HomeMy WebLinkAboutContract 37534STATE OF TEXAS 8 CITY SECRETARY CONTRACT NO. COUNTY OF TARRANT 8 WHEREAS, the City of Fort TnTorth (CITY) and Teague Nall and Perkins, Inc., (ENGINEER) made and entered into City Secretary Contract No. 32378, (the CONTRACT) which was authorized by the City Council by M&C C�20954 on the 6th day of September, 2005; and subsequently revised by Amendment Number 1 which was authorized by the City Council on the 12th day of December, 2006 (M&C C-21883); WHEREAS, the Contract involves engineering services for the following project: WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in the proposal letter dated April 18, 2008, 2008, copies of which are attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $126,900.00. Article II of the the maximum fee to performed under the the City for all $2,193,606.00. 2. Contract is amended to provide for an increase in be paid to Engineer for all work and services Contract, as amended, so that the total fee paid by work and services shall not exceed the sum of OFFICIAL RECORD' CITY SECRETARY FT. WORTH, TX Page -1 - 09-05-0£� PO4:3"I IN ORIGINAL 3. All other provisions of the Contract, which herein, shall remain in full force and effectm are not expressly amended EXECUTED on this the UT��_ day of ��In� 2008 in Fort Worth, Tarrant County, Texas. Marty Hendr City Secretary Fernando Costa Assistant City Manager C-22981 Contract Authorization August 19, 2008 Date Greg i on P.E• Actin r, Transportation/Public Works Department TEAGUE NALL and PERKINS, INC. ENGINEER Ty Hilton Vice President APPROVED A� TO FORM _AND LEGALITY: Amy Ramsey/ Assistant City Attorney Page -2- OFFICIAL RECORD' CITY SECRETARY T. WORTH, TX Civil Engineering Surveying Landscape Architecture Planning April 18, 2008 Mr. Michael R. Weiss P.E. City of Fort Worth Department of Engineering 1000 Throckmorton Fort Worth, Texas 76102 Re: Golden Triangle Boulevard Widening From: IH 35W To: US 377 Fee Proposal for Contract Amendment No. 2 Dear Mr. Weiss: Teague Nall and Perkins, Inc. is submitting this fee Amendment to the above referenced contract based on additional services requested. The following is a brief description and cost for the additional services to be provided on this project: Additional Services: Design water line relocations, extensions and abandonments necessary to accommodate the widening of Golden Triangle Boulevard to a four -lane divided roadway from IH 35W to US 377. The scope of the work for the water system adjustments was discussed in a meeting with the Water Department held on April 9, 2008. The water line relocations will be a separate construction contract from the roadway work. TNP will utilize survey data gathered for the .. A%Ap. %t xAAA, .,;n, mrninr+ fir+ho xh,a+Pr iinP riPsinno therefore. no additional survev effort is required. Specific items of work are summarized below: 1. Relocate (lower) the existing 164ch water line in Golden Triangle in eight (8) locations where it conflicts with proposed storm drain culvert crossing;. 2. Relocate (lower) the existing 124ch waterline on the south side of Golden Triangle where it conflicts with two proposed storm drain crossings. 3. Relocate the existing 8-inch and 21-inch water lines in Alta Vista where they conflict with proposed storm drain improvements. 4. Extend a new 164nch water line in Golden Triangle approximately 950 feet from its present terminus to just east of the future Park Vista Boulevard intersection. 5. Extend a new 12-inch water line in Golden Triangle Boulevard approximately 4800 feet from the future Park Vista Boulevard intersection to just east of the Sports Parkway intersection. 6. Abandon and / or remove approximately 15,000 feet of old 6-inch and 8-inch water line that was part of the old City of Keller water system. Customers connected to the old mains will be reconnected to the 16 inch water line. 1100 Macon Street Fort Worth, Texas 76102 817.336.5773 phone 817.336.2813 fax �niw�ni tnn-nnline.com Mr. Michael R. Weiss, PE, April 18, 2008, Page 2014 7. Relocate existing fire hydrants that are in conflict with the proposed roadway improvements. 8. Prepare traffic control plans and stormwater pollution prevention plans necessary for the water line relocations. A summary of the engineering fees for this amendment are presented below: • Basic Services for Water Relocation Design • Printing • Preparation of Traffic Control Plans • Preparation of Stormwater Pollution Prevention Plans Total Contract Amendment No. 2 $ 102,000.00 $ 9,900.00 $ 10,000.00 $ 5, 000.00 $ 126,900.00 Thank you for consideration of this contract amendment request. If you have any questions, please Jo not hesitate to call me. Sincerely, TEAGUE NALL AND PERKINS, INC. Ty ilton, P.E. Attachments: Exhibit A-1 Supplemental Scope of Services Exhibit B Opinion of Probable Construction Cost Exhibit C Project Schedule v:\projects\ftw05210\design wntractWnendment #2.doc EXHIBIT "A-1" SUPPLEMENTAL SCOPE OF SERVICES (SUPPLEMENT TO ATTACHMENT "A") DESIGN SERVICES: WATER AND/OR SANITARY SEWER IMPROVEMENTS The following is a clarification of the tasks that the ENGINEER will perform under ATTACHMENT "A". Work under this attachment includes engineering services for water and/or sanitary sewer improvements for the following: Golden Triangle Boulevard Water Line Relocations Upon receipt of notice to proceed, the ENGINEER will perform the following tasks: PART A —PRE-ENGINEERING 1. Initial Data Collection a. Pre -Design Coordination Meetings ENGINEER will attend and document meetings, as required, to discuss and coordinate various aspects of the project and to ensure that the project stays on schedule. For purposes of establishing a level of comfort, two (2) meetings are anticipated. These include the following: One (1) pre -design kick-off meeting, (including the CITY's Department of Engineering and other departments that are impacted by the project). One (1) review meeting at completion of the City's review of the conceptual engineering plans. EA1-1 Rev 11l02/05 b. Data Collection In addition to data obtained from the City, ENGINEER will research and make efforts to obtain pertinent information to aid in coordination of the proposed improvements with any planned future improvements that may influence the project. ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including; utilities, City Master plans, property ownership as available from the Tax Assessor's office. The data collection efforts will also include conducting special coordination meetings with affected property owners and businesses as necessary to develop sewer re-routing plans. The following shall be applicable at all locations where it is necessary to relocate or reroute the existing private sanitary sewer service line due to the abandonment or realignment of the existing public sanitary sewer lateral or main: The CITY shall furnish the Engineer with a sample format of how the sewer service line reroute/relocation should be designed and submitted for construction. During design survey, if a rod can be inserted through the cleanout to the bottom of the service line, the Engineer will obtain the flow line elevation and design the service line prior to advertising the project for bid. If the service flow line information cannot be obtained during design survey, the Engineer shall delay the design of the sewer service line until after the start of construction. The CITY will then direct the Contractor to de -hole the service line at the clean -out location of all buildings or structures so that the Engineer's surveyor can determine the flow line of the sewer service line. The Engineer shall use this information to provide the design for the sanitary sewer service line to be rerouted or relocated. c. Coordination with Other Agencies During the concept phase the ENGINEER shall coordinate with all utilities, including utilities owned by the City, TxDOT and railroads. These entities shall also be contacted if applicable, to determine plans for any proposed facilities or adjustment to existing facilities within the project limits. The EA1-2 Rev 11/02/05 information obtained shall be shown on the concept plans. The ENGINEER shall show the location of the proposed utility lines, existing utility lines and any adjustments and/or relocation of the existing lines within the project limits. ENGINEER shall complete all forms necessary for City to obtain permit letters from TxDOT and railroads and submit such forms to the City. City shall be responsible for forwarding the forms to the affected agencies for execution. 2. Schedule Submittal and Monthly Progress Report The ENGIENER shall submit a progress schedule after the design contract is fully executed. The schedule shall be updated and submitted to the CITY along with monthly progress reports as required under Attachment B of the contract. PART B -CONSTRUCTION PLANS AND SPECIFICATIONS 1. Conceptual Engineering i. Surveys for Design a. ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information which will be needed for use by the ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location and buried utilities, structures, and other features relevant to the final plan sheets. For sewer lines located in alleys or backyards, ENGINEER will obtain the following: Obtain permission for surveying through private property. Locate horizontal and vertical alignment of utility lines. Tie improvements, trees, fences, walls, etc., horizontally along rear lines in an approximately 50' wide strip. In addition, locate all rear house corners and building corners in backyards. Profile existing water and/or sewer line centerline. EA1-3 Rev 11102105 Compile base plan from field survey data at 1 "-40' scale. Obtain permission for surveying through private property. Locate horizontal and vertical alignment of utility lines, existing utilities, trees, fences, walls, etc., horizontally along rear lot lines in an approximately 20' wide strip. In addition, locate all rear house corners and building corners in backyards. Compile base plan from field survey data at 1" = 40' horizontal and 1" = 4' vertical scale. When conducting design survey at any location on the project, the consultant or its sub -consultant shall carry readily visible information identifying the name of the company and the company representative. All company vehicles shall also be readily identified. b. Engineer will provide the following information: All plans, field notes, plats, maps, legal descriptions, or other specified documents prepared in conjunction with the requested services shall be provided in a digital format compatible with the electronic data collection and computer aided design and drafting software currently in use by the CITY Department of Engineering. All text data such as plan and profile, legal descriptions, coordinate files, cut sheets, etc., shall be provided in the American Standard Code for Information Interchange (ASCII) format, all drawing files shall be provided in MicroStation (DGN) or Autocad (DWG or DXF) format (currently Release 2002), or as otherwise approved in writing by the CITY, and all data colleted generated during the course of the project shall become the property of the CITY. The minimum information to be provided in the plans shall include the following: 1. A Project Control Sheet, showing ALL Control Points, used or set while gathering data. Generally on a scale of not less than 1:400: 2. The following information about each Control Point; EA1-4 Rev 11/02/05 a. Identified (Existing City Monument #8901, PK Nail, 5/8" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only. c. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). 3. Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate system, as the Control Points. 4. No less than two bench marks plan/profile sheet. 5. Bearings given on all proposed centerlines, or baselines. 6. Station equations relating utilities to paving, when appropriate. 7. Obtain the "foot print" of all properties where the sanitary sewer service line is to be relocated or rerouted. ii. Public Notification and Personnel/Vehicle Identification a. Prior to conducting design survey, ENGINEER will notify affected residents of the project in writing. The notification letter shall be on company letterhead and shall include the following: project name, limits, DOE project no., Consultant's project manager and phone no., scope of survey work and design survey schedule. The letter will be reviewed and approved by the City prior to distribution. b. When conducting site visits to the project location, the ENGINEER or any of its sub -consultants shall carry readily visible information identifying the name of the company and the EA1-5 Rev 11102105 company representative. All company vehicles shall also be readily identifiable. Conceptual Engineering Plan Submittal a. Conceptual plans shall be submitted to City 100 working days after Notice to Proceed Letter is issued. b. The ENGINEER shall perform conceptual design of the proposed improvements and furnish four (4) copies of the concept engineering plans which includes layouts, preliminary right-of-way needs and cost estimates for the ENGINEER's recommended plan. ENGINEER shall perform remaining field surveys required for final design of selected route(s). The ENGINEER shall also evaluate the phasing of the water, sanitary sewer, street and drainage work, and shall submit such evaluation in writing to the City as a part of the concept phase of the project. All design shall be in conformance with Fort Worth Water Department policy and procedure for processing water and sewer design. ENGINEER shall review the City's water and sewer master plan, other pertinent design information and provide a summary of findings pertaining to the proposed project. 2. Preliminary Engineering Upon approval of Part B, Paragraph iii (b), ENGINEER will prepare preliminary construction plans as follows: a. Overall water and/or sanitary sewer layout sheets and an overall easement layout sheet(s)A b. Preliminary project plans and profile sheets on 22" x 34" sheets which show the following: Proposed water and/or sanitary sewer plan/profile and recommended pipe size, fire hydrants, water service lines and meter boxes, gate valves, isolation valves, manholes etc., related appurtenances and all pertinent information needed to construct the project. EA1-6 Rev 11102105 Legal description (Lot Nos., Block Nos., and Addition Names) along with property ownership shall be provided on the plan view. c. For sewer lines, pipelines schedule for point repairs, rehabilitation and replacement will be located on the base sheets prepared from survey information gathered under Part B, Paragraph b. Conflicts shall be resolved where pipelines are to be rehabilitated on the same line segment. Base sheets shall reference affected or adjacent streets. Where open -cut and trenchless technology construction is anticipated, below and above ground utilities will be located and shown on the base sheets. d. Existing utilities and utility easements will be shown on the plan and profile sheets. ENGINEER will coordinate with utility companies and the City of Fort Worth to determine if any future improvements are planned that may impact the project. e. The design for sewer service line reroute/relocation will be provided if the flow line elevation of the sewer service can be determined from the cleanout location. If this elevation cannot be determined during design survey, the design shall be provided after award of the construction contract as specified in Part A, Paragraph 1 b. f. The ENGINEER shall make provisions for reconnecting all identifiable water and/or wastewater service lines which connect directly to any main being replaced, including replacement of existing service lines within City right-of- way or utility easement. When the existing alignment of a water and sanitary sewer main or lateral is changed, provisions will be made in the final plans and/or specifications by the ENGINEER to relocate all service lines which are connected to the existing main and connect said service lines to the relocated main. EA1-7 Rev 11/02/05 g. The ENGINEER will prepare standard and special detail sheets for water line installation and sewer rehabilitation or replacement that are not already included in the D-Section of the City's specifications. These may include connection details between various parts of the project, tunneling details, boring and jacking details, waterline relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections. h. Right -of -Way Research The ENGINEER will conduct preliminary research for availability of existing easements where open -cut construction or relocation of existing alignments is probable. Temporary and permanent easements will be appropriated based on available information and recommendations will be made for approval by the City. i. Right-of-way/Easement Preparation and Submittal Preparation and submittal of right-of-way, easements and rights -of -entry will be in conformance with "Submittal of Information to Real Property for Acquisition of Property". j. Utility Clearance Phase The ENGINEER will consult with the City's Water Department, Department of Engineering, and other CITY departments, public utilities, private utilities and government agencies to determine the approximate location of above and underground utilities, and other facilities that have an impact or influence on the project. ENGINEER will design City facilities to avoid or minimize conflicts with existing utilities. The ENGINEER shall deliver a minimum of 13 sets of approved preliminary construction plans to the City's Utility EA1-8 Rev 11102/05 Coordinator for forwarding to all utility companies, which have facilities within the limits of the project. k. Preliminary construction plan submittal i. Preliminary plans and specifications shall be submitted to City 80 working days after approval of Part B, Paragraph iii (b). ii. The ENGINEER shall deliver two (2) sets of preliminary construction plans and two (2) sets of specifications and contract documents to CITY for review. Generally, plan sheets shall be organized as follows: Cover Sheet General Notes/Legand Easement layout (if applicable) Abandonment Plan & Profile Sheets Standard Construction Details Special Details (If applicable) iii. The ENGINEER shall submit a preliminary estimate of probable construction cost with the preliminary plans submitted. ENGINEER shall assist City in selecting the feasible and/or economical solutions to be pursued. I. Review Meetings with City The ENGINEER shall meet with CITY to discuss review comments for preliminary submittal. The CITY shall direct the ENGINEER in writing to proceed with Final Design for Final Review. EA1-9 Rev 11/02/05 m. Public Meeting After the preliminary plans have been reviewed and approved by the City, the ENGINEER shall prepare project exhibits, provide the CITY with the database listing the names and addresses of all residents and business to be affected by the proposed project, and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. 3. Final Construction Plan Submittal a. Final Construction Documents shall be submitted to CITY 60 working days after approval of Part B, Paragraph 2 k. Following CITY approval of the recommended improvements, the ENGINEER shall prepare final plans and specifications and contract documents to CITY (each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas) and submit two (2) sets of plans and construction contract documents within 15 days of CITY's final approval. Plan sets shall be used for Part C activities. b. ENGINEER's Estimate of Probable Construction Cost The ENGINEER shall submit a final estimate of probable construction cost with the final plans submitted. c. Mylar Submittals The ENGINEER shall submit a final set of mylar drawings for record storage as follows: 1. Water and sanitary sewer plans shall be submitted as one set of plans. Water and sanitary sewer plans shall be separate from paving and drainage plans. All sheets shall be standard size (22" x 34") with all project numbers (Water/Sanitary Sewer and TPW) prominently displayed. EA1-10 Rev 11/02/05 2. For projects where paving/grating/drainage improvements occur on a Water Department funded project with no T&PW funding involved, a separate set of mylars with cover sheet shall be submitted for TPW. 3. Signed plans sets shall also be submitted as an Adobe Acrobat PDF format (version 6.0 or higher) file. There shall be one (1) PDF file for the Water plan set and a separate PDF file for the TPW plan set. Each PDF file shall contain all associated sheets of the particular plan set. be accepted. PDF files shall conform to naming conventions as follows: I. Water and Sewer file name example — "X- 35667_org36.pdf' where "X-35667" is the assigned file number obtained from the City of Fort Worth, "_org" designating the file is of an original plan set, 1136" shall be the total number of sheets in this file. Example: X-12755_org18.pdf 11. TPW file name example — "WA 956_org47.pdf" where "W-1956" is the assigned file number obtained from the City of Fort Worth, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053_org3.pdf and K-0320_org5.pdf Both PDF files shall be submitted on one (1) Compact Disk, which will become property of and remain with the City of Fort Worth. Floppy disks, zip disks e-mail flash media will not be accepted. 4. For information on the proper manner to submit PDF files and to obtain a file number for the project, contact the Department of Engineering Vault at telephone number (817) 392.8426. File numbers will not be issued to a project EA1-11 Rev 11/02105 unless the DOE number and proper fund codes have been assigned and are in the Department of Engineering database. PART C - PRE -CONSTRUCTION ASSISTANCE Administration a. Deliver Bid Documents The ENGINEER will make available for bidding, upon request by the CITY, up to fifty (50) sets of the final approved and dated plans and specifications and contract documents for the projects to the CITY for distribution to potential bidders. Proposal will be delivered in electronic format. b. Bidding Assistance The ENGINEER shall assist the CITY during this phase including preparation and delivery of any additional addenda prior to bid opening to plan holders and respond to questions submitted to DOE by prospective bidders. Engineer shall attend the scheduled pre -bid conference. The ENGINEER shall assist in reviewing the bids for completeness and accuracy. The ENGINEER shall attend the project bid opening, develop bid tabulations in hard copy and electronic format and return four (4) copies of the bid tabulation, along with the contract documents to the City within three (3) working days after bid openings. c, Assistance During Construction The ENGINEER shall attend the pre -construction conference for the project. The ENGINEER shall also consult with and advise the CITY on design and/or construction changes, if necessary. PART D —CONSTRUCTION STAKING —NOT INCLUDED IN THIS CONTRACT EA1-12 Rev 11102105 TEAGUE NALL AND PERKINS, INC. April 16, 2008 CONSULTING ENGINEERS OPINION OF PROBABLE COST (Pre -Design Phase) EXHIBIT B PROJECT NAME: Golden Triangle Boulevard Utility Relocations CLIENT: CITY OF FORT WORTH, TEXAS Descri tion Unit Unit Cost Quanti Total Water. OFItem 1 16" Water Line Lowering EA $10,000 8 $80,000 2 21" Water Line Relocation LF $250 450 $112,500 3 12" Water Line Relocation LF $200 150 $30,000 4 8" Water Line Relocation LF $150 450 $67,500 5 16" Gate Valve and Vault EA $109000 2 $20,000 6 20" Gate Valve and Vault LF $151000 1 $15,000 7 12" Gate Valve and Box LF $21000 1 $2,000 8 8" Gate Valve and Box LF $1,200 2 $2,400 9 Relocate Fire Hydrant EA $2,000 5 $10,000 Subtotal $33%400.00 Extensions LF $75 950 $71,250 16" Water Line LF $60 5,100 $306,000 F12 12" Water Line LF $45 11250 $56,250 8" Water Line 8" Water Line Other Than Open Cut LF $150 280 $42,000 14 Fire H drant Assembl EA $3,500 13 $45,500 16" Gate Valve and Vault EA $10,000 1 $10,000 12" Gate Valve and BoxEA $2,000 6 $12,000 F16 8" Gate Valve and BoxEA $1,200 20 $24,000 Cl/D.I Fittin s TN $4,000 5 $20,000 Connect to ExistingWater Line EA $2,000 4 $8,000 20 Blow -Off Valve EA $4,500 2 $9,000 21 2" Air Release Valve EA $3,500 1 $3,500 Subtotal $6079500.00 Abandon Old System 22 jAbandon / Remove Existing 6" and 8" Water Lines LF $51 1000 $75,000 23 TReconnect Services to 16" Water Line EA $5,000 5 $25,000 Subtotal $100,000600 General 24 Traffic Control LS $301000 1 $30,000 25 SW3P LS $15,000 1 $15,000 Subtotal $45,000.00 SUB -TOTAL CONST. COST: $1,091,900,00 CONTINGENCY 15% : $164,100.00 TOTAL ESTIMATED CONST. COST: $1,256,000.00 File Name: V:\Projects\FTW05210\Design Contract\Amendment No 2\Estimate Golden Triangel Water Relocations.xls, Estimate M C Y L a a c m Rf ] Z C j Q V U m U O F W J v m�LU d X Q Z ww�Mq w Q J N O ++ 0 d O V a v d M d N d d' .... W [O O a0 00 00 a0 a0 Of 00 00 Q7 : a o 0 0 0 0 0 0 0 0 0 0 t 0) � N c{- N N Q N N 'a � LO to .o ti 00 .D M O m c m H aa) ro m aai (v 0aa) a)'a'o aa) ... 00 0o co co 0o co 0o co co co co 00 0 0 0 0 0 0 0 0 0 0 0 0 M N O '-7 V' N O N LO LO N N N m m O co m> > 7 LO co n r� W = 3 O c;m m m m m m m m m m m m �!0 0 0 0 0 0 0 0 0 0 0 0 N N O m C N C � a O a Y O U co C Y m c c � U D 0 Z a U' a m a)Z a3i c a�i O a U o Z o '> c> m >~ Q a� n Ym,wo %p low a wX Uo ? Za O O HIW U 3 i `tom 00 0) +O N Page 1 of � � � - �; • . � � • � DATE: Tuesday, August 19, 2008 LOG NAME: 20GOLDENTRI-2 REFERENCE NO.: C-22981 gUB�ECT: Authorize Execution of Amendment No. 2 in the AmounDes� n2o fGo den Triangle Boulevardnfrom No. 32378 with a e35W to US 37d7 and (Adopt Appropr'ation Ordinance Interstate Highw y � � �� RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of $126,900.00 from the Water and Sewer Operating Fund to the Water Capital Projects Fund; ro riation ordinance increasing receipts and appropriations in the Water Capital 2. Adopt the attached app p Project Fund in the amount of $126,900.00; and 3. Authorize the City Manager to Execute Amendmenin °• for the design of wat 61ine0improvements aloang Contract No. 32378 with Teague Nall and Perkins, , Golden Triangle Boulevard from Interstate Highway 35W to US 377 thereby increasing the contract amount to $2,193,606.00. DISCUSSION: On September 6, 2005, (M&C C-20954) the City Council authorized the City Manager t 275 00 for Engineering Services Contract 32378 with TelevardNrom Interstate Highway 35W tooUS 37$3as a four -lane the schematic design of Golden Triangle Bou divided arterial street. On December 12, 2006, (M&C C-21883) the City Amendment No. 1 to Engineering Services Contract a S 377 for al total contrat cost of'$2i066,706 00. olden U Council authorized the City Manager to execute 34416 with Teague Nall and Perkins, Inc., in the Triangle Boulevard from Interstate Highway 35W to This contract amendment is needed for the following design services: relocation of various waterlines in conflict with proposed storm drains and culverts; - extension of an existing waterline 5,750 feet from its present terminus to east of the Sports Parkway intersection; and - abandonment of old waterlines. Teague Nall and Perkins, Inc., has lump sum fee of $126,900.00. City services to be performed. proposed to complete the final design plans and specifications for a Staff considers this fee to be fair and reasonable for the scope of 8/2C http://apps. cfwnet.org/council_packet/Reports/mc_print. asp Page 20 Teague Nall and Perkins, Inc., is in compliance with the City's M/WBE Ordinance by committing to 16 percent M/WBE participation on this amendment. The City's goal on this project is 16 percent. This project is located in COUNCIL DISTRICT 2, Mapsco 21 L, M Cl"d R; 22N, P, Q, L and M; and 23 J. It is anticipated that the Texas Department of Transportation (TxDOT) will let the roadway project for construction in early 2009. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds upon approval of the above recommendation and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Water Capital Projects Fund. TO Fund/Account/Centers a) $38,070.00 P253 472045 602170014031 2) $38,070900 P253 531200 602170014031 2) $76,140,00 P253 472045 602170014032 P253 531200 602170014032 $76,140.00 P253 472045 602170014033 $12,690.00 P253 531200 602170014033 $12,690000 Submitted for City Manager's Office by: Originating ®epartment Head: Additional Information Contact: FROM Fund/Account/Centers 1) DE45 538070 0609020 $126,900.00 P253 531200 602170014031 $38,070.00 P253 531200 602170014032 $76,140.00 P253 531200 602170014033 $12,690.00 Fernando Costa (8476) Greg Simmons (7862) Frank Crumb (8246) http://apps. cfwnet. org/council_packet/Reports/mc_print. asp 8/20/200 a� d'11 .�� lIt it YY"lc Xn — RP t i CIA t 11V Ual A '1 1�1 MOlN3a CII0 - 1 LL i`;._ �3 rJilitn Y' t i ►,� e� � B.ytl+ l ii-j_'t '��a� NC'31N3C1 t7'i� `Jt -rMSf Hl:_