Loading...
HomeMy WebLinkAboutContract 35294-A3 CITY SECRETARY ,�y AMENDMENT NO. 3 CONTRACT NO. �2S1 - (No M&C Needed) STATE OF TEXAS S COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and A.N.A. Consultants LLC, (Engineer) made and entered into City Secretary Contract No. 35294, (the Contract) which was executed administratively by the City Manager on the 16t' day of September 2008; and WHEREAS, the Contract involves engineering services for the following project: Fossil Drive, Yolanda Drive, Meadowlane Terrace and Kings Oak Addition Areas Drainage Improvements, Project No. 00485 WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated November 14th, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $ 26, 665.00 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $ 337,405.00. City of Fort Worth,Texas �} Amendment to Engineering Agreement PMO Official Release Date:10.01.2010 OFFICIAL RECORD! Page 1 of 2 CITY SECRETARY FT. WORTH, TX 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the 14 day of DeCe,"0112f , 2011, in Fort Worth, Tarrant County, Texas. A7 T: Cy 00 ��d �o oa .,o 0�r Al City Secretary �� 0 Oo0 qrf 00'0000000 AY APPROVAL RECOMMENDED: APPROVED: &4) Z) Douglas Wiersig, P. Director, Fernando Costa Department of Transpor ation/Public Assistant City Manager Works A.N.A Consultants, L.L.C. ENGINEER Y: Name: Mark N. As said---, -_... Vice President, A.N.A. Consultants, L.L.C. 1331 Airport Freeway, Suite 410 Euless, TX 76040 jAPPROVED TO FORM AND LEGALITY: Assistant City Attorney City of Fort Worth,Texas NO M&C REQUIRED Amendment to Engineering Agreement PMO Official Release Date:6.18.2010 Page 2 of 2 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 1331 Airport Freeway Suite 410 Euless,TX 76040 (817)33.5-9900 Fax(817)335-9955 November 14, 2011 Mr.Juan Pulido, P.E. City of Fort Worth Department of Transportation and Public Works 1000 Throckmorton Street Fort Worth, Texas 76102 Re: Amendment No. 3 -Professional Services Fossil Drive, Yolanda— Meadow Lane, And Kings Oak Addition Areas Drainage Improvements; D.O.E. No.: 6423 City Project No.: 00483 Dear Mr. Pulido: At the request of the City, A.N.A. Consultants has been asked to provide Additional drainage design services for the above referenced project in addition the City is requesting we include the current Attachment`A' (11-14-2011)to our contract as a part of the scope of services. This request for additional services is not part of our existing contract and will exceed our current scope. A.N.A. Consultants, L.L.C. is recommending that our current contract be amended to include these additional services as well as the corresponding fee adjustments. A.N.A.expects to perform the following additional engineering services: Hydrologic modeling for Dry Branch of Trinity River at a design point of the Haltom Road crossing utilizing HEC-HMS software developed by the United States Corps of Engineers (USACE). The model will be developed using North Central Texas Council of Governments (NCTCOG) 2007 2-foot contour data and City of Fort Worth storm drain information. Rainfall data will be taken from NCTCOG iSWM manual for Tarrant County for the 2, 5, 10, 25, 50, and 100-year rainfall events. The additional area of redirected storm flows will be added to the model to determine the peak stream flow and the above described location. ❖ A hydraulic model of the the Dry Branch of the Trinity River will be developed utilizing the USACE HEC-RAS modeling software to determine if there is a rise in the river at the Haltom Road crossing. This hydraulic model will be a steady state model with the peak stream flow for each of the events described above. ❖ If there is an increase in thel00-year peak elevation at the crossing of Haltom Road the engineer shall propose a solution to ensure a zero rise in the floodway of Dry Branch and will be prepared for submittal to the USACE for a letter of map revision (LOMR) by the City of Fort Worth ❖ Survey additional areas around Little Fossil Creek, the Justin Boots company, and 3309 Tom Ellen Street ❖ Determine alternative alignments and incorporate into design plans ❖ Incorporate into design plans replacement of concrete rip-rap protection at Little Fossil Creek crossing at Long Avenue J:10800701contractlContract AmendmentsOmendment 31Amend No3 10-21-11.doc CLIENT SATISFACTION IS OUR BUSINESS .: mom The expected fee for Amendment No.3 is$26,655.00 as shown in Exhibit A which also shows a breakdown of the project fee summary for your review. SUMMARY OF TOTAL FEE Contract Description Original Contract $24,800.00 Amendment No. 1 $208,803.00 Amendment No. 2 $77,147.00 Amendment No. 3 $26,655.00 Total Contract Fee $337,405.00 If you have any questions or require additional information, please give me a call. Sincerely, A.N.A. Consultants, L.L.C. M�tk N. Assaad, Vice Presidept J:10800701contractlContract AmendmentslAmendment 31Amend No3 10-21-11.doc 2 ATTACHMENT "A" Scope for Engineering Design Related Services for Storm Water Improvements Projects The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. Under this scope, "ENGINEER" is expanded to include any sub-consultant, including surveyor, employed or contracted by the ENGINEER. OBJECTIVE A.N.A. Consultants has been asked to provide Additional drainage design services for the Fossil Drive, Yolanda— Meadow Lane, And Kings Oak Addition Areas Drainage Improvements project.. This request for additional services is not part of the existing contract and was determined it will exceed the current scope. The objective of this amendment is to extend A.N.A. Consultants, L.L.C. contract to include these additional services as well as the corresponding fee adjustments. A.N.A. expects to perform the following additional services: • Hydrologic and Hydraulic Modeling for outfall of Kings Oak Addition at Dry Branch crossing at Haltom Road. • Survey Little Fossil Creek outfall area • Survey new concrete drive along Tom Ellen • Survey around Justin Boots building • Survey alternative alignment for inlets at Bonnie Brea • Determine if alternate alignment in Fairview street is feasible • Design repair of concrete rip-rap at Little Fossil Creek at Long Avenue WORK TO BE PERFORMED Task 1. Design Management Task 2. Preliminary Report Task 3. Final Report Task 4. Permitting TASK 1. DESIGN MANAGEMENT. ENGINEER will manage the work outlined in this scope to ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER will manage change, communicate effectively, coordinate internally and externally as needed, and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 1.1. Managing the Team • Lead, manage and direct design team activities • Ensure quality control is practiced in performance of the work • Communicate internally among team members • Task and allocate team resources ATTACHMENT"A"TO STANDARD AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES(REV 10-29-09) PAGE 1 OF 4 1.2. Communications and Reporting • Conduct additional review meetings with the CITY at the end of each design phase. • Prepare invoices and submit monthly in the format requested by the CITY. • Prepare and submit monthly progress reports in the format provided by the respective CITY Department. • Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, as required in Attachment D to this Standard Agreement and according to the City of Fort Worth's Schedule Guidance Document. • Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at the end of the project. • Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure, and provide and obtain information needed to prepare the design. • With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. • Personnel and Vehicle Identification: When conducting site visits to the project location, the ENGINEER or any of its sub-consultants shall carry readily visible information identifying the name of the company and the company representative. ASSUMPTIONS • 4 Monthly Design Reports will be submitted • 4 Monthly Schedule updates will be submitted • Two (2) members of the engineering design team will attend up to two (2) design meetings during the duration of the design process up to Bid Phase Services. DELIVERABLES A. Meeting summaries with action items B. Monthly invoices C. Monthly progress reports D. Baseline design schedule E. Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly M/WBE Report Form and Final Summary Payment Report Form TASK 2. PRELIMINARY REPORT (60 PERCENT). ATTACHMENT"A"TO STANDARD AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES(REV 10-29-09) PAGE 2 OF 4 Preliminary plans shall be submitted to CITY per the approved Project Schedule. ENGINEER will develop the preliminary design of the infrastructure as follows 3.1. Development of Preliminary Report shall include the following, in addition to the original scoped project: • Preliminary Report • Hydrologic & Hydraulic Models ASSUMPTIONS • All storm water calculations and design shall conform to the City of Fort Worth Storm Water Management Design Manual, March 2006. • 8 reports will be delivered for Preliminary Report • ENGINEER shall not proceed with Final Report activities without written approval by the CITY of the Preliminary Report. DELIVERABLES A. Preliminary Report TASK 3. FINAL REPORT (100 PERCENT). Upon approval of the Preliminary report, ENGINEER will prepare Final Report as follows: • Final report ASSUMPTIONS • All storm water calculations and design shall conform to the City of Fort Worth Storm Water Management Design Manual, March 2006. • 8 reports will be delivered for Final Report . DELIVERABLES A. Final Report TASK 4. PERMITTING. ENGINEER will provide permitting support for the CITY to obtain any and all agreements and/or permits normally required for a project of this size and type, as follows 9.1. Flood plain Services (Conditional Letter of Map Revision (CLOMR) and Letter of Map Revision (LOMR) from the Federal Emergency Management Agency (FEMA)) ATTACHMENT"A"TO STANDARD AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES(REV 10-29-09) PAGE 3 OF 4 • Negotiating and coordinating to obtain approval of the agency issuing the agreement and/or permits. • Completing all forms/applications necessary. • Submitting forms/applications for CITY review • Submitting revised forms for agency review • Responding to agency comments and requests ASSUMPTIONS • Review by FEMA submittal fees for CLOMR and LOMR to be paid by CITY DELIVERABLES A. Completed FEMA forms/applications included in Final Report ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existing Scope of Services --CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition. • Services related to development of the CITY's project financing and/or budget. • Services related to disputes over pre-qualification, bid protests, bid rejection and re-bidding of the contract for construction. • Construction management and inspection services • Performance of materials testing or specialty testing services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. • Services related to warranty claims, enforcement and inspection after final completion. • Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. ATTACHMENT"A"TO STANDARD AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES(REV 10-29-09) PAGE 4 OF 4 11/4/2011 Exhibit B-3B-MH EXHIBIT A-1 AMENDMENT NO. 3 PROFESSIONAL SERVICES FEE SUMMARY DESIGN SERVICES FOR FOSSIL DR., YOLANDA-MEADOWLANE, AND KINGS OAK ADDITION DRAINAGE IMPROVEMENTS City Project No.: 00483 Transportation/Public Works Department Engineering Service Improvements Compensation Paving and Drainage $ 26,655.00 Engineering Services Fee Total $ 26,655.00 Total Amendment No. 3 Fee $ 26,655.00 SUMMARY OF TOTAL FEE Contract Description Original Contract $ 24,800.00 Amendment No. 1 $ 208,803.00 Amendment No. 2 $ 77,147.00 Amendment No. 3 $ 26,655.00 Total Contract Fee $ 337,405.00 Fee-Amedment 3-101011 B3B-1 r r O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 0 0 0 0 0 0 O 6 o 0 0 00 O o 0 0 o 0 0 0 0 O ooco oe000 O o00 �eic G O C 0 A OQD t N O b O N N Qt O' ONOb hNl O! O IA b A b Q A Mat Ot N N ip 2�b f A N n 0 5 O o U OQl N N O>N N wG" r. tr - a c J « coO h w U U M to r` r � N _c m 0 0 J O O LL �NNNNNMN�MNNN �NNN NN �NNN I-N H 0 � O b lJOCng aoljj w b b b O) N W Op Q Q N 40al Qd Gb � w U) Q a N N O {p b N N walul/a w mgpaaui6u O g " W (ue n a N N U) Z—U` O Z) may w plai.l Aemn w Ow 2 = 0 O=61a pue maj p w = Uoa�oa g 0 = O ¢ /3f1 w m Z b b !7•-N r 1'� g w SI N Q O joAeAln z J a W Z � N Q w o N b N m Q N b b a TwIl NOiaaui6u Y J u61so " w Z w co) b a N N N N N ry N W O a Ja6eue co N W Q o loafs w W mQ Z z ediouu w 2 W 0 W Y N m W z ILL U. t�L � _ O z a c c c a > v� a H U 0 Z U m m as g can w OV p CL o � o- ww w •Q m O0 2 c p z r- 3: 00 ¢ = O 4 £ � @ a� � ri w w } c d mcl� ud 3 O C a a `LL � 03 m w S Z V Oj m z ` C C O m J C N E U) U) £ o O J tyammtyWy m J fn 2 0 0 16 ' ~ nppm E 00� M 0 _Q �6 = U M,, dar mca+ �t LL 3 C Cl) U ? a = E ) d d w 0 e m ma9 oho E O -Was a5�� m moo °' I io E E d 0md � rc q m E m oo ° N !�:: �m �umcW�c IDU V J ¢`�`� dmm�0Arc0 Hamo m ed °Z<'io-� v =5f O m y ya` c AN`o ga m V a `maWLU cdC� �o� .y e ��o m m � C=cv U y ami °1 � d —° E�UKUw iC y3ctoo E o �inA� m1O m c C C � '° moU amO mf= � = 0 C0 ONmm `m `m b g •� � c5 CF O €a a � ZO1zcy �v_ u m > o .m �0 '9 a 2 Q o m : m o N w M l a m =d E : 1- 2 d U E `a0`aa.OLLK�aUaa man-WOK LLOa OaC �Q 0 a O > c s m 0 LL C a) o V N O e+ A 7 gm o� EL cn s t0 r` N CD CD M [+7 to O O O P227 531200 204280048330 $19,550.00 P227 531200 204280048351 $ 7,105.00