Loading...
HomeMy WebLinkAboutContract 37517COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. �Jc� WHEREAS, LPC Trinity Parks LP, hereinafter called "Developer desires to make certain improvements to Lot 2R, Blocic 4, Trinity Bluff Addition, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows. I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended, is hereby incorporated into this Community Facilities Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. Developer acknowledges that there shall be no reduction in the amount of financial security prior to project completion and acceptance by the City. E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the OFFICIAL RECURD Policy. CITY SECRETARY FT WORTH, TX Trinity Bluffs, Lot 2R Blk 4 1 CFA 2008-035 / DOE 5945 / June 3, 2008 F. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. G. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such iniuries, death or damazes are caused, in whole or in part, by the alleged neWimence of the City of Fort Worth, its officers, servants, or employees H. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. I. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). J. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). K. _ Developer_ hereby. releases and.. agrees to indemnify and... hold.. the City. harmless for any inadequacies in the preliminary plans, speccations and cost estimates supplied by the Developer for this contract. L. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to Trinity Bluffs, Lot 2R Blk 4 2 CFA 2008-035 /DOE 5945 /June 3, 2008 construct current and future improvements provided for in this agreement. M. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: Water (A) None; Sewer (A4) None; Paving (B) Attached, Storm Drain (B4) Attached; Street Lights and Signs (C) None. N. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developers) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibit B and B 1. shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibit B and Bl. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $ 156,269.180 Trinity Bluffs, Lot 2R Bllc 4 3 CFA 2008-035 /DOE 5945 /June 3, 2008 SUMMARY OF COST Project Name Trinity Bluffs, Lot 2R Block 4 CFA 2008-035 DOE 5945 Item Developer Cost City Cost Total Cost A. Construction $ - 1. Streets $64,913.95 $ 64,913.95 2. Storm Drainage $82,509.80 $ 82,509080 3. Street Lights $ - 4. Street Name Signs $ B. Engineering Design $ C. Construction Engineering and Management by DOE 4% $ 5,896.95 $ 53896995 D. Materials Testing by DOE 2% $ 2,948.48 $ 2,948.48 TOTALS $ 156,269.18 $ - $ 1569269018 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Developer's column for Item D represents two percent (2%) of paving and storm drain costs for materials testing. Trinity Bluffs, Lot 2R Blk 4 4 CFA 2008-035 /DOE 5945 /June 3, 2008 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth, Texas this the44 day of S + . 120080 Approval Recommended: ATTEST: Marty tie�ttn� City Secretary Approved ATTEST: to Form: Corporate Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Transportation and Public Works City of Fort Worth Fernando Costa Assistant City Manager i LPC Trinity Parks LP t,PU Th►�u;-h,� �I'tas U I I - I � I , LP, a- �Zx p�.� zezcV(xtNo`S . By: � rn) ff ourtwright l Vice President Trinity Bluf s, o c S CFA 2008-035 /DOE 5945 /June 3, 2008 FORT WORTH t Lp �* r�Q t Voris St rir Park aY {�.0z a t I8�[�a� Garvey St I` �i2 PioneersLA ,, Rest Cemetery t'Y� `t� t* � ' ` � Gounah St ��IL PROJECT LOCATION,COP CO PA qL V � " � `t om Tr_s,�Et Fair" ai F '�'�` "� to 4 fl 28 a Harmon s� Field Park Tandy c�t1 TRINITY BLUFF PARK MLA LOCATION MAP ,F r4 d a� �> �i a v u �jx VL , �, tat c'I t _ 4,z' r, 3a» f F t?'� - 1 r,CVEVEI�i v .y y fly t. E,s ems,. }t',Ce_[i.'( ` _ .` .f SF S rr t k P xr dEt` ryry �xa v ' �' s VIP IImI I 11C�ri h4 if'L# x y ` k 7 l rr t ..c Y+ y�YVI- . �� r � s Ir r r Li,t In4 i 91 _ rINa;_ P A iL. .;t 'rF L _F.d I,Ji F, �`F oriu 'RI ir, f FF!F4? s a'I II I T 4 flt,N. ,rr .7•i•j t nr .-e a s r F �r V �7� a �t t E i tie I r tn�r r r. r nr, d t t i girt s _ t E. r _ __... __e ,__G____- 'at ct hey -_" dfutf5 !s, �n! �cu7t p, 7exD.,_- �t .cl _ ri Ls' [+I i�tt{rl f R,73 t r t r a F ii, iv _:, c e d d t lu r F a _ i� V i tY,eI tp �_ f r 1 L r�ai N1+ 1 k n >t fH 6 t-I art: r t Ec [ 4 I t q Ri a SII Yt , t- _a-tr: r R '.k �.,-! i AI nl: .,. o•�JCf On ' : tf � a , er ,<t •t N_.tl. ,cra 4U1 1k� �_ r t Cl 1.1 :,i I-r, r' . - pa t .. r.x Ir t-IIII In It 1 .. t •ki S gil t', t. t L F vt t y1r. e ., TRINITY BLUFF PARK PLAT TITLE BLOCK Z 3 w W z < Z YN W Z�I� z a Q Q ®O ® Qr W W Q aW w Z � a m a> o 'a I a 0F! U W a N N n Z O dQ O > m I_-O� N ao oW M = Z0 Y� � w a nN i� rr x �O�;q., o W ir p 1 1 I I I DoF1 0 oso b S 4 aon aro n ` / \ 1� I I � Lo ii _ Z � 6 / N Y � U J J _ I u Jq} i � I I ' i 'c � _xt b � 1 L t ^A SAMUELS AVENUES COST ESTIMATE - TRINITY BLUFF PARK EXHIBIT B - PAVING Item No, Description Quantity Unit Cost per Unit Item Cost 1 6" Lime Stabilized Subgrade 193 S.Y. $3.85 $743,05 2 Remove Existing Pavement 77 S.Y. $5.50 $423650 3 7" Concrete Pavement 133 S.Y. $37.80 $5,027.40 4 Enhanced Concrete Sidewalk 5449 S.F. $10.00 $54,490600 5 7" Concrete Curb 282 L.F. $15.00 $45230.00 Total Cost Paving: $64,913.95 W y N Q Z z <15 YN Y� Fm Nmoopn� N m Z ycn n wO 0�� m m0N so x n0 W --- tz si nN \ �i �i rhy Ji .Y3 LIt V Q' W +3 5 i Cl L3 °; U —1 is O N all t H fe I. .Z. � A `y s S oZ X3 tb Y� IT a w w u e' W � 360 RCP S AVENUE I { SAMUEL Ui15�3 Y I \� fi t COST ESTIMATE - TRINITY BLUFF PARK EXHIBIT B1 - STORM DRAINAGE Item No. Description Quantity Unit Cost per Unit Item Cost 1 5' Storm Manhole 1 Ea. $21,000600 $211000.00 2 4' Storm Manhole 1 Ea. $2,500000 $2,500000 3 36" Class III RCP 171 L.F. $99.00 $163929.00 4 30" Class III RCP 346 L.F. $76.00 $26,296.00 5 24" Class III RCP 233 L.F. $59.00 $13,747.00 6 21" Class III RCP 32 L.F. $52.00 $1,664400 7 Remove & Replace Pavement 89 S.F. $4.20 $373280 Total Cost Storm Drainage: $82,509.80