HomeMy WebLinkAboutContract 53703 Received Date: 8:52 AM
Received Time:03/27/20
Developer and Project Information Cover Sheet:
Developer Company Name: Forestar(USA)Real Estate Group Inc.
Address, State,Zip Code: 2221 E.Lamar Blvd, Suite 700,Arlington,TX,76006
Phone&Email: 972-341-2906,MattJohnsonAforestargroup.com
Authorized Signatory,Title: Daniel C.Bartok,Chief Executive Officer
Project Name: Bar C Ranch Phase 8
Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights
Project Location: =8900 Wagley Robertson Rd.
Plat Case Number: PP-48-0994, Plat Name: Bar C Ranch
FP-18-131
Mapsco: Council District: 7
CFA Number: CFA19-0101 City Project Number: 102179
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Bar C Ranch Phase 8 CITY SECRETARY
CFA Official Release Date:02.20.2017
Page 1 of 14 FT. WORM T
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 53703
WHEREAS, Forestar (USA) Real Estate Group Inc. , ("Developer"), desires to make
certain specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as Bar C Ranch Phase 8 ("Project")
within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Bar C Ranch Phase 8 OFFICIAL RECURO
CFA Official Release Date:02.20.2017
CITY SECRETARY
Page 2 of 14
FT WORTH,TX
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) ®, Sewer(A-1) ®, Paving (B) ®, Storm Drain(13-1) ®, Street Lights & Signs
(C) ®.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Bar C Ranch Phase 8
CFA Official Release Date: 02.20.2017
Page 3 of 14
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces,to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Bar C Ranch Phase 8
CFA Official Release Date: 02.20.2017
Page 4 of 14
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character,whether real or asserted,brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from,or in any way connected with,the construction of the infrastructure contemplated
herein,whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers, servants, or employees.
Further,Developer will require its contractors to indemnify, and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Bar C Ranch Phase 8
CFA Official Release Date: 02.20.2017
Page 5 of 14
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement-Bar C Ranch Phase 8
CFA Official Release Date: 02.20.2017
Page 6 of 14
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel; and(2)will not boycott Israel during the term of the contract.
IMMIGRATION AND NATIONALITY ACT
R. Developer shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification
Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms
and supporting eligibility documentation for each employee who performs work under this
Agreement. Developer shall adhere to all Federal and State laws as well as establish
appropriate procedures and controls so that no services will be performed by any Developer
employee who is not legally eligible to perform such services. DEVELOPER SHALL
INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY
DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. City, upon written notice to Developer, shall have the right to immediately
terminate this Agreement for violations of this provision by Developer.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Bar C Ranch Phase 8
CFA Official Release Date: 02.20.2017
Page 7 of 14
Cost Summary Sheet
Project Name: Bar C Ranch Phase 8
CFA No.: CFA19-0101 City Project No.: 102179
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 627,348.06
2.Sewer Construction $ 799,613.10
Water and Sewer Construction Total $ 1,426,961.16
B. TPW Construction
1.Street $ 1,731,546.85
2.Storm Drain $ 1,346,450.90
3.Street Lights Installed by Developer $ 221,601.00
4. Signals $ -
TPW Construction Cost Total $ 3,299,598.75
Total Construction Cost(excluding the fees): $ 4,726,559.91
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 28,539.22
D. Water/Sewer Material Testing Fee(2%) $ 28,539.22
Sub-Total for Water Construction Fees $ 57,078.44
E. TPW Inspection Fee(4%) $ 123,119.91
F. TPW Material Testing(2%) $ 61,559.96
G. Street Light Inspsection Cost $ 8,864.04
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 193,543.91
Total Construction Fees: $ 250,622.35
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond= 100% $ 4,726,559.91 x
Completion Agreement=100%/Holds Plat $ 4,726,559.91
Cash Escrow Water/Sanity Sewer-125% $ 1,783,701.45
Cash Escrow Paving/Storm Drain=125% $ 4,124,498.44
Letter of Credit=125%w/2 r expiration period $ 5,908,199.89
City of Fort Worth,Texas
Standard Community Facilities Agreement-Bar C Ranch Phase 8
CFA Official Release Date: 02.20.2017
Page 8 of 14
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to he
executed in quadruplicate in each entity's respective name by its duly authorized signatories
effective as of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
Forestar(USA)Real Estate Group Inc.
n"ta- "—
Dana Burghd off(M r 26,2016)
Dana Burghdoff
Assistant City Manager Daniol Hi &ok
Date: Mar 26,2020 Daniel Bartok(Mar 26,2020)
Name: Daniel C. Bartok
Recommended by: Title: Chief Executive Officer
� Date: Mar 26,2020
Evelyn Ro (Mar 26,2020)
Evelyn Roberts/Jennifer Ezemack
Project Assistant
Planning and Development Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
Approved as to Form &Legality: administration of this contract, including
ensuring all performance and reporting
requirements.
Richard A.McCracken(Mar 26,2020)
Richard A. McCracken ear�&Ezel- aG`f 0&beGtaG�af
Assistant City Attorney Jennifer Ezernack on behalf of(Mar 26,2020)
M&C No. NSA Name: Janie Morales
Date: Title: Development Manager
Form 1295: N/A G
;7
ATTEST:
Mary J. Kayser/Ronald Gonzales
City Secretary/Assistant City Secretary
City of Fort worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Bar C Ranch Phase 8 CITY SECRETARY
CFA Official Release Date: 02.20.2017
Page 9 of 14 FT. WORTH,T
wB
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 - Changes to Standard Community Facilities Agreement
® Location Map
® Exhibit A: Water Improvements
® Exhibit A-1: Sewer Improvements
® Water and Sewer Cost Estimates
® Exhibit B: Paving Improvements
® Paving Cost Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Cost Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Bar C Ranch Phase 8
CFA Official Release Date: 02.20.2017
Page 10 of 14
ATTACIEMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 102179
None.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Bar C Ranch Phase 8
CFA Official Release Date: 02.20.2017
Page 11 of 14
ATTACHMENT "2"
Phased CFA Provision
City Project No. 102179
The improvements being constructed by Developer pursuant to this Agreement will
connect to improvements Developer is constructing under a separate Community Facilities
Agreement that have not been completed and accepted by the City. Therefore, this Agreement
shall be considered a"Phased CFA"and the provisions contained in this section shall apply to this
Agreement.
The improvements being constructed by Developer under the separate Community
Facilities Agreement shall be defined as the "Parent Project." The improvements being
constructed by Developer under this Agreement shall be defined as the "Child Project."
Developer acknowledges and agrees that due to Developer's election to construct a Phased
CFA, the potential exists for technical, delivery, acceptance or performance problems (hereinafter
"Construction Problems"). Construction Problems may include, but are not limited to: failure of
the improvements to comply with the approved plans or City Specifications; failure of the
improvements in the Parent Project and the Child Project to properly connect to each other;
changes to the design or construction of the improvements in the Parent Project that impact the
design and construction of the improvements in the Child Project; construction delays, delay
claims, or claims for liquidated damages; increased costs for the Developer; failure of the
improvements to pass inspection or material testing; or rejection by the City of some or all of the
improvements and Developer having to remove and reconstruct the improvements at Developer's
expense. In addition, Developer understands and agrees that disputes may arise between
Developer's contractors or their subcontractors relating to responsibility for the Construction
Problems. Developer shall be solely responsible for resolving disputes between contractors or
disputes between contractors and subcontractors.
Developer further acknowledges and agrees that Developer has notified all of Developer's
contractors for the Project that Developer has elected to construct a Phased CFA, the provisions
of this section, the risks associated with a Phased CFA, and that the City shall not bear any
responsibility for Developer's decision to proceed with a Phased CFA.
Developer shall not make the final connection of the improvements in the Child Project to
the improvements in the Parent Project until the improvements in the Parent Project have been
constructed and accepted by the City and the City has consented to Developer making the
connection.
Developer agrees that if this Agreement is for improvements relating to the construction,
renovation or modification of one or more single family residential homes or structures, the City
will not record the plat related to the Project until the improvements are constructed and accepted
City of Fort Worth,Texas
Standard Community Facilities Agreement-Bar C Ranch Phase 8
CFA Official Release Date: 02.20.2017
Page 12 of 14
by the City. Developer agrees that if this Agreement is for improvements relating to the
construction, renovation or modification of one or more commercial buildings or structures, the
Developer shall not receive a Certificate of Occupancy from the City for the building(s)related to
the Project until the improvements in this Agreement are constructed and accepted by the City.
Developer further understands and agrees that completion of the improvements under this
Agreement does not entitle Developer to obtain a final plat of the property until all other
requirements of Federal law, State law, or the City Code relating to the filing and recording of a
final plat have been met by Developer.
BY CHOOSING TO CONSTRUCT A PHASED CFA, DEVELOPER ASSUMES
ALL RISKS AND DEVELOPER SHALL BE LIABLE AND RESPONSIBLE FOR ANY
AND ALL DAMAGES, INCLUDING BUT NOT LIMITED TO ANY AND ALL
ECONOMICDAMA GES PROPERTYLOSS,PROPERTYDAMAGESANDPERSONAL
INJURY, (INCLUDING DEATH OFANYKIND OR CHARACTER, WHETHER REAL
OR ASSERTED. DEVELOPER HEREBYEXPRESSLYRELEASESAND DISCHARGES
CITY FROM ANY AND ALL LIABILITY FOR DAMAGES, INCLUDING, BUT NOT
LIMITED TOANYANDALL ECONOMICDAMAGES,PROPERTYLOSS,PROPERTY
DAMAGE AND PERSONAL INJURY(INCL UDING DEATH)ARISING OUT OF OR IN
CONNECTION WITH,DIRECTLY OR INDIRECTLY, THE CONSTRUCTION OF THE
IMPROVEMENTS OR DEVELOPER'S DECISION TO CONSTRUCT A PHASED CFA.
DEVELOPER,AT ITS SOLE COSTAND EXPENSE,AGREES TO AND DOES HEREBY
INDEMNIFY, DEFEND PROTECT, AND HOLD HARMLESS CITY, AND CITY'S
OFFICERS, REPRESENTATIVES, AGENTS, EMPLOYEES, AND SERVANTS FOR,
FROMANDAGAINSTANYANDALL CLAIMS(WHETHER ATLA W OR INEQUITI9,
LIABILITIES, DAMAGES (INCLUDING ANY AND ALL ECONOMIC DAMAGES,
PROPERTYLOSS, PROPERTYDAIVIAGES AND PERSONAL INJURIES INCLUDING
DEATH LOSSES, LIENS, CAUSES OF ACTION, SUITS, JUDGMENTS AND
EXPENSES (INCLUDING, BUT NOT LIMITED TO, COURT COSTS, ATTORNEYS'
FEES AND COSTS OF INVESTIGATION), OF ANY NATURE, KIND OR
DESCRIPTION ARISING OR ALLEGED TO ARISE BY OR IN ANY WAYRELATED
TO CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S CHOICE TO
CONSTRUCT A PHASED CFA, OR (2) BY REASON OF ANY OTHER CLAIM
WHATSOEVER OF ANY PERSON OR PARTY OCCASIONED OR ALLEGED TO BE
OCCASIONED IN WHOLE OR IN PART BY THE CONSTRUCTIONS OF THE
IMPROVEMENTS OR DEVELOPER'S CHOICE TO CONSTRUCT A PHASED CFA
WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN
WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT
WORTH,ITS OFFICERS SERVANTS, OR EMPLOYEES.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Bar C Ranch Phase 8
CFA Official Release Date: 02.20.2017
Page 13 of 14
DEVELOPER:
FORESTAR(USA)REAL ESTATE GROUP INC.
Daniel Ba&ok
Daniel Bartok(Mar 26,2020)
Name: Daniel C. Bartok
Title: Chief Executive Officer
City of Fort Worth,Texas
Standard Community Facilities Agreement-Bar C Ranch Phase 8
CFA Official Release Date: 02.20.2017
Page 14 of 14
00 42 43
DAP-BID PROPOSAL
Page I of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
t of Bid
Bidlist Item Uni
Description Specification Section No. Unit Price Bid Value
No. Measure Quantity
UNIT I:WATER IMPROVEMENTS
1 3305.0109 Trench Safety 33 05 10 LF 9457 $0.10 $945.70
2 3305.1003 20"Steel Casing By Open Cut 33 05 22 LF 48 $132.20 $6,345.60
5 3311.0001 Ductile Iron Water Fittings w/Restraint TON 5.36 $9,792.00 $52,436.16
3311 12
6 3311.0261 8"PVC Water Pipe 3311 12 LF 8694 $26.20 $227,782.80
7 3311.0461 12"PVC Water Pipe 3411 12 LF 687 $39.40 $27,067.80
8 3312.0001 Fire Hydrant 33 12 40 EA 15 $5,334.00 $80,010.00
9 0117 Connection to Existing 4"-12"Water EA 3 $1,639.00 $4,917.00
Main 33 12 25
10 3312.2003 1"Water Service 33 12 10 EA 219 $791.00 $173,229.00
11 3312.2203 2"Water Service 33 12 10 EA 4 $2,659.00 $10,636.00
12 3312.3003 8"Gate Valve 33 12 20 EA 28 $1,392.00 $38,976.00
13 3312.3005 12"Gate Valve 34 12 20 EA 2 $2,501.00 $5,002.00
12
13
14__
15
16
17
18
19
20
21
22_
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
43
44
TOTAL UNIT I:WATER IMPROVEMENTSI $627,348.06
CITY OF FORT NORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Fomi Version May 22,2019 Bar C Ranch PH3 00 42 43—Bid Proposal_DAP.xIs
00 42 43
DAP-BID PROPOSAL
Page 2 or 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Description Specification Section No. Unit of Bid Unit Price Bid Value
No. Measure Quantity
UNIT II:SANITARY SEWER IMPROVEMENTS
1 3301.0002 Post-CCTV Inspection 3301 31 LF 6880 $4.60 $31,648.00
2 3301.0101 Manhole Vacuum Testing 3301 30 EA 40 $201.00 $8,040.00
3 3305.1003 20"Steel Casing By Open Cut 33 05 22 LF 75 $132.20 $9,915.00
4 3305.0109 Trench Safety 33 05 10 LF 6880 $0.60 $4,128.00
5 3331.3101 4"Sewer Service(SDR-26,ASTM EA 208 $1,023.00 $212,784.00
D3034) 3331 50
6 3331.4115 8"Sewer Pipe(SDR-26,ASTM D3034)33 11 10,33 31 12, LF 4524 $43.40 $196,341.60
3331 20
7 3331.4116 8"Sewer Pipe,CSS Backfill 33 11 10,33 31 12, LF 220 $55.90 $12,298.00
33 31 20,33 05 10
8 12"Sewer Pipe(SDR-26,ASTM D3034) 33 11 10,33 31 12, LF 1778 $49.80 $88,544.40
33 31 20,33 05 10
9 12"Sewer Pipe,CSS Backfill 33 11 10,33 31 12, LF 215 $62.30 $13,394.50
33 31 20,33 05 10
10 3331.4212 12"DIP Sewer 3311 10 LF 136 $110.10 $14,973.60
11 3339.0001 Epoxy Manhole Liner 33 39 60 VF 63 $288.00 $18,144.00
12 3339.1001 4'Manhole 33 39 10,33 39 20 EA 36 $3,702.00 $133,272.00
13 3339.1002 4'Drop Manhole 33 39 10,33 39 20 EA 1 $5,410.00 $5,410.00
14 3339.1003 4'Extra Depth Manhole 33 39 10,33 39 20 VF 175 $98.00 $17,150.00
15 9999.0001 Manhole over Existing Line 00 00 00 EA 2 $6,341.00 $12,682.00
16 9999.0002 Drop Manhole over Existing Line 00 00 00 EA 1 $13,585.00 $13,585.00
17 9999.0003 Connect to Existing Manhole 00 00 00 EA 1 $7,303.00 $7,303.00
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
TOTAL UNIT II:SANITARY SEWER IMPROVEMENT $799,613.10
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Four Version Map 22,2019 Bar C Rauh PHS 00 42 43_Bid ProposalDAP.xIs
00 42 43
DAP-BID PROPOSAL
Page 3 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Unit of Bid
No Description Specification Section No. Measure Quantity Unit Price Bid Value
UNIT III: DRAINAGE IMPROVEMENTS
1 0000.0241 Remove Headwall/SET 0241 14 EA 1 $2,559.00 $2,559.00
2 0000.3137 Concrete Riprap 0341 14 SY 64 $222.00 $14,208.00
3 3137.0102 Large Stone Riprap,dry 31 3700 SY 399 $89.00 $35,511.00
4 3305.0109 Trench Safety 33 05 10 EA 4818 $0.20 $963.60
5 3341.0201 21"RCP,Class III 3341 10 LF 473 $53.10 $25,116.30
6 3341.0205 24"RCP,Class III 3341 10 LF 1973 $62.10 $122,523.30
7 3341.0208 27 RCP,Class III 3341 10 LF 693 $69.30 $48,024.90
8 3341.0302 30"RCP,Class 111 3341 10 LF 322 $81.30 $26,178.60
9 3341.0305 33"RCP,Class III 3341 10 LF 241 $96.50 $23,256.50
10 3341.0309 36"RCP,Class III 3341 10 LF 571 $113.30 $64,694.30
11 3341.0312 39"RCP,Class III 3341 10 LF 41 $139.60 $5,723.60
12 3341.1601 9x5 Box Culvert 3341 10 LF 504 $565.70 $285,112.80
13 3349.0001 4'Storm Junction Box 33 49 10 EA 13 $3,939.00 $51,207.00
14 3349.0002 5'Storm Junction Box 33 49 10 EA 1 $4,514.00 $4,514.00
15 3349.0003 6'Storm Junction Box 34 49 10 EA 1 $5,089.00 $5,089.00
16 3349.4105 24"SET,1 pipe 33 49 40 EA 3 $2,513.00 $7,539.00
17 3349,4106 27"SET,1 pipe 33 49 40 EA 1 $2,846.00 $2,846.00
18 3349.4108 33"SET,1 pipe 34 49 40 EA 1 $3,134.00 $3,134.00
19 3349.4109 36"SET, 1 pipe 34 49 40 EA 1 $3,766.00 $3,766.00
20 3349.5002 10'Curb Inlet 33 49 20 EA 27 $3,939.00 $106,353.00
21 3349.5002 15'Curb Inlet 34 49 20 EA 1 $4,514.00 $4,514.00
22 3349.6001 10'Recessd Curb Inlet 34 49 20 EA 4 $4,284.00 $17,136.00
23 3349.7001 4'Drop Inlet 34 49 20 EA 2 $3,479.00 $6,958.00
24 9999.0001 Inlet Protection 31 2500 EA 34 $288.00 $9,792.00
25 9999.0002 Remove Abondoned Gas Line 00 00 00 LF 600 $15.00 $9,000.00
26 0466 6180 WINGWALL(PW-1)(HW=9 FT) TxDOT 446 EA 4 $39,963.00 $159,852.00
27 9999.0003 Pedestrian Hand Rail 00 00 00 LF 933 $251.00 $234,183.00
28 9999.0004 4.5'Concrete Flume 00 00 00 LF 563 $108.00 $60,804.00
29 9999.0005 Recyclex TRM-V 00 00 00 SY 491 $12.00 $5,892.00
30_
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT III:DRAINAGE IMPROVEMENT $1,346,450.90
CITY OF FORT NORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Fomi Version May 22,2019 Bar C Ranch PH8 00 42 43-Bid Proposal_DAP.xIs
00 42 43
DAP-BID PROPOSAL
Page 7 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Description Specification Section No. Unit of Bid Unit Price Bid Value
No. Measure Quantity
Bid Summary
UNIT I:WATER IMPROVEMENTS $627,348.06
UNIT II:SANITARY SEWER IMPROVEMENTS $799,613.10
UNIT III:DRAINAGE IMPROVEMENTS $1,346,450.90
UNIT IV:PAVING IMPROVEMENTS -
UNIT V:STREET LIGHTING IMPROVEMENTS
UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS -
Total Construction Bid $2,773,412.06
This Bid is submitted by the entity named below:
BIDDER: BY/
Powell Consh•uction,Inc.
P.O.Box 2967
McKinney,T\ 75070 TITLE: i' '
0- vo)( o
DATE: l
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 3 6�working days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Fomi Version May 22,2019 Bar C Ranch pHs 00 42 43_Bid Proposal_DAP.sIs
00 42 43
DAP-BID PROPOSAL
Page 4 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
BidlistItem Unit of Bid
No Description Specification Section No. Measure Q�u� Unit Price Bid Value
UNIT IV:PAVING IMPROVEMENTS
1 2411.3000 Remove Concrete Curb&Gutter 0241 15 LF 121 $25.00 $3,025.00
2 3211.0400 Hydrated Lime 32 11 29 TON 674 $155.00 $104,470.00
3 3211.0501 6"Lime Treatment(32#1SY) 32 11 29 SY 32035 $3.15 $100,910.25
4 3211.0502 8"Lime Treatment(42#1SY) 32 11 29 SY 7630 $3.65 $27,849.50
5 3213.0101 6"Cone.Pvmt. 32 12 12 SY 30152 $33.15 $999,538.80
6 3213.0301 4"Sidewalk Pvmt 32 13 20 SF 20685 $5.50 $113,767.50
7 3213.0501 Barrier Free Ramp,Type R-1 32 13 20 EA 10 $1.600.00 $16,000.00
8 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 28 $1.300.00 $36,400.00
9 3217.0003 4"BRK Pvmt Marking HAS(W) 32 17 23 LF 1292 $1.40 $1.808.80
10 3217.0201 8"SLD Pvmt Marking HAS W) 32 17 23 LF 130 $4.00 $520.00
11 3441.4003 Furnish/install Alum Sign Ground Mont EA 18 $475.00 $8,550.00
City Std. 00 00 00
12 9999.0001 8"Cone Pvmt 32 13 13 SY 7140 $41.55 $296,667.00
13 9R9 p9.0002 Construct Type III Barricade with Rip 00 00 EA 6 $2,500.00 $15,000.00
14 9999.0003 Remove Type III Barricade 00 00 00 EA 2 $1,000.00 $2,000.00
15 9999.0004 SWPPP Maintenance 31 2500 LS 1 $2.000.00 $2,000.00
17 9999.0005 Pavement Header 00 00 00 LF 152 $20.00 $3,040.00
18
19
20
21
22 - - - - -
23 - - - — - -
24
25 -— -
26
27 -
28
29 — - - -
30
31
32
33
34
35
36
37
38
39
40
TOTAL UNIT IV:PAVING IMPROVEMENT $1,731,546.85
CITY OF FORT WORTH
STANDARD CON STTdU CTf ON SPECIFICATION DOCUMENTS-DF V P.LUPL R A WAR 1)1.1)PROJECTS
Fomt Version May 22,2019 Bar C Ranrh PH8 00 42 43_Bid Pwi.—] l AP Xk
00 42 43
DAP-BID PROPOSAL
Page 7 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Description Specification Section No. Unit r Bide Quantity
Na. Measur Unit Price Bid Value
N
Bid Summary
UNIT I:WATER IMPROVEMENTS -
UNIT II:SANITARY SEWER IMPROVEMENTS -
UNIT III:DRAINAGE IMPROVEMENTS -
UNIT IV:PAVING IMPROVEMENTS $1,731,546.85
UNIT V:STREET LIGHTING IMPROVEMENTS -
UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS -
Total Construction Bid $1,731,546.85
This Bid is submitted by the entity named below:
BIDDER: BY:
Glenn Thurman,Inc.
P.O.Box 850842
Mesquite,TX 75185 TITLE: r'Yt±/'EC1 �I�� �� !�1
DATE: C
l- 3- Zozo
Contractor agrees to complete WORK for FINAL ACCEPTANCE within working days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019 Bar C Ranch PH8 00 42 43_Bid Proposal_DAP.xis
00 42 43
DAP-BID PROPOSAL
Page 5 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Description Specification Section No. Unit of Bid Unit Price Bid Value
No. Measure Quantity
UNIT V:STREET LIGHTING IMPROVEMENTS
1 2605.3015 2"Condt PVC SCH 80(T) 26 05 33 LF 3900 $7.84 $30,576.00
2 3441.3301 Rdwy Ilium Foundation TY 1 3441 20 EA 50 $1,109.00 $55,450.00
3 3441.3302 Rdwy Ilium Foundation TY 3 3441 20 EA 3 $1,581.00 $4,743.00
4 3441.3401 10-10-10 Triplex CU Elec Conductor 3441 20 LF 3900 $3.37 $13,143.00
5 9999.0001 Rdwy Ilium.Assembly TY 11 3841 20 EA 50 $2,092.00 $104,600.00
6 9999.0001 Rdwy Ilium.Assembly TY 18 w/dbl 33A arms 35 41 20 EA 3 $4,363.00 $13,089.00
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT V:STREET LIGHTING IMPROVEMENT-1 $221,601.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,2019 Bar C Ranch PH8 00 42 43_Bid Proposal_DAP.xIs
00 42 43
DAP-BID PROPOSAL
Page 7 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Description Specification Section No. Unit of Bid Unit Price Bid Value
No. Measure Quantity
Bid Summary
UNIT I:WATER IMPROVEMENTS
UNIT II:SANITARY SEWER IMPROVEMENTS
UNIT III: DRAINAGE IMPROVEMENTS
UNIT IV:PAVING IMPROVEMENTS
UNIT V:STREET LIGHTING IMPROVEMENTS $221,601.00
UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS
Total Construction Bid $221,601.00
This Bid is submitted by the entity named below:
BIDDER: BY: Ruc ar Wolfe
Company Name: ��
Address:
TITLE:Presi ent
DATE:12/18/2019
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 45 working days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version May 22,20I9 Bar C Ranch PH8 00 42 43_Bid Proposal_DAP.Xls
co
OD
1 CD
r-�LL
x z
00
v CoLL
o
� a
U
0
co
2 y
V1 L
by ossti� o W c o
3 � CD
Ci
ti II
$lG
Z o
O
O
W
OO j 3!V1N
O3
O o
O � ti
O w
W O
11,
1`Z
N83HlaW N019NIlan aHd3Z '` w '
3I! N Q 0. <
O F-
slnavr sI O U
ZU
NOSla3H08 A319VM '^
NSISIN3908 `/J
c dn33NIM j
UQ U
� Z
t
A O
3JXY K
y o�
a
w S3l ONN
6 3 i
A _
m 3ia
an1V030 al0
NOSASa
S�
uun0 9alo0 `Wd 95:4 61OZ/9Z/9 `6Mp•s}!9!4X3 V30 9 asO4d 43uDd 0 log\g aso4d 4ouoa 0 lo8\Vd0 994\ONVI 00*\9000\ONVI—X1N\:S
ndMTd nSNB CD co
CD OD
oV
CD LL
Icn
I w _ N Z
z� x 0�
vCo LL
z� CD
< W O a
I I X� aU o
I 0 w CO
>
0 �I 00 in en
i CD
W x >o> Lp
z oJJ I z~W
> 3 �L
L�MCD
W CD
> O
<� u �
w > W Li-
z �Lij 0
z oz� z�vn
o z�� Wo >� I >z>
F- >�N m� z - � z>
»och
� > �
Q Qz /
»>
U
o <zW
07 O CO
Z
0_ V /
O
0 J W
n
OC�M
M
P
m 99 n do �n n
to v
k-l
1� co
Cp
(O
N
avoa o sna ,> - O
N O
O M It N N M
O o O N N N CO
CO co
B O to
N O N N
I�I
C] N
cCl CO M vsoxuNltlo co
g ff g18 N
toco m -� 'n i
ianoo vu3lnnva 8 O oy UI N�
3a 1- N N
W u) N
I I I IIII s M
M M � �p � ,�
>I I III I u7 tn V7 toO I g N N N
a_ O N O _ CN o�� x
W I III I M N O Of 00 n O coy N N
r
In In Ln I a N
aaa I g g aavA3lnoa atlo inoa _ �o�sEs N M O
N x
�I N M O 04 M ON M N
DO S
a u7 co n
N toJ
M M M M
Of On - /
Go AVM Nn3M011IM O
� / 0
co
M N N N N N N N N N N Y GO
to 00
N M It In fC n CO O1 3 d I ' * X
Co
M g 3Naa a31YM A3sMoaa J
N s ff
M O �LI 1� CO O1 O N O O n m O1 � co
11
I
0
uosdwoL4i uoy}ouor `Wd 80:Z1 61OZ/ZL/ll `6Mp•s}igil{x3 Vd0 19 asoyd L{ouoa 0 aog\g asoyd youoa 0 Jo8\Vd0 994\ONVI 00*\9000\ONVI—X1N\:S
,WMIIV�l JSNO
1 CD co
CD OD
I
I
�Z
I
I I v CoLL
it I CD
vzA
IIU �—pq 2CO
x CD
M
II ~
z 0 z U �
� t
cncn� QJ � II W � o �
w wo- z� mo �� , I 3 ��
J w ~
V) o�o� I \
w w � �
J
cn
cn Q }
Q w � z /
z 0 �zu /
0
N Qr
Cl V)
LL
V) cD o
p z i
0_ F- C
0_ X M M
0_ W J — — — — — — n
«77Ln
M
v
can °N a v rn
rn GD n cn ''Ns� M Op
,I N
avoa orvessna g
t M
\ N N
M
M N N I
o CD
1 W m N N � 00
'So a O N N O rn O Ico N
n CD � a0 N X o
I�I I p N
MLvo to
�& ianoo tlso N
� rn 4$ rn C4
o ianoo vu3unvo „g N
W,I III I n N .�yg N
I QI III M 0 0 0 �� � �o N
a_ N c C4 LO N �'�� X
I� _ N �r N
N In u7 rn O y c��� N
00 NOE M
g aavn3 noe rvo a3ainoe N1 �o�Es N
I I III N M O M O tG OO M
O � M ^ N \
N M a u) t0 O
1 O rn N M O M M
rn /
/ co 8 nvm rvnsmonim
h
n M M N N N N N N N N N N o��` O
Q�
� LO o rn N _ y
M It 0 tG n GD � �_ � M � N N
aM g 3niaa a3ivm e3smoaa Z L WW
!-o
N M uO rn O O Q L
I O OI Z � o
M W m
O F 2
w
i
0
uosdwoL4i uoy}ouor `Wd LO:Zl 61OZ/Zl/ll `6Mp•sl!giyx3 VJO 19 asoyd youoa 0 aog\g asoyd youoa 0 Jo8\Vdo 994\ONVI 00*\9000\ONVI—X1N\:S
►000•t
►OOO�e
00�•Ot —
■
u
• ■ e
•
•
I1
iii��r� � �!,:❖:
... ::.-.AAA:•: ' ��':•:� �br..
oo! o•.
So
MINI '
IMM man-
Nil iffill-190
■ ►► ►■■ ■
�dM11V�1 HSNB co
1 OD
I 04�Z
II x 00
o U-
_ N L
z Q
Z J z = I I 0 U •-
z J I 15
W y
W ry z Q II rn
p Q M LP ti L
J p II Woo
0 o o N I I 3 � ��
cn z o � U �U � II
LL
0 0 V p QJ � JI
O O z
0_ 0_ p o
Woo~
O O V) �_ m
�w O
0 0 W J 0 >
U /
O M
� M
n
OM
N
M
O 89 3S H H H HH
(0 m °N a w rn
c00 c00 M M
N
M M M M M (7
wwr7 aroa o a N
w o 0� x M O
N N Vj
M O NUZU (0 N
O
U �^ Of O M Iu) O N
�U Z rn N NCIA
U) ap
(nZa_ O (00 �(0 O1 U N
QOO N O c0
O ^ N � > a0 N N
Z M
Z P� (0
0} (0U �noo`So aA� O) c N
Z OLn
WU = N 1an00 Yll3imvo OZ
J�
U�Z O I I I 6 n N NM
N
Q rc c0
3: I I N Q _ ^
M N
X Of M N
co
/ I aaVA3ln09 Ntlo 83alnoe N
M O M 04 O O M N \
N
/ O u1 c0 1� a0 O rn 1 M M M M
/ O1 /
AVM NfISMOIIIM
Q
M N N N N N N N N N NC)
O M
/ w
O C�
/ � � �
N M Le) (0 n m Of O � � s * x
v
3AItla d31VM A3SM08a Q `PGJ \ x
N
� 0
O
�Mc� t-2 � ��
W
I O � �A w r)
J
O
H
0
uun0 galoo 'Wd ZO:S 61OZ/9Z/9 `6e(p•s}iglyx3 Vdo 9 asoyd youoa 0 aog\g asoyd youoa 0 Jo8\Vdo 994\ONVI 00*\9000\ONVI—X1N\:S
dMIld JSNB
1 CD co
CD OD
I 00LL
I
0Z
II I x 04
MLL.
N L
CD
z � I II Iz —
w ww w o
II U •— Po
J V) Lu Ii I J F �I X co
>� I M � � F
CD Z O 0 cn I N CDt
z (n o <UI W o o
oN
C-D 0 0 zz oU I I c�iinLL
!n !n o Q J
0 0 z o, I
0 0 WU o J
X mw> Woos = —I
w 0- 0- �cn
�
<0 > o /
�zc
<zu
c�
�M
� � M
N MM
II °' v O e9 ]s H y p
_� 3cn
N N M
a avoa ONvssnarn
a O
N N M
O_ cMG cm N N
o Mtn
O m - N N N uj a0
('G O N (O O1 O N
Of
n N N 00 Nto N
00
n �o°vsa1� Of N
04
ianoa vu3innva �p N
M IM to W rn o Y n N N
> I I I IA OO �� (O CNI N
O N O u7 N `b$� X
W N O CM a0 1, O - N y
I I I I iA N u7 It * x O M N
aatlA31n09 HLO
tl a3alnoe s�° N
M X
M N co
11 Lr
� �(o
N M � O1 M M
/coAtl NnSMOIIIM
1- M M N N N N N N N N N N y p�j act"' O
to rn z°y o
Z
/ �n co
1G 1, 40 cma o ,W
3Naa a31VM asM°aa
N
M u7 1C n a0 Of a0 O O
N
_
I O O
II M _
— - - - - - - /�'� W w
U)
I
0
uun0 galo0 'Wd SO:S 61OZ/9Z/9 '6Mp•s}iglyx3 Vd0 9 asoyd youoa 0 aog\g asoyd youoa 0 Jo8\Vd0 994\ONVI 00*\9000\ONVI—X1N\:S
,dM11d dSNB� CD OD
o�
r-�LL
�ycli Z
I I w Co LL
U ^� CD
o
\\ UZ
w z I I I I U �, CO
c� w II 0 o
I
J H U LP
Ld CD
co
i � d
W
W H W U X in t
F- w 0 I I M W C o
N II
V �ch zu � II 3 � cnLL
z II
Cf) u� � N I
O V) F- m N �moOf z� J
w E w L — �
W woo
0z o Qz �
Qz
�zu
OM
M
Imo/ O M
M O 8 � dHd 2� 1H
to
_
Oc0 3 It Mao
Of 00 1� c0
ii M 10 V7 a
M N M M M M M M M
p avoa orvvssnarn
O
N a N N N M
O M X N N
40 O1
O p c O M N
_ N N Ln a0
a0 3 (0 O O�0 Of O N
OI (0
In a7 N Go N
�I M O N
(0 N °� iynoa vsoa?Hlv� c N
O1 Ln
of I I noo tlll31MV] c0 of aD N�
U, I I III n N N
s M
I I III M ui u7 N O N s N
N
LL II I I O N O N x
I M M
D to u1 It It It xco
O1 M N
D awminos avo aaalnos to N
l lII l N_ M O M O O M N
It LO co n
to O n 00 Of M M M M
/AVM NnSMaIIIM co O
/ _/ CD N N N N N r- M
/ 01
/ to ' M a
N M v 110
Lt. o v a v x J \
a0
3naa aaLVM Aasroaa O U)
N M �O 1� 0 O 1 0 F
rn cM w _
I �
O
uun0 galo0 'Wd 90:5 61OZ/9Z/9 '6Mp•s}igll{x3 Vd0 9 asoyd L43UDH 0 aog\g asoyd youoa 0 Jo8\Vd0 994\ONVI 00*\9000\ONVI—X1N\:S