Loading...
HomeMy WebLinkAboutOrdinance 6224 T ORDINANCE NO. Z 2 4"' AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF ALLEY FROM PRUITT STREET TO PENNSYLVANIA AVENUE AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im- proved by raising, grading and filling same and by constructing thereon the following, to-wit: UNIT 1: ALLEY From Pruitt Street to Pennsylvania Avenue, between 9th and loth Streets, known and designated as Unit 1, Pro- ject No. 104-24000-195, to be improved with six-inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade, so that the finished roadway will be twelve feet wide. UNIT 2: WEST 5th STREET From Carroll Street to Foch Street, known and designated as Unit 2, Project No. 104-24000-195, to be improved with seven-inch thick hot-mix asphaltic pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and two-foot wide con- crete gutter, so that the finished roadway will be thirty feet wide and by constructing four-foot wide concrete sidewalks where specified. UNIT 3: RENZEL BOULEVARD From Station 27 + 66 to Highway 80, known and designated as Unit 3, Project 104-24000-195, to be improved with six- inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be forty feet wide and by constructing four-foot wide concrete sidewalks and six-inch thick concrete driveways where specified. UNIT 4: OWASSO STREET From E1 Campo Avenue to Collinwood Avenue, known and designated as Unit 4, Project No. 104-24000-195, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and an eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by con- structing six-inch thick concrete driveways where specified. UNIT 5: WEST ELIZABETH LANE From Joyce Drive to Highway 183, known and designated as Unit 5, Project No. 104-24000-195, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty-six feet wide and by constructing four- foot wide concrete sidewalks where specified. UNIT 6: THOMAS PLACE From Lovell Avenue to Locke Avenue, known and designated as Unit 6, Project No. 104-24000-195, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized sub- grade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. UNIT 7: THOMAS PLACE From Locke Avenue to East-West Freeway Service Road, known and des- ignated as Unit 7, Project No. 104- 24000-195, to be improved with six- inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing four-foot wide con- crete sidewalk where specified. UNIT 8: FARNSWORTH AVENUE From Hervie Street to Prevost Street, known and designated as Unit 8, Pro- ject No. 104-24000-195, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty-six feet wide and by constructing six- inch thick concrete driveways where specified. UNIT 9: NORMAN AVENUE From Williams Road to Reagan Drive, known and designated as Unit 9, Pro- ject No. 104-24000-195, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. UNIT 10: MARQUITA DRIVE From Ruby Place to U.S. Highway 80, known and designated as Unit 10, Project No. 104-24000-195, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six- inch thick lime stabilized subgrade, seven-inch high concrete curb and two-foot wide concrete gutter, so that the finished roadway will be forty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalks where specified. together with concrete curbs, gutters, driveways and incidentals to such improvements on proper grade and line where same are not already so constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of said im- provements to be constructed as and where shown on the Plans and in strict accordance with the Plans and Specifications therefor; contract therefore has been made and entered into with Ernest Loyd ; and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amount per front foot proposed to be assessed against abutting property and the owners thereof, and such estimates have been examined, NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. Such estimates be, and they are hereby adopted and approved. II. It is hereby found and determined that the cost of improvements on each portion of streets, avenues, and public places hereinafter described, with the amount or amounts per front foot proposed to be assessed for such improvements against abutting pro- perty and the owners thereof, are as follows, to-wit: UNIT 1: ALLEY From Pruitt Street to Pennsylvania Avenue between Ninth and Tenth Streets, known and designated as Unit 1, Project No. 104-24000-195 The estimated cost of improvements is $ 3,774.10 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ -0- ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 4.43 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for six-inch thick concrete driveway is $ -0- per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ b 43 plus the cost incurred for concrete driveway construction where specified. III. A hearing be given and held by and before the City Council of the City of Fort Worth, Texas, to all owning or claiming any property abutting upon said portions of highways , streets , avenues and public places , as well as to all owning or claiming any interest in any such property. Such hearing shall be given and held on the 2nd day of February , 19 70 , at 9:30 A.M. in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and the City Secretary is hereby directed to give or cause to be given notice of the time and place of such hearing and of other matters and facts in accordance with the terms and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts of said Session, now being known as Article 1105b of Vernon's Texas Civil Statutes as amended by Acts 1967, 60th Legislature, Page 365, Chapter 176, Section 1, emergency effective May 12, 1967. Such notice shall be by advertisement inserted at least three (3) times in a newspaper published in the City of Fort Worth, Texas, the first publication to be made at least twenty-one (21) days before the date of said hearing. Said notice shall comply with and be in accordance with the terms and provisions of said Act as amended. The City Secretary is further directed to give or cause to be given personal notice of the time and place of such hearing to all owning or claiming any property abutting on said portions of highways, streets, avenues and public places , as well as to all owning or claiming any interest in any such property. Such personal notice shall be in writing and shall be given or caused to be given by the City Secretary by depositing such written notice in the United States Mail at least fourteen (14) days before the date of the hearing, postage prepaid, in envelopes addressed to all persons owning or claiming any interest in the respective properties abutting the high- ways, streets, avenues and public places or portions thereof to be improved, as the names of such persons are shown on the current rendered tax rolls of the City of Fort Worth and at the addresses so shown, or if the name of such respective owners do not appear on such rendered tax rolls, then address to such owners as their names are shown on the current unrendered tax rolls of the City of Fort Worth at the addresses shown thereon. In those cases in which an owner of property abutting a highway, street, avenue or public place or portion or portions there- of which is to be improved is listed as "unknown" on the then current City of Fort Worth tax rolls, or the name of an owner is shown on the City of Fort Worth tax rolls but no address for such owner is shown, no notice need be mailed. In those cases where the owner is shown to be an estate, the mailed notice may be addressed to such estate. In this connection, the City Secretary shall prepare and file or cause to be prepared and filed with these proceedings a list of the properties to be assessed, the names of those persons owning or claiming any interest in said properties to whom the notice was mailed, together with the last known addresses determined as aforesaid of the respective owners and those per- sons owning or claiming any interest in said property. The City Secretary shall certify that each of the parties in said list whose address is shown on the then current rendered or unrendered tax rolls of the City of Fort Worth was mailed a copy of the notice of hearing and shall further certify the date or dates on which said notice was mailed. A copy of each notice shall be attached to such certificate. The certificate of the City Secretary will be con.. clusive evidence of the facts therein recited. XIV. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED AND APPROVED THIS DAY OCjW464,,tA 19A. APPROVED AS TO FORM AND LEGALITY: � � r City Attorney UNIT 2: WEST FIFTH STREET From Carroll Street to Foch Street, known and designated as Unit 2, Project No. 104-24000- 195. The estimated cost of improvements is $ 15,632.66 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.05 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 6.58 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for four-foot wide concrete sidewalk is $ 2.95 the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .85 per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $ 13.43 plus the cost incurred for concrete driveway construction where specified. UNIT 3: RENZEL BOULEVARD From Station 27 + 66 to Highway 80, known and designated as Unit 3, Project No. 104-24000-195. The estimated cost c,. improvements is $ 50,372.96 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for ,.:oncrete curb and gutter is $ 2.60 ; the estimated amount per front foot to be assessed against abutting property and the owners uiereof for pavement is $ 7.84 the estimated amount per trnnt foot to be assessed against abutting property and the owners thereof for four-foot wide concrete sidewalk is $ 2.95 ; the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .85 per square foot; the total estimated amount per fro.it foot to be assessed against abutting property and the own- ers thereof is $ 14.24 plus the cost incurred for concrete driveway con- struction where specified. UNIT 4: OWASSO STREET From E1 Campo Avenue to Collinwood Avenue, known and designated as Unit 4, Project No. 104-24000-195. The estimated cost of improvements is $8,157.05 ; the estimated amount per front foot to be assessed against: abutting property and the owners thereof for concrete curb and gutter is $ 2.63 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.81 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .85 per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $ 9.29 , plus the cost incurred for concrete driveway construc- tion where specified. UNIT 5: WEST ELIZABETH LANE From Joyce Drive to Highway 183, known and designated as Unit 5, Project No. 104-24000-195. The estimated cost of improvements is $ 13,446.12 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.60 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 7.91 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for four-foot wide concrete sidewalk is $ 2.95 the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ -0- per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $ 13 , plus the cost incurred for concrete driveway construction where specified. UNIT 6: THOMAS PLACE From Lovell Avenue to Locke Avenue, known and designated as Unit 6, Project No. 104-24000-195. The estimated cost c improvements is $ 10,282.80 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.60 ; the estimated amount per front foot to be assessed against abuttinh property and the owners !hereof for pavement is $ 5.66 the estimated amount per t.ront foot to be assessed against abutting property and the owners thereof for four-foot wide concrete sidewalk is $ 2.95 ; the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick: concrete driveway is $ .85 per square foot; the total -estimated amount per fro.it foot to be assessed against abutting property and the own- ers thereof is $ 12.06 plus the cost incurred for concrete driveway con- struction where specified. UNIT 7: THOMAS PLACE From Locke Avenue to East-West Freeway Service Road, known and designated as Unit 7, Project No. 104-24000-195. The estimated cost of improvements is $ 9,729.50 the estimated amount per front foot to be assessed against: abutting property and the owners thereof for concrete curb and gutter is $ 2.60 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.66 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for four-foot wide concrete sidewalk is $ 2.95 ; the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ _0_ per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $ 11.21 , plus the cost incurred for concrete driveway construc- tion where specified. UNIT 8: FARNSWORTH AVENUE From Hervie Street to Prevost Street, known and designated as Unit 8, Project No. 104- 2400.0-195. The estimated cost of improvements is $ 16,984.82 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.60 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 6.97 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .85 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 10.42 , plus the cost incurred for concrete driveway con- struction where specified. UNIT 9: NORMAN AVENUE From Williams Road to Reagan Drive, known and designated as Unit 9, Project No. 104- 24000-195. The estimated cost of improvements is $ 27,953.47 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.60 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.66 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .85 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 9.11 plus the cost incurred for concrete driveway con- struction where specified. UNIT 10: MARQUITA DRIVE From Ruby Place to U.S. Highway 80, known and designated as Unit 10, Project No. 104- 24000-195. The estimated cost of improvements is $ 26,926.13 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.02 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 8.90 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for four-foot wide concrete sidewalk is $ 2.95 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .85 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 15.72 z plus the cost incurred for concrete driveway con- struction where specified. City of Fort Worth, Texas Ums MORPHIs Mayor and Council Communication DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGIE GRAHAM • NUMBER 1/5/70 C-1641 Paving at Ten Locations on the lo' 3 West Side City Council action is requested on the project described below. Project Description Nature of Work: Assessment .Paving at Ten Locations on the West Side. Roadway Unit Street Limits Width R.O.W. 1 Alley From Pruitt Street to 12 feet 20 feet Pennsylvania Avenue between Ninth and Tenth Streets 2 West Fifth Street From Carroll Street to 30 feet 50 feet Foch Street 3 Renzel Boulevard From Station 27+66 to 40 feet 80 feet Highway 80 4 Owasso Street From E1 Campo Avenue to 30 feet 60 feet Collinwood Avenue 5 West Elizabeth Lane From Joyce Drive to 36 feet 50 feet Highway 183 6 Thomas Lane From Lovell Avenue to 30 feet 60 feet Locke Avenue 7 Thomas Lane From Locke Avenue to 30 feet 60 feet East-West Freeway Service Road 8 Farnsworth Avenue From Hervie Street to 36 feet 80 feet Prevost Street 9 Norman Avenue From Williams Road to 30 feet 50 feet Reagan Drive 10 Marquita Drive From Ruby Place to 40 Feet 60 feet Highway 80 Petitions have been received from property owners for the pawing of all units, except Unit 5, which was City initiated. as the result of a community facility contract. Sidewalks have been included in Units 2, 3, 5, 6, 7, and 10 to tie in with existing sidewalks, and to serve churches, shopping centers, and streets that tie into major thoroughfares. DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE NUMBER Paving at Ten Locations on the 2 of 3 1/5/70 C-1641 West Side Submission of Bids The following bids have been received: Bidder Amount Bid Ernest Loyd $166,594.75 Austin Road Company and Worth Construction Company 184,138.60 Texas Bitulithic Company 185,228.00 Bids Received: December 11, 1969 Working Time Bid: 150 Days Project Cost and Financing Based on the low net bid, approximately $94,887.20 will be assessed against abutting property owners. The cost to the City-at-large will be approximately $88,000, including engineering expenses. A Bond Fund Transfer from Unspecified Funds is proposed to provide for the City's portion of the cost of the project. Recommendations It is recommended that: 1) The following Bond Fund Transfers be approved: Amount From To Reason $94,887.20 Unspecified 10 Locations on Property Owners' Portion 042-09724-901 West Side of Construction Cost 042-10424-195 $88,000.00 Unspecified 10 Locations on City's Portion of Construc- 104-24000-901 West Side tion, Engineering and 104-24000-195 Miscellaneous Costs 2) An ordinance be adopted: a) Declaring the necessity for and ordering the improvements;. b) Making provisions for levying of assessments; c) Directing the Public Works Department to prepare costs and amounts to be assessed; d) Awarding a contract to Ernest Loyd in the amount of $166,594.75; and, e) Making appropriations to cover indebtedness thereby incurred for improvements as described above. DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE NUMBER Paving at Ten Locations on the 1/5/70 C-1641 West Side 3 °� 3 3) An ordinance be adopted: a) Approving the estimates of cost and amounts proposed to be assessed; and, b) Setting February 2, 1970, as the date of the Benefit Hearing. HDM:ms Attachments: "A" - Map of Project "B" - Resume of Location Map "C" - Engineers' Preliminary Rolls SUBMITTED BY: DISPOSITION COUNCIL: P CESSED BY II�f,�_C AP�PR'O,V,E�DY [I OTHER (DESCRIBE) ////J � � M � Noo CITY SECR ARY �W & K� Aft FjLTIZ� and • PQO.� DATE CITY MANAGER ietting Date Ot Beatfiti ARL I HTS I I in ¢ i m o 7 �.r . n'•.^I; � i e'em EL AMP a z aYF CA AY = fl CA PO A o ESIJING PERS ING BIRC MAN Unit E r4 HIiNTT - WESTc e nt E EN A 10 LENA A LINGION HEI HTS 9 = 00 FR Unit 1 TLCH LOV LLo w F k W Sl.i- POPE Sr. o �o F� z + i[�R ll aV ZON n HOME Hir- (o b• N J Q J n r 2 N V�1� z o BOA 0 WO.1 H o a o '!' F z DIAZ HOU HTO ";4`;`tti KE � Q _Z � ARK;;.. fLETCHE yr DWI ATE N R T'.!f BON NELL RD �1 o IgIE KILPATRICK �O eON. BRIST l j ERcp' > GU ANCOi S Wp I RRIM J �i Oiar Sh = LIB EY AVE �cF 3 a 00 N !� sr Unit 2' H u W W E Far ISWCr AV 300 E T : - — BLED eiem. LANCAST ARBOR AVE ¢ I Y o J� W �ADDIf a EANN AVE > ARK R JAVE 8500 DQREEN AVE WE DOREE AVE r w C DOWN Do 3 U.S. U• Hw ELIZ BETP ll c� o s o 800�rr E IIAB TH o GLAD PE RD Q o hj N UT Q �� Unl t 5 �• o ; SANa� v _o m z ` S/ & _ ? dl O O 9 RUSH NORMAN AVE UL PL I O ac 1 Worih •Clt o Q U 00� ARRICK E ALBERT,�� AVE z uK PL e 0 F PL F( ORDO Q �t • _ a Unit 10 ine "� o z A Benbrodk Cif _ F CT E y Y"o WESTVAL Assessment Paving 10 Locations on the West side Project No. 104- 24000. 195 CITY OF FORT WORTH PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION ASSESSMENT PAVING AT 10 LOCATIONS ON THE WEST SIDE PROJECT NO. 104-24000-195 A Neighborhood Hearing was conducted by the Engineering Division of the Public Works Department at Como Elementary School No. 73 on December 22, 1969, for the Assessment E'aving at 1i Locations on the West Side. Procedures concerning owner participation in the cost, method and policies of determining assessments, street constructLon standards and methods of payment were explained by :,r. Schiaidt to the nineteen (19) persons present. Unit 1, :alley from Pruitt to Pennsylvania Avenue - between Ninth and Tenth Streets : r. John Chapman represented the Elmwood Baptist Church, East 25' of 3, Edward Heirs l:,ddition. He was in favor of paving the alley. Vir. Riggle, 1710 Pruitt who owns West 38' of 2, Block 8, Edward Heirs Addition, was not in favor of paving the alley. Unit 2, West Fifth Street: Frank Krynik, Jr. , 837 Coury Road who owns Tract 16 of William Bussell Survey, does not think the street should be paved since there is a strip of transition type of pavement in front of his property. He also stated that the grade on the street is bad as the water does not drain off. And in addition, he wants a wider driveway. He was told that this is possible. Mr. P. M. Fitzgerald, 2927 West Sixth Street, who owns Lots 1 and z of 2, Block 15, K. M. Van Zandt's Second Addition, is in the process of selling his property and has concern about having to pay for a sidewalk and having it torn out soon thereafter by the firm who is buying his property. Unit 3, Renzel Boulevard: No Comment Unit 4, Owasso Street: No Comment Unit 5, West Elizabeth Lane: No Comment Units 6 & 7, Thomas Place: Mr. Clowe, 4139 Locke, who owns Lot 19, Block 20, Arlington Heights, Fourth Filing, objected to paving both blocks and having only one petition circulated even though people on both blocks signed the petition. He says the pavement is good that is now on the street. Mr. Ted Wilkinson, 4136 Locke, who owns Lots 21, Block 11, Arlington Heights, Fourth Filing, doesn't want to pay for having street paved again, as he said he helped to pay for having it done in 1954. Unit 8, Farnsworth Avenue: Rev. Wesley Mitchell, 3216 Farnsworth Avenue, who owns Lots 31 & 32, Block 112, Chamberlin Arlington Heights, Second Filing, wanted to know when work would begin and what type of pavement is being used. Unit 9, Norman Avenue: Page V. Yeager, 7808 Norman who owns Lot 16, Block 3, Bankhead Estates Addition, was concerned about sewer lines being put in and paying for it. Unit 10, Marquita Drive: No Comment A good number of those present expressed a desire to attend the Benefit Hearing on February 2, 1970. They were given a cordial invitation to attend and express their desires. After quite a lengthy discussion, the meeting adjourned. LOT R i r � i i { ' � I /S 1. vFtvirr sr. f • I CANNON or UNIT 1 : Alley From Pruitt to Pennsylvania between Ninth and Tenth r= z 9 _ 5.-u T..21 T.22 `1..v T...J1113 Tr..NI i..Sl Te%� Te.y —.Lei 7./ .I___- '_ 69 • // / do 14)17 sT _ (04ki AA/0) 1V6th -- - Aa - S I 7 L ' t s' � z ^. ./o F B '.. e f � �i z /„ ` F • s r 6i �_ 4 7fh _--- UNIT 2: West Fifth Street From Carroll to Foch Street 3 � .01 \ UNIT 3: Renzel Boulevard From Station 27+66 to U. S. Highway 80 1 % f 3 COL L/NWOOD /Y /3 /6 /7 /d /9 100, • I1 /1 !J /3 /6 /7 /C 1 /0 1 2 J Y -5 6 7 d 9 /O: / Z ,j Y S 6 7 B 9 /O / 1 I 3 EL CAMPO 4 /Y /J /6 /7 /B I /9 ZO' // /1 /J /Y /S /6 /7 /B /9 10. d 9 /O t - 6 3 6 7 8 9 /O i P6RS/1/NC U NIT 4: Owasso Street From El Campo Avenue to Collinwood Avenue 10 IN /4 (i'�\/ I 14 WEST ELIZABETH _ A � � 6 2 /G- - —__ 5 __ [/�-i!� _ll Nu - i 1 lo i 9 A /o h 11 16 !Z 10 7A9AIAl UNIT 5: West Elizabeth Lane From Joyce Drive to State Highway 183 r ROSEDAU 4YX ROSSAALE STREET _ r I t i )/ 3J JS 37 7J h zi i7 zf zf J! ' �/ J) Jr J, )1 - ti i. t♦ tr to tr t� J♦ t� r L♦ I 7l JJ 3♦" J7 i9. ,� z3 a: aJ 93 31 I Ei 0 C Li9 17 I1 it ,3 J/ J s / .♦ .� > > i 1— I O / 1 7 31 ]T JT]' `r, rr rr r♦ rr ri » >i ri r UNITS 6 & 7: Thomas Place From Lovell to Locke Avenue & from Locke Ave. to East-West Freeway Service Rd . — — - 2 � �� 'I a r✓ 0�9� 9 � s s e ! 7c/s is i7 is is � // i s s � �s.f f 3 9r ) I 44 IS 7Gz I Ag ZU�� •S�s S f J i7� 1-�,__I h c J sr a �` ��� � J9 s a �•' - - 20 i/'l '6 S /S r > / �.s t 2c 1➢ G - • +j// 1. 1 I i I I I t 4 lij+�- i,If�'� vy t/�tZ�ta if ra Z'L �3• �• , a> S{s, r-�0 72231I' So s/37 55`4$33633e xf /ENICK UNIT 8 : Farnsworth Avenue From Hervie Patreet to Prevost Street � F • T �•'IBe P Q v /Gq kiwi NO L �r •. 0 UNIT 9 : Norman Avenue From Williams Road to Reagan Drive 80 o 4 b CULC' L T AD 8 9 UNIT 10 : Marquita Drive From Ruby Place to U. S . Highway 80 FORT WORTH, TEXAS 19 TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS. Gentlemen: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below: Estimates of the total cc_t of improvements on a portion of ALLEY FROM PRUITT STPERT TO PF.NNSY ,VANTA AVENUE and portions of sundry other streets, avenues and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to-wit: PROJECT NO. 104-24000-195, UNIT 1: ALLEY FROM PRUITT STREET TO PENNSYLVANIA AVENUE BETWEEN 9th and loth STREETS, to be improved with six-inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade so that the finished roadway will be twelve feet wide. The following assessment rates have been established: Cost per linear foot . . . . . . . . . . . . . . . . . . . . $13.28 Sir.-inch thick reinforced concrete pavement 4.43 /LF (Apt. and Ind. Zoning) based on one-third for each property owner and one-third to the City PROJECT NO. 104-24000-195, UNIT2: WEST 5th STREET FROM CARROLL STREET TO FOCH STREET to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and two-foot wide con- crete gutter, so that the finished roadway will be thirty feet wide and by constructing four-foot wide concrete sidewalks where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter . . . . . . . . . . . . . $ 3.05 /LF Seven-inch hot-mix asphaltic concrete pavement (Ind. Zoning) . . . . . . . . . . . . . . . . . . . . . 6.58 /LF Five-inch thick concrete sidewalk . . . . . . . . . . . . . . 2.95 /LF Six-inch thick concrete driveway . . . . . . . . . . . . . . .85 per Sq. Ft. PROJECT NO. 104-24000-195, UNIT 3: RENZF.L BOULEVARD FROM STATION 27 + 66 TO HIGHWAY 80, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be forty feet wide and by constructing four-foot wide concrete sidewalks and six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter . . . . . . . . . . . $2.60 /LF Six-inch thick concrete asphaltic pavement (Residential Zoning) . . . . . . . . 2.80 /LF Six-inch thick concrete asphaltic pavement (Apt. & Comm. Zoning) . . . . . . . . . . . . . . . . . . 7.84 /LF Five-inch thick concrete sidewalk . . . . . . . . . . . . . . . 2.95 /LF Six-inch thick concrete driveways . . . . . . . . . . . . . . . .85 per Sq. Ft. PROJECT NO. 104-24000-195, UNIT 4: OWASSO STREET FROM EL CAMPO AVENUE TO COLLINWOOD AVENUE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and an eighteen- inch wide concrete gutter so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter . . . . . . . . . . . $2.63 /LF Eighteen-inch gutter only . . . . . . . . . . . . . . . . . . 1.32 /LF Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) . . . . . . . . . . . . o . . . . . 2.77 /LF Six-inch thick concrete driveways . . . . . . . . . . . . . . .85 per Sq. Ft. PROJECT NO. 104-24000-195, UNIT 5: WEST ELIZABETH LANE FROM JOYCE DRIVE TO HIGHWAY 183, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty-six feet wide and by con- structing four-foot wide concrete sidewalks where specified. The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter . . . . . . . . . . $2.60 /LF Sever.-inch hot-mix asphaltic concrete pavement (Residential Zoning) . . . . . . . . . . . . . . . . . . 2.80 /LF Seven-inch hot-mix asphaltic concrete pavement (Commercial Zoning) . . . . . . . . . . . . . . . . . . . 7.91 /LF Five-inch thick concrete sidewalk . o . . . . . . . . . . . . 2.95 /LF PROJECT NO. 104-24000-195, UNIT 6: THOMAS PLACE FROM LOVELL AVENUE TO LOCKE AVENUE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide and by construct- ing sip;-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter . . . . . . . . . . $2.60 /LF Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) . . . . . . . . . . . . . . . . . . 2.80 /LF Five-inch thick concrete sidewalk . . . . . . . . . . . . . . 2.95 /LF Six-inch thick concrete driveway . . . . . . . . . . . . . . . .85 per Sq. Ft . PROJECT NO. 104-24000-1951UNIT 7 : THOMAS PLACE FROM LOCKE AVENUE TO EAST-WEST FREEWAY SERVICE ROAD, to he improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen- inch wide concrete gutter so that the finished roadway will be thirty feet wide and by constructing four-foot wide concrete sidewalk where specified. The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter . . . . . . . . . . $2.60 /LF Six-inch hot-mix asphaltic concrete pavement (Residential Zoning less $ .27 credit) . . . . . . . . . 2.53 /LF Six-inch hot-mix asphaltic concrete pavement (Commercial Zoning less $ .27 credit) . . . . . . . . . . 5.39 /LF Five-inch thick concrete sidewalk . . . . . . . . . . . . . . 2.95 /LF PROJECT NO. 104-24000-195, UNIT 8: FARNSWORTH AVENUE FROM HERVIE STREET TO PREVOST STREET, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty-six feet wide and by constructing six- inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter . . . . . . . . . . $2.60 /LF Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) . . . . . . . . . . . . . . . . . . 2.80 /LF Six-inch thick concrete driveways . . . . . . . . . . . . . . .85 per Sq. Ft. PROJECT NO. 104-24000-195, UNIT 9: NORMAN AVENUE FROM WILLIAMS ROAD TO REAGAN DRIVE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick line stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by construct- ing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter . . . . . . . . . . . . $2.60/LF Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) . . . . . . . . . . . . . . . . . . . 2.86/LF Si.,..-inch thick concrete driveways . . . . . . . . . . . . . . . .85 per Sq. Ft. PROJECT NO. 104-24u00-195, UNIT 10: MARQUITA DRIVE FROM RUBY PLACE TO U.S. HIGHWAY 80, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and two-foot wide concrete gutter, so that the finished roadway will be forty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalks where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter . . . . . . . . . . . . . . $3.02/LF Seven-inch hot-mix asphaltic concrete pavement (Residential Zoning) . . . . . . . . . . . . . . . . . . . 2.38/LF Seven-inch hot-mix asphaltic concrete pavement (Commercial & Industrial Zoning) . . . . . . . . . . . . . 8.90/LF Five-inch thick concrete sidewalks . . . . . . . . . . . . . . . 2.95/LF Six-inch thick concrete driveways . . . . . . . . . . . . . . . .85 per Sq. Ft. The assessments result in the following division of costs: TOTAL PROPERTY OWNERS' COST FOR PAVEMENT . . . . . . .$ 50,159.61 TOTAL PROPERTY OWNERS' COST FOR CURB, GUTTER, DRIVEWAYS & SIDEWALKS . . . . . . . . . .$ 44,727.59 TOTAL PROPERTY OWNERS' COST . . . . . . . . . . .$ 94,887.20 TOTAL CITY OF FORT WORTH'S COST . . . . . . . . .$ 88,367.02 TOTAL ESTIMATED COST . . . . . . . . . . . . L83t254.22 PROJECT NO. 104-24000-195, UNIT 1: ALLEY FROM PRUITT STREET TO PENNSYLVANIA AVENUE BETWEEN NINTH AND TENTH STREETS, to be improved with sik-inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade, so that the finished roadway will be twelve feet-wide. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT PRUITT STREET ON WEST SIDE OF THE ALLEY WEST SIDE OF ALLEY EDWARDS HEIRS ADDITION Elmwood �Baptist Church E. 25' 8 100' Pavement $4.43 $443.00 1712 Pruitt 76104 of 3 Apt. $ 443.00 Robert Gilmer E. k of 8 100' Pavement $4.43 $443.00 2404 Salerno Dr. 4 Ind, $ 443.00 Dallas, Texas EAST SIDE OF STREET Dr. Leon Oo Smith Na of 8 50' Pavement $4.43 $221.50 1701 Pennsylvania 76104 1 Apt. $ 221.50 Myrtle T. Sassin So ' of 8 50' Pavement $4e43 $2.21.50 5539 McComas St. 1 Apt. $ 221.50 Dallas, Texas Owren F. Riggle W. 38' 'of 8 100' Pavement $4.43 $443.00 1710 Pruitt 76104 2 Apt. $ 443.00 COST TO PROPERTY OWNERS m ASSESSMENT $,1,772.00 COST TO CITY OF FORT WORTH $2,002.11 TOTAL ESTIMATED CONSTRUCTION COST, UNIT NO.. 1 JL774.11 . 1 PROJECT NO. 104-24000-195, UNIT 2. WEST FIFTH STREET FRCM CARROLL STREET TO FOCH STREET, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and two-foot wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing four-foot vide concrete sidewalks where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT SOUTHWEST INTERSECTION OF CARROLL STREET AND WEST FIFTH STREET SOUTH SIDE OF STREET R. M. VAN ZANDT°S SECOND ADDITION P. M. Fitzgerald 1 & E. k 15 75' Pavement $6,58 $493.`50 2927 West Sixth St. of 2 Ind. 75' Curb & Gutter 3.05 228.75 76107 75 Sidewalk 2,95 221,25 $ 943.50 P. M. Fitzgerald W. k of 15 75' Pavement $6.58 $493.50 2927 West Sixth 2 & Lot Ind. 75' Curb & Gutter 3.05 228.75 t6107 3 75' Sidewalk 2.95 221.25 $ 943.50 Franky E. Kizer 4,5, & 15 1.50° Pavement $6.58 $987.00 2713 West Fifth St. 6 Ind. $ 987.00 76107 H. Malvern Marks 7 & 8 15 125' Pavement $6.58 $822.50 3612 W. Biddison E. k of Ind. 125' Curb & Gutter 3.05 381.25 76109 9 125' Sidewalk 2.95 368.75 $1,572.50 Julius A. Junge, Jr. W. k of 15 75' Pavement $6.38 $493.50 2800 West Seventh 9, All of Ind. 75' Sidewalk 2.95 221.25, 76107 10 $ 714.75 NORTH SIDE OF STREET WILLIAM BUSSELL-SURVEY Frank Krynik, Jr. Tract 16 50' Pavement $6.58 $329.00 837 Coury Road Ind. 50' Curb & Gutter 3.05 152.50 7614.0 391 Sidewalk 2.95 115.05 85 Sq.- Ft. Drive .85 72.25 $ 668.80 2 PROJECT NO, 104-24000-195, UNIT 20 WEST FIFTH STREET FROM CARROLL STREET TO FOCH STREET - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET WILLIAM BUSSELL SURVEY Leggett - Leggett - 6,7, & 8 of Blk. 19 250' Pavement $6.58 $1,645.00 Leggett and Tract 18 34' Sidewalk 2.95 100.30 P.O. Box 9540 Ind. $1,745.30 Charles Glenn & Tract 27 250' Pavement $6.58 $1,645.00 Jerry D. Smith Ind. 250' Curb & Gutter 3.05 762.50 5417 E. Lancaster 220' Sidewalk 2.95 649.00 233 Sq. Ft. Driveway.85 198.05 $3,254.55 COST TO PROPERTY OWNERS - ASSESSMENT $10,829.90 COST TO CITY OF FORT WORTH 4,797.36 TOTAL ESTIMATED CONSTRUCTION COST, UNIT NO. 2 $15,627.26 3 PROJECT NO. 104-24000-195n UNIT 3s RENZEL BOULEVARD FROM STATION 27+66 TO HIGHWAY 80, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be forty feet wide and by constructing fmur-foot wide concrete sidewalks and six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT STATION 27+66 OF RENZEL BOULEVARD WEST SIDE OF STREET HAYES - COVINGTON SURVEY A. L. Carlock Soo Part of Tract1139' Pavement $2.80 $3,189.20 1027 Cliffdale 4-C 1139' Curb & Gutter 2.60 2,961.40 Dallas, Texas Res. 1139' Sidewalk 2.95 3,360.65 75211 $9,510.65 A. L. Carlock N. Part of Tract 300' Pavement $7.84 $2,352.00 1027 Cliffdale 4-C 300' Curb & Gutter 2.60 780.00 Dallas, Texas Comm. 300' Sidewalk 2.95 885.00 75211 $4,011.00 EAST SIDE OF STREET L. W. MOORE SUBDIVISION Westridge Baptist N. Part of Block 2,50' Pavement $7.84 $1,960.00 Church 3801 Plantation -Dr. C 250' Curb & Gutter 2.60 650.00 76116 Comm. 250' Sidewalk 2.95 737.50 $3,347.50 Westridge Baptist Soo Part of Block682.6' Pavement $2.80 $1,911.28 Church C 682.6' Curb & Gutter2.60 1,774.76 2801 Plantation Dr. Res. 632.6' Sidewalk 2.95 1,866.17 76116 688 Sq. Ft. Driveway.85 584.80 $6,137.01 Diocese of Dallas Block A 444' Pavement $7.84 $3,480.96 P.O. Box 19507 Apt. 444' Curb & Gutter 2.60 1,154.40 Dallas, Texas 444' Sidewalk 2.95 1,309.80 $5,945.16 COST TO PROPERTY OWNERS - ASSESSMENT $28,957.32 COST TO CITY OF FORT WORTH 121,415.64 TOTAL ESTIMATED CONSTRUCTION COST, UNIT 3 $50,372.96 4 PROJECT NO. 104-24000-195, UNIT 9s OWASSO STREET FROM EL CAMPO AVENUE TO COLLINWOOD AVENUE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch think concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHWEST CORNER OF INTERSECTION OF EL CAMPO AVENUE AND OWASSO STREET WEST SIDE OF STREET QUEENSBORO FIRST FILING Charlie Ma Hinkle 10 3 120' Side Lot Credit 3800 El Campo Res- 100' Pavement $2077 $277.00 76107 100' Gutter Only 1.32 132.00 $ 409.00 Rufus A. Beavers 20 3 120' Side Lot Credit 3801 Collinwood Res- 100' Pavement $2.77 $277.00 100' Gutter Only 1.32 132.00 $ 409.00 EAST SIDE OF STREET Lyston M. Walker 11 4 120' Side Lot Credit 3737 Collinwood Res. 100' Pavement $2.77 $277.00 76107 100' Gutter Only 1.32 132.00 $ 409.00 Mrs. Savena Franklin 1 4 120' Side Lot Credit 1315 Grand Res. 100' Pavement $2.77 $277.00 76106 100' Curb & Gutter 2.63 263.00 215 Sq. Ft. Driveway.85 182.75 $ 722.75 COST TO PROPERTY OWNERS - ASSESSMENT $1,949.75 COST TO CITY OF FORT WORTH $6,207,30 TOTAL ESTIMATED CONSTRUCTION COST, UNIT 4 $8,157.05 5 PROJECT NO. 104-24000-195, UNIT 5: WEST ELIZABETH LANE FROM JOYCE DRIVE TO HIGkiWAY 183, to be improved with seven-inch thick hot-mile asphaltic concrete pavement on.a_;six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty-six feet wide and by con- structing four-foot wide concrete sidewalks where specified. BLOCK OWNER LOT . ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHEAST INTERSECTION OF JOYCE DRIVE AND WEST ELIZABETH LANE NORTH SIDE OF STREET ALTA MERE ADDITION H. Bodour 12 25 175' Side Lot Credit 4204 Ridgehaven Res. 100' Pavement $2.80 $280.00 76116 100' Curb -.& Gutter 2.60 260.00 175' Sidewalk 2.95 516.25 $1,056,25 H. Bodour 13 25 135' Pavement $7.91 $1,067.85 4204 Ridgehaven Comm. 125' Curb & Gutter 2.60 325.00 76116 135' Sidewalk 2.95 398.25 $1,791.10 SOUTH SIDE OF STREET Robert C. Brennand 22-R 28 310' Pavement $7.91 $2,452.10 Bassett Tower Comm. 2701 Curb & Gutter 2.60 702.00 El Paso, Texas 79901 2801 Sidewalk 2.95 826.00 $3,980.10 COST TO PROPERTY OWNERS - ASSESSMENT $ 6,827.45 COST TO CITY OF FORT WORTH $ 6,618.67 TOTAL ESTIMATED CONSTRUCTION COST m UNIT 5 $13,446.12 6 PROJECT NO. 104-24000-195, UNIT 6e THOMAS PLACE FROM LOVELL AVENUE TO LOCKE AVENUE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHWEST INTERSECTION OF LOVELL AVENUE AND LOCKE AVENUE WEST SIDE OF STREET ARLINGTON HEIGHTS FOURTH FILING F. A. Collier 39 19 125' Side Lot Credit 4200 Lovell Res. 100' Pavement $2.80 $280.00 100' Curb & Gutter 2.60 260.00 107' Sidewalk 2.95 315.65 194 Sq. Ft. Driveway.85 164.90 $1,020.55 Georgia A. Richards 1 19 125' Side Lot Credit 4205 Locke Res. 100' Pavement $2.80 $280.00 100' Curb 6; Gutter 2.60 260.00 125' Sidewalk 2.95 368.75 $ 908.75 EAST SIDE OF STREET Virgil Clowe 19 _ 20 125' Side Lot Credit 4139'Locke Res. 100' Pavement $2,80 $280.00 100' Curb & Gutter 2.60 260.00 109' Sidewalk 2.95 321.55 $ 861.55 Marc E. Touchon, Jr. 21 20 125' Side- Lot Creidt 2017 Western Res. 100' Pavement $2.80 $280.00 100' Curb & Gutter 2.60 260.00 194 Sq. Ft. Driveway.85 164.90 107' Sidewalk 2.95 315.65 $1,020.55 COST TO PROPERTY OWNERS - ASSESSMENT ,811.40 COST TO CITY OF FORT WORTH TOTAL ESTIMATED CONSTRUCTION, COST, UNIT 6 110,282.80 7 PROJECT NO. 104m24000-195, UNIT 7: THOMAS PLACE FROM.-LWKE AVENUE TO EAST-WEST FRMNAY SERVICE ROAD, to be improved with six-inch thir-k hot-mix asphaltic concrete pavement on a sins-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by construct° 4.ng four-foot wide concrete sidewalk where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHWEST INTERSECTION OF LOCKE AVENUE AND THOMAS PLACE WEST SIDE OF STREET ARLINGTON HEIGHTS FOURTH FILING Alex Ed Adolfson 39 12 125' Side Lot Credit 4200 Locke Res. 100' Pavement $2.53 $253.00 100' Curb & Gutter 2.60 260.00 106' Sidewalk 2.95 312.70 $ 825.70 Joe S. Driskell 1 12 125' Pavement $5.39 $673.75 4117 West Rosedale Comm. 97' Sidewalk 2.95 286.15 $ 959.90 EAST SIDE OF STREET Arlington Heights Community 19 1 1 125' Pavement Center Comm. $5.39 $673.75 c/o Joe S. Driskell $ 673.75 4117 West Rosedale Ted E. Wilkinson 21 11 125' Side Lot Credit 4136 Locke Res. 100' Pavement $2.53 $253.00 100' Curb & Gutter 2.60 260.00 109' Sidewalk 2.95 321.55 $ 834.55 COST TO PROPERTY OWNERS - ASSESSMENT $3,293.90 COST TO CITY OF FORT WORTH 6,435.60 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 7 9 729.50 8 PROJECT NO. 104-24000-195, UNIT 8s FARNSWORTH AVENUE FROM HERVIE STREET TO PREVOST STREET, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty-six feet wide and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHWEST CORNER OF INTERSECTION OF HERVIE STREET AND FARNSWORTH AVENUE NORTH SIDE OF STREET CHAMBERLIN ARLINGTON HEIGHTS SECOND FILING E. J. Walton 21 & 22 112 50' Pavement $2.80 $140.00 958 East Allen Res. 50' Curb & Gutter 2.60 130.00 $ 270.00 Lonzell Fields 23 & 24 112 50' Pavement $2.80 $140.00 1420 E. Myrtle Res. 50' Curb & Gutter 2.60 130.00 151 Sq. Ft. Driveway.85 128.35 $ 398.35 Hillary Gill 25 & 26 112 50' Pavement $2.80 $140.00 c/o M. C. Gregory Res. 50' Curb & Gutter 2.60 130.00 3725 Crestline 151 Sq. Ft. Driveway.85 128.35 $ 398.35 Vernon C. Jenkins, Jr. 27 & 28 112 50' Pavement $2.80 $140.00 1029 Morningside Drive Res. 50' Curb & Gutter 2.60 130.00 151 Sq. Ft. Driveway.85 128.35 $ 398. 35 Trentman Co. 29 & 30 112 50' Pavement $2<80 $140.00 1310 Trans-American Res. 50' Curb & Gutter 2.60 130.00 Life Bldg. $ 270.00 Wesley W. Mitchell 31 & 32 112 50' Pavement $2.80 $140.00 3216 Farnsworth Avenue Res. 50' Curb & Gutter 2.60 130.00 151 Sq. Ft. Driveway.85 128.35 $ 398.35 9 PROJECT NO. 104-24000-195, UNIT 8: FARNSWORTH AVENUE FROM HERVIE STREET TO PREVOST STREET CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET CHAMBERLIN ARLINGTON HEIGHTS SECOND FILING Trentman Co. 33 & 34 112 50' Pavement $2.80 $140.00 1310 Trans - American Res. 50' Curb & Gutter 2.60 130.00 Life Bldg. $ 270.00 R. B. Trentman, Trustees 35 & 36 112 50' Pavement $2.80 $140.00 3501 Bluebonnet Circle Res. 50' Curb & Gutter 2.60 130.00 $ 270.00 Essie Ashford 37 & 38 112 50' Pavement $2.80 $140.00 1132 East Leuda Res. 50' Curb & Gutter 2.60 130.00 151 Sq. Ft. Driveway.85 128.35 $ 398.35 A. Cash 39 & 40 112 50' Pavement $2.80 $140.00 5300 Farnsworth Res, 50' Curb & Gutter 2.60 130.00 $ 270.00 SOUTH SIDE OF STREET Henry W. Cash 1 & 2 121 50' Pavement $2.80 $140.00 5301 Farnsworth Res. 50' Curb & Gutter 2,.60 130.00 151 Sq. Ft. Driveway .85 128.35 $ 398.35 R. B. Trentman, 3 & 4 121 50' Pavement $2.80 $140.00 Trustees Res. 50' Curb & Gutter 2.60 130.00 3501 Bluebonnett Circle $ 270.00 R. B. Kirby 5 & 6 121 50 Pavement $2.80 $140.00 5309 Farnsworth Res. 50' Curb & Gutter 2.60 130.00 151 Sq. Ft. Driveway.85 128.35 $ 398.35 10 PROJECT NO. 104-24000-19.5, UNIT 8t FARNSWORTH AVENUE FROM HERVIE STREET TO PREVOST STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET CHAMBERLIN ARLINGTON HEIGHTS SECOND FILING J. Matt Walker 7 & 8 121 50' Pavement $2.80 $140.00 301 W. T. Waggoner Res. 50' Curb & Gutter 2.60 130.00 Building 76102 $ 270.00 Trentman Co. 9 & 10 121 50' Pavement $2.80 $140.00 1310 Trans-American Res, 50' Curb & Gutter 2.60 130.00 Life Bldg. $ 270.00 Alex Johnson 11 & 12 121 50' Pavement $2.80 $140.00 5321 Farnsworth Res. 50' Curb & Gutter 2.60 130.00 151 Sq. Ft. Driveway .85 128.35 $ 398.35 J. Dorsey Adams 13 & 14 121 50' Pavement $2,80 $140.00 1009 Evans Res. 50' Curb & Gutter 2.60 130.00 151 Sq. Ft. Driveway .85 128.35 $ 398.35 M. C. Gregory 15 & 16 121 50' Pavement $2.80 $140.00 3725 Crestline Road Res, 50' Curb & Gutter 2.60 130.00 151 Sq. Ft. Driveway.85 128.35 $ 398.35 Trentman Co. 17 & 18 121 50' Pavement $2.80 $140.00 1310 Trans-American Res. 50' Curb & Gutter 2.60 130.00 Life Bldg. $ 270.00 Trentman Co. 19 & 20 121 50' Pavement $2.80 $140.00 1310 Trans-American Res, 50' Curb & Gutter 2.60 130.00 Life Bldg. $ 270.00 COST TO PROPERTY OWNERS - ASSESSMENT $ 6,683.50 COST TO CITY OF FORT WORTH $10,301.32 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 8 $16,984.82 11 PROJECT NO,_104-24000-195, UNIT 9: NORMAN AVENUE FRDM WILLIAMS ROAD TO REAGAN DRIVE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six- inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHEAST CORNER OF INTERSECTION OF WILLIAMS ROAD AND NORMAN AVENUE NORTH SIDE OF STREET BANKHEAD ESTATES ADDITION Jesse L. Kay 18A 3 207>6' Side Lot Credit 3529 Williams Road Res. 107,6' Pavement $2.80 $301.28 107,6' Curb & Gutter2.60 279,76 $ 581,04 Co L. Vandiver 17A 3 56' Pavement $2,80 $156.80 7820 Norman Avenue Res. 56' Curb & Gutter 2.60 145,60 85 Sq, Ft. Drivewayo85 72.25 $ 374.65 John So Irving 17B 3 56' Pavement $2.80 $156.80 P.O. Box 665 Res. 56' Curb & Gutter 2.60 145.60 Bridgeport, Texas 85 Sq. Ft. Driveway,85 72.25 $ 374.65 Page V. Yeager 16 3 112' Pavement $2.80 $313.60 7808 Norman Res, 101' Curb & Gutter 2.60 262.60 $ 576,20 Norma Bo Ward 15 3 112' Pavement $2.80 $313.60 7800 Norman Avenue Res, 112' Curb & Gutter 2,60 291.20 85 Sq. Ft, Drivewayo85 72.25 $ 677.05 Co B. Hickey etux 14 3 112' Pavement $2.80 $313.60 7732 Norman Res, 112' Curb & Gutter 2.60 291.20 171 Sqa Ft, Driveway,85 145.35 $ 750.15 12 t PROJECT NO. 104-24000-195, UNIT 8: NORMAN AVENUE FROM WILLIAMS ROAD TO REAGAN DRIVE - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET &ANKHEAD ESTATES ADDITION Cathryn Southerland 13 3 112' Pavement $2.80 $313.60 7724 Norman Res. 112' Curb & Gutter 2.60 291.20 85 Sq. Ft. Driveway .85 72.25 $ 677.05 Virgil A. Roberson 12A & 12B 3 112' Pavement $2.80 $313.60 7716 Norman Res. 112' Curb & Gutter 2.60 291.20 85 Sq. Ft. Driveway.85 72.25 $ 677.05 Z. C. Selby S. 190' of 3 112' Pavement $2.80 $313.60 7704 Norman 11 Res. 112' Curb & Gutter 2.60 291.20 85 Sq. Ft. Driveway.85 72.25 $ 677.05 F. A. Mann 10A 3 113.62' Side Lot Credit 3520 Reagan Drive Res. 100' Pavement $2.80 $280.00 100' Curb & Gutter 2.60 260.00 85 Sq. Ft. Driveway.85 72.25 $ 612.25 SOUTH SIDE OF STREET J. W. Brodie 10A 4 113.57' Side Lot Credit 3528 Reagan Drive Res. 100' Pavement $2.80 $280.00 100' Curb & Gutter 2.60 260.00 $ 540.00 R. J. Thomas 9 4 112' Pavement $2.80 $313.60 7701 Norman Res; 112' Curb & Gutter 2.60 291.20 140 Sq. 'Ft. Driveway.85 119.00 $ 723.80 13 PROJECT NO. 104m24000=195, UNIT 8: NORMAN AVENUE FROM WILLIAMS ROAD TO REAGAN DRIVE - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET BANkHEAD ESTATES ADDITION W. D. Cok 8B 4 62' Pavement $2.80 $173.60 5200 Camp Bowie Blvd. Res. 62' Curb & Gutter 2.60 161.20 85 Sq. Ft. Driveway.85 72.25 $ 407.05 W. T. Wilburn 8A 4 50' Pavement $2.80 $140.00 7719 Norman Res. 50' Curb & Gutter 2.60 130.00 85 Sq. Ft. Driveway.85 72.25 $ 342.25 W. J. Eggleston 7A 4 56' Pavement $2.80 $156.80 7721 Norman Res. 56' Curb & Gutter 2.60 145.00 85 Sq. Ft. Driveway.85 72.25 $ 374.05 T. L. Eggleston 7B 4 56' Pavement $2.80 $156.�80 Rt. 1, Box 14, Res. 56' Curb & Gutter 2.60 145.00 Crowley, Texas $ 301.80 R. D. Eugene Perry 6 4 112' Pavet.ient $2.80 $313.60 7737 Norman Res. 112 ' Curb & Gutter 2.60 291.20 171 Sq. Ft. Driveway.85 145.35 $ 750.15 Derrell E. Snell 5 4 112' Pavement $2.80 $313.60 7801 Norman Res. 112' Curb & Gutter 2.60 291.20 85 Sq. Ft. Driveway.85 72.25 $ 677.05 Aubrey Kelly 4 4 -112' Pavement $2.80 $313.60 7813 Norman Res. 112' Curb & Gutter 2.60 291.20 85 Sq. Ft. Driveway.85 72.25 $ 677.05 14 R PROJECT NO. 104-24000-195, UNIT 9: NORMAN AVENUE FROM WILLIAMS ROAD TO REAGAN DRIVE - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET BANKHEAD ESTATES ADDITION N. H. Bramlett 3 4 122' Pavement $2.80 $341.60 7815 Norman Res. 112' Curb & Gutter 2.60 291.20 85 Sq. Ft.Driveway .85 72.25 $ 705.05 Hans Lauer N. 190' 4 212.8' Pavement $2.80 $595.84 3816 Plantation of 1 and Res. 212.8' Curb & Gutter2.60 553.28 Drive N. 190' of 85 Sq. Ft. Driveway.85 72.25 W. 102' $f;221.37 of 2 COST TO PROPERTY OWNERS - ASSESSMENT $12,696.76 COST TO CITY OF FORT WORTH 15,256.71 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 8 $27,953.47 15 PROJECT NO. 104-24000-195, UNIT 10: MARQUITA DRIVE FROM RUBY PLACE TO U.S. HIGHWAY 80, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and two-foot wide concrete gutter, so that the finished roadway will be forty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalks where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHWEST CORNER AT INTERSECTION OF RUBY PLACE AND MARQUITA DRIVE WEST SIDE OF STREET HIGHLAND HOMES ADDITION Peter J. Pealer 10 9 65.4' Pavement $8.90 $582.06 4020 Tamworth Road Comm. 65.4' Curb & Gutter3.02 197.51 47.4' Sidewalk 2.95 139.83 140 Sq. Ft. Driveway .85 119.00 $1,038.40 Cletus W. Doogs 11 9 63' Pavement $2.38 $149.94 5321 Lovell Res. 63' Curb & Gutter 3.02 190.26 52' Sidewalk 2.95 153.40 85 Sq. Ft. Driveway.85 72.25 $ 565.85 C. W. Yelvington 12 9 63' Pavement $2.38 $149.94 3528 Marquita Drive Res. 63' Curb & Gutter 3.02 190.26 52' Sidewalk 2.95 153.40 85 Sq. Ft. Driveway.85 72.25 $ 565.85 Clifton W. Yelvington 13 9 63' Pavement $2.38 $149.94 7025 Willis Res. 63' Curb & Gutter 3.02 190.26 52' Sidewalk 2.95 153.40 85 Sq. Ft. Driveway.85 72.25 $ 565.85 V. D. Holder 14 9 63' Pavement $2.38 $149.94 3520 Marquita Drive Res. 63' Curb & Gutter 3.02 190.26 41' Sidewalk 2.95 120.95 170 Sq. Ft. Driveway.85 144.50 $ 605.65 16 PROJECT NO. 104-24000-195, UNIT 10: MARQUITA DRIVE FROM RUBY PLACE TO U.S. HIGHWAY 80 CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET HIGHLAND HOMES ADDITION Florence Co Purselley 15 9 63' Pavement $2.38 $149.94 3621 Ramona Res. 63' Curb & Gutter 3.02 190.26 52' Sidewalk 2.95 153.40 85 Sq. Ft. Driveway.85 72.25 $ 565,85 R. B. Willburn 16 9 63' Pavement $2.38 $149.94 3512 Marquita Drive Res. 63' Curb & Gutter 3.02 190.26 52' Sidewalk 2.95 153.40 85 Sq. Ft. Driveway.85 72.25 $ 565.85 Children's World, Inc.17 & 18 9 184' Pavement $8.90 $1,637.60 c/o Paul Buchschacher Comm. 184' Curb & Gutter 3.02 555.68 2200 Fidelity Union Tower 184' Sidewalk 2.95 542.80 Dallas, Texas 75201 $25736.08 CHAPEL DRIVE INTERSECTS Taylor Gandy et al 4 193' Pavement $8.90 $1,717.70 First National Bank Ind. 161' Sidewalk 2.95 474.95 $2,192.65 EAST'SIDE OF STREET Buddies Super Market W. 100' 193' Pavement $8.90 $15717.70 c/o Margin F. Poer & of S., 193'of Blk. 3 $1,717.70 Company Ind. 1407 Main Street Suite 1411 Dallas, Texas 75202 17 n _ c PROJECT NO, 104-24000-195, UNIT 10: MAROUITA DRIVE FROM RUBY PLACE TO U.S. HIGHWAY 80 CONTINUED BLOCK 0WNNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET HIGHLAND HOMES ADDITION CHAPEL DRIVE INTERSECTS Gateway National Bank 1 10 121' Pavement $8.90 $1,076.90 P.O. Box 12097 Comm. 121' Curb & Gutter 3.02 365.42 76116 121' Sidewalk 2.95 356.95 $1,799.27 Ralph E. Belter 2 10 82' Pavement $8.90 $ 729.80 3.507 Garfield Comm. 82' Curb & Gutter 3.02 247.64 Wichita Falls, Texas 76308 71' Sidewalk 2.95 209.45 $1,186.89 Gateway National Bank C 10 49' Pavement $8.90 $ 436.10 P.O. Box 12097 Comm. 49' Curb & Gutter 3.02 147.98 76116 49' Sidewalk 2.95 144.55 $ 728.63 U.S. Post Office A 10 363' Pavement $8.90 $3,230.70 c/o Mr. A. P. Dewitt Comm. $3,230.70 Chief, Real Estate Post Office Dept. Box 3 Dallas, Texas 75221 COST TO PROPERTY OWNERS - ASSESSMENT $18,065.22 COST TO CITY OF FORT WORTH ;$ 8,860.91 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 10 $26,926413 18