HomeMy WebLinkAboutOrdinance 6510 ORDINANCE NO.
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF GUILFORD-BRYANT IRVIN ROAD
CONNECTION AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH CONCHO
CONSTRUCTION COMPANY, INC. FOR THE CONSTRUCTION OF SAID
IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE,
EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESS—
MENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED
AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY
SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAP-
TION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH,
TEXAS, AND BY FILING THE COMP)-'TE ORDINANCE IN APPROPRIATE ORDINANCE
RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with Concho Construction Cowany, Inc. for the making and construction of certain
street improvements on the hereinafter described portions of streets, avenues and public
places in said City, to-wit:
UNIT III-A: TEXAS PACIFIC RAILWAY COMPANY Known and designated as Unit III-A,
OVERPASS BRIDGE ON GUILFORD- Project No. 104-23000-118.
BRYANT IRVIN ROAD CONNECTION.
UNIT III-B: WEST VICKERY BOULEVARD At intersection with Guilford-Bryant
Irvin Road Connection, from Station
122*66 to Station 134+56, known and
designated as Unit III-B, Project No.
104-23000-118.
Y�
WHEREAS, by sundry proceedings heretofore passed by the City Council of the
City of Fort Worth, Texas, including Ordinance No. 6296 , a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real and true owners thereof; and,
WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 6296 , and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOW, THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT:
I.
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
II.
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the' true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on*the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows:
III.
When each of the certifiactes has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
J -}
PASSED AND APPROVED THIS _ day of , 19
APPROVED AS TO FORM AND LEGALITY:
I *04 70
City Attorney
PROJECT NO. 104-23000-118, UNIT III-A, TEXAS AND PACIFIC RAILWAY COMPANY OVERPASS BRIDGE
ON GUILFORD-BRYANT IRVIN ROAD CONNECTION.
PROJECT NO. 104-23000-118, UNIT III-B WEST VICKERY BOULEVARD AT INTERSECTION WITH GUILFORD-
BRYANT IRVIN ROAD CONNECTION,from Station 122+66 to Station 13 +5 , to be improved by con-
structing a seven-inch thick reinforced concrete pavement on a six-inch thick lime stabilized
subgrade with seven-inch high concrete curb so that the finished roadway will consist of two
twenty-six foot lanes with a twelve to eight foot concrete median, and by constructing six-
inch thick concrete driveways where specified.
BLACK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE OF STREET RIDGLEA PARK ADDITION
Ridglea Park Corp. 8 200' No Assessment
Apt.
City of Fort Worth 584' No Assessment
F. G. BEASLEY SURVEY
Dr. Mal Rumph Traet 1 406' adjusted to
909 Eighth Ave. Comm. 135' Pavement $14.50 1,957.50
135' Curb only .91 122.85
$2,o80.35
SOUTH SIDE OF STREET INMAN SURVEY
Texas & Pacific R.R. T & P Yard 1190' Adjusted to
Room 301 315' Pavement $4.79 1,508.85
T & P Bldg. 315' Curb only .91 286.65
221 W. Lancaster 270 Sq. ft Drive .84 226.80
Attn. Mr. Love $2,022.30
UNIT III-B TOTAL COST TO PROPERTY OWNERS.. . . ... . $4,102.65
TOTAL COST TO CITY OF FORT WORTH. . . . . $92,479.56
TOTAL ESTIMATED CONSTRUCTION COST. . . . $96,582.21
UNIT III-A TOTAL ESTIMATED CONSTRUCTION COST.. .. $340,704.21
TOTAL ESTIMATED CONSTRUCTION COST, UNITS III-A & III-B. . . . . . . . . . . . . . .. $437,286.42
City of Dort Worth, Texas
�aArarin
:�ee8 Mayor and Council Communication
G
DATE NUM�R E SUBJECT: Final Payment - Units IIIA and PAGE
IIIB,. Guilford-Bryant Irvin Road 1 2
Of
7 6 71 FP-810 Connection
Final Council action on the project described below is requested.
Project Description
Name:. Unit IIIA, Texas and Pacific Railway Company Overpass Bridge on Guilford-
Bryant Irvin Road Connection, .and Unit IIIB, Paving and Improvements on West
Vickery Boulevard at Intersection with Guilford-Bryant Irvin Road Connection,
Project Number 104-23000-118
Contractor: Concho .Construct n Company, Inc.
Contract Awarded: April 270 . 970 (M&C C-1696)
Work Order Issued: May. 28, 10b.
Work Order Effective: June 2, ..1970
Date of Final Inspectiotl and .Appr.oval: April ..28, 1971
Working Time Bid: 150 -Working .Days +5 (Change. Order #1, 3/17/71) - 155
The contractor Was .all.oWed 21 working days in June 1970 due to
restrictions in the Work area imposed by the location of power
lines and a transformer bank.
Working Time Used: 155
Project .Cost and -Financing
Original Bid Price: $414,815.62
Change Order Number 1: + 1,966.25 (A.R. .1-15., 2.3.. 1, 3/17/71)
Revised Contract Price: $416,781.87
Final Contract Cost: $397,533.11
Partial payments previously made: 10, Amount: $357.,.779.80
Final Payment Due: $39,753.31
Final payment will be made from Project Account Number. 1.0.4-23000-118. Suffi-
cient funds are available.
Deviation from Bid Price: The. final..cos.t. of. .this._.project. is. $19.,248.76 less
than the revised bid price because .of. variations..be.tween.-quantities estimated
in. the contract documents and .quantities. actually..measur.ed .and used at .the job
site as follows:
1) The need for .3374 .S.Y. .less lime treated.,sub"grade..for a.savings. of
$1,349..60,
2) The need for 40. tons less lime. for a.-savings. of $1.,000, and
3) The need for. 3184 S..Y.. less 7':. reinforeed. concrete paving. for a
savings. of $1.7,766..72. All concrete .paving. was installed as shown on
the- plans. Inadvertently the. .quantity estimate was .incorrect in .the
original bid. proposal.
4) Miscellaneous variations.increased. .the .other unit cost' items by $867.56.
' DATE REFERENCE SUBJECT: Final Payment -..Units..IIIA and PAGE
NUMBER
a
IIIB,.. .Guil£ord-Bryant .Irvin..Road 2 ,f 2
7/6/71 FBER
,Compliance .-with.-Specifications
During testing on..this -project ..8.corings were..made.with...the..following .results:
Exceeds Even. with Below Specs. .but . .Below
,Specs -. ..Specs.. .,.WLthin.-Tolerance Tolerance
Paving 8 0 0 0
Sub-grade 2 6 0 0
On the entire project the average thickness of ,the reinforced concrete paving
is 7..42 inches as compared. to ,the 7.00 .inches...specified, ..and the average
thickness of the lime stabilized sub-grade is 6..04 .inches as compared to the
.6.00 inches -specified.
Tests :made during construction..show,that .materials used .were in compliance
with contract. specifications.
Recommendation . ,
It is recommended that the .project-described above be.,accepted. .by the. adoption
.of an ordinance- and that final payment of $39,.753..31 be .authorized to Concho
Construction Company,. Inc.
RNL:mm
SUBMITTED BY: DISPOSITION BY NCIL: PROCESSED BY
a VED El OTHER (DESCRIBE)
CITY SECRETARY
DATE
CITY MANAGER —/- /