HomeMy WebLinkAboutOrdinance 6508 ORDINANCE NO.
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF PUTNAM STREET
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH S.R.O.
ASPHALT, INC., ARLINGTON„TEW FOR THE CONSTRUCTION CF SAID
IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE,
EXECUTION A14D DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESS-
MENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED
AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY
SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAP-
TION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH,
TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE
RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with S-R_p_ ASPHALT, INC.,_ARLI GTQN,, TEXAS for the making and construction of certain
street improvements on the hereinafter described portions of streets, avenues and public
places in said City, to-wit:
UNIT 1: PUTNAM STREET From Station 22+93 (Approximately 35'
South of the North Line of Lot 7-A
Pollard Estates Addition) to Meadowbrook
Drive, known and designated as Unit 1,
Project No. 104-24000-213.
UNIT 2: McGEE STREET From Greenlee Street to 180' North, known
and designated as Unit 2, Project No.
104-24000-213.
UNIT 3: GREENLEE STREET From McGee Street to Forest Avenue,
known and designated as Unit 3,
Project No. 104-24000-213.
UNIT 4: BEATY STREET From end existing pavement (East line
of Lot 6, Block 7, East Greenhill Addition)
to 586' East Mims Street, known and
designated as Unit 4, Project No.
104-24000-213.
UNIT 5: MIMS STREET From Beaty Street to 475' North, known
and designated as Unit 5, Project No.
104-24000-213.
UNIT 6: MUSE STREET From Greenlee Street to 350' North of
Norma Street, known and designated as
Unit 6, Project No. 104-24000-213.
WHEREAS, by sundry proceedings heretofore passed by the City Council of the
City of Fort Worth, Texas, including Ordinance No. 6380 , a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real and true owners thereof; and,
WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 6380 , and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOW, THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT:
I.
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; -and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
II.
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on'the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows:
III.
When each of the certifiactes has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying_ the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the. appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
oe
PASSED AND APPROVED THIS o7p day of 4 ic.+ 9 19 .
APPROVED AS TO FORM AND LEGALITY:
r 0 010 0 0
0 e
Fe 4"
City Attorney
PROJECT NO. 104-24000-213, UNIT 1: PUTNAM STREET FROM STATION 22+93 (APPROXIMATELY 35' SOUTH
OF THE NORTH LINE OF LOT 7-A, POLLARD ESTATES ADDITION) TO MEADOWBROOK DRIVE, to be improved
with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized
subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the
finished roadway will be thirty feet wide and by constructing six-inch thick concrete drive-
ways where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE SOUTHWEST CORNER OF PUTNAM AVENUE AND MEADOWBROOK DRIVE
WEST SIDE OF STREET DRISCOLL ACRES ADDITION
Bobby Joe Holdri.dge 46-C 57 .5' Frontage
2416 Putnam Res. 20' Pavement $2.92 $ 58.40
76112 35' Curb & Gutter 2.48 86.80
$ 145.20
A. J. Truesdell 47 , 48, 639' Pavement $2.92 $1,865.88
2400 Canton Drive 49, 50, Res. 623' Curb & Gutter 2.48 1,545.04
76112 51 & 52 $3,410.92
MEADOWBROOK DRIVE INTERSECTS
EAST SIDE OF STREET POLLARD ESTATES ADDITION
Handley Meadowbrook 1, 2 324' Pavement $2.92 $946.08
Christian Churc7 & 3 Res. 308' Curb & Gutter 2.48 763.84
P.O. Box 8157 116 Sq. Ft. Driveway .80 92.80
$1,802.72
Bill H. Hamilton 7-A 55' Existing Facilities No Assessment
2417 Putnam
J. C. Steward 5 & 220' Pavement $2.92 $642.40
2629 Putnam 6 Res. 220' Curb & Gutter 2.48 545.60
76112 $1,188.00
1.
PROJECT NO. 104-24000-213, UNIT 1: PUTNAM STREET FROM STATION 22+93 TO MEADOWBROOK DRIVE,
CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE OF STREET POLLARD ESTATES ADDITION
Lloyd Starks 4 110' Pavement $2.92 $321.20
2401 Putnam Res. 110' Curb & Gutter 2.48 272.80
76112 85 Sq. Ft. Drive .80 68.00
$ 662.00
COST TO PROPERTY OWNERS - ASSESSMENTS . . . . . . . . $7,208.84
COST TO CITY OF FORT WORTH . . . . . . . . . . . . . 6,143.26
TOTAL ESTIMATED CONSTRUCTION COST, UNIT NO. 1 . . . . $13,352.10
2
PROJECT NO. 104-24000-213, UNIT 2: McGEE STREET FROM GREENLEE STREET TO 180' NORTH,
to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch
thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch
wide concrete gutter, so that the finished roadway will be thirty feet wide.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHEAST CORNER OF GREENLEE STREET AND McGEE STREET
EAST SIDE OF STREET CRAVENS-PETERS SUBDIVISION
Clint P. Humphrys L 100' Frontage
2617 McGee Street Res. 100' Pavement $2.92 $292.00
76112 100' Curb & Gutter 2.48 248.00
$540.00
J. H. Peel G & 82.5' Frontage
2613 McGee Street F Res. 82.5' Curb & Gutter $2.48 $204.60
76112 $204.60
COST TO PROPERTY OWNERS - ASSESSMENTS . . . . . . . . $ 744.60
COST TO CITY OF FORT WORTH . . . . . . . . . . . . . 680.62
TOTAL ESTIMATED CONSTRUCTION COST, UNIT NO. 2 . . . . $1,425.22
3
PROJECT NO. 104-24000-213, UNIT 3: GREENLEE STREET FROM McGEE STREET TO FOREST AVENUE,
to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch
thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide
concrete gutter, so that the finished roadway will be thirty feet wide and by construct-
ing six-inch thick concrete driveways where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHEAST SIDE OF McGEE STREET AND GREENLEE STREET
NORTH SIDE OF STREET CRAVENS-PETERS SUBDIVISION
Clint P. Humphrys L 157 .3' Side Lot Credit
2617 McGee Street Res, 100' Pavement $2.92 $292.00
76112 100' Curb & Gutter 2.48 248.00
$540.00
M. P. Mills K 209' Side Lot Credit
2612 Forest Avenue Res. 109' Pavement $2.92 $318.28
76112 104' Curb & Gtr. 2.48 257.92
$576.20
FOREST AVENUE INTERSECTS
SOUTH SIDE OF STREET I. CARRODINE SURVEY
Larry P. Rattan Tract 2J-lA 227.3' Side Lot Credit
2618 Forest Avenue Res. 127.3' Pavement $2.92 $371.72
76112 127.3' Curb & Gtr. 2.48 315.70
140 Sq. Ft. Drive .80 112.00
$799.42
TOMLIN ADDITION
Larry P. Rattan I I 136.7 ' Side Lot Credit
2618 Forest Ave. Res. 100' Pavement $2,92 $292.00
76112 100' Curb & Gtr. 2.48 248.00
$540.00
4
PROJECT NO. 104-24000-213, UNIT 3: GREENLEE STREET FROM McGEE STREET TO FOREST AVENUE,
CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
COST TO PROPERTY OWNERS - ASSESSMENTS . . . . . . . . $2,455.62
COST TO CITY OF FORT WORTH . . . . . . . . . . . . . 5,824.54
TOTAL ESTIMATED CONSTRUCTION COST, UNIT NO. 3 . . . 8 280.16
5
PROJECT N0. 104-24000-213, UNIT 4: BEATY STREET FROM END EXISTING PAVEMENT (EAST LINE OF
LOT 6, BLOCK 7, EAST GREENHILL ADDITION) TO 586' EAST MIMS STREET, to be improved with six-
inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized sub-
grade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the
finished roadway will be thirty feet wide from Station 48 to Mims Street and forty feet
wide from Mims Street to Station 60+50 (33' West of E. line of Tract 6B, J. W. Haynes Sub-
division) and by constructing six-inch thick concrete driveways where specified.
BLOCK
OWNER LOT ZONING 1,, 110NTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHEAST CORNER OF LOT 1, C. L. BEATY SUBDIVISION
NORTH SIDE OF STREET C. L. BEATY SUBDIVISION
W. R. Sexton 1 & 1 252.8' Pavement $2.92 $738.18
6945 Beaty 1-A Res. 252.8' Curb & Gtr. 2.48 626.94
76112 171 Sq. Ft. Drive .80 136.80
$1,501.92
I. E. Owen 1-B 1 344.2' Pavement $2.92 $1,005.06
c/o Charles L. Owen Res. 344.2' Curb & Gtr. 2.48 853.62
P.O. Box 1936 $12858.68
76101
MIMS STREET INTERSECTS GREEN HILLS SUBDIVISION
Mr. & Mrs. L. G. Doss 3 & 17 245' Pavement $2.92 $715.40
7031 Beaty 2 Res. 245' Curb & Gtr. 2.48 607.60
76112 85.5 Sq. Ft. Drive .80 68.40
$1,391.40
Henry M. Coke 1 17 60' Pavement $2.92 $175.20
Rt. 4, Box 3 Res. 60' Curb & Gtr. 2.48 148.80
85.5 Sq. Ft. Drive .80 68.40
$ 392.40
J. W. HAYNES SURVEY
Owner:
Jane Roach Wofford Tract 6 105.9' Pavement $2.92 $309.23
5309 Rutland Res. 105.9' Curb & Gtr. 2.48 262.63
76133 85 Sq. Ft. Drive .80 68.00
$ 639.86
Buyer:
Jack D. Riley
7109 Beaty Street
76112
6
PROJECT NO. 104-24000-213, UNIT 4: BEATY STREET FROM END EXISTING PAVEMENT TO 586'
EAST MIMS STREET, CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE OF STREET J. W. HAYNES SURVEY
Fort Worth Ind. Tract 6-B 200' Frontage
School District Res. 169' Pavement $2.92 $493.48
3210 W. Lancaster 169' Curb & Gutter 2.48 419.12
76107 $ 912.60
SOUTH SIDE OF STREET HYDE JENNINGS SUBDIVISION
Nellie E. McCrea C 26 60' Pavement $2.92 $175.20
7116 Beaty Res. 60' Curb & Gutter 2.48 148.80
85 Sq. Ft. Driveway .80 68.00
$ 392.00
C. B. Culp B & A 26 150' Pavement $2.92 $438.00
7112 Beaty Res. 150' Curb & Gutter 2.48 372.00
76112 171 Sq. Ft. Driveway .80 136.80
$ 946.80
Terrell E. & 1-D 26 201.35' Pavement $7.58 $1,526.23
Ruth C. Gass Comm. 201.35' Curb & Gutter 2.48 499.35
2400 Forest Avenue $2,025.58
76112
It
MIMS STREET INTERSECTS GREEN MEADOW PARK ADDITION
Sabine Valley Lbr. Co. 17, 16 2 275' Pavement $2.92 $ 803.00
4329 Belknap & 15 Res. 275' Curb & Gutter 2.48 682.00
76117 $1,485.00
Steven Hilliard 18 2 100' Pavement $2.92 $292.00
2801 Major Res. 100' Curb & Gutter 2.48 248.00
76112 $ 540.00
7
PROJECT NO. 104-24000-213, UNIT 4: BEATY STREET FROM END EXISTING PAVEMENT TO 586'
EAST MIMS STREET, CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE OF STREET GREEN MEADOW PARK ADDITION
MAJOR STREET INTERSECTS
Jerry L. McKinney 15 1 120.65' Side Lot Credit
2800 Major Res. 100' Pavement $2.92 $292.00
76112 100' Curb & Gutter 2.48 248.00
140 Sq. Ft. Driveway .80 112.00
$ 652.00
HYDE JENNINGS SUBDIVISION
V. E. Kummero 2 19 277.4' Frontage
6935 Craig Res. 208' Pavement $2.92 $607.36
208' Curb & Gutter 2.48 515.84
85 Sq. Ft. Driveway .80 68.00
$1,191.20
COST TO PROPERTY OWNERS - ASSESSMENT . . . . . . . . . $13,929.44
COST TO THE CITY OF FORT WORTH . . . . . . . . . . . . 14,591.41
TOTAL ESTIMATED CONSTRUCTION COST, UNIT 4 . . . . . . $284520.85
8
PROJECT NO. 104-24000-213, UNIT 5: MIMS STREET FROM BEATY STREET TO 475' NORTH, to be
improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick
cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide con-
crete gutter, so that the finished roadway will be thirty-six feet wide.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHWEST CORNER OF BEATY STREET AND MIMS STREET
WEST SIDE OF STREET C. L. BEATY SUBDIVISION
I. E. Owen 1-B 1 337.4' Pavement $2.92 $985.21
c/o Charles L. Owen Res. 337.4' Curb & Gutter 2.48 836.75
P.O. Box 1936 $1,821.96
76101
VAN NATTA LANE INTERSECTS EAST GREEN HILL ADDITION
Keechi Lands Limited 28 6 135' Frontage
c/o Edward Slavik & Co. Res. 32' Pavement $2.92 $ 93.44
Petroleum Tower 32' Curb & Gutter 2.48 79.36
Corpus Christi, Texas $ 172.80
EAST SIDE OF STREET J. W. HAYNES SURVEY
Fort Worth Ind. Tract 6-B 585' Frontage
School District Res. 85' Pavement $2.92 $248.20
3210 W. Lancaster 63' Curb & Gutter 2.48 156.24
76107 $ 404.44
GREEN HILL ADDITION
L. G. Doss 3 17 331' Side Lot Credit
7031 Beaty Res. 231' Pavement $2.92 $674.52
76112 231' Curb & Gutter 2.48 572.88
$1,247.40
COST TO PROPERTY OWNERS - ASSESSMENT . . . . . . . . $ 3,646.60
COST TO THE CITY OF FORT WORTH . . . . . . . . . . . 5,907.03
TOTAL ESTIMATED CONSTRUCTION COST, UNIT 5 . . . . . . $ 9$ 53.63
9
PROJECT NO. 104-24000-213, UNIT 6: MUSE STREET FROM GREENLEE STREET TO 350' NORTH OF
NORMA STREET, to be improved with six-inch thick hot-mix asphaltic concrete pavement on
a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and two-foot
wide concrete gutter, so that the finished roadway will be thirty feet wide.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT APPROXIMATELY STATEION 13 + 50 ON MUSE STREET
WEST SIDE OF STREET J. W. HAYNES SURVEY
George W. Blandi_n Tract 5 847 ' Frontage
1106 Seventh Street Res. 235' Pavement $2.57 $ 603.95
Wichita Falls, Texas 612' Curb & Gtr. 2.83 1,731.96
$21335.91
EAST SIDE OF STREET A. S. McGEE SUBDIVISION
Albert W. Clayton 1 6-A 93.13' Existing Facilities
7201 Hightowner 76112 Res. No Assessment
HIGHTOWER STREET INTERSECTS
Dennis Earl Bell 1 6-B 93.13' Existing Facilities
7200 Hightower 76112 Res. No Assessment
Robert James Corp. 1 5-A 93' Existing Facilities
1308 Lake 76102 Res. No Assessment
NORMA STREET INTERSECTS
J. W. Myatt, Jr. 1 5-B 93' Existing Facilities
7200 Norma 76112 Res. No Assessment
B. D. Kidwell Tract 4 236' Pavement $2.57 $ 606.52
2616 Janice Lane 76112 Res. 236' Curb & Gtr. 2.83 667 .88
$1,274.40
Walter Douglas Tucker 1 C 113' Existing Facilities
7201 Greenlee Street Res. No Assessment
76112
COST TO PROPERTY OWNERS - ASSESSMENTS . . . . . . . . $3,610.31
COST TO CITY OF FORT WORTH . . . . . . . . . . . . . 3,517.14
TOTAL ESTIMATED CONSTRUCTION COST, UNIT 6 . . . . . . $7,127.45
10
'City of Fort Worthi Texas
UNK
MIATSON Mayor and Council Communication
DOSS&
DATE REFERENCE susJECT: Final .Payment. -. Assessment PAGE
• NUMSER FP 808 Paving a.t..Six .Locations on the .East i or
6/28/71Side
k.
Final Council action on the project described below is requested.
Project Description
Name: Assessment Paving at .Six Locations on
the East Side,. Proj. No.. 104-24000-213
Contractor: S.R.O. :Asphalt, .Inc.
Contract .Awarded: September. 21.,.. 1970 (M&C .C-1846)
Work Order Issued: December 30,1 1970 (Partial Work Ordnri
Units 3 and 6)
January .26, 1971 (Partial Work Order,
.Units 1,. 2 & 4)
February 10, 1971 .(Full Work Order to
include. Unit-.5)
Work- Order Effective: January 11, 1971
Date. of Final Inspection and. .Appr.oval: .,April, 27, 1971
Working Time Bid: 80 _Working Days
Working Time Used: 61 Working. Days
. ...Projject Cost..and_,.Financing
Original Bid Price: $77-,230.07
Ghange. Order No. 1: -$6,851.00 (M&C C-1846, 9/21/70 and
M&C. G-1649, 10/19/70).
-wised Contract Price: $70-,379.07
Final Contract Cost: $62.,054.01
Partial. Payments Previously Made: Three, in. the amount. of..$55,477.64.
. .Final Payment. Due: $6,576.37
Payment to be made from-Project Account number 104-24000-213.
Deviation from _Bid..Price: The final project. cost. is $8,.325..06 less than. the
revised contract price. This under-run was caused-primarily. by the lack. of
necessity for 6" metal pipe. .subdrain. .for .a .savings. of, .$5,250. The remainder
of the cost difference ($3,075..06) .resulted .from minor .variations between
quantities estimated in the contract documents and-quantities, actually. measured
.and used at the .j.ob .site.
Compliance mith-Specifi.ca.tions
During testing on this project, 29 corings were made with the following results:
Exceeds Even with Below Specs .but Below
.Specs Specs within. Tolerance Tolerance
Paving 28 0 1 0
Sub-grade 8 21 0 0
DATE REFERENCE SUBJECT: Final Payment Assessment. PAGE
NUMBER
FP-808 Paving at .Six. Locations on. the,East _f or 2
On the .entire project the average .thickness-of the HMAC ,paving is ..6.36 .inches
as compared to ,the -6.00 inches specified, and .the .average. .thickness of .the
cement stabilized sub-grade is 6..06 -inches as._compar.ed. .to -the .6.00 inches
specified.
Tests made during construction .show .that..materials .used .were in compliance
with. contract .specifications.
Recommendations
It is. zecommended that the project described above .be ..accepted-by the adoption
of an ordinance and -that final payment .of $6,576.37 be authorized to S.R.O.
-Asphalt, Inc.
RNL:mm
SUBMITTED BY: DISPOSITIO COUNCIL: PROCESSED BY
APPROVED ❑ OTHER (DESCRIBE)
XW
CITY SECRETARY
�T�/�91
CITY MANAGER