Loading...
HomeMy WebLinkAboutContract 50443-A1 AMENDMENT NO. 1 TO AGREEMENT STANDARD AGREEMENT FOR PROFESSIONAL SERVICES HVAC REPLACEMENT PROJECT— ALLIANCE CONTROL TOWER STATE OF TEXAS CITY SECRETARY CONTRACT NO. -A I COUNTY OF TARRANT WHEREAS, The City of Fort Worth and Summit Consultants, Inc. (Consultant) made and entered into City Secretary Contract No. 50443 (The Contract) which was administratively authorized, the 20th day of March, 2018, for HVAC Replacement Project— Alliance Control Tower; and WHEREAS, further amendment is necessary to reimburse the Consultant as part of the design services agreement for additional design services for dividing this project into two phases — Phase I, New Roof and Phase II, Replacement of HVAC. NOW THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I — Scope of Services, Paragraph (3) shall be added to read as follows: (3) Provide additional design services for the design and detailing of the Alliance Tower Renovation project being divided into two phases. The cost of this additional service is $5,200.00 plus $1,500.00 in reimbursable expenses. The scope of services is described more fully in Summit Consultants, Inc.'s Letter dated May 22, 2019, subject: "Alliance Tower Renovation Additional Services". 2. Article II — Compensation, first paragraph, is amended as follows: "Consultant shall be compensated in accordance with the Fee Schedule shown in Attachment "C". Payment shall be considered full compensation for all labor, materials, supplies, and equipment necessary to complete the services described in Attachment "C". However the total fee paid by the City shall not exceed a total of $51,700.00 unless the City and the Consultant mutually agree upon a fee amount for additional services and amend this Agreement accordingly." 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. t OFFICIAL RECORD t0. V CITY SECRETARY FT. WORTH,TX r4OA rth,TexasStandard Agreement for Professional Services AMENDMENT(Rev.01Jul2019) Page 1lliance Tower—Summit Consultants,Inc.Amendment No.1 March 2020 EXECUTED this the I �/— day of 2020, in Fort Worth, Tarrant County, Texas. Summit Consultants, Inc. APPROVED: By: By: G re Brown, P.4 .,CxA Jesus Chapa resident Deputy City Manager APPROVAL ECOMMENDED: RECORDED: ..4, 1C 0: By: J�o (01 �0 By: Steve ooke, Director AAafy J. ay r e Property Management Department City Secre ary APPROVED AS TO FORM AND LEGALITY: M&C Not Required Contract Authorization By: ' ion B. Str ng Assistant City At ney CONTRACT COMPLIANCE MANAGER: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. By: ;y S.VWR I G(Illllivn Brian R. Glass, AIA Architectural Services Manager OFFOAL RECORD CITY SECRETARY FT WORTH, XX City of Fort Worth,Texas-Standard Agreement for Professional Services AMENDMENT(Rev.01Ju12019) Page 2 of 2 Aviation Alliance Tower—Summit Consultants,Inc.Amendment No.1 March 2020 ATTAC H M E N T "C" ASUMM-1,t F` C O V S U L T A N T S, I N C May 22, 2019 wwwsummiimep.com Alfonso Meza City of Fort Worth Property Management Department 401 W. 131^Street Fort Worth,Texas 76102-4616 Attn.: Alfonso Meza Re: Alliance Tower Renovation Additional Services SCOPE OF SERVICES: ADDITIONAL SERVICES Summit is projecting additional cost will be incurred for reimbursable expenses and design efforts due to the Alliance Tower Renovation project being broken down into two different phases. The phases have increased the number of issued sets, which will increase Summits printing costs and design time in order to prepare two different sets. COMPENSATION FOR ENGINEERING SERVICES: Summit Consultants will be paid for additional services stated above a not to exceed sum of $6,700.00(includes$1,500, not to exceed,of reimbursable expenses for travel and printing). Compensation for other Additional Services will be on the basis of direct salary cost times 2.9 plus reimbursable expenses times 1.2. Please see Exhibit A Hourly Billing Ranges for current total billing ranges for Summit personnel. PHASE AMT. DUE —_ Additional Services for Phasing not to exceed)_ $5 200.00 Reimbursable Expenses not to exceed $1,500.00 Additional Services fees will be billed monthly based on the percentage of completion of the Additional Service. design+engineering+consulting+commissioning City of Fort Worth May 22, 2019 Page 2 FORM OF CONTRACT: If this proposal meets with your approval, please sign where indicated and return an executed copy for our files. We deeply appreciate this opportunity to be of service and look forward to working with you on this project. Sincerely, SUMMIT CONSULTANTS, INC. 0.`"g:;'' Kerry McLeroy, P.E. Accepted: CITY OF FORT WORTH By: Title Date: