Loading...
HomeMy WebLinkAboutContract 37417CeT`,' SECRETARY q I CONTRACT NO. AGREEMENT TO EXTEND ENGINEERING SERVICE CONTRACT FOR THE SECOND YEAR (City of Fort Worth Contract No. 35309) As provided for in the above referenced contract and based upon satisfactory performance by your company in the first year of the contract, this contract is hereby extended for the second year by mutual agreement of both parties, using the enclosed unit costs . APPROVALS SRLS TEXAS, L.L. Mark Bilyeu, Date: 7- Z9- �S ATTESTED BY: CITYOF FORT WORTH Fernando Costa Assistant City Manager Date: 8/& /os T � Public Works APPROVED AS TO FORM AND G�1�� City Contract Authorization Date: 15 I 0 w OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX � ORIGINAL SRLS TEXAS, L.L.C. a division of Smith Roberts Land Senlices, Inc. 6112 Mcuart Ave. • Suite 200 • Fort Worth, TX 76133 • Tel: (817) 632-7500 • Fax (817) 632-7507 May 81 2008 Najib Fares, P.E., Infrastructure Manager Transportation & Public Works Department City Of Fort Worth 1000 Throckmorton Street Fort Worth, Texas, 76102 RE: 2008 Street Maintenance Program Management and Inspection Services Mr Fares: Attached to this letter are the two fee schedules, (from SRLS), in which are included the labor and field testing cost that will cover the above referenced program. We look forward in continuing to work with you and your staff and make your projects a success. Sincerely, Gilbert Ybarra, P.E. Project Manager Cc: Mark Bilyeu, Jim Duncan, President Chief Financial Officer Attachments: as stated OFFICIAL RECORD CITY SECRETARY FT IqORTH, TX The Right of Way Specialist® Testing Services Fee Schedule Field work Material testing technician (4 hour minimum) this hourly rate includes all field work such as testing of soils sample pickups, nuclear densities, Held gradations (soil cement), concrete, hot mix asphaltic concrete asphalt core thicknesses, and transportation costs -Concrete cylinder pickup with trip charge) -Laboratory testing tests 1.) Concrete cylinders 2.) Standard proctors 3.) Atterburg limits 4.) Soil moisture content -Asphalt testing l.) Gradation cost $J unit 40.00 minimum 2 hrs 15.00 each 145.00 each 45.00 each 20.00 each $50.00 each OFFICIAL RECORD CITY SECRETARY T. WORTH, TX LABOR COSTS Rate Number required PERCENT TIME USED Annual Cost Project Manager Chief Inspector $120.00 $80.00 1 1 1.30% 50% $39240.00 $83,200900 Senior Inspector $70.00 3.5 110% $5609560.00 Administrative Tech $60.00 1 50% $62AW100 Annual Labor Cost $709,400.00 Subcontracted Services (LABORATORY) $1509000.00 . SUBTOTAL $859,400.00 Direct Cost Mileage Miscellanous 4 vehicules x100 miles/day x 250 days x $0.505 Copies/office supplies/etc. 1 $50,500.00 $5,000600 Total Direct Cost $55,500.00 Contract not -to -exceed amount= COMBINED TOTAL $914,900.00 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 7/15/2008 ---�.��f.�.:�� .�x�..�, ��F. �a ���, � _.�. ,��f, _ .� ����.�,..�., x �. w.,w���._. .� � .u. _ .w.,. � _..,_.�_._ DATE: Tuesday, July 15, 2008 LOG NAME: 20SRLS/ENG (2) REFERENCE NO.: C-22923 SUBJECT: Authorize Execution of the First Renewal of City Secretary Contract No. 35309 with SRLS Texas, LLC, in the Amount of $914,900 for Engineering, Construction Management, Inspection, Testing, and Quality Control for the City of Fort Worth 2008 Contract Street Maintenance Program RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute the first renewal of City Secretary Contract No. 35309, an Engineering Services Agreement with SRLS Texas, LLC, for an additional year for an amount not exceed $914,900 for engineering, construction management, inspections, testing, and quality control for the 2008 Contract Street Maintenance Program. DISCUSSION: On May 8, 2007, (M&C C-22110) the City Council approved City Secretary Contract No. 35309, with SRLS Texas, LLC, for their services to include the preparation of contract specifications, construction management, inspections, testing, and coordination between City departments, utility companies and the public for the 2007 Contract Street Maintenance Program. The contract was for one year with aone-year renewal option. For the renewal year, SRLS Texas, LLC, has proposed to perform the necessary work based on hourly rates for an amount not to exceed $914,900. City staff considers this fee to be fair and reasonable for the scope of services to be performed. SRLS Texas, LLC, is in compliance with the City's M/WBE Ordinance by committing to 15 percent M/WBE participation on this first Renewal Option. The City's goal on this Renewal Option is 15 percent. The project is located in all COUNCIL DISTRICTS. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, on a project by project basis of the various Contract Street Maintenance Funds. TO Fund/Account/Centers FROM Fund/Account/Centers C293 SVARIOUS 20VARIOUS $914,900.00 Submitted for City Manager's Office b� Fernando Costa (8476) Originating Department Head: Greg Simmons (7862) Additional Information Contact: George Behmanesh (7914) Logname: 20SRLS/ENG (2) Page 1 of 1