COIVINIUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, MDJ DEVELOPMENT hereinafter called "Developer", desires to
make certain improvements to GODDARD SCHOOL, FS-008-006 an addition to the
City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth and subsequently amended, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. Developer acknowledges that there shall be no reduction in the amount
of financial security prior to project completion and acceptance by the
City.
E. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
Project Name — GODDARD SCF100 OFFICIAL RECORD
CFA Number—200&064 / DOE 6031 CITY SECRETARY
Date: Aug 28, 2008 FT WORTH, TX
F. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 6, Section II, of the
Policy.
G. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such injuries, death or
damapaes are caused, in whole or in part, by the alleged neglizence of
the City of Fort Worth, its officers, servants, or employees.
H. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
I. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
J. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article I04.100, Ordinance 7234).
K. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
L. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
Project Name — GODDARD SCHOOL 2
CFA Number — 2008-064 /DOE 6031
Date: Aug 28, 2008
construct current and future improvements provided for in this
agreement.
AMENDMENTS TO THF_, FOLLOWING SECTIONS AS
NECESSARY PER PROJEC'ISPECIFICATIONS
M. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof: Water (A)None; Sewer (A-1) None; Paving (B)Attached,
Storm Drain (B-l) None; Street Lights and Signs (C) None..
N. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developers) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B I
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B. The
estimated total cost of current improvements and related support services
specified in this agreement, including design, construction and inspection
is estimated to $,S, a 57. 10 D
Project Name — GODDARD SCHOOL
CFA Number — 2008-064 /DOE 6031
Date: Aug 28, 2008
3
Project Name
CFA
SUMMARY OF COST
GODDARD SCHOOL
2008-064
DOE 6031
Item
Developer
Cost
City Cost
Total Cost
A. Construction
1. Streets
2, Storm Drainage
4,960.00
41960400
3. Street Lights Inspection
4. Street Name Signs
5. Power Cost
B. Engineering Design
C. Construction Engineering
and Management by DOE 4%
198.40
198.40
D. Materials Testing by DOE
2%
99.20
99.20
$ 51257060
$ -
$ 5,257060
TOTALS
$ 6,200.00 125% Financial Guarantee
Notes:
l .All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
2. Developer's column for Item C represents four percent (470) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
4. Developer's column for Item D represents two percent (2%) of paving and storm drain
costs for materials testing.
5. Future Improvements to Ray White Rd for $19,676.14 paid.
Project Name — GODDARD SCHOOL q.
CFA Number — 2008-064 /DOE 6031
Date: Aug 28, 2008
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by
its City Secretary, with the corporate seal of the
executed this instrument in triplicate, at Fort Worth,
120080
Approval Recommended:
A TT�'CT•
Al lIJJl:
Corporate Secretary
Project Name — GODDARD SCHOOL
CFA Number — 2008-064 /DOE 6031
Date: Aug 28, 2008
City affixed, d said Developer has
Texas this the day of
Transportation and Public Works
Department
Fernando Costa
Assistant City Manager
MDJ DEVELOPMENT, LLC
8145 BASTER SPRINGS RD
AUSTIN, TEXAS 78745
By:
(Registered Agent Name and Title)
DFFICfAI. RECORD
5 CITY SECRETARY
FT WORTHm ry I
I11. 1 � 111
PftOPO5E0 X10NUtAENT SIGN_
PkgU]DE ELECTRICAL FOR GROUND
L]GHTS. 1" CUNOUIT TO 0-60XE5.
REFER TO SITE ELECTRICAL PLAN,
T PROPERLY LINE
t
I
f
}
} I OPTIC 6UI
O 1 Aw
I1
I
1
I
PC
Pi
1,
1
} EXIST.CUNG.APRON —�
z_ 1
J 1
r I MITERED END SECTION
PER TXDOT
w 1 STANDARD DETAIL
0 1 INV EL467:00
a I TIE RIPRAP TO
1 EXIST.CONC.APRON
1
f
68. 15 LF - 121 ° RCP
I
T
I
l
I
3
I
:
1
i
1
POWER
IPOLE
T
�
f�
r
F
0
k
0
I�
EXHIBIT "B1"
STt]RM DitA[NAGE
SCALE:I"=aa•-o"
1
I
1
1
i
Q
ONC
CITY OF FORT YIORTH
SAN SEWER MAP � 20bfi�4485
CITY OF FOR7 WOI�TN
WA1FR AdAP � Z066-448W
Engineer's Opinion of Probable Cost
Storm Drainage:
Pay Item
Description
Quantity
Unit
Unit Price
Cost
1
21" RCP
69
LF
$ 40.00
$ 2,760A0
2
21" Headwall
1
EA
$ 2,200.00
$ 25200000
Total
$ 49960.00
The Goddard School
3hiver & Ray White Rds
I