ORDINANCE NO.
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF WICHITA STREET
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH
ERNEST LOYD FOR THE CONSTRUCTION CF SAID
IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE,
EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESS-
MENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED
AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY
SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAP-
TION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH,
TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE
RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with ER NEST LOYD for the making and construction of certain
street improvements on the hereinafter described portions of streets, avenues and public
places in said City, to-wit:
UNIT 1: WICHITA STREET From Wilbarger Street to Vaughn Boulevard,
known and designated as Unit 1, Project No.
104-22000-118.
UNIT 1-A: VAUGHN BOULEVARD From Wichita Street to Berry Street, known
and designated as Unit 1-A, Project No.
104-22000-118.
WHEREAS, by sundry proceedings heretofore passed by the City Council of the
City of Fort Worth, Texas, including Ordinance No. 6342 , a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public placers and against
the real and true owners thereof; and,
WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 6342 , and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOW, THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT:
I.
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; .and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
II.
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed and shall' be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on'the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows:
III.
When each of the certifiactes has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the. appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and After
the date of its passage.
PASSED AND APPROVED THIS day of , 19
APPROVED AS TO FORM AMID LEGALITY:
City Attorney
PROJECT NO. �UNIT E WICHITA STREET FROM WILBARGER STREET TO VAUGHN BOULEVARD,
to be improved by co:struct-ag a seven-inch thick hot-mix asphaltic concrete pavement on a
six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch
concrete gutter, so that the finished roadway will be forty feet wide and by constructing
six-inch thick concrete driveways and four.-foot wide concrete sidewalk where specified.
BLOCK
CWr 7ER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGI?FING° AT THE NORTHWEST CORNER OF WILBARGER STREET AND WICHITA STREET
WEST SIDE OF STREET JESSE ,JUSTICE SURVEY
Elmer Doggett S. 70' of Tract 70' Pavement $8.45 $591.50
2405 Alloway 4-B _ 70' Gutter Only 1.30 91.00
Comm. $ 682.50
Maurine Bryant Ellis S. 50' of N. 100' 50' Pavement $6.04 $302.00
4324 Wichita Street of Tract 4-B 50' Curb & Gutter 2.60 130.00
Comm. 35' Sidewalk 2.76 96.60
116 Sq. Ft. Driveway .80 92.80
$ 621.40
Bernice Korn Lewis N. 50' of Tract 50' Pavement $8.45 $422.50
& A. L. Korn 4-B 50' Curb & Gutter 2.60 130.00
23G3 Stanley
Comm. 30' Sidewalk 2.76 82,80
155 Sq. Ft. Driveway .80 124.00
$ 759.30
TRUELAND ADDITION
Mrs. Doris Nantz 22 4 50' Pavement $8.45 $422.50
3548 Wosley Comm. 50' Curb & Gutter 2.60 130.00
35' Sidewalk 2.76 96.60
116 Sq. Ft. Driveway .80- 92.80
$ 741.90
Bob Woods 21 4 50' Pavement $8.45 $422.50
5708 Wilkes Comm. 50' Curb & Gutter 2.60 130.00
7M9 32' Sidewalk 2.76 88.32
140 Sq. Ft. Driveway .80 112.00
$ 752.82
1
PROJECT NO. 104-22000-118, UNIT 1: WICHITA STREET FROM WILBARGER STREET TO VAUGHN BOULEVARD -
CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE OF STREET JESSE JUSTICE SURVEY
Richard Carlson Tract 4-C 129' Pavement $8.45 $1,090.05
& Alice B. Carlson Comm. 129' Curb & Gutter 2.60 335.40
Stone 89' Sidewalk 2.76 245.64
4300 Wichita Street 310 Sq. Ft. Driveway .80 248.00
$1,919.09
CHILDRESS STREET INTERSECTS KADEL SUBDIVISION
Charles L. Price 3 81' Pavement $6.04 $ 489.24
4232 Wichita Street Comm. 81' Curb & Gutter 2.60 210.60
63' Sidewalk 2.76 173.88
140 Sq. Ft. Driveway .80 112.00
$ 985.72
JESSE JUSTICE SURVEY
L. W. Bransom, Est. Tract 2 90' Pavement $8.45 $ 760.50
3403 Baylor Comm. 90' Curb & Gutter 2.60 234.00
68' Sidewalk 2.76 187.68
171 Sq. Ft. Driveway .80 136.80
$1,318.98
Mrs. Margie Palmer Tract 2-F & S. 5' 60' Pavement $8.45 $ 507.00
3404 Baylor of Tract 2-E 60' Curb & Gutter 2.60 156.00
Comm. 38' Sidewalk 2.76 104.88
171 Sq. Ft. Driveway .80 136.8U
$ 904.68
Wade Bransom Food Tracts 2-E, 2-D,&2-C
Market Co. , a Corp. Comm. 305' Pavement $8.45 $2,577.25
Loy Bransom, Pres. 293' Curb & Gutter 2.60 761.80
200 E. Renfro 219' Sidewalk 2.76 604.44
Burleson, Texas 667 Sq. Ft. Driveway .80 533.60
$4,477.09
Adjusted by Council Action 8-10-70 to $4,350.00
R. J. Wages, Jr. Tracts 2-B & 2-A 105' Pavement $8.45 $ 887.25
4117 Wichita Street Comm. 83' Sidewalk 2.76 229.08
171 Sq. Ft. Driveway .80 136.80
$1,253.13
2
PROJECT NO. 104-22000-118, UNIT 1: WICHITA STREET FROM WILBARGER STREET TO VAUGHN BOULEVARD -
CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE OF THE STREET GLEN GARDEN ADDITION
Glen Garden Baptist Church 165' Adjusted to
3162 N. Glen 3 14 100' Pavement $3.63 $ 363.00
Garden Drive Comm. 100' Gutter Only 1.30 130.00
$ 493.00
GLEN GARDEN DRIVE INTERSECTS
A. H. Davidson, Jr. 4 13 125' Pavement $8.45 $1,056.25
275 NE. 148th Comm. 105' Sidewalk 2.76 289.80
N. Miami, Florida 155 Sq. Ft. Driveway .80 124.00
$1,470.05
JESSE JUSTICE SURVEY
Masonic Home & School Tract 1 2163' Pavement $3.63 $7,851.69
c/o Mr. Ardell Young Apt. 90' Sidewalk 2.76 248.40
Suite 203 $8,100.09
Fort Worth Club Bldg. Adjusted by Council Action (M&C G-1619) $5,924.00
EAST SIDE OF STREET MASONIC HOME ADDITION SECOND FILING
Joe E. Robbins N. part of 1 1 200' Adjusted to
3021 Pioneer 2 and 3 Comm. 135' Sidewalk $2.76 $372.60
$ 372.60
Mrs. Minnie Teague 1 & 2 less 1 267' Adjusted to
3609 Wichita StreetN. part Comm. 165' Pavement $6.04 $ 996.60
165' Sidewalk 2.76 455.40
85 Sq. Ft. Driveway .80 68.00
$1,520.00
Adjusted by Council Action (M&C G-1619) to $1,122:35
Jack B. Reid A 1 222.84' Adjusted to
3201 Comanche Res. 100' Pavement $3.63 $ 363.00
100' Sidewalk 2.76 276.00
$ 639.00
COMANCHE STREET INTERSECTS
Alma Hanson Swint N. 100' 2 106.68' Adjusted to
3713 Wichita of 1 Res. 100' Pavement $3.63 $ 363.00
100' Sidewalk 2.76 276.00
$ 639.00
3
>la'ROJECT NO. 104-22000-118, UNIT 1° W1=CHITA 51REET FROM. WILMRC.ER STUE ET TO VAIFGHN BOULEVARD
CONTINUED
BLDCY
OWNER LOT ZONING FRONTAGE RATE'S AMOUNT ASSESSMENT
EAST SIDE OF STRRZ" MASOK(C RCK" APDX I—L,�)N SECONL)
AlU Hanson Swint S. 100° 2 to
3713 Wi��hita St. of 1 Res� -00)° Tcrtnptn ' $3�63 $.363.00
89` ?0 7/6 245�64
$ 608.64
)Mlsnwln J. Woodard 19-A 2 201i.65' Ay jru,s t J ttc
3`01 Eastland 10 ° ?Avrment $3.t,3 $388,41
1107' Sidewalk 1.76 295.32
194 Sq� Ft, Ori✓ewey .80) 155.20
$ 838.93
Er-nie:gt F. Ge(e�slin 1 3 200o811° Adjusted to
3204 Ea.-,;tland Aye� )Ree o 101° Paa;'ement $3�63 $36(�,63
1011' Sidewal1k: 2.716 278.76
$ 645.39
Oaerge R� Reed, Sr'. W,, _t of 3 200�25° Ad-lusted to
3201 Grayson 1:-� Res. 100, Pavement $3.63 $363 0 00
100° Sidewalk 20716 276000
$ 639.00
GRA`40N STREET INTERSECTS
David Leon Ford 1 9 200° Adjusted to
3204 Grayson Res. 100° Pavement $3063 $363000
100' Sidewalk 2.76 276.00
$ 639.00
John T� Eady W. 95, 9 200.441 Adjusted to
3201 Montague of 12 Res. 100' Pavement $3 o Eva $363,00
100' Sidewalk 2,76 276.00
$ 639.00
PROJECT NO. 104-22000-118, UNIT 1: WICHITA STREET FROM WILBARGER STREET TO VAUGHN
BOULEVARD - CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE OF STREET MASONIC HOME SECOND FILING
MONTAGUE STREET INTERSECTS
H. H. Rouse C 10 200' Adjusted to
4013 Wichita St. Res. 100' Pavement $3.63 $ 363.00
100' Sidewalk 2.76 276.00
85 Sq. Ft. Driveway .80 68.00
$ 707.00
A. M. Mosely G 10 200' Pavement $8.45 $1,690.00
3201 Baylor Comm. 200' Sidewalk 2.76 552.00
$2,242.00
BAYLOR STREET INTERSECTS
Reproco, Inc. N. 188' 17 188' Pavement $8.45 $1,588.60
P.O. Box 1967 of 1-A Comm. 168' Gutter Only 1.30 218.40
Houston, Texas 98' Sidewalk 2.76 270.48
$2,077.48
J. R. Wages, Jr. S. 12' 17 101' Pavement $8.45 $ 853.45
4117 Wichita St. of 1-A Comm. 101' Gutter Only 1.30 131.30
& 1-B & 83' Sidewalk 2.76 229.08
N. 89' of 12 $1,213,83
Richard H. Smith W. 60.7'17 111' Pavement $8.45 $ 937.95
3201 Hardeman of S. Comm. 61' Curb & Gutter 2.60 158.60
111' of 20' Gutter Only 1.30 26.00
12 86' Sidewalk 2.76 237.36
$1,359.91
Adjusted by Council Action (M&C G-1619) to $1,250.00
HARDEMEN STREET INTERSECTS BARTON SUBDIVISION
Fort Worth Ind. A, B, 18 200' Pavement $3.63 $ 726.00
School District & C Res. 200' Gutter Only 1.30 260.00
3210 W. Lancaster $ 986.00
76107
5
PROJECT NO. 104-22000-118, UNIT 1: WICHITA STREET FROM WILBARGER STREET TO VAUGHN
BOULEVARD - CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE OF STREET MASONIC HOME SECOND FILING
Fort Worth Ind. 12 25 200' Pavement $3.63 $726.00
School District Res. 200' Gutter Only 1.30 260.00
$ 986.00
CHILDRESS STREET INTERSECTS
D. S. Moriarity X-Y-1 25 120' Adjusted to
3204 Childress St. Res. 100' Pavement $3.63 $363.00
100' Curb & Gutter 2.60 260.00
85 Sq. Ft. Driveway .80 68.00
$ 691.00
D. S. Moriarity X-Y-2 25 80' Pavement $8.45 $676.00
3204 Childress St. Comm. $ 676.00
Elmer Doggett 12 25 200' Pavement $8.45 $1,690.00
2405 Alloway Dr. Comm. 200' Curb & Gutter 2.60 520.00
$2,210.00
TOTAL COST TO PROPERTY OWNERS - UNIT 1 . . . . . . . . . $41,998.79
6
VAUGHN BOULEVARD, UNIT 1-A: FROM WICHITA STREET TO BERRY STREET, to be improved by
constructing four-foot wide concrete sidewalks on both sides of the street.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE INTERSECTION OF WICHITA STREET AND VAUGHN BOULEVARD
WEST SIDE OF STREET JESSE JUSTICE SURVEY
Masonic Home & School Tract 1
3300 Vaughn Blvd. Apt. No Assessment
MEADOWLAWN ADDITION
Don R. Young & 12 6 195' Sidewalk $2.76 $538.20
Hazelle R. Ghahreman $ 538.20
3644 University Drive
Dallas, Texas
Larry Clark 13 6 195' Sidewalk $2.76 $538.20
6709 Robindale Comm. $ 538.20
EMERSON STREET INTERSECTS
E. L. White 9 7 137' Sidewalk $2.76 $378.12
1725 Mercantile Comm. $ 378.12
Bldg.
Dallas, Texas
TOTAL COST TO PROPERTY OWNERS, UNIT 1-A . . . . . . . $ 1,454.52
TOTAL COST TO PROPERTY OWNERS - UNITS 1 & 1-A . . . . $ 43,453,31
TOTAL COST TO CITY OF FORT WORTH - UNITS 1 & 1-A . . . $109,730.77
TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . . $153,184.08
7
UM
�► City of Fort Worth, Texas
°BBg Mayor and Council Communication
DATE REFERENCE SUBJECT: Final Payment - Widening and PAGE
• NUMIER
7/12/71 FP-813 Paving of Wichita Street lot 2
Final Council action on the project described below is requested.
Project Description
Name: Widening and Paving of Wichita Street
from Wilbarger to Vaughn, Project No.
104-22000-118
Contractor: Ernest Loyd
Contract Awarded: June 29, 1970 (M&C C-1770)
Work Order Issued: November 19, 1970
Work Order Effective: Novmeber 30, 1970
Date of Final Inspection and Approval: June 1, 1971
Working Time Bid: 90 Working Days
Working Time Used: 64 Working Days
Project Cost and Financing
Original Bid Price: $145,467.00
Change Order #1: - 10,218.10 (Deleted Sidewalks and
Rip-rap, 8/24/70)
Change Order #2: + 93.00 (Additional Driveway,
9/28/70)
Change Order #3: + 1,694.73 (Street maintenance costs
prior to issuance of
work order, 2/11/71)
Change Order #4: + 375.00 (Concrete retaining curb
@ 4013 Wichita, 4/14/71)
Revised Contract Price: $137,411.63
Final Contract Cost: $139,258.25
Partial payments previously made: 5, Amount: $122,415.35
Final Payment Due: $ 16,842.90
Payment to be made from Project Account Number 104-22000-118.
Deviation from Bid Price: The final cost of this project is .$1,846.62 over
the revised contract price. This over-run can be attributed to minor varia-
tions between quantities estimated in the contract documents and quantities
actually measured and used at the job .site,
Compliance with Specifications
During testing on this project 35 corings were made with the following results..
Exceeds Even with Below Specs but Below
Specs secs within Tolerance Tolerance
Paving 24 8 3 0
Base 7 28 ' 0 0
DATE REFERENCE SUBJECT: Final Payment - Widening and PAGE
NUMBE7 12 71
FP-813 Paving of Wichita Street 2 of 2
On the entire project the average thickness of the HMAC paving is 7.12 inches
as compared to the 7.00 inches specified, and the average thickness of the soil
cement stabilized base is 6.04 inches as compared to the 6.00 inches specified.
Tests made during construction .show that materials used were in compliance
with contract specifications.
Recommendations
It is recommended that the .project described above be accepted by the adop-
tion of an ordinance and that final payment of $16,842.90 be authorized to
Ernest Loyd.