HomeMy WebLinkAboutContract 53739 r , CSC No.,53739
CITY OF FORT WORTH, TEXAS
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES
SFCq �Oq�y This AGREEMENT is between the City of Fort Worth, a Texas home-rule municipality
("City"), and Halff Associates, Inc., authorized to do business in Texas ("Consultant"), for a
PROJECT generally described as: City of Fort Worth Mapping Activity Statement (MAS) #4
for FEMA Cooperating Technical Partners (CTP) Project.
Article I
Scope of Services
(1) Consultant hereby agrees to perform the professional services set forth in the
Scope of Services attached hereto as Attachment "A". These services shall be
performed in connection with City of Fort Worth Mapping Activity Statement (MAS) #4
for FEMA Cooperating Technical Partners (CTP) Project.
(2) Additional services, if any, will be requested in writing by the City. City shall not pay
for any work performed by Consultant or its subconsultants, subcontractors and/or
suppliers that has not been ordered in writing. It is specifically agreed that
Consultant shall not be compensated for any alleged additional work resulting from
oral orders of any person.
Article 11
Compensation
Consultant shall be compensated an amount up to $767,000 in accordance with the Fee
Schedule shown in Attachment "B". Payment shall be considered full compensation for all
labor, materials, supplies, and equipment necessary to complete the services described in
Attachment "A".
The Consultant shall provide monthly invoices to the City. Payment for services rendered
shall be due within thirty (30) days of the uncontested performance of the particular
services so ordered and receipt by City of Consultant's invoice for payment of same.
Acceptance by Consultant of said payment shall operate as and shall release the City from
all claims or liabilities under this Agreement for anything related to, done, or furnished in
connection with the services for which payment is made, including any act or omission of
the City in connection with such services.
Article III
Term
Unless terminated pursuant to Article VIII herein, this Agreement shall be for a term
beginning on the effective date, as described below, and shall continue until the expiration of
the funds or completion of the subject matter contemplated herein, whichever occurs first.
City of Fart Worth,Texas OFFICIAL RECORD
Standard Agreement for Professional Services
Revision Date:11.07.17
Page 1 of 9 CITY SECRETARY
FT WORTH,TX
Article IV
Independent Contractor
Consultant shall operate hereunder as an independent contractor, and not as an officer,
agent, servant, or employee of the City. Consultant shall have exclusive control of and the
exclusive right to control the details of the work to be performed hereunder and of all persons
performing same, and shall be solely responsible for the acts and omissions of its officers,
agents, employees, contractors and subcontractors. The doctrine of respondeat superior
shall not apply as between City and Consultant, its officers, agents, employees, contractors,
and subcontractors, and nothing herein shall be construed as creating a partnership or joint
venture between City and Consultant.
Article V
Professional Competence and Indemnification
(1) Work performed by Consultant shall comply in all aspects with all applicable local,
state and federal laws and with all applicable rules and regulations promulgated by
the local, state and national boards, bureaus and agencies. Approval by the City
shall not constitute or be deemed to be a release of the responsibility and liability of
Consultant or its officers, agents, employees, contractors and subcontractors for the
accuracy and competency of its services performed hereunder.
(2) THE CONSULTANT, AT NO COST TO THE CITY, AGREES TO DEFEND,
INDEMNIFY AND HOLD THE CITY, ITS OFFICERS, AGENTS SERVANTS AND
EMPLOYEES, HARMLESS AGAINST ANY AND ALL CLAIMS, LAWSUITS,
ACTIONS, COSTS AND EXPENSES OF ANY KIND, INCLUDING, BUT NOT
LIMITED TO, THOSE FOR PROPERTY DAMAGE OR LOSS (INCLUDING
ALLEGED DAMAGE OR LOSS TO CONSULTANT'S BUSINESS AND ANY
RESULTING LOST PROFITS) AND/OR PERSONAL INJURY, INCLUDING
DEATH, THAT MAY RELATE TO, ARISE OUT OF OR BE OCCASIONED BY
CONSULTANT'S BREACH OF (i) ANY OF THE TERMS OR PROVISIONS OF
THIS AGREEMENT OR (ii) ANY NEGLIGENT ACT OR OMISSION OR
INTENTIONAL MISCONDUCT OF CONSULTANT, ITS OFFICERS, AGENTS,
ASSOCIATES, EMPLOYEES, CONTRACTORS (OTHER THAN THE CITY) OR
SUBCONTRACTORS, RELATED TO THE PERFORMANCE OR NON-
PERFORMANCE OF THIS AGREEMENT. THIS SECTION SHALL SURVIVE
ANY TERMINATION OR EXPIRATION OF THIS AGREEMENT.
Article VI
Insurance
(1) Consultant shall not commence work under this Agreement until it has obtained all
insurance required under this Article and the City has approved such insurance, nor
shall Consultant allow any subcontractor to commence work on its subcontract until
all similar insurance of the subcontractor has been so obtained and approval given
by the City; provided, however, Consultant may elect to add any subconsultant as
an additional insured under its liability policies.
City of Fort Worth,Texas
Standard Agreement for Professional Services
Revision Date:11,07.17
Page 2 of 9
Commercial General Liability
$1,000,000 each occurrence
$2,000,000 aggregate
Automobile Liability
$1,000,000 each accident (or reasonably equivalent limits of
coverage if written on a split limits basis). Coverage shall be
on any vehicle used in the course of the Project.
Worker's Compensation
Coverage A: statutory limits
Coverage B: $100,000 each accident
$500,000 disease - policy limit
$100,000 disease - each employee
(2) Additional Insurance Requirements
a. Except for employer's liability insurance coverage under Consultant's worker's
compensation insurance policy, the City, its officers, employees and servants shall
be endorsed as an additional insured on Consultant's insurance policies.
b. Certificates of insurance shall be attached to this Agreement prior to its execution.
c. Any failure on part of the City to attach the required insurance documentation
hereto shall not constitute a waiver of the insurance requirements specified
herein.
d. Each insurance policy shall be endorsed to provide the City a minimum thirty days
notice of cancellation, non-renewal, and/or material change in policy terms or
coverage. A ten days notice shall be acceptable in the event of non-payment of
premium.
e. Insurers must be authorized to do business in the State of Texas and have a
current A.M. Best rating of A: VII or equivalent measure of financial strength and
solvency.
f. Other than worker's compensation insurance, in lieu of traditional insurance, City
may consider alternative coverage or risk treatment measures through insurance
pools or risk retention groups. The City must approve in writing any alternative
coverage.
g. Workers' compensation insurance policy(s) covering employees employed on the
Project shall be endorsed with a waiver of subrogation providing rights of recovery
in favor of the City.
City of Fort Worth,Texas
Standard Agreement for Professional Services
Revision Datei 11.07.17
Page 3 of 9
h. City shall not be responsible for the direct payment of insurance premium costs
for Consultant's insurance.
i. Consultant's insurance policies shall each be endorsed to provide that such
insurance is primary protection and any self-funded or commercial coverage
maintained by City shall not be called upon to contribute to loss recovery.
j. In the course of the Agreement, Consultant shall report, in a timely manner, to
City's officially designated contract administrator any known loss occurrence which
could give rise to a liability claim or lawsuit or which could result in a property loss.
k. Consultant's liability shall not be limited to the specified amounts of insurance
required herein.
I. Upon the request of City, Consultant shall provide complete copies of all
insurance policies required by these Agreement documents.
Article VII
Transfer or Assignment
City and Consultant each bind themselves, and their lawful successors and assigns, to this
Agreement. Consultant, its lawful successors and assigns, shall not assign, sublet or transfer
any interest in this Agreement without prior written consent of the City.
Article VIII
Termination of Contract
(1) a. City may terminate this Agreement for its convenience on 30 days' written notice
to Consultant.
b. Either the City or the Consultant, for cause, may terminate this Agreement if
either party fails substantially to perform through no fault of the other and the
nonperforming party does not commence correction of such nonperformance within
5 days' written notice or thereafter fails to diligently complete the correction.
(2) If City chooses to terminate this Agreement, upon receipt of notice of termination,
Consultant shall discontinue services rendered up to the date of such termination
and City shall compensate Consultant based upon calculations in Article II of this
Agreement and Exhibit "B" attached hereto and incorporated herein.
(3) All reports, whether partial or complete, prepared under this Agreement, including
any original drawings or documents, whether furnished by the City, Its officers,
agents, employees, consultants, or contractors, or prepared by Consultant, shall be
or become the property of the City, and shall be furnished to the City prior to or at
the time such services are completed, or upon termination or expiration of this
Agreement.
City of Fort worth.Texas
Standard Agreement for Professional Services
Revision Date:11.07.17
Page 4 of 9
Article IX
Right to Audit
(1) Consultant agrees that the City shall, until the expiration of three (3) years after final
payment under this Agreement, have access to and the right to examine any directly
pertinent books, documents, papers and records of Consultant involving transactions
relating to this Agreement. Consultant agrees that the City shall have access during
normal working hours to all necessary facilities and shall be provided adequate and
appropriate workspace in order to conduct audits in compliance with the provisions of
this section. City shall give Consultant reasonable advance notice of intended audits.
(2) Consultant further agrees to include in all its subcontracts hereunder, a provision to
the effect that the subcontracting consultant agrees that the City shall, until the
expiration of three (3) years after final payment under the subcontract, have access
to and the right to examine any directly pertinent books, documents, papers and
records of such sub-consultant, involving transactions to the subcontract, and
further, that City shall have access during normal working hours to all sub-
consultant facilities, and shall be provided adequate and appropriate work space in
order to conduct audits in compliance with the provisions of this article. City shall
give Consultant and any sub-consultant reasonable advance notice of intended
audit.
(3) Consultant and sub-consultants agree to photocopy such documents as may be
requested by the City. The City agrees to reimburse Consultant for the cost of copies
at the rate published in the Texas Administrative Code in effect as of the time copying
is performed.
Article X
Minority Business and Small Business Enterprise (MBE)(SBE) Participation
In accordance with the City's Business Diversity goals (Chapter 20, Article X of the City's
Code of Ordinances a/k/a Ordinance No. 20020-12-2011, as amended), the City has goals
for the participation of minority business enterprises and/or small business enterprises in City
contracts. Consultant acknowledges the MBE and SBE goals established for this Agreement
and its accepted written commitment to MBE and SBE participation. Any misrepresentation
of facts (other than a negligent misrepresentation) and/or the commission of fraud by the
Consultant may result in the termination of this Agreement and debarment from participating
in City contracts for a period of time of not less than three (3) years.
Article XI
Observe and Comply
Consultant shall at all times observe and comply with all federal, state, and local laws and
regulations and with all City ordinances and regulations which in any way affect this
Agreement and the work hereunder, and shall observe and comply with all orders, laws
ordinances and regulations which may exist or may be enacted later by governing bodies
having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance
City of Fort Worth,Texas
Standard Agreement for Professional Services
Revision Date:11.07.17
Page 5 of 9
thereof shall be considered. Consultant agrees to defend, indemnify and hold harmless City
and all of its officers, agents and employees from and against all claims or liability arising out
of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its
employees.
Article XII
Immigration Nationality Act
Consultant shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification
Form (1-9). Upon request by City, Consultant shall provide City with copies of all 1-9 forms
and supporting eligibility documentation for each employee who performs work under this
Agreement. Consultant shall adhere to all Federal and State laws as well as establish
appropriate procedures and controls so that no services will be performed by any
Consultant employee who is not legally eligible to perform such services. CONSULTANT
SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY
CONSULTANT, CONSULTANT'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. City, upon written notice to Consultant, shall have the right to immediately
terminate this Agreement for violations of this provision by Consultant.
Article XIII
Venue and Jurisdiction
If any action, whether real or asserted, at law or in equity, arises on the basis of any
provision of this Agreement, venue for such action shall lie in state courts located in
Tarrant County, Texas or the United States District Court for the Northern District of Texas
— Fort Worth Division. This Agreement shall be construed in accordance with the laws of
the State of Texas.
Article XIV
Contract Construction
The parties acknowledge that each party and, if it so chooses, its counsel have reviewed
and revised this Agreement and that the normal rule of construction to the effect that any
ambiguities are to be resolved against the drafting party must not be employed in the
interpretation of this Agreement or any amendments or exhibits hereto.
Article XV
Severability
The provisions of this Agreement are severable, and if any word, phrase, clause,
sentence, paragraph, section or other part of this Agreement or the application thereof to
any person or circumstance shall ever be held by any court of competent jurisdiction to be
invalid or unconstitutional for any reason, the remainder of this Agreement and the
application of such word, phrase, clause, sentence, paragraph, section, or other part of this
Agreement to other persons or circumstances shall not be affected thereby and this
City of Fort Worth,Texas
Standard Agreement for Professional Services
Revision Date:11.07.17
Page 6 of 9
Agreement shall be construed as if such invalid or unconstitutional portion had never been
contained therein.
Article XVl
Notices
Notices to be provided hereunder shall be sufficient if forwarded to the other Party by
hand-delivery or via U.S. Postal Service certified mail return receipt requested, postage
prepaid, to the address of the other Party shown below:
City of Fort Worth
Attn: Clair Davis
Transportation and Public Works
200 Texas Street
Fort Worth, Texas 76102
Consultant:
Halff Associates, Inc.
Attn: Cindy Mosier
4000 Fossil Creek Blvd
Fort Worth, TX 76137
Article XVII
Prohibition On Contracts With Companies Boycotting Israel
Consultant acknowledges that in accordance with Chapter 2270 of the Texas Government
Code, the City is prohibited from entering into a contract with a company for goods or
services unless the contract contains a written verification from the company that it: (1)
does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The
terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in
Section 808.001 of the Texas Government Code. By signing this contract, Consultant
certifies that Consultant's signature provides written verification to the City that
Consultant. (1) does not boycott Israel; and (2) will not boycott Israel during the
term of the contract
Article XVIII
Headings
The headings contained herein are for the convenience in reference and are not intended
to define or limit the scope of any provision of this Agreement
City of Fort Worth,Texas
Standard Agreement for Professional Services
Revision Dale:11.07.17
Page 7 of 9
Article XIX
Attachments, Schedules and Counterparts
This Agreement may be executed in one or more counterparts and each counterpart shall,
for all purposes, be deemed an original, but all such counterparts shall together constitute
but one and the same instrument.
The following attachments and schedules are hereby made a part of this Agreement:
Attachment A - Scope of Services
Attachment B--Compensation
Attachment C -Amendments to Standard Agreement for Engineering Services
Attachment D - Project Schedule
Attachment E- Location Map-not applicable see City of Fort Worth FEMA MAS No.4
Duly executed by each party's designated representative to be effective on the date
subscribed by the City's designated Assistant City Manager.
BY: BY:
CITY OF FORT WORTH CONSULTANT
Halff Associates, Inc.
zwfa (Mr 30,z01 ULde % .
Dana Burghdoff
Assistant City Manager Cindy M6sier
Water Resources Team Leader
Date: Mar 30,2020
Date: 3� 20( 20 20
APPROVAL RECOMMENDED:
By: Wil4arq Jo nson(Mar 30,2020)
7 William M. Johnson
Director, Transportation & Public Works
City of Fort Worth.Texas
Standard Agreement for Professional Services t,7
Revision Date:11.07.17 �, m [ ETA
(,R
Page 8 of 9
` 0 OR'rHs Tf's
19}D'
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and Form 1295
administration of this contract, including No: 2020_589479
ensuring all performance and reporting
requirements.
-� M&C No: 20_0167 0y'0("A0XU NO-
Clair Davis, P.E., CFM
Floodplain Administrator M&C Date:3/17/2020
APPROVED AS TO FORM AND LEGALITY ATTEST: .......
. p 4
Bye Black(Mar 30,2020)
Douglas W. Black Mary J. Kayser %
Assistant City Attorney `
City Secretary ..
'`
I
City or Fora Worth.Texas
Standard Agreement for Professional Services
Revision Date:11.07.17
Page 9 of 9
ATTACHMENT "A"
Scope of Work
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project. Under this scope, "ENGINEER"
is expanded to include any sub-consultant, including surveyor, employed or contracted by
the ENGINEER.
OBJECTIVE
City of Fart Worth Cooperating Technical Partners (CTP) Flood Risk Project
WORK TO BE PERFORMED
Task 1. Develop Topographic Data
Task 2. Perform Field Survey
Task 3. Develop Hydrologic Data
Task 4. Develop Hydraulic Data
Task 5. Perform Floodplain Mapping
Task 6. Develop Non-Regulatory Products
Task 7. Flood Risk Review Meeting
Task 8. Resilience Meeting
Task 9. Permitting
Task 10. Plan Submittal Checklists
The work to be performed includes the above tasks. Details for each task are included in
Attachment F- City of Fort Worth Cooperating Technical Partners (CTP) Flood Risk Project
Mapping Activity Statement#4.
City of Fort Worlh,Texas
Attachment A
PMO Release late:0712312012
Page 1 or 1
ATTACHMENT B
COMPENSATION
Professional Services for
City of Fort Worth Mapping Activity Statement(MAS)#4
for FEMA Cooperating Technical Partners (CTP)
Project City Project No. 101046
Lump Sum Project
1. Compensation
A. The ENGINEER shall be compensated a total lump sum fee of $767,000 as
summarized in Exhibit B-1 — Engineer Invoice and Section IV—Summary of Total
Project Fees. The total lump sum fee shall be considered full compensation for
the services described in Attachment A, including all labor materials, supplies,
and equipment necessary to deliver the services.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
IL Method of Payment
A. Partial payment shall be made to the ENGINEER monthly upon City's approval of
an invoice prepared and submitted by the ENGINEER in the format and including
content as presented in Exhibit B-1, Progress Reports as required in item 111. of
this Attachment B, and Schedule as required in Attachment D to this Agreement.
B. The estimated current physical percent complete as required on the invoice shall
be calculated from the progress schedule as required in Attachment D to this
Standard Agreement and according to the current version of the City of Fort
Worth's Schedule Guidance Document.
C. The cumulative sum of such monthly partial fee payments shall not exceed the
total current project budget including all approved Amendments.
D. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department, Stormwater Management Division
monthly progress reports and schedules in the format required by the City.
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 1 of 4
B-1
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility Fee Amount %
Prime Consultant
Halff Associates, Inc. Project Management and $665,300 86.7
Execution of MAS#4 Tasks
Proposed MBEISBE Sub-Consultants
Gorrondona & Surveying $76,700 10
Associates, Inc.
Non-MBEISBE Consultants
AECOM Independent QAIQC $25,000 3.3
TOTAL $ 767,000 100%
Project Number& Name Total Fee MBEISBE Fee MBEISBE
$ 767,000 $ 76,700 10%
City MBEISBE Goal = 10% Consultant Committed Goal = 10 %
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 2 of 4
B-2
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across work types and work phases.
City of Fort Worth,Texas
Attachment 8
PMO Official Release Date:8.09.2012
Page 3 of 4
B-3
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
City of Fort Worth Invoice Date:
200 Texas Street Invoice:
Fort Worth TX 76102 Project:
Attention: Mr. Clair Davis, Clair.Davis@fortworthtexas.gov
Project Name: City of Ft Worth/FEMA CTP FY16
For Professional Services Rendered through:
Re: CFW Mapping Activity Statement#4 for FEMA CTP FY16
Hourly Fee Pct. Earned To Previous Current
Camp Date Amount Amount
00PH01-Develop Topographic Data 6,000.00
OOPH02-Perform Field Survey 209,300.00
OOPH03-Hydrology 146,400.00
OOPH04-Hydraulics 211,800.00
OOPH05-Floodplain 152,000.00
OOPH06-Non-Regulatory Products 37,500.00
OOPH07-Flood Risk Review 2,000.00
OOPH08-Resilience Meeting 2,000.00
Total Services: 767,000.00
Remaining Fee: Total Earned to Date:
Less Previous Billings:
Amount Due this Invoice:
Remit payment to P.O. Box 678316, Dallas, TX 75267-8316
Reference Halff Associates Project 32833.000 and Invoice 00000000
Contact Jennifer Barr at jbarr@halff.com with any bitlings questions.
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:6.09.2092
Page 4 of 4
B-4
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGREEMENT
Professional Services for
City of Fort Worth Mapping Activity Statement(MAS)#4
for FEMA Cooperating Technical Partners (CTP) Project
City Project No. 101046
Revised Article 1V.K.2.g - For Insurance policies K.1.a, K.1.b, and KA.c. above, any
deductible or self-insured retention in excess of$36,000.00 that would change or alter
the requirements herein is subject to approval by the CITY in writing, if coverage is not
provided on a first-dollar basis. The CITY, at it sole discretion, may consent to alternative
coverage maintained through insurance pools or risk retention groups. Dedicated
financial resources or letters of credit may also be acceptable to the CITY.
Revised Article VU - ENGINEER shall at all times observe and comply with all federal
and State laws and regulations and with all City ordinances and regulations which in any
way affect this AGREEMENT and the work hereunder, and shall observe and comply with
applicable laws, ordinances and regulations which may exist or may be enacted later by
governing bodies having jurisdiction or authority for such enactment and those orders
(administrative,judicial, executive and otherwise), to the extent provided by CITY. No
plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to
defend, indemnify and hold harmless CITY and all of its officers, agents and employees
from and against all claims or liability arising out of the violation of any such order, law,
ordinance, or regulation, whether it be by itself or its employees.
City of Fort Worth,Texas
Attachment C
PMO Release Date:05.19.2010
Page 1 of 1
FORT WORTH
ATTACHMENT "D"
PROJECT SCHEDULE
Professional Services for
City of Fort Worth Mapping Activity Statement (MAS)#4
for FEMA Cooperating Technical Partners (CTP)
Project City Project No. 101046
Project Activities Schedule
PIT�ICCI[/StUdy Baseline asciiiie
STARTi ■1
DATE
City of Fort Worth MAS #4 03/24/2020 09/30/2020
Develop Topographic Data 03/24/2020 09/30/2020
Perform Field Surveys 03/24/2020 09/30/2020
Develop Hydrologic Data 03/24/2020 09/30/2020
Develop Hydraulic Data 03/24/2020 09/30/2020
Perform Floodplain Mapping 08/01/2020 09/30/2020
Develop Non-Regulatory Products and Datasets 08/01/2020 09/30/2020
Flood Risk Review 09/01/2020 09/30/2020
Resilience Meeting 09/01/2020 09/30/2020
City of Fort worth,Texas
Attachment D
Revision date:07.20.2018
Page 1 of 1
a4e�Rt,�e
FEMA
"_D 3 CITY OF FORT WORTH
COOPERATING TECHNICAL PARTNERS(CTP)
FLOOD RISK PROJECT
MAPPING ACTIVITY STATEMENT(MAS)
Mapping Activity Statement No. 4
The Flood Risk Project described in this FRP-MAS dated July 22, 2016 shall be completed in accordance
with the CTP Partnership Agreement dated November 19, 2012 between the City of Fort Worth(herein
referred to as"CTP")and the Federal Emergency Management Agency(FEMA).
The Flood Risk Project within this MAS includes the following project areas and production phases:
• Lower West Fork Trinity and Denton HUC-8 Watersheds—Phase Two(Risk Identification&
Assessment)
o FYI 6-1 —Leverage Open Channel Studies
■ Develop Hydrologic Data
■ Develop Hydraulic Data
Iff Perform Floodplain Mapping
■ Develop Non-Regulatory Products
■ Flood Risk Review Meeting
• Resilience Meeting
o FYI 6-2—New Flood Risk Identification
■ Develop Topographic Data
■ Perform Field Survey
■ Develop Hydrologic Data
■ Develop Hydraulic Data
■ Perform Floodplain Mapping
■ Develop Non-Regulatory Products
• Flood Risk Review Meeting
■ Resilience Meeting
This Flood Risk Project will be completed by the following entities:
• The City of Fort Worth;
• Contractor(s)
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project—Mapping Activities Statement No. 4
i
Preface: FEMA Region 6-Implementation of the Risk MAP Program
FEMA Region 6 has produced a number of regionally specific Risk MAP Implementation
documents that shall be used to guide project efforts for studies performed in Region 6 States
(Arkansas, Louisiana, New Mexico, Oklahoma, and Texas). The information in this section is
intended to assist CTPs in the preparation of the Mapping Activities Statements for submittal and
funding.
Region 6 Risk MAP Implementation Guidance, Tools and Templates are available on the Risk
MAP SharePoint site at:
Risk MAP SharePoint>Region 6>Resources Page>Regional Implementation Documents
Projects should be phased in alignment with the Framework to Achieve Mitigation Action,
available at:
Risk MAP SharePoint > Region 6 > Resources Page > Regional Implementation Documents >
Framework V4
Phasing Risk MAP Project Production.In order to allow the flexibility required to move projects
from initiation (Discovery) to effective issuance, FEMA Region 6 has identified the following
phases for project funding:
• Phase One- Discovery
o To include Flood Risk Report, FIood Risk Map and Flood Risk Database
o Discovery and Discovery Close-Out meetings
• Phase Two - Risk Identification and Assessment
o Engineering and Risk MAP product development
o Project Kick-off,Flood Risk Review and Resilience meetings
• Phase Three -Regulatory Product Update
o Preparation of FIS and FIRM
o Panel Preparation,Preliminary Panel Issuance
o Consultation Coordination Officer's (CCO) Meeting
o Effective Panel Issuance
FEMA Region 6 requires its Cooperating Technical Partners to utilize this phased approach for all
Flood Risk Projects submitted for funding.
Standards for Flood Risk Analysis and Mapping. All processes and deliverables shall be
completed in accordance with the Federal Emergency Management Agency (FEMA)'s Standards
for Flood Risk Analysis and Mapping, dated November 30, 2015, located on FEMA's website at:
http://Nvww.fema.goy/guidelines-and-standards-flood-risk-analysis-and-mapping. These guidelines and
standards (httl2://www.fema.gov/modia-library/assets/documents/35313) define the specific
implementation of the statutory and regulatory requirements for NFIP flood risk analysis and
mapping, and address the performance of flood risk projects,processing of letters of map change
and related Risk MAP activities. The guidelines and standards are organized in a hierarchy:
Program Standards—A required element of the Risk MAP program. Exceptions to
program standards can only be granted by program leadership through an exemption
process.
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project—Mapping Activities Statement No. 4 3
Please note FEMA will also be performing periodic audits and overall study/project management to ensure
quality, including National Quality Reviews(QRs)required per FEMA standards for all flood risk projects.
Whether or not the CTP performs the Independent QC review mentioned in the preceding paragraph, the
CTP will be responsible for addressing any and all comments resulting from National QRs and any
additional independent QA reviews required by the FEMA Regional Office, including re-submittal of
deliverables as needed to pass technical or quality review. The CTP will submit regulatory products to
FEMA's designated National QR reviewer for review and approval prior to public issuance.
FIRM-related tasks require a passing QC Report from FEMA's National FIRM database auto-validation
tool for Quality Review(QR)#1,#2, and#5 as required in FEMA standards. Training materials for these
steps are available on the Mapping Information Platform(MIP)at MIP User Care>Training Materials. The
MIP can be accessed at the following web address: http://hazards.fema.gov
Additionally,should the study be selected for Independent Verification and Validation(IV&V),the partner
will be provided a copy of the IV&V findings. If the findings indicate that items are not in accordance with
FEMA's Standards for Flood Risk Analysis and Mapping,dated November 30,2015,the partner will assist
FEMA in the preparation of materials meeting these standards.
Mapping Information Platform (MIP) Projects. Two projects will be established for each Flood Risk
Project. The Regulatory(REG)project will track the engineering and map production elements as well as
oversee the preparation, preliminary, post-preliminary and effective issuance of the Regulatory products
(Flood Insurance Study Text and Flood Insurance Rate Maps),while the Risk MAP Products(RMP)project
will track the project cost and progress of the non-regulatory products and other related services.
CTPs should note that projects obligated in the MIP only include FEMA dollars. CTPs should update
the MIP to inform FEMA of the FEMA dollars spent each month. Leverage costs,fees and data are entered
separately at the completion of the tasks, but are not included in the task dollars for project incremental
progress reporting. CTPs shall assure that all MIP tasks are updated monthly by the 25th of each month to
assure their projects are in an acceptable Schedule Performance Indicator (SPI) value. SPI shall range
between 0.92 and 1.08 to be considered in compliance.
It is expected that the CTP partner will include the leverage costs,fees and data provided at the completion
of each tasks identified in this document as leverage. Should the units available for reporting in the MIP
not match those necessary, the CTP shall enter additional information in the comments section to identify
the actual units reported. (Leverage Dollars may need to be reported for the Discovery efforts under the
MIP Scoping task,but only panels are currently available as a unit for reporting.)
Earned Value Data Entry and the Mapping Information Platform (MIP). The MIP Workflow is
designed and used to track the Earned Value of all on-going mapping projects. The MIP tool is the system
of record for Earned Value Management for the Agency. The information available through the MIP, is
automatically calculated based on the date of report,using the Actual cost and schedule of work performed,
or"actuals"and comparing them to the expected cost and schedule of work performed,or"baseline".
The MIP study workflow allows FEMA and CTPs to manage the status of these projects at a task level.
The cost and schedule information,updated by the CTP for each contracted task,is compared to the baseline
established for those tasks. This information is rolled up to a project level and monitored by the FEMA
Region to assess progress and Earned Value.
Once the baseline has been established in the MIP, the CTP shall input the performance and actual cost to
date for all tasks within each project for which the CTP is responsible. This must be completed at a
minimum by the 25`r'of each month and at the completion of the task. When a task is completed, including
all QA/QC activities in this FRP-MAS,plus the Quality Control Reviews required by FEMA standards,the
CTP shall enter 100%complete,enter the actual completion cost,and the actual completion date within the
Manage Data Development,Manage Preliminary Map Production,or Manage Post-Preliminary Processing
tasks as applicable. The "Manage" tasks remain open and accept updates for up to 90 days after the
FYI6-FRP-MAS Region 5 Template Version 1.0(March 2016)
Flood Risk Project—Mapping Activities Statement No.4 5
Digital Data Delivery. FEMA will provide download/upload capability for data submittals through the
MIP located at https://hazards.fema.gov. As each activity is completed,the data must be submitted to the
MIP for validation by the FEMA Project Monitor. Metadata is required for all digital activities. Metadata
is required for all activities in accordance with Appendix M,Data Capture Standards, dated May 2013.
Project Data Archive,The Mapping Partner shall maintain an archive of all data submitted. All supporting
data must be retained for a minimum of three years from the date a funding recipient submits its final
expenditure report to FEMA.
Risk MAP SharePoint. Assistance with the SharePoint may be requested through
spadmingriskmapcds.com. FEMA Region 6 points of contact for assistance and questions related to the
Risk MAP SharePoint are diane.howe@feina.dhs.gov and/or esava eg a,h2opartnersusa.com. Please note
that after 90-days your account password will need to be reset. Please email spadmin a,riskmapeds.com to
reset your password.
Numerous templates have been created to aid the CTP in preparing for and delivering the Region's
objectives as identified by phase and task in the Framework to Achieve Mitigation Action. CTPs may
utilize the regionally provided templates available on the Risk MAP SharePoint site at:
http://pin.riskmapeds.com/FEMA REGIONS/REGIONVI/Resources
Additionally, CTPs may use the FEMA Region 6 Risk MAP SharePoint site to upload their CTP templates
under the Mapping Partners Tab at the following location:
http://pm.riskmapcds.com/FEMA_REGIONS/REGION VI/panes/Mapping%20Partners.aspx
CTP Coordination with FEMA. The Mapping Partner shall notify FEMA at least four weeks prior to all
relevant meetings. The CTP should notify all other applicable parties of all Flood Risk Project meetings
with community officials, and other relevant meetings, at least two weeks prior to the meeting (with as
much notice as possible). FEMA and/or its contractor may or may not attend the community meetings.
Staffing needs from FEMA are to be coordinated through the Watershed Project Team(WPT)meetings.
Additionally, the CTP shall manage their contractor to assure delivery of the appropriate items and shall
approve all data delivered on their behalf,prior to its submission. The CTP lead shall coordinate inquiries
with the responsible FEMA POC to assure delivery of the tasks outlined in this FRP-MAS.
Watershed Project Team. In cooperation, the State CTP Lead and the FEMA Project Monitor will
establish a Watershed Project Team(WPT). The WPT should be established at the onset of a project. The
WPT is intended to assure a broad discussion of existing risk assessment and understanding of the project
area prior to meeting with the communities.
The WPT should review the need for input from a subject matter experts to include Floodplain Management
and Insurance, the National Flood Insurance Program, the Hazard Mitigation Planning and Hazard
Mitigation Assistance available through FEMA's Mitigation Division, the team may vary from project to
project. These subject matter experts may be Local,Regional,State or Federal partners,based on the project
needs. The WPT should also include the identified FEMA Project Monitor as a team member. As a project
progresses, it may be deemed that other FEMA team members are necessary for the successful delivery of
Risk MAP within the project area. The WPT will be led by the CTP and meet periodically throughout a
project's lifecycle. The CTP is responsible for coordinating the activities identified in this MAS. The
FEMA Region should be provided with documentation identifying the WPT membership and meeting
schedule.
Community Engagement. The CTP is expected to provide supplementary support to the Mapping Partner
responsible for the Community Engagement activities funded through the Project Management SOW,
CERC SOW and/or other contracts. Community Engagement activities funded through this MAS shall not
supplant or duplicate Community Engagement activities funded through other grants or contracts.
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project—Mapping Activities Statement No. 4 7
Project Meetings. This Flood Risk Project will include in-person opportunities to engage communities,
build risk awareness, increase capabilities for risk communication, and stimulate mitigation action at the
local level. The overarching goal is to create a climate of understanding and ownership of the mapping
process at the State and local levels. Well-planned and executed community engagement and project
outreach can reduce political stress, confrontation in the media, and public controversy, which can arise
from lack of information, misunderstanding,or misinformation. These engagement and outreach activities
also can assist the CTP,FEMA and other members of the WPT in responding to congressional inquiries.
The actual number of meetings will be determined based on the risk and need at the local level and
determined as part of developing the project-based communication plan. Provisions may be made for
remote access video/audio feeds for those that cannot attend in person. These opportunities are included in
each phase as they are outlined in the Framework to Achieve Mitigation Action.
The CTP shall consult the each phase and scope section within the FRP-MAS template and review the need
for each meeting identified in order to meet the objectives
Other Requirements.The Project Monitor may request additional information on status of projects on an
ad hoc basis in order to answer incoming correspondence and required reporting for FEMA leadership.The
CTP will provide information as requested by the FEMA Project Monitor.
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project—Mapping Activities Statement No. 4 9
Table 1.3—Total Riverine Stream Mileage Counts by Type of Study
ApproximateCurrent, watershed Current CNIAS Detailed Detailed Limited
(onlyUpdated or Name or Validity W/ no Detail •
Floodway Floodway
(ZoneNew Study? Jurisdiction Status?
Or •
Effective Lower West Valid=## 8.4 iila ii/a n/a n/a
Study Fork Trinity Unknown=## n/a 2.3 n/a 11.1 n/a
Mileage HUC-8
Watershed Unverified�## 2.1 n/a n/a n/a n/a
Updated Lower West Valid=## 23.6 n/a n/a n/a n/a
Study Fork Trinity Unknown=## n/a n/a n/a n/a n/a
Mileage HUC-8
Watershed Unverified=## n/a n/a n/a n/a n/a
Lower West Valid=## 0.4 n/a n/a n/a n/a
New Study Fork Trinity Unknown=## ii/a n/a n/a n/a n/a
Mileage HUC-8
Watershed Unverified=## n/a n/a II/a n/a n/a
Effective Denton Valid=## 1.8 n/a n/a 1.0 n/a
Study HUC-8 Unknown=## 0.8 n/a n/a 7.4 n/a
Mileage Watershed Unverified=## n/a 0.5 n/a n/a n/a
Updated Denton Valid�## 11.5 nfa ii/a n/a n/a
Study HUC-8 Unknown=## n/a n/a n/a n/a n/a
Mileage Watershed Unverified=## n/a n/a ii/a n/a n/a
Denton Valid=## 2.2 n/a n/a n/a n/a
New Study HUC-8 Unknown=## n/a n/a n/a n/a n/a
Mileage Watershed
Unverified=## n/a ii/a n/a n/a 11/a
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project—Mapping Activities Statement No. 4 91
Table 1.4—Summary of Topographic Data
Watershed/ and L`nd New/Existing Accuracy Sotii-ce/Data Cotilact Use
1(' 110hils of OR Year
Source Tol)o Data Leveraged Acquired
Collection
Existing 1.2 ft TNRIS TNRIS None
Lower West vertical;
Fork Trinity 2009
River HUC-
8 Watershed
Lower West Existing Unknown NCTCOG NCTCOG To be
Fork Trinity vertical; evaluated
River HUC- 2015
8 Watershed
Denton Existing Unknown NCTCOG NCTCOG To be
HUC-8 vertical; evaluated
Wateshed 2015
Standards: All Topographic Data Development work shall be performed in accordance with the standards
specified in Section 5 -Standards.
Deliverables: The CTP shall make the following products available to FEMA by uploading the digital
data to the MIP in accordance with the schedule outlined in Section 6—Schedule. Where paper
documentation is required by state law for professional certifications,the CTP may submit the paper in
addition to a scanned version of the paper for the digital record. Please coordinate with the regional and/or
state representative to verify state reporting requirements.
• An intermediate Technical Study Data Notebook(TSDN)describing the scope of work,direction
from FEMA, issues, information for next mapping partner,etc.
• Acquisition and processing document detailing actual flight, acquisition, and processing
methodology and results.
• Breaklines
• Bare Earth DEM
• Contours
• Survey ground control and checkpoints, including x,y,z file of points,survey control
documentation,photographs at point locations, and Certification of Work.
• Checkpoint analyses spreadsheet used to assess the accuracy of data, including Root Mean Square
Error calculations to support vertical accuracy.
• Identification of data voids and methods used to supplement data voids.
• Low confidence area polygon file and metadata.
• National Geodetic Survey data sheets for Network Control Points used to control topographic
data acquisition and ground surveys.
• Metadata file complying with the NFIP Metadata Profiles Specifications, and
• Support documentation and Certification of Work. Where paper documentation is required by
State Law for Professional certifications,the Mapping Partner may submit the paper in addition
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project—Mapping Activities Statement No.4 13
• Digital sketches of cross section and structure data
• Documentation of the horizontal and vertical datum
• National Geodetic Survey data sheets for Network Control Points used to control topographic
data acquisition and ground surveys
• Digital versions of draft text for inclusion in the FIS report
• Digital survey data consistent with the Data Capture Technical Reference
• Metadata file complying with the NFIP Metadata Profiles Specifications
• Support documentation
• Certification of Work
• DFIRM Database files
• A Summary Report that describes and provides the results of all automated or manual QA/QC
review steps taken as outlined in the approved QAIQC Plan.
• Upload of all study data through the MIP Data Development Task—Perform Field Survey
• Report leverage data in the MIP Data Development Task—Perform Field Survey for any leverage
data utilized in this task.
Task: Develop Hydrologic Data
Responsible Mapping Partner: The City of Fort Worth
Scope:The CTP shall perform hydrologic analyses for the flooding source(s) identified in Table 1.5—
S'ummary of Hydrologic Analyses. Hydrologic analysis activities include the determination of peak flood
discharges,the use of rainfall-runoff models,regression equations, gage analysis,and hydrograph
development to support the level of detail required for the project. The CTP shall calculate peak flood
discharges and/or flood hydrographs for the 10%, 4%,2%, 1%, "1%plus", "I%minus", and 0.2%annual
chance events using the analysis method listed in Table 1.5. These flood discharges will be the basis for
subsequent Hydraulic Analyses performed under this MAS. In addition,the CTP will be responsible for
addressing any and all comments resulting from the independent QC, including resubmittal of
deliverables as needed to pass technical review.
If GIS-based modeling is used,the CTP shall document automated data processing and modeling
algorithms, and provide the data to FEMA to ensure these are consistent with FEMA standards. Digital
datasets(such as elevation,basin,or land use data)are to be documented and provided to FEMA for
approval before performing the hydrologic analyses to ensure the datasets meet minimum requirements. If
non-commercial(i.e.,custom-developed)software is used for the analysis,then the CTP shall provide full
user documentation,technical algorithm documentation,and the software to FEMA for review before
performing the hydrologic analyses.
The CTP will compare the calculated,or computed,discharge with discharge determined from reliable gage
data,if any.This comparison will only be done at locations where the two discharge values are considered
representative of the same flooding source.Results of this comparison will be used in making a professional
judgment for determining the discharge to be used for the hydraulic analysis.
FY16-FRP-MAS Region 5 Template Version 1.0(March 2016)
Flood Risk Project—Mapping Activities Statement No. 4 15
Deliverables: The CTP shall make the following products available to FEMA by uploading the digital data
to the MIP in accordance with the schedule outlined in Section 6—Schedule. Where paper documentation
is required by state law for professional certifications, the CTP may submit the paper in addition to a
scanned version of the paper for the digital record. Please coordinate with the regional and/or state
representative to verify state reporting requirements
• An intermediate Technical Study Data Notebook(TSDN)describing the scope of work, direction
from FEMA, issues, information for next mapping partner,etc.
• Digital copies of all hydrologic modeling(input and output)files for the 10%, 4%,2%, 1%, "1%
plus",and 0.2%annual chance events.
o Watersheds should be studied in their entirety
■ Detailed Streams require the 10%, 4%,2%, 1%,"1%plus"and 0.2%annual
chance events to be analyzed
■ Limited Detailed Streams require the 1%, "1%plus" and 0.2%annual chance
events to be analyzed
■ Approximate Streams require theI%, "1%plus"and 0.2%annual chance events
to be analyzed
o PMR streams should be studied to a termination point of hydrologic significance (mouth
of stream, confluence with larger stream, dam,etc.)
• Digital hydrologic data consistent with the Data Capture Standards as described in the latest
Technical Reference: Data Capture.
• FIRM Database files as described in the FIRM Database Technical Reference,Table 2.
• Metadata file complying with the latest Technical Reference: Metadata Profiles for Hydrology.
• Digital Summary of Discharges Tables presenting discharge data for the flooding sources for
which hydrologic analyses were performed (for flooding sources mapped as Zone AE on the
FIRM).
• Digital versions of draft text for inclusion in the FIS report.
• Digital versions of all backup data used in the analysis including GIS data layers work maps.
• A Hydrology Report summarizing the approach and results of the hydrologic analysis for each
study area in Table 1.8.
• Watershed Project Team meeting minutes and documentation/resolution of any concerns raised in
coordination with local community technical staff throughout this task effort.
• Perform Quality Assurance and Quality Control(QA/QC)review and provide
o A Summary Report that describes the findings of the independent QA/QC review;
o Confirmation of update(s)made to the NDEP;
o Recommendations to resolve any problems that are identified during the independent
QA/QC review; and
• A Summary Report that describes and provides the results of all automated or manual QA/QC
review steps taken during the preparation of the FIRM as outlined in the approved QA/QC Plan.
• Written certification that the digital data meet the minimum standards and specifications.
• Written response to any comments resulting from the independent QA/QC review.
• If data is changed following the independent QAIQC review,then updated deliverables for the
Develop Hydrologic Data task must be submitted to the MIP.
• Upload of all study data through the MIP Data Development Task—Develop Hydrologic Data
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project—Mapping Activities Statement No. 4 17
Table 1.6: Summary of Hydraulic Data
11) Flooding Current C111-re"t Current Proposed Total
Source Name Inventory CNMS Study Study Mileage
Paper--Not (Unhiown, (Apim-wNiniale. (Approximate,
vali(l) Detailed)
FYI 6-1 —Leverage Open Channel Studies
I Stream CF-3 Modernized Unverified, Detailed Detailed 3.6
Unknown
2 Stream CF- Modernized Valid, Detailed Detailed 0.6
3A Unknown
3 Stream CF- Modernized Valid, Detailed Detailed 0.9
3B Unknown
4 Stream CF- Not Studied Unknown N/A Detailed 0.2
3C
5 Stream CF- Not Studied Unknown NIA Detailed 0.1
3D
6 Stream MC-1 Modernized Valid Detailed, Detailed 3.1
Approximate
7 Cottonwood Modernized Valid Detailed Detailed 4.7
Creek
8 Cottonwood Modernized Unknown Approximate Detailed 0.3
Creek
Tributary
FYI 6-2—New Flood Risk Identification
7 Little Dosier Modernized Unknown Approximate Detailed 3.2
Creek
8 Little Dosier Modernized Unknown Approximate Detailed 0.8
Creek
Tributary 1
9 Little Dosier Not Studied Unknown NIA Detailed 0.1
Creek
Tributary 2
10 Clear Fork Modernized Unknown Approximate Detailed 1.4
Trinity River
11 Clear Fork Modernized Unknown Approximate Detailed 2.0
Trinity River
Unnamed
Tributary 1
12 Clear Fork Modernized Unknown Approximate Detailed 1.9
Trinity River
Unnamed
Tributary 2
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project--Mapping Activities Statement No. 4 19
o For Detailed Study Streams depth grids for the 10%,4%, 2%, 1%, "]%plus"and 0.2%
annual chance events shall be delivered
o For Limited Detailed Study Streams and Approximate Study Streams depth grids for the
1%,"1%plus"and 0.2%annual chance events shall be delivered
• Metadata file complying with the latest Technical Reference: Metadata Profiles for Hydraulics.
• Complete set of digital work maps to be used at the Flood Engineering Review meeting. Work
maps will include all appropriate GIS layers and be PDF files depicting effective and revised
flooding, cross sections,streams and roads on an aerial base map.
• A Hydraulic Report summarizing the approach and results of the hydraulic analysis for each study
area in Table 1.6.
• Written certification that the digital data meet the minimum standards and specifications.
• Where paper documentation is required by state law for professional certifications,the CTP may
submit the paper in addition to a scanned version of the paper for the digital record. Please
coordinate with the regional and/or state representative to verify state reporting requirements.
• Upload of all study data through the MIP Data Development Task—Develop Hydraulic Data
• Report leverage data in the MIP Data Development Task—Develop Hydraulic Data for any
leverage data utilized in this task.
• Review the submittal for technical and regulatory adequacy, completeness of required
information, and supporting data and documentation. The technical review is to focus on the
following:
o Use of acceptable model(s)
o Use of appropriate methodology(ies)
o Starting water-surface elevations
o Cross-section geometry
o Manning's"n"values and expansion/contraction coefficients
o Bridge and culvert modeling
o Ineffective and non-conveyance areas
o Flood discharges
o Regulatory floodway computation methods
o Tie-in to upstream and downstream non-revised Flood Profiles and floodways
o Agreement between the model,spatial data, work maps, Flood Profiles and Floodway
Data Tables
o Calibration of model(s)where high-water marks are available.
• Verify that the data was submitted under the applicable HUC-8 folders in the MIP.
• Use the CHECK-2 or CHECK-RAS program, as appropriate,to flag potential problems and focus
review efforts.Explanations for unresolved messages from the CHECK-2 or CHECK-RAS
program, as appropriate.
• A Summary Report that describes and provides the results of all automated or manual QA/QC
review steps taken during the preparation of the FIRM as outlined in the approved QAIQC Plan.
• Written response to any comments resulting from the independent QAIQC review.
• If data is changed following the independent QAIQC review, then updated deliverables for the
Develop Hydraulic Data task must be submitted to the MIP.
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project--Mapping Activities Statement No. 4 21
Task: Please 2 Project Documentation
The Mapping Partner shall prepare and compile the findings of the Phase Two efforts in the intermediate
TSDNs associated with each task described above. These TSDNs shall include all required
documentation(see deliverables statement for each task)associated with the effort undertaken for the data
collection, data validation,community coordination,and validation of deliverables prepared under each
data development task undertaken in this project phase.
The IBR Form will be prepared and finalized with the FEMA POC and the FEMA MIP Champion
following any award to the CTP partner to assure all project delivery tasks, associated costs, schedules
and risks are known to all parties. This meeting will act as the project kick off meeting between FEMA
and its Mapping Partners. This meeting shall be held virtually to allow flexibility for all parties to attend.
Standards:All floodplain mapping work shall be performed in accordance with the standards specified in
Section 5 Standards. The Mapping Partner will perform self-certification audits for the Floodplain
Boundary Standards for all flood hazard areas and submit this FBS certification with the Perform
Floodplain Mapping TSDN.
The CTP assigned the floodplain mapping task will complete all required activities related to levees in
accordance with the Program and Working Standards.
Deliverables: Upon completion of floodplain mapping for all flooding sources in this project,the CTP
shall make the following products available to FEMA by uploading the digital data to the MIP in
accordance with the schedule outlined in Section 6—Schedule.
• Project Specific Integrated Baseline Form—Prepare and Update
• Watershed Project Team meetings support(intermediately throughout this phase, with the
inclusion of the FEMA Project Monitor intermittently for progress update purposes)
• Communication and Action Tracker Worksheet—Prepare and Maintain
• Project and Communications Management Tool(excel file)
• Mitigation Action Tracker data entry for community supported mitigation actions identified
• Delivery of all associated products to the Regional POC for upload to the RiskMAP6.com
website for the identified project areas
• The Mapping Information Platform(MIP)shall be updated each month. Both REG and RMP
projects shall be updated by the 251h of the month.
• Project status will be reported to the Regional Status of Studies worksheet monthly.
• External project meetings will be identified on the Region 6 Risk MAP calendar
• Project coordination materials will be uploaded and shared with FEMA POC through the Region
6 Risk MAP SharePoint.
• Project management discussions and documentation shall be captured.
• Ad-hoc status inquiries,reports and input related to project performance and project scope may
be required periodically. The CTP will support the FEMA POC in providing this information as
required.
• Monthly/Quarterly Coordination calls with the FEMA POC will be performed and recorded under
this task for the Discovery effort.
• Preparation of Key Decision Point(KDP)process paperwork for the following steps:
o KDP2—Prepare Preliminary Flood Insurance Rate Map(FIRM)panels
o Indication of the number of panels intersected by the updated analysis prepared
o Overview of the severity of change and a recommendation for the panels that should be
updated or remain as is based on the analysis prepared in Phase Two.
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project—Mapping Activities Statement No. 4 23
• Draft Digital FIRM (DFIRM) database prepared in accordance with FEMA standards.
• Digital versions of input and output for any computer programs that were used consistent with the
DCS (see draft language and coordinate with the Region regarding its appropriate usage).
• Seamless digital floodplain layer meeting specifications for S XS, S FLD—HAZ_AR and
S_FLD_HAZ_LN
o All required attributes should be included in each of the data sets
o S XS should include water surface elevations
• Perform Quality Assurance and Quality Control(QAIQC)review and provide
o A Summary Report that describes and provides the results of all automated or manual
QA/QC review steps taken during the preparation of the FIRM as outlined in the approved
QAIQC Plan.
o Recommendations to resolve any problems that are identified during the independent
QAIQC review.
• If automated GIS-based models are applied,all input data, output data, intermediate data
processing products, and GIS data layers shall be submitted consistent with the DCS (see draft
language and coordinate with the region regarding its appropriate usage).
• Where paper documentation is required by state law for professional certifications,the CTP may
submit the paper in addition to a scanned version of the paper for the digital record. Please
coordinate with the regional and/or state representative to verify state reporting requirements.
• Maintain an archive of all data submitted for hydraulic modeling review. (All supporting data
must be retained for three years from the date a funding recipient submits its final expenditure
report to FEMA,and once the study is effective all associated data should be submitted to the
FEMA library)
Task- Develop Non-Regulatory Products
Responsible Mapping Partner: The City of Fort Worth
Scope: Risk assessment data and analyses are defined as processes for analyzing or evaluating the risk
associated with a hazard, and using that information to make informed decisions on the appropriate ways
to reduce the impacts of the hazard on people and property. As part of the Risk MAP Program, non-
regulatory Flood Risk Products shall be developed for all Discovery watershed areas.
During Phase Two, the CTP will update the previously created Flood Risk Products (Flood Risk Report,
Flood Risk Map and Flood Risk Database) to include the findings of the engineering analysis performed.
The Mapping Partner will prepare Flood Risk Assessment with a combination of the new engineering
analysis, with the previous HUC8 datasets prepared with Base Level Engineering results. The tables and
risk assessment calculations within the Flood Risk Report(FRR), Flood Risk Map (FRM) and Flood Risk
Database(FRD)will be updated to reflect these changes.
Prepare Flood Risk Products: In "deployed" Watershed project areas the following non-Regulatory
products shall be produced under this task:
• HUC8 Watershed Flood Risk Report. The Flood Risk Report activity includes documenting and
delivering local communities a summary of their watershed and local flood risk information along
with best practices for risk reduction. This is a standard non-regulatory product. The CTP shall
leverage the Watershed Flood Risk Report that was prepared during the Phase One—Discovery
effort and update the contents to reflect the changes due to data refinement and interactions with
communities throughout the Phase Two efforts. CTPs shall feel free to deviate from the National
template in order to prepare and provide a tool that is reliable and useful to the communities
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project—Mapping Activities Statement No. 4 25
• Perform Quality Assurance and Quality Control(QA/QC)review on the products prepared within
this task and provide:
o A Summary Report that describes the findings of the independent QA/QC review;
o Recommendations to resolve any problems that are identified during the independent
QA/QC review.
Table 1.7—Risk Assessment Product Development Table
Flood Risk Database(Datasets)
Flood Risk
and/or ProJect (Flood Risk Composite WSEL Grid(s) Flood Risk Other(acid
FY]6-1 X X X X Ultimate
Conditions
FY16-2 X X X X Ultimate
Conditions
Standards: All work shall be performed in accordance with the standards specified in Section 5-Standards.
Deliverables: The following products, for those communities identified in Table 1.1,will be made
available to FEMA(CDIDVD,external hard drive, FTP,or uploaded to the MIP, as determined by the
Region):
• Flood Risk Report,Map, and Database;
• Flood Risk Assessment(based on Base Level Engineering results)-
• Water Surface Elevation Grids(minimum 10%, 1%and 0.2%events)
• Depth Grids(minimum 10%, 1%and 0.2%events)
• Areas of Mitigation Interest dataset(standard;required)
• Other datasets,as requested and identified to support local mitigation actions
All Flood Risk Databases that are compliant with the Flood Risk Database Technical Reference
(August 2013).
Standards: All Risk MAP work shall be performed in accordance with the standards specified in Section 5
-Standards.
Deliverables: The following products, for those communities identified in Table 1.1,will be made
available to FEMA(CDIDVD, external hard drive, FTP,or uploaded to the MIP, as determined by the
Region):
• Flood Risk Report
• Flood Risk Map
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project—Mapping Activities Statement No. 4 27
As indicated in each of the Data Development tasks within this phase,FEMA Region 6 and its CTPs shall
coordinate with technical staff from local communities in the process earlier than this meeting as the data
is being developed. The CTP should work with local communities to identify technical staff to engage with
throughout the preparation of the analysis and mapping efforts leading up to this Flood Risk Review
meeting. It is the expectation of FEMA that its Mapping Partners shall have intermediate discussions and
touch points with the local communities affected by analysis results through webinars(minimum)prior to
this meeting.
The Flood Risk Review Meeting will also provide the opportunity to show how datasets and outreach tools
can help communities become more resilient by understanding risk data, communicating about risk,
prioritizing mitigation actions and improving mitigation plans, especially risk assessments and mitigation
strategies. Activities include planning, presenting, and facilitating discussions of data inputs and
engineering models used for flood studies with community officials. In addition,draft work maps showing
initial study results will be presented during the meeting.
Standards: All Risk MAP work shall be performed in accordance with the standards specified in Section 5
-Standards. All communication with local governments will be done in accordance with 44 CFR Part 66.
Deliverables: The CTP shall deliver the following to the FEMA Regional Project Monitor in accordance
with the schedule outlined in Section 6--Schedule.
• All documentation prepared for this meeting task shall be delivered in a Coordination &
Correspondence TSDN at the completion of Phase Two.
• Watershed Project Team meetings support(intermediately throughout this phase,with the inclusion
of the FEMA Project Monitor intermittently for progress update purposes)
• Communication and Action Tracker Worksheet—Prepare and Maintain
• Project and Communications Management Tool(excel file)
• Mitigation Action Tracker data entry for community supported mitigation actions identified
• Preparation and distribution of all letters,newsletters,flyers, exhibits and reports identified by the
Watershed Project Team based on project areas
• Project materials for distribution at these meetings will be uploaded and shared with FEMA POC
(Diane.Howc(a,fcma.dhs.goy)through the Region 6 Risk MAP SharePoint.
• Preparation of Key Decision Point(KDP)process paperwork and coordination with local entities
in order to prepare:
o KDP2—Prepare Preliminary Flood Insurance Rate Map(FIRM)panels documentation
o Indication of the number of panels intersected by the updated analysis prepared
o Overview of the severity of change and an recommendation for the panels that should be
updated or remain as is based on the analysis prepared in Phase Two
• Documentation of all conversation and interactions with communities related to Data
Development efforts
o Enter contact date&info into Region 6 Communications Tracker
o Call Logs and emails; and
• Meeting invitation,agenda,presentation slides(as requested), and meeting notes for FEMA
review.
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project—Mapping Activities Statement No. 4 29
issue is identified.The SPR describes the issue and proposes possible resolutions.For additional
information on SPRs, consult the Regional Office.
Information supporting FEMA standards and requirements regarding the TSDN and FEDD file may be
found in Procedure Memorandum 62 TSDNand FEDD File Protocol for Mapping Projects and Data
Capture Technical Reference.
X X X X X X X X X
X X X X X X
X X X X X X X X X X X
X X X X X X X X X X X
X X X X X X X X X X
X X X X X X
SECTION 3 -PERIOD OF PERFORMANCE
The mapping activities outlined in this MAS will be completed as specified in the Cooperative Agreement
Funding Opportunity Announcement,Award Notice and/or Articles of Agreement. The Mapping
Activities may be terminated at the option of FEMA or the CTP in accordance with the provisions of the
Partnership Agreement dated November 19,2012. If these mapping activities are terminated, all products
produced to date must be submitted and updated into the MIP(if applicable)and the remaining funds,
provided by FEMA for this MAS,from uncompleted activities will be returned to FEMA.
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project--Mapping Activities Statement No. 4 31
SECTION 5 — STANDARDS
The standards relevant to this MAS are available in FEMA's Guidelines and Standards Policy Memo
located at littp://www:fema.gov/media-library/assets/documejits/35313.Additional information,along
with links to Guidance,Technical References,Templates and other resources that support these standards,
may be accessed and/or downloaded from the FEMA Flood Hazard Mapping website at
http://www.fema.gov/guidelines-and-standards-flood-risk-analysis-and-mappinz. The Geospatial Data
Coordination Policy and the Geospatial Data Coordination Implementation Guide are located at
https://hazards.femaa.gov under"Tools&Links."
All Flood Risk Projects, including regulatory National Flood Insurance Program(NFIP)map changes and
other Risk Mapping Analysis,and Planning(Risk MAP) activities,shall be completed in accordance with
the Federal Insurance and Mitigation Administration(FIMA)Policy 204-078-1, Standards for Flood Risk
Analysis and Mapping, located on FEMA's website at www.fema.Roy/guidelines-and-standards-flood-
risk-analysis-and-mapping. This policy presents the standards for Flood Risk Projects,Letters of Map
Change(LOMC)and other related Risk MAP activities. The standards are organized in a hierarchy:
Program Standard—A required element of the Risk MAP program. Exceptions to program
standards can only be granted by program leadership through an exemption process.
Working Standard—A required element usually at a higher level of specificity than the program
standards. Working standards are applied by specialists(engineers,planners,technicians,
scientists, etc.)and have minimal ethical, political, and legal impacts to the program. FEMA
Regional Offices may occasionally grant exceptions to these requirements.
Technical references, guidance documents and other best practice recommendations for Flood Risk
Projects are located on FEMA's website at www.fema. ov/ uidelines-and-standards-flood-risk-anal sis-
and-mapping. These are also organized in a hierarchy:
Technical References—These documents are specifications of a technical nature, but too
granular to be considered standards.There are a number of standards that mandate compliance
with the Technical Reference.
Guidance—These documents provide a recommended approach to meet the standards. Accepted
approaches are not limited to this recommended approach; other methods may be used to meet or
exceed the standards.
Best Practices Any method, in addition to guidance, that meets or exceeds the standard. Best
practices are shared by regions and Mapping Partners following successful approaches to
program activities.
Ali the standards for the Risk MAP Program are listed in the above referenced FIMA Policy. This policy
supersedes all of the standards included in the previous Guidelines and Spec fcations for Flood Hazard
Mapping Partners and associated Procedure Memorandums(PM). Some useful guidance is still available
in these documents. These documents and information about how to use them in coordination with newer
documents can be found on FEMA's website at http://www.fema.gov/p-uidelines-and-standards-flood-
risk-analysis-and-mapping,
FEMA is in the process of updating existing guidance at: http://www.fema.p-ov/media-
library/assets/documents/21123, htti)s://www.fema.gov/media-library/assets/doeuments/i 1576 and
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project---Mapping Activities Statement No. 4 33
Table 5.1—Applicable Standards for Project Activities
Activities
CY
CL
Guidelines and Specifications for
Flood Hazard Alapping Partners X X X X X X X X X X X X X X X X X
and Procedure A-lemorandums
FEMA's Geospatial Data X X X
Coordination Policy
FEMA's Gcospatial Data
Coordination Implementation X X X
Guide
Engineer Manual t 110-2-1003,
Hydrographic Surveys X X
(USACE),January 1,2002
"Numerical Models Accepted by
FEMA for NFIP Usage," X X X X X X X
Updated April2003
NFIP Metadata Profile X X X X X X X X X
Specifications
Document Control Procedures X X X X
Afanual
44 Code of Federal Regulations X X X X X X X X X X X X X X X X X
Parts 65, 66 and 67
Data Sharing Agreement
Table 5.2: Project Activities and Applicable Portions of PEMA Guidelines and Specifications
Activity Description Applicable Volume, Section/Subsection, and
Appendix
Volume 1
Perform Discovery Appendix I
Discovery Report document
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project—Mapping Activities Statement No. 4 35
Activity Applicable
lunie, Section/Subsection, and
Description i
Appendix
PM 61
Acquire Base Map and Volume 1
Perform Independent QAIQC: Base Map Appendices A,K, L,N and O
Volume 1
Develop Hydrologic Data and
Perform Independent QAIQC: Appendices A, C, E,F, G,H, and M
Hydrologic Data
PM 59
Volume 1
Develop Hydraulic Data and Appendices A, B, C,E, F, G,H, and M
Perform Independent QAIQC: Hydraulic Data
PM 34,43, 51, 52, 53, 59,63
Volume 1
Appendices A, B, C, D, H, and M
Coastal Guidelines Updates"
PM 47
Perform Coastal Analysis Hazard Analyses and
Perform Independent QAIQC: Coastal Analysis OG 7-11:Application of TAW Runup
Methodology to FEMA Needs
OG 8-11: Joint Probability—Optimal Sampling
Method for Tropical Storm Surge Frequency
Analysis
Volume I
Appendices C,D, E, F, G, H, K, L, and M
Perform Floodplain Mapping and
Perform Independent QAIQC: PM 51, 52, S3 and 56
Floodplain Mapping CNMS User's Guide
(including Redelineation/Digitization)
CNMS data model
"NVUE: Calculation Guidance under Risk MAP"
Volume 1
Develop FIRM Database Appendices K, L and M
PM 42, 56
Produce Preliminary Map Products and Volume 1
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project—Mapping Activities Statement No. 4 37
SECTION 6 --SCHEDULE
The activities documented in this MAS shall be completed in accordance with'fable 6.1 Project Activities
Schedule, which should drive the schedule within the MIP. If changes to this schedule are required, the
CTP shall coordinate with FEMA and the PMT in a timely manner.
Table 6.1—Project Activities Schedule
Project/Study Baseline Baseline
START DATE END DATE
Develop Topographic Data 01/01/2020 03/01/2020
Perform Field Survey 01/01/2020 03/01/2020
Develop Hydrologic Data 01/01/2020 05/01/2020
Develop Hydraulic Data 03/01/2020 07/01/2020
Perform Flood lain Mapping 07/01/2020 09/01/2020
Develop Non-Regulatory Products 07/01/2020 09/01/2020
Flood Risk Review 08/15/2020 09/30/2020
Resilience Meeting 1 08/15/2020 09/30/2020
FEMA or its designee shall create the Flood Risk Project in the MIP and baseline the project activities with
schedule and cost information within 30 days of the fiends being awarded and FEMA's approval of the final
cost and schedule.
The CTP will coordinate with FEMA, or its designee,to develop a baseline schedule for individual project
activities. FEMA or its designee will utilize the individual project task schedule create the Flood Risk
Project in the MIP and baseline the project activities with schedule and cost information within 30 days of
the funds being awarded and FEMA's approval of the final cost and schedule. The baseline schedule for
individual project activities may be re-baselined in the MIP with approval from the FEMA Project Officer,
and does not require a change to this MAS unless the overall project end date is modified.
SECTION 7- CERTIFICATIONS
Data Capture
DCS Certification Form will be in compliance with Appendix M,Data Capture Standards,dated May 2013
Perform Field Surveys and Develop Topographic Data
A Registered Professional Engineer or Licensed Land Surveyor shall provide an accuracy
statement for field surveys and/or topographic data used and shall certify these data meet the
accuracy statement provided. Data accuracy should be stated used the Federal Geographic Data
Committee National Standards for Spatial Data Accuracy, but the American Society for
Photogrammetry and Remote Sensing accuracy reporting standards are acceptable.
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Projoct—Mapping Activities Statement No. 4 39
i
https:Hriskinapporta[.inse.fema.gov/FEMA_REGIONS/REGIONVI/Contracting_Pro rg amMgmt/I/CTP%
20Grant%2OTcinplates/2016/20160304 CTP PerforinanceMetricsMenu_Draft.doex
Performance Reporting: Recipients are responsible for providing updated performance reports using the
SF-PPR on a quarterly basis throughout the period of performance, including partial calendar quarters as
well as for periods where no grant award activity occurs. The CTP shall refer to 2 CFR 200 to obtain
minimum requirements for progress reporting. The Project Officer, as needed, may request additional
information on progress.
The CTP may meet with FEMA and/or its contractor(s)as frequently as needed to review the progress of
the project in addition to the quarterly financial and status submittals. These meetings may alternate
between FEMA's Regional Office,the City of Fort Worth office,and conference calls,as necessary.
The CTP must report performance of the grant in conjunction with the progress reporting. The
performance of the CTP is measured by the following criteria. Quantitative Targets for performance
measures will be defined between you and your FEMA Region and amended to the MAS when
completed.
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project—Mapping Activities Statement No. 4 41
Uniqueness and value of the national, State,regional or local Provide a statement of some of the
unique value that has been provided
relationships maintained, including ability to effectively by this cooperative agreement.
cooperate and coordinate with NFIP stakeholders as well as
other whole community stakeholders affected by program
activities.
Adherence to statutory and regulatory requirements as well
as program standards for timeliness, completeness and Report submittals and o there
was deliverryy of any products
quality of project activities and deliverables submitted to v FEMA and/or provided to the public communities that had errors. If so,
identify any corrective actions plans
Demonstrated quality ofproduct(s)submitted to FEMA that you and the Region determined
and/or provided to the public. for said issue.
Ability to cooperate and coordinate with the staff of the Provide statement certifying that
following organizations during all phases of project communication throughout the Risk
activities as needed: the FEMA Regional Offices;the MAP project has been completed in
Federal Insurance and Mitigation Administration in the conjunction with the entities listed
FEMA Headquarters Office in Washington,DC; and
designated FEMA contractors.
The CTP shall communicate with communities throughout the life of each project. Continued engagement
is necessary and appropriate and will build upon the relationships established or enhanced during Discovery
and provide transparency into the Risk MAP process.This may occur through monthly or quarterly updates
or project status calls with community leaders,project websites including updates at several milestones or
along a specific timeline,or other methods.
SECTION 11--PROJECT COORDINATION
Throughout the project,all members of the Project Team will coordinate,as necessary,to ensure the
products meet the technical and format specifications required and contain accurate, up-to-date
information. Coordination activities may include:
• Meetings,teleconferences,and video conferences with FEMA and other Project Team members
• Telephone conversations with FEMA and other Project Team members on a monthly basis,and
an ad hoc basis, as required.
• Updates to the MIP and other FEMA status information systems in accordance with FEMA
standards and requirements.
• E-mail,facsimile transmissions,and letters,as required.
FY16-FRP-MAS Region 6 Template Version 1.0(March 2016)
Flood Risk Project—Mapping Activities Statement No. 4 43
3/24/2020 M&C Review
Official site of the City of Fort Worth,Texas
CITY COUNCIL AGENDA FORTWORTII
DATE: 3/17/2020 REFERENCE NO.: **M&C 20-0167 LOG NAME: 20FEMA_CTP_HALFF
CODE: C TYPE: CONSENT PUBLIC HEARING: NO
SUBJECT. Authorize Execution of a Professional Engineering Services Agreement with Halff
Associates, Inc., in an Amount not to Exceed $767,000.00 for City of Fort Worth Mapping
Activity Statement#4 for FEMA Cooperating Technical Partners Grant (ALL COUNCIL
DISTRICTS)
RECOMMENDATION:
It is recommended that the City Council authorize execution of an Agreement with Halff Associates,
Inc. in the amount of$767,000.00 for City of Fort Worth Mapping Activity Statement#4 for FEMA
Cooperating Technical Partners Grant (City Project No. 101046).
DISCUSSION:
The contract recommended by this Mayor and Council Communication will be used to update Flood
Insurance Rate Maps (FIRMs) and other flood hazard awareness products through the Cooperating
Technical Partner(CTP) program with the Federal Emergency Management Agency (FEMA). This
work will be primarily funded by FEMA through a CTP Mapping Services Grant, with cash and in-kind
services provided for the necessary local match portion.
RFQ's were published in August 2017 for professional services related to the CTP grant projects to be
completed in compliance with recently-updated FEMA procurement regulations. Halff Associates, Inc.
(Halff)was identified as the most qualified responder for the CTP services specified. Halff proposes to
perform the services identified in the grant application for a lump sum fee of$767,000.00. Staff has
determined the proposed fees to be reasonable for the scope of services required.
City Council approved the application for the grant from FEMA in the amount up to $700,000.00
through M&C C-27746. Acceptance of the grant and final funding commitments of $700,000.00 in
grant funds from FEMA, Appropriation Ordinance Number 22513-12-2016 in the amount of
$67,000.00, and $225,700.00 of in-kind services.were authorized by City Council through M&C C-
28005. The total available funding for this project is $992,700.00.
Compliance with the City's Business Diversity Enterprise (BDE) Ordinance has been achieved by the
following method: Halff Associates, Inc. is in compliance with the City's BDE Ordinance by
committing to 10\% SBE participation on this project. The City's SBE goal on this project is 10\%.
This program serves ALL COUNCIL DISTRICTS.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are available in the current operating budget, as
appropriated, of the Grants Operating Federal Fund to support approval of the above recommendation
and award of the contract. Prior to any expenditure being incurred, the Transportation & Public Works
Department has the responsibility to validate the availability of funds. This is a reimbursement grant.
TO
Fund Department Account Project Program I Activity Budget Reference# Amount
ID ID Year Chartfield 2
FROM
Fund Department Account Project Program Activity Budget Reference# Amount
ID ID Year (Chartfield 2)
apps.cfwnet.org/council_packet/mc_review.asp?I D=27736&councildate=3/17/202O 1/2
3/24/2020 M&C Review
Submitted for City Manager's Office by_ Dana Burghdoff(8018)
Originating Department Head: William Johnson (7801)
Additional Information Contact: Monte Hall (8662)
ATTACHMENTS
Ft Worth CTP MAS No 4.pgf
apps.cfwnet.org/council_packet/mc_review.asp?ID=27736&councildate=3/17/2020 2/2