Loading...
HomeMy WebLinkAboutContract 52222-CO2 FORT `FORTH City of Fort Worth CITY SECRETARY. RECEIVED Change Order Request aaaa-co a 0 20fdoject Name:I Sedimentation Basin Sludge Removal System Replacement City Sec No.: 52222 CI SFORTft*ject No.(s): 56016-0600430-CO5383 DOE No. N/A City Proj.No.: CO2328 Project Description: North Holly Water Treatment Plant-Sedimentation Basin Sludge Removal System Replacement Contractor: BAR Constructors,Inc. Change Order# Date: 2/24/2020 City Project Mgr.1 Dena Johnson APAI Inspector: I Joshua Wheeler Phone Number:1 817-392-7866 -1 Phone Number: 817-991-6640 Dept. Water Sewer Totals Contract Time (Calender days) Original Contract Amount $7,528,000.00 $7,528,000.00 425 Extras to Date $10,762.50 $10,762.50 030 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $7,538,762.50 $7,538,762.50 455 Amount of Proposed Change Order $10,829.79 $10,829.79 089 Revised Contract Amount - $7,549,592.29 $7,549,592.29 544 Original Funds Available for Change Orders $225,840.00 $225,840.00 Remaining Funds Available for this CO $215,077.50 $215,077.50 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.29% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+2591.) $9,410,000.00 JUSTIFICATION(REASONS)FOR CHANGE ORDER City staff asked to replace the six(6)8" plug valves in the sludge Valve Vault with six(6)8"gate valves due to maintenance concerns.Similar to the plug valves,the gate valves shall be furnished with electric motor acuators. Furnish the gate valves in accordance with Section 40 05 61 and install in a configuration that is similar to what is shown for the plug valve installation on sheets M-012 and M-013 of the drawings. Coordinate and furnish the electric motor actuators in accordance with Section 40 05 57.23.The gate valves and actuators shall be for modulating service and shall be assembled,calibrated,and tested by the valve supplier per Section 40 05 57.33. Plummer views the $10,829.79 contract modification as reasonable and recommends proceeding with the cost component of PCM-002. Bar advised that replacing the plug valves with gate valves modified with custom made electric motor acuators will delay the delivery of the gate valves until November 2020.Accordingly, Bar has requested a 89 day schedule extension to provide sufficient time for equipment installation. Plummer views the 89 day schedule extension as reasonable for the stated reason and recommends authorizing the extension as long as the City is able to have sedimentation basins available and can operate them manually for sludge blow downs. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Company_I�ame_ _ Contractor Name Contractor, nature Date BAR Constructors, Inc. Isidro Arrambide '2,� Inspec)9,N D to Project M n r Da 00. v u 2 ti o MS�A 3 �► ZD Dire, . Water Dep) 0.. Date Sr. apital.Pr 'ec s fficer.(Water Dept) _ D to 3 f zo (aA Assis nt_Q 4 ity Attorney Date, Assista t City,Managgr Date Council Action(If Required) M&C Number N/A M&C Date Approved - J F w0puryi City of Fort Worth Change Order Additions Project Name Sedimentation Basin Sludge Removal System Replacement City Sec No.: 52222 Project No.(s): 56016-0600430-CO5383 DOE No. N/A City Proj.No.: CO23228 Project North Holly Water Treatment Plant-Sedimentation Basin Sludge Removal System Replacement Description Contractor BAR Constructors, Inc. Change Order:= Date: 2/24/2020 City Project Mgr, Dena Johnson City Inspector Joshua Wheeler ADDITIONS ITEM DESCRIPTIOR DEPT Qty Unit Unit Cost Total 8 Gate Valves with Electri Morter Actuators as described in PCM-002 Water 1.00 LS $10,829.79 $10,829.79 Water $10,829.79 Sewer Page 2 of 4 Additions Sub Total $10,829.79 FORT WORTH City of Fort Worth w Change Order Deletions Project Name Sedimentation Basin Sludge Removal System Replacement City Sec No.: 52222 Project No.(s): 56016-0600430-CO5383 DOE No. N/A City Proj.No.: I CO2328 Project Description North Holly Water Treatment Plant-Sedimentation Basin Sludge Removal System Replacement Contractor BAR Constructors,Inc. Change Order: M Date 2/24/2020 City Project Mgr. Dena Johnson City Inspector: F Joshua Wheeler DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total Water Sewer Page 3 of 4 IDeletions Sub Total M1WBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Chanae Orders co# DATE AMOUNT Total $"u."uu Page 4 of 4 Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Oli u � Signature A Name of Employee Title s A by. Mart'J. ay tart' L EC®R®ETARY S,