Loading...
HomeMy WebLinkAboutContract 37547-A6 (2)AMENDMENT NO. 6 STATE OF TEXAS § CITY SECRETARY CONTRACT NO.Sy7-/�C�' M&C COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Alan Plummer Associates, Inc. (Engineer) made and entered into City Secretary Contract No. 37547 (the Contract) which was authorized by the City Council by M&C C-22998 on the 26th day of August, 2008; and WHEREAS, the Contract involves engineering services for the following project: Village Creek Reclaimed Water Deliver�ystem Design WHEREAS, it has become necessary to execute Amendment No. 6 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in M&C C-22998, adopted on the 26th day of August, 2008, and further amplified in a proposal letter dated June 18, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $31,500. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $3,260,212. 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED on this the day of , 2013, in Fort Worth, Tarrant County, Texas. ATTEST: City APROVED AS TO FORM AND LEGALITY By CITY OF FORT WORTH Fernando Costa Assistant City Manager PROVED z C S. Frank Crumb, P.E. Director, Water Depa ALAN PLUMMER ASSOCIATES, INC. Engineer Assistant City Attorney Cletus R. Martin, P.E. Associate t A OM ressure to keep the pump on its curve. pdate schedule for components of design, permitting, and construction. FJ. �Ite \/OSItS perational changes due to increased system pressure from pushing the pig at the highest levation in the system, These site visits will impact design and operation plan preciously nentioned, F:\projecis\0398\000-00\059-01\2093-06-98_Cronberg Amendmeni6.docx Page 1 of2 Se ices Not Included 1. Review of shop drawings 2. Review Contractor's proposal 3. Full time inspection of construction 5. Permitting of any kind, environmental or Txl�®�' �. Review of Pay Estimates 7. Assistance for document preparation or review of claim on contractors or Contractor's Bond. I Storm Water Pollution Prevention Plan June 18, 2013 l design, did � Construction Administration f:\projects\03181000-00\051-01\contract amendment mwbe breakdownJun 18 2013.doc I