Loading...
HomeMy WebLinkAboutOrdinance 6508 ORDINANCE NO. ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF PUTNAM STREET AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH S.R.O. ASPHALT, INC., ARLINGTON„TEW FOR THE CONSTRUCTION CF SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE, EXECUTION A14D DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESS- MENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAP- TION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract with S-R_p_ ASPHALT, INC.,_ARLI GTQN,, TEXAS for the making and construction of certain street improvements on the hereinafter described portions of streets, avenues and public places in said City, to-wit: UNIT 1: PUTNAM STREET From Station 22+93 (Approximately 35' South of the North Line of Lot 7-A Pollard Estates Addition) to Meadowbrook Drive, known and designated as Unit 1, Project No. 104-24000-213. UNIT 2: McGEE STREET From Greenlee Street to 180' North, known and designated as Unit 2, Project No. 104-24000-213. UNIT 3: GREENLEE STREET From McGee Street to Forest Avenue, known and designated as Unit 3, Project No. 104-24000-213. UNIT 4: BEATY STREET From end existing pavement (East line of Lot 6, Block 7, East Greenhill Addition) to 586' East Mims Street, known and designated as Unit 4, Project No. 104-24000-213. UNIT 5: MIMS STREET From Beaty Street to 475' North, known and designated as Unit 5, Project No. 104-24000-213. UNIT 6: MUSE STREET From Greenlee Street to 350' North of Norma Street, known and designated as Unit 6, Project No. 104-24000-213. WHEREAS, by sundry proceedings heretofore passed by the City Council of the City of Fort Worth, Texas, including Ordinance No. 6380 , a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and public places and against the real and true owners thereof; and, WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review, found and determined that, in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No. 6380 , and WHEREAS, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance with the contract therefor; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; -and the contract with reference thereto be, and it is hereby, found and declared fully completed and performed. II. The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro- perty assessed and shall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on'the respective certificates, together with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows: III. When each of the certifiactes has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying_ the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the. appropriate Ordinance Records of said City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. oe PASSED AND APPROVED THIS o7p day of 4 ic.+ 9 19 . APPROVED AS TO FORM AND LEGALITY: r 0 010 0 0 0 e Fe 4" City Attorney PROJECT NO. 104-24000-213, UNIT 1: PUTNAM STREET FROM STATION 22+93 (APPROXIMATELY 35' SOUTH OF THE NORTH LINE OF LOT 7-A, POLLARD ESTATES ADDITION) TO MEADOWBROOK DRIVE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete drive- ways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF PUTNAM AVENUE AND MEADOWBROOK DRIVE WEST SIDE OF STREET DRISCOLL ACRES ADDITION Bobby Joe Holdri.dge 46-C 57 .5' Frontage 2416 Putnam Res. 20' Pavement $2.92 $ 58.40 76112 35' Curb & Gutter 2.48 86.80 $ 145.20 A. J. Truesdell 47 , 48, 639' Pavement $2.92 $1,865.88 2400 Canton Drive 49, 50, Res. 623' Curb & Gutter 2.48 1,545.04 76112 51 & 52 $3,410.92 MEADOWBROOK DRIVE INTERSECTS EAST SIDE OF STREET POLLARD ESTATES ADDITION Handley Meadowbrook 1, 2 324' Pavement $2.92 $946.08 Christian Churc7 & 3 Res. 308' Curb & Gutter 2.48 763.84 P.O. Box 8157 116 Sq. Ft. Driveway .80 92.80 $1,802.72 Bill H. Hamilton 7-A 55' Existing Facilities No Assessment 2417 Putnam J. C. Steward 5 & 220' Pavement $2.92 $642.40 2629 Putnam 6 Res. 220' Curb & Gutter 2.48 545.60 76112 $1,188.00 1. PROJECT NO. 104-24000-213, UNIT 1: PUTNAM STREET FROM STATION 22+93 TO MEADOWBROOK DRIVE, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET POLLARD ESTATES ADDITION Lloyd Starks 4 110' Pavement $2.92 $321.20 2401 Putnam Res. 110' Curb & Gutter 2.48 272.80 76112 85 Sq. Ft. Drive .80 68.00 $ 662.00 COST TO PROPERTY OWNERS - ASSESSMENTS . . . . . . . . $7,208.84 COST TO CITY OF FORT WORTH . . . . . . . . . . . . . 6,143.26 TOTAL ESTIMATED CONSTRUCTION COST, UNIT NO. 1 . . . . $13,352.10 2 PROJECT NO. 104-24000-213, UNIT 2: McGEE STREET FROM GREENLEE STREET TO 180' NORTH, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF GREENLEE STREET AND McGEE STREET EAST SIDE OF STREET CRAVENS-PETERS SUBDIVISION Clint P. Humphrys L 100' Frontage 2617 McGee Street Res. 100' Pavement $2.92 $292.00 76112 100' Curb & Gutter 2.48 248.00 $540.00 J. H. Peel G & 82.5' Frontage 2613 McGee Street F Res. 82.5' Curb & Gutter $2.48 $204.60 76112 $204.60 COST TO PROPERTY OWNERS - ASSESSMENTS . . . . . . . . $ 744.60 COST TO CITY OF FORT WORTH . . . . . . . . . . . . . 680.62 TOTAL ESTIMATED CONSTRUCTION COST, UNIT NO. 2 . . . . $1,425.22 3 PROJECT NO. 104-24000-213, UNIT 3: GREENLEE STREET FROM McGEE STREET TO FOREST AVENUE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by construct- ing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST SIDE OF McGEE STREET AND GREENLEE STREET NORTH SIDE OF STREET CRAVENS-PETERS SUBDIVISION Clint P. Humphrys L 157 .3' Side Lot Credit 2617 McGee Street Res, 100' Pavement $2.92 $292.00 76112 100' Curb & Gutter 2.48 248.00 $540.00 M. P. Mills K 209' Side Lot Credit 2612 Forest Avenue Res. 109' Pavement $2.92 $318.28 76112 104' Curb & Gtr. 2.48 257.92 $576.20 FOREST AVENUE INTERSECTS SOUTH SIDE OF STREET I. CARRODINE SURVEY Larry P. Rattan Tract 2J-lA 227.3' Side Lot Credit 2618 Forest Avenue Res. 127.3' Pavement $2.92 $371.72 76112 127.3' Curb & Gtr. 2.48 315.70 140 Sq. Ft. Drive .80 112.00 $799.42 TOMLIN ADDITION Larry P. Rattan I I 136.7 ' Side Lot Credit 2618 Forest Ave. Res. 100' Pavement $2,92 $292.00 76112 100' Curb & Gtr. 2.48 248.00 $540.00 4 PROJECT NO. 104-24000-213, UNIT 3: GREENLEE STREET FROM McGEE STREET TO FOREST AVENUE, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT COST TO PROPERTY OWNERS - ASSESSMENTS . . . . . . . . $2,455.62 COST TO CITY OF FORT WORTH . . . . . . . . . . . . . 5,824.54 TOTAL ESTIMATED CONSTRUCTION COST, UNIT NO. 3 . . . 8 280.16 5 PROJECT N0. 104-24000-213, UNIT 4: BEATY STREET FROM END EXISTING PAVEMENT (EAST LINE OF LOT 6, BLOCK 7, EAST GREENHILL ADDITION) TO 586' EAST MIMS STREET, to be improved with six- inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized sub- grade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide from Station 48 to Mims Street and forty feet wide from Mims Street to Station 60+50 (33' West of E. line of Tract 6B, J. W. Haynes Sub- division) and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING 1,, 110NTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF LOT 1, C. L. BEATY SUBDIVISION NORTH SIDE OF STREET C. L. BEATY SUBDIVISION W. R. Sexton 1 & 1 252.8' Pavement $2.92 $738.18 6945 Beaty 1-A Res. 252.8' Curb & Gtr. 2.48 626.94 76112 171 Sq. Ft. Drive .80 136.80 $1,501.92 I. E. Owen 1-B 1 344.2' Pavement $2.92 $1,005.06 c/o Charles L. Owen Res. 344.2' Curb & Gtr. 2.48 853.62 P.O. Box 1936 $12858.68 76101 MIMS STREET INTERSECTS GREEN HILLS SUBDIVISION Mr. & Mrs. L. G. Doss 3 & 17 245' Pavement $2.92 $715.40 7031 Beaty 2 Res. 245' Curb & Gtr. 2.48 607.60 76112 85.5 Sq. Ft. Drive .80 68.40 $1,391.40 Henry M. Coke 1 17 60' Pavement $2.92 $175.20 Rt. 4, Box 3 Res. 60' Curb & Gtr. 2.48 148.80 85.5 Sq. Ft. Drive .80 68.40 $ 392.40 J. W. HAYNES SURVEY Owner: Jane Roach Wofford Tract 6 105.9' Pavement $2.92 $309.23 5309 Rutland Res. 105.9' Curb & Gtr. 2.48 262.63 76133 85 Sq. Ft. Drive .80 68.00 $ 639.86 Buyer: Jack D. Riley 7109 Beaty Street 76112 6 PROJECT NO. 104-24000-213, UNIT 4: BEATY STREET FROM END EXISTING PAVEMENT TO 586' EAST MIMS STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET J. W. HAYNES SURVEY Fort Worth Ind. Tract 6-B 200' Frontage School District Res. 169' Pavement $2.92 $493.48 3210 W. Lancaster 169' Curb & Gutter 2.48 419.12 76107 $ 912.60 SOUTH SIDE OF STREET HYDE JENNINGS SUBDIVISION Nellie E. McCrea C 26 60' Pavement $2.92 $175.20 7116 Beaty Res. 60' Curb & Gutter 2.48 148.80 85 Sq. Ft. Driveway .80 68.00 $ 392.00 C. B. Culp B & A 26 150' Pavement $2.92 $438.00 7112 Beaty Res. 150' Curb & Gutter 2.48 372.00 76112 171 Sq. Ft. Driveway .80 136.80 $ 946.80 Terrell E. & 1-D 26 201.35' Pavement $7.58 $1,526.23 Ruth C. Gass Comm. 201.35' Curb & Gutter 2.48 499.35 2400 Forest Avenue $2,025.58 76112 It MIMS STREET INTERSECTS GREEN MEADOW PARK ADDITION Sabine Valley Lbr. Co. 17, 16 2 275' Pavement $2.92 $ 803.00 4329 Belknap & 15 Res. 275' Curb & Gutter 2.48 682.00 76117 $1,485.00 Steven Hilliard 18 2 100' Pavement $2.92 $292.00 2801 Major Res. 100' Curb & Gutter 2.48 248.00 76112 $ 540.00 7 PROJECT NO. 104-24000-213, UNIT 4: BEATY STREET FROM END EXISTING PAVEMENT TO 586' EAST MIMS STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET GREEN MEADOW PARK ADDITION MAJOR STREET INTERSECTS Jerry L. McKinney 15 1 120.65' Side Lot Credit 2800 Major Res. 100' Pavement $2.92 $292.00 76112 100' Curb & Gutter 2.48 248.00 140 Sq. Ft. Driveway .80 112.00 $ 652.00 HYDE JENNINGS SUBDIVISION V. E. Kummero 2 19 277.4' Frontage 6935 Craig Res. 208' Pavement $2.92 $607.36 208' Curb & Gutter 2.48 515.84 85 Sq. Ft. Driveway .80 68.00 $1,191.20 COST TO PROPERTY OWNERS - ASSESSMENT . . . . . . . . . $13,929.44 COST TO THE CITY OF FORT WORTH . . . . . . . . . . . . 14,591.41 TOTAL ESTIMATED CONSTRUCTION COST, UNIT 4 . . . . . . $284520.85 8 PROJECT NO. 104-24000-213, UNIT 5: MIMS STREET FROM BEATY STREET TO 475' NORTH, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide con- crete gutter, so that the finished roadway will be thirty-six feet wide. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF BEATY STREET AND MIMS STREET WEST SIDE OF STREET C. L. BEATY SUBDIVISION I. E. Owen 1-B 1 337.4' Pavement $2.92 $985.21 c/o Charles L. Owen Res. 337.4' Curb & Gutter 2.48 836.75 P.O. Box 1936 $1,821.96 76101 VAN NATTA LANE INTERSECTS EAST GREEN HILL ADDITION Keechi Lands Limited 28 6 135' Frontage c/o Edward Slavik & Co. Res. 32' Pavement $2.92 $ 93.44 Petroleum Tower 32' Curb & Gutter 2.48 79.36 Corpus Christi, Texas $ 172.80 EAST SIDE OF STREET J. W. HAYNES SURVEY Fort Worth Ind. Tract 6-B 585' Frontage School District Res. 85' Pavement $2.92 $248.20 3210 W. Lancaster 63' Curb & Gutter 2.48 156.24 76107 $ 404.44 GREEN HILL ADDITION L. G. Doss 3 17 331' Side Lot Credit 7031 Beaty Res. 231' Pavement $2.92 $674.52 76112 231' Curb & Gutter 2.48 572.88 $1,247.40 COST TO PROPERTY OWNERS - ASSESSMENT . . . . . . . . $ 3,646.60 COST TO THE CITY OF FORT WORTH . . . . . . . . . . . 5,907.03 TOTAL ESTIMATED CONSTRUCTION COST, UNIT 5 . . . . . . $ 9$ 53.63 9 PROJECT NO. 104-24000-213, UNIT 6: MUSE STREET FROM GREENLEE STREET TO 350' NORTH OF NORMA STREET, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and two-foot wide concrete gutter, so that the finished roadway will be thirty feet wide. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT APPROXIMATELY STATEION 13 + 50 ON MUSE STREET WEST SIDE OF STREET J. W. HAYNES SURVEY George W. Blandi_n Tract 5 847 ' Frontage 1106 Seventh Street Res. 235' Pavement $2.57 $ 603.95 Wichita Falls, Texas 612' Curb & Gtr. 2.83 1,731.96 $21335.91 EAST SIDE OF STREET A. S. McGEE SUBDIVISION Albert W. Clayton 1 6-A 93.13' Existing Facilities 7201 Hightowner 76112 Res. No Assessment HIGHTOWER STREET INTERSECTS Dennis Earl Bell 1 6-B 93.13' Existing Facilities 7200 Hightower 76112 Res. No Assessment Robert James Corp. 1 5-A 93' Existing Facilities 1308 Lake 76102 Res. No Assessment NORMA STREET INTERSECTS J. W. Myatt, Jr. 1 5-B 93' Existing Facilities 7200 Norma 76112 Res. No Assessment B. D. Kidwell Tract 4 236' Pavement $2.57 $ 606.52 2616 Janice Lane 76112 Res. 236' Curb & Gtr. 2.83 667 .88 $1,274.40 Walter Douglas Tucker 1 C 113' Existing Facilities 7201 Greenlee Street Res. No Assessment 76112 COST TO PROPERTY OWNERS - ASSESSMENTS . . . . . . . . $3,610.31 COST TO CITY OF FORT WORTH . . . . . . . . . . . . . 3,517.14 TOTAL ESTIMATED CONSTRUCTION COST, UNIT 6 . . . . . . $7,127.45 10 'City of Fort Worthi Texas UNK MIATSON Mayor and Council Communication DOSS& DATE REFERENCE susJECT: Final .Payment. -. Assessment PAGE • NUMSER FP 808 Paving a.t..Six .Locations on the .East i or 6/28/71Side k. Final Council action on the project described below is requested. Project Description Name: Assessment Paving at .Six Locations on the East Side,. Proj. No.. 104-24000-213 Contractor: S.R.O. :Asphalt, .Inc. Contract .Awarded: September. 21.,.. 1970 (M&C .C-1846) Work Order Issued: December 30,1 1970 (Partial Work Ordnri Units 3 and 6) January .26, 1971 (Partial Work Order, .Units 1,. 2 & 4) February 10, 1971 .(Full Work Order to include. Unit-.5) Work- Order Effective: January 11, 1971 Date. of Final Inspection and. .Appr.oval: .,April, 27, 1971 Working Time Bid: 80 _Working Days Working Time Used: 61 Working. Days . ...Projject Cost..and_,.Financing Original Bid Price: $77-,230.07 Ghange. Order No. 1: -$6,851.00 (M&C C-1846, 9/21/70 and M&C. G-1649, 10/19/70). -wised Contract Price: $70-,379.07 Final Contract Cost: $62.,054.01 Partial. Payments Previously Made: Three, in. the amount. of..$55,477.64. . .Final Payment. Due: $6,576.37 Payment to be made from-Project Account number 104-24000-213. Deviation from _Bid..Price: The final project. cost. is $8,.325..06 less than. the revised contract price. This under-run was caused-primarily. by the lack. of necessity for 6" metal pipe. .subdrain. .for .a .savings. of, .$5,250. The remainder of the cost difference ($3,075..06) .resulted .from minor .variations between quantities estimated in the contract documents and-quantities, actually. measured .and used at the .j.ob .site. Compliance mith-Specifi.ca.tions During testing on this project, 29 corings were made with the following results: Exceeds Even with Below Specs .but Below .Specs Specs within. Tolerance Tolerance Paving 28 0 1 0 Sub-grade 8 21 0 0 DATE REFERENCE SUBJECT: Final Payment Assessment. PAGE NUMBER FP-808 Paving at .Six. Locations on. the,East _f or 2 On the .entire project the average .thickness-of the HMAC ,paving is ..6.36 .inches as compared to ,the -6.00 inches specified, and .the .average. .thickness of .the cement stabilized sub-grade is 6..06 -inches as._compar.ed. .to -the .6.00 inches specified. Tests made during construction .show .that..materials .used .were in compliance with. contract .specifications. Recommendations It is. zecommended that the project described above .be ..accepted-by the adoption of an ordinance and -that final payment .of $6,576.37 be authorized to S.R.O. -Asphalt, Inc. RNL:mm SUBMITTED BY: DISPOSITIO COUNCIL: PROCESSED BY APPROVED ❑ OTHER (DESCRIBE) XW CITY SECRETARY �T�/�91 CITY MANAGER