Loading...
HomeMy WebLinkAboutContract 37394AMENDMENT No. 2 THE STATE OF TEXAS § CITY SECRETARY CONTRACT NO, RS Z- COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Freese and Nichols, Inc., (Engineer) made and entered into City Secretary Contract No. 33246, (the Contract) which was authorized by the City Council by M&C 21249 on the 10 h day of January, 2006; and WHEREAS, the Contract involves engineering services for the following project: Construction Management for the Eagle Mountain Water Treatment Plant, Raw Water Pump Station, Raw Water Intake, and Raw Water Transmission Main WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an amended scope of work and revised maximum fee. NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I, Section A; Scope of services is amended as follows 3.02 Eagle Mountain WTP Contract • Revise resident engineer time from 24 months to 31 months. • Revise resident representative time from 21 months to 27 months. 3.07 Amendment No. 1 Delete preparation of Record Drawings 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $3,134,770.44, Engineer acknowledges its commitment to obtain an additiona127.92% M/WBE participation for this amendment. The Engineer's commitment for the Contract remains unchanged. OFFICIA!_ RECORD CITY SECRETARY FT: WORTH, TX i ORIGINAL All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. ��� EXECUTED on this 2008, in Fort Worth, Tarrant County, Texas. ATTEST: Ma� Secretary APPROVAL RECOMMENDED: S. Frank Crumb, P.E. Director, Water Department Freese and Nichols, Inc. ENGINEER .� By: Name: Thomas Haster, P.E. Principal APPROVED AS TO FORM�4Alp LEGALITY: Assistant OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX day of Contract huthorizatioa Onto APPROVED: Fernando Costa Assistant City Manager Freese C1 l(I Nicho[s, Inc. 4055 International Plaza, Suite 200 April 21, 2008 Engineers Environmental Scientists Architects Fort Worth, Texas 76109 817 735 7300 817 735-7491 fax www.freese.com City of Fort Worth Water Engineering Department 1000 Throckmorton Street Fort Worth, Texas 76101 ATTN: Mr. Chris Harder, P.E. RE: Eagle Mountain Water Treatment Plant Phase Ill 35 MGD Expansion Project Project No. PW77-060770510050 Amendment No. 2 - Eagle Mountain Water Treatment Plant Construction Management Services Contract Dear Mr. Harder: Attached please find four copies of Amendment No. 2 to the Eagle Mountain Water Treatment Plant Construction Management Services Contract (City Secretary Contract t33246) for execution. This amendment will provide additional Construction Management Services at the Eagle Mountain Water Treatment Plant required due to the extended duration of the construction contract. We appreciate the opportunity to provide our services to the Fort Worth Water Department. Sincerely, G. E. Gay, P.E. cc: Bob Pence Jana Collier File FTW05340.4.21.CM Contract Amendment #2 transmittal OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Freese c11rd • N 1 C n o Ls, Inc. Engineers Environmental Scientists Architects 4055 International Plaza, Suite 200 Apri1212 2008 City of Fort Worth Water Engineering Department 1000 Throckmorton Street Fort Worth, Texas 76101 ATTN: Mr. Chris Harder, P.E. Fort Worth, Texas 76109 817 735-7300 817 735-7491 fax www.freese.com RE: Eagle Mountain Water Treatment Plant Phase I1135 MGD Expansion Project Project No. PW77-060770510050 Amendment No. 2 - Eagle Mountain Water Treatment Plant Construction Management Services Contract Dear Mr. Harder: We are pleased to submit this scope of services as Amendment No. 2 to the Eagle Mountain Water Treatment Plant (EMWTP) Construction Services Contract (City Secretary Contract #33246) to provide additional Construction Management Services needed to complete the project. Amendment No. 1, no M&C Required, executed by City Manager November 30, 2007, provided part-time Construction Management Services for the McCart Avenue Pump Station and Ground Storage Tank. At the time this amendment was negotiated it appeared that the EMWTP Construction Management project would be completed in January 2008 and adequate funds existed ($308,783) in the EMWTP construction management budget to provide the McCart Avenue Construction Management services with no increase in fee. Since this amendment was negotiated several issues have come up that have delayed completion of the EMWTP project. Amendment No. 2 is based on a cost to complete analysis of the EMWTP (complete by June 2008) and the McCart Avenue project (complete by July 2008). Deletion of some services at the McCart project was also utilized to reduce the additional cost to the City. As discussed, we propose to provide the following services: 3.02 Eagle Mountain WTP Contract • Revise resident engineer time from 24 months to 31 months. • Revise resident representative time from 21 months to 27 months. 3.07 Amendment No. 1 • Delete preparation of Record Drawings. The proposed increase in the not -to -exceed ceiling is $250,038. The amendment's proposed M/WBE's participation is $69,800 or 27.92%. The M/WBE participation includes additional services required for Amendment No. 1 (McCart Avenue) and Amendment No. 2 (Eagle Mountain WTP additional time). We appreciate the opportunity to provide our services to the Fort Worth Water Department. Si cerely, G. E. Gay, E. rl OFFICIAL RECORD cc: Bob Pence CITY SECRETARY Jana Collier FT. WORTH TX File FFW05340.4.21.CM Contract Amendment #2 041808 z 0 0 0 0 0 0 0 0 0 o 0 A ao oo�no0 0 00 0 �lno N Vl l 0 Vl ON M Vl r� F Vt a F r b M .-" V1 Vl a F b N ai VI V O� as M�M� 0 a� o F F O 69 69 69 F O N N O� bN9 C) nOw 6N'9 rsn V F F F w w w fA 69 69 69 69 6n 69 6n 6n kn 69 69 0� 0 � °�0000 0l C In o o ao oo Q r o~ f1 o r p �O ^ o 0 o F F F F M w sn sq `n �o ni 0 0 0 Z M .a F„ ate, w F„ av aFwF" �d(n „F C7 O v 0 °00 wFWv N w P cn OzE, �rA rA64 z a a �W w F ] ON z N 00 N N V cH O c L u Iva ] o w G N p V V } C7w3w d CIO� 5 v' w 4 � o Q r O M a a x 0 0 o w 0 0 0 z 0 0 M M F N Oo ri W `o U ca G' vs v3 W F a� pw x � w U a o a F o a� s•CM c via U 0 U O w x p"t tL .G z V N Q ❑ G t C �_ ado F F obC z IALRECO z a W ;" a I SECRETA IsW �o r co .+ N M Mkt C N r N U M&C Request Review Page 1 of 2 �OftT ��'fl}{Tl� City of Fart Worth Employee Intranet �/��/loos Staff Action Tracking Council Agenda M&C Employee Directory ACToday Employee Classifieds PRS IT Online Departments �' Print M&C ,�111 �C� I ��[� � [�P►ifll_ • • - • [•7ifrlE:iE+IiI�1!3 DATE: 7/8/2008 REFERENCE NO.: C-22913 LOG NAME: 60EMWTP AMEND2 CODE: C TYPE: NON -CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 2 to City Secretary Contract No. 33249, an Engineering Agreement with Freese and Nichols, Inc., in the Amount of $250,038.00 for the Construction Management of the Eagle Mountain Water Treatment Plant Expansion, Raw Water Pump Station, Raw Water Intake, and Raw Water Transmission Pipeline, Located Between Eagle Mountain Lake and the Intersection of Boat Club Road and Robertson Road Including the McCart Street Pump Station RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 2 in the amount of $250,038.00 to an engineering agreement with Freese and Nichols, Inc., City Secretary Contract No. 33249, for the construction management of the Eagle Mountain Water Treatment Plant Expansion, Raw Water Pump Station, Raw Water Intake and Raw Water Transmission Pipeline located between Eagle Mountain Lake and the intersection of Boat Club Road and Robertson Road including the McCart Street pump station thereby increasing the amount of the contract from $2,884,732.44 to $3,134,770.44. DISCUSSION: On January 10, 2006, (M&C C-21249) City Council authorized the City Manager to execute an engineering agreement with Freese and Nichols, Inc. (Freese and Nichols), in the amount of $2,884,732.44 for the Eagle Mountain Water Treatment Plant (EMWTP) Expansion, Raw Water Pump Station, Raw Water Intake, and Raw Water Transmission Main construction management. Construction management responsibilities include construction contract administration, inspection, and testing services for the Eagle Mountain Water Treatment Plant Expansion, Raw Water Pump Station, Raw Water Intake Improvements, and Raw Water Transmission Pipeline. These construction contracts, taken together, total approximately $60 million. Final completion has been reached on the Raw Water Pump Station, Intake, and Pipeline projects. Construction has reached substantial completion on the Eagle Mountain Plant Expansion, with final completion expected in late May 2008. On November 30, 2007, the City Manager authorized administrative (no -cost) Amendment No. 1, which added part time construction management of the McCart Pump Station and Ground Storage Tank to the Freese and Nichols engineering agreement. At the time of execution of this amendment, it was anticipated that the Eagle Mountain Water Treatment Plant expansion project would be completed by February 2008, with unexpended funds available for the part time construction management of the McCart Pump Station and Ground Storage Tank project. However, due to the delays in completing the Eagle Mountain Water Treatment Plant project, funding is no longer sufficient to see these two projects through to final completion. Amendment No. 2 increases the allowable fee under this engineering agreement as necessary to provide construction management and inspection through completion for both the Eagle Mountain Plant http://apps.cfwnet.org/council�acket/mc_review.asp?ID=9740&councildate=7/8/2008 7/9/2008 M&C Request Review Page 2 of 2 and the McCart Pump Station and Ground Storage Tank projects. This project is located in COUNCIL DISTRICT 7. Freese and Nichols, Inc., is in compliance with the City's M/WBE Ordinance by committing to an additional 30 percent M/WBE participation on this Amendment No. 2. The City's goal on this amendment is 28 percent. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Projects Fund. TO Fund/AccountlCenters Submitted for City Manager's Office bk Originating Department Head: Additional Information Contact: FROM Fund/AccountlCenters P164 531200 060164052003 $250,038.00 Fernando Costa (8476) S. Frank Crumb (8207) Chris Harder (8293) ATTACHMENTS http://apps.cfwnet.org/council�acket/mc_review.asp?ID=9740&councildate=7/8/2008 7/9/2008