HomeMy WebLinkAboutContract 51200-AR2 d7
CSC No.51200-AR2
T WORTH City of Fort Worth
' Construction Allowance Request
��ioject Name Campbell Street From Crenshaw Avenue to Avenue J Cily Sec No. 51200
Project No.(s)l 100733 MBC: G28771 City Pro).No. 100733
Project Deux( 1 This project hJude the design and the reconstruction of Campbe8 Street kum Ave J b Ow9hawAvenua
Confraclorl JLB Contracting,LLC Allowance No: [--�2 Date: 217/2020
City Project K49r.1 Maged Zald City Inspector: I Adilda Cazodaa
Phone Number. 817-392.6448 Phone Number. 817-223-2282
Dept. Water Sewer Paving Totals Contract Time
Calenderdays
Original Contract Amount $139,599.95 $69,086.60 $1,098,223.03 $1,306,909A8 180
Previous Allowances Allocated $4 400.00 $0.00 $0.00 $0.00 0
Go to ADD&DEL Tabs to Enter CO 8acku $0.00 $0.00 $1,560.00 $1,560.00 0
Original Allowance Available for Allocation $30,000.00 $30,000.00 $80,000.00 $140,000.00
Remaining Funds Available for this Allocation $25,600.00 $30,000.00 $80,000.00 $135,600.00
Revised Contract Time 180
JUSTIFICATION;(REASONS)FOR ALLOWANCE
During the TDLR inspection,the inspector requested to add a passing space 5'x5'within 200 linear feet at several
locations which.were not on the project plans.The inspector also requested to modify one of P1 ramps in order to meet
ADA requirements.This construction allowance Is needed to pay remobilization cost to the contractor in order to
correct the unaccepted works.The correction has been done and the project was approved by TDLR.
fI
I �
i
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment In full for all costs arising out of,or incidental to,the above Construction Allowance Request
ConkactoPs Re reeen kye Dale s ep or D
2/7/2020
ArahitecMesl n EntAnver Debe m ctMa ste
11 2c 1-a
Ptatirem Mananer Dale G9DJ1aIPMlsotOIlfQOr1As8LDlr
Director Date A*04 Attome f Babe
ECORD
Ask CHManagor Data
WORTH,FT TX
FORT WORTH City of Fort Worth
Construction Allowance Request
Project Name Campbell Street From Crenshaw Avenue to Avenue J City Sec No. 51200
Project No.(s) 100733 M&C: C 28771 City Pro].No. 100733
Project This project include the design and the reconstruction of Campbell Street from Ave J to Crenshaw Avenue.
Description
Contractor 113 Contracting,LLC Allowar:ce No: L=.__I Date: 217/2020
City Project Mgr, Maged Zaki Cily inspector FAdIIdaCazorIa
CONSTRUCTION ALLOWANCE ITEMS TO BE ADDED
ITEM DESCRIPTION. DEPT Q Unit unit Cost Total
Unit 3
57 Remobilization Cast Paving 1 LS $1,560.00 $1,560.00
i
i
Water
Sewer
Paving $1,560.00
Page 2 of 4 lAdditions Sub Total $1,560.00
FORT Wioa-rH City of Fort Worth
Construction Allowance Request
Project Name Campbell Street From Crenshaw Avenue to Avenue J City Sec No. 51200
Project No.(s) 100733 MSC; C-28771 City Pro).No, 100733
Project Description This project include the design and the reconstruction of Campbell Street from Ave J to Crenshaw Avenue.
Contractor JLB Contracting,LLC Allowance No: F-2-1 Date 2/7/2020
City Project Mgr. I Maged Zakl City inspector I Adilda Cazoria
CONSTRUCTION ALLOWANCE ITEMS TO BE DELETED
ITEM DESCRIPTION DEPT ; City Unit . Unit Cost Total
Water
Sewer
Paving
Page 3 of 4 IDeletions Sub Total
I
MMBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# DATE AMOUNT
Total $0.00
i
I
i
I
I
Page 4 of 4
f
AUTODESK'BIM 360' fortworthgov>100733-Campbell St(Ave 3 to Crenshaw). A AL
Document Management FOLDERS REVIEWS TRANSMITTALS ISSUES
Reviews > Review detail
CLOSED #16 Construction Allowance Approval Workflow
Export Report This review is closed.
Names Description Version Markup Comments PROGRESS
100733-CAp2-Signed.pdf - V2 0 No comments yet.
Initiator Initial Review n
r`Q!;........ MZ MagedZaki Feb 11,10:51 AM
t/ k •`� <maged.zaki@fortworthtexas.gov.
MGIf�`7- S� er Ot ;� k Submitted to Reviewer 1
Mary J.Kayser(Mar 12,2020) `_ y During the TDLR inspection,the
T inspector requested to add a
passing space 5'x5'within 200
Jr linear feet at several locations
•• which were not on the project
plans.The inspector also requested
•• to modify one of P3 ramps in order
.� to meet ADA requirements.This
constructio_Show more
Reviewer 1 Initial Review 1 n
LZ Lane Zarate Feb 11,10:58 AM
<ta ne.za rate @fo rtwo rth texas.g ov>
Submitted to Reviewer 2
Approved
Reviewer 2 Initial Review 2 n
Jennifer Roberts Feb 17,2:51 PM
<ien nifer.roberts @fortwo rt htexas.g ov:
Submitted to Reviewer 3
Reviewed and approved by 5nr
CPO.
Reviewer 3 Initial Review 3 n
LP Lauren Prieur Feb 17,2:55 PM
<lau ren.prieu r@fortwort h texas.gov>
Submitted to Reviewer 4
No comments
Reviewer 4 Initial Review 4 n
W3 William Johnson Mar 4,12:31 PM
-viiiiiam.johnson@fortworthtexas.gov�
Submitted to Reviewer 5
Reviewer 5 Initial Review 5 n
DB Douglas Black Mar 4,3:38 PM
<doug.blac k@ fortworthtexas.gov,
Submitted to Approver
approved.
OFFICIAL RECORD Approver Final Review
CITY• WORTH,
�S�ECRETARY DB Dana Burghdoff Mar 4,5:37 PM
FT. OR iT H,Tx da,,a Du,ghderr@rons Orthtexas qow•
Review ended
Review closed ~
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Mage Zaki(Mar 12,2020)
Project Manager Maged Zaki
Title Professional Enfineer
This form is N/A as No City Funds are associated with this Contract
Printed Name Signature
r
CIAL RECORIC]
SECRETARYWORTH,TX