Loading...
HomeMy WebLinkAboutContract 37641-A1AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO.3JLa j—;kj (M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Wade Trim, Inc., (Engineer) made and entered into City Secretary Contract No. 37641, (the Contract) which was authorized administratively by the City Manager on the 24th day of September 2008; and WHEREAS, the Contract involves engineering services for the following project. Storm Water Utility Project - Lockwood Court Drainage Improvements, Project No. 01069: DOE No. 6004 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised max1mum fee, NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract. 1. Article I, of the Contract is amended to include the additional engineering services specified in a proposal letter dated September 1, 2009, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $17,820.00, 2. Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $42,770.00. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 3. All other provisions of the Contract, which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the pN'~ day of 200, in Fort Worth, Tarrant County, Texas. ATTEST: Marty Hendriic City Secretary William A! Verkest, P-E. Director, Department of Transportation and Public Works Wade T Engine By: nc. I Name: David Speicher, P.E. Title: Vice President APPROVED AS TO�FORM AND LEGALITY: Assistant City Contract Authorizatiala It 2) oci Safi. APPROVED: Fernando Costa Assistant City Manager OFFICIAL RECORD CITY SECRETARY T. WORTH, TX 0 September 1, 2009 Attn: Mr. Michael Owen, PE Senior Professional Engineer City of Fort Worth Transportation and Public Works 1000 Throckmorton Street Fort Worth, TX 76102 RE: Amendment No. 1 Storm Water Utility Projects — Lochwood Court Drainage Improvements Project No. 01069 City Secretary Contract No. 37641 Dear Mr. Owen, Per your request, this amendment revises the previously approved Stomp Water Utility Project, City Secretary Contract No. 37641 for the storm water study of Lochwood Court. Specifically, this amendment includes the provision for additional Design Level Survey, Subsurface Utility Engineering — Level "B" (including the use of Ground Penetrating Radar), and Studies for specific portions of the project. This work is to be included with and will support the storm water evaluations and preliminary cost preparation associated with the original contract. This work is being performed to better determine the location of underground utilities that are located in close proximity with the planned improvements. More detailed information on the requirements for relocation or upgrade of these utilities will allow for an improved construction cost estimate. The specific work to be included is as follows: • Additional survey as shown on Exhibit A to locate utility appurtenance such as manhole lids, valves, etc. This work will include a topographic survey to support the design. • Perform a subsurface utility exploration by use of ground penetrating radar as requested by Steve Eubanks. • Modification to our study, proposed improvement plan, and preliminary construction cost based upon new information obtained. • Administration, Project Management and Coordination of the additional work Wade Trim, Inc. 920 South Main Street Suite 170 Grapevine, TX 76051 817.488.0050 877.533.9873 817.488.0030 fax www.wadetrim.com Lochw000d Amendment September 1, 2009 Page 2 of 3 The total Contract Amendment No. 1 value is $ 17,8200 A detailed breakdown of the estimated budget is included in Exhibit B. Contract value revisions are as follows: Original Contract Fee: $ 24,950.00 Amendment No. 1: $ 17,820000 TOTAL CONTRACT $ 429770.00 Original M/WBE Fee: Gorrrondona and Associates — $ 5,000 — 2Q.0% Amendment No. 1 M/WBE Fee: Gorrrondona and Associates - $9,295 — 52.2% Total M/WBE participation - $14,295 — 33.4% Once authorized, we plan to complete the new work within 2 months. Thank you for your consideration. Please contact me should you require any additional information. We look forward to hearing from you. Sincerely, David A. White, P.E. Vice President DAW:daw Attachments —Exhibit A Attachments —Exhibit B Lochw000d Amendment September 1, 2009 Page 3 of 3 EXHIBIT Limits of Survey Storm Water Utility Projects - Lochwood Court Drainage Improvements Project No. 01069, City Secretary Contract No. 37641 fly. cf. t�. Cv cisI. Otte b fSs'g fir. 3� to -•- _GoNCk��k It Ot y> 4 Ott It U c a�G O GO 3 6 Cpy W Qua a a a y e' 6 A V M n M N M U m ~ &o w o CO7 ir a t F t Z O � W W S o u gg m E W &Z a bS I s z O 0 o om gt�8n' og EVE a a= 9 ZI m F Oo f7 m icrE m m o 0 po 0o 0o N o N N GQ H oo H QQ M oo N 0o N N w�� H N �Ny N H M N N H N N N U! N N N N N H N q M N N M N N N NJ11 � y N CO O N eeCo co co Go ee oo co Co tryv Mn N mNN N N N p M ee H po N pQ N p M o M po N H oo M po M H NNtonYl �a�S SOO / � N pp N Hm.H H H N pp N p N pp N N N N Gp N pp N pp N N N ON a 4� pQ pQ n p p p p C p p p a � pp Co QQ QQ po po ee pe oo po po GO Gp oo I € H c Z W w m f] a s o m a W _o c n 8 u� O o _ e o' E aE o�42 o ci c S > ZB a s n < a LL S b E E ao�u'i I o 0 0 o a Til I I ffr 'ZOPTEMTOTMA L 11,r COUNCIL ACTION: Approved on 11/3/2009 DATE: Tuesday, November 03, 2009 REFERENCE NO.: **C-23883 LOG NAME: 20AMENDILOCHWOOD SUB IECT: Authorize Amendment No. 1 in the Amount of $17,820.00 to City Secretary Contract No. 37641 an Engineering Agreement with Wade Trim, Inc., for the Storm Water Utility Project &ndash; Lochwood Court Drainage Improvements It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 in the amount of $17,820.00 to City Secretary Contract No. 37641 with Wade Trim, Inc., for the Storm Water Utility Project &ndash; Lochwood Court Drainage Improvements thereby revising the total contract cost to $42,770.00. The Storm Water Management Program was established to reduce flooding in Fort Worth, preserve streams, minimize water pollution and to operate the storm water system in a more effective manner to fully comply with state and federal regulatory requirements. This will be accomplished by infrastructure reconstruction and system maintenance, master planning, enhanced development review and increased public education and outreach. (Project No. 01069) On October 16, 2007, (Ordinance No. 17840-10-2007) the City Council authorized the issuance and sale of $25,000,000.00 in Storm Water (Drainage) Revenue Bonds, Series 2007, to fund a two year Storm Water Capital project program. The need for drainage improvements on Lochwood Court was identified All to home flooding in the area. Wade Trim, Inc., was selected to study the drainage in the subject area and provide subsequent design services far drainage improvements. On September 24, 2008, the City Manager executed administratively anEnginee ring Agreement with Wade Trim, Inc., for the study of Lochwood Court. It is anticipated that the study project will be expanded to a design project. The purpose of the study is to evaluate the existing conditions, identify the required drainage improvements and to identify a clear design scope of work and estimate of construction costs for identified improvements. Amendment No. 1 will provide additional survey, Level B subsurface utility engineering and updates to the original study report. Wade Trim, Inc., proposes to perform the additional study services for a lump sum fee of $17,820.00. City staff considers the fee to be fair and reasonable for the scope of services proposed. In addition to the contract amount, $1,782.00 is required for project management by the Transportation and Public Works Department. WadeTrim, Inc., is in compliance with the City 's M/WBE Ordinance by committing to 33 percent M/WBE participation on the overall contract. This amendment revises the previously approved Storm Water Utility Project — Lochwood Court Drainage Study. The cost of the study does not exceed the $25,000.00 M/WBE requirement nor does Amendment No. 1 exceed the $50,000.00 M/WBE amendment requirement. This project is located in COUNCIL DISTRICT 7, Mapsco 32N. 1. _ : �! � :_►�,_: 1 The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Storm Water Capital Projects 2007 Revenue Bond Fund. ubmitted for QJX Manager's Office by; Fernando Costa (8476) M U J % t t' Department Rea