HomeMy WebLinkAboutContract 37547-A6 (2)AMENDMENT NO. 6
STATE OF TEXAS § CITY SECRETARY CONTRACT NO.Sy7-/�C�'
M&C
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth (City) and Alan Plummer Associates, Inc.
(Engineer) made and entered into City Secretary Contract No. 37547 (the Contract)
which was authorized by the City Council by M&C C-22998 on the 26th day of August,
2008; and
WHEREAS, the Contract involves engineering services for the following project:
Village Creek Reclaimed Water Deliver�ystem Design
WHEREAS, it has become necessary to execute Amendment No. 6 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends the
Contract:
1.
Article I of the Contract is amended to include the additional engineering services
specified in M&C C-22998, adopted on the 26th day of August, 2008, and further
amplified in a proposal letter dated June 18, 2013, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional services to be performed by
Engineer total $31,500.
2.
Article II of the Contract is amended to provide for an increase in the maximum
fee to be paid to Engineer for all work and services performed under the Contract, as
amended, so that the total fee paid by the City for all work and services shall not exceed
the sum of $3,260,212.
3.
All other provisions of the contract, which are not expressly amended herein, shall
remain in full force and effect.
EXECUTED on this the day of , 2013, in Fort
Worth, Tarrant County, Texas.
ATTEST:
City
APROVED AS TO FORM
AND LEGALITY
By
CITY OF FORT WORTH
Fernando Costa
Assistant City Manager
PROVED
z
C
S. Frank Crumb, P.E.
Director, Water Depa
ALAN PLUMMER ASSOCIATES, INC.
Engineer
Assistant City Attorney Cletus R. Martin, P.E.
Associate
t
A OM
ressure to keep the pump on its curve.
pdate schedule for components of design, permitting, and construction.
FJ. �Ite \/OSItS
perational changes due to increased system pressure from pushing the pig at the highest
levation in the system, These site visits will impact design and operation plan preciously
nentioned,
F:\projecis\0398\000-00\059-01\2093-06-98_Cronberg Amendmeni6.docx Page 1 of2
Se ices Not Included
1. Review of shop drawings
2. Review Contractor's proposal
3. Full time inspection of construction
5. Permitting of any kind, environmental or Txl�®�'
�. Review of Pay Estimates
7. Assistance for document preparation or review of claim on contractors or Contractor's Bond.
I Storm Water Pollution Prevention Plan
June 18, 2013
l
design, did � Construction Administration
f:\projects\03181000-00\051-01\contract amendment mwbe breakdownJun 18 2013.doc