HomeMy WebLinkAboutContract 52222-CO2 FORT `FORTH City of Fort Worth CITY SECRETARY.
RECEIVED Change Order Request
aaaa-co a
0 20fdoject Name:I Sedimentation Basin Sludge Removal System Replacement City Sec No.: 52222
CI SFORTft*ject No.(s): 56016-0600430-CO5383 DOE No. N/A City Proj.No.: CO2328
Project Description: North Holly Water Treatment Plant-Sedimentation Basin Sludge Removal System Replacement
Contractor: BAR Constructors,Inc. Change Order# Date: 2/24/2020
City Project Mgr.1 Dena Johnson APAI Inspector: I Joshua Wheeler
Phone Number:1 817-392-7866 -1 Phone Number: 817-991-6640
Dept. Water Sewer Totals Contract Time
(Calender days)
Original Contract Amount $7,528,000.00 $7,528,000.00 425
Extras to Date $10,762.50 $10,762.50 030
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $7,538,762.50 $7,538,762.50 455
Amount of Proposed Change Order $10,829.79 $10,829.79 089
Revised Contract Amount - $7,549,592.29 $7,549,592.29 544
Original Funds Available for Change Orders $225,840.00 $225,840.00
Remaining Funds Available for this CO $215,077.50 $215,077.50
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.29%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+2591.) $9,410,000.00
JUSTIFICATION(REASONS)FOR CHANGE ORDER
City staff asked to replace the six(6)8" plug valves in the sludge Valve Vault with six(6)8"gate valves due to
maintenance concerns.Similar to the plug valves,the gate valves shall be furnished with electric motor acuators.
Furnish the gate valves in accordance with Section 40 05 61 and install in a configuration that is similar to what is
shown for the plug valve installation on sheets M-012 and M-013 of the drawings. Coordinate and furnish the electric
motor actuators in accordance with Section 40 05 57.23.The gate valves and actuators shall be for modulating service
and shall be assembled,calibrated,and tested by the valve supplier per Section 40 05 57.33. Plummer views the
$10,829.79 contract modification as reasonable and recommends proceeding with the cost component of PCM-002.
Bar advised that replacing the plug valves with gate valves modified with custom made electric motor acuators will
delay the delivery of the gate valves until November 2020.Accordingly, Bar has requested a 89 day schedule
extension to provide sufficient time for equipment installation. Plummer views the 89 day schedule extension as
reasonable for the stated reason and recommends authorizing the extension as long as the City is able to have
sedimentation basins available and can operate them manually for sludge blow downs.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company_I�ame_ _ Contractor Name Contractor, nature Date
BAR Constructors, Inc. Isidro Arrambide '2,�
Inspec)9,N D to Project M n r Da
00. v u 2 ti o MS�A 3 �► ZD
Dire, . Water Dep) 0.. Date Sr. apital.Pr 'ec s fficer.(Water Dept) _ D to
3 f zo (aA
Assis nt_Q 4
ity Attorney Date, Assista t City,Managgr Date
Council Action(If Required)
M&C Number N/A M&C Date Approved -
J
F w0puryi City of Fort Worth
Change Order Additions
Project Name Sedimentation Basin Sludge Removal System Replacement City Sec No.: 52222
Project No.(s): 56016-0600430-CO5383 DOE No. N/A City Proj.No.: CO23228
Project North Holly Water Treatment Plant-Sedimentation Basin Sludge Removal System Replacement
Description
Contractor BAR Constructors, Inc. Change Order:= Date: 2/24/2020
City Project Mgr, Dena Johnson City Inspector Joshua Wheeler
ADDITIONS
ITEM DESCRIPTIOR DEPT Qty Unit Unit Cost Total
8 Gate Valves with Electri Morter Actuators as described in PCM-002 Water 1.00 LS $10,829.79 $10,829.79
Water $10,829.79
Sewer
Page 2 of 4 Additions Sub Total $10,829.79
FORT WORTH City of Fort Worth
w Change Order Deletions
Project Name Sedimentation Basin Sludge Removal System Replacement City Sec No.: 52222
Project No.(s): 56016-0600430-CO5383 DOE No. N/A City Proj.No.: I CO2328
Project Description North Holly Water Treatment Plant-Sedimentation Basin Sludge Removal System Replacement
Contractor BAR Constructors,Inc. Change Order: M Date 2/24/2020
City Project Mgr. Dena Johnson City Inspector: F Joshua Wheeler
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Water
Sewer
Page 3 of 4 IDeletions Sub Total
M1WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Chanae Orders
co# DATE AMOUNT
Total $"u."uu
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.