HomeMy WebLinkAboutContract 37640AMENDMENT N0.3 STATE OF TEXAS §CITY SECRETARY CONTRACT NO.31h) (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Transystems Corporation Consultants (Engineer) made and entered into City Secretary Contract No. 34116 (the Contract) which was authorized by the City Council by M&C C-21715 on the 26th day of September, 2006; and WHEREAS, the Contract involves engineering services for the following project: Engineering Design Services; Street Reconstruction, Water and Sewer Replacement on Fain Street (N. Beach St to Airport Fwy), Fairview Street (Airport Fwy to Maurice Avenue), Harper Street (S. Dead End to Parrish Road), Karnes Street (Airport Fwy to Race Street) and Primrose Ave (Gwynne St to Eagle Dr), 2004 CIP Contract Year 4 & 5, Contract 46, Project No. 00445; DOE No. 5398 WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal dated September 10, 2008, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $9,301.00 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $256,508.00 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, Tx I � ORIGINAL EXECUTED on this the C qLl day of Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: n A.Douglas Rademaker, P.E. Director, Department of Engineering TranS_ystems Corporation Consultants ENGINEER APPROVED: Fernando Costa Assistant City Manager ATTEST: 2008, in Fort rMa Hendrix, City Secretary By: - % Name: Jopseph C. Masterson, P.E. NO M&C I�IiQUIIa1 iJ Vice -President �LITY: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX �S� September 10, 2008 Mr. Gopal Sahu, P.E. Department of Engineering City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Transystems Bank of America Building 500 West 7' Street Suite 1100 Fort Worth, TX 76102 Te1817 339 8950 Fax 817 336 2247 www.transystems.com SUMMARY OF DESIGN FEE RE: Amendment No. 3 Capital Improvement Project — Contract 46 DOE # 5398 Water Project No. P253 531200 6041700445 83 Sewer Project No. P258 531200 7041700445 83 Street Project No, C200 531200 2044000445 83 Dear Mr. Sahu, Per your request, this amendment revises the previously approved Capital Improvement Project —Contract 46, City Secretary Contract No. 34116 design plans and contract documents. Specifically, this amendment includes the provision of additional topographic survey, design of new water line, water line easement preparation and Traffic Control for the east side of Beach Street between Fain and Wheeler Streets. This work is to be included with and will augment the designs associated with the original contract. The specific work to be included is as follows: • Beach Street (East side of right-of-way) — o Additional survey of area between Fain and Wheeler Streets. o Design of 530 LF of proposed 84ch water line o Preparation of water line easement for proposed extension into private property o Preparation of traffic control along the proposed route Engineering design work for the scope as amended is associated with the proposed improvements for the Beach Street water line extension. The fee for these services are calculated based upon the following formula: Construction Cost X ASCE Curve "A" X 85% Page 2 of 2 September 10, 2008 Construction costs for the proposed improvements are summarized in attached estimate. The calculated fee for engineering design is as follows: Existing Contract (T&PW &Water Dept) Basic Services Fee $219863307 X 6.7% X 85% = $170,070 Amendment 3 Construction Costs = $66,748 Revised Construction Costs = $3,053,055 Revised Calculated Fee with New Curve A Percentage $31053,055 X 6.7% X 85% = $173,871 Amendment 2 Basic Services is difference between original contract value and revised calculated fee $173,871 - $170,070 = $3,801 Basic Services Total: _ $3,801 Additional Services: Survey —Additional Beach Street = $ 4,200 Water Line Easement Preparation = $ 800 Administrative (10%) Fee on MWBE Firms = 500 Total Additional Services Costs: $ 5,500 Total Contract Amendment No. 3 Value: 9 301 Contract value revisions are as follows: Original Contract Fee: Amendment No.1: Amendment No. 2: Amendment No. 3: TOTAL CONTRACT $215,967.00 $ 11,660.00 $ 19,580.00 9 301.00 $256,508.00 Thank you for your consideration. Please contact me should you require any additional information. Sincerely, TranSystems Corporation Consultants Schellbach, P.E. icipal Services Team Leader Attachments G:1FWO610380�ProjectMgmtlProposallAmendment 2\Letter amendment 3_2008-9-11.doc