HomeMy WebLinkAboutOrdinance 4917 pORMLL ITY trRrPC.D
4.
j.. FT. WaRTH, TEX.
ORDINANCE NO. _�� ►J /
AN ORDINANCE DETERMINING THE NECESSITY OF AND PROVIDING
FOR A SANITARY SEWER MAIN PROJECT FROM A POINT AT THE
INTERSECTION OF BRENTWOOD-STAIR ROAD AND EAST LOOP,
THENCE, SOUTHWESTERLY TO ITS CONNECTION WITH MAIN 238,
REQUIRING THE DEPOSIT OF A CERTAIN PORTION OF THE ESTI-
MATED COST PRIOR TO CONSTRUCTION; PROVIDING THAT CERTAIN
CONNECTING CHARGES SHALL BE DUE PRIOR TO APPLICATION
BEING MADE FOR A PLUMBING PERMIT; PROVIDING FOR REFUNDS
OF CERTAIN CONNECTION CHARGES; INCORPORATING THE APPLI-
CABLE PROVISIONS OF THIS ORDINANCE IN THE DEVELOPER'S
CONTRACT PROVIDING FOR CONSTRUCTION OF THIS PROJECT;
PROVIDING A SAVINGS CLAUSE; AND NAMING AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS:
SECTION 1.
That the City Council of the City of Fort Worth,I in the exercise
of its sound discretion, deems it necessary and finds thadpublic necessity
requires that a project consisting of a sanitary sewer main be constructed
from a point at the intersection of Brentwood-Stair Road and East Loop,
thence, southwesterly to its connection with Main 238, such project being
designated on the map attached and hereby made a part of this ordinance,
for the purpose of providing sanitary sewer service to Lots 1, 2 and 3,
Seddon Addition, and suct-other property situated adjacent to or downstream
from the tract, which, when connections are made, will deposit sewage into
the sanitary sewer main shown on the map attached, all of which real property
is located in the City of Fort Worth, Tarrant County, Texas; and that public
necessity requires that certain connection and pro-rata share construction
cost charges be fixed and determined prior to the construction of such
sanitary sewer project.
SECTION 2.
In accordance with the provisions of Section 29: Article 1175, of
the Revised Civil Statutes of the State of Texas, it is hereby determined
that the owners of property to be served by the subject sanitary sewer
facility shall be required to pay a connection charge. The connection
change includes a pro-rata share of the cost of constructing said sewer main,
and is hereby determined to be Six Hundred Ten and 66/100 Dollars ($610.66).
�T8TEX.
CITY
SECTION 3-
Prior to the construction of the project, an amount of money
equivalent to seventy-five per cent (75) of the total estimated cost of
the project shall be deposited with the City. Such deposit shall be
applied to the cost of the construction of the project herein provided for.
SECTION 4.
Applicable connection charges not deposited prior to the
commencement of construction of the project, as set forth in Section 3,
shall be due and payable to the City of Fort Worth at such time as a contract
with the City for extension of community facilities into the area is entered
into, or at the time an application is made for a plumbing permit to allow
connection of the building sites on the property hereinabove described to
the sanitary sewer system provided for herein, whichever shall occur first.
SECTION 5•
In the event any of such property owners whose real property
will be served by the subject sewer main initially deposits with the City
of Fort Worth an amount in excess of the total connection charges for all
present or potential building sites owned by such property owner, he shall
be eligible for refund of that portion of the deposit in excess of the total
amount of the connection charges allocable to all of his building sites. All
such refunds shall be paid solely from future connection charge payments
deposited by other benefiting building site owners served directly or
indirectly by the sanitary sewer main herein provided for, and from no other
source. Refunds shall only be made from connection charges collected by
the City of Fort Worth after the construction of the project. No refund
shall be made on this project after twenty years from the date of passage
of this ordinance.
SECTION 6.
The Epplicable provisions of this ordinance shall be incorporated
into the developer's contract which shall provide for the installation of
community facilities under consideration in this ordinance, and into subse-
quent contracts for installation of other community facilities in this
drainage area.
• M
SECTION 7•
This ordinance shall be and is hereby declared to be cumulative
of all other ordinances of the City of Fort Worth providing for the construc-
tion, installation, and connection charges of sanitary sewer service mains
and service lines to building sites, and shall not operate to repeal or
affect any such ordinance or ordinances except insofar as the provisions of
such ordinance or ordinances are inconsistent or in conflict with the provi-
sions of this ordinance, in which instance or instances such conflicting in
said other ordinance or ordinances shall be and are hereby repealed.
SECTION 8.
If any section, sub-section, sentence, clause or phrase of this
ordinance is for any reason held to be unconstitutional, such decision shall
not affect the validity of the remaining portions of this ordinance, and all
the remainder of this ordinance not so declared to be invalid shall continue
to be in full force and effect. The City Council of the City of Fort Worth,
Texas, hereby declares that it would have passed this ordinance and each
section, sub-section, sentence, clause or phrase thereof irrespective of the
fact that any one or more sections, sub-sections, sentences, clauses or
phrases be declared unconstitutional.
SECTION 9•
This ordinance shall tape effect and be in full force and effect
from and after the date of its passage, and it is so ordained. The City
Secretary is directed to cause a certified copy of this ordinance to be
filed of record with the County Clerk of Tarrant County, Texas.
APPROVED AS TO FORM AND LECAIITY:
S. G. Johndroe, Jr., City Attorney
Yee gift
khr. pooku
`.
City of Fort Worth Texas oFFFIC-�-R
Tti;t
Mayor and Council Communi aD TARY
DATE REFERENCE SUBJECT: PAGE
NUMBER Proposed Developer's Contract,
6/17/63 C-102 SApddon .Addition 1 of 2
Mr, Joe B. 0w1!vn.. an individual, developer of Seddon Addition, has executed
a proposed developer's contract for sanitary sewers, street lights, street
improvements and storm drains to serve Trots 1, 2 and 3 of the addition. The
estimated cost of the public facilities are as follows
TOTAL DEVEMPER C
Street Improvements
Construction. 500 M 500.00 -0m
Engineering 50,00 mom 50-00
Storm Drains 400,0o 400.00 m0-
Street Lights 2,145.00 2,145,00 -0-
Sanitary Severe ll,120,81 88360e6o 2,760,21
$14,2.3.4 $n..405,6o $2,810,21
The street improvements required of the developer consist of constructing
and gutter along one side of one street, all other street improvements are
being constructed by the Texas Turnpike Authority and the Texas Highway Aepart—
meat in connection with construction of the Fast hoop and the Twmpihe Inter-
change. The City's epZineering costs for street iVrovemonte will be paid
from Project Noo 97-Hm501, Miscellaneous Street Engineering in new additions.
The sanitary sever to be constructed is consid d an approach main and has a
potential for seven connections in additioil to -use for this development,
Based on the estimated cost of the Mary sewer main, the charge will
10,66, per connaetion, which the City will collect and pay to the developer,
in accordance with the policy for installation of sanitary sever mains,
Financing for the City's share of the sever cost will be arrangid when .^the
construction contract is awarded,
Imomediately adjacent to lots 1, 2 and 3, Seddon Addition, is Tract "e,
Seddon Additions., a large tract which the developer has not let made
definite glans for doping. In the proposed contract, the developer
agrees to enter into a developer's contract for the necessary facilities for
tract "A" before requesting a building permit or connection to the sever on
tract "A",
h j
DATE REFERENCE SUBJECT: PAGE
NUMBER Proposed Developer's Contract..EA 1 6 C�102 SeddonAddition —-�`— of .�`
OFFICIAL RILcoR
CITY SECRETAR
fhe following recowwndations we made:
ET. WORTH, TEX,]
1) That the City Manager be authorized to execute the proposed contract ob
behalf d the City.
2) That an ordinance be adopted establishing the charge of $610*66 per
connection to the sanitary sewer approach main.
JLBa nr
SUBMITTED BY: DISPOSITIO.Ft,BY COUNCIL: e
ESSUB
f) PPROV D El BY
(DESCRIBE)
SECRETARY
G DATE
CITY MANAGER z -// 4