HomeMy WebLinkAboutContract 37547-A5 (2)AMENDMENT NO. S n STATE OF TEXAS n S� § CITY SECRETARY CONTRACT NO. M&C COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Alan Plummer Associates, Inc. (Engineer) made and entered into City Secretary Contract No. 37547 (the Contract) which was authorized by the City Council by M&C C-22998 on the 26th day of August, 2008; and WHEREAS, the Contract involves engineering services for the following project: Village Creek Reclaimed Water Deliver�ystem Design WHEREAS, it has become necessary to execute Amendment No. 5 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: i� Article I of the Contract is amended to include the additional engineering services and costs in the amount of $219,813.00 as specified in "Attachment A" dated January 10, 2012 and 'Attachment B", both attached hereto and incorporated herein. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $3,228,712.00. 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED on this the day of , 2012, in Fort Worth, Tarrant County, Texas. ATTEST: City Secretary 0 0 CITY OF FORT WORTH ?� * o� o0 .rja - �- Fernando Costa Assistant City Manager APPROVED I I "lk GVVvvv S. Frank Crumb, P.E. Director, Water Department APROVED AS TO FORM AND LEGALITY ALAN PLUMMER ASSOCIATES, INC. Engineer By: Assistant City Attorney President To WORTH, TX ATTACHMENT A FOR CONTRACT AMENDMENT NO. 5 CITY OF FORT WORTH VILLAGE CREEK RECLAIMED WATER DELIVERY SYSTEM ADDITIONAL CONSTRUCTION ADMINISTRATION PHASE SERVICES SCOPE OF SERVICES JANUARY 10, 2012 The following is a clarification of the tasks that the ENGINEER will perform under ATTACHMENT A. The project includes additional construction administration phase services related to five construction contracts as follows: Pump Station No, 1, Pipeline Sections I and IV, Pipeline Section II, Pipeline Section 111, and the Water Quality Improvements Projects. BASIC ENGINEERING SERVICES A. CONSTRUCTION PHASE SERVICES 1. Provide an additional nine (9) months Field Administration Services. These additional services are needed to construction delays and additional documentation work required to comply with TWDB requests. Additional work included in this task includes the following. a. Additional meetings with TWDB staff. b. Coordination with the contractors on contracts for Parts 14 and the Pump Station to address issues related to project documentation required by the TWDB. c. Re -organization of the documentation after construction move of the documentation. d. Confirmation of State required documentation, in order to comply with changes requested by the TWDB inspector. e. Modifications to the Buy -American documentation as requested by the TWDB inspector, including requests for additional documentation, contacting supply vendors for product specification, cross referencing with submittals and schedule of values and reformatting of Buy American logs. f. Modification of the Davis Bacon documentation and re -organization to comply with changes requested by TWDB inspector. g. Additional work related to closing -out the contracts. This work includes coordinating with the TWDB, prime consultant, contractors and City staff. 2. Provide additional construction engineering services related to the Reclaimed Water Pump Station and Water Quality Improvements Projects. These additional services are needed due to construction delays and additional assistance needed during start-up of the system. Additional work included in this task includes the following. a. Review additional shop drawings including coordination meetings with Trojan on design of the UV tank. b. Attend additional construction coordination meetings, address questions and general administration during the extended construction time. c. Coordination of passivation of the UV tank. d. Additional project management related to extended ARRA requirements and 9 months of project extensions, f:\projects\0318\042-01\projectmgmt\contract amendment\amendment_5_scope.docx A-1 e. Attend additional monthly engineering coordination meetings. f. Assist the Contractor with start-up operations and troubleshooting of pumps and meters. g. Assist the plant operators with start-up operations and troubleshooting of the reclaimed water system. h. Assist the Contractor with start-up operations and troubleshooting of the controls and chlorination system. i. Visit the site monthly during the extended construction period and update the punchlist. j. Assist the Contractor with organizing and assembling the O&M manuals to help close out the project. Provide additional reviews of the O&M manuals as needed to complete the documents. k. Design new power metering systems at the pump station and UV system. I. Design modifications to the buried portion of the 3&inch UV discharge pipe to accommodate an electrical ductbank located in a different location than shown on the record drawings. m. Evaluate moving the UV system VFDs to a secondary location. n. Design structural modification to the pipeline support needed to accommodate differing wall elevations than shown on the record drawings. o. Revise the UV pumps controls narrative to accommodate updated UV system operations. p. Additional site visits and meetings and correspondence for the additional construction duration of 9 months. q. Review pay=apps and assist with close out documents during the extended construction period. r. Additional services related to multiple updates to the pump station operations manual. 3. Provide additional construction management services related to the Reclaimed Water Pump Station and Water Quality Improvements Projects. These additional services are needed due to construction delays. a. Provide field visits and labor interviews needed for the Davis -Bacon documentation required by the TWDB. b. Provide site visits as needed during the extended construction period. c. Provide construction management services during the extended construction period. 4. Provide additional assistance for pipeline construction administration due to design and coordination for multiple PCMs on four construction contracts. ADDITIONAL SERVICES Additional Services to be formed by the ENGINEER, if authorized by the CITY, which are not included in the above -described Basic Services, may include, but are not limited by the following. No allowance has been set aside for Additional Services, f:\projects\0318\042-01\projectmgmt\contract amendment\amendment_5_scope.docx A-2 ATTACHMENT B FOR CONTRACT AMENDMENT NO. 5 CITY OF FORT WORTH VILLAGE CREEK RECLAIMED WATER DELIVERY SYSTEM COMPENSATION JANUARY 10, 2012 Compensation A. The ENGINEER shall be compensated a total lump sum fee of $219,813 as summarized in Exhibit B-1 — Engineer Invoice. The total lump sum fee shall be considered full compensation for the services described Attachment A, including all labor materials, supplies, and equipment necessary to deliver the services. B. The ENGINEER shall be paid monthly payments as described in Section II —Method of Payment. IL Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER, B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Water Department monthly progress reports in the format required by the City. f:\projects\0318\042-01\projectmgmt\contract amendment\amendment_5_scope.docx B-1 ATTACHMENT E1 FOR CONTRACT AMENDMENT NO. 5 CITY OF FORT WORTH VILLAGE CREEK RECLAIMED WATER DELIVERY SYSTEM COMPENSATION SUMMARY JANUARY 2012 BASIC SERVICES A. Construction Phase Services T®tal $77,313 $77,313 $142,500 $142,500 TOTAL $219,813 $219,813 f:\projects\0318\042-01\projectmgmt\contract amendment\amendment_5_scope.docx B1-1 Consulting Firm M/WBE Subconsultants 1. CP&Y, Inc. Subtotal Subconsultants Prime Consultant Total ATTACHMENT 01 FOR CONTRACT AMENDMENT NO, 5 M1NBE BREAKDOWN COST SUMMARY JANUARY 2012 Scope of Services Construction Administration Construction Administration Fee Percent � 142, 500 142, 500 77,313 219, 813 65% 65% 35% 100% f:\projects\0318\042-01\projectmgmt\contract amendment\amendment_5_scope.docx B1-2 ATTACHMENT B1 FOR - CONTRACT AMENDMENT NO, 5 CITY OF FORT WORTH VILLAGE CREEK RECLAIMED WATER DELIVERY SYSTEM APAI PORTION January 2012 Additional Construction Administration Phase Services No. Task Descri tion Contract Value 2.a. Additional Review of Shop Drawings $16,100 2.b. Additional Site Visits, Meetings, and Correspondence for the Additional Construction Period $14,900 2.c. Coordinate UV Tank Passivation $2,440 2.d. Attend Monthly Engineering Coordination Meeting $27600 2.e. Additional Project Management Related to Extended ARRA Requirements and 9 Months of Project Extensions $15,100 4, Pipeline Construction Admin (31&042-33) Due to Design of Multiple PCMs $26,173 TOTAL $77,313 f:\projects\0318\042-01\projectmgmt\contract amendment\amendment_5_scope.docx B1-3 ATTACHMENT B1 FOR CONTRACT AMENDMENT NO.5 CITY OF FORT WORTH VILLAGE CREEK RECLAIMED WATER DELIVERY SYSTEM CP&Y, INC. PORTION January 2012 Additional Construction Administration Phase Services No Task Description Contract Value Additional Field Administration $ 34,850 1.a. Additional Meetings with TWDB Staff $ 31310 lobe Coordination with Contractors related to TWDB Documentation $ 41140 1.c. Re -organization of the documentation after files were moved $ 91960 1.d. Confirmation of documentation at request of TWDB inspector $ 31560 1.e. Modifications to the Buy -American documentation at the request of the TWDB inspector $ 51980 1.f. Modification of the Davis -Bacon documentation at the request of the TWDB inspector $ 31780 1. . Additional work related to closing out documents to coordinate with contractors, city staff and TWDB $ 41120 Additional Construction Engineering Services $ 941800 2.fff Engineering assistance to help Contractor troubleshoot start-up issues with pumps and meters $ 91300 2. . Engineering assistance to help plant operators troubleshoot operational issues with the new utilit $ 81800 2.h. Engineering assistance to help Contractor troubleshoot control issues. $ 91600 2.i, Additional coordination and site visits needed to manage and track the multiple punchlists generated. $ 7,700 2.'o Assist Contractor organizing and assembling the O&Ms and multiple reviews of the documents $ 14,800 2.k. Design power metering systems at pump station and UV system $ 83800 2.1, Design modifications to buried 36" pipe for UV system due to conflict with buried conduit $ 41300 2.m. Evaluate relocation of VFDs at UV system $ 31200 2. n. Design modification of pipeline support due differing site elevations. $ 3,500 2.o. Revise UV Pumps control narrative to accommodate UV system operation $ 41700 f:\projects\03181042-01\projectmgmt\contract amendment\amendment_5_scope.docx B1-4 2.p. Additional site visits, meetings and correspondence for the additional construction period $ 81600 2. . Additional services related to document coordination of the pay applications and close out documents $ 75700 2.r. Additional services related to multiple updates to the pump station operations manual $ 31800 Additional Construction Management Services $ 12,850 3.a. Additional field visits needed for the Davis -Bacon Interviews $ 43800 3.b. Additional site visits for the additional construction period $ 42850 3.c. Additional construction management services for the additional construction period $ 31200 TOTAL $ 1429500 f:\projects\0318\042-01\projectrngmt\contract amendmentlamendment_5_scope.docx 81-5 n v Q . � P m 0 a tit Z � � v r- O U � � _~ O r � W r O � :. � O E"" v � i• a Q e- N LL /� M O ii O � �:. ® � � � V � v � � a0. � W LL a �W �' a � G. ,� a LLI � a � � ��� �/ '� W � Ci '01 s ii ~ ~ � G Z aD a� �Zo� c � V � LL N Cd� W y}; . h � CV q j Z � `' � W � W }pp�p � a v+ � W � i L W W � o Z � d' O ;W � ` b � :,; � T O ❑ � � = W wa M V t- � a lif � !n Z y ` Z Z � � � o r ° �"O W � W W W 4. j ��'a V W W ,r. i' W � W ^.:4�1 v m r a �� e Z. O � � E m m c 0 0 0 0 0 O O O O 0000 O M O O or�ov ®��� O aO CVr �oro�rn W Vi WfR #l�f�l� �ov�c�d ���� E E � E eQ�Q O1ClOG1 L t L t �+ZaIi: W' o \ 0 c 0 \ 0 \ 0 o 0 0 0 0 0 0 0 {y,;,Y J O r O I� eY N �d7 CA O l(' N O 3 p o o `-' o co �r cp cV r csi rn `-' ;: V W ti Cn t0 O O Q) to O O O O N O O) 6L) O N r O ', w ,. O O O � O O C'7 ti O N d' O o 0 o cri M ai cD ao ui ao � v� r,a '❑ O O O CO CO O r r M � lA O r O r lfy � M l!) '� Ch (O O o � � CO N � COO � � � dN' M � �-a EH Ei? N �- Efl EA N to '6 EH d3 E9 `� �' O O O O N O CA Ln O N �-- O O O O r O O C+7 ti O N d: O � Q, O O O M M Ch CD 00 to 00 V' 'tt a �� to O O CO C10 O r r (*� t(') Ln O iL �� r O r tC') Cn cq tC) 'cf' ch r CD O '..Z CD Cn O CD O� In � 00 lt� N I� CO W_ � � � � .t7., � � N � 69 64 N 6M9 �` y O 'c _. �Ya g =4 Ot s 1�,. ,,' ►-� O O O O O O O O O O O O W �� O O O O O O O O O O O O °� o o® o �n o in ® o �n o o� 3 O O O N O h O O c�7 � lC) O ��' r O r � t!') N O O th I� ti O t-v CA r O C7 M CD C10 O � f`') I� CO U; N tt CD O r r ti9 N Ffi �! M CA Z � e� ER t�3 � (� a�s � � �N � z O O V :; m _ `^. N C p W � �� y � C O O � O 'a � � O +.+ '� � Q c E ° c°i cyo � W '� � a :,m , N N � � W d : Y � _ � -- — Z? O .� �_ m a c � c c O O Q N t0 C� W N � �. y U � � •� L "O O � CL in � W a E � o ID c U ° f0 ° a CA __ Z� __ 0 � d vi ° � o ° � a n .E E E E v` @ •c .` .n •c •c � �_ � O � O O � � p CA � to Cb r O O O in r" r e- N7 _ s ' aiS oiS .Q N .� Ju' N N � r = r r 'i �4� ..�•' C �+ U Vr "u0� , • �- � y � y Qi �. •.: J � � � " c �' E � � E �� c c � c� � ° a U � � 'a c 7 � >; � m 2� C C7 � w0.. C '� rn fU C � Qi O � � � .. LL" N O N U N L O U L m Q L � L � ci � C � N W E � � � -.YJ U CO � � � � .c O L U a � N Z� � I— � � W � I— � m y m ,� "W a ° O c � Q fi � O L j � C .0 Q L j v ��> CL1 U U (n W U' � J U [n U W J Z N C � • • • • • • • • r o • • • N F W O c LLa � � W d N ta, r O a � O W z F o O v y ? W W N �� a� LL Z W O a Z U W a � a o 0 F z V 0 � N O ti m � N Z Z 2 W � m Z 0 0 Z Z Q W Z H �LL 0 6a. W � z u. W W � �� oc F a W h � W 0 a' G J F O W � a k U �` F- LL W m t e i I i 0 0 0 0 0 O N CD O T O (D O O CA I` CA 00 CD 0 O C) 00 00 00 O 1� O O of a CD LO Q� 0) ti O 0 co N IOC) C7 co r� Ln r- N :;:. W LO 'ch 64 64 LO 0) 64 N ~ tf3 Z c7 O O N C) C) O M .. O O O V CO O M ll) ti O O Oa m OD 1� LO co LO It 60- 6j- LO CM T T 6 ) N 601, O O O O O O CI' O e- 6R Ef3 Q O O O O O O O O O T m N O O O O CD � � T Lon T Ei3 64 ffl Ef-} LLI Q c c L 0 U c 0 d �o = U Q C an o U ° ca v m to o c a� U aw d to M N co N CO CD N tf> O N o N (n CO O .Q no co co CD O C C C) c CJ Li — C _ _ E CC C n a g ,Q vi >- �- E N cti Q 06 o Q cu W (D Q M 4 DCF VI Z c p aa) p - J uw C:C O cc c6 ca p tm L F- Q W c U V s U > w CLc U) U U 1- an d d Fo Rr 4Vo W H Citm of Fort Worth • -472 [011san• • (for use with CHANGE ORDERS or AMENDMENTS greater than $50,000) Language to be inserted in the M&C for this Agreement Alan Plummer Associates, Inc. agrees to maintain its initial M/WBE commitment of 38%that it made on the original agreement and extend and maintain that same M/WBE commitment of 38% to all prior amendments up to and inclusive of this Amendment No. 5. Therefore Alan Plummer Associates, Inc. remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. Cletus R. Martin Printed Signature i o be Cotnpieted by the Representative of the C6nsiiitant%��Gti~ Senior Project Manager Title Authorized Signature/Date Alan Plummer Associates, Inc. Company Name Alan Plummer Associates, Inc. Address Fort Worth, Texas 76107 City/State/Zip 3 yo M/WBE %Paid to Date Contact Name (if different) cmartin@apaienv.com E-mail address 817-806-1700 Phone number 817-870-2536 Fax Number as of Date M/V1/BE Signature Date ROBERT F.ADAMS, DE, PE 318-042-20 JAMES L.ALTSTAETTER, PE STEPHEN J.COONAN, PE January 10, 2012 JOHN M. D'ANTONI, DE, PE PEGGY W. GLASS, PhD DAVID A. GUDAL, PE REX H.HUNT, PE Mr. Michael Graves, P.E. BETTY L.JORDAN, PE Project Manager ELLENT. McDONALD, PhD, PE CP&Y, InC. JOHN R.MINAHAN, PE 15100 Trinity Boulevard, Suite 200 TIMOTHY J. NOACK, PE Fort Worth, Texas 76155 ALAN H. PLUMMER,JR., PE, BCEE Re: City of Fort Worth WILLIAM C. RACKLEY, PE Village Creek Eastern Reclaimed Water Delivery System ALAN R.TUCKER,PE Additional Construction Administration Phase Services Contract Amendment No. 5 — Letter of Intent 1320 SOUTH UNIVERSITY DRIVE SUITE 300 FORT WORTH,TEXAS 76107 PHONE 817.606.1700 FAX 8I7.670.2536 www.apaienv.com TBPE Firm No. 13 Dear Mr. Graves: As you are aware, Alan Plummer Associates, Inc. (APAI) has included your firm as an M/WBE participant on our team for the above -referenced project. This letter serves as a "Letter of Intent" to utilize your firm for these services at a fee of $142,500. The fee for this work is being included in APAI's prime contract amendment with the City of Fort Worth. Please sign below so that this "Letter of Intent" can be forwarded to the City for record purposes. We look forward to working with you on this project. Sincerely, ALAN PLUMMER A�JSSOCIATES, INC. l � /��'/(JG�ti Cletus R. Martin, P.E. Project Manager CRM/vlw Enclosure cc: Mr. David Townsend, P.E., City of Fort Worth Water Department ACKNOWLEDGED: ,�`�� � fl �=)' n r ��-��.� �i71r. Michael Graves, P.E. CP&Y, Inc. F:\projects\03181042-20\Doc\Corresp\Graves_L6 Amendment 5.doc M&C Review Page 1 of 2 CITY COUNCIL AGENDA COUNCIL ACTION: Approved on 7/24/2012 Official site of the City of Fort Worth, Texas FORT �'ORTII _,�� DATE: 7/24/20.12 REFERENCE **C-25759 LOG NAME: 60RECLAIMENGRAMEND#5 NO.. CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 5 to City Secretary Contract No. 37547 with Alan Plummer Associates, Inc., in the Amount of $219,813.00, for the Design of the Village Creek Reclaimed Water Delivery System for a Total Contract in the Amount of $3,228,712.00 (COUNCIL DISTRICT 5) RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment No. 5 to City Secretary Contract No. 37547, an engineering Agreement with Alan Plummer Associates, Inc., for the Village Creek Reclaimed Water Delivery System Design, in the amount of $219,813.00, thereby increasing the contract cost to $3,228,712.00. DISCUSSION: On August 26, 2008, (M&C C-22998) the City Council authorized the execution of an Engineering Agreement with Alan Plummer Associates, Inc., for the design of the Village Creek Reclaimed Water Delivery System consisting of a reclaimed water pump station at the Village Creek Wastewater Treatment Plant (VCWWTP) and a reclaimed water main from the VCWWTP site to the DFW Airport and a connecting reclaimed water main to the City of Arlington. Also included was assistance in easement preparation and acquisition and preparation of a reclaimed water rate analysis to establish reclaimed water rates, assist in development of Reclaimed Water Contract, and assist in permitting and regulatory compliance. Amendment No.1, (M&C C-24046) approved on January 26, 2010, included additional design work for the reclaim pump station, assistance in the Texas Water Development Board (TWDB) Drinking Water State Revolving Fund -American Reinvestment and Recovery Act of 2009 (DWSRF/ARRA) application process, and construction phase services, including submittal review and technical support, for all four construction projects (Reclaim Pump Station, Water Distribution Main Part 1 and 4, Part 2, and Part 3) and construction administration and part-time resident inspection for the pump station project. Amendment No. 2, (M&C C-24218) approved on May 11, 2010, included additional submittal review for all four construction projects (Reclaim Pump Station, Water Distribution Main Part 1 and 4, Part 2, and Part 3) not anticipated before start of construction. In addition, afull-time field Administrative Technician was added to provide support for all four contracts to meet TWDB DWSRF/ARRA documentation and certification requirements and prevent the City from losing a part or all of its DWSRF-ARRA funding. Amendment No. 3, (M&C C-24365) approved on July 27, 2010, included the design of the in -plant water system pump station, an in -channel type ultraviolet (UV) disinfection system and associated piping to the reclaimed water pump station with associated modifications to the reclaimed water pump station. Amendment No. 4, (M&C C-24676) approved on January 4, 2011, covered the additional design mhtml:file://H:\My Documents\PROJECTS\Reuse\M&C\M&C C-25759 (Amendment #5).... 9/5/2012 M&C Review Page 2 of 2 engineering and construction administration and management services related to all five contracts and additional bid phase requirements for construction administration and management services related to UV system contract, and reclaimed water program operation assistance. This proposed Amendment No. 5 includes an additional nine months of construction administration to meet TWDB DWSRF/ARRA documentation and certification requirements and TWDB Inspection Reviews as the Part 2 Contractor (WR Hodgson) went bankrupt requiring coordination with the Bonding Company to hire a second contractor which extended completion of the over-all project. Also, additional design is required for the UV System during construction and additional assistance to the plant staff is required in starting up new UV system and getting into operation. Alan Plummer Associates, Inc., agrees to maintain its initial M/WBE commitment of 38 percent that it made on the original Agreement and extend and maintain that same M/WBE commitment of 38 percent to all prior amendments up to and inclusive of this Amendment No. 5. Therefore, Alan Plummer Associates, Inc., remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. This project is located in COUNCIL DISTRICT 5. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, in the Sewer Capital Projects Fund. TO Fund/Account/Centers Submitted for City Manager's Office b� Originating Department Head: Additional Information Contact: ATTACHMENTS 60RECLAfMENGRAMEND#5 Map.pdf FROM Fund/Account/Centers P275 531200 701300021330 $219.813.00 Fernando Costa (6122) S. Frank Crumb (8207) David Townsend (8430) mhtml:file://H:\My Documents\PROJECTS\Reuse\M&C\M&C C-25759 (Amendment #5).... 9/5/2012