HomeMy WebLinkAboutOrdinance 6618 ORDINANCE No.
AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OFT E COST OFIMPROVE-
MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION O
NORTH SERVICE ROAD OF IH 20
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE
CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE
OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING
THE CITY SECRETARY TO GIVE NOTICE OF SUCH EARING; AND DIRECTING THE
CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE
CAPTION OF SAME IN THE MINUTE ROOD. OFT E CITY COUNCIL AND BY FILLING
THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE
CITY; AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the
hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im-
proved by raising, grading and filling same and by constructing thereon the following, to-wit:
UNIT I, FORTH SERVICE ROAD OF IH 20 From Forest Park Boulevard to Park-
view Drive, known and designated as
Unit I, Project No. 104-36000-290,
a seven-inch thick reinforced con-
crete pavement on a six-inch thick
lime stabilized subgrade with seven-
inch high superimposed concrete curb
on a thirty-six foot roadway and by
constructing six-inch thick concrete
driveways and four-foot wide concrete
sidewalk where specified.
UNIT II, PARKVIEW DRIVE
(IMPROVED By DEVELOPERS' CONTRACT No. 6856)
UNIT III, PARKVIEW DRIVE From 1500' west of Forest Park Boule-
vard to Forest Park Boulevard, known
and designated as Unit III, Project No.
104-36000-290, a ten-inch thick rein-
forced concrete pavement on a six-inch
thick liaise stabilized subgrade with
seven-inch high superimposed concrete
curb from the northeast corner of Lot
2, Block 2, Tower Addition, to a point
285' east and from a point 280' west
of Forest Park Boulevard to Forest
Park Boulevard, and by constructing
seven-inch thick reinforced concrete
pavement on a six-inch thick lime
stabilized subgrade with seven-inch
high superimposed concrete curb from
UNIT III,, PARKVIEW DRIVE a point 285` east of the north-
(CONTINUED) east corner of Lot 2, Bloch 2,
Tower Addition to :35' east, so
that the finished roadway will
he thirty-six feet wide and by
constructing six-inch thick
concrete driveways where specified.
together with concrete curbs, gutters, driveways and incidentals to such improvements
on proper grade and line where same are not already so constructed, together with storm
sewers and drains and other necessary incidentals and appurtenances; all of said im-
provements to be constructed as and where shown on the Plans and in strict accordance
with the Plans and Specifications therefor; contract therefore has been made and
entered into with Austin Road Company
and
WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public
Works Director to prepare and file estimates of the cost of such improvements and
estimates of the amount per front foot proposed to be assessed against abutting property
and the owners thereof, and such estimates have been examined, NOW, THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT:
I.
Such estimates be, and they are hereby adopted and approved.
ii.
Tt is hereby found and determined that the cost of improvements on each portion of
streets, avenues, and public places hereinafter described, with the amount or amounts
per front foot proposed to be assessed for such improvements against abutting pro-
perty and the owners thereof, are as follows, to-wit;
UNIT I, NORTH SERVICE ROAD OF IH 20 From Forest Park Boulevard to Parkview
Drive , known and designated as Project
No. 104-36000-290, Unit I.
The estimated cost of improvements is 74j6l.04 the estimated amount
per front foot to be assessed against abutting property and the owners thereof forsuperimposed
concrete curblfi###&#### is $ 1.33 -; the estimated amount per front foot to
be assessed against abutting property and the owners thereof for pavement is 6.47
the estimated amount per front foot to be assessed against abutting property and the
owners thereof for four-foot wide concrete sidewalk is $ 2.75
the estimated
amount per square foot to be assessed against abutting property and the owners thereof for
six-inch thick concrete driveway is $- .90 _ per square foot; the total
estimated amount per front foot to be assessed against abutting property and the owners
thereof is $_ 20.53 plus the cost incurred for concrete driveway construction
where specified.
IIIa
A hearing be given and held by and before the City Council of the City
of Fort Worth, Texas, to all owning or claiming any property abutting upon said
portions of highways, streets, avenues and public places, as well as to all
owning or ,claiming any interest in any such property. Such hearing shall be
given and held on the 21st day of February , 19 72 , at 9:30 A.M.
in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and
the City Secretary is hereby directed to give orcause to be given notice ,of the
time and place of such hearing and of other 'matters and facts in accordance with
the terms and provisions of an Act passed at the First Called Session.of the
Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts
of said Session, now being known as Article 1105b of Vernon's Texas Civil Statutes
as amended by Acts 1967, 60th Legislature, ]Page 365, Chapter 176, Section 1,
emergency effective MaT 12, 1967. , Such notice shall be.by advertisement -inserted
at least three (3) times in a newspaper published in the -City of Fort Worth,
Texas, the first publication to be made at least twenty-one (21) days before
the date of said hearing; Said notice shall comply with and be in accordance with
. the terms and provisions of said Act as amended. The City Secretary is further
directed to give or cause to be given personal notice of the time and place of
such hearing to all owning or claiming any property abutting on said portions of
highways, streets, avenues and public places, as well as to all owning or claiming
Any interest in any such property, Such personal notice shall be in writing and
shall be given or caused to be given by the City Secretary by depositing such
written notice in the United..S.tates Mail at least fourteen (14) days before the
date of the hearing, postage prepaid, in envelopes addressed to all persons
owning or claiming any interest in the respective properties abutting the high-
ways, streets, avenues and public places or portions thereof to be improved, as
the names 'of such persons are shown on the current rendered tax rolls of the City
of Fort Worth and at the addresses so shown, or if the name of such respective
owners do not appear on such rendered tax rolls, then address to ,such owners as
their names are shown on the current unrendered tax rolls of the City of Fort Worth
at the addresses shown thereon. In those cases in which an owner of property
abutting a highway, street, avenue or public place or portion or portions there-
of which is to be,improved is listed as "unknown" on the then current City of
Fort Worth tax rolls, or the name of an owner is shown on the City of Fort Worth
tax rolls ,but no address for such owner is shown,' no notice need be mailed. In
those cases where the owner is shown to be an estate, the mailed notice may be
addressed to such estate. In this connection, the City, Secretary shall prepare
and file or cause to be prepared ,and filed with these proceedings a list of the
properties to be assessed,, the names of those ,persons owning or claiming any
interest in said properties to whom the notice was mailed,.' together with the last
known addresses determined as aforesaid of the respective owners and those perg
sons owning or claiming any interest in said property.
The City Secretary shall certify that each of the parties in said list whose
address is shown on the then current rendered or unrendered tax rolls of the City
of Fort Worth was mailed a copy,of the notice of hearing and shall further certify
the date or dates , on which said notice was mailed. A copy of each notice shall be
attached to such' certificate. The certificate of the City Secretary will be con-
clusive evidence of the facts therein recited.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance
by copying the caption of same in the Minute Book of the City Council and by
filing the complete ordinance in the appropriate Ordinance Records of this City.
V.
This ordinance shall take effect and be in full force and effect from and
after the date of its passage.
Passed and approved this day of 19
APPROVED AS TO FORM AND LEGALITY:
01400
ity Attorney
UNIT III,, PA VIEW DRIVE From 1500' west of Forest Park
Boulevard to Forest Park Boule-
vard, known and designated as
Unit III, Project No. 104-36000-
290.
The estimated cost of improvements is $199,088.54; the estimated amount per
front foot to be assessed against abutting property and the owners thereof for
superimposed concrete curb is $1.33; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for ten-inch pavement
is $23.27; the estimated amount per front foot to be assessed against abutting
property and the owners thereof for seven-inch pavement is $16.74; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for six-inch thick concrete driveway is 1 .90 per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $24.60 and/or $18.08, plus the cost incurred for concrete drive-
way construction where specified.
ter '
City of Fort Worth, Texas
4 ,q Mayor and Council Communication
DATE REFERENCE SUBJECT: Award of Contract - North Ser- PAGE
a NUMYER
vice Road of IH 20 and Parkview
1/24172 C-2153 iat 3
ye
Council action on the project described below is requested,
Project Description
Roadway R,O,W,
Unit Street. Limits Width - Feet Feet
I North Service Forest. Park Boulevard 36 60
Road - IH 20 to Parkview Drive
II* Parkview Drive North Service Road 36 to 40 60
IH 20 to 1500' west
of Forest Park Boulevard
III Parkview Drive 1500' west of Forest 36 50
Park Boulevard to Forest
Park Boulevard
To be improved by Developer in accordance with Developers' Contract No,
6856, Towers Addition, in conjunction with this contract,
This project is City initiated as a result of Developers' Contract No, 6856
(M&C C-2003, June 14, 1971) , The North Service Road of IH 20, Unit I will
be improved by constructing seven-inch reinforced concrete pavement with a
seven-inch high superimposed curb on a six-inch thick lime stabilized subgrade
with six-inch thick concrete driveways where specified. Four-foot wide con-
crete sidewalk will be constructed on the north side of the street to serve
pedestrian traffic generated by business establishments, Unit III, Parkview
Drive will be improved by constructing a ten-inch thick reinforced concrete
pavement on a six-inch thick lime stabilized subgrade with seven-inch high
superimposed concrete curb from the northeast corner of Lot 2, Block 2, Towers
Addition to a point 285' east and from a point 280' west of Forest Park
Boulevard to Forest Park Boulevard, and by constructing seven-inch thick rein-
forced concrete pavement on a six-inch thick lime stabilized subgrade with
seven-inch high superimposed concrete curb from a point 285' east of the north-
east corner of Lot 2, Block 2, Towers Addition to 935' east and by construct-
ing six-inch thick concrete driveways where specified.
Submission of Bids
The following bids have been received:
Bidder Amount Bid
Austin Road Company $248,954, 16
Texas Bitulithic Company 253,884�90
DATE REFERENCE SUBJECT; Award of Contract - North Ser- PAGE
NUMBER 2 3
1/24/72 C-2153 vice Road of IH 20 and Parkview of
The following contractors took plans but submitted no bids:
L L. Grimes and Co. , Inc.
20 R. W. Gibbins, Inc.
3o J. L. Bertram Construction Co. , Inc.
4. Charles Cohen, Inc.
Bids Received: December 27, 1971
Working Days Allotted: 100
Project Cost and Financing
Based on the low bid, approximately $58,581.52 will be assessed against
abutting property owners to be provided for by a Bond Fund Transfer from
the Revolving Fund. The developer has deposited $44,108.67 for his share
of the cost of a box-culvert on Unit III. The cost to the City-at-large
will be approximately ,$171,159.39 for construction, .inspection engineering
salaries, and miscellaneous items, for which funds are available in Project
Account No. 104-36000-290, "Towers Addition" as provided by M&C G-1901, dated
January 24, 1972.
Recommendations
It is recommended that:
1) The following bond fund transfers be approved:
Amount From To Reason
$58,581.52 Unspecified Parkview Drive To provide funds for
Revolving Fund (Towers Addition) property owners" share
042-09724-901 Revolving Fund of construction cost of
042-10436-290 Parkview Drive, Unit III
and North Service Road
of IH 20
2) An ordinance be adopted:
a) Declaring the necessity for and ordering the improvements;
b) Making provisions for levying of assessments;
c) Directing the Public Works Director to prepare estimates of
costs and amounts to be assessed;
DATE REFERENCE SUBJECT: Award of Contract - North Ser- PAGE
NUMBER
1/24/72 C-2153 vice Road of IH 20 and Park- 3 of 3
view Drive
d) Awarding the contract to Austin Road Company in the amount
of $248,954. 16,
e) Making appropriations to cover indebtedness thereby incurred
for improvements of the project named above.
3) An ordinance be adopted:
a) Approving the estimates of costs and amounts proposed to
be assessed; and,
b) Setting February 21, 1972, as the date of the Benefit Hearing.
RNL:mj
Attachments:
"A" - Location Map
"B" - Engineers` Preliminary Rolls
SUBMITTED BY: DISPOSITION BY COUNCIL: PROCESSED BY
Q�APPROVED ❑ OTHER (DESCRIBE) 7 �
CITY SECRETARY
CITY MANAGER
i v�1
�� �c, N (Cl
31
31
i/
cu
G
® Yll
Cr
CD
90
e
, f
S/
CITY OF FORT WORTH
PUBLIC WORKS DEPARTMENT
ENGINEERING DIVISION
A neighborhood Meeting was conducted by the Engineering Division of the Public Words
Department at City- Hall, Public Yorks Conference Room, on January 12, 1972, for the
Assessment Paving -of North. Service Road of IH 20 and Parkview Drive, project No. 104-
36000-290, Units I and 111.
Procedures concerning ®canner participation in the cost, method and policies ®f deter-
mining assessments, street construction standards and methods of payment were explain-
ed by Mr. Schmidt.
Mr. Estes, representing Pier l Imports and Economy Supply Company asked a few questions
about the driveways and sidewalk. Mr. Schmidt showed him the plans and explained about
the City°s sidewalk policy,
The meeting was them adjourned.
FORT WORTH, TEXAS
,January 24 , 19 72
TO TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS.
Gentlemen and Mrs. Rimmer:
In accordance with the proceedings of your Honorable Body, I have prepared
estimates of the cost of street improvements as shown below:
Estimates of the total cost of improvements on a portion of NORTH SERVICE ROAD
"g y s, avenues and public places in the City
of Fort Worth Texas.
OF IH 20 grid portions ��ds�s�gmatea�am®u���tper front foot to be assessed against
abutting' property- and the owners thereof, on each portion of street, avenue and public
place are as follows, to-wit:
PROTECT NO. 104.-360.00-290, UNIT Io NORTH SERVICE ROAD OF IH 20 FROM FOREST PARK BOULE-
VARD TO PARKVIk Dk VE, to be °improved by constructing a seven-inch thick reinforced
concrete pavement on a sire-inch thick lime stabilized subgrade with seven-inch high
superimposed concrete curb on a thirty-six foot roadway and by constructing six-inch
thick concrete driveways and four-foot wide concrete sidewalk where specified.
The following assessment rates have been established:
Seven-inch thick.reinforced concrete pavement
(Industrial Zoning) less 27c credit for
existing penetration . . . . . . . . . . . . . $16.47/LF
Seven-inch superimposed concrete curb . . . . . . . . . 1.33/LF
Four-foot wide concrete sidewalk . . . . . . . . . . . . 2.75/LF
Six-inch thick concrete driveway . . . . . G . . . .90/SF
The assessments result in the following division of costs:
Total Cost to Property Owners . . . . . . . . . . $22,051.57
Total Cost to City of Fort Worth . . . . . . . . . $52,709.47
Total Estimated Construction Cost . . . . . . . . $74,671.04
PROJECT NO. 104-36000-290, UNIR III : PARKVIEW DRIVE FROM 15001 WEST OF FOREST PARK
BOULEVARD TO FOREST PARK BOULEVARD: t thick
�reinforced concrete pavement on a six-inch thick lime stabilized subgrade with seven-
inch high superimposed concrete curb from the northeast corner of Lot 2, Block 2,
Tower Addition to a point 2851 east and from a point 2801 west of Forest Park Boule-
vard to Forest Park Boulevard, and by constructing seven-inch thick reinforced con-
crete pavement on a six-inch thick lime stabilized subgrade with seven-inch high
superimposed concrete curb from a point 2851 east of the northeast corner of Lot 2,
Block 2, Tower Addition to 935' east., so that the finished roadway will be thirty-
six feet wide and by constructing six-inch thick concrete driveways where specified.
The following assessment rates have been established:
Ten-inch thick reinforced concrete pavement
(Industrial Zoning) . . . . . . . . . . . . . . . . . . . . . $23.27/LF
Seven-inch thick reinforced concrete pavement
(Industrial Zoning) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16.74/JTIF
Seven-inch superimposed concrete curb. . . . . . . . . . . . . 1.33/LF
Six-inch thick concrete driveway. . . . . . . . . . _ _ . . . . .90/SF
The assessments result in the following division of costs :
Total Cost to Property Owners . . . . . . . . . . . . . . . . .$ 36,529.95
Total Cost to City of Fort Worth. . . . . . . . . . . . . . . 162,558.59
Total Estimated Construction Cost. . . . . . . . . . . . . .$199,088.54
JACK M. G _, T-E. -
CITY ENGINEER
PROJECT NO. 104-36.000-.290 UNIT 1 NORTH SERVICE ROAD OF IH 20 FROM FOREST PARK BOULE-
VARD TO PARKVIEW DRIVE, to be improved by constructing seven-inch thick reinforced pave-
ment an six-inch h ck iimi. stabilized subgrade with seven-inch high superimposed concrete
curb on a thirty-six f®6f roadway and by constructing six-inch thick concrete driveways
and foam-foot wide concrete sidewalk where specified.
BLOCK
OTC' R LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING A`1 THE SOUTHEAST CORNEA. OF LOT B, BLOCK 32-33, EDWARD HEIRS ADDITION
NORTH SIDE OF STREET BDWARD HEIRS ADDITION
Economy Supply E. 32-33 100' Pavement $16.47 $1,647,00
Fogarty Foundation B Ind, 200' Sidewalk '2.75 550.00
(owner) $2 n 197.00
Poo. Box 151
76101
]bier I Imports of A 54 200' Pavement $16<47 $3,294.00
Fort Worth, Inc. Ind. 200' Curb 1.33 266.00
2620 West Freeway 140' Sidewalk 2.75 385.00
76102 465 Sq. Ft. give .90 4 M 50
$4,363.50
Ranchers' Inn C 33-36 200' Pavement $16.47 $3,294.00
Dave Bloxom, Owner Ind, 200' Curb 1.33 266.00
7800 W. Vickery Blvd, 135' Sidewalk 2,75 371.25
76116 504 Sq. Ft, give . 90 453.60
$4,384.85
Woodcrafters 0-1 33-36 115' Pavement $16,47 $1,894.05
Kenneth i. Allen Ind. 115° Curb 1.33 152.95
617 Brockrview 63' Sidewalk 2.75 173.25
Hurst, Texas 403 Sq. Ft. Drive . 90 362.70
76053 $2,582e95
l
PROJECT NO. I04-36000-290, UNIT In NORTH SERVICE ROAD OF Ili 20 FROM FOREST PARK BOULEVARD
TO lPARKVIEW DRIVE, CONTINUED
BLOCK
OAR LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE OR STREET EDWARUD HEIRS ADDITION
Seven Cs, Inc. YD®2 33®36 11°Pavement $16.47 $ 181. 17
617 Br®okview Ind. 11° Curb 1.33 14.63
Hurst, Texas 11' Sidewalk 2.75 30o25
76053 $ 226.05
TOWERS ADDITION
Fort Worth Mtge, Corp. 2 2 257.49' Pavement $16.47 $4,240.86
& W� S. Dubose, Inc. Ind. 257.49 a Curb 1.33 342.46
3000 Sandage 171 Sq. Rt. Drive .90 153.90
76109 $4,737.22
Allen & Alvin 2idelI I 2 200' Pavement $16.47 $3,294.00
Suite 200 Ind, 200' Curb 1.33 266000
7007 Preston Road $3,560.00
Dallas, Texas 75205
TOTAL COST TO PROPERTY OWNERS . a . , o , , , , , $22,051.57
TOTAL COST TO CITY OF FORT WORTH o , , , . , , , , 528709.47
TOTAL ]ESTIMATED CONSTRUCTION COST o a o , o , a $74 9 76 Y.04
2
PROJECT NO. 104-36000-2.90, UNIT III PAAKVIEW DRIVE FROM 1500` WEST OF FOREST PARR BOULE-
VARD TO FOREST ARK B®UFV-'A to be im roved by constructing ten-inch thick reinforced
concrete .pavemeit on a six-inch thick liana .stabili';ed subgra a with seven-inch high super-
imposed concrete curb from' the northe t' corner of Lot 2, Block 2, Tower. Addition to a
point 285° .east and from a point 2800 west of Forest Park Boulevard to Forest Park Boule-
vard, and by gsuperimposed nurada witheseven'inchchigh inforced rete pavement on a i -inch thick
lime stabilized aub
concrete curb fro '' a point "285'
east of the northeast corner of Lot 2, Block 2, Tower Addition to 935°east, so that the
finished roadway will be thirty-six feet wide and by constructing six-inch thick concrete
driveways where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHEAST CORNER OF LOT 2, BLOCK 2, TOWER ADDITION
SOUTH SIDE OF STREET EDWARD HEIRS
]Park Dept. Garage 34 288' Pavement (10") $23.27 $6,701.76
City of Fort Worth Ind. 835' Pavement (7") 16.74 13,977.90
1123' Curb 1.33 1,493.59
$22,173.25
W➢ S. Dubose, Inc. 31 110` "Pavement (709) $16.74 $1,841;40
3000-Sandage Ind. 250' Pavement (1009) 23.27 5,817.50
76109 360' Curb 1033 478.80
$ 8,137.70
FORTH SIDE OF STREET CRAWFORD ADDITION
Benard J. Dolensa C 19 246' Pavement (10") $23.27 $5,724.42
1066 W. Magnolia Ind. 246' Curb 1.33 327.18
76104 186 S . Ft. Drive .90 167.40
$ 6,219.00
Tarrant County Water
Control Board No Assessment
3
PROJECT NO, 104—��000—�90� � TCT �YTn SPAR VTEW� �RT�dE FR0�9 1500' WEST OF FOREST PARK BOULE—
VARD TO FOREST PARK BOULEVARD CONTIT E,
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
TOTAL COST TO ]PROPERTY OWNERS $ 36,529.95
TOTAL COST TO CIT17 OF FORT WORTH 1629558o59
TOTAL ESTIMATED CONSTRUCTION COST o . o o e o $12.9 W 54
TOTAL COST TO PROPERTY OWNERS — ASSESSMENTS (UNITS IC & 1111) 58,581.52 .
TOTAL COST TO CITY OF FORT WORTH 17l,159.39
STORM DRAIN COST PAID IN ADVANCE (W, S_ DEBOSE) 44g108.67
TOTAL EST l °Fj) '';O 27 9 5 9,55
4