Loading...
HomeMy WebLinkAboutContract 37537AMENDMENT N"0 z STATE OF TEXAS §CITY SECRETARY CONTRACT NO. �1 � (M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Carter &Burgess, Inc. (Engineer) made and entered into City Secretary Contract No. 34414 (the Contract) which was authorized by the City Council by M&C C-21662 on the 14th day of November, 20069, and WHEREAS, the Contract involves engineering services for the following project: Senders Ranch Pump Station and Ground Storage Tank Construction Management WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated June 30, zuva, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $32,460. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $353,100.00 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY S1=CRETARY FT. WORTH, TX � ORIGINAL EXECUTED on this the day of , 2008, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: S. Frank Crumb, P.E. Director, Water Department Carter &Burgess Inc. ENGINEER Name: Steven Veal, P.E. Principal/Vice-President ;GALITY: t��=�iC{A� RECORD CITY SECRETARY FT. WORTH, TX APPROVED: Fernando Costa Azfing Assistant City Manager ATTEST: Marty Uttf ?AC'� Author.ixatiOR tv JACOBS Carter Burgess June 30, 2008 Ms. Farida Goderya, P.E. City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, Texas 76102 777 Main Sheet Fnrt �NoHh, Texas 76102 Box 901 N8 Frni �No0h, Texas 76101-2058 Phone:81l-735-6006 Fax 817-735-6148 r nv.c-b.com Reference: Amendment No. 2 to the Engineering Services Agreement Sendera Ranch Pump Station and Ground Storage Tank Construction Management Contract No. 34414, M&C C-21662 Carter & Burgess, Inc. Job No. 014861.001 Dear Ms. Goderya: The purpose of this letter is to summarize our request for Amendment No. 2 for the Senders Ranch Pump Station and Ground Storage Tank Construction Management project. We are requesting this amendment for compensation of additional scope activities. Carter &Burgess, Inc. (C&B) was awarded the Senders Ranch Pump Station and Ground Storage Tank Construction Management on November 14, 2006. The original contract was awarded for $258,640. On March 14, 2008 we received Amendment No. 1 for additional services related to additional geotechnical testing and three additional months of construction administration and part-time construction representation. The additional cost for Amendment No. 1 was $62,000, bringing the total contract value to $320,640. Additional Effort Performed to Date During the original budgeting effort, costs were calculated for the required geotechnical and materials testing that would be required for the project. These budget efforts were calculated based on the number of proposed tests for the construction and on a rate schedule provided by our subconsultant Mas4ek Engineering (a certified minority business). Due to additional testing required for the pre- stressed concrete tank, the original proposed budget of $20,340 was modified to a total not4o-exceed budget of $47,340. All material testing has now been completed and the last invoice has been paid to Mas4ek. The actual cost for these services was $37,924.50. As a result, there is $9,415.50 remaining in the overall budget that can be allocated to other areas. The original scope and fee assumed a 12 month schedule for construction. Amendment No. 1 added 3 months of additional time to the overall schedule for the project, which provided services until December, 2007. Due to delays in the incoming power, the project is estimated to be complete at the end of June. As a result, we have 6 additional months of construction administration and coordination. This was 3 months of additional monthly meetings, 6 additional pay estimates and project coordination time with both the contractor and City staff including start-up of the pump station. As a result, we are requesting=ate-a"tionat-$46-�7-QO be added to the contract. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Carter & Buryess, Inc. Carter & BurlJess Consultants, Inc C&B ArchitectslEngineers, Inc. C&B ArchifecislEngineers, P.C. C&B Nevada, Inc. Farida Goderya, P.E. 3/30/2008 Page 2 Carter & Burgess, Inc. is also performing on -site construction representation for an average of approximately 24 hours a week for the duration of the contract, or as required by field activities. Since we are at the end of the project and field work has been decreasing and our time has been limited to key activities. For an additional 3 months of construction, we are requesting an additional $10,000 to cover the cost of on -site construction representation. Finally, our subconsultant Multatech which consisted of all the architectural, electrical and plumbing services has also requested additional fees to cover the additional site meetings, site visits, requests for information and coordination for the extended 9 months of the construction contract. Multatech has requested $15,175,50 to cover these services. The original contract with Multatech was $40,000. This request would increase their contract to $55,175.50. A summary of the additional effort that should be included in this amendment is provided below: • Completion of geotechnical testing required (MWBE) • Six months of additional construction administration services $ 16,700.00 • Six months of additional on -site construction representation $ 10,000000 • Additional construction administration services Multatech $ 157175.50 Total Effort Additional Effort Required $ 32,460.00 Our total requested budget for Amendment No. 1 is $32,460.00. This would increase the authorized budget for the project to $353,100.00. The original MWBE participation goal was 18%. The original contract for this project was $258,640.00 and the original contract included $60,340.00 for MWBE firms, meeting the participation goal with 23% participation. For amendment 2, the geotechnical testing performed by Mas-tek, a MWBE firm, was reduced by <$9,415.50>. However, our MWBE subconsultant, Multatech requested $15,175.50 in additional compensation for construction administration services. The MWBE participation represents 18% of the total proposed amendment and will finalize the total MWBE commitment for the overall contract at 26%. The totals for the contract and our MWBE participation are outlined in Attachment A. We look forward to meeting with you to discuss this requested Amendment No. 2 for the project. I will contact you in the next few days to discuss this request and schedule a meeting if necessary. Please feel free to contact us any time if you have any questions at 817-735-6000. Sincerel y Steven Veal, P.E. Principal/Vice-President SCV/KDP/nh Attachments T:Uob\014861 \W P\CORR\014861. L01.doc cc: Correspondence Kathy Pontesso, P.E. Senior Project Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX GartFr `� Burr,��ss. Inr. C��rfc�i R BuR�esa (:onsuganls, Inc t .r',B lv�chilt�clalF_ngine�as, Inc. t'„Ei Archile�atilf_nginF�ear;, P (: r;t�,ES �!eaarla, Inc. M E E co C 0 M L N E a 0 Mimi c 0 U Y b = d � a; E 0 v y �a 0 L i 0 cQ C a^^ 'i V L m C co � o W 0 0 0 U o O 0 0 N 0 0 0 0 0 O Lr) Liz O O O LC) Nt O O O r� N O O ® cc 67 N LL! L� (~ Lqct M N co (R ER 69 (A 6q N o ++ o C W E 00 00 o � N 00 � N E Q N 0 0 0 O O Lo LLB O a� O Lo UD O E CDc~- qKT � O (O Lo O N o� o W d ON 0 c E a CD CD 0 0 0 0 0 0 E o O o � M N CN(� N Q b4 EA EA U � c � W o o gCO 0 N 00 � o 0 0 0 0 r 0 0 0 0 0 M N Nt O U �oovoo — W � N Ln C C U) L/1 Q (B U IL 7 W is O O Ucom O IE T ®FFICI�4L RECCR� CITY �1=t�RF3'AF�Y FT. WORTH, TX tv ARCHITECTURE ENGINEERING June 9, 2008 Ms. Kathy Pontesso PE Senior Project Manager Jacobs Engineering Group Inc. 777 Main St Fort Worth, Texas 76102 Re: Additional Construction Administration Services, Sendera Ranch Pump Station Dear Ms. Pontesso: A recap of additional services is as follows: • Attendance at 5 additional construction meetings at 2 hrs per mtg @ $140.00 /hr. $ 1,400.00 • 5 additional construction meetings at 3 hrs per trip @ $140.00 /hr. $ 29100.00 • Participate in 2 conference calls to discuss contractor clarifications with suppliers at 1 hr per call @ $140.00 /hr $ 280.00 • Provide review and responses to RFIs, coordination with prime consultant, coordination with contractor for 80 hrs over additional 9 month period @ $140 /hr $ 11,200.00 • Miscellaneous expenses (mileage, courier, document delivery.) $ 195,50 TOTAL $ 15,175.50 We appreciate your consideration of this change request. Sincerely, Laurence J Maloney, PE Multatech Engineering, Inc. lmaloney a,multatech.com OFFICIAL. RECORD CITY SECRETARY T. WORTH, TX JUN 2008 JACObs Ader Burgess 1407 Texas Street, Suite 200, Fort Worth, Texas 76102-3428 Phone: 817-877-5571 Fax: 817-877-4245 www.multatech.com M&C Request Review Page 1 of 2 C�`[�] �{)RT �'�'I�RTII 1 ' �0/ nf'. � City of Fort Worth En�plog-ee Intranet s/2�/Zoos �'"�"``�- Staff Action Tracking Council Agenda Ni&C Employee Directory ACToday Employee Classifieds PRS IT Online Departments _� Print M&C COUNCIL ACTION: Approved on 8/26/2008 DATE: 8/26/2008 REFERENCE NO.: �*C-22989 LOG NAME: 60SR PS AMEND2 CODE: C TYPE: CONSENT PUBLIC HEARING: NO SUBJECT: Authorize Execution of Amendment No. 2 in the Amount of $32,460.00 to City Secretary Contract No. 34414 with Carter and Burgess, Inc., for Construction Management of the Sendera Ranch Pump Station and Ground Storage Tank (City Project No. 00376) Located on John Day Road in Sendera Development, Denton County RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 2 in the amount of $32,460.00 to City Secretary Contract No. 34414, an Engineering Agreement with Carter and Burgess, Inc., for Construction Management of Sendera Ranch Pump Station and Ground Storage Tank (City Project No. 00376) thereby increasing the contract amount to $353,100. DISCUSSION: On November 14, 2006, (M&C C-21846) the City Council authorized execution of an Engineering Agreement with Carter and Burgess, Inc., for Construction Management services during the construction of the Sendera Ranch Pump Station and Ground Storage Tank for $258,640. Amendment No. 1 (M&C C-22622), authorized on January 15, 2008, included additional construction phase services related to geotechnical testing, three additional months of construction administration and part time construction representation. This Amendment No. 2 compensates the Engineer for additional services related to delays in incoming power and six additional months of construction administration and representation. This project is located on John Day Road in Sendera Development (zoned MU-2), Denton County, COUNCIL DISTRICT 7. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget as appropriated, of the Water Capital Projects Fund. TO Fund/AccountlCenters FROM Fund/AccountlCenters P264 531200 607180037630 8115.00 P264 531200 607160037630 $24,345.00 http://apps.cfwnet.org/council�acicet/mc_review.asp?ID=10032&councildate=8/26/2008 08/27/2008 M&C Request Review Page 2 of 2 Submitted for City Manager's Office b� Originating Department Head: Additional Information Contact: Fernando Costa (8476) S. Frank Crumb (8207) Farida S. Goderya (8214) ATTACHMENTS Sendera Ranch Site Maps.pdf http://apps.cfwnet.org/council packet/mc review.asp?ID=10032&councildate=8/26/2008 08/27/2008