes designated for interior coating are listed on the Manhole Rehabilitation Schedule. Interior manhole coating shall meet the requirements of this Section or of Section DA-10, DA-11, DA-13, or DA-14. 2. Description The Contractor shall be responsible for the furnishing of all labor, supervision, materials, equipment, and testing required for the completion of interior coating of manholes in accordance with the Contract Documents. 3. Manufacturer's Recommendations Materials, mixture ratios, and procedures utilized for the coating process shall be in accordance with manufacturer's recommendations. 4. Manholes Manholes to be coated are of brick, block, or concrete construction. All manholes shall have a minimum of one-half (1/2) inch specialty cement-based coating material (Quadex QM-1 s or Reliner MSP) sprayed or trowelled on coating over the original interior surface. B. MATERIALS 1. Scope This section governs the materials required for completion of interior coating of manholes. 2. Interior Coating The interior coating shall be a proprietary two component, 100 percent solids, rigid polyurethane system designated as Spray Wall as manufactured by Sprayroq, Inc. 3. Specialty Cement The specialty cement-based coating material shall be either Quadex QM-1 s as manufactured by Quadex, Inc. or Reliner MSP as manufactured by Standard Cement Materials. 4. Material Identification The interior manhole coating material sprayed onto the surface of the manhole shall be a urethane resin system formulated for the application to a sanitary sewer environment. The spray system shall exhibit the physical properties as follows: Pro a Standard Long Term Value Tensile Strength ASTM D-638 5,000 psi Flexural Stress ASTM D-790 10,000 psi Flexural Modulus ASTM D-790 550,000 psi 310612000 version ASC-19 PART DA - ADDITIONAL SPECIAL CONDITIONS 5. Mixing and Handling Mixing and handling of specialty cement material and interior coating material, which may be toxic under certain conditions shall be in accordance with the recommendations of the manufacturer and in such a manner as to minimize hazard - to personnel. It is the responsibility of the Contractor to provide appropriate protective measures to ensure that materials are under control at all times and are not available to unauthorized personnel or animals. All equipment shall be subject to the approval of the Engineer. Only personnel thoroughly familiar with the handling of the coating material shall perform the spray coating operations and coating installations. - C. EXECUTION 1. General - Manhole coating shall not be installed until sealing of manhole frame and grade adjustments, or partial manhole replacement when required for the manhole per the - Manhole Rehabilitation Schedule, is complete. 2. Temperature Normal interior coating operation shall be performed at temperatures of 40OF or greater. No application shall be made when freezing is expected within 24 hours. 3. Interior Manhole Coating .. The interior coating shall be applied to the manhole from the bottom of the frame to the bench, down to the top of the trough. ■ b. The interior coating shall be installed in accordance with the manufacturer's recommendations and the following procedure. 1) The surface shall be thoroughly cleaned of all foreign materials and - matter. Cleaning shall be accomplished by using high pressure water spray (minimum 3500 psi at spray tip), cleaning with muriatic acid, degreaser, or other solvents as needed in order to remove any film or - residue on the surface. 2) Place covers over the invert to prevent extraneous material from ' entering the sewers. 3) Apply a minimum of one-half (1/2) inch specialty cement product (Quadex QM-1 s or Reliner MSP) smooth surface for the urethane coating material. 4) Spray the urethane onto the manhole wall and bench/trough with a • * minimum thickness of 125 mils (0.125 inches). Thickness to be verifiable through the use of methods acceptable to the Engineer. 310612000 version ASC-20 f PART DA - ADDITIONAL SPECIAL CONDITIONS 5) Coat trough area with specialty cement product (Quadex QM-1 s or Reliner MSP). 1. Testing of Rehabilitated Manholes a. Testing of rehabilitated manholes for watertightness shall be performed by the Contractor after operations are complete in accordance with Section DA- 18. D. MEASUREMENT AND PAYMENT _ Payment shall be based on the Contract Unit Price per vertical foot, measured from the bottom of the frame to the top of the bench. The Contract Unit Price shall be payment in full for performing the work and for furnishing all labor, supervision, materials, equipment and material testing required to complete the work. Grouting, if necessary, shall be included in the above unit price. Grouting of the pipe seals, bench and trough, and lower portion of a particular manhole, if required by Manhole Rehabilitation Work Schedule or required to be done by the Engineer, shall be paid for separately at the Contract Unit Price. DA-13 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM: -' A. GENERAL 1. Scope This section governs all work, materials and testing required for the application of interior manhole coating. Manholes designated for interior coating are listed of the Manhole Rehabilitation Schedule, listed in Section I. Interior manhole coating shall meet the requirements of this Section, or of Section DA-10, DA-11, DA-12, or DA-14. 2. Description The Contractor shall be responsible for the furnishing of all labor, supervision, materials, _ equipment, and testing required for the completion of interior coating of manholes in accordance with the Contract Documents. 3. Manufacturer's Recommendations Materials, mixture ratios, and procedures utilized for the coating process shall be in accordance with manufacturer's recommendations. 4. Manholes Manholes to be coated are of brick, block, or concrete construction. All manholes shall have a minimum of one-half (1/2) specialty cement-based coating material (Quadex QM-1 s or Reliner MSP) sprayed or trowelled on coating over the original .. interior surface. B. MATERIALS 1. Scope 310612000 version ASC-21 PART DA - ADDITIONAL SPECIAL CONDITIONS This section governs the materials required for completion of interior coating of manholes. 2. Interior Coating Raven Ultra High-Build epoxy Coating, a two-part epoxy resin system using 100% solids based epoxy binder with fibrous and flake fillers, is manufactured by Raven Lining systems and designated as Raven 405. �- 3. Specialty Cement The specialty cement-based coating material shall be either Quadex QM-1 s as manufactured by Quadex, Inc. or Reliner MSP as manufactured by Standard Cement Materials. .. 4. Material Identification Contractors will completely identify the types of grout, mortar, sealant, and/or root control chemicals proposed and provide case histories of successful use or defend the choice of grouting materials based on chemical and physical properties, ease of application, and expected performance. These grouting materials shall be compatible with Raven 405 interior coating. The contractor shall be responsible for getting approval from Raven Lining systems and/or the grout manufacturers for the use of these grouting materials. 5. Mixing and Handling Mixing and handling of interior coating, which may be toxic under certain conditions shall be in accordance with the recommendations of the manufacturer and in such a manner as to minimize hazard to personnel. It is the responsibility of the Contractor to provide appropriate protective measures to F ..,re that . -rials are under control at all times and are not available to unauthorized personnel or animais. All equipment shall be subject to the approval of the Engineer. Coating shall be performed only by certified applicators approved by the manufacturers. C. EXECUTION 1. General Manhole coating shall not be performed until sealing of manhole from frame and grade adjustments, partial manhole replacement, manhole grouting or sewer replacement/repairs are complete. 2. Temperatures Normal interior coating operation shall be performed at temperatures of 40OF or greater. No application shall be made when freezing is expected within 24 hours. 3. Interior Manhole Coating �- 310612000 Version ASC-22 ... PART DA - ADDITIONAL SPECIAL CONDITIONS a. Manholes scheduled for interior coating are shown on the Manhole Rehabilitation Schedule. The interior coating shall be applied to the manhole from the bottom of the manhole frame to the bench/trough, including the bench/trough. �• b. The interior coating shall be installed in accordance with the manufacturer's recommendations and the following procedure. .. 1) The surface preparation shall comply with the requirements of Section DA-9, SURFACE PREPARATION FOR MANHOLE RESTORATION. 2) Apply a minimum of one-half (1/2) inch specialty cement-based product (Quadex QM-1 s or Reliner MSP) smooth surface for the urethane coating material. 3) The surface prior to application may be damp but shall not have noticeable free water droplets seeping or running water. Material shall be spray applied per manufacturer's recommendations with a minimum thickness of 125 mils (0.125 inch). 4) After the walls are coated, the wooden bench covers shall be removed and the bench sprayed to the same average and minimum thickness as required for the walls. 5) The final application shall have a minimum of three (3) hours cure time or be set hard to the touch, before being subjected to active flow. 6) No applications shall be made to frozen surfaces or if freezing is expected to occur in side the manhole within 24 hours after application. 4. Testing of Rehabilitated Manholes a. After the epoxy liner has set (hard to touch), all visible pinholes shall be repaired. Repairs shall be made by lightly abrading the surface and brushing the lining material over the area. All blisters and evidence of uneven cover shall be repaired according to the manufacturer's recommendations. Spot check of coating thickness may be made by Owner's Representative, and the contractor shall repair these areas as required, at no additional cost to the Owner. b. Testing of rehabilitated manholes for watertightness shall be performed by the Contractor after operations are complete in accordance with Section DA- 18—VACUUM TESTING OF REHABILITATED MANHOLES. — D. MEASUREMENT AND PAYMENT 310612000 Version ASC-23 PART DA - ADDITIONAL SPECIAL CONDITIONS Payment shall be based on the Contract Unit Price per vertical foot, measured from the bottom of the frame to the top of the bench. The Contract Unit Price shall be payment in full for performing the work and for furnishing all labor, supervision, materials, equipment all testing necessary to complete the work. Payment for grouting of pipe seals, bench and trough and manhole walls shall be based on the Contract Unit Price for each manhole actually grouted. •• DA-14 INTERIOR MANHOLE COATING: PERMACAST SYSTEM WITH EPDXY LINER: - OMITTED •• DA-15 INTERIOR MANHOLE COATING-STRONG-SEAL-SYSTEM: - OMITTED DA-16 RIGID FIBERGLASS MANHOLE LINERS: - OMITTED DA- 17 PVC LINED CONCRETE WALL RECONSTRUCTION: - OMITTED DA-18 PRESSURE GROUTING: A. GENERAL 1. Scope. This Section governs all work, materials and testing required for the _ pressure grouting of manhole defects. Manholes or sections of manholes with active leaks shall be repaired as indicated in the Manhole Rehabilitation Schedule. 2. Description_ The Contractor shall be responsible for the furnishing of all labor, supervision, materials, equipment, and testing required for the completion of pressure grouting of manhole defects in accordance with the Contract Documents. 3. Manufacturer's Recommendations. Materials, additives, mixture ratios, and procedures utilized for the grouting process shall be in accordance with manufacturer's recommendations. — 4. Manholes. Manholes to be grouted are of brick, concrete, or fiberglass construction. A. MATERIALS 1. Grouting Materials: a. Urethane Gel Grout: Urethane gel grout, such as Scotch-Seal 5610 gel or equal shall be a hydrophilic polymer. The chemical shall be mixed within the range of from 8 to 10 parts of water and shall contain a reinforcing agent supplied by the same manufacturer. The material shall gel and cure to a tough flexible elastomeric condition. When wet, the gel shall exhibit strength properties of at least 25 psi tensile at 150 percent elongation. The material .. shall not change in linear dimension more than eight percent when subjected to wet and dry cycles. b. The chemical grout shall be applied so as to have the grout material flow freely into the defects. To avoid any wastage of the material flowing through the defects, a gel control agent may be added. The following properties shall be exhibited by the grout: 310612000 version ASC-24 ,,, PART DA - ADDITIONAL SPECIAL CONDITIONS 1) Documented service of satisfactory performance in similar usage. 2) Controllable reaction times and shrinkage through the use of chemicals supplied by the same manufacturer. The minimum gel set time shall be established so that adequate grout travel is achieved. 3) Resistance to chemicals; resistant to most organic solvents, mild .. acids and alkali. 4) Compressive recovery return to original shape after repeated deformation. 5) The chemical shall be essentially non-toxic in a cured form. .. 6) Sealing material shall not be rigid or brittle when subjected to dry atmosphere. The material shall be able to withstand freeze/thaw and moving load conditions. 7) Sealing material shall be noncorrosive. -� a. A reinforcing agent such as Scotch-Seal Brand 5612 reinforcing agent or equivalent shall be utilized in accordance with manufacturer's recommendations. Any 5612 reinforcing agent which contains lumps must .. be discarded. Care must be taken to be sure that the pH of the water in the tank is from 5 to 9. As a precaution against the possibility of the pH being outside this range, take a small amount of water from the tank to which Gel .. Reinforcing Agent 5612 is to be added. Add a few drops of 5612 to this test sample. Scotch-Seal Brand Gel Reinforcing Agent 5612 should disperse readily. If precipitation occurs, drain the tank and retest. Repeat as _ necessary until dispersion occurs. If dispersion does not occur, do not use the water source. b. A filler material such as Celite 292 (diatomaceous earth) from Johns .. Mansville or equivalent shall be utilized. The addition of the filler material shall not exceed the quantity specified by the manufacturer, and continuous agitation of the water side of the mixture is required. The filler material may also be utilized as a reinforcing agent in accordance with the urethane gel grout manufacturer's recommendations. -� 1. Additives: Grout additions may be utilized for catalyzing the gel reaction, inhibiting the gel reaction, buffering the solution, lowering the freezing temperature of the solution, acting as a filler, providing strength or for inhibition of root growth. 2. Root Control: A root inhibiting chemical such as dichlobenil shall be added to the chemical grout mixture at a safe level of concentration and shall have the ability to remain active within the grout for a minimum of 12 months. 3. Material Identification: Contractor shall completely identify the types of grout, mortar, sealant, and/or root control chemicals used and provide case histories of successful use or defend the choice of grouting materials based on chemical and physical 310612000 version ASC-25 PART DA - ADDITIONAL SPECIAL CONDITIONS properties, ease of application, and expected performance, to the satisfaction of the Engineer. 4. Mixing and Handling: Mixing and handling of chemical grout and forming constituents, which may be toxic under certain conditions shall be in accordance with the recommendations of the manufacturer and in such a manner as to minimize ,. hazard to personnel. It is the responsibility of the Contractor to provide appropriate protective measures to ensure that chemicals or gels produced by the chemicals are under control at all times and are not available to unauthorized personnel or animals. .. All equipment shall be subject to the approval of the Engineer. Only personnel thoroughly familiar with the handling of the grout material and additives shall perform the grouting operations. .. C. EXECUTION 1. General. Manhole grouting shall not be performed until sealing of manhole frame and grade adjustments, partial manhole replacement, or manhole repairs are complete. 2. Preliminary Repairs: a. Seal all unsealed lifting holes, unsealed step holes, voids larger than .. approximately one-half (1/2) inch in thickness. All cracked or deteriorated material shall be removed from the area to be patched and replaced with Octocrete, as manufactured by IPS Systems, Inc. or equal, in accordance _ with manufacturer's specifications. b. Cut and trim all roots within the manhole. 3. Temperature. Normal grouting operations including application of interior coating shall be performed in accordance with manufacturer's recommendations. 4. Grouting Material Usage. Grouting of the manhole may include corbel, wall, pipe seals, manhole joints, wall to flattop joint, and/or bench/trough. Areas of the manhole designated to be grouted will be directed by the Engineer. If entire manhole is scheduled for grouting, grouting shall include the entire manhole including corbel, wall, pipe seals and bench/trough. Pipe seal grouting shall include all pipe seals in the specified manhole and grouting of the specified manhole including the bench/trough to the maximum height of 18 inches from the crown. 5. Drilling and Injection: �- a. Injection holes shall be drilled through the manhole wall at locations indicated in the appropriate detail(s). b. Grout shall be injected through the holes under pressure with a suitable probe. Injection pressure shall not cause damage to the manhole structure or surrounding surface features. Grout shall be injected through the lowest holes first. The procedure shall be repeated until the manhole is externally sealed with grout. J• 310612000 Version ASC-26 _ PART DA - ADDITIONAL SPECIAL CONDITIONS C. Grouting from the ground surface shall not be allowed. d. Grout travel shall be verified by observation of grout to defects or adjacent injection holes. Provide additional injection holes, if necessary, to ensure grout travel. e. Injection holes shall be cleaned with a drill and patched with a waterproof quick setting mortar for brick and concrete manholes. 6. Testing of Rehabilitated Manholes. Testing of rehabilitated manholes for water tightness shall be performed by the Contractor in the presence of the Engineer in accordance with the requirement of Section DA-18, VACUUM TESTING OF REHABILITATED MANHOLES of these specifications. D. MEASUREMENT AND PAYMENT If the entire manhole is grouted, the Contract Unit Price shall be per vertical foot grouted as indicated on the Manhole Rehabilitation Schedule included in these specifications or as required by the Engineer. Payment for grouting pipe seals, bench and trough, and 18 inches above crown of pipe, and grouting flattop to wall joint, shall be based on the Contract Unit Price per each manhole rehabilitated as indicated on the Manhole Rehabilitation Schedule. The Contract Unit Price shall be payment in full for performing the work and for furnishing all labor, supervision, .� materials, equipment, preliminary repairs and testing necessary to complete the work including grouting with urethane grout. .. DA-19 VACUUM TESTING OF REHABILITATED MANHOLES: - OMITTED DA-20 FIBERGLASS MANHOLES: - OMITTED DA-21 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES: The contractor shall be responsible for locating and marking all previously exposed manholes and water valves in each street of this contract before the resurfacing process commences for a particular street. The contractor shall attempt to include the Construction Engineer (if he is available) in the Mobservation and marking activity. In any event a street shall be completely marked a minimum of two (2) working days before resurfacing begins on any street. Marking the curbs with paint is a recommended procedure. k It shall be the contractors responsibility to notify the utility companies that he has commenced work on the project. As the resurfacing is completed (within same day) the contractor shall locate the covered manholes and valves and expose them for later adjustment. Upon completion of a street the contractor shall notify the utilities of this completion and indicate the start of the next one in order for the utilities to adjust facilities accordingly. The following are utility contact OF persons: Company Telephone Number Contact Person Southwestern Bell Telephone 338-6275 "Hot Line" — 310612000 Version ASC-27 PART DA - ADDITIONAL SPECIAL CONDITIONS Texas Utilities 336-9411 Mr. Roy Kruger Ext. 2121 Lone Star 336-8381 Mr. Jim Bennett Ext. 6982 City of Fort Worth, 871-8100 Mr. Jim Bob Wakefield Street Light and Signal Of course, under the terms of this contract, the contractor shall complete adjustment of the storm drain and Water Department facilities, one traffic lane at a time within five (5) working days after •• completing the laying of proposed H.M.A.C. overlay adjacent to said facilities. Any deviation from the above procedure and allotted working days may result in the shut down of the resurfacing operation by the Construction Engineer. The contractor shall be responsible for all materials, equipment and labor to perform a most accurate job and all costs to the contractor shall be figured subsidiary to this contract. DA-22 REPLACEMENT OF CONCRETE CURB AND GUTTER: Contractor shall replace all damaged existing curb and gutter, as designated by the Construction Engineer, and replace with standard concrete curb and gutter, laydown curb and gutter, or in like kind, as governed by the standard City Specifications. Pay limits for laydown curb and gutter are as shown in Drawing No. S-S5 of the Standard Specifications. Included, and figured subsidiary to this unit price, will be the required excavation into the street to aid in the construction of the curb and gutter. The pay limit will be 9" out from the gutter lip, with same day haul-off of the removed — material to a suitable dumpsite. The street void shall be filled with H.M.A.C. "Type D" mix and compacted to standard City densities and top soil, if needed, shall be added and leveled to grade behind the curb. Existing improvements within the parkway such as water meters, sprinkler — system, etc. da-laged during construction shall be replaced with same or better at no cost to the City. Backfill for curb and gutter shall be completed within fourteen (14) calendar days from the day of demolition to date of completion. if the contractor fails to complete the work within fourteen (14) calendar days, a $100 dollar liquidated damage will be assessed per block per day. The unit price bid per linear foot shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. — DA-23 REPLACEMENT OF 6" CONCRETE DRIVEWAYS: This item shall include the removal and replacement of existing concrete driveways, due to — deterioration or in situations where curb and gutter is replaced to adjust grades to eliminate ponding water with same day haul-off of the removed material to a suitable dump site. For specifications governing this item see Item No. 104 "Removing Old Concrete", Item No. 504" — Concrete Sidewalk and Driveways". Pay limits for concrete driveway are as shown in Drawing No. S-S5 of the Standard Specifications. The unit price bid per square yard shall be full compensation for all labor, material, equipment, supplies, and incidentals necessary to complete the work. 310612000 Version - ASC-28 .. PART DA - ADDITIONAL SPECIAL CONDITIONS DA-24 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE: The contractor shall remove all existing deformed H.M.A.C. pavement and/or bad base material that shows surface deterioration and/or complete failure. The Engineer will identify these areas upon which time the contractor will begin work. The failed area shall be saw cut, or other similar -• means, out of the existing pavement in square or rectangular fashion. The side faces shall be cut vertically and all failed and loose material excavated. As a part of the excavation process, all unsatisfactory base material shall be removed, if required, to a depth sufficient to obtain stable sub-base. The total depth of excavation could range from a couple of inches to include the surface-base-some sub-base removal for which the Engineer will select the necessary depth. The remaining good material shall be leveled and uniformly made ready to accept the fill material. All excavated material shall be hauled off site, the same day as excavated, to a suitable dumpsite. After satisfactory completion of removal as outlined above, the contractor shall place the permanent pavement patch, with "Type D" surface mix. This item will always be used even if no base improvements are required. The proposed H.M.A.C. repair shall match the existing pavement section or the depth of the failed material, whichever is greater. However, the patch thickness shall be a minimum of 2 inches. Generally the existing H.M.A.C. pavement thickness will not exceed 6". Before the patch layers are applied, any loose material, mud and/or water shall be removed. A liquid asphalt tack coat shall be applied to all exposed surfaces. Placement of the surface mix lifts shall not exceed 3 inches with vibrator compactions to follow each lift. Compactions of the mix shall be to standard densities of the City of Fort Worth, made in preparation to accept the recycling process. All applicable provisions of Standard Specification Item Nos. 300 "Asphalts, Oils, and Emulsions", 304 "Prime Coat", and 312 "Hot-Mix Asphaltic Concrete" shall govern work. The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-25 GRADED CRUSHED STONES: This item shall be used to repair the failed base material in areas exceed 8" deep as directed by the Engineer. The material shall be graded crushed stones. For specifications governing this item see Item No. 208 "Flexible Base". The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-26 WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE: - OMITTED DA-27 BUTT JOINTS- MILLED: - OMITTED DA-28 2" H.M.A.C. SURFACE COURSE (TYPE "D" MIX): - OMITTED DA-29 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER: This item shall include the removal and reconstruction of existing concrete valley gutters at locations to be determined in field: 310612000 Version ASC-29 PART DA - ADDITIONAL SPECIAL CONDITIONS Removal of existing concrete valley, asphalt pavement, concrete base, curb and gutter, and necessary excavation to install the concrete valley gutters all shall be subsidiary to this pay item. Furnishing and placing of 2:27 concrete base and crushed limestone to a depth as directed by the Engineer and necessary asphalt transitions as shown in the concrete valley gutter details, shall be subsidiary to this Pay Item. See standard specification Item No. 314, "Concrete Pavement", Item 312 "Hot-Mix Asphaltic Concrete", Item No. 104, "Removing Old Concrete", Item No. 106, "Unclassified Street Excavation" Item No. 208 "Flexible Base." Measurement for final quantities of valley gutter will be .. by the square yard of concrete pavement and the curb and gutter section will be included. Contractor may substitute 5" non-reinforced (2:27) Concrete Base in lieu of Crushed Stone at no .. additional cost. See Item 314" Concrete Pavement". Asphalt base material may be required at times as directed by the Engineer to expedite the work _ at locations identified in the field. The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch. Contractor shall work on one-half of Valley Gutter at a time, and the other half shall be open to traffic. Work shall be completed on each half within seven (7) calendar days. If the contractor fails to complete the work on each half within seven (7) calendar days, a $100 dollars liquidated damage will be assessed per each half of valley gutter per day. The unit price bid per square yard for Concrete Valley as shown on the proposal will be full compensation for materials, labor, equipment, tools and incidentals necessary to complete the work. DA-30 NEW 7" CONCRETE VALLEY GUTTER: This item shall include the construction of concrete valley gutters at various locations to be _ determined in field. Removal of existing, asphalt pavement, concrete base, curb and gutter, and necessary excavation to install the concrete valley gutters all shall be subsidiary to this pay item. Furnishing and placing of 2:27 concrete base and crushed limestone to a depth as directed by the Engineer and necessary asphalt transitions as shown in the concrete valley gutter details shall be _ subsidiary to this Pay Item. See standard specification Item No. 314", Concrete Pavement", Item 312 "Hot-Mix Asphaltic Concrete", Item No. 104, "Removing Old Concrete", Item No. 106, "Unclassified Street Excavation" Item No. 208 "Flexible Base." Measurement for final quantities of valley gutter will be by the square yard of concrete pavement and the curb and gutter section will be included. Contractor may substitute 5" non-reinforced (2:27) Concrete Base in lieu of Crushed Stone at no additional cost. See Item 314" Concrete Pavement". The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch. Contractor shall work on one-half of Valley gutter at a time, and the other half shall be open to traffic. Work shall be completed on each half within seven (7) calendar days. .. 310612000 Version ASC-30 PART DA - ADDITIONAL SPECIAL CONDITIONS If the Contractor fails to complete the work on each half within seven (7) calendar days, a $100 dollars liquidated damage will be assessed per each half of valley gutter per day. The unit price bid per square yard for Concrete Valley as shown on the proposal will be full compensation for materials, labor, equipment, tools and incidentals necessary to complete the work. DA-31 NEW 4" STANDARD WHEELCHAIR RAMP: The Contractor shall construct standard concrete wheelchair ramps as shown on the enclosed details, or as directed by the Engineer. The removal of existing substandard wheelchair ramps and sidewalk as required for the installation of new wheelchair ramps shall be subsidiary to this pay item. The removal and _ replacement of existing curb and gutter as required for the installation of new wheelchair ramps shall be included in Pay Item 5 (Removal and Replacement of Curb and Gutter). Pay limits for laydown curb and gutter are as shown in the Standard Pay Limit Detail (WR-1). The pay limit will extend from 9" outside the lip of gutter to 15" back from the face of curb. Any asphalt tie-in shall be subsidiary to the curb and gutter pay item. Pay limits for "Standard Wheelchair Ramp" will start 15" back from the face of curb and encompass the remainder of the ramp and sidewalk. All applicable provision of standard Specifications Item 104 "Removing Old Concrete" and Item 504 "Concrete Sidewalk Driveways" shall apply except as herein modified. All concrete flared surface shall be colored with LITHOCHROME color hardener as manufactured by L.M. Scofield Company or equal. The color hardener shall be brick red color and dry-shake type, and shall be used in accordance with manufacturer's instructions. Concrete stain may be applied after concrete is poured (Product sold by BAER). "Contractor shall provide a colored sample concrete panel of one foot by one foot-by three inches dimension, or other dimension approved by the Engineer, meeting the aforementioned .. specification. The sample, upon approval by the Engineer, shall be the acceptable standard to be applied for -" construe:. -nvF_.J in the scope of this pay item. The method of application shall be by screen, sifter, sieve or other means in order to provide for a uniform color distribution." The unit price bid per square yard for 4" standard wheelchair ramp as shown on the proposal will .. be full compensation for materials, labor, equipment, tools and incidentals necessary to compete the work. DA-32 8" PAVEMENT PULVERIZATION: - OMITTED DA-33 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUT) The following specifications are for the furnishing and placing of reinforced concrete pavement or base as shown on detail and as directed by the Engineer. A. GENERAL: Reinforced concrete pavement or base shall conform to Specification Item No. 314 herein except for finishing and curing. 310612000 version ASC-31 PART DA - ADDITIONAL SPECIAL CONDITIONS B. FINISHING: The reinforced concrete shall be brought to a uniform surface by working with a wooden float. The surface shall be flush with the adjacent pavement and shall have a finish similar to the surrounding pavement. The surface shall be even and shall provide a smooth ride. .• C. CURING: The reinforced concrete pavement surfaces shall be sprayed uniformly with a membrane curing compound conforming to the requirements of ASTM C-309, Type 2, white-pigmented compound, which shall not produce permanent discoloration of the concrete. Concrete shall be allowed to cure for seven days or test cylinders reach 3000 psi before removal of barricades. D. EXECUTION: Included in this item will be the removal of the existing reinforced concrete pavement. The existing pavement shall be sawed so as to maintain an even, straight pavement cut. The existing reinforcing steel at sawed line and construction joints shall be lapped 18 inches with the new reinforced concrete pavement. The existing steel shall be thoroughly cleaned before lapping. The following work method will be performed on each utility cut: 1. Place safety signs, barricades and/or other warning devices where necessary and as .. required. 2. Replace pavement to nearest joint. •• 3. Mark out the damaged area with keel, chalk line or paint being sure to include all areas requiring repair. .. 4. Saw cut along marked lines a minimum of two (2) inches deep. 5. Remove existing concrete. 6. Form joints and place reinforcing steel and Dowel Bars (as required) according to standard specifications. 7. Place and finish concrete. 8. Clean up job site, removing all debris. 9. Maintain traffic control devices to protect the area until the concrete has cured seven days or concrete reaches 3000 psi compressive strength. E. PAYMENT: Payment shall be made at the unit price per linear foot as shown on the proposal and shall be full compensation for furnishing all labor, materials, equipment tools and incidentals necessary .. to complete the work. 310612000 Version ASC-32 i� PART DA - ADDITIONAL SPECIAL CONDITIONS DA-34 RAISED PAVEMENT MARKERS - OMITTED DA-35 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING - OMITTED DA-36 LOADING, TRANSPORTATION, AND DISPOSAL OF CONTAMINATED SOIL - OMITTED DA-37 ROCK RIPRAP- GROUT- FILTER FABRIC: - OMITTED .. DA-38 CONCRETE PIPE FITTINGS AND SPECIALS: Bidders shall submit the following for L-301 pre-stressed concrete cylinder pipe to be .. installed on this project: 1. A complete list of fittings and specials upon which the lump sum is bid. 2. Provide a unit price indicating the cost for furnishing and installing each of the various .. items of fittings and specials. The lump sum as bid in the Proposal shall be payment in full for all fittings and specials necessary for the construction of the project as designed. Payment for the installation of the pipe fittings, specials, and random lengths shall be included. Should the Engineer approve any changes to the fittings, specials or random pipe lengths listed as justifying the amount bid in the Proposal, the price submitted with the Proposal shall be used to determine the increase or decrease in the value of the lump sum of the Proposal, and the Contractor shall be paid on the basis of this adjusted value under that bid item. DA-39 PIPE INSTALLED BY SHORT BORE: A. GENERAL: 1. Furnish materials and necessary accessories, with strengths, thickness, .. coatings, and fittings indicated, specified and/or necessary to complete the work. 2. All excavation shall provide an open area conforming to the outside diameter of the carrier conduit. The excavation shall be to an alignment and grade which will allow the carrier conduit to be installed to proper line and grade as shown on the Plans and as established in the Specifications. 3. Work shall be performed in accordance with the requirements of the City of Fort Worth Water Department, as applicable. B. MATERIALS: 1. Carrier Pipe: Carrier pipe shall be as shown on drawings and as specified in the General Contract Documents. 2. Grout: Grout shall be Portland Cement grout of min. 2000 psi compressive strength at 28 days. Proportioned not less than 1 cu. ft. of cement to 3 cu. ft. of fine sand with sufficient water added to provide a free flowing thick slurry. 310612000 Version ASC-33 PART DA - ADDITIONAL SPECIAL CONDITIONS C. EXECUTION 1. Where sewer pipe is required to be installed across the root system of a tree (drip line) by short bore, construction shall be performed in such a manner so •• as to minimize damage to the tree. During construction operations, barricades to safeguard pedestrians shall be furnished and maintained, until such time as the backfill has been completed and then shall be removed from the site. .. 2. The minimum length of pipe to be replaced by short bore shall be as designated on the plans. Additional lengths of sewer line installed by short bore beyond "minimum length" criteria will be determined by the Contractor and extended to the appropriate limits. This extension must be approved by the City prior to proceeding with construction. .. 3. Pits and Trenches: a. Suitable pits or trenches shall be excavated for the purpose of conducting the short bore operations and for placing end joints of the pipe. Wherever end trenches are cut in the sides of the embankment or beyond it, such work shall be sheeted securely and braced in a manner to prevent earth from caving in. b. The location of the pit shall meet the approval of the Engineer. C. The pits of trenches excavated to facilitate these operations shall be backfilled immediately after the carrier pipe installation has been .. completed. d. The space between the carrier pipe and the limits of excavation shall be pressure grouted or mud-jacked. 3. Carrier Pipe Installation: The carrier pipe shall be installed by boring/excavating a _ hole with the earth auger and simultaneously jacking pipe into place. a. The short bore process shall proceed from a pit provided for the auger and jacking equipment and workmen. The Contractor must minimize excessive .. over-excavation during augering operations and maintain proper sewer alignment and grade. Excavated material shall be placed near the top of the working pit and disposed of as required. The use of water or other fluids in connection with the boring operation will be permitted only to the extent required to lubricate cuttings. Jetting or sluicing will not be permitted. .. b. All voids between the carrier pipe and the limits of excavation shall be pressure grouted or mud-jacked. •� 4. Installation of Carrier Pipe: 3/06/2000 version ASC-34 PART DA - ADDITIONAL SPECIAL CONDITIONS a. Sanitary sewer pipe located within the encasement pipe shall be supported by "skids" or "bands" to prevent the pipe and bells from snagging on the inside of the casing, and to keep the installed line from resting on the bells. b. All skids shall be treated with a wood preservative. Skids should extend for the full length of the pipe with the exception of the bell area and spigot area necessary for assembly unless otherwise specified. C. The Contractor shall prevent over-belling the pipe while installing it through the augered hole. A method of restricting the movement between the assembled bell and spigot where applicable shall be provided. d. At all short bore installations, the annular space between the carrier pipe and the limits of excavation shall be filled with grout or mud jacked. Care must be taken that not too much water is forced into the voids so as not to float the pipe. e. Closure of the short bore after the carrier pipe has been installed shall be plugged at the ends as shown on the drawings or as required by the Engineer. .. D. MEASUREMENT AND PAYMENT: Installation of pipe by short bore will be measured by the linear foot of pipe, complete in place. Such measurement will be made between the ends of the pipe along the central axis as installed. The work performed and materials furnished as prescribed by this item will be paid for at the Contract Unit Price bid per linear foot for Pipe Installed by Short Bore of the size specified as shown on plans. The furnishing of all materials, pipe, liner materials required for installation, for all preparation, hauling and installing of same, and for all labor, tools, equipment and incidentals necessary to complete the work, including excavation, backfilling and disposal of surk,is mater"'l shall be included in the Contract Unit Price as shown in the Bid Proposal. DA-40 SANITARY SEWER POINT REPAIR: A. GENERAL.: Sanitary sewer point repairs include all labor and materials necessary to remove and replace defective sections of existing sewer lines. Repair work may be required at joints, service connections, and on short segments of damaged pipe. A point repair is considered to be 10 feet in length. Point repair footage required that is greater than 10 feet is considered extra length and will be paid for on a price per linear foot of extra length installed. The contractor shall seek City approval for extra length point repairs before proceeding with construction. It shall be the Contractors responsibility to accurately locate the exact limits of the point of repair, since the point repair locations indicated on the plans are based on previously performed television inspections. The exact location of the point repairs will be determined by the Contractor through pre-construction internal television inspection prior to excavation to determine the true extent of the repair. The Contractor shall note the location and limits of the point repairs using sanitary sewer stationing and street addresses. After the location of the point repair is determined, the Contractor shall excavate and remove the damaged pipe and replace with new pipe. 310612000 Version ASC-35 PART DA - ADDITIONAL SPECIAL CONDITIONS Sanitary sewer point repairs include all labor and materials necessary to expose and correct the defects. The materials and construction methods used shall conform to the applicable specifications, including excavation and backfill, surface restoration, pipe installation, and sewer flow control. If noted on the plans or directed the City, the Contractor shall install clay dams at the downstream end of all point repairs. Clay dams shall be constructed from bentonite or approved equal material and installed in accordance with Specifications included herein. B. MATERIALS: The sanitary sewer point repair pipe replacement material shall be consistent and compatible with the existing sanitary sewer line being repaired. Typically, the point repairs will be constructed with gasketed joint, gravity SDR 35 or 26 PVC or Class 51 DI sewer pipe. Installation shall be in strict compliance with manufacturer recommendations. The method of jointing the ends of the replaced pipe with the existing pipe shall be constructed with City-approved stainless steel rigid fittings encased in concrete to create a water-tight connection. All pipe material and construction methods utilized shall be in strict compliance and in accordance with all applicable specifications and regulations in effect in ^ Fort Worth. C. EXECUTION: .. 1. Excavate repair pit and uncover the sewer line a minimum of 12 inches clearance all around the damaged section. The Contractor shall excavate, shape the bottom of the .. trench and place the required pipe bedding so that the grade of the replaced pipe matches the existing sewer line grade. 2. Remove defective pipe or fittings to the nearest joint or by cutting perpendicular to the pipe axis to leave a plain end. 3. Prepare a replacement section of like pipe material, or as otherwise approved by ENGINEER, to within one-fourth inch of required replacement pipe length. 4. Connect replacement section to existing pipe with appropriate size rigid coupling. 5. All service connections within the repair area shall be tested by CONTRACTOR to determine if they are active or inactive. Only active services shall be reconnected to the sewer system. Inactive services shall be plugged with hydraulic cement or non-shrink grout. Any liability associated with the plugging of active services shall be the CONTRACTOR's sole responsibility. ^ 6. Where a service lateral reconnection cannot be made because of the poor condition of the existing service lateral pipe, the OWNER and ENGINEER must be notified. Additional .. work to replace the entire sanitary sewer service on private property may then be authorized. 7. Point repairs shall be visually inspected and measured by ENGINEER prior to backfilling. 310612000 version ASC-36 PART DA - ADDITIONAL SPECIAL CONDITIONS 8. Surface Restoration: Service and lateral pits, and other work areas shall be restored to condition as good as that before construction occurred. Disturbed grasses shall be sodded in accordance with the specifications contained herein. Pavements removed or damaged shall be replaced. Concrete embankment shall be replaced or installed at locations indicated in the Drawings and in accordance with these specifications. D. TESTING: — 1. PROCEDURE: Sanitary sewer lines with point repairs shall be tested to determine the adequacy of each repair by televising the repaired area and ten (10) feet beyond each end of the repair. Video tapes of the repaired section shall be provided for ENGINEER and shall become property of OWNER. Visual observations, by ENGINEER, may be made where repairs can be observed by lamping the sewer line from the closest manhole, instead of television inspection. If the repair is found to be unsatisfactory by ENGINEER, CONTRACTOR shall repair the defect at no additional cost. 2. TESTING CRITERIA: A repair will be considered unsatisfactory if any one of the following are observed: r' a. Pipe joint not seated properly. b. Improperly connected lateral or service connection. C. Cracked or broken pipe. .r E. MEASUREMENT AND PAYMENT: 1. Pipeline Point Repairs shall be paid for at the Contract Unit Prices as follows: The unit price shall cover the entire cost of a 10-foot sewer repair. 2. Additional length of repair required will be paid for at the unit price bid for additional horizontal feet of repair, paid to the nearest 0.1 foot. 3. The prices shall be payment in full for performing and completing the work and for furnishing all labor and materials necessary including excavation and removal of existing structure, trench safety system, pipe repair materials, connectors, pipe sealing materials, labor, backfilling, surface restoration, testing, and all incidental costs. 4. Service reconnections within the point repair area shall be paid for separately at the unit price bid for service connection. 5. Surface restoration of Concrete embankment or riprap shall be paid for separately at the Contract Unit Price for Concrete Embankment actually installed. 6. Sanitary sewer point repairs along with lateral line point repairs and obstruction removals are located in areas which in many instances will require the removal of .� existing landscaping, structures, sidewalks, driveways, etc. Items removed or disturbed shall replaced or restored to original conditions or better. 310612000 Version ASC-37 PART DA - ADDITIONAL SPECIAL CONDITIONS 7. Removal of Debris: Excess excavated material and debris are to be removed from the work site daily. Cost of hauling excess excavation and debris is to be included in the price bid for "Service Line Point Repair'. 8. Disconnected Service Lines: At the locations where inactive services are .. discovered, the Contractor shall remove the service line no longer in use by excavating at the property line and plugging the service line. 9. Abandonment of Point Repair: If a pipe is exposed and found in good condition, not requiring a point repair, notify the Engineer who will record abandonment of point repair. Backfill the excavation, replace pavement or sidewalk and repair and seed or sod unpaved areas. DA-41 FLOWABLE FILL High strength fast fix (H.S. Four F) flowable fill, shall consist of an appropriate amount of cementitious material (with other additives as necessary) mixed with water and aggregates in a manner that will produce a flowable mix that will fill all voids in the excavation. This fill shall develop a compressive strength of 2160 pounds per square foot (15 psi) minimum an hour after placement, and a 28 day compressive strength within the range of 300 psi to 450 psi. The material must be such that the continuous mixing can be metered on site, as the (H.S. Four F) is being discharged from the mixer. In addition, the mixer shall be capable of producing different mix designs from the same load by simply changing material feed settings. 310612000 Version ASC-38 .. APPENDIX A STATE REVOLVING FUND (SRF) REQUIREMENTS APPENDIX A TWDB CONTRACT CONDITIONS PRIVITY OF CONTRACT. This contract is expected to be funded in part with funds from the Texas Water Development Board. Neither the State of Texas nor any of its departments, agencies or — employees is, or will be, a party to this contract or any lower tier contract. This contract is subject to regulations contained in 31 TAC Chapter 363 in effect on the date this contract is executed. DEFINITION. The term "TWDB" means the Executive Administrator of the Texas Water Development Board, or other person who may be at the time acting in the capacity or authorized to perform the functions of such Administrator, or the authorized representative thereof. — FINAL PAYMENT. The retainage and its interest earnings, if any, shall not be paid to the Contractor until the TWDB has authorized a reduction in, or release of, retainage on the contract work. REVIEW BY OWNER AND TWDB. (a) The Owner, authorized representatives and agents of the Owner, and the TWDB shall, at all times have access to and be permitted to observe and review all work, materials, equipment, payrolls, personnel records, employment conditions, material invoices, and other relevant data and records pertaining to this Contract, provided, however that all instructions and approval with respect to the work will be given to the Contractor only by the Owner through authorized representatives or agents. — (b) Any such inspection or review by the TWDB shall not subject the state of Texas to any action for damages. — FLOOD HAZARD INSURANCE This provision applies to any contract which will construct structures that are insurable under the National Flood Insurance Program of the Federal Emergency Management — Agency. The Contractor shall apply for flood insurance on all insurable structures that will be built under this contract. A copy of the completed application must be provided to the owner before commencing construction of the project. The Contractor shall obtain the flood hazard insurance as soon as possible and submit a copy of the policy to the Owner. ARCHEOLOGICAL DISCOVERIES. No activity which may affect a State Archeological Landmark is authorized until the Owner has complied with the provisions of the Antiquities Code of Texas. The Owner has previously coordinated with the appropriate agencies and impacts to known cultural or archeological deposits have been avoided or mitigated. However, the Contractor may encounter unanticipated cultural or archeological deposits during construction. Al-1 If archeological sites or historic structures are discovered after construction operations are begun, the Contractor shall immediately cease operations in that particular area and notify the Owner, the TWDB, and the Texas Historical Commission, (512-463-6096). The Contractor shall take reasonable steps to protect and preserve the discoveries until they have been inspected by the Owner's representative and the TWDB. The Owner will promptly coordinate with the Texas Historical Commission and any other appropriate agencies to obtain any necessary approvals or permits to enable the work to continue. The Contractor shall not resume work in the area of the discovery until authorized to do .. so by the Owner. ENDANGERED SPECIES. No activity is authorized that is likely to jeopardize the continued existence of a threatened or endangered species as listed or proposed for listing under the Federal Endangered Species Act (ESA), and/or the State of Texas Parks and Wildlife Code on — Endangered Species, or to destroy or adversely modify the habitat of such species. If a threatened or endangered species is encountered during construction, the Contractor shall immediately cease work in the area of the encounter and notify the Owner, who will immediately implement actions in accordance with the ESA and applicable State statutes. These actions shall include reporting the encounter to the TWDB, the U.S. Fish and Wildlife Service, and the Texas Parks and Wildlife Department, obtaining any necessary approvals or permits to enable the work to continue, or implement other mitigative actions. The Contractor shall not resume construction in the area of the encounter until authorized to do so by the Owner. LAWS TO BE OBSERVED. _ In the execution of the Contract, the Contractor must comply with all applicable Local, State and Federal laws, including but not limited to laws concerned with labor, safety, minimum wages, and the environment. The Contractor shall make himself familiar with and at all times shall observe and comply with all Federal, State and Local laws, ordinances and regulations which in any manner affect the condurt of the work, and shall indemnify and save harmless the Cwner, the i W DB, and their representatives against any claim arising from violation of any such law, ordinance or regulation by himself or by his subcontractor or his employees. HAZARDOUS MATERIALS. Materials utilized in the project shall be free of any hazardous materials, except as may be specifically provided for in the specifications. If the Contractor encounters existing material on sites owned or controlled by the Owner or in material sources that are suspected by visual observation or smell to contain hazardous materials, the Contractor shall immediately notify the Engineer and the Owner. The Owner will be responsible for the testing for and removal or disposition of hazardous materials on sites owned or controlled by the Owner. The Owner may suspend the work, wholly or in part during the testing, removal or disposition of .. hazardous materials on sites owned or controlled by the Owner. Al-2 EQUAL EMPLOYMENT OPPORTUNITY do During the performance of this contract, the Contractor agrees as follows: (1) The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, age, handicap, or national origin. The Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, age, handicap, or national origin. Such action shall include, but not be limited to the following: Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. (2) The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive considerations for employment without regard to race, color, religion, sex, age, handicap, or national origin. (3) The Contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employees. (4) The Contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, the Age Discrimination in Employment Act of 1967,29 U.S. C.A. 621 (1985), Executive Order 12250 of November 2, 1980, the Rehabilitation Act of 1973, 29 U.S.C.A. 701 et seq. (1985), and of the rules, regulations, and relevant — orders of the Secretary of Labor. (5) The Contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders. (6) In the event of the Contractor's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, this contract may be canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of — September 24, 1965, and such other sanctions may be imposed and remedies invested as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by Law. (7) The Contractor will include the portion of the sentence immediately preceding paragraph 1, and the provisions of paragraph 1 through 7, in every subcontract or .� purchase order unless exempted by rules, regulations, or orders of the Secretary of A 1-3 Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The Contractor will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance: PROVIDED, HOWEVER, That in -- the event a Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency the Contractor may request the United States to enter into such litigation to protect the interest of the United States. (8) The Contractor will comply with Executive Order 11246 based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the Standard Federal Equal Employment Opportunity Construction Contract Specifications, as set forth in 41 CFR Part 60-4 and its efforts to meet the goals established for the geographical area where the Contract is to be performed. The hours of minority and female employment and training must be substantially uniform throughout the length of the Contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals shall be a violation of the Contract, the Executive Order, and the regulations in 41 CFR Part 60-4. The goals are expressed as percentages of the total hours of employment and training of minority and female utilization the Contractor should reasonably be able to achieve in each construction trade in which it has employees in the covered area. Goals are published periodically in the Federal Register in notice form, and such notices may be obtained from any office of federal contract compliance's programs office or from federal procurement contracting officers (512) 229-5835. The Contractor is expected to make substantially uniform progress toward its goal in each craft during the period specified. Whenever the Contractor, or any subcontractor at any tier, subcontracts a portion of the work involving any construction trade, it shall physically include in each subcontract in excess of $10,000 the provisions of these specifications and the notice which contains the applicable goals set for minority and female participation and which is set forth in the solicitations from which this contract resulted. r "' Al-4 S.R.F. 1. The Contractor shall complete the two attached Texas Water Development Board forms at time of contract execution. 2. The Contractor shall submit along with the by-monthly payroll certification the attached form SRF-74, Certification By Contractor for Labor Standard Compliance. CONTRACTOR'S ACT OF ASSURANCE STATE OF TEXAS COUNTY OF Q.rt'Gxl ' BEFORE ME, f �� �j , a Notary Public duly commissioned ••• and qualified in and for the County of -ToxrwT in the State of Texas came and appeared�ak�SQ'-)CMUTUCh�. 6 _,as represented by .- �RIC" .ud &-f,3Cl cu--1n J the corporation, sr , /who declares he/she is authorized to represents ek C ,Q pursuant to provisions of a resolution adopted by said corporation on the day of ° , 20UU (a duly certified copy of such resolution is attached to and is hereby made a part of this document).= L f V H. , as the representative ok-6 EYlG-Mruvh"011f ,L/ n . - declares that h assures the Texas Water Development Board that it will construdL wr CUVX u�x..1, Lfg project at Texas, in PM accordance with sound construction practice, all laws of the State of Texas, and the rules of the Texas Water Development Board. Q GIVEN UNDER MY HAND and seal of office this day of r; 20Z AD ,,r�• LISA A RAULSTON NOTARY PUBLIC State of Texas OF, E�' Comm. Exp. 0�16-2001 sa Printed Na My Commission expires 9�10 1 R A3-1 CONTRACTOR'S ACT OF ASSURANCE RESOLUTION Name I hereby certify that it was RESOLVED by a quorum of the directors of the Ocin '( n _ Ltd . Name of Corporation meeting on the day of , 20 CV , that 0•�� be, and hereby is authorized to act on behalf of �� Name of Corporation as its representative, in all business transactions conducted in the State of Texas, and; That all above resolution was unanimously ratified by the Board of Directors at said meeting and that the resolution has not been rescinded or amended and is now in full forces and effect; and; In authentication of the adoption of this resolution, I subscribe my name and affix c the seal of the corporation this — day ofI�On , 20�. ` Secr ry (seal) a A4-1 CERTIFICATION BY CONTRACTOR of LABOR STANDARDS COMPLIANCE In accordance with Title 29, Subtitle A, Part 5, Section 5.6(A)(1), each monthly engineering estimate must be accompanied by the following certificate executed by each prime contractor employing mechanics and laborers at the work site in which the federal government is to participate: Date Estimate Number: for period to .� Name of Project Location Contract Number Date of Contract Awarded State Revolving Fund Loan Number I hereby certify that all of the contract requirements as specified under the labor standards have been complied with by: as principal contractor and by each subcontractor (Name of Contractor) employing mechanics or laborers at the site of the work, or there is a substantial dispute with respect to the required provisions. Name of Contractor/Subcontractor Signature and Title Notes: 1. This certification may be placed on the estimate or on a separate sheet attached to the estimate. 2. The Texas Water Development Board shall, prior to approving a voucher, satisfy itself that copies of these certificates are on file with the owner. A5-1 PART E - SPECIFICATIONS / EASEMENTS / PERMITS w EASEMENT DQ'UMENTS One copy of all the right-of-entry forms and all easements (temporary construction and permanent) obtained for this project are contained is this document following this page. As as dM w 'f SANITARY SEWER REHABILITATION PARCEL No. 1 (L-1771) PROJECT NO.XLIX(49) DOE No.2115 2115 31ST STREET am LOT 8,BLOCK 70 ROSEN HEIGHTS T THE STATE OF TEXAS } } COUNTY OF TARRANT } i PERMANENT SANITARY SEWER EASEMENT THAT WE,the city of Fort Word,,hereinafter referred to as"Grantor", for and in consideration w+ of One Dollar ($1.00) and other valuable consideration paid by the City of Fort Worth, a municipal corporation of Tarrant County, Texas, receipt of which is hereby acknowledged, do grant, bargain, and convey unto said City, its successors and assigns, the use and passage in, over, across, below and along the following parcel or tract of land situated in Tarrant County, w Texas,in accordance with the plat hereto attached: do SEE ATTACHED EXHIBIT It is further agreed and understood that the City of Fort Worth will be permitted the use of the above described strip of land for the purpose of the construction and maintenance of a sanitary sewer main. An ingress and egress easement shall be granted in order that access may be gained to the above described Permanent Utility Easement. TO HAVE AND TO HOLD the above described premises, together with all and singular, tine rights appurtenances thereto in anywise belonging unto the said City of Fort Worth, its successors and assigns, forever. And I hereby bind myself, my heirs, successors and assigns, to warrant and forever defend,all and singular,the said premises unto the said City of Fort Worth, its successors and assigns, against every person whomsoever lawfully claiming or to claim the same or any part thereof. It is intended by these presents to convey a right-of-way to the said City of Fort Worth to maintain,construct and repair the above described improvements,with the usual rights of ingress and egress in the necessary use of such right-of-way,in and along said premises. r� IN WITNESS WHEREOF, Grantor has caused this instrument to be executed on the day of .2000. am • Page I of 4 a$$Y•'-.' Syr, 57DI 3nL1 IWQW &I-A ftM WIE `C 'cG r ariRM, I[ )S' 7 r S'7-i06 i•za rap 657-a9d.•74Q F ARI'SEWER REHABILITATION PARCEL No. I (L-1771) CT NO.XLIX(d9) .2115 ST STREET BLOCK 70 ROSEN HEIGHTS ACKNOWLEDGEMENT THE STATE OF TEXAS COUNTY OF TARRANT BEFORE ME, , the undersigned authority, on this day personally appeared, known to me,or proved to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. GIVEN UNDER MY HAND AND SEAL OF OFFICE, this the day of �.. ,2000. Notary Public,State of Texas My Commission expires on the day of 2000. t Page 2 of d f "L"'A' a nUw ,lfrC�n SANITARY SEWER REHABILITATION PARCEL No. I (L-1771) PROJECT NO.XLIX(49) DOE No.2115 2115 31 ST STREET LOT 8, BLOCK 70 ROSEN HEIGHTS EXHIBIT"A" Being a Permanent Sanitary Sewer Easement out of Lot 8, Block 70 of Rosen Heights, an addition to the City of Port Worth, Tarrant County, Texas as recorded in Volume 204A, Page 154 of the Plat Records of Tarrant County. Texas. said Lot 8 being deeded to the City of Port MR Worth as recorded in Volume 3148, Page 244 of the Deed Records of Tarrant County, Texas. said Permanent Sanitary Sewer Easement being more particularly described by metes and bounds as follows: COMMENCING at a 60D nail found for the west corner of Lot 18, Block 70 of said Rosen Heights, said 60d nail being the south corner of Lot 17, Block 70 of said Rosen Heights, said 60D nail also being in the northeast right-of-way line of 30th Street(a 60.0' right-of-way), from dft which a 60d nail found for the south corner of Lot 19, Block 70 of said Rosen heights bears South 45 degrees 00 minutes 00 seconds East (Reference Bearing), a distance of 100.00 feet; THENCE North 45 degrees 00 minutes 00 seconds East, with the southeast line of said Lot 17 and with the said northwest line of said Lot 18, a distance of 160.00 feet to the POINT OF *+ BEGINNING,said point being the south corner of said Lot 8 and the west corner of said Lot 7, said point also being in the northeast line of a 20.0'alley as recorded in Volume 204A, Page 154 of said Plat Records of Tarrant County.Texas; i THENCE North 45 degrees 00 minutes 00 seconds West, with the southwest line of said Lot 8 and with the northeast line of said 20.0'alley, a distance of 10.00 feet to a point for corner; THENCE North 45 degrees 00 minutes 00 seconds East,a distance of 140.00 feet to a point for corner in the northeast line of said Lot 8, said point being in the southwest right-of- way line of 31 st Street(a 60.0'right-of-way); am THENCE South 45 degrees 00 minutes 00 seconds East, with the northeast line of said Lot 8 and with the southwest right-of-way line of said 31 st Street,a distance of 10.00 feet to a point for the east corner of said Lot 8 and for the north corner of said Lot 7; s THENCE South 45 degrees 00 minutes 00 seconds West, with the southeast line of said Lot 8 and with the northwest line of said Lot 7,a distance of 140.00 feet to the POINT OF BEGINNING and containing 1,400 square feet or 0.032 acres of land,more or less. +A Date:July 25,2000 _ V�Truett Wilson Registered Professional Land Surveyor No. 5146 Page 3 of 4 t8l-Uhgpr.a ! 0558€u51{S. r+G 6207 Ea=r,rw+gg 4Ta.R a4^D 3U.r[ 59 r'CRr wGNIN. it 7's,17 ax,6i7•app_a��, raf 9' -ii4- 6E EX TT B I 97B 79 PARCEL No. 1 (L- 1771) 3 > ST STREET (600 RIGHT-OF-WAY) S 45'00'00"E 10.00' cr { OW 3Y I I of 1-0 I I �3 of low• I U I LOT 8 0' -0LOT 7 I LOT 6 toI 1p I I I ( Z I I V) I I I I �I 10.0' PERMENANT SANITARY so SEWER EASEMENT (1,400 SOFT. OR 0.032 ACRES do N 45'00'00"WNotP.0. 10.00' B. ROSEN HElCHTS VOLUME 204A, PAGE 154 P.R.T.C.T. ( to { LOT 16 LOT 17 o LOT 18 LOT 19 � I I IZ I I FND 6Od NAIL S 45'00'00"£ T00TO. (REFERENCE BEARING) P.0.C. FND 60d NAIL 0 20 40 80 30TH STREET (600 RIGHT-OF-WAY) C-� SCALE IN FEET EXHIBIT SHOWING A 10.0' PERMANENT SANITARY SEWER EASEMENT BEING A PORTION OF LOT 8, BLOCK 70 ROSEN HEIGHTS AN ADDITION TO THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS ' RECORDED IN VOLUME 204A, PAGE 154 OF THE PLAT RECORDS OF TARRANT COUNTY, TEXAS PROJ.CT. SANITARY SEWER REHABILITATION PROJECT XLIX 49 DCE No 2115 EASFMENI ACQUISITION AREA 1400 SQUARE FEET OR 0032 ACRES - TRUE T WIL C JOB NO 0002-1155 DRAwN BY RK CnpD FILE 1155A DWG RFC,STFRTO PROFESSIONAL LAND SURVEYOR DATr JULY 25, 2000 RAZE 4 OF 4 , .7 t = 4Q. I,n 5146 GORRONDONA k ASSOCIATES. INC. • 6707 BRENTWOOD STAIR ROAD. SUITE 50 FORT WURTH, TX • PH 9177496-1424 FAX 817j496-176g Contract 49 Parcel No. 2 2614 NW 30th Street Lot 17, Block 70 Rosen Heights Second Filing DOE No. 2115 TEMPORARY RIGHT-OF-ENTRY AGREEMENT .. Sylvester Crownover, Owner, herewith grants permission to the City of Fort Worth and its independent contractor, to enter upon the owner's property located at Lot 17, Block 70, Rosen Heights Second Filing, also described as 2614 NW 30th Street (premises), for maintaining, rehabilitating, or replacing a sanitary sewer main or portion thereof, service or manhole. The following items will be performed: • A Right of Entry (ROE) is required to access and reconnect the private sanitary sewer service to the new sewer main. Any entry and use of the premises by the City of Fort Worth or its independent contractor under the Right-of-Entry agreement shall be permissive and shall not constitute a trespass to the property by the City or its independent contractor. Upon completion of said sanitary sewer project an its acceptance by the City of Fort Worth, Texas, all entry and use of the premises shall cease. The City of Fort Worth further agrees to restore the premises to the same condition that existed prior to entry. If restoration is required, the work shall be performed in a timely manner, weather permitting. This agreement is executed this day of , 20_, by Sylvester Crownover, owner. OWNER: � I I I I it I.,, L-1771 STA 28+02 (PROP) L-1771 STA 27+21 (EXIST)BLOCK 70 I L-4951 STA 0+00 (EXIST)I REMOVE EXIST MH REPLACE W/ STD 4' DIA MH INSTALL WATERTIGHT Mll INSERT ERT INSTALL CONCRETE COL.AR - - - - - - 1 - 04&71- I CP-227 N - 5185.43 E • 4789.79 LOT 18 I E - 4864.61 2612 NW 30th ST. i ( ELEV - 658.42 I JACOBS, WAYNE I 3876 INVERNESS CMN -• i LIVERMORE, CA 94550 i i 1 ROE-1 2 id 'i SY .. i p IP.A.__ _. ._. __._......... ........_ t I ( I I LOT 17 I �. 2614 NW 30th ST. N CROWNOVER, SYLVESTER 2614 NW 30th ST. ROE-2 FORT WORTH, TX 76106 W — — — — — — — — I I ROE-2 L-1771 - SANITARY SEWER REHABILITATION CONTRACT XLIX (49) PROJECT NO. PS58-070580174310 D.O.E. NO. 2115 Contract 49 Parcel No. 1 2612 NW 30th Street •. Lot 18, Block 70 Rosen Heights Second Filing DOE No. 2115 TEMPORARY RIGHT-OF-ENTRY AGREEMENT Wayne Jacobs, Owner, herewith grants permission to the City of Fort Worth and its independent contractor, to enter upon the owner's property located at Lot 18, Block 70, Rosen Heights Second Filing, also described as 2612 NW 30th Street (premises), for maintaining, rehabilitating, or replacing a sanitary sewer main or portion thereof, service or manhole. The following items will be performed: Ma • A Right of Entry (ROE) is required to access and reconnect the private sanitary sewer service to the new sewer main. Any entry and use of the premises by the City of Fort Worth or its independent contractor under the Right-of-Entry agreement shall be permissive and shall not constitute a trespass to the property by the City or its independent contractor. Upon completion of said sanitary sewer project an its acceptance by the City of Fort Worth, Texas, all entry and use of the premises shall cease. The City of Fort Worth further agrees to restore the premises to the same condition that existed prior to entry. If restoration is required, the work shall be performed in a timely i manner, weather permitting. This agreement is executed this day of , 20_, by Wayne Jacobs, owner. OWNER: I I I I 's I F,E T I L-1771 STA 28+02 (PROP R EN HEIGHTS SECOND FILING L-1771 STA 27+21 (EXIST) �,• I I BLOCK 70 L-4951 STA 0+00 (EXIST)I REMOVE EXIST MH REPLACE W/ STD 4' DIA MH INSTALL WATERTIGHT IAi INSERT T INSTALL CONCRETE CO AR CP-227 — — — — — — � '7r N - 5185.43 E • 4789.79 LOT 18 I E - 4864.61 2612 NW 30th ST. ELEV - 658.42 JA1,08S, WAYNE 3876 INVERNESS CMN ---�- i l LIVERMORE, CA 94550 ROE-1 .{....� . .-. c fir— ;A:t;itr?fi: — — — - `2 ':at.c',e4!r' r.• y. 22 pm CD �IT N // r I I LOT 17 2614 NW 30th ST. ROE-1 L-1771 .. SANITARY SEWER REHABILITATION CONTRACT XLIX (49) PROJECT NO. PS58-070580174310 D.O.E. NO. 2115 Contract 49 Parcel No. 3 5705 Boca Raton - Lot 7 & 8, Block 3 Woodhaven Country Club Estates DOE No. 2115 TEMPORARY RIGHT-OF-ENTRY AGREEMENT William etux Jeanie Harrison, Owner, herewith grants permission to the City of Fort Worth and its independent contractor, to enter upon the owner's property located at Lot 7 & 8, Block 3, Woodhaven Country Club Estates, also described as 5705 Boca Raton (premises), for maintaining, rehabilitating, or replacing a sanitary sewer main or portion thereof, service or manhole. The following items will be performed: • A Right of Entry (ROE) is required to access and reconnect the private sanitary sewer service to the new sewer main to the existing sanitary sewer manhole located on your property. Any entry and use of the premises by the City of Fort Worth or its independent contractor under the Right-of-Entry agreement shall be permissive and shall not constitute a trespass to the property by the City or its independent contractor. Upon completion of said sanitary sewer project an its acceptance by the City of Fort Worth, Texas, all entry and use of the premises shall cease. The City of Fort Worth further agrees to restore the premises to the same condition that existed prior to entry. If restoration is required, the work shall be performed in a timely manner, weather permitting. i This agreement is executed this day of , 20_, by William etux Jeanie Harrison, owner. OWNER: 1 I I I I I I I ' I I LOTS & 8 LOT 9 L 5705 Bo A RATON 5709 BOCA RATON 5713 B BLIII/p BLVD HARRISOf , WILLIAM VEASLEY, WESLEY HARWE CONS UCT 58 LF 8- CL 51 DI ETUX JEANIE 5709 BOCA RATON 5713 - SANIT Y S WER SERVICE BETWE N P.O. BOX 531 BLVD MANH S @ 296 MINIMUM GRADE FORT WORTH, TX I FORT WORTH, TX I FORT RECO CT MISTING PRIVATE I 7s�01 SANIT Y S MANHOLE 35 BUILDING LINE ^� I I N • 549.25 E . 72 .00 I ROE-3 _ U-41STING ATE j rn o rri m• 12' AK2 — la! oAK • r � � CUR —_ D-HOLE 277, ORM - I -DRAIN P f 96R-M - - CUT. PLUG AND ANY STRUCTION BANDON IN PLACE ON E PROJECT avvvv_v Z. vim---- rr-�.K v v�v v ^9 vV_v v v v v y,�►y�Yv v v v 1100 '300 L-7213 mommsm ROE-3 L-7213 SANITARY SEWER REHABILITATION CONTRACT XLIX (49) PROJECT NO. PS58-070580174310 D.O.E. NO. 2115 AE FCItP'� o SECTICi( E SPECIFIC�7I04 J Y JA iUARY 1 , 1916 - EtxJk WATER DEPARTMENT All materials , construction r=thods and procedures used in this project shall conform, to Sections El , E2, and UA of the Fort North h':ter U_•pa�tr;nt General Contract Documents and General Specifications , together with any • additional material specifications , construction(s) or later revision(s) . (See revisions listed on this sheet;. Sections El , E2 and E2A of the = Fort Korth Water Vapartcent General Contract Docu.ients and General Specifications are hereby mad_' a part of this contract document by reference for all purposes , the saize as if copies verbatim herein, and such Sections _ are filed and kept in the office of Vie City Secretary of.the City of Fort Korth as an official record of the ,City of Fort North. INDEX El MATERIAL SPECIFICATIO,iS — jl E1 COdSTRUCTI ON SPECI FI CATI OiiS - E 2 A, GENERAL DESI 4 DETAILS Pevisions as of Peril 20, 1981 , follow: E1-2.4 Backfi11 : (Correct minimum co-paction requirEraent to SSA Procter densi ;: and correct P. I . values as follows :) 4 c. Additional backfill requireiments when approti•ed for use in streets : 1 . Ty e 6 Backfill . Maximum plastic index (PI ) shall be E 1 . Ty e C backfill (a Material reetirg requirements and heti•ine a PI of S or less shall be considered as suitable for coi-,yact- ion by betting (b) Material meeting r•equire-.znt and t,ati•ine a PI Cf c or more shall be considered for use only xi t►l c,ee<<anieal ccmp_ction Ee-2.111'renCh backfill : (Correct minimum co,rpaction require,,:-Ent wherayer it appears in this section to'95: Procter demity except for paragrapn 2. 1 where the `95S r.Qdified Procter density" shall re,--zin Vnc)t'ng:J) • SECTION E10O - MATERIAL SFECIFICATIONS MATERIAL STANDARD E10O-4 JA�NUARY 1, 1978 (ADDED 5/13/90) E10 W.-.TEPTICHT MANHOLE INSEPTS F10d-= . 1 CEhEP•A� This standard covers the furnishing and installation of ►ratertight caskcted manhole inserts in .the Fort Worth sanitary sewer collection system. ' EIMI-4 .2 MATERIALS A':0 OESICv: a : The manhole insert shell be of corrosion-proof h•i'gh 'density polyethelene that meets or exceeds the requirements of ASTM D1248, Catecory 5, Type III . b. .The minimum thickness of the manhole insert shall be 1/8". C. The manhole insert shall hive* a gasket that provides positive seal in wet or dry conditions. The gasket shall be made of closed cell neoprene rubber and meet the requirement of ASTM D1O56, or equal . d. The manhole insert -shall have a strap for removing the insert. The strap shall be made of minimum 1" wide woven polypropalene or nylon webbing, with -the ends treated to prevent unravelling. Stainless steel hard•Kare shall be used to securely attach strap to the insert. e. The manhole insert shall have one or more vent holes or valves to r� release gasses and allow rater inflow 'at a rate no treater than 10 gallons per 24 hours. Z100-4 .3 INSTALLATION: a. The . manhole frame shall be cleaned of all dirt and debris before placing the r_nhole insert on the rim. b. The r.anhole insert shall be fully seated around t%e manhole frame rim. to retard water from seeping between the cover and the m-anhole frame rim. E1O0 (1) PART F - BONDS & INSURANCE k CERTIFICATE OF INSURANCE -. TO: CITY OF FORT WORTH Date: April 16,2001 NAME OF PROJECT: Sanitary Sewer Rehabilitation Contract XLIX(49) r PROJECT NUMBER- PS58-070580174310 IS TO CERTIFY THAT: Jackson Construction Ltd, 5112 Sun Valley Dr., Ft.Worth, Tx. 76119 is,at the date of this certificate,Insured by this Company with respect to The business operations hereinafter described,for the type of insurance and accordance with provisions of the standard policies used by this Company, and further hereinafter described.Exceptions to standard policy noted on reverse side hereof. TYPE OF INSURANCE Policy Effective Expires Limits of Liability Worker's Compensation TSF0001072700 10/01/2000 10/01/2001 500,0000/500,000/500,000 omprehensive eneral Bodily Injury: Liability Insurance(Public Ea.Occurrence: $1,000,000 Liability) Property Damage: 46COT0286 10/01/2000 10/01/2001 Ea.Occurrence: $1,000,000 Blasting 46CQT0286 10/01/2000 10/01/2001 Ea.Occurrence: $1,000,000 Collapse of Building or structures adjacent to Ea.Occurrence:$1,000,000 excavations 46CQT0286 10/01/2000 10/01/2001 Damage to Underground Utilities 6CQT0286 10/01/2000 10/01/2001 Ea. Occurrence: $1,000,000 Builder's Risk Comprehensive Bodily Injury. 1,000,000 Automobile Liability Ea. Person: $ Ea.Occurrence: $ 1,000,000 Property Damage: 46UENQT0287 10/01/2000 10/01/2001 Ea,Occurrence: $ 1,000,000 Bodily Injury: Contractual Liability Ea.Occurrence: $ 1,000,000 Property Damage: 6CQT0286 10/01/2000 10/01/2001 Ea. Occurrence: $1,000,000 Other 46HUQT0288 10/01/2000 10/01/2001 $10,000,000 Locations covered: As described above, Ft.Worth,Tx. Description of operations covered: As described above The above policies either in the body thereof or by appropriate endorsement provided tht they may not be changed or canceled by the insurer in less than five(5)days after the insured has received written notice of such change/or cancellation. Where applicable local laws or regulations require more thatn five(5)days actual notice of change or cancellation to be assured,the above policies contain such special requirements,either in the body thereof or by appropriate endorsement thereto attached. Aaency Coble-Cravens Insurance Agency. Inc. Ro ert W. urdi Fort Worth Agent B y �. P.O. Box 429 Address 202 E. Border,Arlington, TX 76004-0429 Title President CONTRACTOR COMPLIANCE WITH WORKERS'COMPENSATION LAW Pursuant to V.T.C.A Labor Code Section 406.096,Contractor certifies that it provides workers' compensation insurance coverage for all its employees employed on city of Fort Worth Project Number PS58- 070580174310 JACKSON CONSTRUCTION,LTD. CONTRACTOR B :- anc, . mlt.jL P nJ title .� Date STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME,the undersigned authority,on this day personally appeared known to me be the person whose name i subscribed to foregoing i tru ent,and ackn ledg o�he executed the same as the act and deed o^-� a for the purpose and consideration therein expressed and in the capacity ther&stated.0 Q GIVEN UNDER MY HAND AND SEAL OF OFFICE this I 1 day of .20 ()J _. �►�"' N LISA A RAULSTON ot Public in and fo R, �¢" NOTARY PUBLIC the State of Texas ,iI State of Texas Comm.Exp.MI&2001 PERFORMANCE BOND THE STATE OF TEXAS § COUNTY OF TARRANT § KNOW ALL MEN BY THESE PRESENTS: That we (1) JACKSON CONSTRUCTION, LTD. a (2) CORPORATION of TEXAS, hereinafter call Principal, and (3) ** a corporation organized and existing under the laws of the State and fully authorized to transact business in the State of Texas, as Surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation organized and existing under the laws of the State of Texas,hereinafter called Owner,in the penal sum of: NINE HUNDRED TWENTY-ONE THOUSAND EIGHT HUNDRED SIXTY-SEVEN AND 30/100....................................................................................................................... ($921,867.30)Dollars in lawful money of the United States,to be paid in Fort Worth,Tarrant County,Texas,for the payment of which sum well and truly be made,we hereby bind ourselves,our heirs,executors,administrators and successors,jointly and severally,firmly by these presents. THE CONDITION OF THIS of: OBLIGATION is such that Whereas, the Principal entered into a certain contract with the City of Fort Worth,the Owner, dated the of ,2001 a copy of which is hereto attached and made a part hereof,for the construction of: A p R 2 4 2001 SANITARY SEWER REHABILITATION CONTRACT XLIX(49) designated as Project No. (s) PS58-070580174310, a copy of which contract is hereby attached, referred to, and made a part hereof as fully and to the same extent as if copied at length herein, such project and construction being hereinafter referred to as the"work". NOW THEREFORE, if the Principal shall well,truly, and faithfully perform the work in accordance with the plans, specifications, and contract documents during the original term thereof, and any extensions thereof which may be granted by the Owner, with or without notice to the Surety, and if he shall satisfy all claims and demands incurred under such contract, and shall fully indemnify and save harmless the Owner from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and expense which the Owner may incur in making good any default,then this obligation shall be void; otherwise to remain in full force and effect. **INDEPENDENCE CASUALTY AND SURETY COMPANY PROVIDED FURTHER, that if any legal action filed upon this bond, venue shall lie in Tarrant County, State of Texas. AND PROVIDED FURTHER,that the said Surety,for value received,hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the work to be performed thereunder or the specifications accompanying the same shall in any wise affect its obligations on this bond, and it does hereby waive notice of any such change,extension of time,alteration or addition to the terms of the contract or to the work or to the specifications. IN WITNESS WHEREOF, this instrument is executed in 10 counterparts each one of which shall be deemed an original,this the of ,2001. ATTEST: .APR 2 4 2001 Or JACKSON CONSTRUCTION,LTD. arincipal) ecretary PRINCIP (4) BY: Title: (SEAL) 5112 SUN VALLEY DRIVE &MAO C WbL9A FORT WORTH,TX 76119 (Address) Independence Casualty and Surety -any Witness a to Principal S re 51 2 Sun Valley Drive t Worth,Address TX 19 BY: A S (Attorney-in act)(5)Jack M rowley P.O. Box 429 (Surety)Secretary Arlington, TX 76004-0429 (Address) (SEAL) NOTE: Date of Bond must not be prior to date of Contract (1) Correct Name of Contractor (2) A Corporation,a Partnership or an Individual,as case may be (3) Correct name of Surety -- (4) If contractor is Partnership all Partners should execute Bond (5) A true copy of Power of Attorney shall be attached to Bond by ��✓ Attorney-in-Fact.. kE. ord�etr, rety 2 Arlington, TX 76010 (Address) Independence Casualty and Surety Company HOME OFFICE: SAN DIEGO,CALIFORNIA POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS:That INDEPENDENCE CASUALTY AND SURETY COMPANY,a Texas Corporation,does hereby appoint: JACK M.CROWLEY its true and lawful Attomey(s)in-Fact,with full power and authority,to execute,on behalf of the Company,fidelity and surety bonds,undertakings,and other contracts of suretyship of a similar nature. This Power of Attorney is granted and is signed and sealed by facsimile under the authority of the following Resolution adopted by the Board of Directors on the 23rd day of February, 1998,which said Resolution has not been amended or rescinded and of which the following is a true copy: "RESOLVED,that the Chairman of the Board,the President,an Executive Vice President or a Senior Vice President of the Company,and each of them,is hereby authorized to execute Powers of Attomey qualifying the attorney named in the given Power of Attorney to execute on behalf of the Company,fidelity and surety bonds,undertakings,or other contracts of suretyship of a similar nature;and to attach thereto the seal of the Company; provided however,that the absence of the seal shall not affect the validity of the instrument. FURTHER RESOLVED,that the signatures of such officers and the seat of the Company,and the signatures of any witnesses,the signatures and seal of any notary,and the signatures of any officers certifying the validity of the Power of Attorney,may be affixed by facsimile." IN WITNESS WHEREOF,INDEPENDENCE CASUALTY AND SURETY COMPANY has caused these presents to be signed by its duly authorized • officers this 11th day of March 1999. INDEPENDENCE CASUALTY AND SURETY COMPANY '- STATE OF CALIFORNIA SS. #JohnL. Executive Vice President COUNTY OF SAN DIEGO IN WITNESS WHEREOF,the undersigned certify that they are adults,and have witnessed the signing of this instrument by the principal or have witnessed the principal's acknowledgment of the signature on the power of attorney,pursuant to California Probate Code§4121 and 4122. g®rryFaf*aul �— / Janis Theodore CERTIFICATE: I,John H.Craig,Assistant Secretary of INDEPENDENCE CASUALTY AND SURETY COMPANY,do hereby certify that the original POWER OF ATTORNEY,of which the foregoing is a true copy,is still in full force and effect,and that this certificate may be signed by facsimile under the authority of the above quoted resolution. IN WITNESS WHEREOF,1 have subscribed my name as Assistant Secretary,on this day of 9V Y s INDEP CE C ALTY A URETY COMPANY k tid a 5' ICS 37 John rai ,Assists cretary PAYMENT BOND THE STATE OF TEXAS § COUNTY OF TARRANT § KNOW ALL MEN BY THESE PRESENTS: That we (1) JACKSON CONSTRUCTION, LTD. a (2) of Tarrant County, hereinafter call Principal, and (3) ** , a corporation organized and existing under the laws of the State TX and fully authorized to transact business in the State of Texas, as Surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation organized and existing under the laws of the State of Texas,hereinafter called Owner,and unto all person,firms,and corporations who may furnish materials for, or perform labor upon, the building or improvements hereinafter referred to in the penal sum of NINE HUNDRED TWENTY-ONE THOUSAND EIGHT HUNDRED SIXTY-SEVEN AND 30/100.............................................................................................................................................. ($921,867.30)Dollars in lawful money of the United States to be paid in Fort Worth, Tarrant County,Texas,for the payment of which sum will and truly be made, we hereby bind ourselves, our heirs, executors, administrators and successors,jointly and severally,firmly by these presents. THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the City of Fort Worth, the Owner, dated the day of A.D. , 2001, a copy of which is hereto attached and made a part thereof,for the consideration of:: APR 2 4 2001 SANITARY SEWER REHABILITATION CONTRACT XLIX(49) designated as Project No. (s)PS58-070580174310,a copy of which is hereto attached, referred to, and made a part hereof as fully and to the same extent as if copied at length herein, such project and construction being hereinafter referred to as the"work". NOW THEREFORE, the condition of this obligation is such that, if the Principal shall promptly make payment to all claimants as defined in Chapter 2253,Texas Government Code, supplying labor and materials in the prosecution of the work provided for in said Contract,then this obligation shall be null and void, otherwise it shall remain in full force and effect. **INDEPENDENCE CASUALTY AND SURETY COMPANY THE BOND IS MADE AND ENTERED into solely for the protection of all claimants supplying labor and material in the prosecution of the work provided for in said Contract, as claimants are defined in said Chapter 2253, and all such claimants shall have a direct right of action under the bond as provided in Chapter 2253, Texas Government Code. PROVIDED FURTHER,that if any legal action be filed upon this bond,venue shall lie in Tarrant County, Texas, State of Texas, and that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time,alteration or addition to the terms of the contract or to the work to be performed thereunder or the specification accompanying the same shall in any wise affect its obligation on this bond, and it does hereby waive notice of any such change,extension of time, alteration or addition to the terms of the contract or to the work or the specifications. PROVIDED FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder whose claim shall be unsatisfied. IN WITNESS WHEREOF, this instrument is executed in 10 counterparts each one of which shall be deemed an original,this the day of A.D.,2001. APR 2 4 2001 JACKSON CONSTRUCTION,LTD. ATTEST: PRINCIP (4) O�— BY: Title: �1C. (Principal) Secretary 5112 SUN VALLEY DRIVE FORT WORTH,TX 76119 (SEAL) (Address) 1 Independence ualty and S ty Company fitness as to Principal Surety - 51 2 Sun Valley Drive BY: Fort Worth, TX 76119 (Atto e -in-fact)(5 Jack M. Crowley - Address P.O. Bo 29, Arlington, 'TX 76004-0429 m A (Address) (Surety)Secretary 202 E. Border, Arlington, TX 76010 (Address) (SEAL) NOTE: Date of Bond must not be prior to date of contract (1) Correct Name of Contractor (2) A Corporation,a Partnership or an Individual,as case may be (3) Correct name of Surety (4) If contractor is Partnership all Partners should execute Bond (5) A true copy of Power of Attorney shall be attached to Bond by Attorney-in-Fact.. Witness as�toety Independence Casualty and Surety Company HOME OFFICE:SAN DIEGO,CALIFORNIA POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS:That INDEPENDENCE CASUALTY AND SURETY COMPANY,a Texas Corporation,does hereby appoint: JACK M.CROWLEY its true and lawful Attomey(s)-in-Fact,with full power and authority,to execute,on behalf of the Company,fidelity and surety bonds,undertakings,and other contracts of suretyship of a similar nature. This Power of Attorney is granted and is signed and sealed by facsimile under the authority of the following Resolution adopted by the Board of Directors on the 23rd day of February, 1998,which said Resolution has not been amended or rescinded and of which the following is a true copy: _ "RESOLVED,that the Chairman of the Board,the President,an Executive Vice President or a Senior Vice President of the Company,and each of them,is hereby authorized to execute Powers of Attorney qualifying the attorney named in the given Power of Attorney to execute on behalf of the Company,fidelity and surety bonds,undertakings,or other contracts of suretyship of a similar nature;and to attach thereto the seal of the Company; provided however,that the absence of the seal shall not affect the validity of the instrument. FURTHER RESOLVED,that the signatures of such officers and the seal of the Company,and the signatures of any witnesses,the signatures and seal of any notary,and the signatures of any officers certifying the validity of the Power of Attorney,may be affixed by facsimile." IN WITNESS WHEREOF, INDEPENDENCE CASUALTY AND SURETY COMPANY has caused these presents to be signed by its duly authorized officers this 11th day of March 1999. dgJ ��o�G INDEPENDENCE CASUALTY AND SURETY COMPANY STATE OF CALIFORNIA SS. John L. annum, Executive Vice President COUNTY OF SAN DIEGO IN WITNESS WHEREOF,the undersigned certify that they are adults,and have witnessed the signing of this instrument by the principal or have witnessed the principal's acknowledgment of the signature on the power of attorney,pursuant to California Probate Code§4121 and 4122. f 1 rry Fafaul Janis Theodore T CERTIFICATE: I,John H.Craig,Assistant Secretary of INDEPENDENCE CASUALTY AND SURETY COMPANY,do hereby certify that the original POWER OF ATTORNEY,of which the foregoing is a true copy,is still in full force and effect,and that this certificate may be signed by facsimile under the authority of the above quoted resolution. IN WITNESS WHEREOF, I have subscribed my name as Assistant Secretary,on this day of 9VAyTY�'O S x a INDEP CE C ALTY A URETY COMPANY ICS 37 John Wtrai ,/Assista cretary (Address) MAINTENANCE BOND THE STATE OF TEXAS § = COUNTY OF TARRANT § _ KNOW ALL MEN BY THESE PRESENTS: That(1)JACKSON CONSTRUCTION,LTD.as Principal, acting herein by and through (2)Larry H, Jackson its duly authorized Larry H. Jackson and (3) ** a corporation organized under the laws of the State of TEXAS,as surety, do hereby acknowledge themselves to be held and bound to pay unto the City of Fort Worth,A Municipal Corporation, chartered by virtue of Constitution and laws of the State of Texas, at Fort Worth, in Tarrant County, Texas the sum of NINE HUNDRED TWENTY-ONE THOUSAND EIGHT HUNDRED SIXTY-SEVEN AND 30/100....................................................................................................................... ($921,867.30)in lawful money of the United States, for the payment of which sum well and truly be made unto said City of Fort Worth and its successors, said Contractor and surety do hereby bind themselves, their heirs, executors, administrators,assigns and successors,jointly and severally. This obligation is conditioned,however;that, APR 2 4 2001 WHEREAS, the Principal has entered into a certain contract with the City of Fort Worth, dated the day of 2001, the performance of the following described public work and the construction of the following described public improvements: SANITARY SEWER REHABILITATION CONTRACT XLIX(49) all of same being referred to herein and in said contract as the Work and being designated as project PS58- 070580174310 and said contract, including all of the specifications, conditions and written instruments referred to therein as contract documents being hereby incorporated herein by reference for all purposes and made a part hereof, the same as if set out verbatim herein;and, WHEREAS, in said Contract,Contractor binds itself to use such materials and to so construct the work that it will remain in good repair and condition for and during the period One (1) Year after the date of the final acceptance of the work by the City;and WHEREAS,said Contractor binds itself to maintain said work in good repair and condition for said term of One(1)Year;and, WHEREAS, said Contractor binds itself to repair or reconstruct the work in whole or in part at any time within said period, if in the opinion of the Director of the Water Department of the City of Fort Worth, it be necessary;and, WHEREAS, said Contractor binds itself,upon receiving notice of the need therefor to repair or reconstruct "" said work as herein provided. NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or reconstruct said work in accordance with all the terms and conditions of said Contract, these_presents shall be null and void,and have no force or effect. Otherwise this Bond shall be and remain in full force and effect,and said City shall have and recover from the said Contractor and its surety damages in the premises prescribed by said Contract. This obligation shall be continuing one and successive recoveries may be had hereon for successive breaches until the full amount hereof is exhausted. WHEREAS,all parties covenant and agree that if any legal action be filed upon this bond,venue shall lie in Tarrant County,Texas;and, IN WITNESS WHEREOF, this instrument is executed in 10 counterparts, each one of which shall be deemed an original,dated 2001. APR 24 Lu'J ATTEST: Get. e^ (Principa Secretary (Seal) JACKSON CONSTRUCTION,LTD. PRINCIP L(4) B 112V�� Title: 5112 SUN VALLEY DRIVE FORT WORTH,TX 76119 4-M—�itlljj Mn (Address) Witness a to Principal Ind epe ence asualty Company 5112 Sun Valley Drive S Fort Worth (Address) TX 76119 BY: - T: (Att rn y-n-fact)(5) ck M. Crowley P.O. ox 429, Arlington TX 76604-0429 (Address) (Surety)Secretary NOTE: Date of Bond must not be prior to date of Contract (SEAL) (1) Correct Name of Contractor (2) A Corporation,a partnership or an Individual,as case may be (3) Correct name of Surety (4) If Contractor is Partnership all Partners should execute Bond ., (5) A true copy of Power of Attorney shall be attached to Bond by Attorney-in-Fact. Witness as to Surety 2 Border Ar ington, TX 76010 Independence Casualty and Surety Company HOME OFFICE:SAN DIEGO,CALIFORNIA POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS:That INDEPENDENCE CASUALTY AND SURETY COMPANY,a Texas Corporation, does hereby appoint: JACK M.CROWLEY its true and lawful Attomey(s)-in-Fact,with full power and authority,to execute,on behalf of the Company,fidelity and surety bonds,undertakings, and other contracts of suretyship of a similar nature. This Power of Attomey is granted and is signed and sealed by facsimile under the authority of the following Resolution adopted by the Board of Directors on the 23rd day of February, 1998,which said Resolution has not been amended or rescinded and of which the following is a true copy: "RESOLVED,that the Chairman of the Board,the President,an Executive Vice President or a Senior Vice President of the Company,and each of them,is hereby authorized to execute Powers of Attorney qualifying the attorney named in the given Power of Attorney to execute on behalf of the Company,fidelity and surety bonds,undertakings,or other contracts of suretyship of a similar nature;and to attach thereto the seal of the Company; provided however,that the absence of the seal shall not affect the validity of the instrument. FURTHER RESOLVED,that the signatures of such officers and the seal of the Company,and the signatures of any witnesses,the signatures and seal of any notary,and the signatures of any officers certifying the validity of the Power of Attorney,maybe affixed by facsimile." IN WITNESS WHEREOF, INDEPENDENCE CASUALTY AND SURETY COMPANY has caused these presents to be signed by its duly authorized officers this 11th day of March 1999. Gv�SY INDEPENDENCE CASUALTY AND SURETY COMPANY a r k STATE OF CALIFORNIA SS. John L. annum, Executive Vice President COUNTY OF SAN DIEGO IN WITNESS WHEREOF,the undersigned certify that they are adults,and have witnessed the signing of this instrument by the principal or have witnessed the principal's acknowledgment of the signature on the power of attorney,pursuant to California Probate Code§4121 and 4122. r , /Irry Fafaul Janis Theodore w CERTIFICATE: 1,John H.Craig,Assistant Secretary of INDEPENDENCE CASUALTY AND SURETY COMPANY,do hereby certify that the original POWER OF ATTORNEY,of which the foregoing is a true copy,is still in full force and effect,and that this certificate may be signed by facsimile under the authority of the above quoted resolution. IN WITNESS WHEREOF, I have subscribed my name as Assistant Secretary,on this day of 50 y[Y °T x sG INDEP CE C ALTY A URETY COMPANY ICS 37 John rai ,Assists cretary PART G-CONTRACT THE STATE OF TEXAS § COUNTY OF TARRANT § THIS CONTRACT, made and entered into the day of , 2001 by and between the City of Fort Worth, a home-rule municipal corporation located in Tarrant County, Texas, acting through its City Manager thereunto duly authorized so to do, Party of the First Part, hereinafter termed "OWNER", and JACKSON CONSTRUCTION, LTD.of the City of FORT WORTH County of TARRANT and State of TEXAS, Party of the Second Part, hereinafter termed"CONTRACTOR". WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned,to be made and performed by the Party of the First Part(Owner),said Party of the Second Part (Contractor) hereby agrees with the said party of the First Part (Owner) to commence and complete certain improvements described as follows: SANITARY SEWER REHABILITATION CONTRACT XLIX(49) And all extra work connected therewith, under the terms as stated in the Contract Documents, and at his (their) own proper cost and expense to furnish all the materials, supplies, machinery, equipment, tools, superintendent, labor,bonds, insurance, and other accessories and services necessary to complete the said construction, in accordance with all the requirements of the Contract Documents,which include all maps, plats, blueprints and other drawings and printed or written explanatory matter thereof, and the specifications thereof, as prepared by the Engineers employed by the Owner, each of which has been identified by the endorsement of the Contractor and the Engineers thereon,together with the Contractor's Written Proposal and the other parts of the Contract Documents hereto attached, including the Fort Worth Water Department General Contractor Documents and General Specifications, all of which are made a part hereof and collectively and constitute the entire contract. �� j0 T The Contractor hereby agrees to commence work within ten (10) days after the date written notice to do so shall have been given to him, and to substantially complete same within the time stated in the proposal. The Owner agrees to pay the contractor in current funds for the performance of the contract in accordance with the Proposal submitted therefor, subject to additions and deductions, as provided in the Contract Documents and all approved modifications thereof, and to make payment on account thereof as provided therein. IN WITNESS WHEREOF, the Parties to these presents have executed this Contract in 10 counterparts in the year and say first above written. City of Fort Worth, Texas(Owner) ATTEST: Party of the First part BY: y, )i.§5T. City Manager CW S pity Secretary J�5`3-61 (Seal) WITNESSES: JACKSON CONSTRUCTION,LTD. 5112 SUN VALLEY DRIVE FORT WORTH,TX 76119 Contractor BY•A4' Title: J APPROVED: Paub� Approved as to Form and Legality: A. Douglas Rademaker, P.E. Director AsstLhty Attorney T Department of Engineering -- '� y �Tri CW Contract Authorization Date u �K�Q� Cc��G°�® COW NCU EY Ff. wooG�yb, fae PART H PLANS (DETAILS) & FIGURES REPLACE PAVEMENT TO NEAREST JOINT SEE LONGITUDINAL JOINT SPACING No. 3 BARS ON 24' CENTERS BOTH WAYS WITH MIN. 2 BARS L❑NGITUDINAL IN DITCH. EXIST. CURB CLASS 'A' REINF❑RCED CONCRETE EXIST. CO PAVEMENT REPLACEMENT & GUTTER EXIST, L'❑NC, EXIST. CURB PAVEMENT PAVEMENT & GUTTER EXIST, J T Z EXIST, J T f • .• • 6' MI . ° .12 ° • • • � ° 12 o • • EXIST. SUB BA °• ♦ •••• °•••. .° EXIST. SUB BASE (IF ANY) . °; °, • •• ; . 2127 CONCRETE ( IF ANY) • REFER TO FIGURES 'A' AND 'B' 00 � 0 o DO o0 0 0 0 0 0 0 NOTES, LONGITUDINAL J❑INT 01 REINFORCED CONCRETE PAVEMENT WILL HE REPLACED TO ORIGINAL DEPTH SPACING OR TO A MINIMUM DEPTH OF 5', WHICHEVER IS GREATER STREET SPACING ® WIDTH IF STEEL EXISTS IN CONCRETE PAVEMENT TO HE CUT, THE STEEL SHALL HE CUT AND SALVAGED AS POSSIBLE. A MINIMUM LAP SPLICE DISTANCE OF 12' WILL HE 28' & 30' ON € PROVIDED. 03 REINFORCED CONCRETE PAVEMENT WILL BE REPLACED AS SHOWN OVER TRENCH 36' & 40' ON CA 8' FROM IN THE EVENT N❑N-REINFORCED CONCRETE PAVEMENT IS REMOVED. BACK OF CURB ® BEDDING OF PIPE TO MATCH ADJACENT SECTIONS OR SPECIFICATION 402, WHICHEVER 44' ON CLL 11' OFFLC IS GREATER. FIGURE 1 48' ON CLL 12' OFF LC TYPICAL SECTION - TRENCH REPAIR CONCRETE PAVEMENT CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPT. ENGINEERING DIVISION 60' 6' L 18' OFFLC NOT TO SCALE FIG. 1 t .. --m-w .--t I I I I I I I REPLACE PAVEMENT TO NEAREST JOINT SEE L❑NGITUDINAL JOINT L SPACING No. 3 BARS ON 24' CENTERS BOTH WAYS WITH MIN. 2 BARS L❑NGITUDINAL IN DITCH. REPLACE CURB CLASS 'A' REINFORCED CONCRETE S GUTTER PAVEMENT REPLACEMENT EXIST. CONC. EXIST. CURB PAVEMENT 8. GUTTER EXIST. J❑ Z EXIST. J❑ T °• •' ° • ° EXIST. SUB EASE •° ° • • ( IF ANY) °°' •°-• • •°•• 2127 CONCRETE • :°• REFER TO FIGURES 'A' AND 'B' 0 PROPOSED PIPE' OQ o 40 DITCH WALL- NOTES, LONGITUDINAL JOINT SPACING _ Q REINFORCED CONCRETE PAVEMENT WILL BE REPLACED TO ORIGINAL DEPTH STREET OR TO A MINIMUM DEPTH OF 5', WHICHEVER IS GREATER. WIDTH SPACING ® IF STEEL EXISTS IN CONCRETE PAVEMENT TO BE CUT, THE STEEL SHALL BE CUT AND SALVAGED AS POSSIBLE. A MINIMUM LAP SPLICE DISTANCE OF 12' WILL BE 28' & 30' ON PROVIDED. Q 36' B 40' ON Eg 8' FROM 3 REINFORCED CONCRETE PAVEMENT WILL BE REPLACED AS SHOWN OVER TRENCH BA OF CURB IN THE EVENT NON-REINFORCED CONCRETE PAVEMENT IS REMOVED. ® BEDDING OF PIPE TO MATCH ADJACENT SECTIONS OR SPECIFICATION 402, WHICHEVER 44' ON CLa 11' OFFLC IS GREATER. FIGURE 1 B 48' ON CLa 12' OFFLC TYD I CAL SECTION - TRENCH REPAIR CONCRETE PAVEMENT 60' 6' L 18' OFFLC CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPT. ENGINEERING DIVISION NOT TO SCALE FIG. IB 1 1 1 1 1 1 I I I t 1 D PRIME C[lAT EX I ST. H. M. A. C. PROPOSED SURFACE NO. 3 BARS ON 24' CENTERS BOTH WAYS EXIST. CURB EXIST. H. M. A. H. M. A. C. REPLACEMENT WITH MIN. 2 BARS LONGITUDINAL IN DITCH & GUTTER SURFACE ( 1 1/2 ' MIN. ) EXIST. CURB & GUTTER SAW CUT SAW CUT 0 /Mi - •, Ali. O p O - �•• •I �• i O O � O O 6' MI p EXISTING CONC. BAST_ 12' •• ° • ° _ °•' . 12' EXISTING SUBBASE o•a . .°••.•'° °°�•o ..°. ( IF ANY) ° • CLASS 'A' REINF❑R ED °a °• °•°° f'ONCRETE BASE 2127 CONCRETE �� of REFER TO FIGURES 'A' AND 'B' PROPOSED PIP 1 0 DITCH WALL o1 0 o Q o Q D 0 1 l0 1 IQ o 1 NOTES, © REINF❑RCED CONCRETE BASE WILL BE REPLACED ALL EXIST ASPHALT COURSE SHALL BE REPLACED TO ❑RIGINAL DEPTH OR TO A MAXIMUM DEPTH TO THE ❑RIGINAL DEPTH, MINIMUM PAVEMENT ON OF 6', WHICHEVER IS THE GREATER, ALL ASPHALT STREETS SHALL BE 1 1/2 ' OF FINE 02 IF STEEL EXISTS IN CONCRETE BASE TO BE CUT, GRADED SURFACE COURSE. THE STEEL SHALL BE CUT AND SALVAGED AS O BEDDING OF PIPE TO MATCH ADJACENT SECTI❑NS P❑SSIBLE. A MINIMUM LAP SPLICE DISTANCE OF OR FIGURES 'A' AND 'B' WHICHEVER IS MORE 12' WILL BE PR❑VIDED. STRINGENT. 03 REINF❑RCED CONCRETE BASE WILL BE REPLACED © 2- 27 CONCRETE MAY BE DELETED IF HALF THE AS SHOWN OVER TRENCH, IN THE EVENT SPECIFIED THICKNESS OF 2127 IS ADDED TO THE N❑N-REINF❑RCED C❑NRETE IS REMOVED. CLASS 'A' CONCRETE. FIGURE 2 ASPHALT SURFACE & REINFORCED CONCRETE BASE NOT TO SCALE SEE N❑TEO4 BELOW PROPOSED EXIST. CURB EXIST. H. M. A. C. H. M. A. C. REPLACEMENT SURFACE (2' MIN. ) EXIST. CURB & GUTTER EXIST. H. M. A. C. L GUTTER SAW CUT SAW CUT SURFACE •• 12 EXISTING GRAVEL BASE .• • •. ' 12' •o • • ••° • ° ° _ ° EXISTING S❑IL SUBBASE ° . . . • .. ° PRIME COAT • 2, 27 C❑NCRETE REFER TO FIGURES 'A' AND 'B' 0 � PROPOSED PIP 1 DITCH WALL o 01 O o O 0 0 � 1 l0 1 IO o 1 N❑TESi © 2- 27 CONCRETE SHALL BE INSTALLED AMIN OF 8' BELOW BOTTOM OF EXISTING H. M. A. C. PAVEMENT O2 ALL EXISTING ASPHALT SHALL BE REPLACED TO THE ORIGINAL DEPTH. MINIMUM PAVEMENT REPLACEMENT SHALL BE 2' OF FINE GRADED SURFACE COURSE. O3 BEDDING OF PIPE TO MATCH ADJACENT SECTION OR SPECIFICATI❑N 402, WHICHEVER IS MORE STRINGENT ® ON MAJOR PROJECTS, THE PROJECT ENGINEER OR DESIGNER MUST EVALUATE THE FULL WIDTH OF EXISTING H. M. A. C. PAVEMENT AS TO THICKNESS, CONDITIONS AND ABILITY TO WITHSTAND CONSTRUCTI❑N LOADING. IF APPROPRIATE, THE FULL WIDTH OF SURFACE SHALL BE REMOVED AND REPLACED WITH APPROPRIATE TREATMENT TO EXISTING BASE OR SUBGRADE MATERIAL. FIGURE 4 ASPHALT PAVEMENT REPAIR DETAIL_ NOT TO SCALE - EXCAVATION, BACKEILL AND PAVEMENT REPAIR UNDER EXISTING STREETS MIN. 2' HOT OR COLD MIX ASPHALT TEMPORARY PAVING REPAIR SHOWN - - FOR PERMANENT PAVING REPAIR DETAILS IST. STREET PAVEMENT SEE FIGURES 1-5 OR AS SPECIFIED IN THE PLANS OR SPECIFICATIONS. r 000000000000000000000000000000o0o0a0o0o0000000000000000000 MIN. 6' COMPACTED L%FLEX—BASE MATERIA � %��j���% •. :.• BOTTOM OF TEMPORARY OR . ° PERMANENT PAVEMENT REPAIR •' ' EXIST. BASE -_ - #TYPE C BACKFILL SEE SPEC. E1-2 ; SAND MATERIAL V-6' MAXIMUM 7 EMBEDMENT SEE SPEC. E1-2 MINIMUM 6' SAND - }} EMBEDMENT COVER Q MINIMUM 6' EMBEDMENT 1,55C G of P5I1D1C INCLUDED IN LINEAR FOOT BID PRICE OF PIPE - FIGURE A _ ( WATER SIZES UP TO & INCLUDING 12 0 ) N T S REV: MARCH 25, 1999 FXCAVA T I ❑N, BACKF- ILL AND PAVEMENT REPAIR UNDER EXISTING STREETS MIN, 2' HOT OR COLD MIX ASPHr^•.LT TEMPORARY PAVING REPAIR SHOWN - FOR PERMANENT PAVING REPAIR DETAILS EXIST, STREET PAVEMENT SEE FIGURES 1-5 OR AS SPECIFIED IN THE PLANS OR SPECIFICATI❑NS. °o°o°o°o°o°o°o°o°o°1 �°o°o°°°°°o°o°b M/' MiN 6' COMPACTED FLEX-3ASE MATERIAL d :.• 907TCM OF TEMPORARY OR . ° PERMANENT PAVEMENT REPAIR EXIST• BASE - xTYPE C BACKFILL + x SAND MATERIAL SEE SPEC, E1-2 EMBEDMENT _ - = 1'-6' MAXIMUM SEE SPEC. E1-2 ; I� 1) SEWER - MINIMUM 12' SAND EMBEDMENT C❑VEn` 2) WATER - MI,;:MUM 6' - ''1''�"�•. • c SAND EMBEDMENT COVER '': :.:: .... x CRUSHED STONE •�. ... . SEE SPEC. E1-3 MINIMUM EMBED'Ac NT = Q~ `b oho o ;o; INCLUDED IN LINEAR FOOT 3I3 PRICE OF Pi?E FIGURE B ( SEWER: ALL SIZES) ( WATER SIZES 16a & LARGER) N T S REV: MARCH 25, 1999 A �. lL -- ---- RIGHT-OF-WAY 12 4" 5 --- ,A M Roadway Meter Box _ T(YforClass lAeter Box 4, 1'Sfoi-Class"BMeter Box - I As shown on plans -}- • Corp Cock'B. I Walk Service Coupling + Storm Gas Line Copper Service Line Water Maina Sewer 0--, SQnitary Sewer NOTE : I . On Initial Installation: No More Than One Splice Per Copper Service Line Will Be Allowed With No Splice Under Pavement. 2. Service Line Installations Shall Include A Class "A" Or Class "B" Meter Box As Applicable For The Size Service Intended. 3. If Meter Box Is Not Installed At The Time Of Service Connection, A Strip Of Blue Vinyl Tape At Least 3" Wide And 10 MIL Thick Shall Be Fastened To The End Of The Service And Extended Through The Backfill At The Meter Box Location. UTILITIES SERVICE DETAIL E1-17 Material 1-1 -7 B FIGURE I E2-17 Construction IPa�, ing 0- Other /-`Surface Material .O O. .r�'jo Y D'."•' .`Tr� :Oi;.�' Y;�� :O:^• O::p D D • • Q,. --� Roadway Base L T —' 47 1 I I 7 If Valve Operating Nut is More Than 3' Below Pave- r J rent Surface - Provide Extension Stem To 1 ' Below McKinley Iron and Steel Co. , Pavement Surface. 1 No. YB5 three piece valve box or equal . Detail Pertains to All Gate Valve Gate Valve Sizes 4" Thru 12" Torque bolts prior to backfi11 . a I Mai n TYPICAL GATE VALVE AND BOX , EXTENSION STEM DETAIL FIGURE 3 E 1-10Material 1 _1_7$ E 2-10 Construct io-. 6" Lead from Kains. 12" a"d Larger to Have Gate Valve I Exrstina or Pr Curb .�.�, a bottom Rest Concrete Blocking e;•.. r --T •.�: A':� Concrete .e Blocking J Fire Hydrant Main Exercise care to avoid Plugging Drain Ho;c, Wit,i Concrete 1 Existing or Proposed Curb Firc Hyr-;rait t: Pavement or Other Surface be Se: Plum:: Trench 2'-6" Base I Parke .ay Extension Barrel areJ.: r Stem for Extra Sur,,., f Depth if Necessary Gate Valve Minimum. j C. F. Grave 6" Fire Hydrant I Proportionally Anchoring C ,. I Lead I Around Bas_ ] in-- for Connec- i,:0 - I- I i t i on off of Can- Man Crete Pipe 12" 4, i Dia:-,-.etcr and ° I i I Concrete Larger e i Concrete Rc;t 12" x 12'' x 611 I * Bury Depth: (1) 3'-6" for Cast Iron Pipe Varies (2) 5'-t7" for A-C Pipe Ref. figure 6 STANDARD FIRE HYDRANT DETAIL =�� FIGURE 5 El- Mat�st n.; , _: bearing Areas shown arc on 150 P.S. I .G test pressure and 3000 P.S. F. soil bearing value. y Flug Tee 1500= Concrete Bendlix on i HORIZONTAL BLOCKING TABLE :.-Dimension "X" May Vary If Necessary To Provide Bearinc Acainst Undisturbed Trench Wall Pipe X 11 ' - 15 220 - 30' I 45' I 90' Tee r Piug Size Di-. �• MaA. Min. Max Mir,. P'ax. " in. Max Ft IIAII �. ��R _.�, ` Area Vol .I �� Ar-a V,1 11pi� rea V-1 4" 11 .90 .8 .05 .95 .90t �> .97 .90 .05 .9? j .82 .0- 1 . 16 .5 _ 6" ? c .90 1 .8 .OS o5I .90 .05 1 .05 1 . 10 .05 1 .7311 .9: .05 1 . 19iI .41 .C� 8" I 1 .go .81 051 .95 i 901 .051 1 .41 2 .0'D .05j 1 86 3 .471 1 1 .57; 2 .46 10" 1 .5 .90 I .8 .05i 1 .26 1 .60 .051 1 .79 3.20 . l 2 . 18 5.c2i 2 1 .993.9 12" 1 1 13 1 1 2J 05 1 O 1 2. 14 '--.50i .2 1 2 1 1$.00 3- _ 16" 12 I 1 .4i 2.001 . 1 2.1,0 1-.00 1 I 2.8 $.001 .4 I .751r-- 101 5, 3 . 16113.0� ' - 20" 2 1 .77 i 3. I D .2 2.c'- 16.20 .3 I 3.52 12.40 1 .6 4.70 .00 1 . 15 1 3 .94 1: .55 -- 24" 2 2. 14 i4.50 .2" 3.00 C0 5 L.25 18-10 5 65132.Do! 1 E5 4.76i2 .6011.0^ 30'' � 2. ,' 2 6-6 17. 10' 55 3.72 20 ? ..35 30 2 .201 1 .75i 7 .0 5 ►43`--0i " - 5 .91 L•:•33;2. 1 2 c i i3 110 001 .75 4. 50 b L 1 '- E. 36 4O.80 2.6s, $. 72.00i ;. 1 7 20'�' 0 2 c 42' I : I S 72 11 11 2 g - �� 2 4 c I L 1 /1 0D 1~7 ,1 - 1 8 301^.0 " 1 4. 35 1$. 0, 1.6 6.00 T 12 . 8 .4$ tUo 1 C.4 11 1 126. 10. 1 = 4" 14.0 .CO .5Ck, .0e 6.70 C') 17.00 9.40188-0010.00i 13 .00 2�d1�.Od 10.74i1,00i' 2 .' " NOTES : Minimnu�;, areas shown are in square feet . Volur-,es s,^oY:n are in cu •ic yares . Vertical dimensions o` all block bearing areas shall be Identical to the horizontal dimension sho•�n . r r HORIZONTAL BLOCKING DETAIL FIGURE 9 E E-1 - 20material 1-1 -7$ -2-2 0 Consstruu ction. r S:-ee- Surface z7 Concrete or c" Crushed Stone Base ?.4CKFILL : Compacted For Perranent Pa: nc Mechan' cally or jetted See Special Documier t s -nirlum D=P-h After Compacteo - �-anular _7�edmer,t To _= Jetted or Ta-ioed Crushed Limestone Beddinc_ F:r Water Mains 16" Dia. `c a-d Larcer and San. Sew_,er J lines (See E1 -3;E2-3) PPROA = pe Sizes Y _c- W; dti Ditch W' dt Ditch Widt Dit_ . Wal 11W11 iiW�i CIee-ance "I D. �iDe 'e'enSiD^e PresLresse "-" i 2 r 12" I 2 1 6" I 2' -;'' 2 ' -71' - I 6" �. 20'1 I 2 1 _ 1 0'' 3 1 _011 _ I 6:. 42'' - - 5 ' -7" 48'' - - 6' -2" 911 -.Note: G,a ,lar embedment is to be included in the price bic per linear foot W pipe. TYPICAL EMBEDMENT DETAIL FIGURE 19 1-1-78 E 1-2 Material E _� Construction existing surface 6ackfill as specified N(` ri .rr_.rc,,r r,,; . /are--.r rr rc •q. �Y 0. � 1 I � 1 ! , 1 i 11 , lO 6" min. dimension. 6" wax. for pay purposes +men bid per cubic yard. O2 6" rin. dimension. Max. for pay purposes sha', l be 6" o main 24'' and s^aller, 9" on r-ains 30'' and larcer, when bid per cubic yard. - Q3 4" rin , dimension. 4" max. for pay purposes when bid per cubic yard. OClass "E" 1500= concrete. Concrete encasement shall stop I either side of joint , and when oncas4ng concrete pressure pipe, full lengths of pipe shall bt encased, joints excluded. CONCRETE ENCASEMENT DETAIL 1-1-78 FIGURE 20 E 1 -7 Material E 2-7 Construction r+ NOTES O 6" blind flange tapped 2" with 2" brass plug. 0 125=' pattern blind flange drilled and tapped for 6" blind flange. 6" blind flange attached with bronze bolts. Gaskets shall be full faced as otherwise required in E 2-4. - O Lifting lugs shall be provided in quantities 4 sufficient to loft and handle the flange as a balanced load. OAttach the 125" pattern blind flange with steel 3 bolts and bronze nuts then cover with cement grout after installation. 2 O125 ' pattern fiance, unless required otherwise. 1 Flanges and blind flanges to be designed to / withstand pressure rating of pipe. 6 Wye branch to be one size larger w than, but tapered to standard run normal diameter unless otherwise specified. O7 Standard run diameter. 5 6 / 7 i \ 45" I i I i a.n STANDARD CLEANING WYE DETAIL Material Specifica. :o) E 1 -4 Co:istruct ion :pec i= icat io- E 2 FIGURE 28 1-1-78 When a fire hydrant is located at end of _ Mains 6" and 8" in diameter, wye may be omitted Contractor will make a reasonable effort to prevent back-flow of purged water (See E2-24) EXTEND PIPE RISER ABOVE GROUND LEVEL `7 'Polly-Pig' CAP AFTER DITCH HAS BEEN DEWATERED J Haw 1 . Install MJ Wye at terminal end of main � . . , ,sure on A-C pipe will require "Ring-Ticht" to plain end adapter in addition to MJ Wye 3. Block Wye streight run end plug 4. After cleaning with "Polly-Pic" install branch end plus. CLEANING WYE DETAIL FOR NON - LOOPED SYSTEM 12" AND UNDER FIGURE 29 El-7 Material 1-1-78 E2-7 Construction .� i ii 81 - 011 Yo u j�, Wa te r I�Twl co o I H CD now- Funds In Action . �� ?I{?..?" n �- t:M •.,�'` � 1. � ',,�.y...,•'••s TTT ', 7 -�',+ t r,.s '•^' liy �'yaf _.ti . Questions on this protect, call S' Y-8o6 je+sl 1 Tv ,v • A�terhoure water and sewer e�e�re�c�e�; i1! 1:� � �fr'�;��4�<+ 4.5 adius /3 R, While PMS ii PROJECT 2'-6' 2,-6" PROPERTY LINE " 2 -6" &6" 6" Mln. i t PLAN VIEW 4 - 6" OIA. STEEL GUARD POST FILLED WITH CONC. CONC. s SET POST IN CONC. FIRE HYDRANT BARRICADE DETAIL FIGURE 31 1 E I — 12 MATERIAL E2 -12 CONSTRUCTION 5 • 1 • 80 R.M. per /lop 1\ / ��(I yw►t ev � I / dig/. .I1�I.vv,���I i 1 awh a piukbas,Red:E P- Mi/lin'r1n 2,�cx•s •'� 1 ( . p�e:crme�b-lumosr/c joint t�,1' :�• :•� sec&q (A.- r h'ek ar go,:rores - ton�, mod/f . P iP s d•t'f ,�ta�al�YA<< Ca�+r•r•cts o ,�`j ' a";' �, rd'il ! c:�(�'a+! o•� c q w 1, �I .� A i0 1 G•orl riY _'..: _....�.�.r...r.:.►+' .. :i• 'gyp. .12a':�:8 � '. . :�f , rl�i�F <v000�J C°o�t• !e Q-.wzov FIGURE M, S-uAlp4opo Af4h azz' (Pi'a edl� lAoar�� EI -14 Katerial E2-14 Construction ' � ''�-�-' ` � ;r 36"site<Pl�fe - !•' i . �I, - I � 9�o�f .r•f.� ,.,►o,-ram,-. - 'j � :i _ / \ .Pill: / I� � insf�lled by sst..�fv.�y �OP li7Vf�l/Orlon by Sl�i'tCf I :'• � Cvn f,,-oP ea,-. (A.-t woe xho..-^ Top dzlee! Pure /:f f:ris� ��%n alt✓afio.r i � j I ,• . �:�'li T tnC'� ivrG�l/j .Hav�olff�c Cotie-.�te's o.- �p:�c I � ?: sr • III��� ill �o�Pt d¢!( A.S. 7.M. C-G7B�^ec��sf ;o:' � -•.: I, n %moo.-csd ..�.,✓jo!¢ �;' .�'. II, Irl tact%ors o� aqw<, I ; /4 I ' ...D I Sifow�, r , x`fia�r e6 .v�Y.f d��..rerrer- w 6`.MIN. I L7-"� Class X' (4000'X1 CO/n C,,c{e � d'WzrAW Q 4 eoc'. a4"Ae /03 (f�i�aC�Jr� s'ifown) 1 -1-78 E1 -14 material E2-14 Construction s i / cove,-, ¢yw< fo Lion iYoe.Ft, / \ �o..4?O.I.N rvrYif Pr�.F Sleff o�' r" 2':r 8 x 24r f0. a,-ee vrf �tr:,!o�eed Co�+C�efc y^ada ulQD✓ rq lied O('b��'vk, V. ...:� ToP of COnC�t�a cone lrO�s' 7S � •� ^ a �r'..r ¢ltvo"tron. - 75C �iovro'�d by file wif¢� and s'anrfa�Y 6'ewt.- cYJ.sfi,,�fo� r'o a 8rfe deiry.,.sfed 6y rise Pv66 C Ei►yri►ta/,. - F'fGl.IRS J00 Sr��Voo,Qo �1��vi�o.CE E1-14 material — 1-1 -78 E2-1' Construction MA*iOLE FRAME AND 241131A. COVER, EQUAL / TO MCKINLEY IRON _ + WORKS NO.A24AM: I (REF . E2-14) . \ 1 / I / I TOP OF CONCRETE CONE _ ��•,. SECTION 15'' BELOW FIN;!SH RIM ELEVATION: 1 (RE-- . FIGS . 103 6 104) . •e,. • 16. .er, MIN. I GROUT • t I' �. i , •1.'*� •�.,a. : E11 Mi N - - C LA S.S F (4000=) I r — I NOTE . 1 . PRECAST 4 '? !A. CONE WITH - ---- - - - - -ll �. --- STANDARD 30G= MANHOLE COVER AND RI N'; IN LIEU OF 241 S ALLOW MANHOLE FIG 106) 1 P 2 . M.AN�IOLE TO __ USED WHE=E SEWER LINES ARE LESSr THAN 6' DE_. . , r • SHALLOW MANHOLE PRECAST CONE 1-1 -78 EI-1L MATERIAL FIGURE 105 E2-I"i CONSTRUCTION; L NOTES ,U"" 1 . Shallow manhole to be constructed of Class R w"*t•a "F" (4000#) concrete (Ref. E2-14) or of precast � wca� cone with Standard 300T manhole ring and cover. ti ` 2. Frame and cover as manufacture' by McKinley Iron Works, No. PM 24X40 or equal , may be adjusted for elevation on a maxinum of four (4) courses brick in paved streets, or areas to be ,,. FRAME COV1iR paved; minimum of two (2) courses in other T. V. I. S. PATTERN NA• 10, areas. OR EQUAL Mortar �I See Mote 2 Ref: E 1-14 M. H. COVER _ -o. --- j '. See Note 1 M.N. FRAME oo. o _:. VARI�►ELE PiPF SIZE- f o;.`D 17 CLASS �— CONGRE'E SECTION —"A="A" OF ( 000.=, 24!'X 40„ M. H. .�a t JfF i I' " I i n � I I � 'i" Manhole to be used where sewer 11nes are less tnan 6IV dee:. TOP PLAN VIEW OF 24" X 40" M.H . DETAIL OF SHALLOW SANITARY SEWER MANHOLE- FIGURE 106 E 1 -14 Material 1-1-78� E 2-14 Construction Where M.H. 's are In street Where M.H. 's are built install two or more courses of in streets to be paved, brick .or concrete grade rings M.H. rim to be set to •:tween casting and top of brick proposed paving grade .one, or concrete slab. Use standarc McKinley, No. A24 Am. or Equal M.H. Fra-e d Cover 2 - 0" Set in Mortar Use Cast Iron Pipe to First Joint Behind Limit of Excavation o 171 Install 1A, Step ~' Same as in Stang n.H. 14" 1 = 2" 3" 511 4,1 Ali 1 M.J. Cas Push-on Pig_ Iron Tee � n`J Conc. Collar h, — Install N.::s Away from M.H . ll� O Wa I 1 on M. J. 4' -0" Fitting CO:,-TEN IUD Bol is o If Required Provide Concrete Limit of = — Stub Extension At i�, EEndd of P.E. in M.H. , See Excavation - earl Standard L Dia. M t� M. H. Detail > = icure 1^; �— - Slope 1!`1 11 I, . �• Ve tical 3/4r I �;; a 'C •D' Point o' a _F8„ i 111, r�s Thrust Block to Grouter Invert-- Use 4000,=' Concrete Extend 6" In All �� O �' ria. for sewer Directions from pipe up to Outside Diameter ria . 5' ria. for of Pipe sewer pipe 21 " to TYPICAL SECTION 39" aia. STANDARD FOUR FOOT DROP ACCESS MANHOLE FIGURE 107 E 1- 14 Material 1'-1-78 E 2- 1=: Construction possible, with instal ia, ior, as tollcr,s • ' Pipe f itt ins. 1 . 2. Pour manhole flog to s.�rinc line or titti 3. Break out top of fit : inz to spring line . 4. Pour re:'ainder o' manhole invert to n,ro•. ice verticai inver: wall up . o 3/4 point of :he Iarcer DiPe in•.oIvec, as ci:ailec. 5. ',-,eel trowel rinisn inve- of ranhoie. B. When special siiue: ocs prohibit use o: stanca'c .. ipe ittinc= as above Ii the inver, sha. l be for,-.ec of concrete anc _ te_I o,,e' fini :-ed to pr_. . __ functional characteristics to those at -orced tv the acove ins:al la: ion. thus rcr-ec she11 be accomplishes to the cr.z i .c.r ' _ sa: i _faction. ---+----•ram Q � Typical ?tan � A Of M.r. Bo; tor- I .. ��U-I ion Nanhoies dip Concrete . 6 .. . Slab ', j A• Section - JUNCTION MANHOLE BOTTOM _,_,$ FIGURE 108 �a:e- i EI - I4 Cons t;...._ io-i E2- iL- Natural I ��Dimensio- " " Sewe- Pipe - 12 " C- r' \ I - ar � -=d`en: Minims_, Depth Attar Compac, ion . T � G[ r• 6" Min. (TYP. ) Crushed Limestone to i\ Extend from 6" Selo, / (•`a�%e I ` . Pipe to Spring! ine 2; < (Excavate for Sells) � S Crus",e" L Cc,esto le -tic;:,--• _ a -.� . Cost of Granular Embedme7-- and Crushes' Limestone oeddinc w 7Y;" S:C71 ',IN Includes in Price Eid Per Foot of Sewer Pipe �r STANDARD EMBEDMENT .- FIGURE 109 Ei-2 Material k 1 -1-78. EE2-2 Cons , -ction Existing surface Qackfill as specified • r I O I , *� L51- I� `•Or•1 I Q��� ..•. �I�' �� �, .:P Mho � ..r�• r•• " ;, I ' p If cy 0 0 6" min. dimension. 6" max. for pay purposes when bid per cu:. ic yard. O6" min. dimension- Max. for pay purposes snail be 6" o.i mains 24" and smaller, 9" or, mains 30" and larger, when bid per cubic yarc. 0 4" min. dimension. 4" max. for pay purposes when bid per cubic yard. O4 Class "E" 1500# concrete. CONCRETE ENCASEMENT DETAIL E 1-7 Material 1-1-78 FIGURE 1 1 3 E 2-7 Construction CLEANOUT NOTES 1. THE TEE AND ADAPTERS INSTALLED SHALL BE SDR-35 PVC MATERIAL. NOTE: ALL PIPE AND FITTINGS SHALL BE 2. CONNECTIONS TO THE EXISTING MAIN SHALL BE MADE USING RUBBER SLEEVE COUPLINGS WITH STAINLESS STEEL BAND CLAMPS. SDR-35 WITHIN THE R.O.W. THE CLAMPS SHALL BE TIGHTENED TO THE TORQUE RECOMMENDED BY THE MANUFACTURER. PROPERTY 3. THE EMBEDMENT MATERIAL USED SHALL BE EQUAL TO THAT USED LINE FOR THE MAINLINE SEWER. 4. SLOPE OF THE MAINLINE LATERAL SHALL BE 2.OX MINIMUM, UNLESS 18. INSTRUCTED OTHERWISE BY THE CONSTRUCTION ENGINEER. 5. THE MAINLINE WASTEWATER LATERAL SHALL BE CONSTRUCTED IN SUCH A MANNER AS TO CLEAR EXISTING UTILITIES AND PROPOSED *CITY OF FORT WORTH FACILITIES SUCH AS STORM SEWER MAINS, PAVING, RETAINING WALLS. ETC. VERTICAL BENDS (45' MAX.) MAY BE INSTALLED IF APPROVED 4"x 12"x 12" CONC. STANDARD CLEANOUT BY THE CONSTRUCTION ENGINEER. PAD (CLASS "B" CONC.) , CAP 6. THE CLEANOUT STACK AND CASTING MAY BE PLACED IN THE ' PARKWAY AND IN VEHICLE TRAFFIC AREAS IF NECESSARY. 7. FOR COMMERCIAL MAINLINE LATERALS. USE CAST IRON CLEANOUT STACK AND CASTING ONLY. °^ BACKFILL CLEANOUT STACK WITH B. MAINLINE LATERAL CONNECTION TO THE PRIVATE LATERAL SHALL BE #3 REINFORCED STEEL ;'' ^'ti APPROVED GRANULAR BACKFILL, A MINIMUM OF S BEHIND THE CURB. "=' BAR AROUND CAP (TYP.) , "�'�=� — f> � 6" ALL AROUND 9. IF THE PRIVATE LATERAL DOES NOT EXIST OR IS TO BE BUILT BY ;1 OTHERS, A MINIMUM OF 2' OF MAINLINE LATERAL STUBOUT FROM THE FERNCO FLEXIBLE I ' `rs CLEANOUT WITH A STOPPER OR CAP WILL BE REQUIRED. COUPLING OR 4" RISER 10. IN HIGH TRAFFIC AREAS, (STREETS, DRIVEWAYS, SIDEWALKS AND APPROVED EQUAL. :Y,ti;` (CAST IRON OR PVC) WALKWAYS) WASTEWATER CLEANOUT STACK AND CASTING SHALL BE OF (DOUBLE BAND) CAST IRON WITH CONCRETE COLLAR. f 11. IN NON—TRAFFIC AREAS WASTEWATER CLEANOUT STACK AND CASTING TWO WAY SHALL BE SDR-35 MATERIAL CONCRETE TCELEANOUT SWEEP TEE ANCHOR SDR-;5 SERVICE, SLOPE-VARIES, 2% MINIMUM . .• I' �� 4" MIN. FERNCO FLEXIBLE COUPLING OR 6„ APPROVED EQUAL. MIN. MAIN SEWER TWO WAY LATERAL CLEANOUT TO BE PLACED *INSTALL FLUSH WITH PAVEMENT IN DURING OPEN CUT CONSTRUCTION ONLY. PAVED AREAS. *INSTALL 2" ABOVE GRADE WHEN TWO WAY LATERAL CLEANOUT, BEHIND CURB. j or 3/4 Roadway 61 i - Standard a a Curb !; Gutter � •I�'� 111 I •L - 1 y rJ 2 '-611 1 // 1 ... — > v J I ` ICJ C h^ J a1 .r I v1 I� /L � 3 1 c; 1 C I N > ` C CJ cn 000 N R dwv j watertight ?lua 3 ' Min. I I / e CL 1„ '� o vi c ine,Mi n. 2ir Grad_ I r . L l a Y r Cone$_r If C. I . Min. Grade 1% TYPI CAL SECTION Note: Er.,�edment and back-" i l I as required for adjacent sewer main, shall be included in the price bid per sewer service complete in place. a J L Standard Cur Gutter Section c L CJ a I � Service Line c M Ln Sewer service line locaticn to be marked with red vinyl T I tape at least 3' wide and 10 mil thick attached tc NOTE :Tees Will Be Used On All Service the end of the service and Lines Constructed At Same Time As extending through the back- Public Sewer. fill at the point-1 of house service connection behind the proposed curb. SERVICE LINE DETAILS FIGURE 115 El-9 Material 1 -1-78 E2-9 Construction