Loading...
HomeMy WebLinkAboutOrdinance 6308 i . ' • r ORDINANCE NO, ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF RA.MEY AVENUE AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH TEXAS BITULITHIC COMPANY FOR THE CONSTRUCTION OF SAID IMPROVEMENTS FULLY COMPLETED AND. PERFORMED; DIRECTING THE ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPRO- PRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract With TEXAS BITULITHIC COMPANY for the making and construction of certain street improvements on the hereinafter described portions of streets, avenues and public places in .said City, to-wit: RAMEY AVENUE From Amanda Street to Stalcup Road, known and designated as Unit II, Project No. 104-22000-136: a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven- inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be forty feet wide, and by constructing six-inch thick concrete drive- ways and four-foot wide concrete sidewalks where specified. WHEREAS, by sundry proceedings heretofore passed by the City Council of the City of Fort Worth, Texas, including Ordinance No. 6114 , a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and public places and against the real and true owners thereof; and, WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review, found and determined that, in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No. 6 114 , and WHEREAS, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance with the contract therefor; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; ,and the contract with reference thereto be, and it is hereby, found and declared fully completed and performed. II. The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro- perty assessed and shall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the .certificates, with the property descriptions to be shown on the respective certificates, together with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows: III. When each of the certifiactes has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the, contract price. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the appropriate Ordinance Records of said City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED AND APPROVED THIS day of v 19 �. APPROVED AS TO FORM AND LEGALITY: s � / City Attorney FORT WORTH, TEXAS 19 TO THE HONORABLE CITY COUNCIL, OF THE CITY OF FORT WORTH, TEXAS, Gentlemen: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below: Estimates of the total cost of improvements on a portion of RAMEY AVENUE and portions of sundry other streets, avenues and public places in the City of Fort Worths Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to-wit: PROTECT NO. 104-22000-136, UNIT II: RANEY AVENUE FROM AMANDA STREET TO STALCUP ROAD, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curbs and two- foot wide concrete gutters, so that the finished roadway will be forty feet wide, and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalks where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2.63/L.F. Six-inch Hot-mix Asphaltic Concrete Pavement (Commercial Zoning with credit granted for existing penetration) . . . . . . . . . . . . 7.34/L.F. Six-inch Hot-mix Asphaltic Concrete Pavement (Residential Zoning with credit granted for existing penetration) . . . . . . . . . . . . 2.50/L.F. Six-inch Hot-mix Asphaltic Concrete Pavement (Commercial Zoning with credit granted for owner-occupied residence) . . . . . . . . 4.92%L.F. Four-foot wide concrete sidewalks. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . 2.37'/L.F. Six-inch thick concrete driveways. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -74/S.F„ The assessments result in the following division of costs: Total Cost to Property Owners for pavement. . . . . . . . . .$ 26,282.37 Total Cost to Property Owners for curb, gutter, sidewalk, and driveways. . . . . . . . . . . . . . . . . . . 33,429.01 TOTAL COST TO PROPERTY OWNERS w 59,711.38 Total Cost to City of Fort Worth for pavement and other improvements. . . . . . . . . . . . . . . . . . . . .$143,207.66 Total Cost to City of Fort Worth for curb, gutter, sidewalk, and driveways. . . . . . . . .. . . . . . . . . . 35,056.35 TOTAL COST TO CITY OF FORT WORTH 178,264.01 TOTAL CONSTRUCTION COST 1237,975.39 1 PROJECT No. 104-22000-136, UNIT II: RAA'IY AVENUE FROM AMANDA STREET TO STALCUP ROAD, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six- inch thick lime stabilized subgrade with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be forty feet wide, and by constructing four-foot wide concrete sidewalk and six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHEAST CORDER OF AMPMA STREET AND RAlEY AVENUE NORTH SIDS; OF STREET MAXvIELL SUBDIVISION E. J. Maxwell 12 3 94' Pavement $7.34 $689.96 2525 RidgTiar Boulevard Comm. 87' Curb & Gutter 2.63 228.81 76' Sidewalk 2.37 180.12 195 Sq. Ft. Drive .74 144.30 $1,243.19 Willie Curtis 13 3 50' Pavement $2.50 $125.00 3824 Burnice Drive lies. 50' Curb & Gutter 2.63 131.50 50' Sidewalk 2.37 118.5o $ 375.o0 Hobart T. Douglas 14 3 50' Pavement $2.50 $125.00 5928 Maceo Lane Res. 50' Curb & Gutter 2.63 131.50 39' Sidewalk 2.37 92.43 113 Sq. Ft. Drive .74 83.62 $ 432.55 Gladys Benjamin 15 3 100' Pavement $2.50 $250.00 508 N. Lindsey Avenue & Res. 100' Curb & Gutter 2.63 263.00 Mt. Pleasant, Texas 16 95' Sidewalk 2.37 225.15 113 Sq. Ft. Drive .74 83.62 $ 821.77 Henry A. and Bobbie 17 3 56' Pavement $2.50 $140.00 Jean Majors Res. 56' Curb & Gutter 2.63 147.28 4928 Rainey Avenue 45' Sidewalk 2.37 106.65 113 Sq. Ft. Drive .74 83.62 $ 477.55 W. H. Thomas 18 3 50' Pavement $2.50 $125.00 4931 Rainey Avenue Res. 50' Curb & Gutter 2.63 131.50 45' Sidewalk 2.37 lo6.65 113 Sq. Ft. Drive .74 83.62 $ 446.77 2 PROJECT NO. 104-22000-136, UNIT II - CONT. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET MAXWELL SUBDIVISION Ft. Worth-Arlington 19 3 50' Pavement $2.50 $125.00 Inv. Group Res. 50' Curb & Gutter 2.63 131.50 1015 Pennsylvania Avenue 39' Sidewalk 2.37 92.43 113 Sq. Ft. Drive .74 83.62 $ 432.55 M. C. Gregory, Jr. 20 3 50' Pavement $2.50 $125.00 3263 Bilglade Res. 50' Curb & Gutter 2.63 131.50 39' Sidewalk 2.37 92.43 113 Sq. Ft. Drive .74 83 .62 $ 432.55 Manzie Alexander 21 3 50' Pavement $2.50 $125.00 1010 Louisiana Res. 50' Curb & Gutter 2.63 131.50 39' Sidewalk 2.37 92.43 113 Sq. Ft. Drive .74 83.62 $ 432.55 Mrs. Ruth S. Si_�ith 22 3 50' Pavement $2.50 $125.00 4945 Ramey Avenue Res. 34' Curb & Gutter 2.63 89.42 39' Sidewalk 2.37 92.43 113 Sq. Ft. Drive .74 83.62 $ 390.47 LENA STREET INTERSECTS Johnny Edwards 13 4 141' Adjusted to 4951 Rainey Avenue Res. 100' Pavement $2.50 $250.00 100' Curb & Gutter 2.63 263.00 100' Sidewalk 2.37 237.00 $ 750.00 SIMON AND MARK MAYER ADDITION Melvin Nickerson S. 125' 1 61' Pavement $2.50 $152.50 1266 E. Myrtle of 1 Res. 61' Curb & Gutter 2.63 160.43 61' Sidewalk 2.37 144.57 45 -50 3 PROJECT NO. lo4-22000-136, UNIT II - CONT. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET SIMON AND MARK MIAYER ADDITION Jack Carter 2 1 61' Pavement $2.50 $152.50 511 W. T. Waggoner Res. 61' Curb & Gutter 2.63 160.E+3 Building 50' Sidewalk 2.37 118.50 113 Sq. Ft. Drive .74 83.62 $ 515.05 Lillie Taylor 3 1 61' Pavement $2.50 $152.50 1824 Langston Res. 61' Curb & Gutter 2.63 160.43 50' Sidewalk 2.37 118.50 113 Sq. Ft. Drive .74 83.62 $ 515.05 B. J. Himbre W. 50' 1 50' Pavement $2.50 $125.00 c/o Johnson-Campbell of 4 Res. $ 125.00 Lumber Company P. 0. Box 10248 Miss Lucille Locklin E. 11' 1 72' Pavement $2.50 $180.00 218 Atherton Avenue of 4 Res. 72' Curb & Gutter 2.63 189.36 Atherton, California & 5 67' Sidewalk 2.37 158.79 113 Sq. Ft. Drive .74 83.62 $ 611.77 S. & E. Holderness 6 1 .22' Pavement $2.50 $305.00 5017 Ramey Avenue & Res. 122' Curb & Gutter 2.63 320.86 7 128' Sidewalk 2.37 303.36 113 Sq. Ft. Drive .74 83.62 $1,012.84 L. V. King 8 1 61' Pavement $2.50 $152.50 5029 Ramey Avenue Res. 61' Curb & Gutter 2.63 160.E+3 50' Sidewalk 2.37 118.50 113 Sq. Ft. Drive .74 83.62 $ 515.05 Ray M. King 9 & 1 93' Pavement $2.50 $232.50 626 E. Jessamine W. 32' Res. 93' Curb & Gutter 2.63 244-59 of 10 82' Sidewalk 2.37 194.34 113 Sq. Ft. Drive .74 83.62 $ 755.05 4 PROJECT NO. 104-22000-136, UNIT II - CONT. BLACK OWNER LOT ZONING FRONTAGE RATE, AMOUNT ASSESSMENT NORTH SIDE OF STREET SIMON AND MARK MAYER ADDITION Augustus H. Love E. 29' 1 73' Pavement $2.50 $182.50 5105 Ramey Avenue of 10 & Res. 73' Curb & Gutter 2.63 191.99 W. 44' 61' Sidewalk 2.37 144.57 of 11 185 Sq. Ft. Drive .74 136.90 $ 655.96 Peaceful Rest E. 15' 1 106.5' Pavement $2.50 $266.25 Baptist Church of 11, Res. 106.5' Curb & Gutter 2.63 280.10 5107 Ramey Avenue 12, & 77.5' Sidewalk 2.37 183.68 tip• 30.5' 318 Sq. Ft. Drive .74 235.32 of 13 $ 965.35 George Wilcox E. 30.5' 1 30.5' Pavement $2.50 $ 76.25 1602 Dillard of 13 Res. 30.5' Curb & Gutter 2.63 80.22 30.5' Sidewalk 2.37 72.29 $ 228.76 Joseph Evans S. 248' 1 122' Pavement $2.50 $305.00 5129 Ramey Avenue of 14 Res. 122' Curb & Gutter 2.63 320.86 & 15 111' Sidewalk 2.37 263.07 113 Sq. Ft. Drive .74 83.62 $ 972.55 Man Middleton S. 248' 1 122' Pavement $2.50 $305.00 5137 Ramey Avenue of 16 Res. 122' Curb & Gutter 2.63 320.86 & 17 117' Sidewalk 2.37 277.29 113 Sq. Ft. Drive .74 83.62 $ 986.77 Katie Lee Foster S. 248' 1 122' Pavement $2.50 $305.00 5556 McArthur Drive of 18 Res. 122' Curb & Gutter 2.63 320.86 & 19 111' Sidewalk 2.37 263.07 113 Sq. Ft. Drive .74 83.62 $ 972.55 Albin Hurd S. 248' 1 60' Pavement $2.50 $150.00 1301 East Allen of 20 Res. 60' Curb & Gutter 2.63 157.80 60' Sidewalk 2.37 142.20 $ 450.00 5 PROJECT NO. 1O4-22000-136, UNIT II - CONT. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET WALTER WILLI FOURTH FILING Carson Johnson 1 1 150' Side Lot Adjusted to 2412 Dillard Res. 100' Pavement $2.50 $250.00 75' Curb & Gutter 2.63 197.25 100' Sidewalk 2.37 237.00 $ 684.25 DILLARD STREET INTERSECTS Fred K. Reed 1 2 165' Side Lot Adjusted to 2413 Dillard Res. 100' Pavement $2.50 $250.00 100' Curb & Gutter 2.63 263.00 100' Sidewalk 2.37 237.00 113 Sq. Ft. Drive .74 83.62 $ 833.62 STALCUP'S THIRD Sweet Home 11 3 148' Adjusted to Baptist Church COLT�1. 100' Pavement $2.50 $250.00 5225 Ramey Avenue 85' Curb & Gutter 2.63 223.55 64' Sidewalk 2.37 151.68 410 Sq. Ft. Drive .74 303.4o 928.63 BETHUNE STREET INTERSECTS COWAN SUBDIVISION J. N. Cowan B 90' Pavement $4.92 $442.80 1102 E. Oleander Comm. 90' Curb & Gutter 2.63 236.70 79' Sidewalk 2.37 187.23 113 Sq. Ft. Drive .74 83.62 $ 950.35 J. N. Cowan A 77' Pavement $2.50 $192.50 1102 E. Oleander Res. 77' Curb & Gutter 2.63 202.51 77' Sidewalk 2.37 182.49 577.50 6 PROJECT NO. 104-22000-136, UNIT II - CONT. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET NANCY MILES SUBDIVISION Ernestine Newton 6 71.5' Pavement $2.50 $178.75 3847 Stalcup Road Res. 71.5' Curb & Gutter 2.63 188.05 60.5' Sidewalk 2.37 143.39 113 Sq. Ft. Drive .74 83.62 $ 593.81 Robert Conley 3 71.5' Pavement $2.50 $178.75 5311 Ramey Avenue Res. $ 178.75 James L. Polk 2 71.5' Pavement $2.50 $178.75 5315 Ramey Avenue Res. 15' Curb & Gutter 2.63 39.45 15' Sidewalk 2.37 35.55 $ 253.75 DAN DULANEY SURVEY W. M. Kelly Part of 73' Pavement $2.50 $182.50 5317 Ramey Avenue Tr. 5-B 73' Curb & Gutter 2.63 191.99 Res. 73' Sidewalk 2.37 173.01 $ 547.50 PERKINS - CLARK SUBDIVISION Rufus Clark 2 B 54' Pavement $2.50 $135.00 5337 Ramey Avenue Res. 43' Curb & Gutter 2.63 113.09 43' Sidewalk 2.37 101.91 116 Sq. Ft. Drive .74 85.84 $ 435.84 ANDREW STREET INTERSECTS WOODS ADDITION City of Fort Worth Pt. of 10' - No Assessment Lot 1 $ -0- H. D. Edmondson 1 100' Pavement $7.34 $734.00 5400 Ramey Avenue & Comm. 100' Curb & Gutter 2.63 263.00 2 50' Sidewalk 2.37 118.50 538 Sq. Ft. Drive .74 398.12 $1,513.62 7 PROJECT NO. 104-22000-136, UNIT II - CONT. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET WOODS ADDITION Thomas Jones, Jr. 3 56' Pavement $7.34 $411.04 2413 Lucas Comm. 56' Curb & Gutter 2.63 147.28 31' Sidewalk 2.37 73.47 256 Sq. Ft. Drive .74 189.44 $ 821.23 Jerry Berkowitz, Inc. 4 60' Pavement $7.34 $440.4o 729 N.W. 28th Street Comm. 38' Sidewalk 2.37 90.o6 $ 530.46 John Leona 5 55' Pavement $7.34 $403.70 Leonard Woods Comm. 44' Sidewalk 2.37 lo4.28 1001 Davis $ 507.98 City of Fort Worth 6 65' - No Assessment $ -0- A. E. Wilemon 7,8,9, 339' Pavement $7.34 $2,488.26 201 West Commerce 10 & 11 Comm. 272' Curb & Gutter 2.63 715.36 Dallas, Texas 75208 339' Sidewalk 2.37 803.43 $4,007.05 STALCUP ROAD INTERSECTS SOUTH SIDE OF STREET J. Q. ST. CLAIR SURVEY American Petrofina Co. Tr. 9-A 100' Pavement $7.34 $734.00 P. 0. Box 2159 Comm. $ 734.00 Dallas, Texas 75221 Buddies Super Part of 225' Pavement $7.34 $1,651.50 Markets, Inc. Tract 9 $1,651.50 Attn: Wm. Coughli Comm. P. 0. Box 4337 Fort Worth, Texas City of Fort Worth Part of 60' - No Assessment Tract 9 $ - 0-Lassie Dancer Tracts 86' Pavement $7.34 $631.24 53-12 Rudd 7 & 8 86' Curb & Gutter 2.63 226.18 Comm. 86' Sidewalk 2.37 203.82 $1,o61.24 8 PROJECT NO. 104-22000-136, UNIT II - CONT. BLOCK OWNER LOT ZONING FRONTAGE. RATE AT11iOUNT ASSESSMENT SOUTH SIDE OF STREET J. Q. ST. CLAIR SURVEY H. D. Edmondson Tract 6 43' Pavement $7.34 $315.62 5400 Ramey Avenue Comm. 43' Curb & Gutter 2.63 113.09 20' Sidewalk 2.37 47.40 256 Sq. Ft. Drive .74 189.44 $ 665 .55 WHIT1%10RE COURTS H. D. Edmondson 1-R A 127' Pavement $7.34 $932.18 5400 Ramey Avenue Comin. 127' Curb & Gutter 2.63 331E-01 127' Sidewalk 2.37 300.99 $1,567.18 WILLS POINT COURT INTERSECTS Frank J. Brown 1 B 83' Pavement $7.34 $609.22 5336 Ramey Avenue Cori-Ill. 83' Curb & Gutter 2.63 218.29 65' Sidewalk 2.37 154.o5 164 Sq. Ft. Drive .74 121.36 $1,102.92 W. F. Mitchell 1-R C 50' Pavement $7.34 $367.00 5332 Ramey Avenue Comm. 50' Curb & Gutter 2.63 131.50 56' Sidewalk 2.37 132.72 $ 631.22 Margie Thornton 1-G 50' Pavement $7.34 $367.00 2413 Birdell Comm. 40' Curb & Gutter 2.63 105.20 $ 472.20 BIRDELL STREET INTERSECTS J. Q. ST. CLAIR SURVEY Edward W. Guinn 1-D-1 100' Pavement $7.34 $734.00 5304 Ramey Avenue & Comm. $ 734.00 1-D-2 Max E. Clark and 1-C-2 50' Pavement $7.34 $367.00 Fritz E. Barton Comm. 50' Curb & Gutter 2.63 131.50 c/o E. W. Guinn 32' Sidewalk 2.37 75.84 5304 Ramey Avenue $ 574.34 9 PROJECT N0. 104-22000-136, UNIT II - CONT. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSIVENT SOUTH SIDE OF STREET J. Q. ST. CLAIR SURVEY Russell E. Starnes 1-C-1 50' Pavement $7.34 $367.00 3000 Pioneer Comm. 50' Curb & Gutter 2.63 131.50 50' Sidewalk 2.37 118.50 $ 617.00 Mrs. Effie Whitmore 1-C 113.8' Pavement $4.92 $559.90 5300 Ramey Avenue Comm. 113.8' Curb & Gutter 2.63 299.29 108.8' Sidewalk 2.37 257.86 113 Sq. Ft. Drive .74 83.62 $1,200.67 J. L. Stanley Part of 120' Pavement $7.34 $880.80 5224 Ramey Avenue 1-A 120' Curb & Gutter 2.63 315.60 Comr�i. 75' Sidewalk 2.37 17(.75 461 Sq. Ft. Drive .74 341.14 $1,715.29 J. L. Stanley Part of 270' Pavement $2.50 $675.00 5224 Ramey Avenue 1-A 255' Curb & Gutter 2.63 670.65 Res. 270' Sidewalk 2.37 639.90 $1,985.55 CAREY STREET INTERSECTS HOLLIS SUBDIVISION Robert Thompson E. 50' of 50' Pavement $2.50 $125.00 5154 Ramey Avenue N. 146' Res. 50' Curb & Gutter 2.63 131.50 of 10 50' Sidewalk 2.37 118.50 $ 375.00 J. T. Earl W. 50' of 50' Pavement $2.50 $125.00 c/o Stella Gibbs E. 100' Res. 50' Curb & Gutter 2.63 131.50 5146 Ramey Avenue of N. 146' 50' Sidewalk 2.37 118.50 of 10 $ 375.00 Willie S. Culberson W. 95' 95' Pavement $2.50 $237.50 5224 Kilpatrick of 10 Res. 77' Curb & Gutter 2.63 202.51 77' Sidewalk 2.37 182.49 185 Sq. Ft. Drive .74 136.90 $ 759.40 10 PROJECT NO. 104-22000-136, UNIT II - CONT. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSI.IENT SOUTH SIDE OF STREET HOLLIS SUBDIVISION MARLIN STREET INTERSECTS Stop Six Church of God Tract 1 190' Pavement $2.50 $475.00 4801 Wilbarger Res. 160' Curb & Gutter 2.63 420.80 190' Sidewalk 2•37 450.30 $1,346.10 PARK VIEW ADDITION Evelyn Kissentainer 7 3 75' Pavement $2.50 $187.50 5132 Ramey Avenue Res. 75' Curb & Gutter 2.63 197.25 6++ ' Sidewalk 2.37 151.68 113 Sq. Ft. Drive .74 83.62 $ 620.05 Marshall Madison, Jr. 6 3 50' Pavement $2.50 $125.00 5128 Ramey Avenue Res. 50' Curb & Gutter 2.63 131.50 39' Sidewalk 2.37 92.43 113 Sq. Ft. Drive .74 83.62 $ 432.55 Lonnie Leffall 5 3 50' Pavement $7.34 $367.00 2204 Pine Res. 50' Curb & Gutter 2.63 131.50 32' Sidewalk 2.37 75.84 185 Sq. Ft. Drive .74 136.90 $ 711.24 Nelson H. Carter 4 3 50' Pavement $2.50 $125.00 5116 Rainey Avenue Res. 50' Curb & Gutter 2.63 131.50 39' Sidewalk 2.37 92.43 113 Sq. Ft. Drive .74 83.62 � 432.55 Bettie A. Walker 3 3 50' Pavement $2.50 $125.00 5112 Ramey Avenue Res. 50' Curb & Gutter 2.63 131.50 39' Sidewalk 2.37 92.43 113 Sq. Ft. Drive .74 83.62 $ 432.55 Nathan Bennett 2 3 72' Pavement $2.50 $180.00 5104 Ramey Avenue Res. 72' Curb & Gutter 2.63 189.36 50' Sidewalk 2.37 118.50 226 Sq. Ft. Drive .74 167.24 $ 655.10 11 PROJECT NO. 104-22000-136, UNIT II - CONT. BLOCK OWNER LOT ZONING FRONTAGE RATE. AMOUNT ASSESSMENT SOUTH SIDE OF STREET PARK VIEW ADDITION Della Moore 1 3 72' Pavement $2.50 $180.Oo 5100 Ramey Avenue Res. 72' Curb & Gutter 2.63 189.36 78' Sidewalk 2.37 184.86 113 Sq. Ft. Drive .74 83.62 $ 637.84 WALKER STREET INTERSECTS St. James A.M.E. Church 5 2 71' Pavement $2.50 $177.50 5020 Ramey Avenue Res. 56' Curb & Gutter 2.63 147.28 53' Sidewalk 2.37 125.61 $ 450.39 C. D. Clark 4 2 71' Pavement $2.50 $177.50 5016 Ramey Avenue Res. 71' Curb & Gutter 2.63 186.73 60' Sidewalk 2.37 142.20 113 Sq. Ft. Drive .74 83.62 $ 590.05 Jessie Hickerson 3 2 71' Pavement $2.50 $177.50 5010 Ramey Avenue Res. 71' Curb & Gutter 2.63 186.73 71' Sidewalk 2.37 168.27 113 Sq. Ft. Drive .74 83.62 $ 616.12 Jessie Johnson 2 2 71' Pavement $2.50 $177.50 5004 Ramey Avenue Res. 30' Curb & Gutter 2.63 78.90 71' Sidewalk 2.37 168.27 113 Sq. Ft. Drive .74 83.62 $ 5o8.29 Garnett Allen S. 120' 2 71' Pavement $2.50 $177.50 c/o Union Bankers of 1 Res. 71' Curb & Gutter 2.63 186.73 P. 0. Box 5433 71' Sidewalk 2.37 168.27 Dallas, Texas $ 532.50 JOHNSON STREET INTERSECTS E. L. McBride N. 150' 1 71' Pavement $2.50 $177.50 5657 Comer Drive of 5 Res. 71' Curb & Gutter 2.63 186.73 71' Sidewalk 2.37 168.27 $ 532.50 12 PROJECT NO. 104-22000-136, UNIT II - CONT. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET PARK VIEW ADDITION Jettie Bell Sibley 4 1 71' Pavement $2.50 $177.50 606 Last Tucker Res. 71' Curb & Gutter 2.63 186.73 71' Sidewalk 2.37 168.27 $ 532.50 Lee Daniel Else 3 1 71' Pavement $2.50 $177.50 4950 Ramey Avenue Res. $ 177.50 Ft. Worth-Arlington 2 1 71' Pavement $2.50 $177.50 Invest. Group Res. 56' Curb & Gutter 2.63 147.28 c/o Jack Turnbow 65' Sidewalk 2.37 154.05 1015 Pennsylvania 113 Sq. Ft. Drive .74 83.62 $ 562.45 Monroe Ellison, Jr. 1 1 71' Pavement $2.50 $177.50 2500 Langston Res. 71' Curb & Gutter 2.63 186.73 53' Sidewalk 2.37 125.61 185 Sq. Ft. Drive .74 136.90 $ 626.74 VILLAGE CREEK ROAD INTERSECTS TOM DANNER ADDITION J. W. Webber L. f 80' Pavement $2.50 $200.00 P. 0. Box 621 of 8 Res. 80' Curb & Gutter 2.63 210.40 75' Sidewalk 2.37 177.75 113 Sq. Ft. Drive .74 83.62 $ 671.77 Henry A. Majors W. 2 80' Pavement $2.50 $200.00 4927 Ramey Avenue of 8 Res. 80' Curb & Gutter 2.63 210.40 62' Sidewalk 2.37 146.94 185 Sq. Ft. Drive .74 136.90 $ 694.24 Leeper & E. 2 70' Pavement $2.50 $175.00 Elnora Geiger of 7 Res. 70' Curb & Gutter 2.63 184.10 4924 Ramey Avenue 59' Sidewalk 2.37 139.83 113 Sq. Ft. Drive .74 83 .62 $ 582.55 13 PROJECT NO. 104-22000-136, UNIT II - CONT. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET TOM DANNER ADDITION Carrie Boyd Bays W. 2 70' Pavement $2.50 $175.00 5828 Kilpatrick of 7 Res. 70' Curb & Gutter 2.63 184.10 48' Sidewalk 2.37 113.76 226 Sq. Ft. Drive .74 167.24 $ 640.10 Britton Boyd E. 70' Pavement $2.50 $175.00 1611 W. 46th St. of o Res. 70' Curb & Gutter 2.63 184.10 Los Angeles, California 59' Sidewalk 2.37 139.83 113 Sq. Ft. Drive .74 83 .62 $ 582.55 Robert Kelly W. 2 70' Pavement $2.50 $175.00 c/o Frank Phillips of 6 Res. 70' Curb & Gutter 2.63 184.10 324 W. Third 50' Sidewalk 2.37 139.83 San Angelo, Texas 113 Sq. Ft. Drive .74 83 .62 $ 582.55 TOTAL COST TO PROPERTY OWNERS - ASSESSMENTS $ 59,711.38 TOTAL COST TO CITY OF FORT WORTH 1782264.01 TOTAL CONSTRUCTION COST $2372975.39 14 City of Fort Worth, Texas UNE Mayor and Coundil Communication IMORPHIS B.A B. DATE REFERENCE SUBJECT: Final Payment - Ramey Avenue PAGE • NUNSER Improvements, Unit II 2 G�AHA� 6/1/70 FP--709 or F / v Final City Council action on the project described below is requested. Project Description Name: Ramey Avenue Improvements, Unit II Contractor: Texas Bitulithic Company Contract Awarded: May 12, 1969 (M&C C-1485) Work Order Issued; September 9, 1969 Work Order Effective: September 19, 1969 Date of Final Inspection and Approval: April 29, 1970 Time Bid: 110 Working Days Time Used: 100 Working Days Project Cost and Financing Original Bid Price: $217,155.60 Change Order. No. 1: + $53.90 (A.R. , 1-15 5/16/69) Change Order No. 2: + $417.20 (A.R. , 1-15 8/6/69) Change Order No. 3: + $4,000,.00 (M&C C-1640, 12/29/69) Revised Bid Price: $221,626.70 Final Contract Cost: $216,341.26 Partial Payments Previously made: 7 Amount: $189,709.56 Final Payment Due: $26,631.70 Payment To Be Made From Project Account Number 104-22000-136 Deviation from Bid Price: An under-run of $5,285.44 occurred due to minor variations between quantities estimated in the contract documents and quantities measured and used at the job site. Compliance With Specifications During testing on this project, 12 corings were made with the following results: Exceeds Even With Under Specs But Below Specs Specs Within Tolerance Tolerance Paving 8 4 0 0 Sub-grade 1 11 0 0 DATE REFERENCE SUBJECT: Final Payment - Ramey Avenue PAGE NUMBE6/l/70 FP-709 Improvements, Unit II 2 cf 2 On the entire project, the average thickness of the hot-mix asphaltic concrete paving is 6.48 inches compared to the six inches specified, and the average thickness of the lime stabilized sub-grade is 6.02 inches compared to the six inches specified. Tests made during construction show that materials used were in compliance with contract specifications. Recommendation It is recommended that the project described above be accepted as complete by the adoption of an ordinance, and that final payment of $26,631.70 be authorized to Texas Bitulithic Company. HDM/mh 7.4 D BY: DISPOSI ION COUNCIL: PROCESSED BY APP OV ❑ OTHER (DESCRIBE) ( � 1 RETAR CY / y DATE CITY MANAGER ��