Loading...
HomeMy WebLinkAboutContract 53670 N � CITY SECRETARY CCK RACT NO. CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL SERVICES This AGREEMENT is between the City of Fort Worth, a Texas home-rule municipality ("CITY'), and Neel-Schaffer, Inc., authorized to do business in Texas, ("ENGINEER"), for a PROJECT generally described as: Water and Sanitary Sewer Replacement Contract 2019, WSM-D. Article I Scope of Services The Scope of Services is set forth in Attachment A. Article II Compensation and Term of Agreement A. The ENGINEER's compensation shall be in the amount up to $300,577.00 as set forth in Attachment B. B. Unless otherwise terminated pursuant to Article VI. D. herein, this Agreement shall be for a term beginning upon the effective date, as described below, and shall continue until the expiration of the funds or completion of the subject matter contemplated herein, whichever occurs first. Article III Terms of Payment Payments to the ENGINEER will be made as follows.- A. Invoice and Payment (1) The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGREEMENT, to reasonably substantiate the invoices. (2) The ENGINEER will issue monthly invoices for all work performed under this AGREEMENT. Invoices are due and payable within 30 days of receipt. City of Fort Worth,Texas ® � RE-CORDCOAL Standard Agreement for Engineering Related Design Services Page 1 of 17 11.17.17 MY SECRETARY any balance will be due within 30 days of receipt of the final invoice. (4) In the event of a disputed or contested billing, only that portion so contested will be withheld from payment, and the undisputed portion will be paid. The CITY will exercise reasonableness in contesting any bill or portion thereof. No interest will accrue on any contested portion of the billing until mutually resolved. (5) If the CITY fails to make payment in full to ENGINEER for billings contested in good faith within 60 days of the amount due, the ENGINEER may, after giving 7 days' written notice to CITY, suspend services under this AGREEMENT until paid in full. In the event of suspension of services, the ENGINEER shall have no liability to CITY for delays or damages caused the CITY because of such suspension of services. Article IV Obligations of the Engineer Amendments to Article IV, if any, are included in Attachment C. A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The ENGINEER shall perform its services: (1) with the professional skill and care ordinarily provided by competent engineers practicing in the same or similar locality and under the same or similar circumstances and professional license; and (2) as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17,17 Page 2 of 17 the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on-site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 3 of 17 the Contract Documents, nor shall anything in the Contract Documents or this AGREEMENT between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on-site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on-site observation(s) of a deviation from the Contract Documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the Contract Documents. F, Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, .economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the Contract Documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 4 of 17 work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are not other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. I. Minority Business and Small Business Enterprise (MBE)(SBE) Participation In accord with the City of Fort Worth Business Diversity goals (Chapter 20, Article X of the City's Code of Ordinances alkla Ordinance No. 20020-12- 2011, as amended), the City has goals for the participation of minority business enterprises and/or small business enterprises in City contracts. Engineer acknowledges the MBE and SBE goals established for this contract and its accepted written commitment to MBE and SBE participation. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this Agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 5 of 117 subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to photocopy such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. K. INSURANCE (1) ENGINEER'S INSURANCE a. Commercial General Liability — the ENGINEER shall maintain commercial general liability (CGL) and, if necessary, commercial umbrella insurance with a limit of not less than $1,000,000.00 per each occurrence with a $2,000,000.00 aggregate. If such Commercial General Liability insurance contains a general aggregate limit, it shall apply separately to this PROJECT or location. i. The CITY shall be included as an additional insured with all rights of defense under the CGL, using ISO additional insured endorsement or a substitute providing equivalent coverage, and under the commercial umbrella, if any. This insurance shall apply as primary insurance with respect to any other insurance or self- insurance programs afforded to the CITY. The Commercial General Liability insurance policy shall have no exclusions or endorsements that would alter or nullify: p rem isesloperations, prod uctslcompleted operations, contractual, personal injury, or advertising injury, which are normally contained within the policy, unless the CITY specifically approves such exclusions in writing. ii. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the commercial general liability or commercial umbrella liability insurance maintained in accordance with this agreement. b. Business Auto — the ENGINEER shall maintain business auto liability and, if necessary, commercial umbrella liability insurance with a limit of not less than $1,000,000 each accident. Such insurance shall cover liability arising out of "any auto", including owned, hired, and non-owned City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date?11.17.17 Page 6 of 17 autos, when said vehicle is used in the course of the PROJECT. If the engineer owns no vehicles, coverage for hired or non-owned is acceptable. i. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the business auto liability or commercial umbrella liability insurance obtained by ENGINEER pursuant to this agreement or under any applicable auto physical damage coverage. c. Workers' Compensation -- ENGINEER shall maintain workers compensation and employers liability insurance and, if necessary, commercial umbrella liability insurance with a limit of not less than $100,000.00 each accident for bodily injury by accident or $100,000.00 each employee for bodily injury by disease, with $500,000.00 policy limit. i. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by workers compensation and employer's liability or commercial umbrella insurance obtained by ENGINEER pursuant to this agreement. d. Professional Liability -- ENGINEER shall maintain professional liability, a claims-made policy, with a minimum of $1,000,000.00 per claim and aggregate. The policy shall contain a retroactive date prior to the date of the contract or the first date of services to be performed, whichever is earlier. Coverage shall be maintained for a period of 5 years following the completion of the contract. An annual certificate of insurance specifically referencing this project shall be submitted to the CITY for each year following completion of the contract. (2) GENERAL. INSURANCE REQUIREMENTS a. Certificates of insurance evidencing that the ENGINEER has obtained all required insurance shall be attached to this AGREEMENT prior to its execution. b. Applicable policies shall be endorsed to name the CITY an Additional Insured thereon, subject to any defense provided by the policy, as its interests may appear. The term CITY shall include its employees, officers, officials, agents, and volunteers as respects the contracted services. c. Certificate(s) of insurance shall document that insurance coverage City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date: 11.17.17 Page 7 of 117 specified in this agreement are provided under applicable policies documented thereon. d. Any failure on part of the CITY to attach the required insurance documentation hereto shall not constitute a waiver of the insurance requirements. e. A minimum of thirty (30) days notice of cancellation or material change in coverage shall be provided to the CITY. A ten (10) days notice shall be acceptable in the event of non-payment of premium. Notice shall be sent to the respective Department Director (by name), City of Fort Worth, 200 Texas, Fort Worth, Texas 76102. f. Insurers for all policies must be authorized to do business in the State of Texas and have a minimum rating of A:V or greater, in the current A.M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. g. Any deductible or self insured retention in excess of $25,000.00 that would change or alter the requirements herein is subject to approval by the CITY in writing, if coverage is not provided on a first-dollar basis. The CITY, at it sole discretion, may consent to alternative coverage maintained through insurance pools or risk retention groups. Dedicated financial resources or letters of credit may also be acceptable to the CITY. h. Applicable policies shall each be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. i. The CITY shall be entitled, upon its request and without incurring expense, to review the ENGINEER's insurance policies including endorsements thereto and, at the CITY's discretion; the ENGINEER may be required to provide proof of insurance premium payments. j. Lines of coverage, other than Professional Liability, underwritten on a claims-made basis, shall contain a retroactive date coincident with or prior to the date of the contractual agreement. The certificate of insurance shall state both the retroactive date and that the coverage is claims-made. k. Coverages, whether written on an occurrence or claims-made basis, shall be maintained without interruption nor restrictive modification or changes from date of commencement of the PROJECT until final payment and termination of any coverage required to be maintained after final payments. City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Dale:11.17.17 Page 8 of 17 I. The CITY shall not be responsible for the direct payment of any insurance premiums required by this agreement. m. Sub consultants and subcontractors to/of the ENGINEER shall be required by the ENGINEER to maintain the same or reasonably equivalent insurance coverage as required for the ENGINEER. When sub consultants/subcontractors maintain insurance coverage, ENGINEER shall provide CITY with documentation thereof on a certificate of insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. The doctrine of respondeat superior shall not apply. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 9 of 17 published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City Amendments to Article V, if any, are included in Attachment C. A. City-Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights- of-way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 10 of 17 advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification and Claims The CITY agrees to include in all construction contracts the provisions of Article ME. regarding the ENGINEER's Personnel at Construction Site, and provisions providing for contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third-Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 11 of 17 (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third-party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third-party beneficiary rights under this Agreement. (4) Nothing contained in this Section H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. I. CITY's Insurance (1) The CITY may maintain property insurance on certain pre-existing structures associated with the PROJECT. (2) The CITY may secure Builders Risk/installation insurance at the replacement cost value of the PROJECT. The CITY may provide ENGINEER a copy of the policy or documentation of such on a certificate of insurance. (3) The CITY will specify that the Builders Risk/installation insurance shall be comprehensive in coverage appropriate to the PROJECT risks. J. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. K. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:1 t.17.17 Page 12 of 17 Article VI General legal Provisions Amendments to Article VI, if any, are included in Attachment C. A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure The ENGINEER is not responsible for damages or delay in performance caused by acts of God, strikes, lockouts, accidents, or other events beyond the control of the ENGINEER that prevent ENGINEER's performance of its obligations hereunder. D. Termination (1) This AGREEMENT may be terminated a.) by the City for its convenience upon 30 days' written notice to ENGINEER. b.) by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and the nonperforming party does not commence correction of such nonperformance within 5 days' written notice or thereafter fails to diligently complete the correction. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Cost of reproduction of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Dale:11.17.17 Page 13 of 17 b.) Out-of-pocket expenses for purchasing electronic data files and other data storage supplies or services; c.) The time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all termination expenses. The CITY'S approval will be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification In accordance with 'Texas Local Government Code Section 271.904, the ENGINEER shall indemnify or hold harmless the CITY against liability for any damage committed by the ENGINEER or ENGINEER's agent, consultant under contract, or another entity over which the ENGINEER exercises control to the extent that the damage is caused by or resulting from an act of negligence, intentional tort, intellectual property infringement, or failure to pay a subcontractor or supplier. CITY is entitled to recover its reasonable attorney's fees in proportion to the ENGINEER's liability. G. Assignment Neither party shall assign all or any part of this AGREEMENT without the prior written consent of the other party. H. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, City of For[Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11A7.17 Page 14 of 17 Texas. 1. Severabiliity and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.1. shall survive termination of this AGREEMENT for any cause. J. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. K. Immigration Nationality Act ENGINEER shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by CITY, ENGINEER shall provide CITY with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. ENGINEER shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any ENGINEER employee who is not legally eligible to perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FR011fil ANY PENALTIES, LIABILITIES, OR DOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER, ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. CITY, upon written notice to ENGINEER, shall have the right to immediately terminate this Agreement for violations of this provision by ENGINEER. L. Prohibition On Contracts With Companies Boycotting Israel ENGINEER acknowledges that in accordance with Chapter 2270 of the City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date: 11.17,17 Page 15 of 17 Texas Government Code, CITY is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, ENGINEER certifies that ENGINEER'S signature provides written verification to the CITY that ENGINEER (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, which supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. This AGREEMENT may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but all such counterparts shall together constitute but one and the same instrument. The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A - Scope of Services Attachment B - Compensation Attachment C -Amendments to Standard Agreement for Engineering Services Attachment D - Project Schedule Attachment E - Location Map City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 Page 16 of 17 Duly executed by each party's designated representative to be effective on the date subscribed by the City's designated Assistant City Manager. BY: CITY OF FORT WORTH ENGINEER Neel-Schaffer, Inc. Dana Burg off 7 , Assistant ity Manager ames P. Amick, P.E. Engineering Manager Date: Date: APPROVAL RECOMMENDED: By: r_-e C_ Chris Harder, P.E. Director, Water Department Contract Compliance Manager- By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. {I Y- Liam Conlon Project Manager APPROVED AS TO FORM AND LEGALITY By- /Douglas W Black Senior Assistant City Attorney i - ATT T: ° 3� � k Form 1295 No. 2020-574352 7V -A C •M&C No 20-0094 M ry r .: City Secretary roM&C Date: February 18, 2020 OFFOUAL RECORD City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services CITY SECRU AHY Revised Date:11.17.17 Page 17 of 17 r-T WORTH, TX ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019,WSM•D CITY PROJECT NO.:102300 ATTACHMENT A Scope for Engineering Design Related Services for Water and/or Sanitary Sewer Improvements DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-D CITY PROJECT NO.: 102300 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. The primary purpose of the project is to replace an existing 18"120"water line with a 24" water transmission line in West Lang Avenue from Northwest 27th Street to Angle Avenue (approximately 4,000'). This line will connect to the existing 24" Cast Iron water line in Northwest 27th Street (of which about 1 00' will be replaced across West Long Avenue) and the 18" water line in at the west Right-of-Way of Angle Avenue. Approximately 350' of the existing 12"water line between Northwest 27th Street and Northwest 28th Street will also be replaced with a 12" line. One sewer line in West Long Avenue will also be replaced. This is 8" L-1771 from about halfway in between Northwest 27th Street and Northwest 281h Street to about halfway in between Loraine Street and Northwest 29th Street for a length of about 815'. The replacement skips about 310' of a new portion of PVC from there to about halfway in between Northwest 29th Street and Northwest 30th Street. It continues about 178' southeast of this point down an alley. Additionally, crossing water lines within the limits of the project (all approximately 100') will be replaced as follows: existing 10" in Northwest 27th Street with a 12", existing 20" Cast Iron in Northwest 28th Street with a 24", existing 6" in Northwest 281" Street with an 8", existing 6" in Loraine Street with an 8", existing 6" in Northwest 29th Street with an 8", existing 10" in Northwest 30th Street with a 12", existing 6" in Northwest 3151 Street with an 8", existing 6" in Northwest 32nd Street 1 Hanna Avenue with an 8", existing 8" in Northwest 33rd Street with an 8", existing 6" in Northwest 34th Street with an 8", existing 6" in Northwest 35th Street with an 8", existing 6" in Roosevelt Avenue with an 8", and existing 6" in Prairie Avenue with an 8". Additional crossing sewer lines that will be replaced within the limits of the project are as follows: L-1534 (in alley between Northwest 271h Street and Northwest 28th Street) for approximately 500', L-1533 (in alley between Northwest 27th Street and Northwest 281h Street) for approximately 600', L-1539 (in alley between Northwest 28th Street and Loraine Street) for approximately 580', L-1538 (in alley between Loraine Street and Northwest 29th Street) for approximately 575', L-1536 (in alley between Northwest 291h Street and Northwest 30th Street) for approximately 575', L-3682 (in alley between Northwest 30th Street and Northwest 31st Street) for approximately 850', L-3890 (Northwest 32nd Street 1 Hanna Avenue) for approximately 100'. City of For[Worth,Texas Attachment A PMO Release Date:07.23.2012 Page 1 of 21 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019,WSM•D CITY PROJECT NO.:102300 All water lines will be replaced with the sizes noted, by open cut. All sewer lines will be replaced with 8" lines by open cut. No modeling, calculations or sizing of water or sewer lines are included in this scope. All water and sewer lines will be replaced in their respective existing trenches. It is not anticipated that any water services connect to the water lines being replaced. Therefore no water services are included. Approximately 124 sewer services will be replaced in the alleys. Air release valves will be placed at high points and blow offs at low points for the 24" and 12"water lines. Fire hydrants and valves that connect to an existing water line, being replaced with a proposed water line, will also be replaced. All trenches will be repaired only. No curb and gutter, mill/pulverize and overlay, or drainage improvements are included. The 24" water line portion of the project will be primarily designed as a Ductile Iron pipeline. Bid alternates for Concrete and Steel will be provided. A corrosion study and design will be also be provided for the three materials. Cathodic protection (anode beds) will be designed for each of the three materials. Unique alignments or designs for the two alternates beyond corrosion protection are not included. CCT'Y OF FORT WORTH WATER DEPARTMENT WATER ANO SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-D & 102300 Sewer No.of Water Water Water Main Sewer Sewer Lead Council Mapsco Street From To Size (LF) Cl{LF] No. Size (LF) Services District No. Comments 61D, W. ROW Ex 18" 48W, W. Long NW 27"t' Angle /20" 62A, Ave. St. Ave. to 24" 4000 2 47Z Betw To Betw W.Long NW 27th& NW 29th Ave. (L- NW 281h &Loraine 1771) Streets Streets L-1771 8" 815 2 61D W. Long NW 27th NW 28Lh Ex 12" Ave. St. St. to 12" 350 2 61D NW 27th Ex 24" St. Long Ave. Long Ave. to 24" 100 2 61D NW 27th Ex 10" St. Long Ave. Long Ave. to 12" 100 2 61D NW 28th Ex 20" St. Long Ave. Long Ave. to 24" 100 2 61D NW 281h Ex 6" St. Long Ave. Long Ave. to 8" 10o 2 61D City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 2 of 21 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 20%,WSM•D CITY PROJECT NO.:102300 Sewer No.of Water Water Water Main Sewer Sewer Lead Council Mapsco Street From To Size (LF) CI(LF) No. Size (LF) Services District No. Comments Loraine Ex 6" St. Long Ave. Long Ave. to 8" 100 2 61D NW 29t' Ex 6" St. Long Ave. Long Ave. to 8" 100 2 61D NW 30"' Ex 10" St. Long Ave. Long Ave. to 12" 100 2 61D NW 31s' Ex 6" St. Long Ave. Long Ave. to 8" 100 2 61D NW 32nd St./Hanna Ex 6" Ave. Long Ave. Long Ave. to 8" 100 L-3890 8" 100 2 61D NW 33`d Ex 8" St. Long Ave. Long Ave. to 8" 100 2 61D NW 34th Ex 6" St. Long Ave. Long Ave. to 8" 100 2 61D 48W, NW 3511 Ex 6" 62A, St. Long Ave. Long Ave. to 8" 100 2 477 Roosevelt Ex 6" Ave. Long Ave. Long Ave. to 8" 100 2 48W Prairie Ex 6" Ave. Long Ave. Long Ave. to 8" 100 2 48W Alley Betw NW And NW (L-1534) 2711 St. 2811 St. L-1534 8" 500 2 61D Alley Betw NW And NW (L-1533) 27"St. 2811 St. L-1533 8" 600 2 61D And Alley Betw NW Loraine (L-1539) 2811 St. St. L-1539 8" 580 2 61D Betw Alley Loraine And NW (L-1538) St. 2911 St. L-1538 8" 575 2 61D Alley Betw NW And NW (L-1536) 29th St. 30th St. L-1536 8" 575 2 61D Alley Betw NW And NW (L-1771) 29th St. 30th St. L-1771 1 8" 178 2 61D Alley Betw NW And NW (L-3682) 30th St. 3V St. L-3682 8" 850 2 61D Total 5550 200 4773 WORK TO BE PERFORMED Task 1. Design Management Task 2. Conceptual Design Task 3. Preliminary Design City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 3 of 21 ATTACHMENT A DESIGN SERVICES FOR WATERAND SANITARY SEWER REPLACEMENT CONTRACT 2019,WSM•D CITY PROJECT NO.:102300 Task 4. Final Design Task 5. Bid Phase Services Task 6. Construction Phase Services Task 7. ROW/Easement Services Task 8. Survey and Subsurface Utility Engineering Services Task 9. Plan Submittal Checklists TASK 1. DESIGN MANAGEMENT. ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER shall manage change, communicate effectively, coordinate internally and externally as needed, and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 1.1. Managing the Team • Lead, manage and direct design team activities ® Ensure quality control is practiced in performance of the work • Communicate internally among team members • Task and allocate team resources 1.2. Communications and Reporting • Attend a pre-design project kickoff/chartering meeting with CITY staff to confirm and clarify scope, understand CITY objectives, and ensure economical and functional designs that meet CITY requirements ® Conduct review meetings with the CITY at the end of each design phase Prepare invoices and submit monthly in the format requested by the CITY. • Prepare and submit monthly progress reports in the format provided by the Water Department. e Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, as required in Attachment D to this Standard Agreement and according to the City of Fork Worth's Schedule Guidance Document. • Complete Monthly MIWBE Report Form and Final Summary Payment Report Form at the end of the project • Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure, and provide and obtain information needed to prepare the design City of Fort Worth,Texas Attachment A PMO Release Date:06.1.2014 Page 4 of 21 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019,WSM•D CITY PROJECT NO.;10rJD0 With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. Personnel and Vehicle Identification: When conducting site visits to the project location, the ENGINEER or any of its sub-consultants shall carry readily visible information identifying the name of the company and the company representative. ASSUMPTIONS ® 24 MWBE reports will be prepared ® S meetings with city staff m 24 monthly water department progress reports will be prepared 24 monthly project schedule updates will be prepared DELIVERABLES A. Meeting summaries with action items B. Monthly invoices C. Monthly progress reports D. Baseline design schedule E. Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly M/WBE Report Form and Final Summary Payment Report Form G. Plan Submittal Checklists (See Task 9) TASK 2. CONCEPTUAL DESIGN (30 PERCENT). The Conceptual Design shall be submitted to CITY per the approved Project Schedule. The purpose of the conceptual design is for the ENGINEER to ■ Study the project, ■ Identify and develop alternatives that enhance the system, Present (through the defined deliverables) these alternatives to the CITY n Recommend the alternatives that successfully addresses the design problem, and Obtain the CITY's endorsement of this concept. ENGINEER will develop the conceptual design of the infrastructure as follows. 2.1. Data Collection City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 5 of 21 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019,WSM-D CITY PROJECT NO.:102300 • In addition to data obtained from the CITY, ENGINEER will research proposed improvements in conjunction with any other planned future improvements that may influence the project. • The ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including but not limited to; utilities, agencies (TxDOT and railroads), City Master Plans, and property ownership as available from the Tax Assessor's office. • The data collection efforts will also include conducting special coordination meetings with affected property owners and businesses as necessary to develop sewer re-routing plans. The ENGINEER shall visit the project site and obtain the meter numbers and sizes on all existing meters to be replaced on the project and shall identify existing sample stations and fire line locations. 2.2. Geotechnical Investigations • ENGINEER shall advise the CITY of test borings and other subsurface investigations that may be needed for the project. If the CITY determines that such borings or investigations are needed, then the ENGINEER shall work with the CITY and CITY's geotechnical consultant to draw up specifications for such testing program. The cost of such testing will be paid for by the CITY. 2.3. Fire Line Reconnection A fire line reconnection is not anticipated to be necessary for the lines that have been identified and has therefore not been included in this scope of work. However, the ENGINEER understands that if a fire line reconnection is determined necessary, then the following procedure should be utilized for the reconnection of fire lines during design and construction of water mains: • All fire lines on existing water mains to be replaced shall be clearly identified on the plans and when necessary, detailed sequence of construction should be provided for the reconnection to ensure that affected properties have adequate fire protection during and after construction. The engineer may need to visit with affected property owners to obtain fire flow and pressure requirements and incorporate the data into the fire service reconstruction design. • Design Engineer must coordinate with Water Field Operations during the design stage. For situations where the water main is removed and replaced in the same trench, special attention should be given to maintain adequate fire protection. A 2-inch temporary water line is grossly inadequate to feed a fire line. The transfer time of the fire line to the new water main must be kept to a minimum. Where necessary design and appropriate pay items must be provided for adequate temporary water service to feed fire service lines during construction. If there is any question about the adequacy of the temporary service to the fire line, then the inspector or project manager will request field operations to perform a pressure test at the nearest fire hydrant or outlet to determine the adequacy of the temporary connections. If the temporary connection is inadequate to provide fire protection until the permanent feed is in place, the project manager will assess the situation and make a determination as to the appropriate action. City of Fort Worth,Texas Attachment A PMO Release Date:D6.1.2D14 Page 6 of 21 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 209,WSMA CITY PROJECT NO.:10230D At pre-construction meeting, contractors should be informed of their responsibility to locate, identify and maintain fire service to applicable buildings. The proposed sequence of reconnection for fire lines should be discuss and enforced during construction. The City inspector shall also inspect the project site and take inventory of fire line locations. During construction, the inspector shall notify Water Department Field Operations of the pending fire line shut down. In addition, the contractor must notify the local fire station and property owners of the time frame that the fire line will be shut down on company letter head and inspector shall receive a copy. No fire line shut outs will be allowed without this letter. • The project manager shall be responsible for the implementation and completion of this procedure. 2.4. The Conceptual Design Package shall include the following: Cover Sheet • Graphic exhibits and written summary of alternative design concepts considered, strengths and weaknesses of each, and the rationale for selecting the recommended design concept, ® Proposed phasing of any water and sanitary sewer work that is included in this project documented in both the project schedule and narrative form. • Documentation of key design decisions. ® Estimates of probable construction cost. ASSUMPTIONS ® 0 Geotechnical borings are expected for this project. ® No hard copies of the conceptual design package (30% design) will be delivered. A PDF submittal will be made. DWF files created from design CAD drawings will be uploaded to the designated project folder in Buzzsaw • ENGINEER shall prepare the meeting minutes of the Concept Review meeting and revise the report, if needed. • ENGINEER shall not proceed with Preliminary Design activities without obtaining written approval by the CITY of the Conceptual Design Package. DELIVERABLES A. Conceptual Design Package TASK 3. PRELIMINARY DESIGN (60 PERCENT). City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 7 of 21 ATTACHMENT DESIGN SERVICES FOR WATERAND SANITARY SEWER REPLACEMENT CONTRACT 2019,WSM•D CITY PROJECT NO.:402390 Preliminary plans and specifications shall be submitted to CITY per the approved Project Schedule. ENGINEER will develop the preliminary design of the infrastructure as follows. 3.1. Development of Preliminary Design Drawings and Specifications shall include the following: Cover Sheet A Project Control Sheet, showing all Control Points, used or set while gathering data. Generally on a scale of not less than 1:400. The following information shall be indicated for each Control Point: Identified (existing City Monument##8901, PK Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only; descriptive location (i.e. set in the centerline of the inlet in the South curb lime of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). Overall project easement layout_sheet(s) with property owner information. Not anticipated or included. • Overall protect water and/or sanitary sewer layout sheets. The water layout sheet shall identify the proposed water main improvement/existing water mains in the vicinity and all water appurtenances along with pressure plane boundaries, water tanks, pump stations, valves, and fire hydrants. The sewer layout sheet shall identify the proposed sewer main improvement/existing sewer mains and all sewer appurtenances in the vicinity. There will be one water layout sheet at a scale of 1"=400'. There will be one sewer layout sheet at a scale of 1"=400'. • No Overall water and/or sanitary sewer abandonment sheets will be produced., • Coordinates on all P.C.'s, P.T.'s, P.I.'s, manholes, valves, mainline fittings, etc., in the same coordinate system as the Control Points. • Bench marks per 1,000 ft of plan/profile sheet—two or more. • Bearings given on all proposed centerlines, or baselines. • Station equations relating utilities to paving, when appropriate. • Plan and profile sheets which show the following: proposed water and/or sanitary sewer plan/profile and recommended pipe size, fire hydrants, water service lines and meter boxes, gate valves, isolation valves, manholes, existing meter numbers and sizes that are to be replaced, existing sample locations, existing fire line locations, existing utilities and utility easements, and all pertinent information needed to construct the project. Legal description (Lot Nos., Block Nos., and Addition Names) along with property ownership shall be provided on the plan view. It is anticipated that there will be 11 plan and profile sheets for the 24" water line along West Long Avenue (8"water line crossings will be shown in the plan view only of the 24" water fine sheets), 1 plan and profile sheet for the 12" water line along West Long Avenue, 1 plan and profile sheet for the two 24" water line crossings of West Long Avenue, 1 plan and profile sheet for the two City of Fort Worth,Texas Attachment A PMO Release Date:06.1.2014 Page 8 of 21 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019,WSIA-D CITY PROJECT NO.:102301 12"water line crossings of West Long Avenue, 3 plan and profile sheets for the sewer line L-1771 along and crossing West Long Avenue and 16 plan and profile sheets for the other eight sewer line crossings of West Long Avenue. All plan and profile sheets will be drawn at a scale of 1"=2a' horizontally and 1 = 4' vertically. ® The ENGINEER shall make provisions for reconnecting all identifiable water and/or wastewater service lines which connect directly to any main being replaced, including replacement of existing service lines within City right-of-way or utility easement. When the existing alignment of a water and sanitary sewer main or lateral is changed, provisions will be made in the final plans and/or specifications by the ENGINEER to relocate all service lines which are connected to the existing main and connect said service lines to the relocated main. s The following shall be applicable at all locations where it is necessary to relocate or reroute the existing private sanitary sewer service line due to the abandonment or realignment of the existing public sanitary sewer lateral or main: The CITY shall furnish the ENGINEER with a sample format of how the sewer service line reroute/relocation should be designed and submitted for construction. During design survey, if a rod can be inserted through the cleanout to the bottom of the service line, the ENGINEER will obtain the flow line elevation and design the service line prior to advertising the project for bid. If the service flow line information cannot be obtained during design survey, the ENGINEER shall delay the design of the sewer service line until after a Quality Level A Subsurface Utility Engineering (SUE investigation has been performed). The Level A SUE will be performed; (1) by the ENGINEER if included in the fee proposal; or (2) by the CITY prior to bidding if the CITY determines that it is needed for satisfactory completion of the design; or(3) by the Contractor after the project has been bid, by means of a bid item to that effect. In all options, the ENGINEER shall propose appropriate de- hole locations in the project and collect flow line elevation and other applicable information of the sewer service line. The ENGINEER shall use this information to provide the design for the sanitary sewer service line to be rerouted or relocated. Provide map showing location of new manhole construction at the end of existing sewer segments, 90 degree bends, or tee connections, Site survey or specific design plans for manhole construction is not included as part of the scope. The contract documents shall specify that it is the Contractor's responsibility to coordinate utility location, etc. manhole construction. + The ENGINEER will prepare standard and special detail sheets for water line installation and sewer rehabilitation or replacement that are not already included in the D-section of the CITY's specifications. These may include connection details between various parts of the project, tunneling details, boring and jacking details, waterline relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections. Special details are not anticipated or included. 3.2. Geotechnical Investigation Soil investigations, including field and laboratory tests, borings, related engineering analysis and recommendations for determining soil conditions will be made. In addition to the above investigations, borings and appropriate field and laboratory analysis will be made at reasonable intervals along the project City of Fort Worth,Texas Attachment A PNIO Release Date:08,1,2014 Page 9 of 21 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019,WSM-D CITY PROJECT NO.:102300 alignment for the Contractor's use in determining soil conditions for preparing bids and a Trench Safety Plan. Investigation will include tests for corrosion potential of the soil. 3.3. Constructability Review • Prior to the 60 percent review meeting with the CITY, the ENGINEER shall schedule and attend a project site visit with the CITY Project Manager and Construction personnel to walk the project. The ENGINEER shall summarize the CITY's comments from the field visit and submit this information to the CITY in writing. 3.4. Utility Clearance ID The ENGINEER will consult with the CITY's Transportation and Public Works Department, Water Department, and other CITY departments, public utilities, private utilities, private utilities and government agencies to determine the approximate location of above and underground utilities, and other facilities (current and future) that have an impact or influence on the project. ENGINEER will design CITY facilities to avoid or minimize conflicts with existing utilities, and where known and possible consider potential future utilities in designs. • The ENGINEER shall upload individual DWF files for each plan sheet of the approved preliminary plan set to the designated project folder in Buzzsaw for forwarding to all utility companies which have facilities within the limits of the project. The DWF files should be created directly from the CAD files as opposed to PDF files. 3.5. Traffic Control Plan • Develop a traffic control plan utilizing standard traffic reroute configurations posted as "Typicals" on the CITY's Buzzsaw website. The typicals need not be sealed individually, if included in the sealed contract documents. • Develop supplemental traffic control drawings as needed for review and approval by the Traffic Division of the Transportation and Public Works Department. These drawings shall be sealed by a professional engineer registered in the State of Texas. Supplemental traffic control drawings are not anticipated or included. ASSUMPTIONS • No water or sewer abandonment sheets. • No easements anticipated or included. • One public meeting(s) will be conducted or attended during the preliminary design phase. • Eight borings at an average bore depth of ten feet each will be provided. • Traffic Control "Typicals" will be utilized to the extent possible. It is assumed that no additional project specific traffic control sheets will be developed. City of Fort Worth,Texas Attachment A PNiD Release Date:08A.2014 Page 10 of 21 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019,WSM•D CITY PROJECT NO.;102300 ® PDF's of the drawings will be submitted for the Constructability Review. No hard copies. PDF's of the drawings will be submitted for the Preliminary Design (60% design). No hard copies. PDF's of the specifications will be submitted for the Preliminary Design (60% design). No hard copies. DWF files created from design CAD drawings will be uploaded to the designated project folder in Buzzsaw. The CITY's front end and technical specifications will be used. The ENGINEER shall supplement the technical specifications if needed. PDF's of the drawings will be submitted for Utility Clearance. No hard copies. • ENGINEER shall not proceed with Final Design activities without written approval by the CITY of the Preliminary Design plans. DELIVERABLES A. Preliminary Design drawings and specifications B. Utility Clearance drawings C. Traffic Control Plan D. Storm Water Pollution Prevention Plan E. Estimates of probable construction cost F. Data Base listing names and addresses of residents and businesses affected by the project. TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows. For projects that disturb an area greater than one (1) acre, the Contractor will be responsible for preparing and submitting the Storm Water Pollution Prevention Plan (SWPPP) with appropriate regulatory agencies. The Engineer will prepare the iSWM Construction Plan according to the current CITY iSWM Criteria Manual for Site Development and Construction (If required, as additional services) which will be incorporated into the SWPPP by the contractor. • Draft Final plans (90%) and specifications shall be submitted to CITY per the approved Project Schedule. • Following a 90% construction plan review meeting with the CITY, the ENGINEER shall submit Construction Documents (100%) to the CITY per the approved Project Schedule. Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas. City of Fort Worth,Texas Attachment A PNIO Release Date:08.1,2014 Page 11 of 21 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019,WSM-D CITY PROJECT NO.:10230D a The ENGINEER shall submit a final design estimate of probable construction cost with both the 90% and 100% design packages. This estimate shall use ONLY standard CITY bid items. ASSUMPTIONS Two sets of 22"x 34" size drawings and two sets of I V x 17" size drawings and two specifications will be delivered for the 90% Design package. ® Two sets of 22" x 34" size drawings and two specifications will be delivered for the 100% Design package. A DWF file for the 90% Design will be created from design CAD drawings and will be uploaded to the project folder in Buzzsaw. A DWF file for the 100% Design will be created from design CAD drawings and will be uploaded to the project folder in Buzzsaw. DELIVERABLES A. 90% construction plans and specifications. B. 100% construction plans and specifications. C. Detailed estimates of probable construction costs including summaries of bid items and quantities using the CITY's standard bid items and format. D. Original cover mylar for the signatures of authorized CITY officials. TASK 5. BID PHASE SERVICES. ENGINEER will support the bid phase of the project as follows. 5.1. Bid Support e The ENGINEER shall upload all plans and contract documents onto Buzzsaw for access to potential bidders. Contract documents shall be uploaded in a .xIs file. o Unit Price Proposal documents are to be created utilizing CFW Bidtools only and combined in a specified spreadsheet workbook, Bid Proposal Worksheet Template, and will be populated and configured so that all pages are complete and the Summary Worksheet(s) in the workbook detail and automatically summarize the totals from the inserted Unit Price Proposal document worksheets. Plan Sets are to be uploaded to Buzzsaw in two formats, .pdf and .dwf files. The .pdf will consist of one file of the entire plan set. The Awf will consist of individual files, one for each plan sheet, and will be numbered and named in a manner similar to that of the plan set index. City of Fort Worth,Texas Attachment A PMO Release Date:D8.1.2014 Page 12 of 21 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019,WSMA CITY PROJECT NO.:102300 The ENGINEER shall sell contract documents and maintain a plan holders list on Buzzsaw from documents sold and from Contractor's uploaded Plan Holder Registrations in Buzzsaw. ® The ENGINEER will develop and implement procedures for receiving and answering bidders' questions and requests for additional information. The procedures shall include a log of all significant bidders questions and requests and the response thereto. The log shall be housed and maintained in the project's Buzzsaw folder titled Request for Information. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders questions and requests, in the form of addenda. The ENGINEER shall upload all approved addenda onto Buzzsaw and mail addenda to all plan holders. e Attend the prebid conference in support of the CITY. Assist the CITY in determining the qualifications and acceptability of prospective contractors, subcontractors, and suppliers. When substitution prior to award of contracts is allowed in the contract documents, the ENGINEER will advise the CITY as to the acceptability of alternate materials and equipment proposed by bidders. e Attend the bid opening in support of the CITY. Tabulate and review all bids received for the construction project, assist the CITY in evaluating bids, and recommend award of the contract. A copy of the Bid Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only are to be uploaded into the project's Bid Results folder on Buzzsaw. ® Incorporate all addenda into the contract documents and issue conformed sets. 5.2 Final Design Drawings 1) Final Design Drawings shall be submitted in both Adobe Acrobat PDF format (version 6.0 or higher) format and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall be created from the original CAD drawing files and shall contain all associated sheets of the particular plan set. Singular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example - 1'W-1956_0rg47.pdf" where "W-1956" is the assigned file number obtained from the CITY, " org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W 0053—org3.pdf and K 0320—org5.pdf II. Water and Sewer file name example — "X-35667_org36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_org" City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 13 of 21 ATTACHMENTA DESIGN SERVICES FOR WATERAND SANITARY SEWER REPLACEMENT CONTRACT 2019,WSM-D CITY PROJECT NO.:102300 designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755 orgl8.pdf Both PDF and DWF files shall be uploaded to the project's Final Drawing folder in Buzzsaw. 2) In addition to the PDF and DWF files, the ENGINEER shall submit each plan sheet as an individual DWG file with all reference files integrated into the sheet. If the plans were prepared in DGN format, they shall be converted to DWG prior to uploading. The naming convention to be used for the DWG files shall be as follows: 1. TPW files shall use the W number as for PDF and DWF files, but shall include the sheet number in the name — "W-1956—SHT01.dwg", "W- 1956_SHT02.dwg", etc. Il. Water and Sewer file names shall use the X number as for PDF and DWF files, but shall include the sheet number in the name — "X- 12155_SHT01.dwg", "X-12755—SHT02.dwg", etc. For information on the proper manner to submit files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number(817) 392-8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS • The project will be bid only once and awarded to one contractor. • Five sets of construction documents will be sold to and made available on Buzzsaw for plan holders and/or given to plan viewing rooms. • Two sets of 22" x 34" size and two sets of 11"x 17" size drawings plans and Four specifications (conformed, if applicable) will be delivered to the CITY. • PDF, DWF and DWG files will be uploaded to Buzzsaw. DELIVERABLES A. Addenda B. Bid tabulations C. CFW Data Spreadsheet D. Recommendation of award City of Fort Worth,Texas Attachment A PMO Release Date:D8.1.2014 Page 14 of 21 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER P.EPLACEMENT CONTRACT 2019,WSM-O CITY PROJECT NO.:102300 E. Construction documents (conformed, if applicable) TASK 6. CONSTRUCTION PHASE SERVICES. ENGINEER will support the construction phase of the project as follows. 6.1 Construction Support • The ENGINEER shall attend the preconstruction conference. After the pre-construction conference, the ENGINEER shall provide project exhibits and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. • The ENGINEER shall visit the project site at requested intervals as construction proceeds to observe and report on progress. ® As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents, review change orders, and make recommendations as to the acceptability of the work. The ENGINEER shall attend the "Final" project walk through and assist with preparation of final punch list 6.2 Record Drawings The ENGINEER shall prepare Record Drawings from information provided by the CITY depicting any changes made to the Final Drawings during construction. The following information shall be provided by the CITY: o As-Built Survey o Red-Line Markups from Contractor o Red-Line Markups from City Inspector o Copies of Approved Change Orders o Approved Substitutions • The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions on the sheet or not. Each sheet shall dearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. • The following disclaimer shall be included with the Record Drawing stamp: o These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. City of Fort VVorlh,Texas Attachment A PMO Release Date:08.1.2014 Page 15 of 21 ATTACHMENT A DESIGN SERVICES FOR NATFRANn SANITARY SEWER.'EFL AEME,;Tv0NTPA,,•2019,'"'SM-C CITY PROJECT NO.:.D-=00 O The ENGINEER shall submit a set of sealed Final Drawings, modified and stamped as Record Drawings, on mylar for record storage. The ENGINEER may keep copies of the information provided by the CITY for their files, but all original red-lined drawings shall be returned to the CITY with the mylars. 2) Record Drawings shall also be submitted in both Adobe Acrobat PDF format (version 6.0 or higher) format and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall contain all associated sheets of the particular plan set. Singular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example — "W-1966—rec47.pdf" where "W-1966" is the assigned file number obtained from the CITY, "—rec" designating the file is of a record drawing plan set, "47" shall be the total number of sheets in this file. Example: W-0053_rec3.pdf and K-0320—org5.pdf IL Water and Sewer file name example — "X-35667_rec36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, ",_rec" designating the file is of a record drawing plan set, "36" shall be the total number of sheets in this file. Example: X-12755—rec1B.pdf Both PDF and DWF files shall be uploaded to the project's Record Drawings folder in Buzzsaw. ASSUMPTIONS Four RFI's are assumed. ® Zero Change Orders are assumed No more than eight site visits are assumed. 61 No more than five shop drawing reviews are assumed. m One copy of full size (22"x34") mylars will be delivered to the CITY. DELIVERABLES A. Public meeting exhibits B. Response to Contractor's Request for Information C. Review of Change Orders D. Review of shop drawings City of Fort Worth,Texas Attachment A PMO Release Date:D8.1.2014 Page 16 of 21 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019,WSM•D CITY PROJECT NO.:1D2300 E. Final Punch List items F. Record Drawings on Mylar TASK 7. ROWIEASEMENT SERVICES. ENGINEER will support and perform activities related to ROW and land as outlined below, per scoping direction and guidance from the CITY's Project Manager. 7.1. Right-of-Way Research The ENGINEER shall determine rights-of-way, easements needs for construction of the project. Required temporary and permanent easements will be identified based on available information and recommendations will be made for approval by the CITY. 7.2. Right-of-Way/Easement Preparation and Submittal. ® The ENGINEER shall prepare documents to be used to obtain right-of-way and permanent and/or temporary easements required to construct the improvements. • The ENGINEER shall submit the right-of-way and/or easement documents to CITY PM for real property acquisition • The documentation shall be provided in conformance with the checklists and templates available on the CITY's Buzzsaw site. 7.3. Temporary Right of Entry Preparation and Submittal • Prior to construction, the ENGINEER shall prepare and submit Temporary Right of Entry documents for landowners to CITY PM for real property acquisition. It is assumed that letters will only be required for land owners adjacent to temporary construction easements or who are directly affected by the project and no easement is required to enter their property. • The documentation shall be provided in conformance with the checklists and templates available on the CITY's Buzzsaw site. ASSUMPTIONS • Zero Easements or right-of-way documents will be necessary. • Zero Temporary right-of-entry documents will be necessary. • Right-of-Way research and mapping includes review of property/right-of-way records based on current internet based Tarrant Appraisal District (TAD) information available at the start of the project and available on-ground property information (i.e. iron rods, fences, stakes, etc.). It does not include effort for chain of title research, parent track research, additional research for easements not included in the TAD, right-of-way takings, easement vacations and abandonments, right-of-way vacations, and street closures. Property surveys are not included in this scope. City of Fort Worth,Texas Attachment A PMO Release Date;08.1,2014 Page 17 of 21 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019,WSM•D CITY PROJECT NO.:102300 DELIVERABLES A. Easement exhibits and meets and bounds provided on CITY forms. B. Temporary Right of Entry Letters TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES. ENGINEER will provide survey support as follows. 8.1. Design Survey ® ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information needed by ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities, structures, trees (measure caliper, identify overall canopy, and have qualified arborist identify species of trees), and other features relevant to the final plan sheets. Existing drainage at intersections will be verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope to fit intersecting grade lines. ® The minimum survey information to be provided on the plans shall include the following: A Project Control Sheet, showing ALL. Control Points, used or set while gathering data. Generally on a scale of not less than 1:400: — The following information about each Control Point; a. Identified (Existing. CITY Monument#8901, PK Nail, 5/8" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on CITY Datum only. C. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). — Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate system, as the Control. — No less than two horizontal bench marks, per line or location. — Bearings given on all proposed centerlines, or baselines. -- Station equations relating utilities to paving, when appropriate. 8.2. Temporary Right of Entry Preparation and Submittal City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 18 of 21 ATTACHMENTA DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019,W wb CITY PROJECT NO.:192XD Prior to entering property, the ENGINEER shall prepare and submit Temporary Right of Entry for landowners to CITY PM. • The documentation shall be provided in conformance with the checklists and templates available on the CITY's Buzzsaw site. ASSUMPTIONS ® Topographic survey at intersection will include no more than 100 ft. in each direction. 8 SUE Level A investigations for the five 24" connecting water lines and three to use for crossing storm drains or other utilities to a depth of about 10'. DELIVERABLES A. Copies of field survey data and notes signed and sealed by a licensed surveyor. B. Drawing of the project layout with dimensions and coordinate list. TASK 9. PLAN SUBMITTAL CHECKLISTS Engineer shall complete and submit Plan Submittal Checklists in accordance with the following table: PLAN SUBMITTAL CHECKLIST REQUIREMENTS Traffic Traffic Traffic Street Water Control Control Control Traffic Traffic 30% 60% 90% Storm Storm Lights 15ewer Attachment"A" Signal Engineering Water Wafer {Submit {submit Type (Submit All 30% 60% All @ All @ (Submit All @ 30%) 30% 60%) @ 60%) Required for all work in City ROW Street X X X X X` X X X X Storm Water X X X X X Water 1 Sewer X X X X *If included in street project ASSUMPTIONS City of Fort Worth,Texas Attachment A PVIO Release date:08.1.2014 Page 19 of 21 ATTACHMENT A DESIGN SERVICES FOR WATERAND SANITARY SEWER REPLACEMENT CONTRACT 2019,WSM-D CITY PROJECT NO.:102500 DELIVERABLES A. B. ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existina Scope of. Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition including temporary right-of- entries. Services related to development of the CITY's project financing and/or budget. • Services related to disputes over pre-qualification, bid protests, bid rejection and re-bidding of the contract for construction. 9 Construction management and inspection services • Periodic site visits during construction phase • Design phase public meetings • Performance of materials testing or specialty testing services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. • Services related to warranty claims, enforcement and inspection after final completion. • Services related to submitting for permits (ie.TxDOT, railroad, etc...) • Services related to Subsurface Utility Engineering Levels A, B, C or D • Services related to Survey Construction Staking City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 20 of 21 ATTAGHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEINER Rm-:ACEMENT CONTRACT 2M,WSMI•D CITY PROJECT NO.:102300 • Services related to acquiring real property including but not limited to easements, right-of-way, and/or temporary right-of-entries. ® Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • Construction Shop drawing review, samples and other submittals submitted by the contractor. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. • Pavement rehabilitation City of Fort Worth,Texas Attachment A PMO Release Date:08.1.2014 Page 21 of 21 ATTACHMENT B COMPENSATION Water and Sanitary Sewer Replacement Contract 2019, WSM-D City Project No. 102300 Lump Sum Project I. Compensation A. The ENGINEER shall be compensated a total lump sum fee of $300,577 as summarized in Exhibit B-1 — Engineer Invoice and Section IV--Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor materials, supplies, and equipment necessary to deliver the services. B. The ENGINEER shall be paid monthly payments as described in Section 11 - Method of Payment. II. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit B-1, Progress Reports as required in item III. of this Attachment B, and Schedule as required in Attachment D to this Agreement. B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth's Schedule Guidance Document. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Water Department monthly progress reports and schedules in the format required by the City. City of Fort Worth,Texas Attachment 6 PMO Official Release Date;8.09,2D12 Page 1 of 3 B-1 ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility Fee Amount Prime Consultant Neel-Schaffer, Inc. Design, Construction Phase $226,175 75.25 Services Proposed MBEISBE Sub-Consultants Spooner&Associates, Survey $47,602 15.84% Inc. The Rios Group Subsurface Utility Engineering $18,700 6.22% Nan-MBEISBE Consultants Alpha Testing Geotechnical Investigation $8,100 2.69% TOTAL $300,577 100% Project Number& Name 'Total Fee MBEISBE Fee MBE1SU 102300—Water and Sanitary Sewer $300,577 $66,302 22.06% Replacement Contract 2019, WSM-D City MBEISBE Goal = 12% Consultant Committed Goal = 12% City of Fort Worth,Texas Attachment B PMO Official Release Data:8.09.2012 Page 2 of 3 B-2 EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across work types and work phases. City of Port Worth,Texas Attachment B PMO Official Release pale;8.09.2012 Page 3of3 B-3 EI , m 5. ® » -0 ® ® n q q 'U -u vvoa , i =r [ \ }§ kk § / %� k § � � � iv z \ k � \ -na z § ¢ E § $ Q .. \ CO) ) C (D _ e _ R } Frr \ f % . 0 § \ 0) CD g_ o ¥ Co CD } A (D 0. 2 f [ § � % m 200 © m � ƒ q . # m f 2 CL ; oo k � CL 0 44 \ .. e ; Q 2 ¢ /} / § 0 \ \ \ \ / ■ / ° � > 0 i : ■ u 0 - 6 k > > ¢ } � } \ m » v C, . _ g3 / 0 k e ` E } / / ( J n co ` 3 CGP § J ° /� CL \ \ 0 FT 7» IM � k ` 0 ID § ) } \ \ awmww n -00I ■� � � J }kkkk § (faij� i - _ ° n • 2 ■ R Z: \ E ((}}} or &CD ; r ® ' ' Q ; 0F z IEr ■ / ° § �� § .. ••ED CO) m 7j / ƒ v \ cn ` e » i -1 7 � m c 2 i & CL B CD 0 N .. (D k q » § § ;« ®� f J c)Z R § m@ § } § A } / &\ S 0 > k \ } (° z - - ( � /( _ \ 3 4$ ! \ } \ DECL A ) o r � ® _ ; ~ >> } k / got) « J CD ; EKCD ; - , / /\§ / \ § CD CD CL 0. CD �ƒ ( \ ep/ E 0»-u00 n "00 g � Q kk\kk § K == 'a ; � ■ ƒ §)ID< 0' -® � �\® \-nC z ar . # ƒ ° § § ) ! .. •• E @ /� / ƒ ° - _ (n� \ \ E � � E a / G } E Q § ƒ � k i Li LLJ 7 » ( ƒ� 9§ ƒ %2 • . .. o> R .. § § m - 0 \ \/ ka \ � [ / ` \\ } \ ! ` ; 2 \ k » - \ ƒ \ \ \ - § « /� § rb 2 , $ ! \ » ( } e ! k§ \ \ � \ Er CD / c0-0 & � C \ -13 Ea ID to 0 ® § �\ � _ 2 `J EXHIBIT B-2 Level Ol Effort Spreadsheet TASKIHOUR BREAKDOWN Uesign Services for Water and Sanitary sower Replacement Contract 2019,WSIIR-D City Project No.102309 En W L T>slinescrlptlen nclpa Pr Jere prstedr n Tmal Laker a ons p ucb ensl tsubT °nt RenWnlnB E Ineer bouE}3 CAaO AtlmJnistrativa �� ry�el rcmpbly r uigtt ! S?as Mena}514 }1W }!14 }fts MWBE NerA,]NBE LB Pr ecl Mamemenl 10 9 le SSf.BOB SO 51f BW 1.z cammmiwnmsamRa so s6 sB 1.z1 se6B so Mnrsl Review Meeti a 0 6 8s4aE 1.2.3 reBa%Ire 6vledWe 9 3 56 53.3M 1.25 Pr rtM] M62rsa51te 50 59.iW -pw M eeel n 36 w s 3 31 18 Ba }mP% W file fBA 13 21 Dula GatlM�on 66248 518 51B 58250 23 SBW 50 5555 Cove SMeE 1 4 E655 2,2,T ErM1lhtlaaMS1 52 9 40 qa 60 613140 223 S5 53W 69 . 3.24 42.9B0 EB E2 a08 b✓vF's 2 63s0 iT la2 216 3W f3B 51%.TW 41B Teo lau WIB }0 S.me ita4,e Pra6minaa pesi I Fads wwn W SO lit Cartt 1 W 5&G s.l.0a OunBa sMet 51]a] Ee st]i0 2 9 le s1.rrB W erellia olrt Sewer 3 9 B 5t T16 9.1.0a 51 F4neN plarvpmne 9M1eeG]G"naler 531160 fie Esl,w R 0 58 l36 ST,BW is Fe NPrM�le 9>teela Sewer3 W 18 40 W 90 629,OP0 3.5.3e VYaler P¢Wii 56 58 s.1al sewn Relaid so- s6 so s,1p l l6 00 511,3eB So 541 ruclunFeees 3 4 9 E1310 sl6 3R b Gbne4actadl' Reruw ] 9 58 s1639 33 lRi' G r ]6 9l 9[b E3.965 3,4 a 51.420 SB1W EB.1N 4552B 4 8 Ei 4x 4ta]Bs s14TOB 26 Treff.CwNoI PMn 56 �150 3T PlM1S:Meeti2 5r 630 518 S18 S 5M E5,w 38 2 50 230 6 Resl n 6 16 e 4 Bj 52aa s m R�IansT 61 ss'4� 8 P 4 d6 74 Sf46W W SlyriTs Firwl urea Ia3%j LtniVrxlbn FbnS aM 4.5 6 Bwtlem 6B 6W rd SB89e lE 7A l0 s4 T06 W uc6an Fatnvtes W%ertl 486% 2 4 ] 8 Vlw 4.441 b OYYFs SD 5230 2 19 to m 4B s!44m W W sa6ze 4s1 ms n 3 s6 s4To 5.i.1 0 6]568 50 61660 %an 4ioffere LiM rccn[s ana Ma,ntaln 4 4 E]T40 S;WB 53 i40 s.+.3 Msw An&d 63.s4B so s3.vm 5.1.9a sii8 4-0 61. 5,1;16 Ate 5 5595Dj Tahlak Eusard RewmmeM—rtl 3 2 41 e3s t4e30 421b CoNornctl Se6 0 16 53 Tf0 5989 5389 %T4B 5.3 �WT'e 9 50 sr3B8 49 9 6 SI.sBO 5.5 M kr Elam 559B 5549 s1.195 69 Conshactisn PM1au derrices 1 W fo 31e6 $1. s16,54t s.l parw,nwlonsu Sf s235 5 4YJ5 af.t 2 £ 6T1e MeM FUN'n Meeli�n 2 Z ET10 31.3 Si�V''6 6162 5162 53.362 B.5.9 Rars 52666 W 539W a1.6 r2 12 54.3W Recom OraxiiwrlrlAS Euit 9 9 6 34 55106 R B B B 4 Af0 W W W SfW SSW R�d-Ee�EacumenR 2 Stfi6 68T0 4 B B 9 B 51 1 S4P W SW 43]2 yl]]66 p9,K9 besl Suve 4 s9],i64 5 544 1.A B 10 32 16 9 s1A%0 LBW W sW sW W }t B,fu9! maul Ser.4ces doom 10.2 SWM 50 559.9W 1-0.3 �4W 50 SD s} so t6 166 YID 498 69B Za4 W43o3 }4,WB %B4 A4,39B Water line Fodape 5,i58 55Y. ine Fsole 4]P3 95% olal Huiusr 10.523 1W% Trial EK�ar 5S�B296 jN MBEISEESubourwJMR £683-0Z IW Swel Fee 599,699 I Tc31 Fee-surce Fre 5259933 Winn Fee l]6%dq ee l2a%dL] MEFJSEE Partin�l'wn YLl% 619-0.I�.W �5�,2346e Yofffi ProteMCvst s30a,5TTA0 eesni im YYP lYaln Gw�oe Ibe n nlBBfl �925,(p 6365346B Fuelbe�l0.% 30 51&8T1.68 48,022W Ar 3e 691 l:9AB 355 914.m 43a.00 s1213&W V. 657 a Fart WaM,Texas Atlac[menl B-Level M EMoa 6lpsbmeN TYpBaI WuRv a1 sewer 14egarPupM CITY OF FORT WORTH 1lBR020 WATER NEPARTMENT WATER ANO SANITARY SEWER REPLACEMENT CONTRACT 2019,WSM-D OPCC CITY PROJ.NO.102300 Fn in ,-Neel-Schaffer InC. 515 Houston St suite 751 Fort Worth TX]b IO2 Water De .P Mana Pam Comm�P.E. PAY BID SPK UNIT ITEM ND NO UNW ITEM DESCUMON PRICE AMOUNT UNIT I-WATER L. 3311.0654 1 331110 1 4570 IF 24'P]P Water Restrained hints 206.85 99s 303.50 Bld mtherA fEll 6 CLnrrele AWWA C30 or Steel 1-A 3311.0654 11 10 1570 tF 2 r DIP Water Restrained lotnts L-B 33II.0674 U3 U311 13 4570 LF 24'Copomte AWwA C303 Water Pi Reshaim d hints L-C 3311A684 331114 45 LF 24"$Wei AMA C20n Wale,Pi Re bad ldnts 2-ABC 3304.0002 33 U412 I lS CSUIOdIC PYoteRtoR on 24"DIP Concrete a-Steel l50 000.00 1 150 Au Bldem]e,A M B Cuimr AWWAC303 a,C leel 4. 3311.0564 I W 11 12 sw IF 12'PVC C900 Water PI tl trMM 3oi� L00.00 55000-00 5. 3311.0261 33 1E 12 906 LF 8'PYC Water W 65.63 53062sU 6. 3311.0251 Wil 10 ]00 LF 8"111PWat,r 95.00 9500.Du 7. 3311.0261 331112 190 LF 6"PYC M_Pl 61.95 6195.UU & 0171.OL00 E7123 1 IS c0,v-Uon Smldn 25000.00 250DD.00 9. Ol]1.O102 OL 7123 1 LS Red tine M H.ilt borne 15 c0.00 150DU.CD 10. 074L1218 024114 L5 EA 4"-12'Water Abandonment PI 600.00 9OD0.00 it. 0241A347 024L 14 4 EA sales a6"Water Valve 200.00 8DO.00 11 0241.1348 024114 l EA Sales a 8'water Valve 200.00 200.00 13. 0241.1510 024114 4 E0. Santa a Hre rant 367.50 147100 14. 3125.0101 312500 l LS SWPPP 2 1 Act¢ 14437.50 1 14 437.50 I5. 320L0400 320118 6220 LF Tem halt Paw Re r 2"%MAC on 6•CTB 30A0 156,W0.00 16. 3305-0103 330530 5 FA or,". ExCavdUM of['slip Utilides 1286-25 6431.25 17. 3305.0109 33 05 10 6220 LF Trench Sa 5-00 31 L00.00 1& 3311.0001 331111 3 1 TN 0uctilelmn Water Htun 5 w ReSlmMt far 8"&12 9975.00 2992S.00 19. 3311.0001 331111 9 TN Duthie Iron WWr H[tul i traint for 24' 9187.5D 82687.50 8W e8h-A DI B Concrete AWWp C30 we S4el 21l-A 3311.0001 33 ii Il 9 TN C303 OUehle Iron Water Htti w REStrdint far 24' 2 B 3311.0021 w 1 17 1 LS Fitti s fir A 20-C 1 17111.0011 1 331114 1 l I LS Istee,Rttin s for 24' Bid either A [ B Concrete AWWA 00 or c Steel 21, 33I2.Gaol 3313 40 4 EA Rm rant 4 M.M 16 800.00 22. 33I2A117 231225 32 EA EoA 4'-12'Wdter Main 5775.00 18,603.00 23. 3 OLFI[3 33123D 4 EA 3"Camblnation Air YaNe Assemhl far Water 29925.Dn 119]00.00 24, 3312.3002 331220 5 ]A 6"Gate Va[ve f260.00 6300.00 25. 3312.3003 331220 15 EA MGate Vane F785.00 16775.00 26. 3312.3nn8 331220 5 PA 24-Gate Yaivew Yault 39637.5n 19818].50 2]- 3312.600E 3312 60 4 EA B'BkWCM Valve 19 950.00 I T4800.DD 28. 3471.0001 M7113 T8 MO Trafre Control S 3131.63 56369.25 29. 3471.0002 347133 52 WK Portable Mesa SI n 472-50 2457rlffl 30. 3212.0401 32 1216 100 TN HMAC T2rlsition 152,25 15 R5.00 31. 3216.0101 321b 13 no LF 6`COnoele Curb antl Gutter Matdr Estin 42.00 t 29 400.0n 32. 3305.0207 33G510 400 CY Imported Embedmen UMfill select Fill,AS Directed by to,ur e , 35.00 14 DDn.nn 33. 3305.0203 330510 4n0 CY 1 111.87 44730.00 34. 999-0002 321320 4 EA MA Rarrp $ 2230.00 109M.00 35. 3217.0305 321723 165 LF Pavement M.rWqs,RopBar 11.07S 1,819.13 36, 3217.0301 321723 120 IF 124rdi Shcd Pavement Markin Cr-- V U: 9.98 1197.00 37. 9999.ww- t i5 Ca Vtru.0 n ARwrarke 100 0.00 1 Inn c00A0 38. 3305.0003 33 05 12 5 EA 8"Water Une Lc-ffrqlNot UBed Far In Wan. 7,035.0 j 35 175.00 39. 3W5.0117 33 D5 00 50 C3' CSS Enasement for U01 N Not lnlended for Le Io SG veR 150.00 ]5c0A0 40. 3312.0107 331225 I EA COnnerlian to Exlsti l8"Water Main 12,500.00 12500.00 4L 3312.0107 33 12 25 I EA connection to EKWVq 20"Water Main 15000.00 15 00.00 41 3312.011 33 12 25 3 EA connection to DkIng 24"W W,Main 20 OOOAn OAM.aa 43. 3305.0111 3105 14 30 EA Valve Box Ad uetment 400AD 1zw.00 SUBTOTALUNITIBIP 2713481.13 UNIT]I-SEWER L MI A115 33312rl 4773 LF 8'Seww Pipe PVC DR26 72.98 348309.66 1 3311.0241 3311 12 103 LF W PVC C900 DR18 ewer N 148.05 14 805.00, 3. 0171.O100 017123 1 IS Cm56uRion Stalin 15000.00 I5000.c0 4. 0171.0102 017123 1 IS Red Line AfDollt Sury 5000.90 5DDn.CD 5. 0241.0550 U4113 400 IF Remove Guardra0 100) 4 An 6. 0241.2201 U 41 14 22 EA Rer-.4'Sewer Manhole 787.51 17 325.00 ]. 0330.0001 03300o in Cf [a,r Enrage Sewer Pie 300.00 t 3OD0.00 6. 3110.0107 3110DO 12 EA Remove&Tmn lant3"T 200.00 I 240D.00 9. 3125.0101 312500 L LS 6WPPP>-1Arr. S 14437.50 1 14437.50 10. 3201.WO 32011E 4R73 LF Tem As htk Pavi R fr 2"FMACan 6'Cf8 27.001 131571.00 it. 3216.0101 321613 Soo LF 6"Unrrete Curb and Gv atch EMn 42.00 t 21.000.0 12. 3216A301 321611 60 SY 7"cone V U Gutter Residential 115.50 6.930.00 13. 330L0001 M0131 4E73 LF pre-=In 6.00 2923E.00 14. 3301.0002 M 01 31 4973 LF PmtCCfV I 5.25 25 583.25 15. 330L0101 390I30 27 EA Manlmie Vacuum Teetin 200.00 5400.00 1& 3305.0103 33n530 7 EA onto Excavation of Edson Udrtis 500.M 5 .00 17. 3305.0109 33 as In 4E73 0' tenth Sa 3A 19 D 14 .00 is. 3x5.D112 330517 27 FA [onrrete Lollar 682.50 18427,50 19. 3331.3101 333150 124 F4 4^Sewer Servire eD0.00 99200.00 ZD. 3339.0001 333060 169 VF E Manhole Liner 255.66 $ 48,32L58 21. 3339.1001 3339 26 EA 4'Manhole $ 6,B25.00 $ 177,450.00 333920 22. 3339.1001 333010. 1 EA W Dmp Manhole $ I1,025.W $ I1,025.00 333920 73, 3339.1003 333910, 40 VF 4 E/ Depth Manhole $ M2.13 $ 8,a%.00 333920 24. 1 3471.0001 347113 3 NO Tpffi,control 3341.63 u)024.66 25. 1 3475.0002 U71 IS 12 WK Paoble Nessa esi n 472.53 5,670.00 26. 1 9999.0000• L L5 Conslnnnon Nmveame 35 0D.00 35 .OD 27. 1 3305.0117 330510 50 CY C55 150.00 7500.00 28 9999 OOOOv Tx�s4U& 900 Lr Metal Beam 6.,,!Fence>A End Treotrre l5 $ 25.00 $ 10,000.00 SUBTOTAL UNIT II BID 1099323.38 TOTALAMOURTBID UN[TSI&II 3807804.50 2I13b Cantin en 761 80.90 Total 4,569,383R0 SAY 4 970 000.00 PRELIMINARY-FOR RGVILW ONLY TLeso doeumenu are for Design Review and wl iWcndnd for Con oivUon,Bidding or Permit P,op-1. They were prcp=d by.or under supervision of- 65295 LV512M Type ar PdutNw: PFd Pate Page 1 ATTACHMENT "C" CHANGES AND AMENDMENTS TO STANDARD AGREEMENT Water and Sanitary Sewer Replacement Contract 2019, WSM-D City Project No. 102300 List any changes to the Standard Agreement> None. City of Fort Worth,Texas Attachment C PMO Release Date:05.19.2010 Page 1 of 1 gGGaa� w ,V.,,,,.,, - �� :�e..N o I I I ' I , I LET alla � 3 _ ^{IngedY. 3 o, �:�Yr!a.°�;vl 3 g:dr'u:•!�n �'31w m� .16°,i I 1�1 - = m � 1 I ma yw 55 55 55 f��- 6l(5 55 55 sS 5 -�I p! ;'��,�� 3 y J I ' z wmd �.e eNe a ae ': zera�ee��r� a Saaa�ea'ala;TlaI aa'�3 I iaa,iN�e� !S, al 'tea € -� : a� qe a m 0 ....._..._ ... ._.. ..._ _..._........... 's a 5 0 a N n I Iffto E "SEWER REPLACEMENT CONTRACT 1�®19 WSM WATF_R/8VW VER HAP (,%h00t 1) ( . LONE AVL. FROM H. 27th ST. TO ANGLE AVFf.) 1 I f 4 Replace 575 ft sewer Irne + J{ "i ' ` ;; x• r r (L1536) r r . + , Replace 850 ft svuer Erne ch OF Replace 580 R Sewer line r�# �[ ,t � ti � Replace 575 R ssWer line t *� Replace 100 ft 10"W Nit Replace iDO ti 5"yv Ar , ' .�. } � ,fir'. M. /• +'f + .' "� �' }- ���4'1I Replace 1 Of)11 6"k+V ti Replace 765 ll f7 J'. �'' { Repine 8 Ft +, '. +4 sewer line(L-1?711 ''� � sewer line(L-1771) ti f to ad Y Replace 500 It sewer line ;"f *,' r ► { jr I +� (L-7694} Repiave 100 ft 6"VI! I ' +`J,f,��yyy, 5 1. .�•(�.F} � III f L PY ZIA �% hy(•�. r {.1-J�, _ �� t b r� ,l •af'�� �+;- 1 I �'' 4}[�} .'i fk "yI Replace 4000 ft 18"Y1+ �,•. 3j 4� feEalxce10[7 ft 10'W �'4' f' ;: r i+►,'�'.. AL Fte{[lars 100 ft 20"W � y�; � Fte lace 350 it i 2"W Replace-I00 R 24"Wry .'�. '�.: ++y$ -01 N r Ret}lace ti00 ftsewer line ` '- 1 ,. . , A. �. Prop. Sewe r •. Prop. Water •: WA 9 ER SEWER REPLACEMENT CONTRACT (W. LONG AVE. FROM N.W 27th ST. TO AWGLL AVE.) &1 I V y" /Vq� {' � pC1E'A�E, "c�Iv�ri>dsr k " Knru7vVN, "- 014 ". 'I,.:' +'��/A��►O/ �� _ _ ,. ��y �� �' ` lice . . f Replace 1 N!FE B"W � Replace 1 Q0[t fi"wCy Replace 100 tt 6"W - + R — +r - IUJ KNOWA da .k'`� u." * . :r '., ' dyy�' y ' 4 yj,•� �:4 i;,r;;'# * r* "'. r:,� Replaf.fi 100 It r"s J° M1 Re�Rac 100 If 8-V+� �iS ^ # Mo ,� ' f •.� ?r-'��1 •��K• LLI F. r;� see Fep[acei00!!6"1�V °8"G;1- ' •'SgD;ll. y I ,• r �fi �:iF + W� * {f ' �Qr i', '1 �� _ z1 .+ ti Co {k� i ,- _ � W �� yy,.f'1 h* t• Replace 'Mo sl 6"W �' •' '" �}• f' 5 + . . 'J �C.•'��4Y I .} -p ate., 14 W + •li' �Y '"' '� Y '�1• '' , ..1 Imo' ' Y �� r.. � ` _ ' YT -..Llr I - ` W I�" I ,� :u J"" ` �yI��I 'L I- I F "�. Itl•�- ",:�Iti {Q� �} ~�� J 'VI" � ..... ' Replace IDOItsewer line(L-38, � rl fl 1•.� �' �_1' I; -Y I n ZI+ i• i - :i$�$'rsST. �°— ' � ' �_�� I k �r + .a ��}JIF.. •'� I -719 _— W �y LLI Pro [l EWe m > �+ �* -- -- - — - Prop. Water ' ;+�'f� j - � �` *��, f ,•. �.,4: City of Fort Worth, Texas Mayor and council Communication DATE: 02/18/20 M&C FILE NUMBER: M&C 20-0094 LOG NAME: 602019WSMD-NEELS] SUBJECT Authorize Execution of an Engineering Agreement with Neel-Schaffer, Inc., in the Amount of$300,577.00 for Water and Sanitary Sewer Replacement, Contract 2019 WSM-D Project,and Adopt Appropriation Ordinance(COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of an Engineering Agreement with Neel-Schaffer, Inc.,in the amount of$300,577.00 for Water and Sanitary Sewer Replacement, Contract 2019 WSM-D project(City Project No. 102300); and 2. Adopt the attached Appropriation Ordinance increasing estimated receipts and appropriations in the Water&Sewer Capital Projects Fund in the amount of$474,477.00 transferred from available funds within the Water&Sewer Fund. DISCUSSION: This Mayor and Council Communication is to authorize the preparation of plans and specifications for Water and Sanitary Sewer main replacements as indicated on the following street and alleys,located in the Far Greater Northside Historical Neighborhood Association area: _Street From To Scope W.Long Avenue NW 27th Angle WaterlSewer Streef Avenue AileY between NW 27th Street West Long Menefee Sewer and NW 28th Street ]Avenue Avenue �Alley between NW 27th Street West g Lan 500 feet Sewer _and NW 28th Street Avenue West Alley between NW 28th Street West Long Kearney Sewer and Loraine Street Avenue _Avenue Alley between Loraine Street West Long Kearney Sewer and NW 29th Street ]Avenue Avenue Alley between NW 29th Street West.Lang Kearney Sewer and NW 30th Street Avenue Avenue Alley between NW 29th Street West Long 80 feet Sewer and NW 30th Street Avenue East Alley between NW 30th Street West Long 400 feet Sewer and NW 31st Street Avenue West Alley between NW 30th Street West Long L50 feetand NW 31st Street Avenuet In addition to the contract amount,$173,900.00(Water:$100,000.00;Sewer:$73,900.00)is required for project management,real property acquisition,utility coordination and material testing. This project will have no impact on the Water Department's operating budget when completed.Design is expected to start in February 2020 and be completed by June 2021.The project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. Appropriations for Water and Sanitary Sewer Replacement,Contract 2019 WSM-D,W. Long Avenue,are as depicted below: Fund Existing Additional Project Appropriations Appropriations Total* W&S Capital Projects $0 00 $474,477A0 $474,477.00 -Fund 56002 Project Total $0.00 $474,477.00 $474,477.00 *Numbers rounded for presentation. MANBE OFFICE: Neel-Schaffer,Inc., is in compliance with the City's BDE Ordinance by committing to 22 percent SBE participation on this project.The City's SBE goal on this project is 12 percent. The project is located in COUNCIL DISTRICT 2. FISCAL INFORMATION!CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance,funds will be available in the Water and Sewer Capital Projects(W&S Capital Projects) Fund. Prior to any expenditure being incurred,the Water Department has the responsibility of verifying the availability of funds. Submitted for City Manager's Office b Dana Burghdoff 8018 Originating Business Unit Head: Chris Harder 5020 Additional Information Contact: Liam Conlon 6824 rn ■ ■ o cn (P cn (31 cTTn m tn, Cn CTnn cry cn cn a cn (nn (TYi cn cn (.n 0 cn cn � V T T V � � T T 0) VJ J V! VJ I 0) 0) 0) V/ V+ 0) 0) VJ V/T V' C aaoo ooCaaO000C� OO0000aao 0 aOoo oaC� aO0000aaa000CDOo N N N N N N N N N N N N N N N N ' z m O a O O a a o O a a O O O CD o a a a O O a O m -1 -4 W W � -4 � y y � � -4 v -A -4 0 W W W W W W Cl a a 0 a 0 0 Cl a o a 0 0 0 a a a a 0 o a a O LD a CD • a 0 0 0 0 0 a a a C7 a 0 a 0 0 0 o a • 'n A O 4P O W N W N W W W W W W W W W W W W W W W W W W -Aa (D a C) a a o 0 0 C) a C) 0 0 0 0 (D a s C) C) a m cn .A. (n cn cn cn cn cn cn cn cn 0 cn 4 cn cn cn cn cn cn .A m (D (0 (D (D W W 0 W -I W 1 �f W 1 (D W W Ul W W I (D -n c�/ rn V l{�i Ol ()IeJ (e'�Ye�] W � � W - W (.n -' W � W -' Ul V 0) VJ i O a a a C] o a a a a W O C] a a 0 O 0 • 0 0 0 0 W On " W O Ul - o (n O (W cn 1 W cn -I a C) 0 0 a cn C) a cn C5 C] 1 a a a c n 0 C) f n a C7 0 o o y a o 0 o o o 0 3 0 0 1 co O o o a Ca 0 0 0 0 o a a a o 0 0 0 0 0 0 N N • N N N N N IN N N N N N N N N N N IN N CO W W W W W W W W W W W W W W W W W W W o a ` o 0 0 o a o �Cl 0 o a 0 Cl 0 0 o a a o C) a a 0 Cl 0 a 0 0 0 0 o a 0 0 0 a a 0 0 a o ooaaaoo000 ooCDaao 0 0 0 o a 0 0 0 0 0 o a o 0 0 o a o �! �I --4 -4 v � -4 � V y � v � � � V W W c0 co W --I -P 4:�, 4 �A co W co Oo W �l W w C) a -A 4 C] a a 0 0 0 0 a -P 4 o a a 0 n �■ • r (p co N N N N N N N N Na N N N N N N N N N • co co a a a a 0 0 o a a 0 0 o a a 0 0 0 0 co to N N N N N N N N Na N N N N N N N N N co CD o a 1c) 0 0 0 o a a a o Cl a 0 0 a 0 0 r. W GJ ffl N tA W • N N ffl 1 fi9 ffl 69 40 Efl - -I W 4�-- b9 W Efl 69 N .A N • P co • W N N 1 N N NA�k N 3 W (D -I W N M -I OD C O W -A W do a cn a 0 0 0 a a � OO o cn 4A1 N .A w W O CO C) a 0 0 0 CD a a W C) W (n a 0 a W Ul W 00 (D o a a o o CD a s OD O CO a a o O M O (D 0 C) 0 0 0 o a C) 0 0 0 0 0 0 0 o n 0 0 0 0 0 0 o C) 0 0 0 0 0 0 0 0 o a 0 0 0 o a 0 0 N N CF) W O O N N O 11 � O O • cn al W W O O W W W W O O • Ul U1 O O O O N "CD • • W W O O O O • O O —A. —5 --A —4 W W O O ■s • co flo • • CO (O y CO (O -69 w -69 N) N OOo • M� W 66 O O Ilk 8 � a s z g a � a g s