HomeMy WebLinkAboutContract 53424-PM1FORT WORTH
PROJECT MANUAL
FOR
CITY SEC ETARY
coNrRAcrNo. Soqa4-eM,
THE CONSTRUCTION OF
Lakes of River Trails East Phase 17 A
Water, Sanitary Sewer, Sturm Wuter, Pa ving , and Lighting Improvements
IPRC No. -19-0187
City Project No. -102275
FID No. -30114-0200431-102275-E07685
X-No. -X-26183
Betsy Price
Mayor
F ile No. -W-2657
Christopher P . Harder
Director, Water Department
William Johnson.
David Cooke
City Manager
Director, Transportatio n and Public Works Departme nt
Prepared for
CKK Residential Group, II Ltd.
2550 South Precinct Line Road
Fort Worth, TX 76181
Icon Consulting Engineers, Inc.
2840 W. Sou thlake Blvd., Ste 110
Southlake, Texas 76092
EFRN F-900 7
CllY SECRETA
00 00 10- 1
TABLE OF CONTENTS FOR DEVELOPER AWARDED PROJECTS
Page 1 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised September 1, 2015
SECTION 00 00 10 1
TABLE OF CONTENTS 2
DEVELOPER AWARDED PROJECTS 3
4
Division 00 - General Conditions 5
00 11 13 Invitation to Bidders 6
00 21 13 Instructions to Bidders 7
00 41 00 Bid Form 8
00 42 43 Proposal Form Unit Price 9
00 43 13 Bid Bond 10
00 45 11 Bidders Prequalification’s 11
00 45 12 Prequalification Statement 12
00 45 13 Bidder Prequalification Application 13
00 45 26 Contractor Compliance with Workers' Compensation Law 14
00 45 40 Minority Business Enterprise Goal 15
00 52 43 Agreement 16
00 61 25 Certificate of Insurance 17
00 62 13 Performance Bond 18
00 62 14 Payment Bond 19
00 62 19 Maintenance Bond 20
00 72 00 General Conditions 21
00 73 00 Supplementary Conditions 22
00 73 10 Standard City Conditions of the Construction Contract for Developer Awarded 23
Projects 24
25
Division 01 - General Requirements 26
01 11 00 Summary of Work 27
01 25 00 Substitution Procedures 28
01 31 19 Preconstruction Meeting 29
01 31 20 Project Meetings 30
01 32 16 Construction Progress Schedule 31
01 32 33 Preconstruction Video 32
01 33 00 Submittals 33
01 35 13 Special Project Procedures 34
01 45 23 Testing and Inspection Services 35
01 50 00 Temporary Facilities and Controls 36
01 55 26 Street Use Permit and Modifications to Traffic Control 37
01 57 13 Storm Water Pollution Prevention Plan 38
01 58 13 Temporary Project Signage 39
01 60 00 Product Requirements 40
01 66 00 Product Storage and Handling Requirements 41
01 70 00 Mobilization and Remobilization 42
01 71 23 Construction Staking 43
01 74 23 Cleaning 44
01 77 19 Closeout Requirements 45
01 78 23 Operation and Maintenance Data 46
01 78 39 Project Record Documents 47
Technical Specifications which have been modified by the Engineer specifically for this 48
Project; hard copies are included in the Project’s Contract Documents 49
00 00 10- 2
TABLE OF CONTENTS FOR DEVELOPER AWARDED PROJECTS
Page 2 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised September 1, 2015
None 1
2
Technical Specifications listed below are included for this Project by reference and can be 3
viewed/downloaded from the City’s Buzzsaw site at: 4
5
htps://projectpoint.buzzsaw.com/client/fortworthgov/Resources/02%20-6
%20Construction%20Documents/Specifications 7
8
Division 02 - Existing Conditions 9
02 41 13 Selective Site Demolition 10
02 41 14 Utility Removal/Abandonment 11
02 41 15 Paving Removal 12
13
Division 03 - Concrete 14
03 30 00 Cast-In-Place Concrete 15
03 34 13 Controlled Low Strength Material (CLSM) 16
03 34 16 Concrete Base Material for Trench Repair 17
03 80 00 Modifications to Existing Concrete Structures 18
19
Division 26 - Electrical 20
26 05 00 Common Work Results for Electrical 21
26 05 10 Demolition for Electrical Systems 22
26 05 33 Raceway and Boxes for Electrical Systems 23
26 05 43 Underground Ducts and Raceways for Electrical Systems 24
25
Division 31 - Earthwork 26
31 10 00 Site Clearing 27
31 23 16 Unclassified Excavation 28
31 23 23 Borrow 29
31 24 00 Embankments 30
31 25 00 Erosion and Sediment Control 31
31 36 00 Gabions 32
31 37 00 Riprap 33
34
Division 32 - Exterior Improvements 35
32 01 17 Permanent Asphalt Paving Repair 36
32 01 18 Temporary Asphalt Paving Repair 37
32 01 29 Concrete Paving Repair 38
32 11 23 Flexible Base Courses 39
32 11 29 Lime Treated Base Courses 40
32 11 33 Cement Treated Base Courses 41
32 12 16 Asphalt Paving 42
32 12 73 Asphalt Paving Crack Sealants 43
32 13 13 Concrete Paving 44
32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps 45
32 13 73 Concrete Paving Joint Sealants 46
32 14 16 Brick Unit Paving 47
32 16 13 Concrete Curb and Gutters and Valley Gutters 48
32 17 23 Pavement Markings 49
32 31 13 Chain Link Fences and Gates 50
00 00 10- 3
TABLE OF CONTENTS FOR DEVELOPER AWARDED PROJECTS
Page 3 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised September 1, 2015
32 31 26 Wire Fences and Gates 1
32 31 29 Wood Fences and Gates 2
32 32 13 Cast-in-Place Concrete Retaining Walls 3
32 91 19 Topsoil Placement and Finishing of Parkways 4
32 92 13 Hydro-Mulching, Seeding, and Sodding 5
32 93 43 Trees and Shrubs 6
7
Division 33 - Utilities 8
33 01 30 Sewer and Manhole Testing 9
33 01 31 Closed Circuit Television (CCTV) Inspection 10
33 03 10 Bypass Pumping of Existing Sewer Systems 11
33 04 10 Joint Bonding and Electrical Isolation 12
33 04 11 Corrosion Control Test Stations 13
33 04 12 Magnesium Anode Cathodic Protection System 14
33 04 30 Temporary Water Services 15
33 04 40 Cleaning and Acceptance Testing of Water Mains 16
33 05 10 Utility Trench Excavation, Embedment, and Backfill 17
33 05 12 Water Line Lowering 18
33 05 13 Frame, Cover and Grade Rings 19
33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 20
33 05 16 Concrete Water Vaults 21
33 05 17 Concrete Collars 22
33 05 20 Auger Boring 23
33 05 21 Tunnel Liner Plate 24
33 05 22 Steel Casing Pipe 25
33 05 23 Hand Tunneling 26
33 05 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate 27
33 05 26 Utility Markers/Locators 28
33 05 30 Exploratory Excavation for Existing Utilities 29
33 11 10 Ductile Iron Pipe 30
33 11 11 Ductile Iron Fittings 31
33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 32
33 11 13 Concrete Pressure Pipe, Bar-Wrapped, Steel Cylinder Type 33
33 11 14 Buried Steel Pipe and Fittings 34
33 11 15 Pre-stressed Concrete Cylinder Pipe 35
33 12 10 Water Services 1-inch to 2-inch 36
33 12 11 Large Water Meters 37
33 12 20 Resilient Seated Gate Valve 38
33 12 21 AWWA Rubber-Seated Butterfly Valves 39
33 12 25 Connection to Existing Water Mains 40
33 12 30 Combination Air Valve Assemblies for Potable Water Systems 41
33 12 40 Dry-Barrel Fire Hydrants 42
33 12 50 Water Sample Stations 43
33 12 60 Blow-off Valves 44
33 31 12 Cured in Place Pipe (CIPP) 45
33 31 13 Fiberglass Reinforced Pipe for Gravity Sanitary Sewers 46
33 31 15 HDPE Pipe For Sanitary Sewers (Gravity and Force Mains) 47
33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 48
33 31 21 Polyvinyl Chloride (PVC) Closed Profile Gravity Sanitary Sewer Pipe 49
33 31 22 Sanitary Sewer Slip Lining 50
00 00 10- 4
TABLE OF CONTENTS FOR DEVELOPER AWARDED PROJECTS
Page 4 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised September 1, 2015
33 31 23 Sanitary Sewer Pipe Enlargement 1
33 31 50 Sanitary Sewer Service Connections and Service Line 2
33 31 70 Combination Air Valve for Sanitary Sewer Force Mains 3
33 39 10 Cast-in-Place Concrete Manholes 4
33 39 20 Precast Concrete Manholes 5
33 39 30 Fiberglass Manholes 6
33 39 40 Wastewater Access Chamber (WAC) 7
33 39 60 Epoxy Liners for Sanitary Sewer Structures 8
33 41 10 Reinforced Concrete Storm Sewer Pipe/Culverts 9
33 41 11 HDPE Storm Sewer Pipe 10
33 46 00 Sub drainage 11
33 46 01 Slotted Storm Drains 12
33 46 02 Trench Drains 13
33 49 10 Cast-in-Place Manholes and Junction Boxes 14
33 49 20 Curb and Drop Inlets 15
33 49 40 Storm Drainage Headwalls and Wingwalls 16
17
Division 34 – Transportation 18
34 41 10 Traffic Signals 19
34 41 13 Removing Traffic Signals 20
34 41 20 Roadway Illumination Assemblies 21
34 41 30 Aluminum Signs 22
34 71 13 Traffic Control 23
24
25
26
Appendix 27
GC-4.01 Availability of Lands 28
GC-4.02 Subsurface and Physical Conditions 29
GC-4.04 Underground Facilities 30
GC-4.06 Hazardous Environmental Condition at Site 31
GC-6.06.D Minority and Women Owned Business Enterprise Compliance 32
GC-6.07 Wage Rates 33
GC-6.09 Permits and Utilities 34
GC-6.24 Nondiscrimination 35
GR-01 60 00 Product Requirements 36
City of Fort Worth Water Department Standard Products 37
38
END OF SECTION 39
00 42 43
DAP - BID PROPOSAL
Page 1 of 7
1 3311.0261 8" PVC Water Pipe 33 11 12 LF 1777 $28.50 $50,644.50
2 3311.0161 6" PVC Water Pipe 33 11 12 LF 130 $24.25 $3,152.50
3 3311.0161 4" PVC Water Pipe 33 11 12 LF 21 $21.50 $451.50
4 3312.3003 8" Gate Valve 33 12 20 EA 11 $1,200.00 $13,200.00
5 3312.3002 6" Gate Valve 33 12 20 EA 5 $850.00 $4,250.00
6 3311.0001 Ductile Iron Water Fittings w/ Restraint 33 11 11 Ton 2 $4,750.00 $9,500.00
7 3312.2003 1" Water Service 33 12 10 EA 20 $825.00 $16,500.00
8 3312.2203 2" Water Service 33 12 10 EA 3 $1,975.00 $5,925.00
9 3305.0109 Trench Safety 33 05 10 LF 1928 $0.25 $482.00
10 3312.4112 16" x 8" Tapping Sleeve & Valve 33 12 25 EA 1 $6,100.00 $6,100.00
11 3201.0122 5' Wide Asphalt Pvmt Repair, Arterial 32 01 17 LF 63 $130.00 $8,190.00
12 3471.0001 Traffic Control 34 71 13 MO 1 $2,000.00 $2,000.00
13 3305.0116 Concrete Encasement for Utility Pipes 35 05 10 CY 3 $155.00 $465.00
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Bidder's Proposal
Description
TOTAL UNIT I: WATER IMPROVEMENTS $120,860.50
Bid
Quantity Unit Price Bid Value
Project Item Information
UNIT PRICE BID Bidder's Application
Specification
Section No.
Unit of
Measure
Bidlist Item
No.
UNIT I: WATER IMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014 00 42 43_Bid Proposal_DAP cfa
00 42 43
DAP - BID PROPOSAL
Page 2 of 7
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Bidder's Proposal
Description Bid
Quantity Unit Price Bid Value
Project Item Information
UNIT PRICE BID Bidder's Application
Specification
Section No.
Unit of
Measure
Bidlist Item
No.
1 3331.4115 8" Sewer Pipe 33 11 10, 33 31 1 LF 1187 $35.00 $41,545.00
2 3331.4116 8" Sewer Pipe w/CSS Backfill 33 11 10, 33 31 1 LF 60 $55.00 $3,300.00
3 3331.4115 6" Sewer Pipe 33 11 10, 33 31 1 LF 21 $32.50 $682.50
4 3339.1001 4' Manhole 33 39 10, 33 39 2 EA 4 $4,250.00 $17,000.00
5 3339.0001 Epoxy Liner for Manhole 33 39 60 VF 25 $370.00 $9,250.00
6 3331.3101 4" Sewer Service 33 31 50 EA 20 $675.00 $13,500.00
7 3301.0101 Manhole Vacuum Testing 33 01 30 EA 4 $140.00 $560.00
8 3301.0002 Post-CCTV Inspection 33 01 31 LF 1268 $2.70 $3,423.60
9 3305.0109 Trench Safety 33 05 10 LF 1268 $0.75 $951.00
10 3305.0116 Concrete Encasement for Utility Pipes 33 05 10 CY 3 $155.00 $465.00
UNIT II: SANITARY SEWER IMPROVEMENTS
TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS $90,677.10
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014 00 42 43_Bid Proposal_DAP cfa
00 42 43
DAP - BID PROPOSAL
Page 3 of 7
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Bidder's Proposal
Description Bid
Quantity Unit Price Bid Value
Project Item Information
UNIT PRICE BID Bidder's Application
Specification
Section No.
Unit of
Measure
Bidlist Item
No.
1 3349.5001 10' Curb Inlet 33 49 20 EA 2 $5,950.00 $11,900.00
2 3349.5002 15' Curb Inlet 33 49 20 EA 2 $8,000.00 $16,000.00
3 3341.0409 48" RCP, Class III 33 41 10 LF 110 $212.00 $23,320.00
4 3341.0309 36" RCP, Class III 33 41 10 LF 455 $150.00 $68,250.00
5 3341.0302 30" RCP, Class III 33 41 10 LF 250 $112.00 $28,000.00
6 3341.0201 21" RCP, Class III 33 41 10 LF 42 $70.00 $2,940.00
7 3349.0002 5' Storm Junction Box 33 49 10 EA 2 $6,200.00 $12,400.00
8 3349.1011 48" Flared Headwall, 1 pipe 33 49 40 EA 1 $6,350.00 $6,350.00
9 3137.0104 Medium Stone Riprap, dry 31 37 00 SY 42 $69.00 $2,898.00
10 3305.0109 Trench Safety 33 05 10 LF 911 $0.75 $683.25
11 3349.2005 30" Parallel Headwall, 1 pipe 33 49 40 EA 1 $3,875.00 $3,875.00
$176,616.25
UNIT III: DRAINAGE IMPROVEMENTS
TOTAL UNIT III: DRAINAGE IMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014 00 42 43_Bid Proposal_DAP cfa
00 42 43
DAP - BID PROPOSAL
Page 4 of 7
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Bidder's Proposal
Description Bid
Quantity Unit Price Bid Value
Project Item Information
UNIT PRICE BID Bidder's Application
Specification
Section No.
Unit of
Measure
Bidlist Item
No.
1 3213.0101 7" Conc Pvmt 32 13 13 SY 7521 $54.60 $410,646.60
2 3211.0502 8" Lime Treatment 32 11 29 SY 7928 $2.50 $19,820.00
3 3211.0400 Hydrated Lime 32 11 29 TON 142.704 $191.00 $27,256.46
4 3213.0501 Barrier Free Ramp, Type R-1 32 13 20 EA 4 $3,000.00 $12,000.00
5 3213.0501 Barrier Free Ramp, Type M-1 32 13 20 EA 2 $4,000.00 $8,000.00
6 3305.0107 Manhole Adjustment, Minor 33 05 14 EA 4 $450.00 $1,800.00
7 3305.0111 Valve Box Adjustment 33 05 15 EA 17 $200.00 $3,400.00
8 3471.0001 Traffic Control (Dead End Barricade) 34 71 13 EA 1 $2,500.00 $2,500.00
9 3213.0301 4" Conc Sidewalk 32 13 20 SF 10280 $5.00 $51,400.00
10 9999.0001 Traffic Signs / Pavement Markings LS 1 $5,025.00 $5,025.00
11 3471.0001 General Traffic Control 34 71 13 MO 3 $2,000.00 $6,000.00
12 3292.0400 Seeding, Hydromulch 32 92 13 SY 2900 $0.30 $870.00
13 3291.0100 Topsoil 32 91 19 CY 480 $12.00 $5,760.00
14 3137.0104 Medium Stone Riprap, dry 31 37 00 SY 42 $175.00 $7,350.00
15 0241.1300 Remove Conc Curb&Gutter 02 41 15 LF 76 $15.00 $1,140.00
UNIT IV: PAVING IMPROVEMENTS
TOTAL UNIT IV: PAVING IMPROVEMENTS $562,968.06
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014 00 42 43_Bid Proposal_DAP cfa
00 42 43
DAP - BID PROPOSAL
Page 5 of 7
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Bidder's Proposal
Description Bid
Quantity Unit Price Bid Value
Project Item Information
UNIT PRICE BID Bidder's Application
Specification
Section No.
Unit of
Measure
Bidlist Item
No.
1 3441.3301 Rdwy Illum Foundation TY 1,2, and 4 34 41 20 EA 10 $650.00 $6,500.00
2 3441.3002 Rdwy Illum Assmbly TY 8,11,D-25, and D-30 34 41 20 EA 10 $1,900.00 $19,000.00
3 3441.3104 150W MH PC Lighting Fixture 34 41 20 EA 10 $405.00 $4,050.00
4 2605.3015 2" CONDT PVC SCH 80 (T) 26 05 33 LF 1331 $8.00 $10,648.00
5 3441.1409 NO 8 Insulated Elec Condr 34 41 10 LF 1331 $6.75 $8,984.25
$49,182.25
UNIT V: STREET LIGHTING IMPROVEMENTS
TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014 00 42 43_Bid Proposal_DAP cfa
00 42 43
DAP - BID PROPOSAL
Page 6 of 7
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Bidder's Proposal
Description Bid
Quantity Unit Price Bid Value
Project Item Information
UNIT PRICE BID Bidder's Application
Specification
Section No.
Unit of
Measure
Bidlist Item
No.
TOTAL UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS
UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014 00 42 43_Bid Proposal_DAP cfa
00 42 43
DAP - BID PROPOSAL
Page 7 of 7
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Bidder's Proposal
Description Bid
Quantity Unit Price Bid Value
Project Item Information
UNIT PRICE BID Bidder's Application
Specification
Section No.
Unit of
Measure
Bidlist Item
No.
90
END OF SECTION
UNIT I: WATER IMPROVEMENTS
Bid Summary
Contractor agrees to complete WORK for FINAL ACCEPTANCE within calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
$1,000,304.16Total Construction Bid
UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS
$90,677.10
$176,616.25
$562,968.06
$49,182.25
$120,860.50
UNIT II: SANITARY SEWER IMPROVEMENTS
UNIT III: DRAINAGE IMPROVEMENTS
UNIT IV: PAVING IMPROVEMENTS
UNIT V: STREET LIGHTING IMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014 00 42 43_Bid Proposal_DAP cfa
WATER IMPROVEMENTS NEW DEVELOPMENT - OPEN TRENCH ALL SIZES
WASTEWATER IMPROVEMENTS NEW DEVELOPMENT - OPEN TRENCH ALL SIZES
00 42 43
DAP - BID PROPOSAL
Page 1 of 7
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Project Item Information
Bidlist Item
Description
No.
UNIT I: WA
1 3311.0261 8" PVC Water Pipe
2 3311.0161 6" PVC Water Pipe
3 3311.0161 4" PVC Water Pipe
4 3312.3003 8" Gate Valve
5 3312.3002 6" Gate Valve
6 3311.0001 Ductile Iron Water Fittings w/ Restraint
7 3312.2003 1" Water Service
8 3312.2203 2" Water Service
9 3305.0109 Trench Safety
10 3312.4112 16" x 8" Tapping Sleeve & Valve
11 13201.0122 5' Wide Asphalt Pvmt Repair, Arterial
12 13471.0001 Traffic Control
13 13305.0116 Concrete Encasement for Utilitv Pines
Bidder's Application
Bidder's Proposal
Specification
Section No,
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
IMPROVEMENTS
33 11 12
LF
1777
$28.50
$50,644.50
33 11 12
LF
130
$24.25
$3,152.50
33 11 12
LF
21
$21.50
$451.50
331220
EA
11
$1,200.00
$13,200.00
33 1220
EA
5
$850.00
$4,250.00
33 11 11
Ton
2
$4,750.00
$9,500.00
33 12 10
EA
20
$825.00
$16,500.00
33 12 10
EA
3
$1,975.00
$5,925.00
33 05 10
LF
1928
$0.25
$482.00
33 1225
EA
1
$6,100.001
$6,100.00
3201 17
LF
63
$130.001
$8,190.00
3471 13
MO
1
$2,000.001
$2,000.00
3505 10
Cy
3
$155.00
$465.00
$120,860.50
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014 Untitled-12
00 42 43
DAP - BID PROPOSAL
Page 2 of 7
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist Item
No
Description
Specification
Section No.
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
UNIT II: SANITARY SEWER IMPROVEMENTS
1
3331.4115 8" Sewer Pie
33 11 10,33 31 1
LF
1187
$35.00
$41,545.00
2
3331.4116 8" Sewer Pipe w/CSS Backfill
33 11 10,33 31 1
LF
60
$55.00
$3,300.00
3
3331.4115 6" Sewer Pipe
33 11 10,33 31 1
LF
21
$32.50
$682.50
4
3339.1001 4' Manhole
33 39 10, 33 39
EA
4
$4,250.00
$17,000.00
5
3339.0001 Epoxy Liner for Manhole
33 39 60
VF
25
$370.00
$9,250.00
6
3331.3101 4" Sewer Service
3331 50
EA
20
$675.00
$13,500.00
7
3301.0101 Manhole Vacuum Testing
33 01 30
EA
4
$140.00
$560.00
8
3301.0002 Post -CCTV Inspection
33 0131
LF
1268
$2.70
$3,423.60
9
3305.0109 Trench Safety
33 05 10
LF
1268
$0.75
$951.00
10
3305.0116 Concrete Encasement for Utilitv PiDes
33 05 10
Cy
3
$155.00
$465.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014 Untitled-12
00 42 43
DAP - BID PROPOSAL
Page 3 of 7
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Bidder's Application
Project Item Information
Bidders Proposal
Bidlist Item
No.
Description
Specification
Section No.
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
UNIT III: DRAINAGE IMPROVEMENTS
1
3349.5001 10' Curb Inlet
33 49 20
EA
2
$5,950.00
$11,900.00
2
3349.5002 15' Curb Inlet
33 49 20
EA
2
$8,000.00
$16,000.00
3
3341.0409 48" RCP, Class Ill
3341 10
LF
110
$212.00
$23,320.00
4
3341.0309 36" RCP, Class III
3341 10
LF
455
$150.00
$68,250.00
5
3341.0302 30" RCP, Class III
3341 10
LF
250
$112.00
$28,000.00
6
3341.0201 21" RCP, Class 111
3341 10
LF
42
$70.001
$2,940.00
7
3349.0002 5' Storm Junction Box
3349 10
EA
2
$6,200.00
$12,400.00
8
3349.1011 48" Flared Headwall, 1 pipe
33 49 40
EA
1
$6,350.00
$6,350.00
9
3137.0104 Medium Stone Ri rap, dry
31 37 00
Sy
42
$69.00
$2,898.00
10
3305.0109 Trench Safety
33 05 10
LF
911
$0.75
$683.25
11
3349.2005 30" Parallel Headwall, 1 pipe
33 49 40
EA
1
$3,875.00
$3,875.00
$176,616.25
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014 Untitled-I2
0045 12
DAP PREQUALIFICATION STATEMENT
Page I of 1
SECTION 00 45 12
DAP - PREQUALIFICATION STATEMENT
Each Bidder is required to complete the information below by identifying the prequalified contractors
and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work
Type" box provide the complete maior work type and actual description as provided by the Water
Department for water and sewer and TPW for paving.
Major Work Type Contractor/Subcontractor Company Name Prequalification
Ex iration Date
Water New Development Open Walker Utilities 1 /31 /2021
Cuts (all sizes); Wastewater New
Development Open Cuts (all
sizes)
The undersigned hereby certifies that the contractors and/or subcontractors described in the table above
are currently prequalified for the work types listed.
BIDDER:
Walker Utilities, Inc. BY: Brandon Walker
124 Brown Trail
Hurst, Texas 76053
(Signature)
TITLE: Vice President
DATE: /-3(- 26
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT— DEVELOPER AWARDED PROJECTS
Form Version September 1, 2015 004512 Prequalification Statement 201S_DAP Utilities
00 45 26
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Page I of I
SECTION 00 45 26
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides
worker's compensation insurance coverage for all of its employees employed on City Project No. 102275.
Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will
provide to City its subcontractor's certificates of compliance with worker's compensation coverage.
CONTRACTOR:
Walker Utilities Inc.
In
Company
1 z-4 $fpW �2i / Signature:
Address
�u1s5-� 1-x r?6D 53
City/State/Zip
THE STATE OF TEXAS §
COUNTY OF TARRANT §
��AACIor� �4I�1�
(Please Print)
Dvr�— ._
Title:
V ij,Clr— fj-e-51dt4'T-
(Please Print)
BEFORE ME, the undersigned authority, on this day personally appeared
91'4no4n 14-gl't/ , known to me to be the person whose name is subscribed to
the foregoing in trument, and acknowledged to me that he/she executed the same as the act and deed of
U j CL%si for the purposes and consideration therein expressed and in
the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this
Decc&cr , 20_8.
E.M
JASON ESCOBEDO
Notary Public, State of Texas
Comm. Expires 02-26-2021n0`` Notary ID 126811961
30 -9 day of
Notary Ic in and for the State of Texas
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised April 2, 2014
Lakes of River Trails East Phase I T/I
102275
mxa" 1130111119*X1 j
2
00 52 43 - 1
Developer Awarded Project Agreement
Page 1 of 4
3 THIS AGREEMENT, authorized on December 30, 2019 is made by and between the Developer,
4 CKK Residential Group, II Ltd., authorized to do business in Texas ("Developer"), and Walker
5 Utilities, authorized to do business in Texas, acting by and through its duly authorized
6 representative, ("Contractor").
7 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
8 follows:
9 Article 1. WORK
10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the
11 Project identified herein.
12 Article 2. PROJECT
13 The project for which the Work under the Contract Documents may be the whole or only a part is
14 generally described as follows:
15 Lakes of River Trails East Phase 17A
16 City Project No.—102275; X No. — X- 26183; FID No. — 30114-0200431-102275-EO7685
17 File No. — W-265 7
18 Article 3. CONTRACT TIME
19 3.1 Time is of the essence.
20 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract
21 Documents are of the essence to this Contract.
22 3.2 Final Acceptance.
23 The Work will be complete for Final Acceptance within 120 calendar days after the date
24 when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard
25 City Conditions of the Construction Contract for Developer Awarded Projects.
26 3.3 Liquidated damages
27 Contractor recognizes that time is of the essence of this Agreement and that Developer
28 will suffer financial loss if the Work is not completed within the times specified in
29 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of
30 the Standard City Conditions of the Construction Contract for Developer Awarded
31 Projects. The Contractor also recognizes the delays, expense and difficulties involved in
32 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not
33 completed on time. Accordingly, instead of requiring any such proof , Contractor agrees
34 that as liquidated damages for delay (but not as a penalty), Contractor shall pay
35 Developer One thousand Dollars ($1,000.00) for each day that expires after the time
36 specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of
37 Acceptance.
CITY OF FORT WORTH Lakes of River Trails East Phase 17,4
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised June 16, 2016
00 52 43 - 2
Developer Awarded Project Agreement
Page 2 of 4
38 Article 4. CONTRACT PRICE
39 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract
40 Documents an amount in current funds of Three hundred eighty-eight thousand one hundred fifty
41 three Dollars and eighty-five cents ($388,153.85 ).
42 Article 5. CONTRACT DOCUMENTS
43 5.1 CONTENTS:
44
A. The Contract Documents which comprise the entire agreement between Developer and
45
Contractor concerning the Work consist of the following:
46
1.
This Agreement.
47
2.
Attachments to this Agreement:
48
a. Bid Form (As provided by Developer)
49
1) Proposal Form (DAP Version)
50
2) Prequalification Statement
51
3) State and Federal documents (project specific)
52
b. Insurance ACORD Form(s)
53
c. Payment Bond (DAP Version)
54
d. Performance Bond (DAP Version)
55
e. Maintenance Bond (DAP Version)
56
f. Power of Attorney for the Bonds
57
g. Worker's Compensation Affidavit
58
h. MBE and/or SBE Commitment Form (If required)
59
3.
Standard City General Conditions of the Construction Contract for Developer
60
Awarded Projects.
61
4.
Supplementary Conditions.
62
5.
Specifications specifically made a part of the Contract Documents by attachment
63
or, if not attached, as incorporated by reference and described in the Table of
64
Contents of the Project's Contract Documents.
65
6.
Drawings.
66
7.
Addenda.
67
8.
Documentation submitted by Contractor prior to Notice of Award.
68
9.
The following which may be delivered or issued after the Effective Date of the
69
Agreement and, if issued, become an incorporated part of the Contract Documents:
70
a. Notice to Proceed.
71
b. Field Orders.
72
c. Change Orders.
73
d. Letter of Final Acceptance.
74
75
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised June 16, 2016
00 52 43 - 3
Developer Awarded Project Agreement
Page 3 of 4
76 Article 6. INDEMNIFICATION
77 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
78 expense, the city, its officers, servants and employees, from and against any and all
79 claims arising out of, or alleged to arise out of, the work and services to be performed
80 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
81 under this contract. This indemnification provision is specifically intended to operate
82 and be effective even if it is alleged or proven that all or some of the damages being
83 sought were caused, in whole or in part, by any act, omission or negligence of the city.
84 This indemnity provision is intended to include, without limitation, indemnity for
85 costs, expenses and legal fees incurred by the city in defending against such claims and
86 causes of actions.
87
88 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
89
the city, its officers, servants and employees, from and against any and all loss, damage
90
or destruction of property of the city, arising out of, or alleged to arise out of, the work
91
and services to be performed by the contractor, its officers, agents, employees,
92
subcontractors, licensees or invitees under this contract. This indemnification
93
provision is specifically intended to operate and be effective even if it is alleged or
94
proven that all or some of the damages being sought were caused, in whole or in part,
95
by any act, omission or negligence of the city.
96
97
Article
7. MISCELLANEOUS
98
7.1
Terms.
99
Terms used in this Agreement are defined in Article I of the Standard City Conditions of
100
the Construction Contract for Developer Awarded Projects.
101
7.2
Assignment of Contract.
102
This Agreement, including all of the Contract Documents may not be assigned by the
103
Contractor without the advanced express written consent of the Developer.
104
7.3
Successors and Assigns.
105
Developer and Contractor each binds itself, its partners, successors, assigns and legal
106
representatives to the other party hereto, in respect to all covenants, agreements and
107
obligations contained in the Contract Documents.
108
7.4
Severability.
109
Any provision or part of the Contract Documents held to be unconstitutional, void or
110
unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
111
remaining provisions shall continue to be valid and binding upon DEVELOPER and
112
CONTRACTOR.
113
7.5
Governing Law and Venue.
114
This Agreement, including all of the Contract Documents is performable in the State of
115
Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
116
Northern District of Texas, Fort Worth Division.
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Cii)� Projecl No. - 102275
Revised June 16, 2016
00 52 43 - 4
Developer Awarded Project Agreement
Page 4 of 4
117
118 7.6 Authority to Sign.
119 Contractor shall attach evidence of authority to sign Agreement, if other than duly
120 authorized signatory of the Contractor.
121
122 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple
123 counterparts.
124
125 This Agreement is effective as of the last date signed by the Parties ("Effective Date")
126
127
Contractor: � l U I I��a —J�—e
BY:
(Signature)
(Signature)
j5rwJo, i�alker
(Printed Name)
Title: \A CC- Q('-eSiJC4
Company Name:
Address: (Z g1,0 W,
City/State/Zip: �V,r
IZ�3o/Iq
Date
De CIO er: /? ;9
By:
(Signatur )
Liz /I CIA 1-,. 460'a it
(Printed ' Name)
Title: An a q ),n P1 PC,(' � 11c-
Company name: ,�,f.
Address: ii�JU��,
rb x SI
_ z
City/State/Zip: l�t. a b ��/1 � � t o l6/
►,Z 3ti f c�
Date
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised June 16, 2016
1
2
3
4
5
6
7
SECTION 00 6213
PERFORMANCE BOND
006213-1
PERFORMANCE BOND
Page 1 of 2
Bond No. 4426517
THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
8 That we, Walker Utilities. Inc. , known as "Principal"
9 herein and SureTec Insurance Company , a corporate surety(sureties, if
10 more than one) duly authorized to do business in the State of Texas, known as "Surety" herein
11 (whether one or more), are held and firmly bound unto the Developer, CKK Residential Group, II
12 LLC., authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas
13 municipal corporation ("City"), in the penal sum of,
14 Three Hundred Eighty Eight Thousand One Hundred Fifty Three and 85/100--- Dollars ($ 388,153.85---- )
15 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the
16 payment of which sum well and truly to be made jointly unto the Developer and the City as dual
17 obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
18 and severally, firmly by these presents.
19 WHEREAS, Developer and City have entered into an Agreement for the construction of
20 community facilities in the City of Fort Worth by and through a Community Facilities
21 Agreement, CFA Number CFA19-0137 ;and
22 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded
23 the 30th day of December , 20 19, which Contract is hereby referred to and made a
24 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor
25 and other accessories defined by law, in the prosecution of the Work, including any Change
26 Orders, as provided for in said Contract designated as Lakes of River Trails East Phase 17A.
27 NOW, THEREFORE, the condition of this obligation is such that if the said Principal
28 shall faithfully perform it obligations under the Contract and shall in all respects duly and
29 faithfully perform the Work, including Change Orders, under the Contract, according to the plans,
30 specifications, and contract documents therein referred to, and as well during any period of
31 extension of the Contract that may be granted on the part of the Developer and/or City, then this
32 obligation shall be and become null and void, otherwise to remain in full force and effect.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised January 31, 2012
Lakes of River Trails East Phase 17A
City Project No. - 1022 75
006213-2
PERFORMANCE BOND
Page 2 of 2
1 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
2 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
3 Worth Division.
4 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
5 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
6 accordance with the provisions of said statue.
7 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED
8 this instrument by duly authorized agents and officers on this the 31 st day of
9 December 20 19
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
ATTEST:
(Principal) Secretary
Witn s as to Principal
�WA, A
Witness as to Surety Elena Sells
PRINCIPAL:
Walker Utilities, Inc.
BY:
Signature
Brandon Walker Vice President
Name and Title
Address: 124 Brown Trail
Hurst, TX 76053
SURETY:
SureTec Insurance Company
BY:
i tur
Jennifer Picchi, Attorney -in -Pact
Name and Title
Address: 2103 CityWest Blvd., Suite 1300
Houston, TX 77042
Telephone Number: (713) 812-0800
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract
from the by-laws showing that this person has authority to sign such obligation. If
Surety's physical address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised January 31, 2012
006214-1
PAYMENTBOND
Page 1 of 2
1 SECTION 00 6214 Bond No. 4426517
2 PAYMENT BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, Walker Utilities. Inc. known as
8 "Principal" herein, and SureTec Insurance Company
,a
9 corporate surety ( or sureties if more than one), duly authorized to do business in the State of
10 Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the
11 Developer, CKK Residential Group, 11 LLC., authorized to do business in Texas "(Developer"),
12 and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum
13 Of Three Hundred Eighty Eight Thousand One Hundred Fifty Three and 85/100--- Dollars ($ 388,153.85---- )
e
14 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the
15 payment of which sum well and truly be made jointly unto the Developer and the City as dual
16 obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
17 and severally, firmly by these presents:
18 WHEREAS, Developer and City have entered into an Agreement for the construction of
19 community facilities in the City of Fort Worth, by and through a Community Facilities
20 Agreement, CFA Number CFA19-0137;and
21 WHEREAS, Principal has entered into a certain written Contract with Developer,
22 awarded the 30th day of December , 20 19 , which Contract is hereby
23 referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all
24 materials, equipment, labor and other accessories as defined by law, in the prosecution of the
25 Work as provided for in said Contract and designated as Lakes of River Trails East Phase 17A.
26 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if
27 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
28 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
29 the Contract, then this obligation shall be and become null and void; otherwise to remain in full
30 force and effect.
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised January 31, 2012
1
2
3
4
5
6
7
8
9
10
11
12
13
006214-2
PAYMENTBOND
Page 2 of 2
This bond is made and executed in compliance with the provisions of Chapter 2253 of the
Texas Government Code, as amended, and all liabilities on this bond shall be determined in
accordance with the provisions of said statute.
IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED
this instrument by duly authorized agents and officers on this the 31st day of
December 2019
ATTEST:
(Principal) Secretary
Wit ss as to Principal
ATTEST:
N/A
(Surety) Secretary
?tM JJL
Witness as to Surety Elena Sells
PRINCIPAL:
Walker Utilities, Inc.
BY:
Signature
Brandon Walker, Vice President
Name and Title
Address: 124 Brown Trail
Hurst, TX 76053
SURETY:
SureTec Insurance Company
BY:
' na re
Jennifer Picchi, Attorney -in -Fact
Name and Title
Address: 2103 CityWest Blvd., Suite 1300
Houston, TX 77042
Telephone Number: (713) 812-0800
Note: If signed by an officer of the Surety, there must be on file a certified extract from the
bylaws showing that this person has authority to sign such obligation. If Surety's physical
address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
14 END OF SECTION
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised January 31, 2012
Lakes of River Trails East Phase 17A
City Project No.-102275
006219-1
MAINTENANCE BOND
Page 1 of 3
1 SECTION 00 6219 Bond No. 4426517
2 MAINTENANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7
8 That we, Walker Utilities, Inc. , known as "Principal"
9 herein and SureTec Insurance Company
a corporate surety (sureties, if
10 more than one) duly authorized to do business in the State of Texas, known as "Surety" herein
11 (whether one or more), are held and firmly bound unto the Developer, CKK Residential Group, II
12 LLC., authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas
13 municipal corporation ("City"), in the sum of Three Hundred Eighty Eight Thousand One Hundred Fifty Three and 85/100---
14 Dollars ($ 388,153.85---- ), lawful money of the United States, to be paid in Fort
15 Worth, Tarrant County, Texas, for payment of which sum well and truly be made jointly unto the
16 Developer and the City as dual obligees and their successors, we bind ourselves, our heirs,
17 executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
18
19 WHEREAS, Developer and City have entered into an Agreement for the construction of
20 community facilities in the City of Fort Worth by and through a Community Facilities
21 Agreement, CFA NumberCFA19-0137; and
22 WHEREAS, the Principal has entered into a certain written contract with the Developer
23 awarded the 30th day of December , 20 19 , which Contract is
24 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all
25 materials, equipment labor and other accessories as defined by law, in the prosecution of the
26 Work, including any Work resulting from a duly authorized Change Order (collectively herein,
27 the "Work") as provided for in said Contract and designated as Lakes of River Trails East Phase
28 17A; and
29
30 WHEREAS, Principal binds itself to use such materials and to so construct the Work in
31 accordance with the plans, specifications and Contract Documents that the Work is and will
32 remain free from defects in materials or workmanship for and during the period of two (2) years
33 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and
34
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised January 31, 2012
006219-2
MAINTENANCE BOND
Page 2 of 3
1 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part
2 upon receiving notice from the Developer and/or City of the need thereof at any time within the
3 Maintenance Period.
4
5 NOW THEREFORE, the condition of this obligation is such that if Principal shall
6 remedy any defective Work, for which timely notice was provided by Developer or City, to a
7 completion satisfactory to the City, then this obligation shall become null and void; otherwise to
8 remain in full force and effect.
9
10 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely
11 noticed defective Work, it is agreed that the Developer or City may cause any and all such
12 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne
13 by the Principal and the Surety under this Maintenance Bond; and
14
15 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
16 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
17 Worth Division; and
18
19 PROVIDED FURTHER, that this obligation shall be continuous in nature and
20 successive recoveries may be had hereon for successive breaches.
21
22
23
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No.-102275
Revised January 31, 2012
006219-3
MAINTENANCE BOND
Page 3 of 3
1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this
2 instrument by duly authorized agents and officers on this the 31 st day of
3 December 2019
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
ATTEST:
(Principal) Secretary
Wi ss as to Principal
ATTEST:
N/A
(Surety) Secretary n�/
l�l ���
Witness as to Surety Elena Sells
PRINCIPAL:
Walker Utilities Inc.
BY:
Signature
Brandon Walker, Vice President
Name and Title
Address: 124 Brown Trail
Hurst, TX 76053
SURETY:
S ec Insurance Co an
Sig
Jennifer Picchi, Attorney -in -Fact
Name and Title
Address: 2103 CityWest Blvd., Suite 1300
Houston, TX 77042
Telephone Number: (713) 812-0800
37 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract
38 from the by-laws showing that this person has authority to sign such obligation. If
39 Surety's physical address is different from its mailing address, both must be provided.
40
41 The date of the bond shall not be prior to the date the Contract is awarded.
M
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised January 31, 2012
SureTec Insurance Company
THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION
Statutory Complaint Notice/Filing of Claims
To obtain information or make a complaint: You may call the Surety's toll free telephone number for information or to make
a complaint or file a claim at: 1-866-732-0099. You may also write to the Surety at:
SureTec Insurance Company
9737 Great Hills Trail, Suite 320
Austin, Tx 78759
You may contact the Texas Department of Insurance to obtain information on companies, coverage, rights or complaints
at 1-800-252- 3439. You may write the Texas Department of Insurance at:
PO Box 149104
Austin, TX 78714-9104
Fax#: 512-490-1007
Web: htto://www.tdi.state.tx.us
Email: ConsumerProtection@tdi.texas.gov
PREMIUM OR CLAIMS DISPUTES: Should you have a dispute concerning your premium or about a claim, you should
contact the Surety first. If the dispute is not resolved, you may contact the Texas Department of Insurance.
Texas Rider 06042015
POA #: 4221800
SureTec Insurance Company
LIMITED POWER OF ATTORNEY
Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents
make, constitute and appoint
Kathy Sells, Lanny Land, Steven W. Lewis, Elena Sells, Jennifer Picchi
its true and lawful Attorney -in -fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge
and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for, providing the bond penalty does not exceed
Five Million and 00/100 Dollars ($5,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the CEO, sealed with the corporate seal
of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney -in -Fact may do in the
premises. Said appointment is made under and by authority of the following resolutions of the Board of Directors of the SureTec
Insurance Company:
Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney -in -Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney -in -Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 201* of April,
1999)
In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its CEO, and its corporate seal to
be hereto affixed this 14th day of August A.D. 2019 .
y�NCF SURETEC INS PANY
0� By:
uj John Kno , CE
State of Texas ss: 7 • d
County of Harris s •^•••••'
•MIFF*�
On this 14th day of August , A.D. 2019 before me personally came John Knox Jr., to me known, who, being by me duly sworn; did depose and say,
that he resides in Houston, Texas, that he is CEO of SURETEC INSURANCE COMPANY, the company described in and which executed the above
instrument; that he knows the seal of said Company; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the
Board of Directors of said Company; and that he signed his name thereto by like order.
� ......I,.- JACQUELYN GREENLEAF
�hP_tY P(�d
tlotary Public, Skate pf Texas
Comm. Expires 05-18-2021
' °;, Notary ID 126903029
,--A M E�7_
Jacq elyn Greenleaf, Notary Public
My commission expires May 18, 2021
I, M. Brent Beaty, Assistant Secretary of SURETEC, INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney, executed by said Company, which is still in full force and effect; and furthermore, the resolutions of the Board of Directors, set
out in the Power of Attorney are in full force and effect.
Given under my hand and the seal of said Company at Houston, Texas this 5 S _ day of �6_ 62__ A.D.
. Bren Beaty, A istant SeeVetary
Any instrument issued in excess of the penalty stated above is totally void and without any validity.
For verification of the authority of this power you may call (713) 812-0800 any business day between 8:30 am and 5:00 pm CST.
MACHINE LAID CONCRETE PAVING CONSTRUCTION
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP -BID PROPOSAL
Page 4 of 7
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist Item
No.
Description
Specification
Section No.
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
UNIT IV: PAVING IMPROVEMENTS
1
3213.0101 7" Cone Pvmt
3213 13
Sy
7526
$49.53
$372,762.78
2
3211.0502 8" Lime Treatment
321129
Sy
8047
$2.50
$20,117.50
3
3211.0400 Hydrated Lime
321129
TON
144.85
$191.00
$27,666.35
4
3213.0501 Barrier Free Ramp, Type R-1
32 1320
EA
4
$3,000.00
$12,000.00
5
3213.0501 Barrier Free Ramp, Type M-1
32 13 20
EA
2
$4,000.00
$8,000.00
6
3305.0107 Manhole Adjustment, Minor
3305 14
EA
7
$450.00
$3,150.00
7
3305.0111 Valve Box Adjustment
3305 15
EA
15
$200.00
$3,000.00
8
3471.0001 Traffic Control (Dead End Barricade)
3471 13
EA
1
$2,500.00
$2,500.00
9
3213.0301 4" Cone Sidewalk
32 13 20
SF
10280
$5.00
$51,400.00
10
9999.0001 Traffic Signs / Pavement Markings
LS
1
$5,025.00
$5,025.00
11
3471.0001 General Traffic Control
3471 13
MO
4
$2,000.00
$8,000.00
12
3292.0400 Seeding, H dromulch
32 92 13
Sy
2900
$0.50
$1,450.00
13
3291.0100 Topsoil
3291 19
Cy
480
$10.00
$4,800.00
14
3137.0104 Medium Stone Ri ra , dry
31 37 00
Sy
41.00
$180.00
$7,380.00
15
0241.1300 Remove Conc Curb&Gutter
0241 15
LF
76
$15.00
$1,140.00
16
3212.0401 HMAC Transition
321216
Sy
118
$95.00
$11,210.00
TOTAL
UNIT IV: PAVING IMPROVEMENTS
$539,601.63
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
00 42 43_Bid Proposal —DAP cfa.xls
BID QUALIFICATION:
01 This proposal is submitted with the understanding that the owner's
credit and financial arrangements for making payment under the
Contract are satisfactory to Stabile & Winn, Inc.
02 Partial Payments on the Fifteenth of the next month, Final
Payment immediately upon acceptance from Owner.
03 Two Year Maintenance Bond is included.
04 All Testing, Soil Series, and Coring for Compliance to be furnished & paid for by others.
05 Construction Staking is not included.
06 Inspection Fees, if any, to be paid for by others.
07 Backfill all work is included.
08 Utility Relocations, if any, to be furnished & paid for by others.
09 Temporary Barricades with Lites & Signage are included.
10 Imported Material (Topsoil, Select Fill, etc.) & Seeding Parkways are not included.
11 After the Utility Contractor has completed their work, the Street
Subgrade and Parkways must be restored to +/- 0.10 Ft. by others
or it will be done on a Force -Account -Basis.
12 Sales Tax is not included.
13 The Erosion Control Plan (SWPPP), and the implementation of
the plan are not included. However, the maintaining of the
existing implementation is included.
14 Unit Prices are contingent upon all the incorporated materials being installed prior to
July 1, 2020. If all the incorporated materials cannot be installed within this time frame,
then our unit prices maybe subjected to increases due to delays that are not within our cause
or scope of work, and shall be treated as a Change Order to the Contract.
This Bid Qualification is a part of this Contract.
Contractor: TABILE & WINN, INC.
Si
John tabile
President
0045 12
DAP PREQUALIFICATION STATEMENT
Page 1 of 1
SECTION 00 45 12
DAP — PREQUALIFICATION STATEMENT
Each Bidder is required to complete the information below by identifying the prequalified contractors
and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work
Type" box provide the complete major work type and actual description as provided by the Water
Department for water and sewer and TPW for pavin&
Major Work Type
Contractor/Subcontractor Company Name
Prequalification
Expiration Date
Machine Laid Concrete Paving
Construction
Stabile and Winn., Inc.
09/01/20
The undersigned hereby certifies that the contractors and/or subcontractors described in the table above
are currently prequalified for the work types listed.
BIDDER:
Stabile and Winn, .Inc BY: John Stabile
PO Box 79380
Saginaw, Texas 76179
(Signature)
TITLE:
DATE:
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT— DEVELOPER AWARDED PROJECTS 00 45 12_Prequalification Statement 2015_DAP Paving.docx
Form Version September 1, 2015
00 45 26 - 1
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Page 1 of 1
1 SECTION 00 45 26
2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it
4 provides worker's compensation insurance coverage for all of its employees employed on City
5 Project No. 102275. Contractor further certifies that, pursuant to Texas Labor Code, Section
6 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with
7 worker's compensation coverage.
8
9 CONTRACTOR:
10
I I
y AKA `T'tG�
By: �.4�.� Lt1, d'7'�6✓Ti_
12
Company
(P ase Print
13
14
1:;b>?nw 7 93A0
Signatu
15
Address
16
17
, �-Va-v
Title:
18
City State/Zip
(Please Print)
19
20
21 THE STATE OF TEXAS
22
23 COUNTY OF TARRANT
24
25 BEFORE ME, the undersigned authority, on this day personally appeared
26 —I.W.. A/. J41.',L , known to me to be the person whose name is
27 subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as
28 the act and deed of �f".C6:4�'�t/.^N.., .ems.- for the purposes and
29 consideration therein expressed and in the capacity therein stated.
30
31
32
33
34
35
36
37
38
39
GIVEN UNDER MY HAND AND SEAL OF OFFICE this I3'Out day of
-J«Nwd4rr.1 , 20Z-o
DEBRA RODRIGUEZ
Notary Public, State of Texas
Comm. Expires 09-07-2022
Notary ID13171267-2
otary Public i d fbr the State of Texas
END OF SECTION
CITY OF FORT WORTH Lakes of river Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.-102275
Revised April 2, 2014
005243-1
Developer Awarded Project Agreement
Page 1 of
SECTION 00 52 43
2 AGREEMENT
3 THIS AGREEMENT, authorized on / d' 131' 1 q is made by and between the Developer,
4 CKK Residential Group, II LLC., authorized to do business in Texas ("Developer"), and Stabile
5 and Winn, Inc., authorized to do business in Texas, acting by and through its duly authorized
6 representative, ("Contractor").
7 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
8 follows:
9 Article 1. WORK
10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the
11 Project identified herein.
12 Article 2. PROJECT
13 The project for which the Work under the Contract Documents may be the whole or only a part is
14 generally described as follows:
15 Lakes of River Trails East Phase 17A
16 City Project No.—102275; X No. — X-26183; FID No. — 30114-0200431-102275-EO7685
17 File No. — W-2657
18 Article 3. CONTRACT TIME
19 3.1 Time is of the essence.
20 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract
21 Documents are of the essence to this Contract.
22 3.2 Final Acceptance.
23 The Work will be complete for Final Acceptance within 120 calendar days after the date
24 when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard
25 City Conditions of the Construction Contract for Developer Awarded Projects.
26 3.3 Liquidated damages
27 Contractor recognizes that time is of the essence of this Agreement and that Developer
28 will suffer financial loss if the Work is not completed within the times specified in
29 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of
30 the Standard City Conditions of the Construction Contract for Developer Awarded
31 Projects. The Contractor also recognizes the delays, expense and difficulties involved in
32 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not
33 completed on time. Accordingly, instead of requiring any such proof , Contractor agrees
34 that as liquidated damages for delay (but not as a penalty), Contractor shall pay
35 Developer One thousand Dollars ($1, 000.00) for each day that expires after the time
36 specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of
37 Acceptance.
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. - 1022 75
Revised June 16, 2016
00 52 43 - 2
Developer Awarded Project Agreement
Page 2 of 4
38 Article 4. CONTRACT PRICE
39 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract
40 Documents an amount in current funds of Five hundred thirty nine thousand six hundred one
41 dollars and sixty three cents. Dollars ($539,601.63).
42 Article 5. CONTRACT DOCUMENTS
43 5.1 CONTENTS:
44
A. The Contract Documents which comprise the entire agreement between Developer and
45
Contractor concerning the Work consist of the following:
46
1.
This Agreement.
47
2.
Attachments to this Agreement:
48
a. Bid Form (As provided by Developer)
49
1) Proposal Form (DAP Version)
50
2) Prequalification Statement
51
3) State and Federal documents (project specific)
52
b. Insurance ACORD Form(s)
53
c. Payment Bond (DAP Version)
54
d. Performance Bond (DAP Version)
55
e. Maintenance Bond (DAP Version)
56
f. Power of Attorney for the Bonds
57
g. Worker's Compensation Affidavit
58
h. MBE and/or SBE Commitment Form (If required)
59
3.
Standard City General Conditions of the Construction Contract for Developer
60
Awarded Projects.
61
4.
Supplementary Conditions.
62
5.
Specifications specifically made a part of the Contract Documents by attachment
63
or, if not attached, as incorporated by reference and described in the Table of
64
Contents of the Project's Contract Documents.
65
6.
Drawings.
66
7.
Addenda.
67
8.
Documentation submitted by Contractor prior to Notice of Award.
68
9.
The following which may be delivered or issued after the Effective Date of the
69
Agreement and, if issued, become an incorporated part of the Contract Documents:
70
a. Notice to Proceed.
71
b. Field Orders.
72
c. Change Orders.
73
d. Letter of Final Acceptance.
74
75
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised June 16, 2016
00 52 43 - 3
Developer Awarded Project Agreement
Page 3 of 4
76 Article 6. INDEMNIFICATION
77 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
78 expense, the city, its officers, servants and employees, from and against any and all
79 claims arising out of, or alleged to arise out of, the work and services to be performed
80 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
81 under this contract. This indemnification provision is specifically intended to operate
82 and be effective even if it is alleged or proven that all or some of the damages being
83 sought were caused, in whole or in part, by any act, omission or negligence of the city.
84 This indemnity provision is intended to include, without limitation, indemnity for
85 costs, expenses and legal fees incurred by the city in defending against such claims and
86 causes of actions.
87
88 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
89 the city, its officers, servants and employees, from and against any and all loss, damage
90 or destruction of property of the city, arising out of, or alleged to arise out of, the work
91 and services to be performed by the contractor, its officers, agents, employees,
92 subcontractors, licensees or invitees under this contract. This indemnification
93 provision is specifically intended to operate and be effective even if it is alleged or
94 proven that all or some of the damages being sought were caused, in whole or in part,
95 by anv act. omission or negligence of the citv.
96
97 Article 7. MISCELLANEOUS
98 7.1 Terms.
99 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of
100 the Construction Contract for Developer Awarded Projects.
101 7.2 Assignment of Contract.
102 This Agreement, including all of the Contract Documents may not be assigned by the
103 Contractor without the advanced express written consent of the Developer.
104 7.3 Successors and Assigns.
105 Developer and Contractor each binds itself, its partners, successors, assigns and legal
106 representatives to the other party hereto, in respect to all covenants, agreements and
107 obligations contained in the Contract Documents.
108 7.4 Severability.
109 Any provision or part of the Contract Documents held to be unconstitutional, void or
110 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
111 remaining provisions shall continue to be valid and binding upon DEVELOPER and
112 CONTRACTOR.
113 7.5 Governing Law and Venue.
114 This Agreement, including all of the Contract Documents is performable in the State of
115 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
116 Northern District of Texas, Fort Worth Division.
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.-102275
Revised June 16, 2016
00 52 43 - 4
Developer Awarded Project Agreement
Page 4 of 4
117
118 7.6 Authority to Sign.
119 Contractor shall attach evidence of authority to sign Agreement, if other than duly
120 authorized signatory of the Contractor.
121
122 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple
123 counterparts.
124
125 This Agreement is effective as of the last date signed by the Parties ("Effective Date").
126
127
Contractor:
Stabile and Winn, Inc.
(Signature)
John Stabile, President
(Printed Name)
Title: 00021 r e4:y�
Company Name: Stabile and Winn, Inc.
Address:
301 N Samson Boulevard
Developer:
CKK Residential Group. II LLC.
B lJ
9----
(Signature)
Kenneth B. Newell
(Printed Name)
Title: Managing Partner
Company name: CKK Residential Group, II LLC
Address:
PO Box 185104
Fort Worth, Texas 76179 Fort Worth, Texas 76181
City/State/Zip: City/State/Zip:
p/i 9
Date
Date
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.-102275
Revised June 16, 2016
0062 13- 1
PERFORMANCE BOND
Page 1 of 2
1 SECTION 00 6213 Bond #CA 3243283
2 PERFORMANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7
8 That we, Stabile & Winn, Inc. , known as "Principal"
9 herein and Great American Insurance Company of New York , a corporate surety(sureties, if
10 more than one) duly authorized to do business in the State of Texas, known as "Surety" herein
11 (whether one or more), are held and firmly bound unto the Developer, CKK Residential Group II,
12 LLC., authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas
13 municipal corporation ("City"), in the penal sum of,
14 Five hundred thirty nine thousand six hundred one and 63/100---- Dollars ($ 539,601.63 ),
15 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the
16 payment of which sum well and truly to be made jointly unto the Developer and the City as dual
17 obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
18 and severally, firmly by these presents.
19 WHEREAS, Developer and City have entered into an Agreement for the construction of
20 community facilities in the City of Fort Worth by and through a Community Facilities
21 Agreement, CFA Number CFA19-0137 and
22 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded
S'1' Q
23 the 31 day of Gti�%120 /, which Contract is hereby referred to and made a
24 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor
25 and other accessories defined by law, in the prosecution of the Work, including any Change
26 Orders, as provided for in said Contract designated as Lakes of River Trails East Phase 17A.
27 NOW, THEREFORE, the condition of this obligation is such that if the said Principal
28 shall faithfully perform it obligations under the Contract and shall in all respects duly and
29 faithfully perform the Work, including Change Orders, under the Contract, according to the plans,
30 specifications, and contract documents therein referred to, and as well during any period of
31 extension of the Contract that may be granted on the part of the Developer and/or City, then this
32 obligation shall be and become null and void, otherwise to remain in full force and effect.
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised January 31, 2012
006213-2
PERFORMANCE BOND
Page 2 of 2
1 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
2 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
3 Worth Division.
4 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
5 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
6 accordance with the provisions of said statue.
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
IN WITNESS WHEREOF, the Principal and the Surety have SIGNYD and SEALED
instrument by duly authorized agents and officers on this thet day of
20 40.
ATTEST:
(Principal) Secretary
Lkimeen,_
Witness as to Principal •
ewe604 //9�
Witness as to Surety
PRINCIPAL:
S & Winn Inc.
BY:
Signature
John Stabile. President _
Name and Title
Address: PO Box 79380
Saginaw: TX 76179
SURETY:
Great American Insurance Company of New York
BY: el
Signature
Tracy Tucker, Attorney -in -Fact
Name and Title
Address: P O Box 2285
Ft Worth TX 76113
Telephone Number: 817/336-8520
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract
from the by-laws showing that this person has authority to sign such obligation. If
Surety's physical address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No.-102275
Revised January 31, 2012
006214- 1
PAYMENTBOND
Page 1 of 2
1 SECTION 00 6214 Bond #CA 3243283
2 PAYMENT BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, Stabile & Winn. Inc. known as
8 "Principal" herein, and Great American Insurance Company of New York , a
9 corporate surety ( or sureties if more than one), duly authorized to do business in the State of
10 Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the
11 Developer, CKK Residential Group, H LLC., authorized to do business in Texas "(Developer"),
12 and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum
13 of Five hundred thirty nine thousand six hundred one and 63/100--- Dollars ($ 539,601.63 )
,
14 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the
15 payment of which sum well and truly be made jointly unto the Developer and the City as dual
16 obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
17 and severally, firmly by these presents:
18 WHEREAS, Developer and City have entered into an Agreement for the construction of
19 community facilities in the City of Fort Worth, by and through a Community Facilities
20 Agreement, CFA Number CFA19-0137 ;and
21 WHEREAS, Principal has entered into a certain written Contract with Developer,
22 awarded the 31 day of CCerytber 2011, which Contract is hereby
23 referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all
24 materials, equipment, labor and other accessories as defined by law, in the prosecution of the
25 Work as provided for in said Contract and designated as Lakes of River Trails East Phase 17A.
26 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if
27 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
28 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
29 the Contract, then this obligation shall be and become null and void; otherwise to remain in full
30 force and effect.
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised January 31, 2012
006214-2
PAYMENT BOND
Page 2 of 2
1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
3 accordance with the provisions of said statute.
4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED 4nd SEALED
5 is instrrum'ent by duly authorized agents and officers on this the C4 day of
6 q/IIA/L 200
7
ATTEST:
John Stabile, President
Name and Title
Address: PO Box 79380
Saginaw. TX 76179
Witness as to Principal
SURETY:
Great American Insurance Company of New York
ATTEST: BY _
lgnature
Tracy Tucker, Attorney -in -Fact
(Surety) Secretary Name and Title
Witness as to Surety
Address: P O Box 2285
Ft Worth TX 76113
Telephone Number: 817/336-8520
9 Note: If signed by an officer of the Surety, there must be on file a certified extract from the
10 bylaws showing that this person has authority to sign such obligation. If Surety's physical
11 address is different from its mailing address, both must be provided.
12
13 The date of the bond shall not be prior to the date the Contract is awarded.
14 END OF SECTION
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No.-102275
Revised January 31, 2012
1
2
3
4
5
6
7
SECTION 00 6219
MAINTENANCE BOND
006219-1
MAINTENANCE BOND
Page 1 of 3
Bond #CA 3243283
THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
8 That we, Stabile & Winn, Inc. , known as "Principal'
9 herein and Great American Insurance Company of New York a corporate surety (sureties, if
10 more than one) duly authorized to do business in the State of Texas, known as "Surety" herein
11 (whether one or more), are held and firmly bound unto the Developer, CKK Residential Group, II
12 LLC., authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas
13 municipal corporation ("City"), in the sum of Five hundred thirty nine thousand six hundred one and 63/100---
14 Dollars ($ 539,601.63 ), lawful money of the United States, to be paid in Fort
15 Worth, Tarrant County, Texas, for payment of which sum well and truly be made jointly unto the
16 Developer and the City as dual obligees and their successors, we bind ourselves, our heirs,
17 executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
18
19 WHEREAS, Developer and City have entered into an Agreement for the construction of
20 community facilities in the City of Fort Worth by and through a Community Facilities
21 Agreement, CFA Number CFA19-0137;and
22 WHEREAS the Principal has entered into a certain written contract with the Developer
23 awarded the C�j day of D eCan be r , 20 1 , which Contract is
24 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all
25 materials, equipment labor and other accessories as defined by law, in the prosecution of the
26 Work, including any Work resulting from a duly authorized Change Order (collectively herein,
27 the "Work") as provided for in said Contract and designated as Lakes of River Trails East Phase
28 17A; and
29
30 WHEREAS, Principal binds itself to use such materials and to so construct the Work in
31 accordance with the plans, specifications and Contract Documents that the Work is and will
32 remain free from defects in materials or workmanship for and during the period of two (2) years
33 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and
34
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised January 31, 2012
006219-2
MAINTENANCE BOND
Page 2 of 3
1 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part
2 upon receiving notice from the Developer and/or City of the need thereof at any time within the
3 Maintenance Period.
4
5 NOW THEREFORE, the condition of this obligation is such that if Principal shall
6 remedy any defective Work, for which timely notice was provided by Developer or City, to a
7 completion satisfactory to the City, then this obligation shall become null and void; otherwise to
8 remain in full force and effect.
9
10 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely
11 noticed defective Work, it is agreed that the Developer or City may cause any and all such
12 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne
13 by the Principal and the Surety under this Maintenance Bond; and
14
15 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
16 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
17 Worth Division; and
18
19 PROVIDED FURTHER, that this obligation shall be continuous in nature and
20 successive recoveries may be had hereon for successive breaches.
21
22
23
CITY OF FORT WORTH Lakes of River Trails East Phase 174
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No.-102275
Revised January 31, 2012
006219-3
MAINTENANCE BOND
Page 3 of 3
1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this
2 in ument by duly authorized agents and officers on this the / day of
3 ,200V
4
5
6
7
8
9
10
11 ATTEST:
12
13 J��V4Z��
14 (Principal) Secretary
15
16
17
18
19
20 Witness as to Principal
21
22
23
24
25
26
27
28
29 ATTEST:
30
31
32 (Sure Secretary 00,
33
34
A�V64��-
35 Witness as to Surety
36
John Stabile President
Name and Title
Address: PO Box 79380 _
Saginaw: TX 76179
SURETY:
Great American Insurance Company of New York
BY: _
Signatur
Tracy Tucker, Attorney -in -Fact
Name and Title
Address: P O Box 2285
Et Worth, TX 76113 ~
Telephone Number: S17/336-8520
37 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract
38 from the by-laws showing that this person has authority to sign such obligation. If
39 Surety's physical address is different from its mailing address, both must be provided.
40
41 The date of the bond shall not be prior to the date the Contract is awarded.
42
CITY OF FORT WORTH Lakes of River Trails East Phase 17,4
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No.-102275
Revised January 31, 2012
DUAL OBLIGEE RIDER
To be attached to and form a part of contract bond number CA 3243283 issued by the
Great American Insurance Company of New York on behalf of Stabile & Winn, Inc.
in the amount of Five hundred it nine thousand six hundred one and 63/100-------
------- ($539,601.63) and dated 40A. 1►GihU in favor of CKK Residential Group
II, LLC.
In consideration of the sum of One Dollar ($1.00), and other good and valuable
consideration receipt of which is hereby acknowledged, the Undersigned herby agree as
follows:
1. City of Fort Worth, Texas is hereby added to said bond as an additional
obligees.
2. The Surety shall not be liable under this bond to the Obligees, or any of them
unless the said Obligees, or any of them, shall make payments to the Principal
strictly in accordance with the terms of the said contract as to payments, and shall
perform all other obligations to be performed under said contract at the time and
in the manner therein set forth.
3. No suit, action or proceeding by reason of any default whatever shall be brought
on this bond after two (2) years and one (1) month from the day on which the
final payment under said construction contract falls due.
4. Aggregate liability of Surety hereunder to Obligees is limited to the penal sum
above stated and Surety, upon making payment hereunder, shall be subrogated to,
and shall be entitled to an assignment of all rights of the payee with respect to the
particular obligation discharged by the payment, either against principal or against
any other party liable to the payee on the discharged obligation.
Signed, sealed and dated this 01 day of 52(ItA4M 20(11).
Stabile & Winn, Inc.
Contrac r
John Stabile, President
CKK Residential Group II, LLC
Great American Insurance
Company of New York
M
Tracy Tuc r, Attorney -in -Fact
GREAT AMERICAN INSURANCE COMPANY OF NEW YORK
New York
Administrative Office: 301 E 4TH STREET a CINCINNATI, OHIO 45202 e 513-369-5000 a FAX 513-723-2740
The number of persons authorized by
this power of attorney is not more than SIX
No. 0 14893
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the GREAT AMERICAN INSURANCE COMPANY OF NEW YORK, a corporation
organized and existing under and by virtue of the laws of the State of New York, does hereby nominate, constitute and appoint the
person or persons named below its true and lawful attorney -in -fact, for it and in its name, place and stead to execute on behalf of
the said Company, as surety, any and all bonds, undertakings and contracts of suretyship, or other written obligations in the nature
thereof; provided that the liability of the said Company on any such bond, undertaking or contract of suretyship executed under this
authority shall not exceed the limit stated below.
Name Address Limit of Power
TRACY TUCKER STEVEN TUCKER ALL OF
W. LAWRENCE BROWN BENNETT BROWN FORT WORTH,
KEVIN J. DUNN ROBERTA ERB TEXAS
ALL
$100,000,000.00
This Power of Attorney revokes all previous powers issued on behalf of the attorney(s)-in-fact named above.
IN WITNESS WHEREOF, the GREAT AMERICAN INSURANCE COMPANY OF NEW YORK has caused these presents to be signed
and attested by its appropriate officers and its corporate seal hereunto affixed this 13TH day of MARCH 9 2018 .
Attest
g� O F0 Arl $�
Assistant Secretary
STATE OF OHIO, COUNTY OF HAMILTON-ss:
GREAT AMERICAN INSURANCE COMPANY OF NEW YORK
(Owde- X4.4
Divisional Senior Vice President
DAVID C. KITCHIN (877-377-2405)
On this 13TH day of MARCH , 2018 , before me personally appeared DAVID C. KITCHIN, to me known,
being duly sworn, deposes and says that he resides in Cincinnati, Ohio, that he is a Divisional Senior Vice President of the Bond
Division of Great American Insurance Company of New York, the Company described in and which executed the above instrument;
that he knows the seal; that it was so affixed by authority of his office under the By -Laws of said Company, and that he signed
his name thereto by like authority.
a4�44.uv
This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors of Great
American Insurance Company of New York by unanimous written consent dated May 14, 2009.
RESOLVED. That the Divisional President, the several Divisional Senior Vice Presidents, Divisional Vice Presidents and Divisional
Assistant Vice Presidents, or any one of them, be and hereby is authorized, from time to time, to appoint one or more Attorneys -in -Fact
to execute on behalf of the Company, as surety, any and all bonds, undertakings and contracts of suretyship, or other written obligations
in the nature thereof, • to prescribe their respective duties and the respective limits of their authority, • and to revoke any such appointment
at any time.
RESOLVED FURTHER. That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant
Secretary of the Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond,
undertaking, contract of suretyship, or other written obligation in the nature thereof, such signature and seal when so used being hereby
adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the
Company with the same force and effect as though manually affixed.
CERTIFICATION
I, STEPHEN C. BERAHA, Assistant Secretary of Great American Insurance Company of New York, do hereby certify that
the foregoing Power of Attorney and the Resolutions of the Board of Directors of May 14, 2009 have not been revoked and are
now in full force and effect.
Signed and sealed this day of
3�pOgPOgA7p � € SEAL
Assistant Secretary
S1185L (06115)
Great American Insurance Company of New York
GREATAMERICAN. Great American Alliance Insurance Company
INSURANCE GROUP Great American Insurance Company
IMPORTANT NOTICE:
To obtain information or make a complaint:
You may contact the Texas Department of Insurance to obtain information on companies,
coverages, rights or complaints at:
1-800-252-3439
You may write the Texas Department of Insurance at:
P.O. Box 149104
Austin, TX 78714-9104
FAX: 1-512-475-1771
Your notice of claim against the attached bond may be given to the surety company that
issued the bond by sending it by certified or registered mail to the following address:
Mailing Address: Great American Insurance Company
P.O. Box 2119
Cincinnati, Ohio 45202
Physical Address: Great American Insurance Company
301 E. Fourth Street
Cincinnati, Ohio 45202
You may also contact the Great American Insurance Company Claim office by:
Fax: 1-888-290-3706
Telephone: 1-513-369-5091
Email: bondclaims@gaic.com
PREMIUM OR CLAIM DISPUTES:
If you have a dispute concerning a premium, you should contact the agent first. If you
have a dispute concerning a claim, you should contact the company first. If the dispute is
not resolved, you may contact the Texas Department of Insurance.
ATTACH THIS NOTICE TO YOUR BOND:
This notice is for information only and does not become a part or condition of the attached
document.
F.9667A (3/11)
STREET LIGHTING AND ELECTRIC
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP - BID PROPOSAL
Page 5 of 7
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist Item
No.
Description
Specification
Section No.
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
UNIT V: STREET LIGHTING IMPROVEMENTS
1
2
3
4
5
3441.3301 Rdwy Ilium Foundation TY 1,2, and 4
3441.3002 Rdwy Ilium Assmbly TY 8,11,D-25, and D-30
3441.3104 150W MH PC Lighting Fixture
2605.3015 2" CONDT PVC SCH 80 (T)
3441.1409 NO 8 Insulated Elec Condr
34 41 20
34 41 20
34 41 20
26 05 33
3441 10
EA
EA
EA
LF
LF
10
10
10
1331
1331
$650.00
$1,900.00
$405 00
$8.00
$6.75
$6,500.00
$19,000.00
$4,050.00
$10,648.00
$8,984.25
TOTAL UNIT V: STREET
LIGHTING
IMPROVEMENTS
$49,182,25
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
00 42 43 Bid Proposal DAP efa
00 45 12
DAP PREQUALIFICATION STATEMENT
Page 1 of 1
SECTION 00 4512
DAP — PREQUALIFICATION STATEMENT
Each Bidder is required to complete the information below by identifying the prequalified contractors
and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work
Type" box provide the complete major work type and actual description as provided by the Water
Department for water and sewer and TPW for paving_
Major Work Type
Contractor/Subcontractor Company Name
Prequalification
Expiration Date
Street Lighting and Electric
STF Design and Build
03/15/2020
The undersigned hereby certifies that the contractors and/or subcontractors described in the table above
are currently prequalified for the work types listed.
BIDDER:
STF Design and Build BY:
2820 East Belknap Street
Fort Worth, Texas 76111
( gna
TITLE: -V-P
DATE: //2/20 2-v
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT— DEVELOPER AWARDED PROJECTS
Lights
0045 12_Prequalification Statement 2015—DAP Street
Form Version September 1, 2015
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
004526-1
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Page I of 1
SECTION 00 45 26
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it
provides worker's compensation insurance coverage for all of its employees employed on City
Project No. 102275. Contractor further certifies that, pursuant to Texas Labor Code, Section
406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with
worker's compensation coverage.
CONTRACTOR:
STY Design and Build Co. Inc By:
Company
2820 E. Belknap Street Signature:
Address
Ft Worth TX 76111 Title:
City/State/Zip
THE STATE OF TEXAS §
COUNTY OF TARRANT §
Larry Hussey
(Please Print)
BEF MEthe dersigned authority, on this day personally appeared
fro41/ u's5eknown to me to be the person whose name is
subscribed t the fore oin strument, cknpw edged to me that he/she executed the same as
the act and deed of �51 ? 3 ' d �• for the purposes and
consideration therein expressed and in the capacity therein stated. /G
Gy9V,N UNDER MY HAND AND SEAL OF OFFICE this ! d day of
20�.
1Y
� Linda G. Ellis '
' My Commission Expires Notary Public in and for the State of Texas
10t2112022
`"OF ID No. 6363838
N.'
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised April 2, 2014
Lakes of river Trails East Phase 17A
Citv Proiect No. - 1022 75
00 52 43 - 1
Developer Awarded Project Agreement
Page 1 of 4
1
SECTION 00 52 43
2 AGREEMENT
3 THIS AGREEMENT, authorized on /- of-olOcAs made by and between the Developer,
4 CKK Residential Group, II LLC., authorized to do business in Texas ("Developer"), and STF
5 Design & Build., authorized to do business in Texas, acting by and through its duly authorized
6 representative, ("Contractor").
7 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
8 follows:
9 Article 1. WORK
10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the
11 Project identified herein.
12 Article 2. PROJECT
13 The project for which the Work under the Contract Documents may be the whole or only a part is
14 generally described as follows:
15 Lakes of River Trails East Phase 17A
16 City Proiect No.—102275; X No. — X-26183; FID No. — 30114-0200431-102275-EO7685
17 File No. — W-2657
18 Article 3. CONTRACT TIME
19 3.1 Time is of the essence.
20 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract
21 Documents are of the essence to this Contract.
22 3.2 Final Acceptance.
23 The Work will be complete for Final Acceptance within 120 calendar days after the date
24 when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard
25 City Conditions of the Construction Contract for Developer Awarded Projects.
26 3.3 Liquidated damages
27
28
29
30
31
32
33
34
35
36
37
Contractor recognizes that time is of the essence of this Agreement and that Developer
will suffer financial loss if the Work is not completed within the times specified in
Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of
the Standard City Conditions of the Construction Contract for Developer Awarded
Projects. The Contractor also recognizes the delays, expense and difficulties involved in
proving in a legal proceeding the actual loss suffered by the Developer if the Work is not
completed on time. Accordingly, instead of requiring any such proof , Contractor agrees
that as liquidated damages for delay (but not as a penalty), Contractor shall pay
Developer One thousand Dollars ($1 0. 00.00) for each day that expires after the time
specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of
Acceptance.
CITY OF FORT WORTH Laker of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised June 16, 2016
00 52 43 - 2
Developer Awarded Project Agreement
Page 2 of 4
38 Article 4. CONTRACT PRICE
39 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract
40 Documents an amount in current funds of Forty nine thousand one hundred eighty two dollars
41 and twenty five cents. ($49,182.25).
42 Article 5. CONTRACT DOCUMENTS
43 5.1 CONTENTS:
44 A. The Contract Documents which comprise the entire agreement between Developer and
45 Contractor concerning the Work consist of the following:
46 1. This Agreement.
47
2. Attachments to this Agreement:
48
a.
Bid Form (As provided by Developer)
49
1) Proposal Form (DAP Version)
50
2) Prequalification Statement
51
3) State and Federal documents (project specific)
52
b.
Insurance ACORD Form(s)
53
c.
Payment Bond (DAP Version)
54
d.
Performance Bond (DAP Version)
55
e.
Maintenance Bond (DAP Version)
56
f.
Power of Attorney for the Bonds
57
g.
Worker's Compensation Affidavit
58
h.
MBE and/or SBE Commitment Form (If required)
59
3.
Standard City General Conditions of the Construction Contract for Developer
60
Awarded Projects.
61
4.
Supplementary Conditions.
62
5.
Specifications specifically made a part of the Contract Documents by attachment
63
or, if not attached, as incorporated by reference and described in the Table of
64
Contents of the Project's Contract Documents.
65
6.
Drawings.
66
7.
Addenda.
67
8.
Documentation submitted by Contractor prior to Notice of Award.
68
9.
The following which may be delivered or issued after the Effective Date of the
69
Agreement and, if issued, become an incorporated part of the Contract Documents:
70
a. Notice to Proceed.
71
b. Field Orders.
72
c. Change Orders.
73
d. Letter of Final Acceptance.
74
75
CITY OF FORT WORTH Lakes gf'River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised June 16, 2016
005243-3
Developer Awarded Project Agreement
Page 3 of 4
76 Article 6. INDEMNIFICATION
77 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
78 expense, the city, its officers, servants and employees, from and against any and all
79 claims arising out of, or alleged to arise out of, the work and services to be performed
80 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
81 under this contract. This indemnification provision is specifically intended to operate
82 and be effective even if it is alleged or proven that all or some of the damages being
83 sought were caused, in whole or in part, by any act, omission or negligence of the city.
84 This indemnity provision is intended to include, without limitation, indemnity for
85 costs, expenses and legal fees incurred by the city in defending against such claims and
86 causes of actions.
87
88 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
89 the city, its officers, servants and employees, from and against any and all loss, damage
90 or destruction of property of the city, arising out of, or alleged to arise out of, the work
91 and services to be performed by the contractor, its officers, agents, employees,
92 subcontractors, licensees or invitees under this contract. This indemnification
93 provision is specifically intended to operate and be effective even if it is alleged or
94 proven that all or some of the damages being sought were caused, in whole or in part,
95 by anv act, omission or negligence of the citv.
96
97 Article 7. MISCELLANEOUS
98 7.1 Terms.
99 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of
100 the Construction Contract for Developer Awarded Projects.
101 7.2 Assignment of Contract.
102 This Agreement, including all of the Contract Documents may not be assigned by the
103 Contractor without the advanced express written consent of the Developer.
104 7.3 Successors and Assigns.
105 Developer and Contractor each binds itself, its partners, successors, assigns and legal
106 representatives to the other party hereto, in respect to all covenants, agreements and
107 obligations contained in the Contract Documents.
108 7.4 Severability.
109 Any provision or part of the Contract Documents held to be unconstitutional, void or
110 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
ill remaining provisions shall continue to be valid and binding upon DEVELOPER and
112 CONTRACTOR.
113 7.5 Governing Law and Venue.
114 This Agreement, including all of the Contract Documents is performable in the State of
115 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
116 Northern District of Texas, Fort Worth Division.
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised June 16, 2016
00 52 43 - 4
Developer Awarded Project Agreement
Page 4 of 4
117
118 7.6 Authority to Sign.
119 Contractor shall attach evidence of authority to sign Agreement, if other than duly
120 authorized signatory of the Contractor.
121
122
123
124
125
126
127
IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple
counterparts.
This Agreement is effective as of the last date signed by the Parties ("Effective Date")
Contractor:
,5LF Ors /�� 411,0 O/J,,O
—By:
( re)
Developer:
CKK Residential Group, 77 LLC
(Sign ture)
Kenneth B. Newell
(Printed Name) (Printed Name)
Title: �/ P Title: Managing Partner
Company Name: <57-7 WAD Company name: CKK Residential Group, II LLC
Address: ,:�12,V F ,Qf.0 f'�/�P sr Address:
PO Box 185104
Fort Worth, Texas 76118
City/State/Zip: r-7-lt)0,0,1/ 7;�- &4 City/State/Zip:
//2%2���
Date
Date
� - ap - /�,
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised June 16, 2016
Bond #4432915
00 62 13 - 1
PERFORMANCE BOND
Page 1 of 2
1 SECTION 00 6213
2 PERFORMANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, STF Design & Build known as "Principal"
8 herein and SureTec Insurance Company a corporate surety(sureties, if
9 more than one) duly authorized to do business in the State of Texas, known as "Surety" herein
10 (whether one or more), are held and firmly bound unto the Developer, CKK Residential Group, H
11 LLC., authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas
12 municipal corporation ("City"), in the penal sum of,
Forty-nine Thousand, One Hundred Eighty-two and Twent Five Cents 49 182.25-----------------
13v Dollars ($ � ),
14 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the
15 payment of which sum well and truly to be made jointly unto the Developer and the City as dual
16 obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
17 and severally, firmly by these presents.
18 WHEREAS, Developer and City have entered into an Agreement for the construction of
19 community facilities in the City of Fort Worth by and through a Community Facilities
20 Agreement, CFA Number CFA19-0137; and
21 WHEREAS, the .n ipal has entered into a certain written contract with the Developer awarded
22 the day of 11
fiv,20 � , which Contract is hereby referred to and made a
23 part hereof for all purposes as if fuset forth herein, to furnish all materials, equipment labor
24 and other accessories defined by law, in the prosecution of the Work, including any Change
25 Orders, as provided for in said Contract designated as Lakes of River Trails East Phase 17A.
26 NOW, THEREFORE, the condition of this obligation is such that if the said Principal
27 shall faithfully perform it obligations under the Contract and shall in all respects duly and
28 faithfully perform the Work, including Change Orders, under the Contract, according to the plans,
29 specifications, and contract documents therein referred to, and as well during any period of
30 extension of the Contract that may be granted on the part of the Developer and/or City, then this
31 obligation shall be and become null and void, otherwise to remain in full force and effect.
CITY OF FORT WORTH Lakes ofRiver Trails East Phase 17A
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Projec•r No. - 102275
Revised January 31, 2012
006213-2
PERFORMANCE BOND
Page 2 of 2
1 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
2 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
3 Worth Division.
4 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
5 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
6 accordance with the provisions of said statue.
7 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED
8 this instrument by duly authorized agents and officers on this the � day of
0J 9 Un C ,20-Z.
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
PRINCIPAL:
STF Design & Build
BY: _
Si tur
ATTEST:
Ay'5i5:`y U
(Principal) Secretary Name and Title
Address: 2820 East Belknap Street
Fort Worth, TX 76111
Witness as to Principal
/ L,4e�__AA
Witness as to Kureo Li say Gingras
SURETY:
SureTec Insurance Company
2103 City West Blvd., Suite 1300, Ho ton, TX 77042
B Y:
Signature
Katie Rogers, Attorney -in -Fact
Name and Title
Address: 500 W. 13th St.
Fort Worth, TX 76102
Telephone Number: 800-728-2374
43 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract
44 from the by-laws showing that this person has authority to sign such obligation. If
45 Surety's physical address is different from its mailing address, both must be provided.
46
47 The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH Lakes of River Trails East Phase l7.A
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project e' w. - 102275
Revised January 31, 2012
POA #: 4221178
SureTec Insurance Company
LIMITED POWER OF ATTORNEY
Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents
make, constitute and appoint
Tracy L. Miller, William Mitchell Jennings, Katie Rogers, Lindsay Senior Gingras -
its true and lawful Attorney -in -fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge
and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for, providing the bond penalty does not exceed
Five Million and 00/100 Dollars ($5,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the CEO, sealed with the corporate seal
of the Company and duly attested by its Secretary, hereby ratifying and confirming all.that the said Attorney -in -Fact may do in the
premises. Said appointment is made under and by authority of the following resolutions of the Board of Directors of the SureTec
Insurance Company:
Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attorneys) -in -Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney -in -Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney -in -Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 20" of April,
1999)
In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its CEO, and its corporate seal to
be hereto affixed this 17th day of May , A.D. 2019 .
SVfiAN� SURETEC INS PANY
w`�r "FO By.
Wt►u z John Kno ., CE
State of Texas ss:
County of Harris ~'
On this 17th day of May , A.D. 2019 before me personally came John Knox Jr., to me known, who, being by me duly sworn, did depose and say,
that he resides in Houston, Texas, that he is CEO of SURETEC INSURANCE COMPANY, the company described in and which executed the above
instrument; that he knows the seal of said Company; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the
Board of Directors of said Company; and that he signed his name thereto by like order.
�iirirrr�
.{h,�YPUe�4 JACOUELYN GREENLEAF
Notary Public, State of Texas
Comm. Expires 05-18-2021
Or ID 126903029
Jacq elyn Greenleaf, Notary Public
My commission expires May 18, 2021
I, M. Brent Beaty, Assistant Secretary of SURETEC INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney, executed by said Company, which is still in full force and effect; and furthermore, the resolutions of the Board of Directors, set
out in the Power of Attorney are in full force and effect.
'l
Given under my hand and the seal of said Company at Houston, Texas this 15Y day of /IUCL� _, _11)Q010 , A.D.
. Brent Beaty, A`Xistant SecVetary
Any instrument issued in excess of the penalty stated.above is totally void and without any validity.
For verification of the authority of this power you may'call (713) 812-0800 any business day between 8:30 am and 5:00 pm CST.
Bond #4432915
006214-1
PAYMENT BOND
Page 1 of 2
1 SECTION 00 6214
2 PAYMENT BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, STF Design & Build known as
8 "Principal' herein, and SureTec Insurance Company
,a
9 corporate surety ( or sureties if more than one), duly authorized to do business in the State of
10 Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the
11 Developer, CKK Residential Group, H LLC., authorized to do business in Texas "(Developer"),
12 and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum
13 Of Forty-nine Thousand, One Hundred Eighty-two and Twenty Five Cents Dollars ($ 49, 1 82.25----------------- )
e
14 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the
15 payment of which sum well and truly be made jointly unto the Developer and the City as dual
16 obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
17 and severally, firmly by these presents:
18 WHEREAS, Developer and City have entered into an Agreement for the construction of
19 community facilities in the City of Fort Worth, by and through a Community Facilities
20 Agreement, CFA Number CFA19-0137;and
21 WHEREAS, PrincipankyWW-,-q,
entered into a certain written Contract with Developer,
22 awarded the day oft20 � , which Contract is hereby
23 referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all
24 materials, equipment, labor and other accessories as defined by law, in the prosecution of the
25 Work as provided for in said Contract and designated as Lakes of River Trails East Phase 17A.
26 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if
27 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
28 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
29 the Contract, then this obligation shall be and become null and void; otherwise to remain in full
30 force and effect.
CITY OF FORT WORTH Crakes of River Trails Fast Phase 17.4
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Cier Projeci A6p. - 102275
Revised January 31, 2012
006214-2
PAYMENTBOND
Page 2 of 2
This bond is made and executed in compliance with the provisions of Chapter 2253 of the
2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
3 accordance with the provisions of said statute.
4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED
5 thissii strument by duly authorized agents and officers on this the 5-4h day of
6 �J (�►��ll��l , 20
7
8
9
10
11
12
13
14
PRINCIPAL:
STF Design & Build
ATTEST: BY:
Signatu
(Principal) Secretary Name and Title
Address: 2820 East Belknap Street
Fort Worth, TX 76111
Witness as to Principal
ATTEST:
see attached power of attorney
(Surety) Secretary
Z111A A4 , A1,411'
Witness as to Surfn a ingras
SURETY:
SureTec Insurance Comaanv
2103 Cit West Blvd., Suite 1300, Houston, TX 77042
BY: M,
Signature
Katie Rogers, Attorney -in -Fact
Name and Title
Address: 500 W. 13th St.
Fort Worth, TX 76102
Telephone Number: 800-728-2374
Note: If signed by an officer of the Surety, there must be on file a certified extract from the
bylaws showing that this person has authority to sign such obligation. If Surety's physical
address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
END OF SECTION
CITY OF FORT WORTH Lakes oj" Rirer Trails East Prase 17 i
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Cin- Project No. - 102275
Revised January 31, 2012
POA #: 4221178
SureTec Insurance Company
LIMITED POWER OF ATTORNEY
Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents
make, constitute and appoint
Tracy L. Miller, William Mitchell Jennings, Katie Rogers, Lindsay Senior Gingras
its true and lawful Attorney -in -fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge
and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for, providing the bond penalty does not exceed
Five Million and 00/100 Dollars ($5,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the CEO, sealed with the corporate seal
of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney -in -Fact may do in the
premises. Said appointment is made under and by authority of the following resolutions of the Board of Directors of the SureTec
Insurance Company:
Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney -in -Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney -in -Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 201" of April,
1999.)
In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its CEO, and its corporate seal to
be hereto affixed this 17th day of May , A.D. 2019 .
I111101111 ,% SURETEC INS7
PANY
SORANp�
w w X qoD By. ' John Kno , CE
dr
State of Texas ss: ��
County of Harris .........
On this 17th day of May , A.D. 2019 before me personally came John Knox Jr., to me known, who, being by me duly sworn, did depose and say,
that he resides in. Houston, Texas, that he is CEO of SURETEC INSURANCE COMPANY, the company described in and which executed the above
instrument; that he knows the seal of said Company; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the
Board of Directors of said Company; and that he signed his name thereto by like order.
JACOUELYN GREENLEAF
a` tlotary Public, State of Texas
I ^'.•'e- Comm. Expires05-18-2021
d( tn°riN4` Notary ID 126903029
,-AMN7_
Jacq elyn Greenleaf, Notary Public
My commission expires May 18, 2021
I, M. Brent Beaty, Assistant Secretary of SURETEC INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney, executed by said Company, which is still in full force and effect; and furthermore, the resolutions of the Board of Directors, set
out in the Power of Attorney are in full force and effect.
Given under my hand and the seal of said Company at Houston;. Teims this _ day of ti i� 14a r OZO a0 ; A.D.
. Bre'd Beaty, A %stint Sedietary
Any instrument issued in excess of the penalty stated above is tot -illy void and without any validity.
For verification of the authority of this power you may call (713) 81:2-01!100 any business day between 8:30 am and 5:00 pm CST.
Bond #4432915
006219-1
MAINTENANCE BOND
Page 1 of 3
1 SECTION 00 6219
2 MAINTENANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7
8 That we, STF Design & Build , known as "Principal"
9 herein and SureTec Insurance Company a corporate surety (sureties, if
10 more than one) duly authorized to do business in the State of Texas, known as "Surety" herein
11 (whether one or more), are held and firmly bound unto the Developer, CKK Residential Group, H
12 LLC., authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas
13 municipal corporation ("City"), in the Sum of Forty-nine Thousand, One Hundred Eighty-two and Twenty Five Cents
14 Dollars ($ 49,182.25 ----------------- ), lawful money of the United States, to be paid in Fort
15 Worth, Tarrant County, Texas, for payment of which sum well and truly be made jointly unto the
16 Developer and the City as dual obligees and their successors, we bind ourselves, our heirs,
17 executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
18
19 WHEREAS, Developer and City have entered into an Agreement for the construction of
20 community facilities in the City of Fort Worth by and through a Community Facilities
21 Agreement, CFA Number CFA19-0137; and
22 WHEREAV the Pri p 1 has entered into a certain written contract with the Developer
23 awarded the day of Lk4, 20 10, which Contract is
24 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all
25 materials, equipment labor and other accessories as defined by law, in the prosecution of the
26 Work, including any Work resulting from a duly authorized Change Order (collectively herein,
27 the "Work") as provided for in said Contract and designated as Lakes of Rimer Trails East Phase
28 17A; and
29
30 WHEREAS, Principal binds itself to use such materials and to so construct the Work in
31 accordance with the plans, specifications and Contract Documents that the Work is and will
32 remain free from defects in materials or workmanship for and during the period of two (2) years
33 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and
34
CITY OF FORT WORTH Lakes gj'River Trails East Phase 17A
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS City Project aX"a. - 102-175
Revised January 31, 2012
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
006219-2
MAINTENANCE BOND
Page 2 of 3
WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part
upon receiving notice from the Developer and/or City of the need thereof at any time within the ..
Maintenance Period.
NOW THEREFORE, the condition of this obligation is such that if Principal shall
remedy any defective Work, for which timely notice was provided by Developer or City, to a
completion satisfactory to the City, then this obligation shall become null and void; otherwise to
remain in full force and effect.
PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely
noticed defective Work, it is agreed that the Developer or City may cause any and all such
defective Work to be repaired and/or reconstructed with all associated costs thereof being borne
by the Principal and the Surety under this Maintenance Bond; and
PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
Worth Division; and
PROVIDED FURTHER, that this obligation shall be continuous in nature and
successive recoveries may be had hereon for successive breaches.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised January 31, 2012
Lakes (if River Trails East Please L?.A
City Project e,Ve. - 102275
006219-3
MAINTENANCE BOND
Page 3 of 3
1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this
2 instrument by duly authorized agents and officers on this the day of
3 20_-D.
4
5
6
7
8
9
10
11 ATTEST:
12
13
14 (Principal) Secretary
15
16
17
18
19
20 Witness as to Principal
21
22
23
24
25
26
27
28
29 ATTEST:
30
31 see attached power of attorney
32 (Suret ) Secre y
33
34
35 Witness as to Surety Li say gras
36
37 *Note
38
39
40
41
42
PRINCIPAL:
STF Design & Build
BY:
Sig ur
Z,1� /7 12 -�s f Z
Name and Title
Address: 2820 East Belknap Street
Fort Worth, TX 76111
SURETY: -
SureTec Insurance Company_
2103 Citywest Blvd., Suite 1300, Houston, Tx 77042
BY:
Signature
Katie Rogers, Attorney -in -Fact
Name and Title
Address: 500 W. 13th St.
Fort Worth, TX 76102
Telephone Number: 800-728-2374
If signed by an officer of the Surety Company, there must be on file a certified extract
from the by-laws showing that this person has authority to sign such obligation. If
Surety's physical address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS ChY Project N 'tk - 102275
Revised January 31, 2012
POA if: 4221178
SureTec Insurance Company.
LIMITED ]POWER OF ATTORNEY
Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston; Harris County, Texas, does by these presents
make, constitute and appoint
Tracy L. Miller, William Mitchell Jennings, Katie Rogers, Lindsay Senior Gingras
its true and lawful Attorney -in -fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge
and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for, providing the bond penalty does not exceed
Five Million and 00/100 Dollars ($5,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the CEO, sealed with the corporate seal
of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney -in -Fact may do in the
premises. Said appointment is made under and by authority of the following resolutions of the Board of Directors of the SureTec
Insurance Company:
Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney -in -Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney -in -Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 20'* of April,
1999.)
In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its CEO, and its corporate seal to
be hereto affixed this firth day of May A.D. 2019 .
SURETEC INS PANY
SVRANC�*+q
\� C�
By:
w w M John Kno , CE
State of Texas ss: 7` d
County of Harris s' •••-•"'
On this 17th day of May , A.D. 2019 before me personally came John Knox Jr., to me known, who, being by me duly sworn, did depose and say,
that he resides in Houston, Texas, that he is CEO of SURETEC INSURANCE COMPANY, the company described in and which executed the above
instrument; that he knows the seal of said Company; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the
Board of Directors of said Company; and that he signed his name thereto by like order.
P�/ JACOUELYN GREENLEAF
b /i
F Notary Public, State of Texas
Comm. Expires 05-18-2021
�'i ''�;,p„����` Notary ID 126903029
MOE
Jacq elyn Greenleaf, Notary Public
My commission expires May 18 2021
I, M. Brent Beaty, Assistant Secretary of SURETEC INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney, executed by said Company, which is still in full force and effect; and furthermore, the resolutions of the hoard of Directors, set
out in the Power of Attorney are in full force and effect.
Given under my hand and the seal of said Company at Houston, Texas this r"_ day of�p a t% A.D.
. Brenf Beaty, A`>1Sristant SeeVetary
Any instrument issued in excess of the penalty stated above is totally void and wiincut ptny validity.
For verification of the authority of this power you may call (713) 812-0800 any business day between 8:30 am and.5:00,:pm C�T.
SureTec Insurance Company
IMPORTANT NOTICE
Statutory Complaint Notice/Filing of Claims
To obtain information or make a complaint: You may call the Surety's toll free telephone number for information or to make
a complaint or file a claim at: 1-866-732-0099. You may also write to the Surety at:
SureTec Insurance Company
9737 Great Hills Trail, Suite 320
Austin, TX 78759
You may contact the Texas Department of Insurance to obtain information on companies, coverage, rights or complaints
at 1-800-252- 3439. You may write the Texas Department of Insurance at:
PO Box 149104
Austin, TX 78714-9104
Fax#: 512-490-1007
Web: http://www.tdi.texas.gov
Email: ConsumerProtection@tdi.texas.gov
PREMIUM OR CLAIMS DISPUTES: Should you have a dispute concerning your premium or about a claim, you should
contact the Surety first. If the dispute is not resolved, you may contact the Texas Department of Insurance.
Texas Rider 8/2019
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
67$1'$5'&,7<&21',7,216
2)7+(&216758&7,21&2175$&7
)25'(9(/23(5$:$5'('352-(&76
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
67$1'$5'&,7<&21',7,2162)7+(
&216758&7,21&2175$&7
)25'(9(/23(5$:$5'('352-(&76
7$%/(2)&217(176
3DJH
$UWLFOH±'HILQLWLRQVDQG7HUPLQRORJ\
'HILQHG7HUPV
7HUPLQRORJ\
$UWLFOH±3UHOLPLQDU\0DWWHUV
%HIRUH6WDUWLQJ&RQVWUXFWLRQ
3UHFRQVWUXFWLRQ&RQIHUHQFH
3XEOLF0HHWLQJ
$UWLFOH±&RQWUDFW'RFXPHQWVDQG$PHQGLQJ
5HIHUHQFH6WDQGDUGV
$PHQGLQJDQG6XSSOHPHQWLQJ&RQWUDFW'RFXPHQWV
$UWLFOH±%RQGVDQG,QVXUDQFH
/LFHQVHG6XUHWLHVDQG,QVXUHUV
3HUIRUPDQFH3D\PHQWDQG0DLQWHQDQFH%RQGV
&HUWLILFDWHVRI,QVXUDQFH
&RQWUDFWRU¶V,QVXUDQFH
$FFHSWDQFHRI%RQGVDQG,QVXUDQFH2SWLRQWR5HSODFH
$UWLFOH±&RQWUDFWRU¶V5HVSRQVLELOLWLHV
6XSHUYLVLRQDQG6XSHULQWHQGHQW
/DERU:RUNLQJ+RXUV
6HUYLFHV0DWHULDOVDQG(TXLSPHQW
3URMHFW6FKHGXOH
6XEVWLWXWHVDQG³2U(TXDOV´
3UH4XDOLILFDWLRQRI%LGGHUV3ULPH&RQWUDFWRUVDQG6XEFRQWUDFWRUV
&RQFHUQLQJ6XEFRQWUDFWRUV6XSSOLHUVDQG2WKHUV
:DJH5DWHV
3DWHQW)HHVDQG5R\DOWLHV
/DZVDQG5HJXODWLRQV
8VHRI6LWHDQG2WKHU$UHDV
5HFRUG'RFXPHQWV
6DIHW\DQG3URWHFWLRQ
6DIHW\5HSUHVHQWDWLYH
+D]DUG&RPPXQLFDWLRQ3URJUDPV
6XEPLWWDOV
&RQWUDFWRU¶V*HQHUDO:DUUDQW\DQG*XDUDQWHH
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
,QGHPQLILFDWLRQ
'HOHJDWLRQRI3URIHVVLRQDO'HVLJQ6HUYLFHV
5LJKWWR$XGLW
1RQGLVFULPLQDWLRQ
$UWLFOH±2WKHU:RUNDWWKH6LWH
5HODWHG:RUNDW6LWH
$UWLFOH±&LW\¶V5HVSRQVLELOLWLHV
,QVSHFWLRQV7HVWVDQG$SSURYDOV
/LPLWDWLRQVRQ&LW\¶V5HVSRQVLELOLWLHV
&RPSOLDQFHZLWK6DIHW\3URJUDP
$UWLFOH±&LW\¶V2EVHUYDWLRQ6WDWXV'XULQJ&RQVWUXFWLRQ
&LW\¶V3URMHFW5HSUHVHQWDWLYH
$XWKRUL]HG9DULDWLRQVLQ:RUN
5HMHFWLQJ'HIHFWLYH:RUN
'HWHUPLQDWLRQVIRU:RUN3HUIRUPHG
$UWLFOH±&KDQJHVLQWKH:RUN
$XWKRUL]HG&KDQJHVLQWKH:RUN
1RWLILFDWLRQWR6XUHW\
$UWLFOH±&KDQJHRI&RQWUDFW3ULFH&KDQJHRI&RQWUDFW7LPH
&KDQJHRI&RQWUDFW3ULFH
&KDQJHRI&RQWUDFW7LPH
'HOD\V
$UWLFOH±7HVWVDQG,QVSHFWLRQV&RUUHFWLRQ5HPRYDORU$FFHSWDQFHRI'HIHFWLYH:RUN
1RWLFHRI'HIHFWV
$FFHVVWR:RUN
7HVWVDQG,QVSHFWLRQV
8QFRYHULQJ:RUN
&LW\0D\6WRSWKH:RUN
&RUUHFWLRQRU5HPRYDORI'HIHFWLYH:RUN
&RUUHFWLRQ3HULRG
&LW\0D\&RUUHFW'HIHFWLYH:RUN
$UWLFOH±&RPSOHWLRQ
&RQWUDFWRU¶V:DUUDQW\RI7LWOH
3DUWLDO8WLOL]DWLRQ
)LQDO,QVSHFWLRQ
)LQDO$FFHSWDQFH
$UWLFOH±6XVSHQVLRQRI:RUN
&LW\0D\6XVSHQG:RUN
$UWLFOH±0LVFHOODQHRXV
*LYLQJ1RWLFH
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
&RPSXWDWLRQRI7LPHV
&XPXODWLYH5HPHGLHV
6XUYLYDORI2EOLJDWLRQV
+HDGLQJV
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
$57,&/(±'(),1,7,216$1'7(50,12/2*<
Defined Terms
$ :KHUHYHUXVHGLQWKHVH*HQHUDO&RQGLWLRQVRULQRWKHU&RQWUDFW'RFXPHQWVWKHWHUPVOLVWHG
EHORZKDYHWKHPHDQLQJVLQGLFDWHGZKLFKDUHDSSOLFDEOHWRERWKWKHVLQJXODUDQGSOXUDOWKHUHRI
DQGZRUGVGHQRWLQJJHQGHUVKDOOLQFOXGHWKHPDVFXOLQHIHPLQLQHDQGQHXWHU6DLGWHUPVDUH
JHQHUDOO\FDSLWDOL]HGRUZULWWHQLQLWDOLFVEXWQRWDOZD\V:KHQXVHGLQDFRQWH[WFRQVLVWHQWZLWK
WKHGHILQLWLRQRIDOLVWHGGHILQHGWHUPWKHWHUPVKDOOKDYHDPHDQLQJDVGHILQHGEHORZZKHWKHU
FDSLWDOL]HGRULWDOLFL]HGRURWKHUZLVH,QDGGLWLRQWRWHUPVVSHFLILFDOO\GHILQHGWHUPVZLWKLQLWLDO
FDSLWDOOHWWHUVLQWKH&RQWUDFW'RFXPHQWVLQFOXGHUHIHUHQFHVWRLGHQWLILHGDUWLFOHVDQGSDUDJUDSKV
DQGWKHWLWOHVRIRWKHUGRFXPHQWVRUIRUPV
Agreement - 7KHZULWWHQLQVWUXPHQWZKLFKLVHYLGHQFHRIWKHDJUHHPHQWEHWZHHQ'HYHORSHU
DQG&RQWUDFWRUFRYHULQJWKH:RUN
Asbestos—$Q\PDWHULDOWKDWFRQWDLQVPRUHWKDQRQHSHUFHQWDVEHVWRVDQGLVIULDEOHRULV
UHOHDVLQJDVEHVWRVILEHUVLQWRWKHDLUDERYHFXUUHQWDFWLRQOHYHOVHVWDEOLVKHGE\WKH8QLWHG
6WDWHV2FFXSDWLRQDO6DIHW\DQG+HDOWK$GPLQLVWUDWLRQ
Business Day –$EXVLQHVVGD\LVGHILQHGDVDGD\WKDWWKH&LW\FRQGXFWVQRUPDOEXVLQHVV
JHQHUDOO\0RQGD\WKURXJK)ULGD\H[FHSWIRUIHGHUDORUVWDWHKROLGD\VREVHUYHGE\WKH&LW\
Buzzsaw±&LW\¶VRQOLQHHOHFWURQLFGRFXPHQWPDQDJHPHQWDQGFROODERUDWLRQV\VWHP
Calendar Day±$GD\FRQVLVWLQJRIKRXUVPHDVXUHGIURPPLGQLJKWWRWKHQH[WPLGQLJKW
City— The City of Fort Worth, Texas, a Texas home-rule municipal corporation, acting by,
its governing body through its City Manager, his designee, or agents authorized pursuant to
its duly authorized charter on his behalf.
Community Facilities Agreement (CFA) -–A Contract between the Developer and the City
for the Construction of one or more following public facilities within the City public right-of-
way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs.
A CFA may include private facilities within the right-of-way dedicated as private right-of-
way or easement on a recorded plat.
Contract—The entire and integrated written document incorporating the Contract
Documents between the Developer, Contractor, and/or City concerning the Work. The
Contract supersedes prior negotiations, representations, or agreements, whether written or
oral.
Contract Documents—Those items that make up the contract and which must include the
Agreement, and it’s attachments such as standard construction specifications, standard City
Conditions, other general conditions of the Developer, including:
D $Q$JUHHPHQW
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
E $WWDFKPHQWVWRWKH$JUHHPHQW
L %LG)RUP
LL 9HQGRU&RPSOLDQFHZLWK6WDWH/DZ1RQ5HVLGHQW%LGGHU
LLL 3UHTXDOLILFDWLRQ6WDWHPHQW
F &XUUHQW3UHYDLOLQJ:DJH5DWHV7DEOHLIUHTXLUHGE\&LW\
G ,QVXUDQFH$FFRUG)RUP
H 3D\PHQW%RQG
I 3HUIRUPDQFH%RQG
J 0DLQWHQDQFH%RQG
K 3RZHURI$WWRUQH\IRU%RQGV
L :RUNHUV&RPSHQVDWLRQ$IILGDYLW
M 0:%(&RPPLWPHQW)RUP,IUHTXLUHGE\&LW\
N *HQHUDO&RQGLWLRQV
O 6XSSOHPHQWDU\&RQGLWLRQV
P 7KH6WDQGDUG&LW\&RQGLWLRQV
Q 6SHFLILFDWLRQVVSHFLILFDOO\PDGHSDUWRIWKH&RQWUDFW'RFXPHQWVE\DWWDFKPHQWLI
QRWDWWDFKHGDVLQFRUSRUDWHGE\UHIHUHQFHDQGGHVFULEHGLQWKH7DEOHRI&RQWHQWVRI
WKH3URMHFW¶V&RQWUDFW'RFXPHQWV
R 'UDZLQJV
S 'RFXPHQWDWLRQVXEPLWWHGE\FRQWUDFWRUSULRUWR1RWLFHRI$ZDUG
T 7KH IROORZLQJ ZKLFK PD\ EH GHOLYHUHG RU LVVXHG DIWHU WKH HIIHFWLYH GDWH LI WKH
$JUHHPHQWDQGLILVVXHGEHFRPHDQLQFRUSRUDWHGSDUWRIWKH&RQWUDFW'RFXPHQWV
L 1RWLFHWR3URFHHG
LL )LHOG2UGHUV
LLL &KDQJH2UGHUV
LY /HWWHUVRI)LQDO$FFHSWDQFH
U $SSURYHG6XEPLWWDOVRWKHU&RQWUDFWRUVXEPLWWDOVDQGWKHUHSRUWVDQGGUDZLQJVRI
VXEVXUIDFHDQGSK\VLFDOFRQGLWLRQVDUHQRW&RQWUDFW'RFXPHQWV
Contractor—The individual or entity with whom Developer has entered into the Agreement.
Day or day – A day, unless otherwise defined, shall mean a Calendar Day.
Developer – An individual or entity that desires to make certain improvements within the
City of Fort Worth
Drawings—That part of the Contract Documents prepared or approved by Engineer which
graphically shows the scope, extent, and character of the Work to be performed by
Contractor. Submittals are not Drawings as so defined.
Engineer—The licensed professional engineer or engineering firm registered in the State of
Texas performing professional services for the Developer.
Final Acceptance – The written notice given by the City to the Developer and/or Contractor
that the Work specified in the Contract Documents has been completed to the satisfaction of
the City.
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
Final Inspection – Inspection carried out by the City to verify that the Contractor has
completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in
conformance with the Contract Documents.
General Requirements—A part of the Contract Documents between the Developer and a
Contractor.
Laws and Regulations—Any and all applicable laws, rules, regulations, ordinances, codes,
and orders of any and all governmental bodies, agencies, authorities, and courts having
jurisdiction.
Liens—Charges, security interests, or encumbrances upon Project funds, real property, or
personal property.
Milestone—A principal event specified in the Contract Documents relating to an
intermediate Contract Time prior to Final Acceptance of the Work.
Non-Participating Change Order—A document, which is prepared for and reviewed by the
City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on
or after the Effective Date of the Agreement.
Participating Change Order—A document, which is prepared for and approved by the City,
which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on
or after the Effective Date of the Agreement.
Plans – See definition of Drawings.
Project Schedule—A schedule, prepared and maintained by Contractor, in accordance with
the General Requirements, describing the sequence and duration of the activities comprising
the Contractor’s plan to accomplish the Work within the Contract Time.
Project—The Work to be performed under the Contract Documents.
Project Representative—The authorized representative of the City who will be assigned to
the Site.
Public Meeting – An announced meeting conducted by the Developer to facilitate public
participation and to assist the public in gaining an informed view of the Project.
Regular Working Hours – Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday
thru Friday (excluding legal holidays).
Samples—Physical examples of materials, equipment, or workmanship that are
representative of some portion of the Work and which establish the standards by which such
portion of the Work will be judged.
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required
submittals and the time requirements to support scheduled performance of related
construction activities.
Site—Lands or areas indicated in the Contract Documents as being furnished by City or
Developer upon which the Work is to be performed, including rights-of-way, permits, and
easements for access thereto, and such other lands furnished by City or Developer which are
designated for the use of Contractor.
Specifications—That part of the Contract Documents consisting of written requirements for
materials, equipment, systems, standards and workmanship as applied to the Work, and
certain administrative requirements and procedural matters applicable thereto.
Specifications may be specifically made a part of the Contract Documents by attachment or,
if not attached, may be incorporated by reference as indicated in the Table of Contents
(Division 00 00 00) of each Project.
Standard City Conditions – That part of the Contract Documents setting forth requirements
of the City.
Subcontractor—An individual or entity having a direct contract with Contractor or with any
other Subcontractor for the performance of a part of the Work at the Site.
Submittals—All drawings, diagrams, illustrations, schedules, and other data or information
which are specifically prepared or assembled by or for Contractor and submitted by
Contractor to illustrate some portion of the Work.
Superintendent – The representative of the Contractor who is available at all times and able
to receive instructions from the City and/or Developer and to act for the Contractor.
Supplementary Conditions—That part of the Contract Documents which amends or
supplements the General Conditions.
Supplier—A manufacturer, fabricator, supplier, distributor, materialman, or vendor having
a direct contract with Contractor or with any Subcontractor to furnish materials or
equipment to be incorporated in the Work by Contractor or Subcontractor.
Underground Facilities—All underground pipelines, conduits, ducts, cables, wires,
manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any
encasements containing such facilities, including but not limited to, those that convey
electricity, gases, steam, liquid petroleum products, telephone or other communications,
cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or
other control systems.
Weekend Working Hours – Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday,
Sunday or legal holiday, as approved in advance by the City.
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
Work—The entire construction or the various separately identifiable parts thereof required
to be provided under the Contract Documents. Work includes and is the result of performing
or providing all labor, services, and documentation necessary to produce such construction
including any Participating Change Order, Non-Participating Change Order, or Field
Order, and furnishing, installing, and incorporating all materials and equipment into such
construction, all as required by the Contract Documents.
Working Day – A working day is defined as a day, not including Saturdays, Sundays, or
legal holidays authorized by the City for contract purposes, in which weather or other
conditions not under the control of the Contractor will permit the performance of the
principal unit of work underway for a continuous period of not less than 7 hours between 7
a.m. and 6 p.m.
Terminology
$ 7KHZRUGVDQGWHUPVGLVFXVVHGLQ3DUDJUDSK%WKURXJK'DUHQRWGHILQHGEXWZKHQXVHGLQ
WKH%LGGLQJ5HTXLUHPHQWVRU&RQWUDFW'RFXPHQWVKDYHWKHLQGLFDWHGPHDQLQJ
%Defective:
7KH ZRUG ³GHIHFWLYH´ ZKHQ PRGLI\LQJ WKH ZRUG ³:RUN´ UHIHUVWR :RUN WKDW LV
XQVDWLVIDFWRU\IDXOW\RUGHILFLHQWLQWKDWLW
D GRHVQRWFRQIRUPWRWKH&RQWUDFW'RFXPHQWVRU
E GRHVQRWPHHWWKHUHTXLUHPHQWVRIDQ\DSSOLFDEOHLQVSHFWLRQUHIHUHQFHVWDQGDUGWHVWRU
DSSURYDOUHIHUUHGWRLQWKH&RQWUDFW'RFXPHQWVRU
F KDVEHHQGDPDJHGSULRUWR&LW\¶VZULWWHQDFFHSWDQFH
&Furnish, Install, Perform, Provide:
7KHZRUG³)XUQLVK´RUWKHZRUG³,QVWDOO´RUWKHZRUG³3HUIRUP´RUWKHZRUG³3URYLGH´RU
WKHZRUG³6XSSO\´RUDQ\FRPELQDWLRQRUVLPLODUGLUHFWLYHRUXVDJHWKHUHRIVKDOOPHDQ
IXUQLVKLQJDQGLQFRUSRUDWLQJLQWKH:RUNLQFOXGLQJDOOQHFHVVDU\ODERUPDWHULDOVHTXLSPHQW
DQGHYHU\WKLQJQHFHVVDU\WRSHUIRUPWKH:RUNLQGLFDWHGXQOHVVVSHFLILFDOO\OLPLWHGLQWKH
FRQWH[WXVHG
' 8QOHVVVWDWHGRWKHUZLVHLQWKH&RQWUDFW'RFXPHQWVZRUGVRUSKUDVHVWKDWKDYHDZHOONQRZQ
WHFKQLFDO RU FRQVWUXFWLRQ LQGXVWU\ RU WUDGH PHDQLQJ DUH XVHG LQ WKH &RQWUDFW 'RFXPHQWV LQ
DFFRUGDQFHZLWKVXFKUHFRJQL]HGPHDQLQJ
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
$57,&/(±35(/,0,1$5<0$77(56
Before Starting Construction
Baseline Schedules: 6XEPLWWR&LW\LQDFFRUGDQFHZLWKWKH&RQWUDFW'RFXPHQWVDQGSULRUWRVWDUWLQJ
WKH:RUN1HZVFKHGXOHVZLOOEHVXEPLWWHGWR&LW\ZKHQ3DUWLFLSDWLQJ&KDQJH2UGHUVRU1RQ
3DUWLFLSDWLQJ&KDQJH2UGHUVRFFXU
Preconstruction Conference
%HIRUHDQ\:RUNDWWKH6LWHLVVWDUWHGWKH&RQWUDFWRUVKDOODWWHQGD3UHFRQVWUXFWLRQ&RQIHUHQFHDV
VSHFLILHGLQWKH&RQWUDFW'RFXPHQWV
Public Meeting
&RQWUDFWRUPD\QRWPRELOL]HDQ\HTXLSPHQWPDWHULDOVRUUHVRXUFHVWRWKH6LWHSULRUWR&RQWUDFWRU
DWWHQGLQJWKH3XEOLF0HHWLQJDVVFKHGXOHGE\WKH&LW\
$57,&/(±&2175$&7'2&80(176$1'$0(1',1*
Reference Standards
$ 6WDQGDUGV6SHFLILFDWLRQV&RGHV/DZVDQG5HJXODWLRQV
5HIHUHQFH WR VWDQGDUGV VSHFLILFDWLRQV PDQXDOV RU FRGHV RIDQ\ WHFKQLFDO VRFLHW\
RUJDQL]DWLRQRUDVVRFLDWLRQRUWR/DZVRU5HJXODWLRQVZKHWKHUVXFKUHIHUHQFHEHVSHFLILFRU
E\LPSOLFDWLRQVKDOOPHDQWKHVWDQGDUGVSHFLILFDWLRQPDQXDOFRGHRU/DZVRU5HJXODWLRQV
LQHIIHFWDWWKHWLPHRIRSHQLQJRI%LGVRURQWKH(IIHFWLYH'DWHRIWKH$JUHHPHQWLIWKHUH
ZHUHQR%LGVH[FHSWDVPD\EHRWKHUZLVHVSHFLILFDOO\VWDWHGLQWKH&RQWUDFW'RFXPHQWV
1R SURYLVLRQ RU LQVWUXFWLRQ VKDOO EH HIIHFWLYH WR DVVLJQ WR &LW\ RU DQ\ RI LWV RIILFHUV
GLUHFWRUVPHPEHUVSDUWQHUVHPSOR\HHVDJHQWVFRQVXOWDQWVRUVXEFRQWUDFWRUVDQ\GXW\RU
DXWKRULW\WRVXSHUYLVHRUGLUHFWWKHSHUIRUPDQFHRIWKH:RUNRUDQ\GXW\RUDXWKRULW\WR
XQGHUWDNHUHVSRQVLELOLW\LQFRQVLVWHQWZLWKWKHSURYLVLRQVRIWKH&RQWUDFW'RFXPHQWV
Amending and Supplementing Contract Documents
$ 7KH&RQWUDFW'RFXPHQWVPD\EHDPHQGHGWRSURYLGHIRUDGGLWLRQVGHOHWLRQVDQGUHYLVLRQVLQ
WKH:RUNRUWRPRGLI\WKHWHUPVDQGFRQGLWLRQVWKHUHRIE\D3DUWLFLSDWLQJ&KDQJH2UGHURUD
1RQ3DUWLFLSDWLQJ&KDQJH2UGHU
% 7KHUHTXLUHPHQWVRIWKH&RQWUDFW'RFXPHQWVPD\EHVXSSOHPHQWHGDQGPLQRUYDULDWLRQVDQG
GHYLDWLRQVLQWKH:RUNQRWLQYROYLQJDFKDQJHLQ&RQWUDFW3ULFHRU&RQWUDFW7LPHPD\EH
DXWKRUL]HGE\RQHRUPRUHRIWKHIROORZLQJZD\V
$)LHOG2UGHU
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
&LW\¶VRU(QJLQHHU¶VUHYLHZRID6XEPLWWDOVXEMHFWWRWKHSURYLVLRQVRI3DUDJUDSK&RU
&LW\¶VZULWWHQLQWHUSUHWDWLRQRUFODULILFDWLRQ
$57,&/(±%21'6$1',1685$1&(
Licensed Sureties and Insurers
$OOERQGVDQGLQVXUDQFHUHTXLUHGE\WKH&RQWUDFW'RFXPHQWVWREHSXUFKDVHGDQGPDLQWDLQHGE\
&RQWUDFWRUVKDOOEHREWDLQHGIURPVXUHW\RULQVXUDQFHFRPSDQLHVWKDWDUHGXO\OLFHQVHGRUDXWKRUL]HG
LQWKH6WDWHRI7H[DVWRLVVXHERQGVRULQVXUDQFHSROLFLHVIRUWKHOLPLWVDQGFRYHUDJHVRUHTXLUHG
6XFKVXUHW\DQGLQVXUDQFHFRPSDQLHVVKDOODOVRPHHWVXFKDGGLWLRQDOUHTXLUHPHQWVDQGTXDOLILFDWLRQV
DVPD\EHSURYLGHG6HFWLRQ
Performance, Payment, and Maintenance Bonds
$ &RQWUDFWRUVKDOOIXUQLVKSHUIRUPDQFHDQGSD\PHQWERQGVLQWKHQDPHRI'HYHORSHUDQG&LW\LQ
DFFRUGDQFHZLWK7H[DV*RYHUQPHQW&RGH&KDSWHURUVXFFHVVRUVWDWXWHHDFKLQDQDPRXQW
HTXDO WR WKH &RQWUDFW 3ULFH DV VHFXULW\ IRU WKH IDLWKIXO SHUIRUPDQFH DQG SD\PHQW RI DOO RI
&RQWUDFWRU¶VREOLJDWLRQVXQGHUWKH&RQWUDFW'RFXPHQWV
% &RQWUDFWRUVKDOOIXUQLVKPDLQWHQDQFHERQGVLQWKHQDPHRI'HYHORSHUDQG&LW\LQDQDPRXQW
HTXDOWRWKH&RQWUDFW3ULFHDVVHFXULW\WRSURWHFWWKH&LW\DJDLQVWDQ\GHIHFWVLQDQ\SRUWLRQRIWKH
:RUNGHVFULEHGLQWKH&RQWUDFW'RFXPHQWV0DLQWHQDQFHERQGVVKDOOUHPDLQLQHIIHFWIRUWZR
\HDUVDIWHUWKHGDWHRI)LQDO$FFHSWDQFHE\WKH&LW\
& $OO ERQGV VKDOO EH LQ WKH IRUP SUHVFULEHG E\ WKH &RQWUDFW 'RFXPHQWV H[FHSW DV SURYLGHG
RWKHUZLVHE\/DZVRU5HJXODWLRQVDQGVKDOOEHH[HFXWHGE\VXFKVXUHWLHVDVDUHQDPHGLQWKHOLVW
RI³&RPSDQLHV+ROGLQJ&HUWLILFDWHVRI$XWKRULW\DV$FFHSWDEOH6XUHWLHVRQ)HGHUDO%RQGVDQG
DV$FFHSWDEOH5HLQVXULQJ&RPSDQLHV´DVSXEOLVKHGLQ&LUFXODUDPHQGHGE\WKH)LQDQFLDO
0DQDJHPHQW6HUYLFH6XUHW\%RQG%UDQFK86'HSDUWPHQWRIWKH7UHDVXU\$OOERQGVVLJQHG
E\DQDJHQWRUDWWRUQH\LQIDFWPXVWEHDFFRPSDQLHGE\DVHDOHGDQGGDWHGSRZHURIDWWRUQH\
ZKLFKVKDOOVKRZWKDWLWLVHIIHFWLYHRQWKHGDWHWKHDJHQWRUDWWRUQH\LQIDFWVLJQHGHDFKERQG
' ,IWKHVXUHW\RQDQ\ERQGIXUQLVKHGE\&RQWUDFWRULVGHFODUHGEDQNUXSWRUEHFRPHVLQVROYHQWRU
LWVULJKWWRGREXVLQHVVLVWHUPLQDWHGLQWKH6WDWHRI7H[DVRULWFHDVHVWRPHHWWKHUHTXLUHPHQWVRI
3DUDJUDSK&&RQWUDFWRUVKDOOSURPSWO\QRWLI\&LW\DQGVKDOOZLWKLQGD\VDIWHUWKHHYHQW
JLYLQJULVHWRVXFKQRWLILFDWLRQSURYLGHDQRWKHUERQGDQGVXUHW\ERWKRIZKLFKVKDOOFRPSO\
ZLWKWKHUHTXLUHPHQWVRI3DUDJUDSKVDQG&
Certificates of Insurance
&RQWUDFWRUVKDOOGHOLYHUWR'HYHORSHUDQG&LW\ZLWKFRSLHVWRHDFKDGGLWLRQDOLQVXUHGDQGORVVSD\HH
LGHQWLILHG LQ WKHVH 6WDQGDUG &LW\ &RQGLWLRQV FHUWLILFDWHV RI LQVXUDQFH DQG RWKHU HYLGHQFH RI
LQVXUDQFH UHTXHVWHG E\ &LW\ RU DQ\ RWKHU DGGLWLRQDO LQVXUHG ZKLFK &RQWUDFWRU LV UHTXLUHG WR
SXUFKDVHDQGPDLQWDLQ
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
7KH FHUWLILFDWH RI LQVXUDQFH VKDOO GRFXPHQW WKH &LW\ DQ DV ³$GGLWLRQDO ,QVXUHG´ RQ DOO
OLDELOLW\SROLFLHV
7KH&RQWUDFWRU¶VJHQHUDOOLDELOLW\LQVXUDQFHVKDOOLQFOXGHD³SHUSURMHFW´RU³SHUORFDWLRQ´
HQGRUVHPHQWZKLFKVKDOOEHLGHQWLILHGLQWKHFHUWLILFDWHRILQVXUDQFHSURYLGHGWRWKH&LW\
7KHFHUWLILFDWHVKDOOEHVLJQHGE\DQDJHQWDXWKRUL]HGWRELQGFRYHUDJHRQEHKDOIRIWKH
LQVXUHGEHFRPSOHWHLQLWVHQWLUHW\DQGVKRZFRPSOHWHLQVXUDQFHFDUULHUQDPHVDVOLVWHGLQ
WKHFXUUHQW$0%HVW3URSHUW\ &DVXDOW\*XLGH
7KHLQVXUHUVIRUDOOSROLFLHVPXVWEHOLFHQVHGDQGRUDSSURYHGWRGREXVLQHVVLQWKH6WDWHRI
7H[DV([FHSWIRUZRUNHUV¶FRPSHQVDWLRQDOOLQVXUHUVPXVWKDYHDPLQLPXPUDWLQJRI$
9,,LQWKHFXUUHQW$0%HVW.H\5DWLQJ*XLGHRUKDYHUHDVRQDEO\HTXLYDOHQWILQDQFLDO
VWUHQJWKDQGVROYHQF\WRWKHVDWLVIDFWLRQRI5LVN0DQDJHPHQW,IWKHUDWLQJLVEHORZWKDW
UHTXLUHGZULWWHQDSSURYDORI&LW\LVUHTXLUHG
$OODSSOLFDEOHSROLFLHVVKDOOLQFOXGHD:DLYHURI6XEURJDWLRQ5LJKWVRI5HFRYHU\LQIDYRU
RIWKH&LW\,QDGGLWLRQWKH&RQWUDFWRUDJUHHVWRZDLYHDOOULJKWVRIVXEURJDWLRQDJDLQVWWKH
(QJLQHHU LI DSSOLFDEOH DQG HDFK DGGLWLRQDO LQVXUHG LGHQWLILHG LQ WKHVH 6WDQGDUG &LW\
&RQGLWLRQV )DLOXUH RI WKH &LW\ WR GHPDQG VXFK FHUWLILFDWHV RURWKHU HYLGHQFH RI IXOO
FRPSOLDQFHZLWKWKHLQVXUDQFHUHTXLUHPHQWVRUIDLOXUHRIWKH&LW\WRLGHQWLI\DGHILFLHQF\
IURPHYLGHQFHWKDWLVSURYLGHGVKDOOQRWEHFRQVWUXHGDVDZDLYHURI&RQWUDFWRU¶VREOLJDWLRQ
WRPDLQWDLQVXFKOLQHVRILQVXUDQFHFRYHUDJH
,ILQVXUDQFHSROLFLHVDUHQRWZULWWHQIRUVSHFLILHGFRYHUDJHOLPLWVDQ8PEUHOODRU([FHVV
/LDELOLW\LQVXUDQFHIRUDQ\GLIIHUHQFHVLVUHTXLUHG([FHVV/LDELOLW\VKDOOIROORZIRUPRIWKH
SULPDU\FRYHUDJH
8QOHVVRWKHUZLVHVWDWHGDOOUHTXLUHGLQVXUDQFHVKDOOEHZULWWHQRQWKH³RFFXUUHQFHEDVLV´,I
FRYHUDJHLVXQGHUZULWWHQRQDFODLPVPDGHEDVLVWKHUHWURDFWLYHGDWHVKDOOEHFRLQFLGHQWZLWK
RUSULRUWRWKHGDWHRIWKHHIIHFWLYHGDWHRIWKHDJUHHPHQWDQGWKHFHUWLILFDWHRILQVXUDQFHVKDOO
VWDWHWKDWWKHFRYHUDJHLVFODLPVPDGHDQGWKHUHWURDFWLYHGDWH7KHLQVXUDQFHFRYHUDJHVKDOO
EH PDLQWDLQHG IRU WKH GXUDWLRQ RI WKH &RQWUDFW DQG IRU WKUHH \HDUV IROORZLQJ )LQDO
$FFHSWDQFHSURYLGHGXQGHUWKH&RQWUDFW'RFXPHQWVRUIRUWKHZDUUDQW\SHULRGZKLFKHYHULV
ORQJHU $Q DQQXDO FHUWLILFDWH RI LQVXUDQFH VXEPLWWHG WR WKH &LW\ VKDOO HYLGHQFH VXFK
LQVXUDQFHFRYHUDJH
3ROLFLHVVKDOOKDYHQRH[FOXVLRQVE\HQGRUVHPHQWVZKLFKQHLWKHUQXOOLI\RUDPHQGWKH
UHTXLUHGOLQHVRIFRYHUDJHQRUGHFUHDVHWKHOLPLWVRIVDLGFRYHUDJHXQOHVVVXFKHQGRUVHPHQWV
DUHDSSURYHGLQZULWLQJE\WKH&LW\,QWKHHYHQWD&RQWUDFWKDVEHHQELGRUH[HFXWHGDQGWKH
H[FOXVLRQV DUH GHWHUPLQHG WR EH XQDFFHSWDEOH RU WKH &LW\ GHVLUHV DGGLWLRQDO LQVXUDQFH
FRYHUDJHDQGWKH&LW\GHVLUHVWKHFRQWUDFWRUHQJLQHHUWRREWDLQVXFKFRYHUDJHWKHFRQWUDFW
SULFHVKDOOEHDGMXVWHGE\WKHFRVWRIWKHSUHPLXPIRUVXFKDGGLWLRQDOFRYHUDJHSOXV
$Q\ VHOILQVXUHG UHWHQWLRQ 6,5 LQ H[FHVV RI DIIHFWLQJ UHTXLUHG LQVXUDQFH
FRYHUDJHVKDOOEHDSSURYHGE\WKH&LW\LQUHJDUGVWRDVVHWYDOXHDQGVWRFNKROGHUV
HTXLW\,Q
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
OLHXRIWUDGLWLRQDOLQVXUDQFHDOWHUQDWLYHFRYHUDJHPDLQWDLQHGWKURXJKLQVXUDQFHSRROVRUULVN
UHWHQWLRQJURXSVPXVWDOVREHDSSURYHGE\&LW\
$Q\GHGXFWLEOHLQH[FHVVRIIRUDQ\SROLF\WKDWGRHVQRWSURYLGHFRYHUDJHRQD
ILUVWGROODUEDVLVPXVWEHDFFHSWDEOHWRDQGDSSURYHGE\WKH&LW\
&LW\DWLWVVROHGLVFUHWLRQUHVHUYHVWKHULJKWWRUHYLHZWKHLQVXUDQFHUHTXLUHPHQWVDQGWR
PDNH UHDVRQDEOH DGMXVWPHQWV WR LQVXUDQFH FRYHUDJH¶V DQG WKHLU OLPLWV ZKHQ GHHPHG
QHFHVVDU\DQGSUXGHQWE\WKH&LW\EDVHGXSRQFKDQJHVLQVWDWXWRU\ODZFRXUWGHFLVLRQRUWKH
FODLPVKLVWRU\RIWKHLQGXVWU\DVZHOODVRIWKHFRQWUDFWLQJSDUW\WRWKH&LW\7KH&LW\VKDOO
EH UHTXLUHG WR SURYLGH SULRU QRWLFH RI GD\V DQG WKH LQVXUDQFH DGMXVWPHQWV VKDOO EH
LQFRUSRUDWHGLQWRWKH:RUNE\&KDQJH2UGHU
&LW\VKDOOEHHQWLWOHGXSRQZULWWHQUHTXHVWDQGZLWKRXWH[SHQVHWRUHFHLYHFRSLHVRISROLFLHV
DQGHQGRUVHPHQWVWKHUHWRDQGPD\PDNHDQ\UHDVRQDEOHUHTXHVWVIRUGHOHWLRQRUUHYLVLRQRU
PRGLILFDWLRQVRISDUWLFXODUSROLF\WHUPVFRQGLWLRQVOLPLWDWLRQVRUH[FOXVLRQVQHFHVVDU\WR
FRQIRUP WKH SROLF\ DQG HQGRUVHPHQWV WR WKH UHTXLUHPHQWV RI WKH&RQWUDFW 'HOHWLRQV
UHYLVLRQVRUPRGLILFDWLRQVVKDOOQRWEHUHTXLUHGZKHUHSROLF\SURYLVLRQVDUHHVWDEOLVKHGE\
ODZRUUHJXODWLRQVELQGLQJXSRQHLWKHUSDUW\RUWKHXQGHUZULWHURQDQ\VXFKSROLFLHV
&LW\ VKDOO QRW EH UHVSRQVLEOH IRU WKH GLUHFW SD\PHQW RI LQVXUDQFH SUHPLXP FRVWV IRU
&RQWUDFWRU¶VLQVXUDQFH
Contractor’s Insurance
$Workers Compensation and Employers’ Liability. &RQWUDFWRUVKDOOSXUFKDVHDQGPDLQWDLQVXFK
LQVXUDQFHFRYHUDJHZLWKOLPLWVFRQVLVWHQWZLWKVWDWXWRU\EHQHILWVRXWOLQHGLQWKH7H[DV:RUNHUV¶
&RPSHQVDWLRQ $FW 7H[DV /DERU &RGH &K DV DPHQGHG DQG PLQLPXP OLPLWV IRU
(PSOR\HUV¶ /LDELOLW\ DV LV DSSURSULDWH IRU WKH :RUN EHLQJ SHUIRUPHG DQG DV ZLOO SURYLGH
SURWHFWLRQ IURP FODLPV VHW IRUWK EHORZ ZKLFK PD\ DULVH RXW RI RU UHVXOW IURP &RQWUDFWRU¶V
SHUIRUPDQFHRIWKH:RUNDQG&RQWUDFWRU¶VRWKHUREOLJDWLRQVXQGHUWKH&RQWUDFW'RFXPHQWV
ZKHWKHULWLVWREHSHUIRUPHGE\&RQWUDFWRUDQ\6XEFRQWUDFWRURU6XSSOLHURUE\DQ\RQHGLUHFWO\
RULQGLUHFWO\HPSOR\HGE\DQ\RIWKHPWRSHUIRUPDQ\RIWKH:RUNRUE\DQ\RQHIRUZKRVHDFWV
DQ\RIWKHPPD\EHOLDEOH
FODLPVXQGHUZRUNHUV¶FRPSHQVDWLRQGLVDELOLW\EHQHILWVDQGRWKHUVLPLODUHPSOR\HHEHQHILW
DFWV
FODLPVIRUGDPDJHVEHFDXVHRIERGLO\LQMXU\RFFXSDWLRQDOVLFNQHVVRUGLVHDVHRUGHDWKRI
&RQWUDFWRU¶VHPSOR\HHV
7KHOLPLWVRIOLDELOLW\IRUWKHLQVXUDQFHVKDOOSURYLGHWKHIROORZLQJFRYHUDJHVIRUQRWOHVV
WKDQWKHIROORZLQJDPRXQWVRUJUHDWHUZKHUHUHTXLUHGE\/DZVDQG5HJXODWLRQV
D 6WDWXWRU\OLPLWV
E (PSOR\HU
VOLDELOLW\
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
HDFKDFFLGHQWRFFXUUHQFH
'LVHDVHHDFKHPSOR\HH
'LVHDVHSROLF\OLPLW
% &RPPHUFLDO*HQHUDO/LDELOLW\&RYHUDJHVKDOOLQFOXGHEXWQRWEHOLPLWHGWRFRYHULQJOLDELOLW\
ERGLO\LQMXU\RUSURSHUW\GDPDJHDULVLQJIURPSUHPLVHVRSHUDWLRQVLQGHSHQGHQWFRQWUDFWRUV
SURGXFWVFRPSOHWHGRSHUDWLRQVSHUVRQDOLQMXU\DQGOLDELOLW\XQGHUDQLQVXUHGFRQWUDFW,QVXUDQFH
VKDOO EH SURYLGHG RQ DQ RFFXUUHQFH EDVLV DQG DV FRPSUHKHQVLYHDV WKH FXUUHQW ,QVXUDQFH
6HUYLFHV2IILFH,62SROLF\7KLVLQVXUDQFHVKDOODSSO\DVSULPDU\LQVXUDQFHZLWKUHVSHFWWR
DQ\RWKHULQVXUDQFHRUVHOILQVXUDQFHSURJUDPVDIIRUGHGWRWKH&LW\7KH&RPPHUFLDO*HQHUDO
/LDELOLW\ SROLF\ VKDOO KDYH QR H[FOXVLRQV E\ HQGRUVHPHQWV WKDW ZRXOG DOWHU RI QXOOLI\
SUHPLVHVRSHUDWLRQVSURGXFWVFRPSOHWHGRSHUDWLRQVFRQWUDFWXDOSHUVRQDOLQMXU\RUDGYHUWLVLQJ
LQMXU\ZKLFKDUHQRUPDOO\FRQWDLQHGZLWKWKHSROLF\XQOHVVWKH&LW\DSSURYHVVXFKH[FOXVLRQV
LQZULWLQJ
)RUFRQVWUXFWLRQSURMHFWVWKDWSUHVHQWDVXEVWDQWLDOFRPSOHWHGRSHUDWLRQH[SRVXUHWKH&LW\
PD\UHTXLUHWKHFRQWUDFWRUWRPDLQWDLQFRPSOHWHGRSHUDWLRQVFRYHUDJHIRUDPLQLPXPRIQR
OHVVWKDQWKUHH\HDUVIROORZLQJWKHFRPSOHWLRQRIWKHSURMHFW
&RQWUDFWRU
V/LDELOLW\,QVXUDQFHXQGHUWKLV6HFWLRQZKLFKVKDOOEHRQDSHUSURMHFWEDVLV
FRYHULQJWKH&RQWUDFWRUZLWKPLQLPXPOLPLWVRI
D HDFKRFFXUUHQFH
E DJJUHJDWHOLPLW
7KH SROLF\ PXVW KDYH DQ HQGRUVHPHQW $PHQGPHQW ± $JJUHJDWH /LPLWV RI ,QVXUDQFH
PDNLQJWKH*HQHUDO$JJUHJDWH/LPLWVDSSO\VHSDUDWHO\WRHDFKMREVLWH
7KH &RPPHUFLDO *HQHUDO /LDELOLW\ ,QVXUDQFH SROLFLHV VKDOO SURYLGH ³;´ ³&´ DQG ³8´
FRYHUDJH¶V9HULILFDWLRQRIVXFKFRYHUDJHPXVWEHVKRZQLQWKH5HPDUNV$UWLFOHRIWKH
&HUWLILFDWHRI,QVXUDQFH
&Automobile Liability. $FRPPHUFLDOEXVLQHVVDXWRSROLF\VKDOOSURYLGHFRYHUDJHRQ³DQ\DXWR´
GHILQHGDVDXWRVRZQHGKLUHGDQGQRQRZQHGDQGSURYLGHLQGHPQLW\IRUFODLPVIRUGDPDJHV
EHFDXVHERGLO\LQMXU\RUGHDWKRIDQ\SHUVRQDQGRUSURSHUW\GDPDJHDULVLQJRXWRIWKHZRUN
PDLQWHQDQFHRUXVHRIDQ\PRWRUYHKLFOHE\WKH&RQWUDFWRUDQ\6XEFRQWUDFWRURU6XSSOLHURUE\
DQ\RQHGLUHFWO\RULQGLUHFWO\HPSOR\HGE\DQ\RIWKHPWRSHUIRUPDQ\RIWKH:RUNRUE\DQ\RQH
IRUZKRVHDFWVDQ\RIWKHPPD\EHOLDEOH
$XWRPRELOH/LDELOLW\&RQWUDFWRU¶V/LDELOLW\,QVXUDQFHXQGHUWKLV6HFWLRQZKLFKVKDOOEHLQ
DQDPRXQWQRWOHVVWKDQWKHIROORZLQJDPRXQWV
a.$XWRPRELOH/LDELOLW\DFRPPHUFLDOEXVLQHVVSROLF\VKDOOSURYLGHFRYHUDJHRQ$Q\
$XWRGHILQHGDVDXWRVRZQHGKLUHGDQGQRQRZQHG
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
1) $1,000,000 HDFK DFFLGHQW RQ D FRPELQHG VLQJOH OLPLW EDVLV 6SOLW OLPLWV DUH
DFFHSWDEOHLIOLPLWVDUHDWOHDVW
2) %RGLO\,QMXU\SHUSHUVRQ
3) %RGLO\,QMXU\SHUDFFLGHQW
4) 3URSHUW\'DPDJH
'Railroad Protective Liability. ,IDQ\RIWKHZRUNRUDQ\ZDUUDQW\ZRUNLVZLWKLQWKHOLPLWVRI
UDLOURDGULJKWRIZD\WKH&RQWUDFWRUVKDOOFRPSO\ZLWKWKHIROORZLQJUHTXLUHPHQWV
7KH&RQWUDFWRU¶VFRQVWUXFWLRQDFWLYLWLHVZLOOUHTXLUHLWVHPSOR\HHVDJHQWVVXEFRQWUDFWRUV
HTXLSPHQW DQG PDWHULDO GHOLYHULHs WR FURVV UDLOURDG SURSHUWLHV DQG WUDFNV RZQHG DQG
RSHUDWHGE\BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
:ULWHWKHQDPHRIWKHUDLOURDGFRPSDQ\,IQRQHWKHQZULWHQRQH
7KH&RQWUDFWRUVKDOOFRQGXFWLWVRSHUDWLRQVRQUDLOURDGSURSHUWLHVLQVXFKDPDQQHUDVQRWWR
LQWHUIHUHZLWKKLQGHURUREVWUXFWWKHUDLOURDGFRPSDQ\LQDQ\PDQQHUZKDWVRHYHULQWKHXVH
RURSHUDWLRQRILWVWKHLUWUDLQVRURWKHUSURSHUW\6XFKRSHUDWLRQVRQUDLOURDGSURSHUWLHVPD\
UHTXLUHWKDW&RQWUDFWRUWRH[HFXWHD³5LJKWRI(QWU\$JUHHPHQW´ZLWKWKHSDUWLFXODUUDLOURDG
FRPSDQ\RUFRPSDQLHVLQYROYHGDQGWRWKLVHQGWKH&RQWUDFWRUVKRXOGVDWLVI\LWVHOIDVWRWKH
UHTXLUHPHQWVRIHDFKUDLOURDGFRPSDQ\DQGEHSUHSDUHGWRH[HFXWHWKHULJKWRIHQWU\LIDQ\
UHTXLUHGE\DUDLOURDGFRPSDQ\7KHUHTXLUHPHQWVVSHFLILHGKHUHLQOLNHZLVHUHODWHWRWKH
&RQWUDFWRU¶VXVHRISULYDWHDQGRUFRQVWUXFWLRQDFFHVVURDGVFURVVLQJVDLGUDLOURDGFRPSDQ\¶V
SURSHUWLHV
7KH&RQWUDFWXDO/LDELOLW\FRYHUDJHUHTXLUHGE\3DUDJUDSK'RIWKH*HQHUDO&RQGLWLRQV
VKDOO SURYLGH FRYHUDJH IRU QRW OHVV WKDQ WKH IROORZLQJ DPRXQWV LVVXHG E\ FRPSDQLHV
VDWLVIDFWRU\WRWKH&LW\DQGWRWKH5DLOURDG&RPSDQ\IRUDWHUPWKDWFRQWLQXHVIRUVRORQJDV
WKH&RQWUDFWRU¶VRSHUDWLRQVDQGZRUNFURVVRFFXS\RUWRXFKUDLOURDGSURSHUW\
D *HQHUDO$JJUHJDWHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
(QWHUOLPLWVSURYLGHGE\5DLOURDG&RPSDQ\,IQRQHZULWHQRQH
E (DFK2FFXUUHQFHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
(QWHUOLPLWVSURYLGHGE\5DLOURDG&RPSDQ\,IQRQHZULWHQRQH
:LWKUHVSHFWWRWKHDERYHRXWOLQHGLQVXUDQFHUHTXLUHPHQWVWKHIROORZLQJVKDOOJRYHUQ
D :KHUHDVLQJOHUDLOURDGFRPSDQ\LVLQYROYHGWKH&RQWUDFWRUVKDOOSURYLGHRQHLQVXUDQFH
SROLF\LQWKHQDPHRIWKHUDLOURDGFRPSDQ\+RZHYHULIPRUHWKDQRQHJUDGHVHSDUDWLRQ
RUDWJUDGHFURVVLQJLVDIIHFWHGE\WKH3URMHFWDWHQWLUHO\VHSDUDWHORFDWLRQVRQWKHOLQHRU
OLQHVRIWKHVDPHUDLOURDGFRPSDQ\VHSDUDWHFRYHUDJHPD\EHUHTXLUHGHDFKLQWKH
DPRXQWVWDWHGDERYH
E :KHUHPRUHWKDQRQHUDLOURDGFRPSDQ\LVRSHUDWLQJRQWKHVDPHULJKWRIZD\RUZKHUH
VHYHUDOUDLOURDGFRPSDQLHVDUHLQYROYHGDQGRSHUDWHGRQWKHLURZQVHSDUDWHULJKWVRI
1RQH
1RQH
1RQH
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
ZD\WKH&RQWUDFWRUPD\EHUHTXLUHGWRSURYLGHVHSDUDWHLQVXUDQFHSROLFLHVLQWKHQDPH
RIHDFKUDLOURDGFRPSDQ\
F ,ILQDGGLWLRQWRDJUDGHVHSDUDWLRQRUDQDWJUDGHFURVVLQJRWKHUZRUNRUDFWLYLW\LV
SURSRVHGRQDUDLOURDGFRPSDQ\¶VULJKWRIZD\DWDORFDWLRQHQWLUHO\VHSDUDWHIURPWKH
JUDGHVHSDUDWLRQRUDWJUDGHFURVVLQJLQVXUDQFHFRYHUDJHIRUWKLVZRUNPXVWEHLQFOXGHG
LQWKHSROLF\FRYHULQJWKHJUDGHVHSDUDWLRQ
G ,IQRJUDGHVHSDUDWLRQLVLQYROYHGEXWRWKHUZRUNLVSURSRVHGRQDUDLOURDGFRPSDQ\¶V
ULJKWRIZD\DOOVXFKRWKHUZRUNPD\EHFRYHUHGLQDVLQJOHSROLF\IRUWKDWUDLOURDGHYHQ
WKRXJKWKHZRUNPD\EHDWWZRRUPRUHVHSDUDWHORFDWLRQV
1RZRUNRUDFWLYLWLHVRQDUDLOURDGFRPSDQ\¶VSURSHUW\WREHSHUIRUPHGE\WKH&RQWUDFWRU
VKDOOEHFRPPHQFHGXQWLOWKH&RQWUDFWRUKDVIXUQLVKHGWKH&LW\ZLWKDQRULJLQDOSROLF\RU
SROLFLHVRIWKHLQVXUDQFHIRUHDFKUDLOURDGFRPSDQ\QDPHGDVUHTXLUHGDERYH$OOVXFK
LQVXUDQFHPXVWEHDSSURYHGE\WKH&LW\DQGHDFKDIIHFWHG5DLOURDG&RPSDQ\SULRUWRWKH
&RQWUDFWRU¶VEHJLQQLQJZRUN
7KHLQVXUDQFHVSHFLILHGDERYHPXVWEHFDUULHGXQWLODOO:RUNWREHSHUIRUPHGRQWKHUDLOURDG
ULJKWRIZD\KDVEHHQFRPSOHWHGDQGWKHJUDGHFURVVLQJLIDQ\LVQRORQJHUXVHGE\WKH
&RQWUDFWRU,QDGGLWLRQLQVXUDQFHPXVWEHFDUULHGGXULQJDOOPDLQWHQDQFHDQGRUUHSDLUZRUN
SHUIRUPHGLQWKHUDLOURDGULJKWRIZD\6XFKLQVXUDQFHPXVWQDPHWKHUDLOURDGFRPSDQ\DV
WKHLQVXUHGWRJHWKHUZLWKDQ\WHQDQWRUOHVVHHRIWKHUDLOURDGFRPSDQ\RSHUDWLQJRYHUWUDFNV
LQYROYHGLQWKH3URMHFW
(Notification of Policy Cancellation: &RQWUDFWRUVKDOOLPPHGLDWHO\QRWLI\&LW\XSRQFDQFHOODWLRQ
RURWKHUORVVRILQVXUDQFHFRYHUDJH&RQWUDFWRUVKDOOVWRSZRUNXQWLOUHSODFHPHQWLQVXUDQFHKDV
EHHQSURFXUHG7KHUHVKDOOEHQRWLPHFUHGLWIRUGD\VQRWZRUNHGSXUVXDQWWRWKLVVHFWLRQ
Acceptance of Bonds and Insurance; Option to Replace
,I&LW\KDVDQ\REMHFWLRQWRWKHFRYHUDJHDIIRUGHGE\RURWKHUSURYLVLRQVRIWKHERQGVRULQVXUDQFH
UHTXLUHGWREHSXUFKDVHGDQGPDLQWDLQHGE\WKH&RQWUDFWRULQDFFRUGDQFHZLWK$UWLFOHRQWKHEDVLV
RI QRQFRQIRUPDQFH ZLWK WKH &RQWUDFW 'RFXPHQWV WKH 'HYHORSHU DQG &LW\ VKDOO VR QRWLI\ WKH
&RQWUDFWRULQZULWLQJZLWKLQ%XVLQHVV'D\VDIWHUUHFHLSWRIWKHFHUWLILFDWHVRURWKHUHYLGHQFH
UHTXHVWHG&RQWUDFWRUVKDOOSURYLGHWRWKH&LW\VXFKDGGLWLRQDOLQIRUPDWLRQLQUHVSHFWRILQVXUDQFH
SURYLGHG DV WKH 'HYHORSHU RU &LW\ PD\ UHDVRQDEO\ UHTXHVW ,I &RQWUDFWRU GRHV QRW SXUFKDVH RU
PDLQWDLQDOORIWKHERQGVDQGLQVXUDQFHUHTXLUHGE\WKH&RQWUDFW'RFXPHQWVWKH'HYHORSHURU&LW\
VKDOOQRWLI\WKH&RQWUDFWRULQZULWLQJRIVXFKIDLOXUHSULRUWRWKHVWDUWRIWKH:RUNRURIVXFKIDLOXUH
WRPDLQWDLQSULRUWRDQ\FKDQJHLQWKHUHTXLUHGFRYHUDJH
$57,&/(±&2175$&725¶65(63216,%,/,7,(6
Supervision and Superintendent
$ &RQWUDFWRUVKDOOVXSHUYLVHLQVSHFWDQGGLUHFWWKH:RUNFRPSHWHQWO\DQGHIILFLHQWO\GHYRWLQJ
VXFKDWWHQWLRQWKHUHWRDQGDSSO\LQJVXFKVNLOOVDQGH[SHUWLVHDVPD\EHQHFHVVDU\WRSHUIRUPWKH
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
:RUNLQDFFRUGDQFHZLWKWKH&RQWUDFW'RFXPHQWV&RQWUDFWRUVKDOOEHVROHO\UHVSRQVLEOHIRUWKH
PHDQVPHWKRGVWHFKQLTXHVVHTXHQFHVDQGSURFHGXUHVRIFRQVWUXFWLRQ
% $WDOOWLPHVGXULQJWKHSURJUHVVRIWKH:RUN&RQWUDFWRUVKDOODVVLJQDFRPSHWHQW(QJOLVK
VSHDNLQJ 6XSHULQWHQGHQW ZKR VKDOO QRW EH UHSODFHG ZLWKRXW ZULWWHQ QRWLFH WR &LW\ 7KH
6XSHULQWHQGHQWZLOOEH&RQWUDFWRU¶VUHSUHVHQWDWLYHDWWKH6LWHDQGVKDOOKDYHDXWKRULW\WRDFWRQ
EHKDOIRI&RQWUDFWRU$OOFRPPXQLFDWLRQJLYHQWRRUUHFHLYHGIURPWKH6XSHULQWHQGHQWVKDOOEH
ELQGLQJRQ&RQWUDFWRU
& &RQWUDFWRU VKDOO QRWLI\ WKH &LW\ KRXUV SULRU WR PRYLQJ DUHDV GXULQJ WKH VHTXHQFH RI
FRQVWUXFWLRQ
Labor; Working Hours
$ &RQWUDFWRU VKDOO SURYLGH FRPSHWHQW VXLWDEO\ TXDOLILHG SHUVRQQHO WR SHUIRUP FRQVWUXFWLRQ DV
UHTXLUHGE\WKH&RQWUDFW'RFXPHQWV&RQWUDFWRUVKDOODWDOOWLPHVPDLQWDLQJRRGGLVFLSOLQHDQG
RUGHUDWWKH6LWH
% ([FHSWDVRWKHUZLVHUHTXLUHGIRUWKHVDIHW\RUSURWHFWLRQRISHUVRQVRUWKH:RUNRUSURSHUW\DW
WKH6LWHRUDGMDFHQWWKHUHWRDQGH[FHSWDVRWKHUZLVHVWDWHGLQWKH&RQWUDFW'RFXPHQWVDOO:RUN
DWWKH6LWHVKDOOEHSHUIRUPHGGXULQJ5HJXODU:RUNLQJ+RXUV&RQWUDFWRUZLOOQRWSHUPLWWKH
SHUIRUPDQFHRI:RUNEH\RQG5HJXODU:RUNLQJ+RXUVRUIRU:HHNHQG:RUNLQJ+RXUVZLWKRXW
&LW\¶VZULWWHQFRQVHQWZKLFKZLOOQRWEHXQUHDVRQDEO\ZLWKKHOG:ULWWHQUHTXHVWE\OHWWHURU
HOHFWURQLFFRPPXQLFDWLRQWRSHUIRUP:RUN
IRUEH\RQG5HJXODU:RUNLQJ+RXUVUHTXHVWPXVWEHPDGHE\QRRQDWOHDVWWZR%XVLQHVV
'D\VSULRU
IRU:HHNHQG:RUNLQJ+RXUVUHTXHVWPXVWEHPDGHE\QRRQRIWKHSUHFHGLQJ7KXUVGD\
IRU OHJDO KROLGD\V UHTXHVW PXVW EH PDGH E\ QRRQ WZR %XVLQHVV'D\V SULRU WR WKH OHJDO
KROLGD\
Services, Materials, and Equipment
$ 8QOHVVRWKHUZLVHVSHFLILHGLQWKH&RQWUDFW'RFXPHQWV&RQWUDFWRUVKDOOSURYLGHDQGDVVXPHIXOO
UHVSRQVLELOLW\ IRU DOO VHUYLFHV PDWHULDOV HTXLSPHQW ODERU WUDQVSRUWDWLRQ FRQVWUXFWLRQ
HTXLSPHQWDQGPDFKLQHU\WRROVDSSOLDQFHVIXHOSRZHUOLJKWKHDWWHOHSKRQHZDWHUVDQLWDU\
IDFLOLWLHV WHPSRUDU\ IDFLOLWLHV DQG DOO RWKHU IDFLOLWLHV DQGLQFLGHQWDOV QHFHVVDU\ IRU WKH
SHUIRUPDQFH&RQWUDFWRUUHTXLUHGWHVWLQJVWDUWXSDQGFRPSOHWLRQRIWKH:RUN
% $OOPDWHULDOVDQGHTXLSPHQWLQFRUSRUDWHGLQWRWKH:RUNVKDOOEHDVVSHFLILHGRULIQRWVSHFLILHG
VKDOOEHRIJRRGTXDOLW\DQGQHZH[FHSWDVRWKHUZLVHSURYLGHGLQWKH&RQWUDFW'RFXPHQWV$OO
VSHFLDOZDUUDQWLHVDQGJXDUDQWHHVUHTXLUHGE\WKH6SHFLILFDWLRQVVKDOOH[SUHVVO\UXQWRWKHEHQHILW
RI&LW\,IUHTXLUHGE\&LW\&RQWUDFWRUVKDOOIXUQLVKVDWLVIDFWRU\HYLGHQFHLQFOXGLQJUHSRUWVRI
UHTXLUHGWHVWVDVWRWKHVRXUFHNLQGDQGTXDOLW\RIPDWHULDOVDQGHTXLSPHQW
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
& $OOPDWHULDOVDQGHTXLSPHQWWREHLQFRUSRUDWHGLQWRWKH:RUNVKDOOEHVWRUHGDSSOLHGLQVWDOOHG
FRQQHFWHGHUHFWHGSURWHFWHGXVHGFOHDQHGDQGFRQGLWLRQHGLQDFFRUGDQFHZLWKLQVWUXFWLRQVRI
WKHDSSOLFDEOH6XSSOLHUH[FHSWDVRWKHUZLVHPD\EHSURYLGHGLQWKH&RQWUDFW'RFXPHQWV
Project Schedule
$ &RQWUDFWRUVKDOODGKHUHWRWKH3URMHFW6FKHGXOHHVWDEOLVKHGLQDFFRUGDQFHZLWK3DUDJUDSK
DQGWKH*HQHUDO5HTXLUHPHQWVDVLWPD\EHDGMXVWHGIURPWLPHWRWLPHDVSURYLGHGEHORZ
&RQWUDFWRUVKDOOVXEPLWWR&LW\IRUDFFHSWDQFHWRWKHH[WHQWLQGLFDWHGLQ3DUDJUDSKDQG
WKH*HQHUDO5HTXLUHPHQWVSURSRVHGDGMXVWPHQWVLQWKH3URMHFW6FKHGXOH
3URSRVHGDGMXVWPHQWVLQWKH3URMHFW6FKHGXOHWKDWZLOOFKDQJHWKH&RQWUDFW7LPHVKDOOEH
VXEPLWWHGLQDFFRUGDQFHZLWKWKHUHTXLUHPHQWVRI$UWLFOH$GMXVWPHQWVLQ&RQWUDFW7LPH
IRUSURMHFWVZLWK&LW\SDUWLFLSDWLRQVKDOOEHPDGHE\SDUWLFLSDWLQJFKDQJHRUGHUV
Substitutes and “Or-Equals”
$ :KHQHYHUDQLWHPRIPDWHULDORUHTXLSPHQWLVVSHFLILHGRUGHVFULEHGLQWKH&RQWUDFW'RFXPHQWV
E\XVLQJWKHQDPHRIDSURSULHWDU\LWHPRUWKHQDPHRIDSDUWLFXODU6XSSOLHUWKHVSHFLILFDWLRQRU
GHVFULSWLRQLVLQWHQGHGWRHVWDEOLVKWKHW\SHIXQFWLRQDSSHDUDQFHDQGTXDOLW\UHTXLUHG8QOHVV
WKHVSHFLILFDWLRQRUGHVFULSWLRQFRQWDLQVRULVIROORZHGE\ZRUGVUHDGLQJWKDWQROLNHHTXLYDOHQW
RU³RUHTXDO´LWHPRUQRVXEVWLWXWLRQLVSHUPLWWHGRWKHULWHPVRIPDWHULDORUHTXLSPHQWRIRWKHU
6XSSOLHUVPD\EHVXEPLWWHGWR&LW\IRUUHYLHZXQGHUWKHFLUFXPVWDQFHVGHVFULEHGEHORZ
“Or-Equal” Items: ,ILQ&LW\¶VVROHGLVFUHWLRQDQLWHPRIPDWHULDORUHTXLSPHQWSURSRVHGE\
&RQWUDFWRULVIXQFWLRQDOO\HTXDOWRWKDWQDPHGDQGVXIILFLHQWO\VLPLODUVRWKDWQRFKDQJHLQ
UHODWHG:RUNZLOOEHUHTXLUHGLWPD\EHFRQVLGHUHGE\&LW\DVDQ³RUHTXDO´LWHPLQZKLFK
FDVH UHYLHZ DQG DSSURYDO RI WKH SURSRVHG LWHP PD\ LQ &LW\¶V VROH GLVFUHWLRQ EH
DFFRPSOLVKHG ZLWKRXW FRPSOLDQFH ZLWK VRPH RU DOO RI WKH UHTXLUHPHQWV IRU DSSURYDO RI
SURSRVHGVXEVWLWXWHLWHPV)RUWKHSXUSRVHVRIWKLV3DUDJUDSK$DSURSRVHGLWHPRI
PDWHULDORUHTXLSPHQWZLOOEHFRQVLGHUHGIXQFWLRQDOO\HTXDOWRDQLWHPVRQDPHGLI
D &LW\GHWHUPLQHVWKDW
LW LV DW OHDVW HTXDO LQ PDWHULDOV RI FRQVWUXFWLRQ TXDOLW\ GXUDELOLW\ DSSHDUDQFH
VWUHQJWKDQGGHVLJQFKDUDFWHULVWLFV
LWZLOOUHOLDEO\SHUIRUPDWOHDVWHTXDOO\ZHOOWKHIXQFWLRQDQGDFKLHYHWKHUHVXOWV
LPSRVHGE\WKHGHVLJQFRQFHSWRIWKHFRPSOHWHG3URMHFWDVDIXQFWLRQLQJZKROHDQG
LWKDVDSURYHQUHFRUGRISHUIRUPDQFHDQGDYDLODELOLW\RIUHVSRQVLYHVHUYLFHDQG
E &RQWUDFWRUFHUWLILHVWKDWLIDSSURYHGDQGLQFRUSRUDWHGLQWRWKH:RUN
WKHUHZLOOEHQRLQFUHDVHLQFRVWWRWKH&LW\RULQFUHDVHLQ&RQWUDFW7LPHDQG
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
LWZLOOFRQIRUPVXEVWDQWLDOO\WRWKHGHWDLOHGUHTXLUHPHQWVRIWKHLWHPQDPHGLQWKH
&RQWUDFW'RFXPHQWV
Substitute Items:
D ,ILQ&LW\¶VVROHGLVFUHWLRQDQLWHPRIPDWHULDORUHTXLSPHQWSURSRVHGE\&RQWUDFWRUGRHV
QRWTXDOLI\DVDQ³RUHTXDO´LWHPXQGHU3DUDJUDSK$LWPD\EHVXEPLWWHGDVD
SURSRVHGVXEVWLWXWHLWHP
E &RQWUDFWRU VKDOO VXEPLW VXIILFLHQW LQIRUPDWLRQ DV SURYLGHG EHORZ WR DOORZ &LW\ WR
GHWHUPLQHLIWKHLWHPRIPDWHULDORUHTXLSPHQWSURSRVHGLVHVVHQWLDOO\HTXLYDOHQWWRWKDW
QDPHGDQGDQDFFHSWDEOHVXEVWLWXWHWKHUHIRU5HTXHVWVIRUUHYLHZRISURSRVHGVXEVWLWXWH
LWHPVRIPDWHULDORUHTXLSPHQWZLOOQRWEHDFFHSWHGE\&LW\IURPDQ\RQHRWKHUWKDQ
&RQWUDFWRU
F &RQWUDFWRUVKDOOPDNHZULWWHQDSSOLFDWLRQWR&LW\IRUUHYLHZRIDSURSRVHGVXEVWLWXWHLWHP
RIPDWHULDORUHTXLSPHQWWKDW&RQWUDFWRUVHHNVWRIXUQLVKRUXVH7KHDSSOLFDWLRQVKDOO
FRPSO\ZLWK6HFWLRQDQG
VKDOOFHUWLI\WKDWWKHSURSRVHGVXEVWLWXWHLWHPZLOO
L SHUIRUPDGHTXDWHO\WKHIXQFWLRQVDQGDFKLHYHWKHUHVXOWVFDOOHGIRUE\WKHJHQHUDO
GHVLJQ
LL EHVLPLODULQVXEVWDQFHWRWKDWVSHFLILHG
LLL EHVXLWHGWRWKHVDPHXVHDVWKDWVSHFLILHGDQG
ZLOOVWDWH
L WKHH[WHQWLIDQ\WRZKLFKWKHXVHRIWKHSURSRVHGVXEVWLWXWHLWHPZLOOSUHMXGLFH
&RQWUDFWRU¶VDFKLHYHPHQWRIILQDOFRPSOHWLRQRQWLPH
LL ZKHWKHUXVHRIWKHSURSRVHGVXEVWLWXWHLWHPLQWKH:RUNZLOOUHTXLUHDFKDQJHLQ
DQ\RIWKH&RQWUDFW'RFXPHQWVRULQWKHSURYLVLRQVRIDQ\RWKHUGLUHFWFRQWUDFW
ZLWK&LW\IRURWKHUZRUNRQWKH3URMHFWWRDGDSWWKHGHVLJQWRWKHSURSRVHG
VXEVWLWXWHLWHP
LLL ZKHWKHULQFRUSRUDWLRQRUXVHRIWKHSURSRVHGVXEVWLWXWHLWHPLQFRQQHFWLRQZLWK
WKH:RUNLVVXEMHFWWRSD\PHQWRIDQ\OLFHQVHIHHRUUR\DOW\DQG
ZLOOLGHQWLI\
L DOOYDULDWLRQVRIWKHSURSRVHGVXEVWLWXWHLWHPIURPWKDWVSHFLILHG
LL DYDLODEOHHQJLQHHULQJVDOHVPDLQWHQDQFHUHSDLUDQGUHSODFHPHQWVHUYLFHVDQG
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
VKDOOFRQWDLQDQLWHPL]HGHVWLPDWHRIDOOFRVWVRUFUHGLWVWKDWZLOOUHVXOWGLUHFWO\RU
LQGLUHFWO\IURPXVHRIVXFKVXEVWLWXWHLWHPLQFOXGLQJFRVWVRIUHGHVLJQDQG'DPDJH
&ODLPVRIRWKHUFRQWUDFWRUVDIIHFWHGE\DQ\UHVXOWLQJFKDQJH
%Substitute Construction Methods or Procedures: ,I D VSHFLILF PHDQV PHWKRG WHFKQLTXH
VHTXHQFH RU SURFHGXUH RI FRQVWUXFWLRQ LV H[SUHVVO\ UHTXLUHG E\ WKH &RQWUDFW 'RFXPHQWV
&RQWUDFWRUPD\IXUQLVKRUXWLOL]HDVXEVWLWXWHPHDQVPHWKRGWHFKQLTXHVHTXHQFHRUSURFHGXUH
RIFRQVWUXFWLRQDSSURYHGE\&LW\&RQWUDFWRUVKDOOVXEPLWVXIILFLHQWLQIRUPDWLRQWRDOORZ&LW\LQ
&LW\¶VVROHGLVFUHWLRQWRGHWHUPLQHWKDWWKHVXEVWLWXWHSURSRVHGLVHTXLYDOHQWWRWKDWH[SUHVVO\
FDOOHGIRUE\WKH&RQWUDFW'RFXPHQWV&RQWUDFWRUVKDOOPDNHZULWWHQDSSOLFDWLRQWR&LW\IRU
UHYLHZLQWKHVDPHPDQQHUDVWKRVHSURYLGHGLQ3DUDJUDSK$
&City’s Evaluation:&LW\ ZLOO EH DOORZHG D UHDVRQDEOH WLPH ZLWKLQ ZKLFK WR HYDOXDWHHDFK
SURSRVDO RU VXEPLWWDO PDGH SXUVXDQW WR 3DUDJUDSKV $ DQG % &LW\ PD\ UHTXLUH
&RQWUDFWRUWRIXUQLVKDGGLWLRQDOGDWDDERXWWKHSURSRVHGVXEVWLWXWH&LW\ZLOOEHWKHVROHMXGJHRI
DFFHSWDELOLW\1R³RUHTXDO´RUVXEVWLWXWHZLOOEHRUGHUHGLQVWDOOHGRUXWLOL]HGXQWLO&LW\¶VUHYLHZ
LVFRPSOHWHZKLFKZLOOEHHYLGHQFHGE\D&KDQJH2UGHULQWKHFDVHRIDVXEVWLWXWHDQGDQ
DFFHSWHG6XEPLWWDOIRUDQ³RUHTXDO´&LW\ZLOODGYLVH&RQWUDFWRULQZULWLQJRILWVGHWHUPLQDWLRQ
'Special Guarantee:&LW\PD\UHTXLUH&RQWUDFWRUWRIXUQLVKDW&RQWUDFWRU¶VH[SHQVHDVSHFLDO
SHUIRUPDQFHJXDUDQWHHZDUUDQW\RURWKHUVXUHW\ZLWKUHVSHFWWRDQ\VXEVWLWXWHContractor shall
indemnify and hold harmless City and anyone directly or indirectly employed by them from and
against any and all claims, damages, losses and expenses (including attorneys fees) arising out
of the use of substituted materials or equipment.
(City’s Cost Reimbursement&LW\ZLOOUHFRUG&LW\¶VFRVWVLQHYDOXDWLQJDVXEVWLWXWHSURSRVHGRU
VXEPLWWHG E\ &RQWUDFWRU SXUVXDQW WR 3DUDJUDSKV $ DQG % :KHWKHU RU QRW &LW\
DSSURYHVDVXEVWLWXWHVRSURSRVHGRUVXEPLWWHGE\&RQWUDFWRU&RQWUDFWRUPD\EHUHTXLUHGWR
UHLPEXUVH&LW\IRUHYDOXDWLQJHDFKVXFKSURSRVHGVXEVWLWXWH&RQWUDFWRUPD\DOVREHUHTXLUHGWR
UHLPEXUVH&LW\IRUWKHFKDUJHVIRUPDNLQJFKDQJHVLQWKH&RQWUDFW'RFXPHQWV
)Contractor’s Expense&RQWUDFWRUVKDOOSURYLGHDOOGDWDLQVXSSRUWRIDQ\SURSRVHGVXEVWLWXWHRU
³RUHTXDO´DW&RQWUDFWRU¶VH[SHQVH
*Substitute Reimbursement&RVWVVDYLQJVRUFKDUJHVDWWULEXWDEOHWRDFFHSWDQFHRIDVXEVWLWXWH
VKDOOEHLQFRUSRUDWHGWRWKH&RQWUDFWE\3DUWLFLSDWLQJ&KDQJH2UGHU
Pre-Qualification of Bidders (Prime Contractors and Subcontractors)
$ 7KH &RQWUDFWRU DQG DQ\ VXEFRQWUDFWRUV DUH UHTXLUHG WR EH SUHTXDOLILHG IRU WKH ZRUN W\SHV
UHTXLULQJSUHTXDOLILFDWLRQ
Concerning Subcontractors, Suppliers, and Others
$Minority and Women Owned Business Enterprise Compliance:
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
5HTXLUHGIRUWKLV&RQWUDFW
&KHFNWKLVER[LIWKHUHLVDQ\&LW\3DUWLFLSDWLRQ
1RW5HTXLUHGIRUWKLV&RQWUDFW
,WLV&LW\SROLF\WRHQVXUHWKHIXOODQGHTXLWDEOHSDUWLFLSDWLRQE\0LQRULW\DQG:RPHQ%XVLQHVV
(QWHUSULVHV0:%(LQWKHSURFXUHPHQWRIJRRGVDQGVHUYLFHVRQDFRQWUDFWXDOEDVLV,IWKH
&RQWUDFW'RFXPHQWVSURYLGHIRUD0:%(JRDO&RQWUDFWRULVUHTXLUHGWRFRPSO\ZLWKWKHLQWHQW
RIWKH&LW\¶V0:%(2UGLQDQFHDVDPHQGHGE\WKHIROORZLQJ
&RQWUDFWRUVKDOOXSRQUHTXHVWE\&LW\SURYLGHFRPSOHWHDQGDFFXUDWHLQIRUPDWLRQUHJDUGLQJ
DFWXDOZRUNSHUIRUPHGE\D0:%(RQWKH&RQWUDFWDQGSD\PHQWWKHUHIRU
&RQWUDFWRUZLOOQRWPDNHDGGLWLRQVGHOHWLRQVRUVXEVWLWXWLRQVRIDFFHSWHG0:%(ZLWKRXW
ZULWWHQFRQVHQWRIWKH&LW\$Q\XQMXVWLILHGFKDQJHRUGHOHWLRQVKDOOEHDPDWHULDOEUHDFKRI
&RQWUDFWDQGPD\UHVXOWLQGHEDUPHQWLQDFFRUGDQFHZLWKWKHSURFHGXUHVRXWOLQHGLQWKH
2UGLQDQFH
&RQWUDFWRUVKDOOXSRQUHTXHVWE\&LW\DOORZDQDXGLWDQGRUH[DPLQDWLRQRIDQ\ERRNV
UHFRUGVRUILOHVLQWKHSRVVHVVLRQRIWKH&RQWUDFWRUWKDWZLOOVXEVWDQWLDWHWKHDFWXDOZRUN
SHUIRUPHG E\ DQ 0:%( 0DWHULDO PLVUHSUHVHQWDWLRQ RI DQ\ QDWXUHZLOO EH JURXQGV IRU
WHUPLQDWLRQRIWKH&RQWUDFW$Q\VXFKPLVUHSUHVHQWDWLRQPD\EHJURXQGVIRUGLVTXDOLILFDWLRQ
RI&RQWUDFWRUWRELGRQIXWXUHFRQWUDFWVZLWKWKH&LW\IRUDSHULRGRIQRWOHVVWKDQWKUHH\HDUV
% &RQWUDFWRUVKDOOEHIXOO\UHVSRQVLEOHWR&LW\IRUDOODFWVDQGRPLVVLRQVRIWKH6XEFRQWUDFWRUV
6XSSOLHUVDQGRWKHULQGLYLGXDOVRUHQWLWLHVSHUIRUPLQJRUIXUQLVKLQJDQ\RIWKH:RUNMXVWDV
&RQWUDFWRU LV UHVSRQVLEOH IRU &RQWUDFWRU¶V RZQ DFWV DQG RPLVVLRQV 1RWKLQJ LQ WKH &RQWUDFW
'RFXPHQWV
VKDOOFUHDWHIRUWKHEHQHILWRIDQ\VXFK6XEFRQWUDFWRU6XSSOLHURURWKHULQGLYLGXDORUHQWLW\
DQ\FRQWUDFWXDOUHODWLRQVKLSEHWZHHQ&LW\DQGDQ\VXFK6XEFRQWUDFWRU6XSSOLHURURWKHU
LQGLYLGXDORUHQWLW\QRU
VKDOOFUHDWHDQ\REOLJDWLRQRQWKHSDUWRI&LW\WRSD\RUWRVHHWRWKHSD\PHQWRIDQ\PRQH\V
GXHDQ\VXFK6XEFRQWUDFWRU6XSSOLHURURWKHULQGLYLGXDORUHQWLW\H[FHSWDVPD\RWKHUZLVH
EHUHTXLUHGE\/DZVDQG5HJXODWLRQV
& &RQWUDFWRU VKDOO EH VROHO\ UHVSRQVLEOH IRU VFKHGXOLQJ DQG FRRUGLQDWLQJ WKH :RUN RI
6XEFRQWUDFWRUV6XSSOLHUVDQGRWKHULQGLYLGXDOVRUHQWLWLHVSHUIRUPLQJRUIXUQLVKLQJDQ\RIWKH
:RUNXQGHUDGLUHFWRULQGLUHFWFRQWUDFWZLWK&RQWUDFWRU
' $OO6XEFRQWUDFWRUV6XSSOLHUVDQGVXFKRWKHULQGLYLGXDOVRUHQWLWLHVSHUIRUPLQJRUIXUQLVKLQJ
DQ\RIWKH:RUNVKDOOFRPPXQLFDWHZLWK&LW\WKURXJK&RQWUDFWRU
( $OO :RUN SHUIRUPHG IRU &RQWUDFWRU E\ D 6XEFRQWUDFWRU RU 6XSSOLHU ZLOO EH SXUVXDQW WR DQ
DSSURSULDWHDJUHHPHQWEHWZHHQ&RQWUDFWRUDQGWKH6XEFRQWUDFWRURU6XSSOLHUZKLFKVSHFLILFDOO\
ELQGVWKH6XEFRQWUDFWRURU6XSSOLHUWRWKHDSSOLFDEOHWHUPVDQGFRQGLWLRQVRIWKHVH&RQWUDFW
;
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
'RFXPHQWV &RQWUDFWRU VKDOO SURYLGH &LW\ FRQWUDFW QXPEHUV DQG UHIHUHQFH QXPEHUV WR WKH
6XEFRQWUDFWRUVDQGRU6XSSOLHUV
Wage Rates
5HTXLUHGIRUWKLV&RQWUDFW
1RW5HTXLUHGIRUWKLV&RQWUDFW
$Duty to pay Prevailing Wage Rates. 7KH &RQWUDFWRU VKDOO FRPSO\ ZLWK DOO UHTXLUHPHQWV RI
&KDSWHU7H[DV*RYHUQPHQW&RGHDVDPHQGHGLQFOXGLQJWKHSD\PHQWRIQRWOHVVWKDQWKH
UDWHVGHWHUPLQHGE\WKH&LW\&RXQFLORIWKH&LW\RI)RUW:RUWKWREHWKHSUHYDLOLQJZDJHUDWHVLQ
DFFRUGDQFH ZLWK &KDSWHU 6XFK SUHYDLOLQJ ZDJH UDWHV DUH LQFOXGHG LQ WKHVH &RQWUDFW
'RFXPHQWV
%Penalty for Violation.$&RQWUDFWRURUDQ\6XEFRQWUDFWRUZKRGRHVQRWSD\WKHSUHYDLOLQJZDJH
VKDOOXSRQGHPDQGPDGHE\WKH&LW\SD\WRWKH&LW\IRUHDFKZRUNHUHPSOR\HGIRUHDFK
FDOHQGDU GD\ RU SDUW RI WKH GD\ WKDW WKH ZRUNHU LV SDLG OHVV WKDQ WKH SUHYDLOLQJ ZDJH UDWHV
VWLSXODWHGLQWKHVHFRQWUDFWGRFXPHQWV7KLVSHQDOW\VKDOOEHUHWDLQHGE\WKH&LW\WRRIIVHWLWV
DGPLQLVWUDWLYHFRVWVSXUVXDQWWR7H[DV*RYHUQPHQW&RGH
&Complaints of Violations and City Determination of Good Cause.2QUHFHLSWRILQIRUPDWLRQ
LQFOXGLQJ D FRPSODLQW E\ D ZRUNHU FRQFHUQLQJ DQ DOOHJHG YLRODWLRQ RI 7H[DV
*RYHUQPHQW &RGH E\ D &RQWUDFWRU RU 6XEFRQWUDFWRU WKH &LW\ VKDOO PDNH DQ LQLWLDO
GHWHUPLQDWLRQEHIRUHWKHVWGD\DIWHUWKHGDWHWKH&LW\UHFHLYHVWKHLQIRUPDWLRQDVWRZKHWKHU
JRRGFDXVHH[LVWVWREHOLHYHWKDWWKHYLRODWLRQRFFXUUHG7KH&LW\VKDOOQRWLI\LQZULWLQJWKH
&RQWUDFWRU RU 6XEFRQWUDFWRUDQGDQ\DIIHFWHGZRUNHURILWVLQLWLDOGHWHUPLQDWLRQ8SRQWKH
&LW\¶VGHWHUPLQDWLRQWKDWWKHUHLVJRRGFDXVHWREHOLHYHWKH&RQWUDFWRURU6XEFRQWUDFWRUKDV
YLRODWHG &KDSWHU WKH &LW\ VKDOO UHWDLQ WKH IXOO DPRXQWV FODLPHG E\ WKH FODLPDQW RU
FODLPDQWVDVWKHGLIIHUHQFHEHWZHHQZDJHVSDLGDQGZDJHVGXHXQGHUWKHSUHYDLOLQJZDJHUDWHV
VXFKDPRXQWVEHLQJVXEWUDFWHGIURPVXFFHVVLYHSURJUHVVSD\PHQWVSHQGLQJDILQDOGHWHUPLQDWLRQ
RIWKHYLRODWLRQ
'Arbitration Required if Violation Not Resolved.$QLVVXHUHODWLQJWRDQDOOHJHGYLRODWLRQRI
6HFWLRQ7H[DV*RYHUQPHQW&RGHLQFOXGLQJDSHQDOW\RZHGWRWKH&LW\RUDQDIIHFWHG
ZRUNHU VKDOO EH VXEPLWWHG WR ELQGLQJ DUELWUDWLRQ LQ DFFRUGDQFH ZLWK WKH 7H[DV *HQHUDO
$UELWUDWLRQ$FW$UWLFOHHWVHT5HYLVHG6WDWXWHVLIWKH&RQWUDFWRURU6XEFRQWUDFWRUDQGDQ\
DIIHFWHGZRUNHUGRHVQRWUHVROYHWKHLVVXHE\DJUHHPHQWEHIRUHWKHWKGD\DIWHUWKHGDWHWKH
&LW\PDNHVLWVLQLWLDOGHWHUPLQDWLRQSXUVXDQWWR3DUDJUDSK&DERYH,IWKHSHUVRQVUHTXLUHGWR
DUELWUDWHXQGHUWKLVVHFWLRQGRQRWDJUHHRQDQDUELWUDWRUEHIRUHWKHWKGD\DIWHUWKHGDWHWKDW
DUELWUDWLRQLVUHTXLUHGDGLVWULFWFRXUWVKDOODSSRLQWDQDUELWUDWRURQWKHSHWLWLRQRIDQ\RIWKH
SHUVRQV7KH&LW\LVQRWDSDUW\LQWKHDUELWUDWLRQ7KHGHFLVLRQDQGDZDUGRIWKHDUELWUDWRULV
ILQDODQGELQGLQJRQDOOSDUWLHVDQGPD\EHHQIRUFHGLQDQ\FRXUWRIFRPSHWHQWMXULVGLFWLRQ
(Records to be Maintained.7KH&RQWUDFWRUDQGHDFK6XEFRQWUDFWRUVKDOOIRUDSHULRGRIWKUHH
\HDUVIROORZLQJWKHGDWHRIDFFHSWDQFHRIWKHZRUNPDLQWDLQUHFRUGVWKDWVKRZLWKHQDPHDQG
;
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
RFFXSDWLRQRIHDFKZRUNHUHPSOR\HGE\WKH&RQWUDFWRULQWKHFRQVWUXFWLRQRIWKH:RUNSURYLGHG
IRULQWKLV&RQWUDFWDQGLLWKHDFWXDOSHUGLHPZDJHVSDLGWRHDFKZRUNHU7KHUHFRUGVVKDOOEH
RSHQDWDOOUHDVRQDEOHKRXUVIRULQVSHFWLRQE\WKH&LW\7KHSURYLVLRQVRI3DUDJUDSK5LJKW
WR$XGLWVKDOOSHUWDLQWRWKLVLQVSHFWLRQ
)Progress Payments :LWK HDFK SURJUHVV SD\PHQW RU SD\UROO SHULRG ZKLFKHYHU LV OHVV WKH
&RQWUDFWRU VKDOO VXEPLW DQ DIILGDYLW VWDWLQJ WKDW WKH &RQWUDFWRU KDV FRPSOLHG ZLWK WKH
UHTXLUHPHQWVRI&KDSWHU7H[DV*RYHUQPHQW&RGH
*Posting of Wage Rates7KH&RQWUDFWRUVKDOOSRVWSUHYDLOLQJZDJHUDWHVLQDFRQVSLFXRXVSODFHDW
DOOWLPHV
+Subcontractor Compliance 7KH &RQWUDFWRU VKDOO LQFOXGH LQ LWV VXEFRQWUDFWV DQGRU VKDOO
RWKHUZLVHUHTXLUHDOORILWV6XEFRQWUDFWRUVWRFRPSO\ZLWK3DUDJUDSKV$WKURXJK*DERYH
Patent Fees and Royalties
$To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold
harmless City, from and against all claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, architects, attorneys, and other professionals and all court
or arbitration or other dispute resolution costs) arising out of or relating to any infringement of
patent rights or copyrights incident to the use in the performance of the Work or resulting from
the incorporation in the Work of any invention, design, process, product, or device not specified
in the Contract Documents.
Laws and Regulations
$ &RQWUDFWRUVKDOOJLYHDOOQRWLFHVUHTXLUHGE\DQGVKDOOFRPSO\ZLWKDOO/DZVDQG5HJXODWLRQV
DSSOLFDEOH WR WKH SHUIRUPDQFH RI WKH :RUN ([FHSW ZKHUH RWKHUZLVH H[SUHVVO\ UHTXLUHG E\
DSSOLFDEOH/DZVDQG5HJXODWLRQVWKH&LW\VKDOOQRWEHUHVSRQVLEOHIRUPRQLWRULQJ&RQWUDFWRU¶V
FRPSOLDQFHZLWKDQ\/DZVRU5HJXODWLRQV
% ,I&RQWUDFWRUSHUIRUPVDQ\:RUNNQRZLQJRUKDYLQJUHDVRQWRNQRZWKDWLWLVFRQWUDU\WR/DZV
RU5HJXODWLRQV&RQWUDFWRUVKDOOEHDUDOOFODLPVFRVWVORVVHVDQGGDPDJHVLQFOXGLQJEXWQRW
OLPLWHGWRDOOIHHVDQGFKDUJHVRIHQJLQHHUVDUFKLWHFWVDWWRUQH\VDQGRWKHUSURIHVVLRQDOVDQGDOO
FRXUWRUDUELWUDWLRQRURWKHUGLVSXWHUHVROXWLRQFRVWVDULVLQJRXWRIRUUHODWLQJWRVXFK:RUN
+RZHYHULWVKDOOQRWEH&RQWUDFWRU¶VUHVSRQVLELOLW\WRPDNHFHUWDLQWKDWWKH6SHFLILFDWLRQVDQG
'UDZLQJVDUHLQDFFRUGDQFHZLWK/DZVDQG5HJXODWLRQVEXWWKLVVKDOOQRWUHOLHYH&RQWUDFWRURI
&RQWUDFWRU¶VREOLJDWLRQVXQGHU3DUDJUDSK
Use of Site and Other Areas
$Limitation on Use of Site and Other Areas:
&RQWUDFWRUVKDOOFRQILQHFRQVWUXFWLRQHTXLSPHQWWKHVWRUDJHRIPDWHULDOVDQGHTXLSPHQWDQG
WKHRSHUDWLRQVRIZRUNHUVWRWKH6LWHDQGRWKHUDUHDVSHUPLWWHGE\/DZVDQG5HJXODWLRQVDQG
VKDOOQRWXQUHDVRQDEO\HQFXPEHUWKH6LWHDQGRWKHUDUHDVZLWKFRQVWUXFWLRQHTXLSPHQWRU
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
RWKHUPDWHULDOVRUHTXLSPHQW&RQWUDFWRUVKDOODVVXPHIXOOUHVSRQVLELOLW\IRUDQ\GDPDJHWR
DQ\VXFKODQGRUDUHDRUWRWKHRZQHURURFFXSDQWWKHUHRIRURIDQ\DGMDFHQWODQGRUDUHDV
UHVXOWLQJIURPWKHSHUIRUPDQFHRIWKH:RUN
$WDQ\WLPHZKHQLQWKHMXGJPHQWRIWKH&LW\WKH&RQWUDFWRUKDVREVWUXFWHGRUFORVHGRULV
FDUU\LQJRQRSHUDWLRQVLQDSRUWLRQRIDVWUHHWULJKWRIZD\RUHDVHPHQWJUHDWHUWKDQLV
QHFHVVDU\IRUSURSHUH[HFXWLRQRIWKH:RUNWKH&LW\PD\UHTXLUHWKH&RQWUDFWRUWRILQLVKWKH
VHFWLRQRQZKLFKRSHUDWLRQVDUHLQSURJUHVVEHIRUHZRUNLVFRPPHQFHGRQDQ\DGGLWLRQDO
DUHDRIWKH6LWH
6KRXOG DQ\ 'DPDJH &ODLP EH PDGH E\ DQ\ VXFK RZQHU RU RFFXSDQW EHFDXVH RI WKH
SHUIRUPDQFHRIWKH:RUN&RQWUDFWRUVKDOOSURPSWO\DWWHPSWWRUHVROYHWKH'DPDJH&ODLP
Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and
against all claims, costs, losses, and damages arising out of or relating to any claim or
action, legal or equitable, brought by any such owner or occupant against City.
%Removal of Debris During Performance of the Work: 'XULQJ WKH SURJUHVV RI WKH :RUN
&RQWUDFWRU VKDOO NHHS WKH 6LWH DQG RWKHU DUHDV IUHH IURP DFFXPXODWLRQV RI ZDVWH PDWHULDOV
UXEELVKDQGRWKHUGHEULV5HPRYDODQGGLVSRVDORIVXFKZDVWHPDWHULDOVUXEELVKDQGRWKHU
GHEULVVKDOOFRQIRUPWRDSSOLFDEOH/DZVDQG5HJXODWLRQV
&Site Maintenance Cleaning:KRXUVDIWHUZULWWHQQRWLFHLVJLYHQWRWKH&RQWUDFWRUWKDWWKH
FOHDQXSRQWKHMREVLWHLVSURFHHGLQJLQDPDQQHUXQVDWLVIDFWRU\WRWKH&LW\RU'HYHORSHULIWKH
&RQWUDFWRUIDLOVWRFRUUHFWWKHXQVDWLVIDFWRU\SURFHGXUHWKH&LW\PD\WDNHVXFKGLUHFWDFWLRQDV
WKH&LW\GHHPVDSSURSULDWHWRFRUUHFWWKHFOHDQXSGHILFLHQFLHVFLWHGWRWKH&RQWUDFWRULQWKH
ZULWWHQQRWLFHE\OHWWHURUHOHFWURQLFFRPPXQLFDWLRQDQGVKDOOEHHQWLWOHGWRUHFRYHULWVFRVWLQ
GRLQJVR7KH&LW\PD\ZLWKKROG)LQDO$FFHSWDQFHXQWLOFOHDQXSLVFRPSOHWHDQGFRVWDUH
UHFRYHUHG
'Final Site Cleaning: 3ULRUWR)LQDO$FFHSWDQFHRIWKH:RUN&RQWUDFWRUVKDOOFOHDQWKH6LWHDQG
WKH:RUNDQGPDNHLWUHDG\IRUXWLOL]DWLRQE\&LW\RUDGMDFHQWSURSHUW\RZQHU$WWKHFRPSOHWLRQ
RIWKH:RUN&RQWUDFWRUVKDOOUHPRYHIURPWKH6LWHDOOWRROVDSSOLDQFHVFRQVWUXFWLRQHTXLSPHQW
DQGPDFKLQHU\DQGVXUSOXVPDWHULDOVDQGVKDOOUHVWRUHWRRULJLQDOFRQGLWLRQRUEHWWHUDOOSURSHUW\
GLVWXUEHGE\WKH:RUN
(Loading Structures:&RQWUDFWRUVKDOOQRWORDGQRUSHUPLWDQ\SDUWRIDQ\VWUXFWXUHWREHORDGHG
LQDQ\PDQQHUWKDWZLOOHQGDQJHUWKHVWUXFWXUHQRUVKDOO&RQWUDFWRUVXEMHFWDQ\SDUWRIWKH:RUN
RUDGMDFHQWSURSHUW\WRVWUHVVHVRUSUHVVXUHVWKDWZLOOHQGDQJHULW
Record Documents
$ &RQWUDFWRUVKDOOPDLQWDLQLQDVDIHSODFHDWWKH6LWHRULQDSODFHGHVLJQDWHGE\WKH&RQWUDFWRU
DQGDSSURYHGE\WKH&LW\RQHUHFRUGFRS\RIDOO'UDZLQJV6SHFLILFDWLRQV$GGHQGD&KDQJH
2UGHUV)LHOG2UGHUVDQGZULWWHQLQWHUSUHWDWLRQVDQGFODULILFDWLRQVLQJRRGRUGHUDQGDQQRWDWHG
WRVKRZFKDQJHVPDGHGXULQJFRQVWUXFWLRQ7KHVHUHFRUGGRFXPHQWVWRJHWKHUZLWKDOODSSURYHG
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
6DPSOHVDQGDFRXQWHUSDUWRIDOODFFHSWHG6XEPLWWDOVZLOOEHDYDLODEOHWR&LW\IRUUHIHUHQFH
8SRQFRPSOHWLRQRIWKH:RUNWKHVHUHFRUGGRFXPHQWVDQ\RSHUDWLRQDQGPDLQWHQDQFHPDQXDOV
DQG 6XEPLWWDOV ZLOO EH GHOLYHUHG WR &LW\ SULRU WR )LQDO ,QVSHFWLRQ &RQWUDFWRU VKDOO LQFOXGH
DFFXUDWHORFDWLRQVIRUEXULHGDQGLPEHGGHGLWHPV
Safety and Protection
$ &RQWUDFWRU VKDOO EH VROHO\ UHVSRQVLEOH IRU LQLWLDWLQJ PDLQWDLQLQJ DQG VXSHUYLVLQJ DOO VDIHW\
SUHFDXWLRQVDQGSURJUDPVLQFRQQHFWLRQZLWKWKH:RUN6XFKUHVSRQVLELOLW\GRHVQRWUHOLHYH
6XEFRQWUDFWRUVRIWKHLUUHVSRQVLELOLW\IRUWKHVDIHW\RISHUVRQVRUSURSHUW\LQWKHSHUIRUPDQFHRI
WKHLUZRUNQRUIRUFRPSOLDQFHZLWKDSSOLFDEOHVDIHW\/DZVDQG5HJXODWLRQV&RQWUDFWRUVKDOO
WDNHDOOQHFHVVDU\SUHFDXWLRQVIRUWKHVDIHW\RIDQGVKDOOSURYLGHWKHQHFHVVDU\SURWHFWLRQWR
SUHYHQWGDPDJHLQMXU\RUORVVWR
DOOSHUVRQVRQWKH6LWHRUZKRPD\EHDIIHFWHGE\WKH:RUN
DOOWKH:RUNDQGPDWHULDOVDQGHTXLSPHQWWREHLQFRUSRUDWHGWKHUHLQZKHWKHULQVWRUDJHRQ
RURIIWKH6LWHDQG
RWKHU SURSHUW\ DW WKH 6LWH RU DGMDFHQW WKHUHWR LQFOXGLQJ WUHHV VKUXEV ODZQV ZDONV
SDYHPHQWV URDGZD\V VWUXFWXUHV XWLOLWLHV DQG 8QGHUJURXQG )DFLOLWLHV QRW GHVLJQDWHG IRU
UHPRYDOUHORFDWLRQRUUHSODFHPHQWLQWKHFRXUVHRIFRQVWUXFWLRQ
% &RQWUDFWRU VKDOO FRPSO\ ZLWK DOO DSSOLFDEOH /DZV DQG 5HJXODWLRQV UHODWLQJ WR WKH VDIHW\ RI
SHUVRQVRUSURSHUW\RUWRWKHSURWHFWLRQRISHUVRQVRUSURSHUW\IURPGDPDJHLQMXU\RUORVVDQG
VKDOOHUHFWDQGPDLQWDLQDOOQHFHVVDU\VDIHJXDUGVIRUVXFKVDIHW\DQGSURWHFWLRQ&RQWUDFWRUVKDOO
QRWLI\RZQHUVRIDGMDFHQWSURSHUW\DQGRI8QGHUJURXQG)DFLOLWLHVDQGRWKHUXWLOLW\RZQHUVZKHQ
SURVHFXWLRQRIWKH:RUNPD\DIIHFWWKHPDQGVKDOOFRRSHUDWHZLWKWKHPLQWKHSURWHFWLRQ
UHPRYDOUHORFDWLRQDQGUHSODFHPHQWRIWKHLUSURSHUW\
& &RQWUDFWRUVKDOOFRPSO\ZLWKWKHDSSOLFDEOHUHTXLUHPHQWVRI&LW\¶VVDIHW\SURJUDPVLIDQ\
' &RQWUDFWRUVKDOOLQIRUP&LW\RIWKHVSHFLILFUHTXLUHPHQWVRI&RQWUDFWRU¶VVDIHW\SURJUDPLIDQ\
ZLWKZKLFK&LW\¶VHPSOR\HHVDQGUHSUHVHQWDWLYHVPXVWFRPSO\ZKLOHDWWKH6LWH
( $OOGDPDJHLQMXU\RUORVVWRDQ\SURSHUW\UHIHUUHGWRLQ3DUDJUDSK$RU$FDXVHG
GLUHFWO\RULQGLUHFWO\LQZKROHRULQSDUWE\&RQWUDFWRUDQ\6XEFRQWUDFWRU6XSSOLHURUDQ\
RWKHULQGLYLGXDORUHQWLW\GLUHFWO\RULQGLUHFWO\HPSOR\HGE\DQ\RIWKHPWRSHUIRUPDQ\RIWKH
:RUNRUDQ\RQHIRUZKRVHDFWVDQ\RIWKHPPD\EHOLDEOHVKDOOEHUHPHGLHGE\&RQWUDFWRU
) &RQWUDFWRU¶VGXWLHVDQGUHVSRQVLELOLWLHVIRUVDIHW\DQGIRUSURWHFWLRQRIWKH:RUNVKDOOFRQWLQXH
XQWLOVXFKWLPHDVDOOWKH:RUNLVFRPSOHWHGDQG&LW\KDVDFFHSWHGWKH:RUN
Safety Representative
&RQWUDFWRUVKDOOLQIRUP&LW\LQZULWLQJRI&RQWUDFWRU¶VGHVLJQDWHGVDIHW\UHSUHVHQWDWLYHDWWKH6LWH
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
Hazard Communication Programs
&RQWUDFWRUVKDOOEHUHVSRQVLEOHIRUFRRUGLQDWLQJDQ\H[FKDQJHRIPDWHULDOVDIHW\GDWDVKHHWVRURWKHU
KD]DUG FRPPXQLFDWLRQ LQIRUPDWLRQ UHTXLUHG WR EH PDGH DYDLODEOHWR RU H[FKDQJHG EHWZHHQ RU
DPRQJHPSOR\HUVLQDFFRUGDQFHZLWK/DZVRU5HJXODWLRQV
Submittals
$ &RQWUDFWRUVKDOOVXEPLWUHTXLUHG6XEPLWWDOVWR&LW\IRUUHYLHZDQGDFFHSWDQFH(DFKVXEPLWWDO
ZLOOEHLGHQWLILHGDVUHTXLUHGE\&LW\
6XEPLWQXPEHURIFRSLHVVSHFLILHGLQWKH*HQHUDO5HTXLUHPHQWV
'DWD VKRZQ RQ WKH 6XEPLWWDOV ZLOO EH FRPSOHWH ZLWK UHVSHFW WR TXDQWLWLHV GLPHQVLRQV
VSHFLILHG SHUIRUPDQFH DQG GHVLJQ FULWHULD PDWHULDOV DQG VLPLODUGDWDWRVKRZ&LW\WKH
VHUYLFHVPDWHULDOVDQGHTXLSPHQW&RQWUDFWRUSURSRVHVWRSURYLGHDQGWRHQDEOH&LW\WR
UHYLHZWKHLQIRUPDWLRQIRUWKHOLPLWHGSXUSRVHVUHTXLUHGE\3DUDJUDSK&
6XEPLWWDOV VXEPLWWHG DV KHUHLQ SURYLGHG E\ &RQWUDFWRU DQG UHYLHZHG E\ &LW\ IRU
FRQIRUPDQFHZLWKWKHGHVLJQFRQFHSWVKDOOEHH[HFXWHGLQFRQIRUPLW\ZLWKWKH&RQWUDFW
'RFXPHQWVXQOHVVRWKHUZLVHUHTXLUHGE\&LW\
:KHQ6XEPLWWDOVDUHVXEPLWWHGIRUWKHSXUSRVHRIVKRZLQJWKHLQVWDOODWLRQLQJUHDWHUGHWDLO
WKHLUUHYLHZVKDOOQRWH[FXVH&RQWUDFWRUIURPUHTXLUHPHQWVVKRZQRQWKH'UDZLQJVDQG
6SHFLILFDWLRQV
)RU,QIRUPDWLRQ2QO\VXEPLWWDOVXSRQZKLFKWKH&LW\LVQRWH[SHFWHGWRFRQGXFWUHYLHZRU
WDNHUHVSRQVLYHDFWLRQPD\EHVRLGHQWLILHGLQWKH&RQWUDFW'RFXPHQWV
6XEPLWUHTXLUHGQXPEHURI6DPSOHVVSHFLILHGLQWKH6SHFLILFDWLRQV
&OHDUO\LGHQWLI\HDFK6DPSOHDVWRPDWHULDO6XSSOLHUSHUWLQHQWGDWDVXFKDVFDWDORJQXPEHUV
WKHXVHIRUZKLFKLQWHQGHGDQGRWKHUGDWDDV&LW\PD\UHTXLUHWRHQDEOH&LW\WRUHYLHZWKH
VXEPLWWDOIRUWKHOLPLWHGSXUSRVHVUHTXLUHGE\3DUDJUDSK&
% :KHUHD6XEPLWWDOLVUHTXLUHGE\WKH&RQWUDFW'RFXPHQWVRUWKH6FKHGXOHRI6XEPLWWDOVDQ\
UHODWHG:RUNSHUIRUPHGSULRUWR&LW\¶VUHYLHZDQGDFFHSWDQFHRIWKHSHUWLQHQWVXEPLWWDOZLOOEH
DWWKHVROHH[SHQVHDQGUHVSRQVLELOLW\RI&RQWUDFWRU
&City’s Review:
&LW\ZLOOSURYLGHWLPHO\UHYLHZRIUHTXLUHG6XEPLWWDOVLQDFFRUGDQFHZLWKWKH6FKHGXOHRI
6XEPLWWDOVDFFHSWDEOHWR&LW\&LW\¶VUHYLHZDQGDFFHSWDQFHZLOOEHRQO\WRGHWHUPLQHLIWKH
LWHPVFRYHUHGE\WKHVXEPLWWDOVZLOODIWHULQVWDOODWLRQRULQFRUSRUDWLRQLQWKH:RUNFRQIRUP
WR WKH LQIRUPDWLRQ JLYHQ LQ WKH &RQWUDFW 'RFXPHQWV DQG EH FRPSDWLEOH ZLWK WKH GHVLJQ
FRQFHSW RI WKH FRPSOHWHG 3URMHFW DV D IXQFWLRQLQJ ZKROH DV LQGLFDWHG E\ WKH &RQWUDFW
'RFXPHQWV
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
&LW\¶VUHYLHZDQGDFFHSWDQFHZLOOQRWH[WHQGWRPHDQVPHWKRGVWHFKQLTXHVVHTXHQFHVRU
SURFHGXUHVRIFRQVWUXFWLRQH[FHSWZKHUHDSDUWLFXODUPHDQVPHWKRGWHFKQLTXHVHTXHQFH
RU SURFHGXUH RI FRQVWUXFWLRQ LV VSHFLILFDOO\ DQG H[SUHVVO\ FDOOHG IRU E\ WKH &RQWUDFW
'RFXPHQWV RU WR VDIHW\ SUHFDXWLRQV RU SURJUDPV LQFLGHQW WKHUHWR 7KH UHYLHZ DQG
DFFHSWDQFHRIDVHSDUDWHLWHPDVVXFKZLOOQRWLQGLFDWHDSSURYDORIWKHDVVHPEO\LQZKLFKWKH
LWHPIXQFWLRQV
&LW\¶V UHYLHZ DQG DFFHSWDQFH VKDOO QRW UHOLHYH &RQWUDFWRU IURP UHVSRQVLELOLW\ IRU DQ\
YDULDWLRQIURPWKHUHTXLUHPHQWVRIWKH&RQWUDFW'RFXPHQWVXQOHVV&RQWUDFWRUKDVFRPSOLHG
ZLWKWKHUHTXLUHPHQWVRI6HFWLRQDQG&LW\KDVJLYHQZULWWHQDFFHSWDQFHRIHDFK
VXFK YDULDWLRQ E\ VSHFLILF ZULWWHQ QRWDWLRQ WKHUHRI LQFRUSRUDWHG LQ RU DFFRPSDQ\LQJ WKH
6XEPLWWDO&LW\¶VUHYLHZDQGDFFHSWDQFHVKDOOQRWUHOLHYH&RQWUDFWRUIURPUHVSRQVLELOLW\IRU
FRPSO\LQJZLWKWKHUHTXLUHPHQWVRIWKH&RQWUDFW'RFXPHQWV
Contractor’s General Warranty and Guarantee
$ &RQWUDFWRUZDUUDQWVDQGJXDUDQWHHVWR&LW\WKDWDOO:RUNZLOOEHLQDFFRUGDQFHZLWKWKH&RQWUDFW
'RFXPHQWV DQG ZLOO QRW EH GHIHFWLYH &LW\ DQG LWV RIILFHUV GLUHFWRUV PHPEHUV SDUWQHUV
HPSOR\HHVDJHQWVFRQVXOWDQWVDQGVXEFRQWUDFWRUVVKDOOEHHQWLWOHGWRUHO\RQUHSUHVHQWDWLRQRI
&RQWUDFWRU¶VZDUUDQW\DQGJXDUDQWHH
% &RQWUDFWRU¶VZDUUDQW\DQGJXDUDQWHHKHUHXQGHUH[FOXGHVGHIHFWVRUGDPDJHFDXVHGE\
DEXVHPRGLILFDWLRQRULPSURSHUPDLQWHQDQFHRURSHUDWLRQE\SHUVRQVRWKHUWKDQ&RQWUDFWRU
6XEFRQWUDFWRUV 6XSSOLHUV RU DQ\ RWKHU LQGLYLGXDO RU HQWLW\ IRU ZKRP &RQWUDFWRU LV
UHVSRQVLEOHRU
QRUPDOZHDUDQGWHDUXQGHUQRUPDOXVDJH
& &RQWUDFWRU¶V REOLJDWLRQ WR SHUIRUP DQG FRPSOHWH WKH :RUN LQ DFFRUGDQFH ZLWK WKH &RQWUDFW
'RFXPHQWVVKDOOEHDEVROXWH1RQHRIWKHIROORZLQJZLOOFRQVWLWXWHDQDFFHSWDQFHRI:RUNWKDWLV
QRW LQ DFFRUGDQFH ZLWK WKH &RQWUDFW 'RFXPHQWV RU D UHOHDVH RI &RQWUDFWRU¶V REOLJDWLRQ WR
SHUIRUPWKH:RUNLQDFFRUGDQFHZLWKWKH&RQWUDFW'RFXPHQWV
REVHUYDWLRQVE\&LW\
UHFRPPHQGDWLRQRUSD\PHQWE\&LW\RU'HYHORSHURIDQ\SURJUHVVRUILQDOSD\PHQW
WKHLVVXDQFHRIDFHUWLILFDWHRI)LQDO$FFHSWDQFHE\&LW\RUDQ\SD\PHQWUHODWHGWKHUHWRE\
&LW\
XVHRURFFXSDQF\RIWKH:RUNRUDQ\SDUWWKHUHRIE\&LW\
DQ\UHYLHZDQGDFFHSWDQFHRID6XEPLWWDOE\&LW\
DQ\LQVSHFWLRQWHVWRUDSSURYDOE\RWKHUVRU
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
DQ\FRUUHFWLRQRIGHIHFWLYH:RUNE\&LW\
' 7KH&RQWUDFWRUVKDOOUHPHG\DQ\GHIHFWVRUGDPDJHVLQWKH:RUNDQGSD\IRUDQ\GDPDJHWR
RWKHUZRUNRUSURSHUW\UHVXOWLQJWKHUHIURPZKLFKVKDOODSSHDUZLWKLQDSHULRGRIWZR\HDUV
IURPWKHGDWHRI)LQDO$FFHSWDQFHRIWKH:RUNXQOHVVDORQJHUSHULRGLVVSHFLILHGDQGVKDOO
IXUQLVKDJRRGDQGVXIILFLHQWPDLQWHQDQFHERQGFRPSO\LQJZLWKWKHUHTXLUHPHQWVRI$UWLFOH
%7KH&LW\ZLOOJLYHQRWLFHRIREVHUYHGGHIHFWVZLWKUHDVRQDEOHSURPSWQHVV
,QGHPQLILFDWLRQ
$ &RQWUDFWRUFRYHQDQWVDQGDJUHHVWRLQGHPQLI\KROGKDUPOHVVDQGGHIHQGDWLWVRZQH[SHQVHWKH
&LW\LWVRIILFHUVVHUYDQWVDQGHPSOR\HHVIURPDQGDJDLQVWDQ\DQGDOOFODLPVDULVLQJRXWRIRU
DOOHJHGWRDULVHRXWRIWKHZRUNDQGVHUYLFHVWREHSHUIRUPHGE\WKH&RQWUDFWRULWVRIILFHUV
DJHQWV HPSOR\HHV VXEFRQWUDFWRUV OLFHQVHV RU LQYLWHHV XQGHU WKLV &RQWUDFW7+,6
,1'(01,),&$7,21 3529,6,21 ,6 63(&,),&$//< ,17(1'(' 72 23(5$7(
$1'%(())(&7,9((9(1,),7,6$//(*('253529(17+$7$//25620(
2)7+('$0$*(6%(,1*628*+7:(5(&$86(',1:+2/(25,13$57%<
$1<$&720,66,21251(*/,*(1&(2)7+(&,7<7KLVLQGHPQLW\SURYLVLRQLV
LQWHQGHGWRLQFOXGHZLWKRXWOLPLWDWLRQLQGHPQLW\IRUFRVWVH[SHQVHVDQGOHJDOIHHVLQFXUUHGE\
WKH&LW\LQGHIHQGLQJDJDLQVWVXFKFODLPVDQGFDXVHVRIDFWLRQV
% &RQWUDFWRUFRYHQDQWVDQGDJUHHVWRLQGHPQLI\DQGKROGKDUPOHVVDWLWVRZQH[SHQVHWKH&LW\LWV
RIILFHUVVHUYDQWVDQGHPSOR\HHVIURPDQGDJDLQVWDQ\DQGDOOORVVGDPDJHRUGHVWUXFWLRQRI
SURSHUW\ RI WKH &LW\ DULVLQJ RXW RI RU DOOHJHG WR DULVH RXW RI WKH ZRUN DQG VHUYLFHV WR EH
SHUIRUPHGE\WKH&RQWUDFWRULWVRIILFHUVDJHQWVHPSOR\HHVVXEFRQWUDFWRUVOLFHQVHHVRULQYLWHHV
XQGHU WKLV &RQWUDFW 7+,6 ,1'(01,),&$7,21 3529,6,21 ,6 63(&,),&$//<
,17(1'(' 72 23(5$7( $1' %( ())(&7,9( (9(1 ,) ,7 ,6 $//(*(' 25
3529(1 7+$7 $// 25 620( 2) 7+( '$0$*(6 %(,1* 628*+7 :(5(
&$86(',1:+2/(25,13$57%<$1<$&720,66,21251(*/,*(1&(2)
7+(&,7<
Delegation of Professional Design Services
$ &RQWUDFWRUZLOOQRWEHUHTXLUHGWRSURYLGHSURIHVVLRQDOGHVLJQVHUYLFHVXQOHVVVXFKVHUYLFHVDUH
VSHFLILFDOO\ UHTXLUHG E\ WKH &RQWUDFW 'RFXPHQWV IRU D SRUWLRQ RI WKH :RUN RU XQOHVV VXFK
VHUYLFHVDUHUHTXLUHGWRFDUU\RXW&RQWUDFWRU¶VUHVSRQVLELOLWLHVIRUFRQVWUXFWLRQPHDQVPHWKRGV
WHFKQLTXHVVHTXHQFHVDQGSURFHGXUHV
% ,I SURIHVVLRQDO GHVLJQ VHUYLFHV RU FHUWLILFDWLRQV E\ D GHVLJQ SURIHVVLRQDO UHODWHG WR V\VWHPV
PDWHULDOVRUHTXLSPHQWDUHVSHFLILFDOO\UHTXLUHGRI&RQWUDFWRUE\WKH&RQWUDFW'RFXPHQWV&LW\
ZLOOVSHFLI\DOOSHUIRUPDQFHDQGGHVLJQFULWHULDWKDWVXFKVHUYLFHVPXVWVDWLVI\&RQWUDFWRUVKDOO
FDXVHVXFKVHUYLFHVRUFHUWLILFDWLRQVWREHSURYLGHGE\DSURSHUO\OLFHQVHGSURIHVVLRQDOZKRVH
VLJQDWXUHDQGVHDOVKDOODSSHDURQDOOGUDZLQJVFDOFXODWLRQVVSHFLILFDWLRQVFHUWLILFDWLRQVDQG
6XEPLWWDOVSUHSDUHGE\VXFKSURIHVVLRQDO6XEPLWWDOVUHODWHGWRWKH:RUNGHVLJQHGRUFHUWLILHG
E\VXFKSURIHVVLRQDOLISUHSDUHGE\RWKHUVVKDOOEHDUVXFKSURIHVVLRQDO¶VZULWWHQDSSURYDOZKHQ
VXEPLWWHGWR&LW\
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
& &LW\VKDOOEHHQWLWOHGWRUHO\XSRQWKHDGHTXDF\DFFXUDF\DQGFRPSOHWHQHVVRIWKHVHUYLFHV
FHUWLILFDWLRQVRUDSSURYDOVSHUIRUPHGE\VXFKGHVLJQSURIHVVLRQDOVSURYLGHG&LW\KDVVSHFLILHG
WR&RQWUDFWRUSHUIRUPDQFHDQGGHVLJQFULWHULDWKDWVXFKVHUYLFHVPXVWVDWLVI\
' 3XUVXDQWWRWKLV3DUDJUDSK&LW\¶VUHYLHZDQGDFFHSWDQFHRIGHVLJQFDOFXODWLRQVDQGGHVLJQ
GUDZLQJVZLOOEHRQO\IRUWKHOLPLWHGSXUSRVHRIFKHFNLQJIRUFRQIRUPDQFHZLWKSHUIRUPDQFH
DQGGHVLJQFULWHULDJLYHQDQGWKHGHVLJQFRQFHSWH[SUHVVHGLQWKH&RQWUDFW'RFXPHQWV&LW\¶V
UHYLHZDQGDFFHSWDQFHRI6XEPLWWDOVH[FHSWGHVLJQFDOFXODWLRQVDQGGHVLJQGUDZLQJVZLOOEH
RQO\IRUWKHSXUSRVHVWDWHGLQ3DUDJUDSK&
Right to Audit:
$ 7KH&LW\UHVHUYHVWKHULJKWWRDXGLWDOOSURMHFWVXWLOL]LQJ&LW\IXQGV
% 7KH &RQWUDFWRU DJUHHV WKDW WKH &LW\ VKDOO XQWLO WKH H[SLUDWLRQ RI WKUHH \HDUV DIWHU ILQDO
SD\PHQWXQGHUWKLV&RQWUDFWKDYHDFFHVVWRDQGWKHULJKWWRH[DPLQHDQGSKRWRFRS\DQ\GLUHFWO\
SHUWLQHQWERRNVGRFXPHQWVSDSHUVDQGUHFRUGVRIWKH&RQWUDFWRULQYROYLQJWUDQVDFWLRQVUHODWLQJ
WRWKLV&RQWUDFW&RQWUDFWRUDJUHHVWKDWWKH&LW\VKDOOKDYHDFFHVVGXULQJ5HJXODU:RUNLQJ+RXUV
WRDOOQHFHVVDU\&RQWUDFWRUIDFLOLWLHVDQGVKDOOEHSURYLGHGDGHTXDWHDQGDSSURSULDWHZRUNVSDFH
LQRUGHUWRFRQGXFWDXGLWVLQFRPSOLDQFHZLWKWKHSURYLVLRQVRIWKLV3DUDJUDSK7KH&LW\VKDOO
JLYH&RQWUDFWRUUHDVRQDEOHDGYDQFHQRWLFHRILQWHQGHGDXGLWV
& &RQWUDFWRUIXUWKHUDJUHHVWRLQFOXGHLQDOOLWVVXEFRQWUDFWVKHUHXQGHUDSURYLVLRQWRWKHHIIHFWWKDW
WKHVXEFRQWUDFWRUDJUHHVWKDWWKH&LW\VKDOOXQWLOWKHH[SLUDWLRQRIWKUHH\HDUVDIWHUILQDO
SD\PHQWXQGHUWKLV&RQWUDFWKDYHDFFHVVWRDQGWKHULJKWWRH[DPLQHDQGSKRWRFRS\DQ\GLUHFWO\
SHUWLQHQWERRNVGRFXPHQWVSDSHUVDQGUHFRUGVRIVXFK6XEFRQWUDFWRULQYROYLQJWUDQVDFWLRQVWR
WKHVXEFRQWUDFWDQGIXUWKHUWKDW&LW\VKDOOKDYHDFFHVVGXULQJ5HJXODU:RUNLQJ+RXUVWRDOO
6XEFRQWUDFWRUIDFLOLWLHVDQGVKDOOEHSURYLGHGDGHTXDWHDQGDSSURSULDWHZRUNVSDFHLQRUGHUWR
FRQGXFW DXGLWV LQ FRPSOLDQFH ZLWK WKH SURYLVLRQV RI WKLV 3DUDJUDSK 7KH &LW\ VKDOO JLYH
6XEFRQWUDFWRUUHDVRQDEOHDGYDQFHQRWLFHRILQWHQGHGDXGLWV
' &RQWUDFWRUDQG6XEFRQWUDFWRUDJUHHWRSKRWRFRS\VXFKGRFXPHQWVDVPD\EHUHTXHVWHGE\WKH
&LW\7KH&LW\DJUHHVWRUHLPEXUVH&RQWUDFWRUIRUWKHFRVWRIWKHFRSLHVDVIROORZVDWWKHUDWH
SXEOLVKHGLQWKH7H[DV$GPLQLVWUDWLYH&RGHLQHIIHFWDVRIWKHWLPHFRS\LQJLVSHUIRUPHG
Nondiscrimination
$ 7KH&LW\LVUHVSRQVLEOHIRURSHUDWLQJ3XEOLF7UDQVSRUWDWLRQ3URJUDPVDQGLPSOHPHQWLQJWUDQVLW
UHODWHGSURMHFWVZKLFKDUHIXQGHGLQSDUWZLWK)HGHUDOILQDQFLDODVVLVWDQFHDZDUGHGE\WKH86
'HSDUWPHQW RI 7UDQVSRUWDWLRQ DQG WKH )HGHUDO 7UDQVLW $GPLQLVWUDWLRQ )7$ ZLWKRXW
GLVFULPLQDWLQJDJDLQVWDQ\SHUVRQLQWKH8QLWHG6WDWHVRQWKHEDVLVRIUDFHFRORURUQDWLRQDO
RULJLQ
%Title VI, Civil Rights Act of 1964 as amended:&RQWUDFWRUVKDOOFRPSO\ZLWKWKHUHTXLUHPHQWVRI
WKH$FWDQGWKH5HJXODWLRQVDVIXUWKHUGHILQHGLQWKH6XSSOHPHQWDU\&RQGLWLRQVIRUDQ\SURMHFW
UHFHLYLQJ)HGHUDODVVLVWDQFH
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
$57,&/(±27+(5:25.$77+(6,7(
Related Work at Site
$ &LW\PD\SHUIRUPRWKHUZRUNUHODWHGWRWKH3URMHFWDWWKH6LWHZLWK&LW\¶VHPSOR\HHVRURWKHU
&LW\FRQWUDFWRUVRUWKURXJKRWKHUGLUHFWFRQWUDFWVWKHUHIRURUKDYHRWKHUZRUNSHUIRUPHGE\
XWLOLW\RZQHUV,IVXFKRWKHUZRUNLVQRWQRWHGLQWKH&RQWUDFW'RFXPHQWVWKHQZULWWHQQRWLFH
WKHUHRIZLOOEHJLYHQWR&RQWUDFWRUSULRUWRVWDUWLQJDQ\VXFKRWKHUZRUNDQG
% &RQWUDFWRUVKDOODIIRUGHDFKRWKHUFRQWUDFWRUZKRLVDSDUW\WRVXFKDGLUHFWFRQWUDFWHDFKXWLOLW\
RZQHU DQG &LW\ LI &LW\ LV SHUIRUPLQJ RWKHU ZRUN ZLWK &LW\¶V HPSOR\HHV RU RWKHU &LW\
FRQWUDFWRUV SURSHU DQG VDIH DFFHVV WR WKH 6LWH SURYLGH D UHDVRQDEOH RSSRUWXQLW\ IRU WKH
LQWURGXFWLRQDQGVWRUDJHRIPDWHULDOVDQGHTXLSPHQWDQGWKHH[HFXWLRQRIVXFKRWKHUZRUNDQG
SURSHUO\FRRUGLQDWHWKH:RUNZLWKWKHLUV&RQWUDFWRUVKDOOGRDOOFXWWLQJILWWLQJDQGSDWFKLQJRI
WKH:RUNWKDWPD\EHUHTXLUHGWRSURSHUO\FRQQHFWRURWKHUZLVHPDNHLWVVHYHUDOSDUWVFRPH
WRJHWKHUDQGSURSHUO\LQWHJUDWHZLWKVXFKRWKHUZRUN&RQWUDFWRUVKDOOQRWHQGDQJHUDQ\ZRUNRI
RWKHUV E\ FXWWLQJ H[FDYDWLQJ RU RWKHUZLVH DOWHULQJ VXFK ZRUN SURYLGHG KRZHYHU WKDW
&RQWUDFWRUPD\FXWRUDOWHURWKHUV
ZRUNZLWKWKHZULWWHQFRQVHQWRI&LW\DQGWKHRWKHUVZKRVH
ZRUNZLOOEHDIIHFWHG
& ,I WKH SURSHU H[HFXWLRQ RU UHVXOWV RI DQ\ SDUW RI &RQWUDFWRU¶V :RUN GHSHQGV XSRQ ZRUN
SHUIRUPHGE\RWKHUVXQGHUWKLV$UWLFOH&RQWUDFWRUVKDOOLQVSHFWVXFKRWKHUZRUNDQGSURPSWO\
UHSRUWWR&LW\LQZULWLQJDQ\GHOD\VGHIHFWVRUGHILFLHQFLHVLQVXFKRWKHUZRUNWKDWUHQGHULW
XQDYDLODEOHRUXQVXLWDEOHIRUWKHSURSHUH[HFXWLRQDQGUHVXOWVRI&RQWUDFWRU¶V:RUN&RQWUDFWRU¶V
IDLOXUH WR VR UHSRUW ZLOO FRQVWLWXWH DQ DFFHSWDQFH RI VXFK RWKHU ZRUN DV ILW DQG SURSHU IRU
LQWHJUDWLRQZLWK&RQWUDFWRU¶V:RUNH[FHSWIRUODWHQWGHIHFWVLQWKHZRUNSURYLGHGE\RWKHUV
$57,&/(±&,7<¶65(63216,%,/,7,(6
Inspections, Tests, and Approvals
&LW\¶VUHVSRQVLELOLW\ZLWKUHVSHFWWRFHUWDLQLQVSHFWLRQVWHVWVDQGDSSURYDOVLVVHWIRUWKLQ3DUDJUDSK
Limitations on City’s Responsibilities
$ 7KH&LW\VKDOOQRWVXSHUYLVHGLUHFWRUKDYHFRQWURORUDXWKRULW\RYHUQRUEHUHVSRQVLEOHIRU
&RQWUDFWRU¶VPHDQVPHWKRGVWHFKQLTXHVVHTXHQFHVRUSURFHGXUHVRIFRQVWUXFWLRQRUWKHVDIHW\
SUHFDXWLRQVDQGSURJUDPVLQFLGHQWWKHUHWRRUIRUDQ\IDLOXUHRI&RQWUDFWRUWRFRPSO\ZLWK/DZV
DQG5HJXODWLRQVDSSOLFDEOHWRWKHSHUIRUPDQFHRIWKH:RUN&LW\ZLOOQRWEHUHVSRQVLEOHIRU
&RQWUDFWRU¶VIDLOXUHWRSHUIRUPWKH:RUNLQDFFRUGDQFHZLWKWKH&RQWUDFW'RFXPHQWV
% &LW\ZLOOQRWLI\WKH&RQWUDFWRURIDSSOLFDEOHVDIHW\SODQVSXUVXDQWWR3DUDJUDSK
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
Compliance with Safety Program
:KLOHDWWKH6LWH&LW\¶VHPSOR\HHVDQGUHSUHVHQWDWLYHVVKDOOFRPSO\ZLWKWKHVSHFLILFDSSOLFDEOH
UHTXLUHPHQWV RI &RQWUDFWRU¶V VDIHW\ SURJUDPV RI ZKLFK &LW\ KDVEHHQ LQIRUPHG SXUVXDQW WR
3DUDJUDSK
$57,&/(±&,7<¶62%6(59$7,2167$786'85,1*&216758&7,21
City’s Project Representative
&LW\ZLOOSURYLGHRQHRUPRUH3URMHFW5HSUHVHQWDWLYHVGXULQJWKHFRQVWUXFWLRQSHULRG7KHGXWLHV
DQGUHVSRQVLELOLWLHVDQGWKHOLPLWDWLRQVRIDXWKRULW\RI&LW\¶VUHSUHVHQWDWLYHGXULQJFRQVWUXFWLRQDUH
VHWIRUWKLQWKH&RQWUDFW'RFXPHQWV
$ &LW\¶V3URMHFW5HSUHVHQWDWLYHZLOOPDNHYLVLWVWRWKH6LWHDWLQWHUYDOVDSSURSULDWHWRWKHYDULRXV
VWDJHVRIFRQVWUXFWLRQDV&LW\GHHPVQHFHVVDU\LQRUGHUWRREVHUYHWKHSURJUHVVWKDWKDVEHHQ
PDGH DQG WKH TXDOLW\ RI WKH YDULRXV DVSHFWV RI &RQWUDFWRU¶V H[HFXWHG :RUN %DVHG RQ
LQIRUPDWLRQ REWDLQHG GXULQJ VXFK YLVLWV DQG REVHUYDWLRQV &LW\¶V 3URMHFW 5HSUHVHQWDWLYH ZLOO
GHWHUPLQHLQJHQHUDOLIWKH:RUNLVSURFHHGLQJLQDFFRUGDQFHZLWKWKH&RQWUDFW'RFXPHQWV
&LW\¶V3URMHFW5HSUHVHQWDWLYHZLOOQRWEHUHTXLUHGWRPDNHH[KDXVWLYHRUFRQWLQXRXVLQVSHFWLRQV
RQWKH6LWHWRFKHFNWKHTXDOLW\RUTXDQWLW\RIWKH:RUN&LW\¶V3URMHFW5HSUHVHQWDWLYH¶VHIIRUWV
ZLOOEHGLUHFWHGWRZDUGSURYLGLQJ&LW\DJUHDWHUGHJUHHRIFRQILGHQFHWKDWWKHFRPSOHWHG:RUN
ZLOOFRQIRUPJHQHUDOO\WRWKH&RQWUDFW'RFXPHQWV
% &LW\¶V 3URMHFW 5HSUHVHQWDWLYH¶V YLVLWV DQG REVHUYDWLRQV DUH VXEMHFW WR DOO WKH OLPLWDWLRQV RQ
DXWKRULW\DQGUHVSRQVLELOLW\LQWKH&RQWUDFW'RFXPHQWV
Authorized Variations in Work
&LW\¶V3URMHFW5HSUHVHQWDWLYHPD\DXWKRUL]HPLQRUYDULDWLRQVLQWKH:RUNIURPWKHUHTXLUHPHQWVRI
WKH&RQWUDFW'RFXPHQWVZKLFKGRQRWLQYROYHDQDGMXVWPHQWLQWKH&RQWUDFW3ULFHRUWKH&RQWUDFW
7LPHDQGDUHFRPSDWLEOHZLWKWKHGHVLJQFRQFHSWRIWKHFRPSOHWHG3URMHFWDVDIXQFWLRQLQJZKROHDV
LQGLFDWHGE\WKH&RQWUDFW'RFXPHQWV7KHVHPD\EHDFFRPSOLVKHGE\D)LHOG2UGHUDQGZLOOEH
ELQGLQJRQ&LW\'HYHORSHUDQGDOVRRQ&RQWUDFWRUZKRVKDOOSHUIRUPWKH:RUNLQYROYHGSURPSWO\
Rejecting Defective Work
&LW\ZLOOKDYHDXWKRULW\WRUHMHFW:RUNZKLFK&LW\¶V3URMHFW5HSUHVHQWDWLYHEHOLHYHVWREHGHIHFWLYH
RU ZLOO QRW SURGXFH D FRPSOHWHG 3URMHFW WKDW FRQIRUPV WR WKH &RQWUDFW 'RFXPHQWV RU WKDW ZLOO
SUHMXGLFHWKHLQWHJULW\RIWKHGHVLJQFRQFHSWRIWKHFRPSOHWHG3URMHFWDVDIXQFWLRQLQJZKROHDV
LQGLFDWHGE\WKH&RQWUDFW'RFXPHQWV&LW\ZLOOKDYHDXWKRULW\WRFRQGXFWVSHFLDOLQVSHFWLRQRU
WHVWLQJRIWKH:RUNDVSURYLGHGLQ$UWLFOHZKHWKHURUQRWWKH:RUNLVIDEULFDWHGLQVWDOOHGRU
FRPSOHWHG
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
Determinations for Work Performed
&RQWUDFWRUZLOOGHWHUPLQHWKHDFWXDOTXDQWLWLHVDQGFODVVLILFDWLRQVRI:RUNSHUIRUPHG&LW\¶V3URMHFW
5HSUHVHQWDWLYHZLOOUHYLHZZLWK&RQWUDFWRUWKHSUHOLPLQDU\GHWHUPLQDWLRQVRQVXFKPDWWHUVEHIRUH
UHQGHULQJDZULWWHQUHFRPPHQGDWLRQ&LW\¶VZULWWHQGHFLVLRQZLOOEHILQDOH[FHSWDVPRGLILHGWR
UHIOHFWFKDQJHGIDFWXDOFRQGLWLRQVRUPRUHDFFXUDWHGDWD
$57,&/(±&+$1*(6,17+(:25.
Authorized Changes in the Work
$ :LWKRXWLQYDOLGDWLQJWKH&RQWUDFWDQGZLWKRXWQRWLFHWRDQ\VXUHW\&LW\PD\DWDQ\WLPHRU
IURP WLPH WR WLPH RUGHU ([WUD :RUN 8SRQ QRWLFH RI VXFK ([WUD:RUN &RQWUDFWRU VKDOO
SURPSWO\ SURFHHG ZLWK WKH :RUN LQYROYHG ZKLFK ZLOO EH SHUIRUPHG XQGHU WKH DSSOLFDEOH
FRQGLWLRQVRIWKH&RQWUDFW'RFXPHQWVH[FHSWDVRWKHUZLVHVSHFLILFDOO\SURYLGHG([WUD:RUN
VKDOOEHPHPRULDOL]HGE\D3DUWLFLSDWLQJ&KDQJH2UGHUZKLFKPD\RUPD\QRWSUHFHGHDQRUGHU
RI([WUDZRUN
% )RUPLQRUFKDQJHVRI:RUNQRWUHTXLULQJFKDQJHVWR&RQWUDFW7LPHRU&RQWUDFW3ULFHRQD
SURMHFWZLWK&LW\SDUWLFLSDWLRQD)LHOG2UGHUPD\EHLVVXHGE\WKH&LW\
Notification to Surety
,IWKHSURYLVLRQVRIDQ\ERQGUHTXLUHQRWLFHWREHJLYHQWRDVXUHW\RIDQ\FKDQJHDIIHFWLQJWKH
JHQHUDOVFRSHRIWKH:RUNRUWKHSURYLVLRQVRIWKH&RQWUDFW'RFXPHQWVLQFOXGLQJEXWQRWOLPLWHG
WR &RQWUDFW 3ULFH RU &RQWUDFW 7LPH WKH JLYLQJ RI DQ\ VXFK QRWLFH ZLOO EH &RQWUDFWRU¶V
UHVSRQVLELOLW\7KHDPRXQWRIHDFKDSSOLFDEOHERQGZLOOEHDGMXVWHGE\WKH&RQWUDFWRUWRUHIOHFWWKH
HIIHFWRIDQ\VXFKFKDQJH
$57,&/(±&+$1*(2)&2175$&735,&(&+$1*(2)&2175$&77,0(
Change of Contract Price
$ 7KH&RQWUDFW3ULFHPD\RQO\EHFKDQJHGE\D3DUWLFLSDWLQJ&KDQJH2UGHUIRUSURMHFWVZLWK&LW\
SDUWLFLSDWLRQ
Change of Contract Time
$ 7KH&RQWUDFW7LPHPD\RQO\EHFKDQJHGE\D3DUWLFLSDWLQJ&KDQJH2UGHUIRUSURMHFWVZLWK&LW\
SDUWLFLSDWLRQ
Delays
$ ,I&RQWUDFWRULVGHOD\HG&LW\VKDOOQRWEHOLDEOHWR&RQWUDFWRUIRUDQ\FODLPVFRVWVORVVHVRU
GDPDJHVLQFOXGLQJEXWQRWOLPLWHGWRDOOIHHVDQGFKDUJHVRIHQJLQHHUVDUFKLWHFWVDWWRUQH\VDQG
RWKHUSURIHVVLRQDOVDQGDOOFRXUWRUDUELWUDWLRQRURWKHUGLVSXWHUHVROXWLRQFRVWVVXVWDLQHGE\
&RQWUDFWRURQRULQFRQQHFWLRQZLWKDQ\RWKHUSURMHFWRUDQWLFLSDWHGSURMHFW
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
$57,&/(±7(676$1',163(&7,216&255(&7,215(029$/25$&&(37$1&(2)
'()(&7,9(:25.
Notice of Defects
1RWLFH RI DOO GHIHFWLYH :RUN RI ZKLFK &LW\ KDV DFWXDO NQRZOHGJH ZLOO EH JLYHQ WR &RQWUDFWRU
'HIHFWLYH:RUNPD\EHUHMHFWHGFRUUHFWHGRUDFFHSWHGDVSURYLGHGLQWKLV$UWLFOH
Access to Work
&LW\LQGHSHQGHQWWHVWLQJODERUDWRULHVDQGJRYHUQPHQWDODJHQFLHVZLWKMXULVGLFWLRQDOLQWHUHVWVZLOO
KDYHDFFHVVWRWKH6LWHDQGWKH:RUNDWUHDVRQDEOHWLPHVIRUWKHLUREVHUYDWLRQLQVSHFWLRQDQG
WHVWLQJ&RQWUDFWRUVKDOOSURYLGHWKHPSURSHUDQGVDIHFRQGLWLRQVIRUVXFKDFFHVVDQGDGYLVHWKHPRI
&RQWUDFWRU¶VVDIHW\SURFHGXUHVDQGSURJUDPVVRWKDWWKH\PD\FRPSO\WKHUHZLWKDVDSSOLFDEOH
Tests and Inspections
$ &RQWUDFWRUVKDOOJLYH&LW\WLPHO\QRWLFHRIUHDGLQHVVRIWKH:RUNIRUDOOUHTXLUHGLQVSHFWLRQV
WHVWVRUDSSURYDOVDQGVKDOOFRRSHUDWHZLWKLQVSHFWLRQDQGWHVWLQJSHUVRQQHOWRIDFLOLWDWHUHTXLUHG
LQVSHFWLRQVRUWHVWV
% ,I&RQWUDFW'RFXPHQWV/DZVRU5HJXODWLRQVRIDQ\SXEOLFERG\KDYLQJMXULVGLFWLRQUHTXLUHDQ\
RIWKH:RUNRUSDUWWKHUHRIWREHLQVSHFWHGWHVWHGRUDSSURYHG&RQWUDFWRUVKDOODVVXPHIXOO
UHVSRQVLELOLW\ IRU DUUDQJLQJ DQG REWDLQLQJ VXFK LQGHSHQGHQW LQVSHFWLRQV WHVWV UHWHVWV RU
DSSURYDOVSD\DOOFRVWVLQFRQQHFWLRQWKHUHZLWKDQGIXUQLVK&LW\WKHUHTXLUHGFHUWLILFDWHVRI
LQVSHFWLRQ RU DSSURYDO H[FHSWLQJ KRZHYHU WKRVH IHHV VSHFLILFDOO\ LGHQWLILHG LQ WKH
6XSSOHPHQWDU\ &RQGLWLRQV RU DQ\ 7H[DV 'HSDUWPHQW RI /LFHQVXUH DQG 5HJXODWLRQ 7'/5
LQVSHFWLRQVZKLFKVKDOOEHSDLGDVGHVFULEHGLQWKH6XSSOHPHQWDU\&RQGLWLRQV
& &RQWUDFWRUVKDOOEHUHVSRQVLEOHIRUDUUDQJLQJDQGREWDLQLQJDQGVKDOOSD\DOOFRVWVLQFRQQHFWLRQ
ZLWKDQ\LQVSHFWLRQVWHVWVUHWHVWVRUDSSURYDOVUHTXLUHGIRU&LW\¶VDFFHSWDQFHRIPDWHULDOVRU
HTXLSPHQWWREHLQFRUSRUDWHGLQWKH:RUNRUDFFHSWDQFHRIPDWHULDOVPL[GHVLJQVRUHTXLSPHQW
VXEPLWWHGIRUDSSURYDOSULRUWR&RQWUDFWRU¶VSXUFKDVHWKHUHRIIRULQFRUSRUDWLRQLQWKH:RUN
6XFKLQVSHFWLRQVWHVWVUHWHVWVRUDSSURYDOVVKDOOEHSHUIRUPHGE\RUJDQL]DWLRQVDSSURYHGE\
&LW\
' &LW\ PD\ DUUDQJH IRU WKH VHUYLFHV RI DQ LQGHSHQGHQW WHVWLQJ ODERUDWRU\ ³7HVWLQJ /DE´ WR
SHUIRUPDQ\LQVSHFWLRQVRUWHVWV³7HVWLQJ´IRUDQ\SDUWRIWKH:RUNDVGHWHUPLQHGVROHO\E\
&LW\
&LW\ZLOOFRRUGLQDWHVXFK7HVWLQJWRWKHH[WHQWSRVVLEOHZLWK&RQWUDFWRU
6KRXOGDQ\7HVWLQJXQGHUWKLV6HFWLRQ'UHVXOWLQD³IDLO´³GLGQRWSDVV´RURWKHU
VLPLODUQHJDWLYHUHVXOWWKH&RQWUDFWRUVKDOOEHUHVSRQVLEOHIRUSD\LQJIRUDQ\DQGDOOUHWHVWV
&RQWUDFWRU¶VFDQFHOODWLRQZLWKRXWFDXVHRI&LW\LQLWLDWHG7HVWLQJVKDOOEHGHHPHGDQHJDWLYH
UHVXOWDQGUHTXLUHDUHWHVW
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
$Q\DPRXQWVRZHGIRUDQ\UHWHVWXQGHUWKLV6HFWLRQ'VKDOOEHSDLGGLUHFWO\WRWKH
7HVWLQJ /DE E\ &RQWUDFWRU &LW\ ZLOO IRUZDUG DOO LQYRLFHV IRUUHWHVWV WR
'HYHORSHU&RQWUDFWRU
,I&RQWUDFWRUIDLOVWRSD\WKH7HVWLQJ/DE&LW\ZLOOQRWLVVXHDOHWWHURI)LQDO$FFHSWDQFH
XQWLOWKH7HVWLQJ/DELV3DLG
( ,IDQ\:RUNRUWKHZRUNRIRWKHUVWKDWLVWREHLQVSHFWHGWHVWHGRUDSSURYHGLVFRYHUHGE\
&RQWUDFWRUZLWKRXWZULWWHQFRQFXUUHQFHRI&LW\&RQWUDFWRUVKDOOLIUHTXHVWHGE\&LW\XQFRYHU
VXFK:RUNIRUREVHUYDWLRQ
Uncovering Work
$ ,IDQ\:RUNLVFRYHUHGFRQWUDU\WRWKH&RQWUDFW'RFXPHQWVRUVSHFLILFLQVWUXFWLRQVE\WKH&LW\LW
PXVWLIUHTXHVWHGE\&LW\EHXQFRYHUHGIRU&LW\¶VREVHUYDWLRQDQGUHSODFHGDW&RQWUDFWRU¶V
H[SHQVH
City May Stop the Work
,IWKH:RUNLVGHIHFWLYHRU&RQWUDFWRUIDLOVWRVXSSO\VXIILFLHQWVNLOOHGZRUNHUVRUVXLWDEOHPDWHULDOV
RUHTXLSPHQWRUIDLOVWRSHUIRUPWKH:RUNLQVXFKDZD\WKDWWKHFRPSOHWHG:RUNZLOOFRQIRUPWR
WKH&RQWUDFW'RFXPHQWV&LW\PD\RUGHU&RQWUDFWRUWRVWRSWKH:RUNRUDQ\SRUWLRQWKHUHRIXQWLO
WKHFDXVHIRUVXFKRUGHUKDVEHHQHOLPLQDWHGKRZHYHUWKLVULJKWRI&LW\WRVWRSWKH:RUNVKDOOQRW
JLYHULVHWRDQ\GXW\RQWKHSDUWRI&LW\WRH[HUFLVHWKLVULJKWIRUWKHEHQHILWRI&RQWUDFWRUDQ\
6XEFRQWUDFWRUDQ\6XSSOLHUDQ\RWKHULQGLYLGXDORUHQWLW\RUDQ\VXUHW\IRURUHPSOR\HHRUDJHQW
RIDQ\RIWKHP
Correction or Removal of Defective Work
$ 3URPSWO\DIWHUUHFHLSWRIZULWWHQQRWLFH&RQWUDFWRUVKDOOFRUUHFWDOOGHIHFWLYH:RUNSXUVXDQWWR
DQDFFHSWDEOHVFKHGXOHZKHWKHURUQRWIDEULFDWHGLQVWDOOHGRUFRPSOHWHGRULIWKH:RUNKDV
EHHQUHMHFWHGE\&LW\UHPRYHLWIURPWKH3URMHFWDQGUHSODFHLWZLWK:RUNWKDWLVQRWGHIHFWLYH
&RQWUDFWRUVKDOOSD\DOOFODLPVFRVWVDGGLWLRQDOWHVWLQJORVVHVDQGGDPDJHVLQFOXGLQJEXWQRW
OLPLWHGWRDOOIHHVDQGFKDUJHVRIHQJLQHHUVDUFKLWHFWVDWWRUQH\VDQGRWKHUSURIHVVLRQDOVDQGDOO
FRXUWRUDUELWUDWLRQRURWKHUGLVSXWHUHVROXWLRQFRVWVDULVLQJRXWRIRUUHODWLQJWRVXFKFRUUHFWLRQ
RUUHPRYDOLQFOXGLQJEXWQRWOLPLWHGWRDOOFRVWVRIUHSDLURUUHSODFHPHQWRIZRUNRIRWKHUV
)DLOXUHWRUHTXLUHWKHUHPRYDORIDQ\GHIHFWLYH:RUNVKDOOQRWFRQVWLWXWHDFFHSWDQFHRIVXFK
:RUN
% :KHQFRUUHFWLQJGHIHFWLYH:RUNXQGHUWKHWHUPVRIWKLV3DUDJUDSKRU3DUDJUDSK
&RQWUDFWRUVKDOOWDNHQRDFWLRQWKDWZRXOGYRLGRURWKHUZLVHLPSDLU&LW\¶VVSHFLDOZDUUDQW\DQG
JXDUDQWHHLIDQ\RQVDLG:RUN
Correction Period
$ ,IZLWKLQWZR\HDUVDIWHUWKHGDWHRI)LQDO$FFHSWDQFHRUVXFKORQJHUSHULRGRIWLPHDVPD\
EH SUHVFULEHG E\ WKH WHUPV RI DQ\ DSSOLFDEOH VSHFLDO JXDUDQWHHUHTXLUHG E\ WKH &RQWUDFW
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
'RFXPHQWVDQ\:RUNLVIRXQGWREHGHIHFWLYHRULIWKHUHSDLURIDQ\GDPDJHVWRWKHODQGRU
DUHDVPDGHDYDLODEOHIRU&RQWUDFWRU¶VXVHE\&LW\RUSHUPLWWHGE\/DZVDQG5HJXODWLRQVDV
FRQWHPSODWHGLQ3DUDJUDSK$LVIRXQGWREHGHIHFWLYH&RQWUDFWRUVKDOOSURPSWO\ZLWKRXW
FRVWWR&LW\DQGLQDFFRUGDQFHZLWK&LW\¶VZULWWHQLQVWUXFWLRQV
UHSDLUVXFKGHIHFWLYHODQGRUDUHDVRU
FRUUHFWVXFKGHIHFWLYH:RUNRU
LIWKHGHIHFWLYH:RUNKDVEHHQUHMHFWHGE\&LW\UHPRYHLWIURPWKH3URMHFWDQGUHSODFHLW
ZLWK:RUNWKDWLVQRWGHIHFWLYHDQG
VDWLVIDFWRULO\FRUUHFWRUUHSDLURUUHPRYHDQGUHSODFHDQ\GDPDJHWRRWKHU:RUNWRWKHZRUN
RIRWKHUVRURWKHUODQGRUDUHDVUHVXOWLQJWKHUHIURP
% ,I&RQWUDFWRUGRHVQRWSURPSWO\FRPSO\ZLWKWKHWHUPVRI&LW\¶VZULWWHQLQVWUXFWLRQVRULQDQ
HPHUJHQF\ZKHUHGHOD\ZRXOGFDXVHVHULRXVULVNRIORVVRUGDPDJH&LW\PD\KDYHWKHGHIHFWLYH
:RUNFRUUHFWHGRUUHSDLUHGRUPD\KDYHWKHUHMHFWHG:RUNUHPRYHGDQGUHSODFHG$OOFODLPV
FRVWV ORVVHV DQG GDPDJHV LQFOXGLQJ EXW QRW OLPLWHG WR DOO IHHV DQG FKDUJHV RI HQJLQHHUV
DUFKLWHFWV DWWRUQH\V DQG RWKHU SURIHVVLRQDOV DQG DOO FRXUW RU RWKHU GLVSXWH UHVROXWLRQ FRVWV
DULVLQJRXWRIRUUHODWLQJWRVXFKFRUUHFWLRQRUUHSDLURUVXFKUHPRYDODQGUHSODFHPHQWLQFOXGLQJ
EXWQRWOLPLWHGWRDOOFRVWVRIUHSDLURUUHSODFHPHQWRIZRUNRIRWKHUVZLOOEHSDLGE\&RQWUDFWRU
& :KHUHGHIHFWLYH:RUNDQGGDPDJHWRRWKHU:RUNUHVXOWLQJWKHUHIURPKDVEHHQFRUUHFWHGRU
UHPRYHGDQGUHSODFHGXQGHUWKLV3DUDJUDSKWKHFRUUHFWLRQSHULRGKHUHXQGHUZLWKUHVSHFW
WRVXFK:RUNPD\EHUHTXLUHGWREHH[WHQGHGIRUDQDGGLWLRQDOSHULRGRIRQH\HDUDIWHUWKHHQG
RI WKH LQLWLDO FRUUHFWLRQ SHULRG &LW\ VKDOO SURYLGH GD\V ZULWWHQ QRWLFH WR &RQWUDFWRU DQG
'HYHORSHUVKRXOGVXFKDGGLWLRQDOZDUUDQW\FRYHUDJHEHUHTXLUHG&RQWUDFWRU¶VREOLJDWLRQVXQGHU
WKLV3DUDJUDSKDUHLQDGGLWLRQWRDQ\RWKHUREOLJDWLRQRUZDUUDQW\7KHSURYLVLRQVRIWKLV
3DUDJUDSKVKDOOQRWEHFRQVWUXHGDVDVXEVWLWXWHIRURUDZDLYHURIWKHSURYLVLRQVRIDQ\
DSSOLFDEOHVWDWXWHRIOLPLWDWLRQRUUHSRVH
City May Correct Defective Work
$ ,I&RQWUDFWRUIDLOVZLWKLQDUHDVRQDEOHWLPHDIWHUZULWWHQQRWLFHIURP&LW\WRFRUUHFWGHIHFWLYH
:RUNRUWRUHPRYHDQGUHSODFHUHMHFWHG:RUNDVUHTXLUHGE\&LW\LQDFFRUGDQFHZLWK3DUDJUDSK
$RULI&RQWUDFWRUIDLOVWRSHUIRUPWKH:RUNLQDFFRUGDQFHZLWKWKH&RQWUDFW'RFXPHQWV
RULI&RQWUDFWRUIDLOVWRFRPSO\ZLWKDQ\RWKHUSURYLVLRQRIWKH&RQWUDFW'RFXPHQWV&LW\PD\
DIWHUVHYHQGD\VZULWWHQQRWLFHWR&RQWUDFWRUDQGWKH'HYHORSHUFRUUHFWRUUHPHG\DQ\VXFK
GHILFLHQF\
% ,Q H[HUFLVLQJ WKH ULJKWV DQG UHPHGLHV XQGHU WKLV 3DUDJUDSK &LW\ VKDOO SURFHHG
H[SHGLWLRXVO\ ,Q FRQQHFWLRQ ZLWK VXFK FRUUHFWLYH RU UHPHGLDO DFWLRQ &LW\ PD\ H[FOXGH
&RQWUDFWRUIURPDOORUSDUWRIWKH6LWHWDNHSRVVHVVLRQRIDOORUSDUWRIWKH:RUNDQGVXVSHQG
&RQWUDFWRU¶VVHUYLFHVUHODWHGWKHUHWRDQGLQFRUSRUDWHLQWKH:RUNDOOPDWHULDOVDQGHTXLSPHQW
LQFRUSRUDWHGLQWKH:RUNVWRUHGDWWKH6LWHRUIRUZKLFK&LW\KDVSDLG&RQWUDFWRUEXWZKLFKDUH
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
VWRUHG HOVHZKHUH &RQWUDFWRU VKDOO DOORZ &LW\ &LW\¶V UHSUHVHQWDWLYHV DJHQWV FRQVXOWDQWV
HPSOR\HHVDQG&LW\¶VRWKHUFRQWUDFWRUVDFFHVVWRWKH6LWHWRHQDEOH&LW\WRH[HUFLVHWKHULJKWV
DQGUHPHGLHVXQGHUWKLV3DUDJUDSK
& $OOFODLPVFRVWVORVVHVDQGGDPDJHVLQFOXGLQJEXWQRWOLPLWHGWRDOOIHHVDQGFKDUJHVRI
HQJLQHHUVDUFKLWHFWVDWWRUQH\VDQGRWKHUSURIHVVLRQDOVDQGDOOFRXUWRURWKHUGLVSXWHUHVROXWLRQ
FRVWVLQFXUUHGRUVXVWDLQHGE\&LW\LQH[HUFLVLQJWKHULJKWVDQGUHPHGLHVXQGHUWKLV3DUDJUDSK
ZLOOEHFKDUJHGDJDLQVW&RQWUDFWRUDQGD&KDQJH2UGHUZLOOEHLVVXHGLQFRUSRUDWLQJWKH
QHFHVVDU\UHYLVLRQVLQWKH&RQWUDFW'RFXPHQWVZLWKUHVSHFWWRWKH:RUNDQG&LW\VKDOOEH
HQWLWOHGWRDQDSSURSULDWHGHFUHDVHLQWKH&RQWUDFW3ULFH
' &RQWUDFWRUVKDOOQRWEHDOORZHGDQH[WHQVLRQRIWKH&RQWUDFW7LPHEHFDXVHRIDQ\GHOD\LQWKH
SHUIRUPDQFHRIWKH:RUNDWWULEXWDEOHWRWKHH[HUFLVHRI&LW\¶VULJKWVDQGUHPHGLHVXQGHUWKLV
3DUDJUDSK
$57,&/(±&203/(7,21
Contractor’s Warranty of Title
&RQWUDFWRUZDUUDQWVDQGJXDUDQWHHVWKDWWLWOHWRDOO:RUNPDWHULDOVDQGHTXLSPHQWFRYHUHGE\DQ\
$SSOLFDWLRQIRU3D\PHQWZLOOSDVVWR&LW\QRODWHUWKDQWKHWLPHRI)LQDO$FFHSWDQFHDQGVKDOOEH
IUHHDQGFOHDURIDOO/LHQV
Partial Utilization
$ 3ULRUWR)LQDO$FFHSWDQFHRIDOOWKH:RUN&LW\PD\XVHRURFFXS\DQ\VXEVWDQWLDOO\FRPSOHWHG
SDUWRIWKH:RUNZKLFKKDVVSHFLILFDOO\EHHQLGHQWLILHGLQWKH&RQWUDFW'RFXPHQWVRUZKLFK
&LW\GHWHUPLQHVFRQVWLWXWHVDVHSDUDWHO\IXQFWLRQLQJDQGXVDEOHSDUWRIWKH:RUNWKDWFDQEH
XVHG E\ &LW\ IRU LWV LQWHQGHG SXUSRVH ZLWKRXW VLJQLILFDQW LQWHUIHUHQFH ZLWK &RQWUDFWRU¶V
SHUIRUPDQFHRIWKHUHPDLQGHURIWKH:RUN&LW\DWDQ\WLPHPD\QRWLI\&RQWUDFWRULQZULWLQJWR
SHUPLW&LW\WRXVHRURFFXS\DQ\VXFKSDUWRIWKH:RUNZKLFK&LW\GHWHUPLQHVWREHUHDG\IRULWV
LQWHQGHGXVHVXEMHFWWRWKHIROORZLQJFRQGLWLRQV
&RQWUDFWRUDWDQ\WLPHPD\QRWLI\&LW\LQZULWLQJWKDW&RQWUDFWRUFRQVLGHUVDQ\VXFKSDUWRI
WKH:RUNUHDG\IRULWVLQWHQGHGXVH
:LWKLQDUHDVRQDEOHWLPHDIWHUQRWLILFDWLRQDVHQXPHUDWHGLQ3DUDJUDSK$&LW\DQG
&RQWUDFWRU VKDOO PDNH DQ LQVSHFWLRQ RI WKDW SDUW RI WKH :RUN WR GHWHUPLQH LWV VWDWXV RI
FRPSOHWLRQ,I&LW\GRHVQRWFRQVLGHUWKDWSDUWRIWKH:RUNWREHVXEVWDQWLDOO\FRPSOHWH&LW\
ZLOOQRWLI\&RQWUDFWRULQZULWLQJJLYLQJWKHUHDVRQVWKHUHIRU
3DUWLDO8WLOL]DWLRQZLOOQRWFRQVWLWXWH)LQDO$FFHSWDQFHE\&LW\
Final Inspection
$ 8SRQZULWWHQQRWLFHIURP&RQWUDFWRUWKDWWKHHQWLUH:RUNLVFRPSOHWHLQDFFRUGDQFHZLWKWKH
&RQWUDFW'RFXPHQWV
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
ZLWKLQGD\V&LW\ZLOOVFKHGXOHD)LQDO,QVSHFWLRQZLWK&RQWUDFWRU
&LW\ZLOOQRWLI\&RQWUDFWRULQZULWLQJRIDOOSDUWLFXODUVLQZKLFKWKLVLQVSHFWLRQUHYHDOVWKDW
WKH:RUNLVLQFRPSOHWHRUGHIHFWLYH&RQWUDFWRUVKDOOLPPHGLDWHO\WDNHVXFKPHDVXUHVDVDUH
QHFHVVDU\WRFRPSOHWHVXFK:RUNRUUHPHG\VXFKGHILFLHQFLHV
Final Acceptance
$ 8SRQFRPSOHWLRQE\&RQWUDFWRUWR&LW\¶VVDWLVIDFWLRQRIDQ\DGGLWLRQDO:RUNLGHQWLILHGLQWKH
)LQDO,QVSHFWLRQ&LW\ZLOOLVVXHWR&RQWUDFWRUDOHWWHURI)LQDO$FFHSWDQFHXSRQWKHVDWLVIDFWLRQ
RIWKHIROORZLQJ
$OOGRFXPHQWDWLRQFDOOHGIRULQWKH&RQWUDFW'RFXPHQWVLQFOXGLQJEXWQRWOLPLWHGWRWKH
HYLGHQFHRILQVXUDQFHUHTXLUHGE\3DUDJUDSK
FRQVHQWRIWKHVXUHW\LIDQ\WR)LQDO$FFHSWDQFH
DOLVWRIDOOSHQGLQJRUUHOHDVHG'DPDJH&ODLPVDJDLQVW&LW\WKDW&RQWUDFWRUEHOLHYHVDUH
XQVHWWOHGDQG
DIILGDYLWVRISD\PHQWVDQGFRPSOHWHDQGOHJDOO\HIIHFWLYHUHOHDVHVRUZDLYHUVVDWLVIDFWRU\WR
&LW\RIDOO/LHQULJKWVDULVLQJRXWRIRU/LHQVILOHGLQFRQQHFWLRQZLWKWKH:RUN
DIWHUDOO'DPDJH&ODLPVKDYHEHHQUHVROYHG
D GLUHFWO\E\WKH&RQWUDFWRURU
E &RQWUDFWRUSURYLGHVHYLGHQFHWKDWWKH'DPDJH&ODLPKDVEHHQUHSRUWHGWR&RQWUDFWRU¶V
LQVXUDQFHSURYLGHUIRUUHVROXWLRQ
,VVXLQJ)LQDO$FFHSWDQFHE\WKH&LW\VKDOOQRWUHOLHYHWKH&RQWUDFWRURIDQ\JXDUDQWHHVRU
RWKHUUHTXLUHPHQWVRIWKH&RQWUDFW'RFXPHQWVZKLFKVSHFLILFDOO\FRQWLQXHWKHUHDIWHU
$57,&/(±6863(16,212):25.
City May Suspend Work
$ $WDQ\WLPHDQGZLWKRXWFDXVH&LW\PD\VXVSHQGWKH:RUNRUDQ\SRUWLRQWKHUHRIE\ZULWWHQ
QRWLFHWR&RQWUDFWRUDQGZKLFKPD\IL[WKHGDWHRQZKLFK:RUNZLOOEHUHVXPHG&RQWUDFWRU
VKDOOUHVXPHWKH:RUNRQWKHGDWHVRIL[HG'XULQJWHPSRUDU\VXVSHQVLRQRIWKH:RUNFRYHUHG
E\ WKHVH &RQWUDFW 'RFXPHQWV IRU DQ\ UHDVRQ WKH &LW\ ZLOO VWRS FRQWUDFW WLPH RQ &LW\
SDUWLFLSDWLRQSURMHFWV
% 6KRXOGWKH&RQWUDFWRUQRWEHDEOHWRFRPSOHWHDSRUWLRQRIWKH3URMHFWGXHWRFDXVHVEH\RQGWKH
FRQWURORIDQGZLWKRXWWKHIDXOWRUQHJOLJHQFHRIWKH&RQWUDFWRUDQGVKRXOGLWEHGHWHUPLQHGE\
PXWXDOFRQVHQWRIWKH&RQWUDFWRUDQG&LW\WKDWDVROXWLRQWRDOORZFRQVWUXFWLRQWRSURFHHGLVQRW
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
DYDLODEOHZLWKLQDUHDVRQDEOHSHULRGRIWLPH&RQWUDFWRUPD\UHTXHVWDQH[WHQVLRQLQ&RQWUDFW
7LPHGLUHFWO\DWWULEXWDEOHWRDQ\VXFKVXVSHQVLRQ
& ,ILWVKRXOGEHFRPHQHFHVVDU\WRVXVSHQGWKH:RUNIRUDQLQGHILQLWHSHULRGWKH&RQWUDFWRUVKDOO
VWRUHDOOPDWHULDOVLQVXFKDPDQQHUWKDWWKH\ZLOOQRWREVWUXFWRULPSHGHWKHSXEOLFXQQHFHVVDULO\
QRUEHFRPHGDPDJHGLQDQ\ZD\DQGKHVKDOOWDNHHYHU\SUHFDXWLRQWRSUHYHQWGDPDJHRU
GHWHULRUDWLRQRIWKHZRUNSHUIRUPHGKHVKDOOSURYLGHVXLWDEOHGUDLQDJHDERXWWKHZRUNDQGHUHFW
WHPSRUDU\VWUXFWXUHVZKHUHQHFHVVDU\
$57,&/(±0,6&(//$1(286
Giving Notice
$ :KHQHYHUDQ\SURYLVLRQRIWKH&RQWUDFW'RFXPHQWVUHTXLUHVWKHJLYLQJRIZULWWHQQRWLFHLWZLOO
EHGHHPHGWRKDYHEHHQYDOLGO\JLYHQLI
GHOLYHUHGLQSHUVRQWRWKHLQGLYLGXDORUWRDPHPEHURIWKHILUPRUWRDQRIILFHURIWKH
FRUSRUDWLRQIRUZKRPLWLVLQWHQGHGRU
GHOLYHUHGDWRUVHQWE\UHJLVWHUHGRUFHUWLILHGPDLOSRVWDJHSUHSDLGWRWKHODVWEXVLQHVV
DGGUHVVNQRZQWRWKHJLYHURIWKHQRWLFH
% %XVLQHVVDGGUHVVFKDQJHVPXVWEHSURPSWO\PDGHLQZULWLQJWRWKHRWKHUSDUW\
& :KHQHYHUWKH&RQWUDFW'RFXPHQWVVSHFLILHVJLYLQJQRWLFHE\HOHFWURQLFPHDQVVXFKHOHFWURQLF
QRWLFHVKDOOEHGHHPHGVXIILFLHQWXSRQFRQILUPDWLRQRIUHFHLSWE\WKHUHFHLYLQJSDUW\
Computation of Times
:KHQDQ\SHULRGRIWLPHLVUHIHUUHGWRLQWKH&RQWUDFW'RFXPHQWVE\GD\VLWZLOOEHFRPSXWHGWR
H[FOXGHWKHILUVWDQGLQFOXGHWKHODVWGD\RIVXFKSHULRG,IWKHODVWGD\RIDQ\VXFKSHULRGIDOOVRQD
6DWXUGD\RU6XQGD\RURQDGD\PDGHDOHJDOKROLGD\WKHQH[W:RUNLQJ'D\VKDOOEHFRPHWKHODVW
GD\RIWKHSHULRG
Cumulative Remedies
7KH GXWLHV DQG REOLJDWLRQV LPSRVHG E\ WKHVH *HQHUDO &RQGLWLRQVDQG WKH ULJKWV DQG UHPHGLHV
DYDLODEOHKHUHXQGHUWRWKHSDUWLHVKHUHWRDUHLQDGGLWLRQWRDQGDUHQRWWREHFRQVWUXHGLQDQ\ZD\DV
DOLPLWDWLRQRIDQ\ULJKWVDQGUHPHGLHVDYDLODEOHWRDQ\RUDOORIWKHPZKLFKDUHRWKHUZLVHLPSRVHG
RUDYDLODEOHE\/DZVRU5HJXODWLRQVE\VSHFLDOZDUUDQW\RUJXDUDQWHHRUE\RWKHUSURYLVLRQVRIWKH
&RQWUDFW'RFXPHQWV7KHSURYLVLRQVRIWKLV3DUDJUDSKZLOOEHDVHIIHFWLYHDVLIUHSHDWHGVSHFLILFDOO\
LQWKH&RQWUDFW'RFXPHQWVLQFRQQHFWLRQZLWKHDFKSDUWLFXODUGXW\REOLJDWLRQULJKWDQGUHPHG\WR
ZKLFKWKH\DSSO\
6WDQGDUG&LW\&RQGLWLRQV2I7KH&RQVWUXFWLRQ&RQWUDFW)RU'HYHORSHU$ZDUGHG3URMHFWV
3DJHRI
&,7<2))257:257+
67$1'$5'&,7<&21',7,216±'(9(/23(5$:$5'('352-(&76
5HYLVHG-DQXDU\
Survival of Obligations
$OOUHSUHVHQWDWLRQVLQGHPQLILFDWLRQVZDUUDQWLHVDQGJXDUDQWHHVPDGHLQUHTXLUHGE\RUJLYHQLQ
DFFRUGDQFH ZLWK WKH &RQWUDFW 'RFXPHQWV DV ZHOODV DOO FRQWLQXLQJ REOLJDWLRQV LQGLFDWHG LQ WKH
&RQWUDFW 'RFXPHQWV ZLOO VXUYLYH ILQDO SD\PHQW FRPSOHWLRQ DQG DFFHSWDQFH RI WKH :RUN RU
WHUPLQDWLRQRUFRPSOHWLRQRIWKH&RQWUDFWRUWHUPLQDWLRQRIWKHVHUYLFHVRI&RQWUDFWRU
Headings
$UWLFOHDQGSDUDJUDSKKHDGLQJVDUHLQVHUWHGIRUFRQYHQLHQFHRQO\DQGGRQRWFRQVWLWXWHSDUWVRIWKHVH
*HQHUDO&RQGLWLRQV
01 11 00 - 1
DAP SUMMARY OF WORK
Page 1 of 3
CITY OF FORT WORTH Lakes of River Trails East Ph 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – Developer Awarded Projects City Project No. - 102275
Revised December 20, 2012
SECTION 01 11 00 1
SUMMARY OF WORK 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. Summary of Work to be performed in accordance with the Contract Documents 6
B. Deviations from this City of Fort Worth Standard Specification 7
1. None. 8
C. Related Specification Sections include, but are not necessarily limited to: 9
1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 10
2. Division 1 - General Requirements 11
1.2 PRICE AND PAYMENT PROCEDURES 12
A. Measurement and Payment 13
1. Work associated with this Item is considered subsidiary to the various items bid. 14
No separate payment will be allowed for this Item. 15
1.3 REFERENCES [NOT USED] 16
1.4 ADMINISTRATIVE REQUIREMENTS 17
A. Work Covered by Contract Documents 18
1. Work is to include furnishing all labor, materials, and equipment, and performing 19
all Work necessary for this construction project as detailed in the Drawings and 20
Specifications. 21
B. Subsidiary Work 22
1. Any and all Work specifically governed by documentary requirements for the 23
project, such as conditions imposed by the Drawings or Contract Documents in 24
which no specific item for bid has been provided for in the Proposal and the item is 25
not a typical unit bid item included on the standard bid item list, then the item shall 26
be considered as a subsidiary item of Work, the cost of which shall be included in 27
the price bid in the Proposal for various bid items. 28
C. Use of Premises 29
1. Coordinate uses of premises under direction of the City. 30
2. Assume full responsibility for protection and safekeeping of materials and 31
equipment stored on the Site. 32
3. Use and occupy only portions of the public streets and alleys, or other public places 33
or other rights-of-way as provided for in the ordinances of the City, as shown in the 34
Contract Documents, or as may be specifically authorized in writing by the City. 35
a. A reasonable amount of tools, materials, and equipment for construction 36
purposes may be stored in such space, but no more than is necessary to avoid 37
delay in the construction operations. 38
01 11 00 - 2
DAP SUMMARY OF WORK
Page 2 of 3
CITY OF FORT WORTH Lakes of River Trails East Ph 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – Developer Awarded Projects City Project No. - 102275
Revised December 20, 2012
b. Excavated and waste materials shall be stored in such a way as not to interfere 1
with the use of spaces that may be designated to be left free and unobstructed 2
and so as not to inconvenience occupants of adjacent property. 3
c. If the street is occupied by railroad tracks, the Work shall be carried on in such 4
manner as not to interfere with the operation of the railroad. 5
1) All Work shall be in accordance with railroad requirements set forth in 6
Division 0 as well as the railroad permit. 7
D. Work within Easements 8
1. Do not enter upon private property for any purpose without having previously 9
obtained permission from the owner of such property. 10
2. Do not store equipment or material on private property unless and until the 11
specified approval of the property owner has been secured in writing by the 12
Contractor and a copy furnished to the City. 13
3. Unless specifically provided otherwise, clear all rights-of-way or easements of 14
obstructions which must be removed to make possible proper prosecution of the 15
Work as a part of the project construction operations. 16
4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 17
lawns, fences, culverts, curbing, and all other types of structures or improvements, 18
to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 19
appurtenances thereof, including the construction of temporary fences and to all 20
other public or private property adjacent to the Work. 21
5. Notify the proper representatives of the owners or occupants of the public or private 22
lands of interest in lands which might be affected by the Work. 23
a. Such notice shall be made at least 48 hours in advance of the beginning of the 24
Work. 25
b. Notices shall be applicable to both public and private utility companies and any 26
corporation, company, individual, or other, either as owners or occupants, 27
whose land or interest in land might be affected by the Work. 28
c. Be responsible for all damage or injury to property of any character resulting 29
from any act, omission, neglect, or misconduct in the manner or method or 30
execution of the Work, or at any time due to defective work, material, or 31
equipment. 32
6. Fence 33
a. Restore all fences encountered and removed during construction of the Project 34
to the original or a better than original condition. 35
b. Erect temporary fencing in place of the fencing removed whenever the Work is 36
not in progress and when the site is vacated overnight, and/or at all times to 37
provide site security. 38
c. The cost for all fence work within easements, including removal, temporary 39
closures and replacement, shall be subsidiary to the various items bid in the 40
project proposal, unless a bid item is specifically provided in the proposal. 41
01 11 00 - 3
DAP SUMMARY OF WORK
Page 3 of 3
CITY OF FORT WORTH Lakes of River Trails East Ph 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – Developer Awarded Projects City Project No. - 102275
Revised December 20, 2012
1.5 SUBMITTALS [NOT USED] 1
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 2
1.7 CLOSEOUT SUBMITTALS [NOT USED] 3
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4
1.9 QUALITY ASSURANCE [NOT USED] 5
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 6
1.11 FIELD [SITE] CONDITIONS [NOT USED] 7
1.12 WARRANTY [NOT USED] 8
PART 2 - PRODUCTS [NOT USED] 9
PART 3 - EXECUTION [NOT USED] 10
END OF SECTION 11
12
Revision Log
DATE NAME SUMMARY OF CHANGE
13
01 25 00 - 1
DAP SUBSTITUTION PROCEDURES
Page 1 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
SECTION 01 25 00 1
SUBSTITUTION PROCEDURES 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. The procedure for requesting the approval of substitution of a product that is not 6
equivalent to a product which is specified by descriptive or performance criteria or 7
defined by reference to 1 or more of the following: 8
a. Name of manufacturer 9
b. Name of vendor 10
c. Trade name 11
d. Catalog number 12
2. Substitutions are not "or-equals". 13
B. Deviations from this City of Fort Worth Standard Specification 14
1. None. 15
C. Related Specification Sections include, but are not necessarily limited to: 16
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 17
2. Division 1 – General Requirements 18
1.2 PRICE AND PAYMENT PROCEDURES 19
A. Measurement and Payment 20
1. Work associated with this Item is considered subsidiary to the various items bid. No 21
separate payment will be allowed for this Item. 22
1.3 REFERENCES [NOT USED] 23
1.4 ADMINISTRATIVE REQUIREMENTS 24
A. Request for Substitution - General 25
1. Within 30 days after award of Contract (unless noted otherwise), the City will 26
consider formal requests from Contractor for substitution of products in place of 27
those specified. 28
2. Certain types of equipment and kinds of material are described in Specifications by 29
means of references to names of manufacturers and vendors, trade names, or catalog 30
numbers. 31
a. When this method of specifying is used, it is not intended to exclude from 32
consideration other products bearing other manufacturer's or vendor's names, 33
trade names, or catalog numbers, provided said products are "or-equals," as 34
determined by City. 35
3. Other types of equipment and kinds of material may be acceptable substitutions 36
under the following conditions: 37
a. Or-equals are unavailable due to strike, discontinued production of products 38
meeting specified requirements, or other factors beyond control of Contractor; 39
or, 40
01 25 00 - 2
DAP SUBSTITUTION PROCEDURES
Page 2 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
b. Contractor proposes a cost and/or time reduction incentive to the City. 1
1.5 SUBMITTALS 2
A. See Request for Substitution Form (attached) 3
B. Procedure for Requesting Substitution 4
1. Substitution shall be considered only: 5
a. After award of Contract 6
b. Under the conditions stated herein 7
2. Submit 3 copies of each written request for substitution, including: 8
a. Documentation 9
1) Complete data substantiating compliance of proposed substitution with 10
Contract Documents 11
2) Data relating to changes in construction schedule, when a reduction is 12
proposed 13
3) Data relating to changes in cost 14
b. For products 15
1) Product identification 16
a) Manufacturer's name 17
b) Telephone number and representative contact name 18
c) Specification Section or Drawing reference of originally specified 19
product, including discrete name or tag number assigned to original 20
product in the Contract Documents 21
2) Manufacturer's literature clearly marked to show compliance of proposed 22
product with Contract Documents 23
3) Itemized comparison of original and proposed product addressing product 24
characteristics including, but not necessarily limited to: 25
a) Size 26
b) Composition or materials of construction 27
c) Weight 28
d) Electrical or mechanical requirements 29
4) Product experience 30
a) Location of past projects utilizing product 31
b) Name and telephone number of persons associated with referenced 32
projects knowledgeable concerning proposed product 33
c) Available field data and reports associated with proposed product 34
5) Samples 35
a) Provide at request of City. 36
b) Samples become the property of the City. 37
c. For construction methods: 38
1) Detailed description of proposed method 39
2) Illustration drawings 40
C. Approval or Rejection 41
1. Written approval or rejection of substitution given by the City 42
2. City reserves the right to require proposed product to comply with color and pattern 43
of specified product if necessary to secure design intent. 44
3. In the event the substitution is approved, if a reduction in cost or time results, it will 45
be documented by Change Order. 46
01 25 00 - 3
DAP SUBSTITUTION PROCEDURES
Page 3 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
4. Substitution will be rejected if: 1
a. Submittal is not through the Contractor with his stamp of approval 2
b. Request is not made in accordance with this Specification Section 3
c. In the Developer’s opinion, acceptance will require substantial revision of the 4
original design 5
d. In the City’s or Developer’s opinion, substitution will not perform adequately 6
the function consistent with the design intent 7
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 8
1.7 CLOSEOUT SUBMITTALS [NOT USED] 9
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 10
1.9 QUALITY ASSURANCE 11
A. In making request for substitution or in using an approved product, the Contractor 12
represents that the Contractor: 13
1. Has investigated proposed product, and has determined that it is adequate or 14
superior in all respects to that specified, and that it will perform function for which it 15
is intended 16
2. Will provide same guarantee for substitute item as for product specified 17
3. Will coordinate installation of accepted substitution into Work, to include building 18
modifications if necessary, making such changes as may be required for Work to be 19
complete in all respects 20
4. Waives all claims for additional costs related to substitution which subsequently 21
arise 22
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 23
1.11 FIELD [SITE] CONDITIONS [NOT USED] 24
1.12 WARRANTY [NOT USED] 25
PART 2 - PRODUCTS [NOT USED] 26
PART 3 - EXECUTION [NOT USED] 27
END OF SECTION 28
29
Revision Log
DATE NAME SUMMARY OF CHANGE
30
01 25 00 - 4
DAP SUBSTITUTION PROCEDURES
Page 4 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
EXHIBIT A 1
REQUEST FOR SUBSTITUTION FORM: 2
3
TO: 4
PROJECT: DATE: 5
We hereby submit for your consideration the following product instead of the specified item for 6
the above project: 7
SECTION PARAGRAPH SPECIFIED ITEM 8
9
10
Proposed Substitution: 11
Reason for Substitution: 12
Include complete information on changes to Drawings and/or Specifications which proposed 13
substitution will require for its proper installation. 14
15
Fill in Blanks Below: 16
A. Will the undersigned contractor pay for changes to the building design, including engineering 17
and detailing costs caused by the requested substitution? 18
19
20
B. What effect does substitution have on other trades? 21
22
23
C. Differences between proposed substitution and specified item? 24
25
26
D. Differences in product cost or product delivery time? 27
28
29
E. Manufacturer's guarantees of the proposed and specified items are: 30
31
Equal Better (explain on attachment) 32
The undersigned states that the function, appearance and quality are equivalent or superior to the 33
specified item. 34
Submitted By: For Use by City 35
36
Signature Recommended Recommended 37
as noted 38
39
Firm Not recommended Received late 40
Address By 41
Date 42
Date Remarks 43
Telephone 44
45
For Use by City: 46
47
Approved Rejected 48
City Date 49
01 31 19 - 1
DAP PRECONSTRUCTION MEETING
Page 1 of 3
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
SECTION 01 31 19 1
PRECONSTRUCTION MEETING 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. Provisions for the preconstruction meeting to be held prior to the start of Work to 6
clarify construction contract administration procedures 7
B. Deviations from this City of Fort Worth Standard Specification 8
1. No construction schedule required unless requested by the City. 9
C. Related Specification Sections include, but are not necessarily limited to: 10
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 11
2. Division 1 – General Requirements 12
1.2 PRICE AND PAYMENT PROCEDURES 13
A. Measurement and Payment 14
1. Work associated with this Item is considered subsidiary to the various items bid. 15
No separate payment will be allowed for this Item. 16
1.3 REFERENCES [NOT USED] 17
1.4 ADMINISTRATIVE REQUIREMENTS 18
A. Coordination 19
1. Attend preconstruction meeting. 20
2. Representatives of Contractor, subcontractors and suppliers attending meetings 21
shall be qualified and authorized to act on behalf of the entity each represents. 22
3. Meeting administered by City may be tape recorded. 23
a. If recorded, tapes will be used to prepare minutes and retained by City for 24
future reference. 25
B. Preconstruction Meeting 26
1. A preconstruction meeting will be held within 14 days after the delivery of the 27
distribution package to the City. 28
a. The meeting will be scheduled and administered by the City. 29
2. The Project Representative will preside at the meeting, prepare the notes of the 30
meeting and distribute copies of same to all participants who so request by fully 31
completing the attendance form to be circulated at the beginning of the meeting. 32
3. Attendance shall include: 33
a. Developer and Consultant 34
b. Contractor's project manager 35
c. Contractor's superintendent 36
d. Any subcontractor or supplier representatives whom the Contractor may desire 37
to invite or the City may request 38
01 31 19 - 2
DAP PRECONSTRUCTION MEETING
Page 2 of 3
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
e. Other City representatives 1
f. Others as appropriate 2
4. Preliminary Agenda may include: 3
a. Introduction of Project Personnel 4
b. General Description of Project 5
c. Status of right-of-way, utility clearances, easements or other pertinent permits 6
d. Contractor’s work plan and schedule 7
e. Contract Time 8
f. Notice to Proceed 9
g. Construction Staking 10
h. Progress Payments 11
i. Extra Work and Change Order Procedures 12
j. Field Orders 13
k. Disposal Site Letter for Waste Material 14
l. Insurance Renewals 15
m. Payroll Certification 16
n. Material Certifications and Quality Control Testing 17
o. Public Safety and Convenience 18
p. Documentation of Pre-Construction Conditions 19
q. Weekend Work Notification 20
r. Legal Holidays 21
s. Trench Safety Plans 22
t. Confined Space Entry Standards 23
u. Coordination with the City’s representative for operations of existing water 24
systems 25
v. Storm Water Pollution Prevention Plan 26
w. Coordination with other Contractors 27
x. Early Warning System 28
y. Contractor Evaluation 29
z. Special Conditions applicable to the project 30
aa. Damages Claims 31
bb. Submittal Procedures 32
cc. Substitution Procedures 33
dd. Correspondence Routing 34
ee. Record Drawings 35
ff. Temporary construction facilities 36
gg. MBE/SBE procedures 37
hh. Final Acceptance 38
ii. Final Payment 39
jj. Questions or Comments 40
01 31 19 - 3
DAP PRECONSTRUCTION MEETING
Page 3 of 3
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
1.5 SUBMITTALS [NOT USED] 1
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 2
1.7 CLOSEOUT SUBMITTALS [NOT USED] 3
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4
1.9 QUALITY ASSURANCE [NOT USED] 5
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 6
1.11 FIELD [SITE] CONDITIONS [NOT USED] 7
1.12 WARRANTY [NOT USED] 8
PART 2 - PRODUCTS [NOT USED] 9
PART 3 - EXECUTION [NOT USED] 10
END OF SECTION 11
12
Revision Log
DATE NAME SUMMARY OF CHANGE
13
01 32 33 - 1
DAP PRECONSTRUCTION VIDEO
Page 1 of 2
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
SECTION 01 32 33 1
PRECONSTRUCTION VIDEO 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. Administrative and procedural requirements for: 6
a. Preconstruction Videos 7
B. Deviations from this City of Fort Worth Standard Specification 8
1. Though not mandatory, it is highly recommended on infill developer projects. 9
C. Related Specification Sections include, but are not necessarily limited to: 10
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 11
2. Division 1 – General Requirements 12
1.2 PRICE AND PAYMENT PROCEDURES 13
A. Measurement and Payment 14
1. Work associated with this Item is considered subsidiary to the various items bid. 15
No separate payment will be allowed for this Item. 16
1.3 REFERENCES [NOT USED] 17
1.4 ADMINISTRATIVE REQUIREMENTS 18
A. Preconstruction Video 19
1. Produce a preconstruction video of the site/alignment, including all areas in the 20
vicinity of and to be affected by construction. 21
a. Provide digital copy of video upon request by the City. 22
2. Retain a copy of the preconstruction video until the end of the maintenance surety 23
period. 24
1.5 SUBMITTALS [NOT USED] 25
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 26
1.7 CLOSEOUT SUBMITTALS [NOT USED] 27
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 28
1.9 QUALITY ASSURANCE [NOT USED] 29
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 30
1.11 FIELD [SITE] CONDITIONS [NOT USED] 31
1.12 WARRANTY [NOT USED] 32
PART 2 - PRODUCTS [NOT USED] 33
01 32 33 - 2
DAP PRECONSTRUCTION VIDEO
Page 2 of 2
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
PART 3 - EXECUTION [NOT USED] 1
END OF SECTION 2
3
Revision Log
DATE NAME SUMMARY OF CHANGE
4
01 33 00 - 1
DAP SUBMITTALS
Page 1 of 8
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
SECTION 01 33 00 1
DAP SUBMITTALS 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. General methods and requirements of submissions applicable to the following 6
Work-related submittals: 7
a. Shop Drawings 8
b. Product Data (including Standard Product List submittals) 9
c. Samples 10
d. Mock Ups 11
B. Deviations from this City of Fort Worth Standard Specification 12
1. None. 13
C. Related Specification Sections include, but are not necessarily limited to: 14
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 15
2. Division 1 – General Requirements 16
1.2 PRICE AND PAYMENT PROCEDURES 17
A. Measurement and Payment 18
1. Work associated with this Item is considered subsidiary to the various items bid. 19
No separate payment will be allowed for this Item. 20
1.3 REFERENCES [NOT USED] 21
1.4 ADMINISTRATIVE REQUIREMENTS 22
A. Coordination 23
1. Notify the City in writing, at the time of submittal, of any deviations in the 24
submittals from the requirements of the Contract Documents. 25
2. Coordination of Submittal Times 26
a. Prepare, prioritize and transmit each submittal sufficiently in advance of 27
performing the related Work or other applicable activities, or within the time 28
specified in the individual Work Sections, of the Specifications. 29
b. Contractor is responsible such that the installation will not be delayed by 30
processing times including, but not limited to: 31
a) Disapproval and resubmittal (if required) 32
b) Coordination with other submittals 33
c) Testing 34
d) Purchasing 35
e) Fabrication 36
f) Delivery 37
g) Similar sequenced activities 38
c. No extension of time will be authorized because of the Contractor's failure to 39
transmit submittals sufficiently in advance of the Work. 40
01 33 00 - 2
DAP SUBMITTALS
Page 2 of 8
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
d. Make submittals promptly in accordance with approved schedule, and in such 1
sequence as to cause no delay in the Work or in the work of any other 2
contractor. 3
B. Submittal Numbering 4
1. When submitting shop drawings or samples, utilize a 9-character submittal cross-5
reference identification numbering system in the following manner: 6
a. Use the first 6 digits of the applicable Specification Section Number. 7
b. For the next 2 digits number use numbers 01-99 to sequentially number each 8
initial separate item or drawing submitted under each specific Section number. 9
c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. 10
A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical 11
submittal number would be as follows: 12
13
03 30 00-08-B 14
15
1) 03 30 00 is the Specification Section for Concrete 16
2) 08 is the eighth initial submittal under this Specification Section 17
3) B is the third submission (second resubmission) of that particular shop 18
drawing 19
C. Contractor Certification 20
1. Review shop drawings, product data and samples, including those by 21
subcontractors, prior to submission to determine and verify the following: 22
a. Field measurements 23
b. Field construction criteria 24
c. Catalog numbers and similar data 25
d. Conformance with the Contract Documents 26
2. Provide each shop drawing, sample and product data submitted by the Contractor 27
with a Certification Statement affixed including: 28
a. The Contractor's Company name 29
b. Signature of submittal reviewer 30
c. Certification Statement 31
1) “By this submittal, I hereby represent that I have determined and verified 32
field measurements, field construction criteria, materials, dimensions, 33
catalog numbers and similar data and I have checked and coordinated each 34
item with other applicable approved shop drawings." 35
D. Submittal Format 36
1. Fold shop drawings larger than 8 ½ inches x 11 inches to 8 ½ inches x 11inches. 37
2. Bind shop drawings and product data sheets together. 38
3. Order 39
a. Cover Sheet 40
1) Description of Packet 41
2) Contractor Certification 42
b. List of items / Table of Contents 43
c. Product Data /Shop Drawings/Samples /Calculations 44
E. Submittal Content 45
1. The date of submission and the dates of any previous submissions 46
01 33 00 - 3
DAP SUBMITTALS
Page 3 of 8
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
2. The Project title and number 1
3. Contractor identification 2
4. The names of: 3
a. Contractor 4
b. Supplier 5
c. Manufacturer 6
5. Identification of the product, with the Specification Section number, page and 7
paragraph(s) 8
6. Field dimensions, clearly identified as such 9
7. Relation to adjacent or critical features of the Work or materials 10
8. Applicable standards, such as ASTM or Federal Specification numbers 11
9. Identification by highlighting of deviations from Contract Documents 12
10. Identification by highlighting of revisions on resubmittals 13
11. An 8-inch x 3-inch blank space for Contractor and City stamps 14
F. Shop Drawings 15
1. As specified in individual Work Sections includes, but is not necessarily limited to: 16
a. Custom-prepared data such as fabrication and erection/installation (working) 17
drawings 18
b. Scheduled information 19
c. Setting diagrams 20
d. Actual shopwork manufacturing instructions 21
e. Custom templates 22
f. Special wiring diagrams 23
g. Coordination drawings 24
h. Individual system or equipment inspection and test reports including: 25
1) Performance curves and certifications 26
i. As applicable to the Work 27
2. Details 28
a. Relation of the various parts to the main members and lines of the structure 29
b. Where correct fabrication of the Work depends upon field measurements 30
1) Provide such measurements and note on the drawings prior to submitting 31
for approval. 32
G. Product Data 33
1. For submittals of product data for products included on the City’s Standard Product 34
List, clearly identify each item selected for use on the Project. 35
2. For submittals of product data for products not included on the City’s Standard 36
Product List, submittal data may include, but is not necessarily limited to: 37
a. Standard prepared data for manufactured products (sometimes referred to as 38
catalog data) 39
1) Such as the manufacturer's product specification and installation 40
instructions 41
2) Availability of colors and patterns 42
3) Manufacturer's printed statements of compliances and applicability 43
4) Roughing-in diagrams and templates 44
5) Catalog cuts 45
6) Product photographs 46
01 33 00 - 4
DAP SUBMITTALS
Page 4 of 8
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
7) Standard wiring diagrams 1
8) Printed performance curves and operational-range diagrams 2
9) Production or quality control inspection and test reports and certifications 3
10) Mill reports 4
11) Product operating and maintenance instructions and recommended 5
spare-parts listing and printed product warranties 6
12) As applicable to the Work 7
H. Samples 8
1. As specified in individual Sections, include, but are not necessarily limited to: 9
a. Physical examples of the Work such as: 10
1) Sections of manufactured or fabricated Work 11
2) Small cuts or containers of materials 12
3) Complete units of repetitively used products color/texture/pattern swatches 13
and range sets 14
4) Specimens for coordination of visual effect 15
5) Graphic symbols and units of Work to be used by the City for independent 16
inspection and testing, as applicable to the Work 17
I. Do not start Work requiring a shop drawing, sample or product data nor any material to 18
be fabricated or installed prior to the approval or qualified approval of such item. 19
1. Fabrication performed, materials purchased or on-site construction accomplished 20
which does not conform to approved shop drawings and data is at the Contractor's 21
risk. 22
2. The City will not be liable for any expense or delay due to corrections or remedies 23
required to accomplish conformity. 24
3. Complete project Work, materials, fabrication, and installations in conformance 25
with approved shop drawings, applicable samples, and product data. 26
J. Submittal Distribution 27
1. Electronic Distribution 28
a. Confirm development of Project directory for electronic submittals to be 29
uploaded to City’s Buzzsaw site, or another external FTP site approved by the 30
City. 31
b. Shop Drawings 32
1) Upload submittal to designated project directory and notify appropriate 33
City representatives via email of submittal posting. 34
2) Hard Copies 35
a) 3 copies for all submittals 36
b) If Contractor requires more than 1 hard copy of Shop Drawings 37
returned, Contractor shall submit more than the number of copies listed 38
above. 39
c. Product Data 40
1) Upload submittal to designated project directory and notify appropriate 41
City representatives via email of submittal posting. 42
2) Hard Copies 43
a) 3 copies for all submittals 44
d. Samples 45
1) Distributed to the Project Representative 46
2. Hard Copy Distribution (if required in lieu of electronic distribution) 47
01 33 00 - 5
DAP SUBMITTALS
Page 5 of 8
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
a. Shop Drawings 1
1) Distributed to the City 2
2) Copies 3
a) 8 copies for mechanical submittals 4
b) 7 copies for all other submittals 5
c) If Contractor requires more than 3 copies of Shop Drawings returned, 6
Contractor shall submit more than the number of copies listed above. 7
b. Product Data 8
1) Distributed to the City 9
2) Copies 10
a) 4 copies 11
c. Samples 12
1) Distributed to the Project Representative 13
2) Copies 14
a) Submit the number stated in the respective Specification Sections. 15
3. Distribute reproductions of approved shop drawings and copies of approved 16
product data and samples, where required, to the job site file and elsewhere as 17
directed by the City. 18
a. Provide number of copies as directed by the City but not exceeding the number 19
previously specified. 20
K. Submittal Review 21
1. The review of shop drawings, data and samples will be for general conformance 22
with the design concept and Contract Documents. This is not to be construed as: 23
a. Permitting any departure from the Contract requirements 24
b. Relieving the Contractor of responsibility for any errors, including details, 25
dimensions, and materials 26
c. Approving departures from details furnished by the City, except as otherwise 27
provided herein 28
2. The review and approval of shop drawings, samples or product data by the City 29
does not relieve the Contractor from his/her responsibility with regard to the 30
fulfillment of the terms of the Contract. 31
a. All risks of error and omission are assumed by the Contractor, and the City will 32
have no responsibility therefore. 33
3. The Contractor remains responsible for details and accuracy, for coordinating the 34
Work with all other associated work and trades, for selecting fabrication processes, 35
for techniques of assembly and for performing Work in a safe manner. 36
4. If the shop drawings, data or samples as submitted describe variations and show a 37
departure from the Contract requirements which City finds to be in the interest of 38
the City and to be so minor as not to involve a change in Contract Price or time for 39
performance, the City may return the reviewed drawings without noting an 40
exception. 41
5. Submittals will be returned to the Contractor under 1 of the following codes: 42
a. Code 1 43
1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or 44
comments on the submittal. 45
a) When returned under this code the Contractor may release the 46
equipment and/or material for manufacture. 47
b. Code 2 48
01 33 00 - 6
DAP SUBMITTALS
Page 6 of 8
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of 1
the notations and comments IS NOT required by the Contractor. 2
a) The Contractor may release the equipment or material for manufacture; 3
however, all notations and comments must be incorporated into the 4
final product. 5
c. Code 3 6
1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is 7
assigned when notations and comments are extensive enough to require a 8
resubmittal of the package. 9
a) The Contractor may release the equipment or material for manufacture; 10
however, all notations and comments must be incorporated into the 11
final product. 12
b) This resubmittal is to address all comments, omissions and 13
non-conforming items that were noted. 14
c) Resubmittal is to be received by the City within 15 Calendar Days of 15
the date of the City's transmittal requiring the resubmittal. 16
d. Code 4 17
1) "NOT APPROVED" is assigned when the submittal does not meet the 18
intent of the Contract Documents. 19
a) The Contractor must resubmit the entire package revised to bring the 20
submittal into conformance. 21
b) It may be necessary to resubmit using a different manufacturer/vendor 22
to meet the Contract Documents. 23
6. Resubmittals 24
a. Handled in the same manner as first submittals 25
1) Corrections other than requested by the City 26
2) Marked with revision triangle or other similar method 27
a) At Contractor’s risk if not marked 28
b. Submittals for each item will be reviewed no more than twice at the City’s 29
expense. 30
1) All subsequent reviews will be performed at times convenient to the City 31
and at the Contractor's expense, based on the City's or City 32
Representative’s then prevailing rates. 33
2) Provide Contractor reimbursement to the City within 30 Calendar Days for 34
all such fees invoiced by the City. 35
c. The need for more than 1 resubmission or any other delay in obtaining City's 36
review of submittals, will not entitle the Contractor to an extension of Contract 37
Time. 38
7. Partial Submittals 39
a. City reserves the right to not review submittals deemed partial, at the City’s 40
discretion. 41
b. Submittals deemed by the City to be not complete will be returned to the 42
Contractor, and will be considered "Not Approved" until resubmitted. 43
c. The City may at its option provide a list or mark the submittal directing the 44
Contractor to the areas that are incomplete. 45
8. If the Contractor considers any correction indicated on the shop drawings to 46
constitute a change to the Contract Documents, then written notice must be 47
provided thereof to the Developer at least 7 Calendar Days prior to release for 48
manufacture. 49
01 33 00 - 7
DAP SUBMITTALS
Page 7 of 8
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
9. When the shop drawings have been completed to the satisfaction of the City, the 1
Contractor may carry out the construction in accordance therewith and no further 2
changes therein except upon written instructions from the City. 3
10. Each submittal, appropriately coded, will be returned within 30 Calendar Days 4
following receipt of submittal by the City. 5
L. Mock ups 6
1. Mock Up units as specified in individual Sections, include, but are not necessarily 7
limited to, complete units of the standard of acceptance for that type of Work to be 8
used on the Project. Remove at the completion of the Work or when directed. 9
M. Qualifications 10
1. If specifically required in other Sections of these Specifications, submit a P.E. 11
Certification for each item required. 12
N. Request for Information (RFI) 13
1. Contractor Request for additional information 14
a. Clarification or interpretation of the contract documents 15
b. When the Contractor believes there is a conflict between Contract Documents 16
c. When the Contractor believes there is a conflict between the Drawings and 17
Specifications 18
1) Identify the conflict and request clarification 19
2. Sufficient information shall be attached to permit a written response without further 20
information. 21
22
23
24
25
1.5 SUBMITTALS [NOT USED] 26
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27
1.7 CLOSEOUT SUBMITTALS [NOT USED] 28
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29
1.9 QUALITY ASSURANCE [NOT USED] 30
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 31
1.11 FIELD [SITE] CONDITIONS [NOT USED] 32
1.12 WARRANTY [NOT USED] 33
01 33 00 - 8
DAP SUBMITTALS
Page 8 of 8
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
PART 2 - PRODUCTS [NOT USED] 1
PART 3 - EXECUTION [NOT USED] 2
END OF SECTION 3
4
Revision Log
DATE NAME SUMMARY OF CHANGE
12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days
5
01 35 13 - 1
DAP SPECIAL PROJECT PROCEDURES
Page 1 of 7
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August, 30, 2013
SECTION 01 35 13 1
SPECIAL PROJECT PROCEDURES 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. The procedures for special project circumstances that includes, but is not limited to: 6
a. Coordination with the Texas Department of Transportation 7
b. Work near High Voltage Lines 8
c. Confined Space Entry Program 9
d. Air Pollution Watch Days 10
e. Use of Explosives, Drop Weight, Etc. 11
f. Water Department Notification 12
g. Public Notification Prior to Beginning Construction 13
h. Coordination with United States Army Corps of Engineers 14
i. Coordination within Railroad permits areas 15
j. Dust Control 16
k. Employee Parking 17
B. Deviations from this City of Fort Worth Standard Specification 18
1. None. 19
C. Related Specification Sections include, but are not necessarily limited to: 20
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 21
2. Division 1 – General Requirements 22
3. Section 33 12 25 – Connection to Existing Water Mains 23
24
1.2 REFERENCES 25
A. Reference Standards 26
1. Reference standards cited in this Specification refer to the current reference 27
standard published at the time of the latest revision date logged at the end of this 28
Specification, unless a date is specifically cited. 29
2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 30
High Voltage Overhead Lines. 31
3. North Central Texas Council of Governments (NCTCOG) – Clean Construction 32
Specification 33
1.3 ADMINISTRATIVE REQUIREMENTS 34
A. Coordination with the Texas Department of Transportation 35
1. When work in the right-of-way which is under the jurisdiction of the Texas 36
Department of Transportation (TxDOT): 37
a. Notify the Texas Department of Transportation prior to commencing any work 38
therein in accordance with the provisions of the permit 39
01 35 13 - 2
DAP SPECIAL PROJECT PROCEDURES
Page 2 of 7
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August, 30, 2013
b. All work performed in the TxDOT right-of-way shall be performed in 1
compliance with and subject to approval from the Texas Department of 2
Transportation 3
B. Work near High Voltage Lines 4
1. Regulatory Requirements 5
a. All Work near High Voltage Lines (more than 600 volts measured between 6
conductors or between a conductor and the ground) shall be in accordance with 7
Health and Safety Code, Title 9, Subtitle A, Chapter 752. 8
2. Warning sign 9
a. Provide sign of sufficient size meeting all OSHA requirements. 10
3. Equipment operating within 10 feet of high voltage lines will require the following 11
safety features 12
a. Insulating cage-type of guard about the boom or arm 13
b. Insulator links on the lift hook connections for back hoes or dippers 14
c. Equipment must meet the safety requirements as set forth by OSHA and the 15
safety requirements of the owner of the high voltage lines 16
4. Work within 6 feet of high voltage electric lines 17
a. Notification shall be given to: 18
1) The power company (example: ONCOR) 19
a) Maintain an accurate log of all such calls to power company and record 20
action taken in each case. 21
b. Coordination with power company 22
1) After notification coordinate with the power company to: 23
a) Erect temporary mechanical barriers, de-energize the lines, or raise or 24
lower the lines 25
c. No personnel may work within 6 feet of a high voltage line before the above 26
requirements have been met. 27
C. Confined Space Entry Program 28
1. Provide and follow approved Confined Space Entry Program in accordance with 29
OSHA requirements. 30
2. Confined Spaces include: 31
a. Manholes 32
b. All other confined spaces in accordance with OSHA’s Permit Required for 33
Confined Spaces 34
D. Use of Explosives, Drop Weight, Etc. 35
1. When Contract Documents permit on the project the following will apply: 36
a. Public Notification 37
1) Submit notice to City and proof of adequate insurance coverage, 24 hours 38
prior to commencing. 39
2) Minimum 24 hour public notification in accordance with Section 01 31 13 40
E. Water Department Coordination 41
1. During the construction of this project, it will be necessary to deactivate, for a 42
period of time, existing lines. The Contractor shall be required to coordinate with 43
the Water Department to determine the best times for deactivating and activating 44
those lines. 45
01 35 13 - 3
DAP SPECIAL PROJECT PROCEDURES
Page 3 of 7
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August, 30, 2013
2. Coordinate any event that will require connecting to or the operation of an existing 1
City water line system with the City’s representative. 2
a. Coordination shall be in accordance with Section 33 12 25. 3
b. If needed, obtain a hydrant water meter from the Water Department for use 4
during the life of named project. 5
c. In the event that a water valve on an existing live system be turned off and on 6
to accommodate the construction of the project is required, coordinate this 7
activity through the appropriate City representative. 8
1) Do not operate water line valves of existing water system. 9
a) Failure to comply will render the Contractor in violation of Texas Penal 10
Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 11
will be prosecuted to the full extent of the law. 12
b) In addition, the Contractor will assume all liabilities and 13
responsibilities as a result of these actions. 14
F. Public Notification Prior to Beginning Construction 15
1. Prior to beginning construction on any block in the project, on a block by block 16
basis, prepare and deliver a notice or flyer of the pending construction to the front 17
door of each residence or business that will be impacted by construction. The notice 18
shall be prepared as follows: 19
a. Post notice or flyer 7 days prior to beginning any construction activity on each 20
block in the project area. 21
1) Prepare flyer on the Contractor’s letterhead and include the following 22
information: 23
a) Name of Project 24
b) City Project No (CPN) 25
c) Scope of Project (i.e. type of construction activity) 26
d) Actual construction duration within the block 27
e) Name of the contractor’s foreman and phone number 28
f) Name of the City’s inspector and phone number 29
g) City’s after-hours phone number 30
2) A sample of the ‘pre-construction notification’ flyer is attached as Exhibit 31
A. 32
3) Submit schedule showing the construction start and finish time for each 33
block of the project to the inspector. 34
4) Deliver flyer to the City Inspector for review prior to distribution. 35
b. No construction will be allowed to begin on any block until the flyer is 36
delivered to all residents of the block. 37
G. Public Notification of Temporary Water Service Interruption during Construction 38
1. In the event it becomes necessary to temporarily shut down water service to 39
residents or businesses during construction, prepare and deliver a notice or flyer of 40
the pending interruption to the front door of each affected resident. 41
2. Prepared notice as follows: 42
a. The notification or flyer shall be posted 24 hours prior to the temporary 43
interruption. 44
b. Prepare flyer on the contractor’s letterhead and include the following 45
information: 46
1) Name of the project 47
2) City Project Number 48
01 35 13 - 4
DAP SPECIAL PROJECT PROCEDURES
Page 4 of 7
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August, 30, 2013
3) Date of the interruption of service 1
4) Period the interruption will take place 2
5) Name of the contractor’s foreman and phone number 3
6) Name of the City’s inspector and phone number 4
c. A sample of the temporary water service interruption notification is attached as 5
Exhibit B. 6
d. Deliver a copy of the temporary interruption notification to the City inspector 7
for review prior to being distributed. 8
e. No interruption of water service can occur until the flyer has been delivered to 9
all affected residents and businesses. 10
f. Electronic versions of the sample flyers can be obtained from the Project 11
Construction Inspector. 12
H. Coordination with United States Army Corps of Engineers (USACE) 13
1. At locations in the Project where construction activities occur in areas where 14
USACE permits are required, meet all requirements set forth in each designated 15
permit. 16
I. Coordination within Railroad Permit Areas 17
1. At locations in the project where construction activities occur in areas where 18
railroad permits are required, meet all requirements set forth in each designated 19
railroad permit. This includes, but is not limited to, provisions for: 20
a. Flagmen 21
b. Inspectors 22
c. Safety training 23
d. Additional insurance 24
e. Insurance certificates 25
f. Other employees required to protect the right-of-way and property of the 26
Railroad Company from damage arising out of and/or from the construction of 27
the project. Proper utility clearance procedures shall be used in accordance 28
with the permit guidelines. 29
2. Obtain any supplemental information needed to comply with the railroad’s 30
requirements. 31
J. Dust Control 32
1. Use acceptable measures to control dust at the Site. 33
a. If water is used to control dust, capture and properly dispose of waste water. 34
b. If wet saw cutting is performed, capture and properly dispose of slurry. 35
K. Employee Parking 36
1. Provide parking for employees at locations approved by the City. 37
01 35 13 - 5
DAP SPECIAL PROJECT PROCEDURES
Page 5 of 7
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August, 30, 2013
1.4 SUBMITTALS [NOT USED] 1
1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 2
1.6 CLOSEOUT SUBMITTALS [NOT USED] 3
1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4
1.8 QUALITY ASSURANCE [NOT USED] 5
1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 6
1.10 FIELD [SITE] CONDITIONS [NOT USED] 7
1.11 WARRANTY [NOT USED] 8
PART 2 - PRODUCTS [NOT USED] 9
PART 3 - EXECUTION [NOT USED] 10
END OF SECTION 11
12
Revision Log
DATE NAME SUMMARY OF CHANGE
8/31/2012 D. Johnson
1.3.B – Added requirement of compliance with Health and Safety Code, Title 9.
Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines.
13
01 35 13 - 6
DAP SPECIAL PROJECT PROCEDURES
Page 6 of 7
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August, 30, 2013
EXHIBIT A 1
(To be printed on Contractor’s Letterhead) 2
3
4
5
Date: 6
7
CPN No.: 8
Project Name: 9
Mapsco Location: 10
Limits of Construction: 11
12
13
14 15
16
THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT 17
WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR 18
PROPERTY. 19
20
CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE 21
OF THIS NOTICE. 22
23
IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER 24
ISSUE, PLEASE CALL: 25
26
27
Mr. <CONTRACTOR’S SUPERINTENDENT> AT <TELEPHONE NO.> 28
29
OR 30
31
Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> 32
33
AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 34
35
PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL 36
37
01 35 13 - 7
DAP SPECIAL PROJECT PROCEDURES
Page 7 of 7
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August, 30, 2013
EXHIBIT B 1
2
3
4
01 45 23 - 1
DAP TESTING AND INSPECTION SERVICES
Page 1 of 2
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
SECTION 01 45 23 1
TESTING AND INSPECTION SERVICES 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. Testing and inspection services procedures and coordination 6
B. Deviations from this City of Fort Worth Standard Specification 7
1. None. 8
C. Related Specification Sections include, but are not necessarily limited to: 9
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 10
2. Division 1 – General Requirements 11
1.2 PRICE AND PAYMENT PROCEDURES 12
A. Measurement and Payment 13
1. Work associated with this Item is considered subsidiary to the various Items bid. 14
No separate payment will be allowed for this Item. 15
a. Contractor is responsible for performing, coordinating, and payment of all 16
Quality Control testing. 17
b. City is responsible for performing and payment for first set of Quality 18
Assurance testing. 19
1) If the first Quality Assurance test performed by the City fails, the 20
Contractor is responsible for payment of subsequent Quality Assurance 21
testing until a passing test occurs. 22
a) Final acceptance will not be issued by City until all required payments 23
for testing by Contractor have been paid in full. 24
1.3 REFERENCES [NOT USED] 25
1.4 ADMINISTRATIVE REQUIREMENTS 26
A. Testing 27
1. Complete testing in accordance with the Contract Documents. 28
2. Coordination 29
a. When testing is required to be performed by the City, notify City, sufficiently 30
in advance, when testing is needed. 31
b. When testing is required to be completed by the Contractor, notify City, 32
sufficiently in advance, that testing will be performed. 33
3. Distribution of Testing Reports 34
a. Electronic Distribution 35
1) Confirm development of Project directory for electronic submittals to be 36
uploaded to City’s Buzzsaw site, or another form of distribution approved 37
by the City. 38
01 45 23 - 2
DAP TESTING AND INSPECTION SERVICES
Page 2 of 2
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised August 30, 2013
2) Upload test reports to designated project directory and notify appropriate 1
City representatives via email of submittal posting. 2
3) Hard Copies 3
a) 1 copy for all submittals submitted to the Project Representative 4
b. Hard Copy Distribution (if required in lieu of electronic distribution) 5
1) Tests performed by City 6
a) Distribute 1 hard copy to the Contractor 7
2) Tests performed by the Contractor 8
a) Distribute 3 hard copies to City’s Project Representative 9
4. Provide City’s Project Representative with trip tickets for each delivered load of 10
Concrete or Lime material including the following information: 11
a. Name of pit 12
b. Date of delivery 13
c. Material delivered 14
B. Inspection 15
1. Inspection or lack of inspection does not relieve the Contractor from obligation to 16
perform work in accordance with the Contract Documents. 17
1.5 SUBMITTALS [NOT USED] 18
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 19
1.7 CLOSEOUT SUBMITTALS [NOT USED] 20
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 21
1.9 QUALITY ASSURANCE [NOT USED] 22
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 23
1.11 FIELD [SITE] CONDITIONS [NOT USED] 24
1.12 WARRANTY [NOT USED] 25
PART 2 - PRODUCTS [NOT USED] 26
PART 3 - EXECUTION [NOT USED] 27
END OF SECTION 28
29
Revision Log
DATE NAME SUMMARY OF CHANGE
30
01 50 00 - 1
DAP TEMPORARY FACILITIES AND CONTROLS
Page 1 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised JULY 1, 2011
SECTION 01 50 00 1
TEMPORARY FACILITIES AND CONTROLS 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. Provide temporary facilities and controls needed for the Work including, but not 6
necessarily limited to: 7
a. Temporary utilities 8
b. Sanitary facilities 9
c. Storage Sheds and Buildings 10
d. Dust control 11
e. Temporary fencing of the construction site 12
B. Deviations from this City of Fort Worth Standard Specification 13
1. None. 14
C. Related Specification Sections include, but are not necessarily limited to: 15
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 16
2. Division 1 – General Requirements 17
1.2 PRICE AND PAYMENT PROCEDURES 18
A. Measurement and Payment 19
1. Work associated with this Item is considered subsidiary to the various Items bid. 20
No separate payment will be allowed for this Item. 21
1.3 REFERENCES [NOT USED] 22
1.4 ADMINISTRATIVE REQUIREMENTS 23
A. Temporary Utilities 24
1. Obtaining Temporary Service 25
a. Make arrangements with utility service companies for temporary services. 26
b. Abide by rules and regulations of utility service companies or authorities 27
having jurisdiction. 28
c. Be responsible for utility service costs until Work is approved for Final 29
Acceptance. 30
1) Included are fuel, power, light, heat and other utility services necessary for 31
execution, completion, testing and initial operation of Work. 32
2. Water 33
a. Contractor to provide water required for and in connection with Work to be 34
performed and for specified tests of piping, equipment, devices or other use as 35
required for the completion of the Work. 36
b. Provide and maintain adequate supply of potable water for domestic 37
consumption by Contractor personnel and City’s Project Representatives. 38
c. Coordination 39
1) Contact City 1 week before water for construction is desired 40
01 50 00 - 2
DAP TEMPORARY FACILITIES AND CONTROLS
Page 2 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised JULY 1, 2011
d. Contractor Payment for Construction Water 1
1) Obtain construction water meter from City for payment as billed by City’s 2
established rates. 3
3. Electricity and Lighting 4
a. Provide and pay for electric powered service as required for Work, including 5
testing of Work. 6
1) Provide power for lighting, operation of equipment, or other use. 7
b. Electric power service includes temporary power service or generator to 8
maintain operations during scheduled shutdown. 9
4. Telephone 10
a. Provide emergency telephone service at Site for use by Contractor personnel 11
and others performing work or furnishing services at Site. 12
5. Temporary Heat and Ventilation 13
a. Provide temporary heat as necessary for protection or completion of Work. 14
b. Provide temporary heat and ventilation to assure safe working conditions. 15
B. Sanitary Facilities 16
1. Provide and maintain sanitary facilities for persons on Site. 17
a. Comply with regulations of State and local departments of health. 18
2. Enforce use of sanitary facilities by construction personnel at job site. 19
a. Enclose and anchor sanitary facilities. 20
b. No discharge will be allowed from these facilities. 21
c. Collect and store sewage and waste so as not to cause nuisance or health 22
problem. 23
d. Haul sewage and waste off-site at no less than weekly intervals and properly 24
dispose in accordance with applicable regulation. 25
3. Locate facilities near Work Site and keep clean and maintained throughout Project. 26
4. Remove facilities at completion of Project 27
C. Storage Sheds and Buildings 28
1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor 29
above ground level for materials and equipment susceptible to weather damage. 30
2. Storage of materials not susceptible to weather damage may be on blocks off 31
ground. 32
3. Store materials in a neat and orderly manner. 33
a. Place materials and equipment to permit easy access for identification, 34
inspection and inventory. 35
4. Equip building with lockable doors and lighting, and provide electrical service for 36
equipment space heaters and heating or ventilation as necessary to provide storage 37
environments acceptable to specified manufacturers. 38
5. Fill and grade site for temporary structures to provide drainage away from 39
temporary and existing buildings. 40
6. Remove building from site prior to Final Acceptance. 41
D. Temporary Fencing 42
1. Provide and maintain for the duration or construction when required in contract 43
documents 44
E. Dust Control 45
01 50 00 - 3
DAP TEMPORARY FACILITIES AND CONTROLS
Page 3 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised JULY 1, 2011
1. Contractor is responsible for maintaining dust control through the duration of the 1
project. 2
a. Contractor remains on-call at all times 3
b. Must respond in a timely manner 4
F. Temporary Protection of Construction 5
1. Contractor or subcontractors are responsible for protecting Work from damage due 6
to weather. 7
1.5 SUBMITTALS [NOT USED] 8
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 9
1.7 CLOSEOUT SUBMITTALS [NOT USED] 10
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 11
1.9 QUALITY ASSURANCE [NOT USED] 12
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 13
1.11 FIELD [SITE] CONDITIONS [NOT USED] 14
1.12 WARRANTY [NOT USED] 15
PART 2 - PRODUCTS [NOT USED] 16
PART 3 - EXECUTION [NOT USED] 17
3.1 INSTALLERS [NOT USED] 18
3.2 EXAMINATION [NOT USED] 19
3.3 PREPARATION [NOT USED] 20
3.4 INSTALLATION 21
A. Temporary Facilities 22
1. Maintain all temporary facilities for duration of construction activities as needed. 23
3.5 [REPAIR] / [RESTORATION] 24
3.6 RE-INSTALLATION 25
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 26
3.8 SYSTEM STARTUP [NOT USED] 27
3.9 ADJUSTING [NOT USED] 28
3.10 CLEANING [NOT USED] 29
3.11 CLOSEOUT ACTIVITIES 30
A. Temporary Facilities 31
01 50 00 - 4
DAP TEMPORARY FACILITIES AND CONTROLS
Page 4 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised JULY 1, 2011
1. Remove all temporary facilities and restore area after completion of the Work, to a 1
condition equal to or better than prior to start of Work. 2
3.12 PROTECTION [NOT USED] 3
3.13 MAINTENANCE [NOT USED] 4
3.14 ATTACHMENTS [NOT USED] 5
END OF SECTION 6
7
Revision Log
DATE NAME SUMMARY OF CHANGE
8
01 55 26 - 1
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 1 of 3
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised July 1, 2011
SECTION 01 55 26 1
STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. Administrative procedures for: 6
a. Street Use Permit 7
b. Modification of approved traffic control 8
c. Removal of Street Signs 9
B. Deviations from this City of Fort Worth Standard Specification 10
1. None. 11
C. Related Specification Sections include, but are not necessarily limited to: 12
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 13
2. Division 1 – General Requirements 14
3. Section 34 71 13 – Traffic Control 15
1.2 PRICE AND PAYMENT PROCEDURES 16
A. Measurement and Payment 17
1. Work associated with this Item is considered subsidiary to the various Items bid. 18
No separate payment will be allowed for this Item. 19
1.3 REFERENCES 20
A. Reference Standards 21
1. Reference standards cited in this specification refer to the current reference standard 22
published at the time of the latest revision date logged at the end of this 23
specification, unless a date is specifically cited. 24
2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 25
1.4 ADMINISTRATIVE REQUIREMENTS 26
A. Traffic Control 27
1. General 28
a. When traffic control plans are included in the Drawings, provide Traffic 29
Control in accordance with Drawings and Section 34 71 13. 30
b. When traffic control plans are not included in the Drawings, prepare traffic 31
control plans in accordance with Section 34 71 13 and submit to City for 32
review. 33
1) Allow minimum 10 working days for review of proposed Traffic Control. 34
B. Street Use Permit 35
1. Prior to installation of Traffic Control, a City Street Use Permit is required. 36
a. To obtain Street Use Permit, submit Traffic Control Plans to City 37
Transportation and Public Works Department. 38
01 55 26 - 2
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 2 of 3
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised July 1, 2011
1) Allow a minimum of 5 working days for permit review. 1
2) Contractor’s responsibility to coordinate review of Traffic Control plans for 2
Street Use Permit, such that construction is not delayed. 3
C. Modification to Approved Traffic Control 4
1. Prior to installation traffic control: 5
a. Submit revised traffic control plans to City Department Transportation and 6
Public Works Department. 7
1) Revise Traffic Control plans in accordance with Section 34 71 13. 8
2) Allow minimum 5 working days for review of revised Traffic Control. 9
3) It is the Contractor’s responsibility to coordinate review of Traffic Control 10
plans for Street Use Permit, such that construction is not delayed. 11
D. Removal of Street Sign 12
1. If it is determined that a street sign must be removed for construction, then contact 13
City Transportation and Public Works Department, Signs and Markings Division to 14
remove the sign. 15
E. Temporary Signage 16
1. In the case of regulatory signs, replace permanent sign with temporary sign meeting 17
requirements of the latest edition of the Texas Manual on Uniform Traffic Control 18
Devices (MUTCD). 19
2. Install temporary sign before the removal of permanent sign. 20
3. When construction is complete, to the extent that the permanent sign can be 21
reinstalled, contact the City Transportation and Public Works Department, Signs 22
and Markings Division, to reinstall the permanent sign. 23
F. Traffic Control Standards 24
1. Traffic Control Standards can be found on the City’s Buzzsaw website. 25
1.5 SUBMITTALS [NOT USED] 26
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27
1.7 CLOSEOUT SUBMITTALS [NOT USED] 28
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29
1.9 QUALITY ASSURANCE [NOT USED] 30
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 31
1.11 FIELD [SITE] CONDITIONS [NOT USED] 32
1.12 WARRANTY [NOT USED] 33
PART 2 - PRODUCTS [NOT USED] 34
PART 3 - EXECUTION [NOT USED] 35
END OF SECTION 36
01 55 26 - 3
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 3 of 3
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised July 1, 2011
1
Revision Log
DATE NAME SUMMARY OF CHANGE
2
01 57 13 - 1
DAP STORM WATER POLLUTION PREVENTION
Page 1 of 3
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised July 1, 2011
SECTION 01 57 13 1
STORM WATER POLLUTION PREVENTION 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. Procedures for Storm Water Pollution Prevention Plans 6
B. Deviations from this City of Fort Worth Standard Specification 7
1. None. 8
C. Related Specification Sections include, but are not necessarily limited to: 9
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the 10
Contract 11
2. Division 1 – General Requirements 12
3. Section 31 25 00 – Erosion and Sediment Control 13
1.2 PRICE AND PAYMENT PROCEDURES 14
A. Measurement and Payment 15
1. Construction Activities resulting in less than 1 acre of disturbance 16
a. Work associated with this Item is considered subsidiary to the various Items 17
bid. No separate payment will be allowed for this Item. 18
2. Construction Activities resulting in greater than 1 acre of disturbance 19
a. Measurement and Payment shall be in accordance with Section 31 25 00. 20
1.3 REFERENCES 21
A. Abbreviations and Acronyms 22
1. Notice of Intent: NOI 23
2. Notice of Termination: NOT 24
3. Storm Water Pollution Prevention Plan: SWPPP 25
4. Texas Commission on Environmental Quality: TCEQ 26
5. Notice of Change: NOC 27
A. Reference Standards 28
1. Reference standards cited in this Specification refer to the current reference 29
standard published at the time of the latest revision date logged at the end of this 30
Specification, unless a date is specifically cited. 31
2. Integrated Storm Management (iSWM) Technical Manual for Construction 32
Controls 33
1.4 ADMINISTRATIVE REQUIREMENTS 34
A. General 35
1. Contractor is responsible for resolution and payment of any fines issued associated 36
with compliance to Stormwater Pollution Prevention Plan. 37
01 57 13 - 2
DAP STORM WATER POLLUTION PREVENTION
Page 2 of 3
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised July 1, 2011
B. Construction Activities resulting in: 1
1. Less than 1 acre of disturbance 2
a. Provide erosion and sediment control in accordance with Section 31 25 00 and 3
Drawings. 4
2. 1 to less than 5 acres of disturbance 5
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction 6
Permit is required 7
b. Complete SWPPP in accordance with TCEQ requirements 8
1) TCEQ Small Construction Site Notice Required under general permit 9
TXR150000 10
a) Sign and post at job site 11
b) Prior to Preconstruction Meeting, send 1 copy to City Department of 12
Transportation and Public Works, Environmental Division, (817) 392-13
6088. 14
2) Provide erosion and sediment control in accordance with: 15
a) Section 31 25 00 16
b) The Drawings 17
c) TXR150000 General Permit 18
d) SWPPP 19
e) TCEQ requirements 20
3. 5 acres or more of Disturbance 21
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction 22
Permit is required 23
b. Complete SWPPP in accordance with TCEQ requirements 24
1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee 25
a) Sign and post at job site 26
b) Send copy to City Department of Transportation and Public Works, 27
Environmental Division, (817) 392-6088. 28
2) TCEQ Notice of Change required if making changes or updates to NOI 29
3) Provide erosion and sediment control in accordance with: 30
a) Section 31 25 00 31
b) The Drawings 32
c) TXR150000 General Permit 33
d) SWPPP 34
e) TCEQ requirements 35
4) Once the project has been completed and all the closeout requirements of 36
TCEQ have been met a TCEQ Notice of Termination can be submitted. 37
a) Send copy to City Department of Transportation and Public Works, 38
Environmental Division, (817) 392-6088. 39
1.5 SUBMITTALS 40
A. SWPPP 41
1. Submit in accordance with Section 01 33 00, except as stated herein. 42
a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City 43
as follows: 44
1) 1 copy to the City Project Manager 45
a) City Project Manager will forward to the City Department of 46
Transportation and Public Works, Environmental Division for review 47
01 57 13 - 3
DAP STORM WATER POLLUTION PREVENTION
Page 3 of 3
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised July 1, 2011
B. Modified SWPPP 1
1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City 2
in accordance with Section 01 33 00. 3
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 4
1.7 CLOSEOUT SUBMITTALS [NOT USED] 5
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 6
1.9 QUALITY ASSURANCE [NOT USED] 7
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 8
1.11 FIELD [SITE] CONDITIONS [NOT USED] 9
1.12 WARRANTY [NOT USED] 10
PART 2 - PRODUCTS [NOT USED] 11
PART 3 - EXECUTION [NOT USED] 12
END OF SECTION 13
14
Revision Log
DATE NAME SUMMARY OF CHANGE
15
01 58 13 - 1
DAP TEMPORARY PROJECT SIGNAGE
Page 1 of 3
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
SECTION 01 58 13 1
TEMPORARY PROJECT SIGNAGE 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. Temporary Project Signage Requirements 6
B. Deviations from this City of Fort Worth Standard Specification 7
1. None. 8
C. Related Specification Sections include, but are not necessarily limited to: 9
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 10
2. Division 1 – General Requirements 11
1.2 PRICE AND PAYMENT PROCEDURES 12
A. Measurement and Payment 13
1. Work associated with this Item is considered subsidiary to the various Items bid. 14
No separate payment will be allowed for this Item. 15
1.3 REFERENCES [NOT USED] 16
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 17
1.5 SUBMITTALS [NOT USED] 18
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 19
1.7 CLOSEOUT SUBMITTALS [NOT USED] 20
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 21
1.9 QUALITY ASSURANCE [NOT USED] 22
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 23
1.11 FIELD [SITE] CONDITIONS [NOT USED] 24
1.12 WARRANTY [NOT USED] 25
PART 2 - PRODUCTS 26
2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 27
2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS 28
A. Design Criteria 29
1. Provide free standing Project Designation Sign in accordance with City’s Standard 30
Details for project signs. 31
01 58 13 - 2
DAP TEMPORARY PROJECT SIGNAGE
Page 2 of 3
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
B. Materials 1
1. Sign 2
a. Constructed of ¾-inch fir plywood, grade A-C (exterior) or better 3
2.3 ACCESSORIES [NOT USED] 4
2.4 SOURCE QUALITY CONTROL [NOT USED] 5
PART 3 - EXECUTION 6
3.1 INSTALLERS [NOT USED] 7
3.2 EXAMINATION [NOT USED] 8
3.3 PREPARATION [NOT USED] 9
3.4 INSTALLATION 10
A. General 11
1. Provide vertical installation at extents of project. 12
2. Relocate sign as needed, upon request of the City. 13
B. Mounting options 14
a. Skids 15
b. Posts 16
c. Barricade 17
3.5 REPAIR / RESTORATION [NOT USED] 18
3.6 RE-INSTALLATION [NOT USED] 19
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 20
3.8 SYSTEM STARTUP [NOT USED] 21
3.9 ADJUSTING [NOT USED] 22
3.10 CLEANING [NOT USED] 23
3.11 CLOSEOUT ACTIVITIES [NOT USED] 24
3.12 PROTECTION [NOT USED] 25
3.13 MAINTENANCE 26
A. General 27
1. Maintenance will include painting and repairs as needed or directed by the City. 28
3.14 ATTACHMENTS [NOT USED] 29
END OF SECTION 30
31
01 58 13 - 3
DAP TEMPORARY PROJECT SIGNAGE
Page 3 of 3
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
1
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M. Domenech Revised for DAP application
2
3
01 60 00 - 1
DAP PRODUCT REQUIREMENTS
Page 1 of 2
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. – 102275
Revised April 7, 2014
SECTION 01 60 00 1
PRODUCT REQUIREMENTS 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. References for Product Requirements and City Standard Products List 6
B. Deviations from this City of Fort Worth Standard Specification 7
1. None. 8
C. Related Specification Sections include, but are not necessarily limited to: 9
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 10
2. Division 1 – General Requirements 11
1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 12
1.3 REFERENCES [NOT USED] 13
1.4 ADMINISTRATIVE REQUIREMENTS 14
A. A list of City approved products for use is located on Buzzsaw as follows: 15
1. Resources\02 - Construction Documents\Standard Products List 16
B. Only products specifically included on City’s Standard Product List in these Contract 17
Documents shall be allowed for use on the Project. 18
1. Any subsequently approved products will only be allowed for use upon specific 19
approval by the City. 20
C. Any specific product requirements in the Contract Documents supersede similar 21
products included on the City’s Standard Product List. 22
1. The City reserves the right to not allow products to be used for certain projects even 23
though the product is listed on the City’s Standard Product List. 24
D. Although a specific product is included on City’s Standard Product List, not all 25
products from that manufacturer are approved for use, including but not limited to, that 26
manufacturer’s standard product. 27
E. See Section 01 33 00 for submittal requirements of Product Data included on City’s 28
Standard Product List. 29
1.5 SUBMITTALS [NOT USED] 30
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 31
1.7 CLOSEOUT SUBMITTALS [NOT USED] 32
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 33
1.9 QUALITY ASSURANCE [NOT USED] 34
01 60 00 - 2
DAP PRODUCT REQUIREMENTS
Page 2 of 2
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. – 102275
Revised April 7, 2014
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1
1.11 FIELD [SITE] CONDITIONS [NOT USED] 2
1.12 WARRANTY [NOT USED] 3
PART 2 - PRODUCTS [NOT USED] 4
PART 3 - EXECUTION [NOT USED] 5
END OF SECTION 6
7
Revision Log
DATE NAME SUMMARY OF CHANGE
10/12/12 D. Johnson Modified Location of City’s Standard Product List
4/7/2014 M.Domenech Revised for DAP application
8
01 66 00 - 1
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 1 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
SECTION 01 66 00 1
PRODUCT STORAGE AND HANDLING REQUIREMENTS 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. Scheduling of product delivery 6
2. Packaging of products for delivery 7
3. Protection of products against damage from: 8
a. Handling 9
b. Exposure to elements or harsh environments 10
B. Deviations from this City of Fort Worth Standard Specification 11
1. None. 12
C. Related Specification Sections include, but are not necessarily limited to: 13
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 14
2. Division 1 – General Requirements 15
1.2 PRICE AND PAYMENT PROCEDURES 16
A. Measurement and Payment 17
1. Work associated with this Item is considered subsidiary to the various Items bid. 18
No separate payment will be allowed for this Item. 19
1.3 REFERENCES [NOT USED] 20
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 21
1.5 SUBMITTALS [NOT USED] 22
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 23
1.7 CLOSEOUT SUBMITTALS [NOT USED] 24
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 25
1.9 QUALITY ASSURANCE [NOT USED] 26
1.10 DELIVERY AND HANDLING 27
A. Delivery Requirements 28
1. Schedule delivery of products or equipment as required to allow timely installation 29
and to avoid prolonged storage. 30
2. Provide appropriate personnel and equipment to receive deliveries. 31
3. Delivery trucks will not be permitted to wait extended periods of time on the Site 32
for personnel or equipment to receive the delivery. 33
01 66 00 - 2
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 2 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
4. Deliver products or equipment in manufacturer's original unbroken cartons or other 1
containers designed and constructed to protect the contents from physical or 2
environmental damage. 3
5. Clearly and fully mark and identify as to manufacturer, item and installation 4
location. 5
6. Provide manufacturer's instructions for storage and handling. 6
B. Handling Requirements 7
1. Handle products or equipment in accordance with these Contract Documents and 8
manufacturer’s recommendations and instructions. 9
C. Storage Requirements 10
1. Store materials in accordance with manufacturer’s recommendations and 11
requirements of these Specifications. 12
2. Make necessary provisions for safe storage of materials and equipment. 13
a. Place loose soil materials and materials to be incorporated into Work to prevent 14
damage to any part of Work or existing facilities and to maintain free access at 15
all times to all parts of Work and to utility service company installations in 16
vicinity of Work. 17
3. Keep materials and equipment neatly and compactly stored in locations that will 18
cause minimum inconvenience to other contractors, public travel, adjoining owners, 19
tenants and occupants. 20
a. Arrange storage to provide easy access for inspection. 21
4. Restrict storage to areas available on construction site for storage of material and 22
equipment as shown on Drawings, or approved by City’s Project Representative. 23
5. Provide off-site storage and protection when on-site storage is not adequate. 24
a. Provide addresses of and access to off-site storage locations for inspection by 25
City’s Project Representative. 26
6. Do not use lawns, grass plots or other private property for storage purposes without 27
written permission of owner or other person in possession or control of premises. 28
7. Store in manufacturers’ unopened containers. 29
8. Neatly, safely and compactly stack materials delivered and stored along line of 30
Work to avoid inconvenience and damage to property owners and general public 31
and maintain at least 3 feet from fire hydrant. 32
9. Keep public and private driveways and street crossings open. 33
10. Repair or replace damaged lawns, sidewalks, streets or other improvements to 34
satisfaction of City’s Project Representative. 35
a. Total length which materials may be distributed along route of construction at 36
one time is 1,000 linear feet, unless otherwise approved in writing by City’s 37
Project Representative. 38
01 66 00 - 3
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 3 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
1.11 FIELD [SITE] CONDITIONS [NOT USED] 1
1.12 WARRANTY [NOT USED] 2
PART 2 - PRODUCTS [NOT USED] 3
PART 3 - EXECUTION 4
3.1 INSTALLERS [NOT USED] 5
3.2 EXAMINATION [NOT USED] 6
3.3 PREPARATION [NOT USED] 7
3.4 ERECTION [NOT USED] 8
3.5 REPAIR / RESTORATION [NOT USED] 9
3.6 RE-INSTALLATION [NOT USED] 10
3.7 FIELD [OR] SITE QUALITY CONTROL 11
A. Tests and Inspections 12
1. Inspect all products or equipment delivered to the site prior to unloading. 13
B. Non-Conforming Work 14
1. Reject all products or equipment that are damaged, used or in any other way 15
unsatisfactory for use on the project. 16
3.8 SYSTEM STARTUP [NOT USED] 17
3.9 ADJUSTING [NOT USED] 18
3.10 CLEANING [NOT USED] 19
3.11 CLOSEOUT ACTIVITIES [NOT USED] 20
3.12 PROTECTION 21
A. Protect all products or equipment in accordance with manufacturer's written directions. 22
B. Store products or equipment in location to avoid physical damage to items while in 23
storage. 24
C. Protect equipment from exposure to elements and keep thoroughly dry if required by 25
the manufacturer. 26
3.13 MAINTENANCE [NOT USED] 27
3.14 ATTACHMENTS [NOT USED] 28
END OF SECTION 29
30
01 66 00 - 4
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 4 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP application
1
01 70 00 - 1
DAP MOBILIZATION AND REMOBILIZATION
Page 1 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
SECTION 01 70 00 1
MOBILIZATION AND REMOBILIZATION 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. Mobilization and Demobilization 6
a. Mobilization 7
1) Transportation of Contractor’s personnel, equipment, and operating supplies 8
to the Site 9
2) Establishment of necessary general facilities for the Contractor’s operation 10
at the Site 11
3) Premiums paid for performance and payment bonds 12
4) Transportation of Contractor’s personnel, equipment, and operating supplies 13
to another location within the designated Site 14
5) Relocation of necessary general facilities for the Contractor’s operation 15
from 1 location to another location on the Site. 16
b. Demobilization 17
1) Transportation of Contractor’s personnel, equipment, and operating supplies 18
away from the Site including disassembly 19
2) Site Clean-up 20
3) Removal of all buildings and/or other facilities assembled at the Site for this 21
Contract 22
c. Mobilization and Demobilization do not include activities for specific items of 23
work that are for which payment is provided elsewhere in the contract. 24
2. Remobilization 25
a. Remobilization for Suspension of Work specifically required in the Contract 26
Documents or as required by City includes: 27
1) Demobilization 28
a) Transportation of Contractor’s personnel, equipment, and operating 29
supplies from the Site including disassembly or temporarily securing 30
equipment, supplies, and other facilities as designated by the Contract 31
Documents necessary to suspend the Work. 32
b) Site Clean-up as designated in the Contract Documents 33
2) Remobilization 34
a) Transportation of Contractor’s personnel, equipment, and operating 35
supplies to the Site necessary to resume the Work. 36
b) Establishment of necessary general facilities for the Contractor’s 37
operation at the Site necessary to resume the Work. 38
3) No Payments will be made for: 39
a) Mobilization and Demobilization from one location to another on the 40
Site in the normal progress of performing the Work. 41
b) Stand-by or idle time 42
c) Lost profits 43
3. Mobilizations and Demobilization for Miscellaneous Projects 44
a. Mobilization and Demobilization 45
01 70 00 - 2
DAP MOBILIZATION AND REMOBILIZATION
Page 2 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
1) Mobilization shall consist of the activities and cost on a Work Order basis 1
necessary for: 2
a) Transportation of Contractor’s personnel, equipment, and operating 3
supplies to the Site for the issued Work Order. 4
b) Establishment of necessary general facilities for the Contractor’s 5
operation at the Site for the issued Work Order 6
2) Demobilization shall consist of the activities and cost necessary for: 7
a) Transportation of Contractor’s personnel, equipment, and operating 8
supplies from the Site including disassembly for each issued Work 9
Order 10
b) Site Clean-up for each issued Work Order 11
c) Removal of all buildings or other facilities assembled at the Site for 12
each Work Oder 13
b. Mobilization and Demobilization do not include activities for specific items of 14
work for which payment is provided elsewhere in the contract. 15
4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 16
a. A Mobilization for Miscellaneous Projects when directed by the City and the 17
mobilization occurs within 24 hours of the issuance of the Work Order. 18
B. Deviations from this City of Fort Worth Standard Specification 19
1. None. 20
C. Related Specification Sections include, but are not necessarily limited to: 21
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 22
2. Division 1 – General Requirements 23
1.2 PRICE AND PAYMENT PROCEDURES 24
A. Measurement and Payment 25
1. Mobilization and Demobilization 26
a. Measure 27
1) This Item is considered subsidiary to the various Items bid. 28
b. Payment 29
1) The work performed and materials furnished in accordance with this Item 30
are subsidiary to the various Items bid and no other compensation will be 31
allowed. 32
2. Remobilization for suspension of Work as specifically required in the Contract 33
Documents 34
a. Measurement 35
1) Measurement for this Item shall be per each remobilization performed. 36
b. Payment 37
1) The work performed and materials furnished in accordance with this Item 38
and measured as provided under “Measurement” will be paid for at the unit 39
price per each “Specified Remobilization” in accordance with Contract 40
Documents. 41
c. The price shall include: 42
1) Demobilization as described in Section 1.1.A.2.a.1) 43
2) Remobilization as described in Section 1.1.A.2.a.2) 44
d. No payments will be made for standby, idle time, or lost profits associated this 45
Item. 46
01 70 00 - 3
DAP MOBILIZATION AND REMOBILIZATION
Page 3 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
3. Remobilization for suspension of Work as required by City 1
a. Measurement and Payment 2
1) This shall be submitted as a Contract Claim in accordance with Article 10 3
of Section 00 72 00. 4
2) No payments will be made for standby, idle time, or lost profits associated 5
with this Item. 6
4. Mobilizations and Demobilizations for Miscellaneous Projects 7
a. Measurement 8
1) Measurement for this Item shall be for each Mobilization and 9
Demobilization required by the Contract Documents 10
b. Payment 11
1) The Work performed and materials furnished in accordance with this Item 12
and measured as provided under “Measurement” will be paid for at the unit 13
price per each “Work Order Mobilization” in accordance with Contract 14
Documents. Demobilization shall be considered subsidiary to mobilization 15
and shall not be paid for separately. 16
c. The price shall include: 17
1) Mobilization as described in Section 1.1.A.3.a.1) 18
2) Demobilization as described in Section 1.1.A.3.a.2) 19
d. No payments will be made for standby, idle time, or lost profits associated this 20
Item. 21
5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 22
a. Measurement 23
1) Measurement for this Item shall be for each Mobilization and 24
Demobilization required by the Contract Documents 25
b. Payment 26
1) The Work performed and materials furnished in accordance with this Item 27
and measured as provided under “Measurement” will be paid for at the unit 28
price per each “Work Order Emergency Mobilization” in accordance with 29
Contract Documents. Demobilization shall be considered subsidiary to 30
mobilization and shall not be paid for separately. 31
c. The price shall include 32
1) Mobilization as described in Section 1.1.A.4.a) 33
2) Demobilization as described in Section 1.1.A.3.a.2) 34
d. No payments will be made for standby, idle time, or lost profits associated this 35
Item. 36
1.3 REFERENCES [NOT USED] 37
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 38
1.5 SUBMITTALS [NOT USED] 39
1.6 INFORMATIONAL SUBMITTALS [NOT USED] 40
1.7 CLOSEOUT SUBMITTALS [NOT USED] 41
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 42
1.9 QUALITY ASSURANCE [NOT USED] 43
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 44
01 70 00 - 4
DAP MOBILIZATION AND REMOBILIZATION
Page 4 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
1.11 FIELD [SITE] CONDITIONS [NOT USED] 1
1.12 WARRANTY [NOT USED] 2
PART 2 - PRODUCTS [NOT USED] 3
PART 3 - EXECUTION [NOT USED] 4
END OF SECTION 5
6
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP application
7
01 71 23 - 1
DAP CONSTRUCTION STAKING AND SURVEY
Page 1 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
SECTION 01 71 23 1
CONSTRUCTION STAKING AND SURVEY 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. Requirements for construction staking and construction survey 6
B. Deviations from this City of Fort Worth Standard Specification 7
1. None. 8
C. Related Specification Sections include, but are not necessarily limited to: 9
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 10
2. Division 1 – General Requirements 11
1.2 PRICE AND PAYMENT PROCEDURES 12
A. Measurement and Payment 13
1. Construction Staking 14
a. Measurement 15
1) This Item is considered subsidiary to the various Items bid. 16
b. Payment 17
1) The work performed and the materials furnished in accordance with this 18
Item are subsidiary to the various Items bid and no other compensation will 19
be allowed. 20
2. Construction Survey 21
a. Measurement 22
1) This Item is considered subsidiary to the various Items bid. 23
b. Payment 24
1) The work performed and the materials furnished in accordance with this 25
Item are subsidiary to the various Items bid and no other compensation will 26
be allowed. 27
1.3 REFERENCES [NOT USED] 28
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 29
1.5 SUBMITTALS 30
A. Submittals, if required, shall be in accordance with Section 01 33 00. 31
B. All submittals shall be approved by the City prior to delivery. 32
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 33
A. Certificates 34
1. Provide certificate certifying that elevations and locations of improvements are in 35
conformance or non-conformance with requirements of the Contract Documents. 36
a. Certificate must be sealed by a registered professional land surveyor in the 37
State of Texas. 38
01 71 23 - 2
DAP CONSTRUCTION STAKING AND SURVEY
Page 2 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
B. Field Quality Control Submittals 1
1. Documentation verifying accuracy of field engineering work. 2
1.7 CLOSEOUT SUBMITTALS [NOT USED] 3
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4
1.9 QUALITY ASSURANCE 5
A. Construction Staking 6
1. Construction staking will be performed by the City. 7
2. Coordination 8
a. Contact City’s Project Representative at least 2 weeks in advance for 9
scheduling of Construction Staking. 10
b. It is the Contractor’s responsibility to coordinate staking such that construction 11
activities are not delayed or negatively impacted. 12
3. General 13
a. Contractor is responsible for preserving and maintaining stakes furnished by 14
City. 15
b. If in the opinion of the City, a sufficient number of stakes or markings have 16
been lost, destroyed or disturbed, by Contractor’s neglect, such that the 17
contracted Work cannot take place, then the Contractor will be required to pay 18
the City for new staking with a 25 percent markup. The cost for staking will be 19
deducted from the payment due to the Contractor for the Project. 20
B. Construction Survey 21
1. Construction Survey will be performed by the City. 22
2. Coordination 23
a. Contractor to verify that control data established in the design survey remains 24
intact. 25
b. Coordinate with the City prior to field investigation to determine which 26
horizontal and vertical control data will be required for construction survey. 27
c. It is the Contractor’s responsibility to coordinate Construction Survey such that 28
construction activities are not delayed or negatively impacted. 29
d. Notify City if any control data needs to be restored or replaced due to damage 30
caused during construction operations. 31
1) City shall perform replacements and/or restorations. 32
3. General 33
a. Construction survey will be performed in order to maintain complete and 34
accurate logs of control and survey work as it progresses for Project Records. 35
b. The Contractor will need to ensure coordination is maintained with the City to 36
perform construction survey to obtain construction features, including but not 37
limited to the following: 38
1) All Utility Lines 39
a) Rim and flowline elevations and coordinates for each manhole or 40
junction structure 41
2) Water Lines 42
a) Top of pipe elevations and coordinates for waterlines at the following 43
locations: 44
(1) Every 250 linear feet 45
01 71 23 - 3
DAP CONSTRUCTION STAKING AND SURVEY
Page 3 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
(2) Horizontal and vertical points of inflection, curvature, etc. (All 1
Fittings) 2
(3) Cathodic protection test stations 3
(4) Sampling stations 4
(5) Meter boxes/vaults (All sizes) 5
(6) Fire lines 6
(7) Fire hydrants 7
(8) Gate valves 8
(9) Plugs, stubouts, dead-end lines 9
(10) Air Release valves (Manhole rim and vent pipe) 10
(11) Blow off valves (Manhole rim and valve lid) 11
(12) Pressure plane valves 12
(13) Cleaning wyes 13
(14) Casing pipe (each end) 14
b) Storm Sewer 15
(1) Top of pipe elevations and coordinates at the following locations: 16
(a) Every 250 linear feet 17
(b) Horizontal and vertical points of inflection, curvature, etc. 18
c) Sanitary Sewer 19
(1) Top of pipe elevations and coordinates for sanitary sewer lines at 20
the following locations: 21
(a) Every 250 linear feet 22
(b) Horizontal and vertical points of inflection, curvature, etc. 23
(c) Cleanouts 24
c. Construction survey will be performed in order to maintain complete and 25
accurate logs of control and survey work associated with meeting or exceeding 26
the line and grade required by these Specifications. 27
d. The Contractor will need to ensure coordination is maintained with the City to 28
perform construction survey and to verify control data, including but not 29
limited to the following: 30
1) Established benchmarks and control points provided for the Contractor’s 31
use are accurate 32
2) Benchmarks were used to furnish and maintain all reference lines and 33
grades for tunneling 34
3) Lines and grades were used to establish the location of the pipe 35
4) Submit to the City copies of field notes used to establish all lines and 36
grades and allow the City to check guidance system setup prior to 37
beginning each tunneling drive. 38
5) Provide access for the City to verify the guidance system and the line and 39
grade of the carrier pipe on a daily basis. 40
6) The Contractor remains fully responsible for the accuracy of the work and 41
the correction of it, as required. 42
7) Monitor line and grade continuously during construction. 43
8) Record deviation with respect to design line and grade once at each pipe 44
joint and submit daily records to City. 45
9) If the installation does not meet the specified tolerances, immediately notify 46
the City and correct the installation in accordance with the Contract 47
Documents. 48
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 49
01 71 23 - 4
DAP CONSTRUCTION STAKING AND SURVEY
Page 4 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
1.11 FIELD [SITE] CONDITIONS [NOT USED] 1
1.12 WARRANTY [NOT USED] 2
PART 2 - PRODUCTS [NOT USED] 3
PART 3 - EXECUTION 4
3.1 INSTALLERS [NOT USED] 5
3.2 EXAMINATION [NOT USED] 6
3.3 PREPARATION [NOT USED] 7
3.4 APPLICATION 8
3.5 REPAIR / RESTORATION [NOT USED] 9
3.6 RE-INSTALLATION [NOT USED] 10
3.7 FIELD [OR] SITE QUALITY CONTROL 11
A. It is the Contractor’s responsibility to maintain all stakes and control data placed by the 12
City in accordance with this Specification. 13
B. Do not change or relocate stakes or control data without approval from the City. 14
3.8 SYSTEM STARTUP [NOT USED] 15
3.9 ADJUSTING [NOT USED] 16
3.10 CLEANING [NOT USED] 17
3.11 CLOSEOUT ACTIVITIES [NOT USED] 18
3.12 PROTECTION [NOT USED] 19
3.13 MAINTENANCE [NOT USED] 20
3.14 ATTACHMENTS [NOT USED] 21
END OF SECTION 22
23
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP application
24
01 74 23 - 1
DAP CLEANING
Page 1 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
SECTION 01 74 23 1
CLEANING 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. Intermediate and final cleaning for Work not including special cleaning of closed 6
systems specified elsewhere 7
B. Deviations from this City of Fort Worth Standard Specification 8
1. None. 9
C. Related Specification Sections include, but are not necessarily limited to: 10
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 11
2. Division 1 – General Requirements 12
3. Section 32 92 13 – Hydro-Mulching, Seeding and Sodding 13
1.2 PRICE AND PAYMENT PROCEDURES 14
A. Measurement and Payment 15
1. Work associated with this Item is considered subsidiary to the various Items bid. 16
No separate payment will be allowed for this Item. 17
1.3 REFERENCES [NOT USED] 18
1.4 ADMINISTRATIVE REQUIREMENTS 19
A. Scheduling 20
1. Schedule cleaning operations so that dust and other contaminants disturbed by 21
cleaning process will not fall on newly painted surfaces. 22
2. Schedule final cleaning upon completion of Work and immediately prior to final 23
inspection. 24
1.5 SUBMITTALS [NOT USED] 25
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 26
1.7 CLOSEOUT SUBMITTALS [NOT USED] 27
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 28
1.9 QUALITY ASSURANCE [NOT USED] 29
1.10 STORAGE, AND HANDLING 30
A. Storage and Handling Requirements 31
1. Store cleaning products and cleaning wastes in containers specifically designed for 32
those materials. 33
01 74 23 - 2
DAP CLEANING
Page 2 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
1.11 FIELD [SITE] CONDITIONS [NOT USED] 1
1.12 WARRANTY [NOT USED] 2
PART 2 - PRODUCTS 3
2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 4
2.2 MATERIALS 5
A. Cleaning Agents 6
1. Compatible with surface being cleaned 7
2. New and uncontaminated 8
3. For manufactured surfaces 9
a. Material recommended by manufacturer 10
2.3 ACCESSORIES [NOT USED] 11
2.4 SOURCE QUALITY CONTROL [NOT USED] 12
PART 3 - EXECUTION 13
3.1 INSTALLERS [NOT USED] 14
3.2 EXAMINATION [NOT USED] 15
3.3 PREPARATION [NOT USED] 16
3.4 APPLICATION [NOT USED] 17
3.5 REPAIR / RESTORATION [NOT USED] 18
3.6 RE-INSTALLATION [NOT USED] 19
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 20
3.8 SYSTEM STARTUP [NOT USED] 21
3.9 ADJUSTING [NOT USED] 22
3.10 CLEANING 23
A. General 24
1. Prevent accumulation of wastes that create hazardous conditions. 25
2. Conduct cleaning and disposal operations to comply with laws and safety orders of 26
governing authorities. 27
3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in 28
storm or sanitary drains or sewers. 29
4. Dispose of degradable debris at an approved solid waste disposal site. 30
5. Dispose of nondegradable debris at an approved solid waste disposal site or in an 31
alternate manner approved by City and regulatory agencies. 32
01 74 23 - 3
DAP CLEANING
Page 3 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
6. Handle materials in a controlled manner with as few handlings as possible. 1
7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with 2
this project. 3
8. Remove all signs of temporary construction and activities incidental to construction 4
of required permanent Work. 5
9. If project is not cleaned to the satisfaction of the City, the City reserves the right to 6
have the cleaning completed at the expense of the Contractor. 7
10. Do not burn on-site. 8
B. Intermediate Cleaning during Construction 9
1. Keep Work areas clean so as not to hinder health, safety or convenience of 10
personnel in existing facility operations. 11
2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 12
3. Confine construction debris daily in strategically located container(s): 13
a. Cover to prevent blowing by wind 14
b. Store debris away from construction or operational activities 15
c. Haul from site at a minimum of once per week 16
4. Vacuum clean interior areas when ready to receive finish painting. 17
a. Continue vacuum cleaning on an as-needed basis, until Final Acceptance. 18
5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which 19
may become airborne or transported by flowing water during the storm. 20
C. Exterior (Site or Right of Way) Final Cleaning 21
1. Remove trash and debris containers from site. 22
a. Re-seed areas disturbed by location of trash and debris containers in accordance 23
with Section 32 92 13. 24
2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object 25
that may hinder or disrupt the flow of traffic along the roadway. 26
3. Clean any interior areas including, but not limited to, vaults, manholes, structures, 27
junction boxes and inlets. 28
4. If no longer required for maintenance of erosion facilities, and upon approval by 29
City, remove erosion control from site. 30
5. Clean signs, lights, signals, etc. 31
3.11 CLOSEOUT ACTIVITIES [NOT USED] 32
3.12 PROTECTION [NOT USED] 33
3.13 MAINTENANCE [NOT USED] 34
3.14 ATTACHMENTS [NOT USED] 35
36
37
38
39
40
01 74 23 - 4
DAP CLEANING
Page 4 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
END OF SECTION 1
2
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP application
3
01 77 19 - 1
DAP CLOSEOUT REQUIREMENTS
Page 1 of 3
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
SECTION 01 77 19 1
CLOSEOUT REQUIREMENTS 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. The procedure for closing out a contract 6
B. Deviations from this City of Fort Worth Standard Specification 7
1. None. 8
C. Related Specification Sections include, but are not necessarily limited to: 9
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 10
2. Division 1 – General Requirements 11
1.2 PRICE AND PAYMENT PROCEDURES 12
A. Measurement and Payment 13
1. Work associated with this Item is considered subsidiary to the various Items bid. 14
No separate payment will be allowed for this Item. 15
1.3 REFERENCES [NOT USED] 16
1.4 ADMINISTRATIVE REQUIREMENTS 17
A. Guarantees, Bonds and Affidavits 18
1. No application for final payment will be accepted until all guarantees, bonds, 19
certificates, licenses and affidavits required for Work or equipment as specified are 20
satisfactorily filed with the City. 21
B. Release of Liens or Claims 22
1. No application for final payment will be accepted until satisfactory evidence of 23
release of liens has been submitted to the City. 24
1.5 SUBMITTALS 25
A. Submit all required documentation to City’s Project Representative. 26
01 77 19 - 2
DAP CLOSEOUT REQUIREMENTS
Page 2 of 3
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1
1.7 CLOSEOUT SUBMITTALS [NOT USED] 2
PART 2 - PRODUCTS [NOT USED] 3
PART 3 - EXECUTION 4
3.1 INSTALLERS [NOT USED] 5
3.2 EXAMINATION [NOT USED] 6
3.3 PREPARATION [NOT USED] 7
3.4 CLOSEOUT PROCEDURE 8
A. Prior to requesting Final Inspection, submit: 9
1. Project Record Documents in accordance with Section 01 78 39 10
2. Operation and Maintenance Data, if required, in accordance with Section 01 78 23 11
B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 12
01 74 23. 13
C. Final Inspection 14
1. After final cleaning, provide notice to the City Project Representative that the Work 15
is completed. 16
a. The City will make an initial Final Inspection with the Contractor present. 17
b. Upon completion of this inspection, the City will notify the Contractor, in 18
writing within 10 business days, of any particulars in which this inspection 19
reveals that the Work is defective or incomplete. 20
2. Upon receiving written notice from the City, immediately undertake the Work 21
required to remedy deficiencies and complete the Work to the satisfaction of the 22
City. 23
3. Upon completion of Work associated with the items listed in the City's written 24
notice, inform the City, that the required Work has been completed. Upon receipt 25
of this notice, the City, in the presence of the Contractor, will make a subsequent 26
Final Inspection of the project. 27
4. Provide all special accessories required to place each item of equipment in full 28
operation. These special accessory items include, but are not limited to: 29
a. Specified spare parts 30
b. Adequate oil and grease as required for the first lubrication of the equipment 31
c. Initial fill up of all chemical tanks and fuel tanks 32
d. Light bulbs 33
e. Fuses 34
f. Vault keys 35
g. Handwheels 36
h. Other expendable items as required for initial start-up and operation of all 37
equipment 38
D. Notice of Project Completion 39
01 77 19 - 3
DAP CLOSEOUT REQUIREMENTS
Page 3 of 3
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
1. Once the City Project Representative finds the Work subsequent to Final Inspection 1
to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). 2
E. Supporting Documentation 3
1. Coordinate with the City Project Representative to complete the following 4
additional forms: 5
a. Final Payment Request 6
b. Statement of Contract Time 7
c. Affidavit of Payment and Release of Liens 8
d. Consent of Surety to Final Payment 9
e. Pipe Report (if required) 10
f. Contractor’s Evaluation of City 11
g. Performance Evaluation of Contractor 12
F. Letter of Final Acceptance 13
1. Upon review and acceptance of Notice of Project Completion and Supporting 14
Documentation, in accordance with General Conditions, City will issue Letter of 15
Final Acceptance and release the Final Payment Request for payment. 16
3.5 REPAIR / RESTORATION [NOT USED] 17
3.6 RE-INSTALLATION [NOT USED] 18
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 19
3.8 SYSTEM STARTUP [NOT USED] 20
3.9 ADJUSTING [NOT USED] 21
3.10 CLEANING [NOT USED] 22
3.11 CLOSEOUT ACTIVITIES [NOT USED] 23
3.12 PROTECTION [NOT USED] 24
3.13 MAINTENANCE [NOT USED] 25
3.14 ATTACHMENTS [NOT USED] 26
END OF SECTION 27
28
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP application
29
01 78 23 - 1
DAP OPERATION AND MAINTENANCE DATA
Page 1 of 5
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
SECTION 01 78 23 1
OPERATION AND MAINTENANCE DATA 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. Product data and related information appropriate for City's maintenance and 6
operation of products furnished under Contract 7
2. Such products may include, but are not limited to: 8
a. Traffic Controllers 9
b. Irrigation Controllers (to be operated by the City) 10
c. Butterfly Valves 11
B. Deviations from this City of Fort Worth Standard Specification 12
1. None. 13
C. Related Specification Sections include, but are not necessarily limited to: 14
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 15
2. Division 1 – General Requirements 16
1.2 PRICE AND PAYMENT PROCEDURES 17
A. Measurement and Payment 18
1. Work associated with this Item is considered subsidiary to the various Items bid. 19
No separate payment will be allowed for this Item. 20
1.3 REFERENCES [NOT USED] 21
1.4 ADMINISTRATIVE REQUIREMENTS 22
A. Schedule 23
1. Submit manuals in final form to the City within 30 calendar days of product 24
shipment to the project site. 25
1.5 SUBMITTALS 26
A. Submittals shall be in accordance with Section 01 33 00. All submittals shall be 27
approved by the City prior to delivery. 28
1.6 INFORMATIONAL SUBMITTALS 29
A. Submittal Form 30
1. Prepare data in form of an instructional manual for use by City personnel. 31
2. Format 32
a. Size: 8 ½ inches x 11 inches 33
b. Paper 34
1) 40 pound minimum, white, for typed pages 35
2) Holes reinforced with plastic, cloth or metal 36
c. Text: Manufacturer’s printed data, or neatly typewritten 37
01 78 23 - 2
DAP OPERATION AND MAINTENANCE DATA
Page 2 of 5
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
d. Drawings 1
1) Provide reinforced punched binder tab, bind in with text 2
2) Reduce larger drawings and fold to size of text pages. 3
e. Provide fly-leaf for each separate product, or each piece of operating 4
equipment. 5
1) Provide typed description of product, and major component parts of 6
equipment. 7
2) Provide indexed tabs. 8
f. Cover 9
1) Identify each volume with typed or printed title "OPERATING AND 10
MAINTENANCE INSTRUCTIONS". 11
2) List: 12
a) Title of Project 13
b) Identity of separate structure as applicable 14
c) Identity of general subject matter covered in the manual 15
3. Binders 16
a. Commercial quality 3-ring binders with durable and cleanable plastic covers 17
b. When multiple binders are used, correlate the data into related consistent 18
groupings. 19
4. If available, provide an electronic form of the O&M Manual. 20
B. Manual Content 21
1. Neatly typewritten table of contents for each volume, arranged in systematic order 22
a. Contractor, name of responsible principal, address and telephone number 23
b. A list of each product required to be included, indexed to content of the volume 24
c. List, with each product: 25
1) The name, address and telephone number of the subcontractor or installer 26
2) A list of each product required to be included, indexed to content of the 27
volume 28
3) Identify area of responsibility of each 29
4) Local source of supply for parts and replacement 30
d. Identify each product by product name and other identifying symbols as set 31
forth in Contract Documents. 32
2. Product Data 33
a. Include only those sheets which are pertinent to the specific product. 34
b. Annotate each sheet to: 35
1) Clearly identify specific product or part installed 36
2) Clearly identify data applicable to installation 37
3) Delete references to inapplicable information 38
3. Drawings 39
a. Supplement product data with drawings as necessary to clearly illustrate: 40
1) Relations of component parts of equipment and systems 41
2) Control and flow diagrams 42
b. Coordinate drawings with information in Project Record Documents to assure 43
correct illustration of completed installation. 44
c. Do not use Project Record Drawings as maintenance drawings. 45
4. Written text, as required to supplement product data for the particular installation: 46
a. Organize in consistent format under separate headings for different procedures. 47
b. Provide logical sequence of instructions of each procedure. 48
01 78 23 - 3
DAP OPERATION AND MAINTENANCE DATA
Page 3 of 5
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
5. Copy of each warranty, bond and service contract issued 1
a. Provide information sheet for City personnel giving: 2
1) Proper procedures in event of failure 3
2) Instances which might affect validity of warranties or bonds 4
C. Manual for Materials and Finishes 5
1. Submit 5 copies of complete manual in final form. 6
2. Content, for architectural products, applied materials and finishes: 7
a. Manufacturer's data, giving full information on products 8
1) Catalog number, size, composition 9
2) Color and texture designations 10
3) Information required for reordering special manufactured products 11
b. Instructions for care and maintenance 12
1) Manufacturer's recommendation for types of cleaning agents and methods 13
2) Cautions against cleaning agents and methods which are detrimental to 14
product 15
3) Recommended schedule for cleaning and maintenance 16
3. Content, for moisture protection and weather exposure products: 17
a. Manufacturer's data, giving full information on products 18
1) Applicable standards 19
2) Chemical composition 20
3) Details of installation 21
b. Instructions for inspection, maintenance and repair 22
D. Manual for Equipment and Systems 23
1. Submit 5 copies of complete manual in final form. 24
2. Content, for each unit of equipment and system, as appropriate: 25
a. Description of unit and component parts 26
1) Function, normal operating characteristics and limiting conditions 27
2) Performance curves, engineering data and tests 28
3) Complete nomenclature and commercial number of replaceable parts 29
b. Operating procedures 30
1) Start-up, break-in, routine and normal operating instructions 31
2) Regulation, control, stopping, shut-down and emergency instructions 32
3) Summer and winter operating instructions 33
4) Special operating instructions 34
c. Maintenance procedures 35
1) Routine operations 36
2) Guide to "trouble shooting" 37
3) Disassembly, repair and reassembly 38
4) Alignment, adjusting and checking 39
d. Servicing and lubrication schedule 40
1) List of lubricants required 41
e. Manufacturer's printed operating and maintenance instructions 42
f. Description of sequence of operation by control manufacturer 43
1) Predicted life of parts subject to wear 44
2) Items recommended to be stocked as spare parts 45
g. As installed control diagrams by controls manufacturer 46
h. Each contractor's coordination drawings 47
1) As installed color coded piping diagrams 48
01 78 23 - 4
DAP OPERATION AND MAINTENANCE DATA
Page 4 of 5
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
i. Charts of valve tag numbers, with location and function of each valve 1
j. List of original manufacturer's spare parts, manufacturer's current prices, and 2
recommended quantities to be maintained in storage 3
k. Other data as required under pertinent Sections of Specifications 4
3. Content, for each electric and electronic system, as appropriate: 5
a. Description of system and component parts 6
1) Function, normal operating characteristics, and limiting conditions 7
2) Performance curves, engineering data and tests 8
3) Complete nomenclature and commercial number of replaceable parts 9
b. Circuit directories of panelboards 10
1) Electrical service 11
2) Controls 12
3) Communications 13
c. As installed color coded wiring diagrams 14
d. Operating procedures 15
1) Routine and normal operating instructions 16
2) Sequences required 17
3) Special operating instructions 18
e. Maintenance procedures 19
1) Routine operations 20
2) Guide to "trouble shooting" 21
3) Disassembly, repair and reassembly 22
4) Adjustment and checking 23
f. Manufacturer's printed operating and maintenance instructions 24
g. List of original manufacturer's spare parts, manufacturer's current prices, and 25
recommended quantities to be maintained in storage 26
h. Other data as required under pertinent Sections of Specifications 27
4. Prepare and include additional data when the need for such data becomes apparent 28
during instruction of City's personnel. 29
1.7 CLOSEOUT SUBMITTALS [NOT USED] 30
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 31
1.9 QUALITY ASSURANCE 32
A. Provide operation and maintenance data by personnel with the following criteria: 33
1. Trained and experienced in maintenance and operation of described products 34
2. Skilled as technical writer to the extent required to communicate essential data 35
3. Skilled as draftsman competent to prepare required drawings 36
01 78 23 - 5
DAP OPERATION AND MAINTENANCE DATA
Page 5 of 5
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1
1.11 FIELD [SITE] CONDITIONS [NOT USED] 2
1.12 WARRANTY [NOT USED] 3
PART 2 - PRODUCTS [NOT USED] 4
PART 3 - EXECUTION [NOT USED] 5
END OF SECTION 6
7
Revision Log
DATE NAME SUMMARY OF CHANGE
8/31/2012 D. Johnson 1.5.A.1 – title of section removed
4/7/2014 M.Domenech Revised for DAP Application
8
01 78 39 - 1
DAP PROJECT RECORD DOCUMENTS
Page 1 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
SECTION 01 78 39 1
PROJECT RECORD DOCUMENTS 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. Work associated with the documenting the project and recording changes to project 6
documents, including: 7
a. Record Drawings 8
b. Water Meter Service Reports 9
c. Sanitary Sewer Service Reports 10
d. Large Water Meter Reports 11
B. Deviations from this City of Fort Worth Standard Specification 12
1. None. 13
C. Related Specification Sections include, but are not necessarily limited to: 14
1. Division 0 – Bidding Requirements, Contract Forms and Conditions of the Contract 15
2. Division 1 – General Requirements 16
1.2 PRICE AND PAYMENT PROCEDURES 17
A. Measurement and Payment 18
1. Work associated with this Item is considered subsidiary to the various Items bid. 19
No separate payment will be allowed for this Item. 20
1.3 REFERENCES [NOT USED] 21
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 22
1.5 SUBMITTALS 23
A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to 24
City’s Project Representative. 25
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 26
1.7 CLOSEOUT SUBMITTALS [NOT USED] 27
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 28
1.9 QUALITY ASSURANCE 29
A. Accuracy of Records 30
1. Thoroughly coordinate changes within the Record Documents, making adequate 31
and proper entries on each page of Specifications and each sheet of Drawings and 32
other Documents where such entry is required to show the change properly. 33
2. Accuracy of records shall be such that future search for items shown in the Contract 34
Documents may rely reasonably on information obtained from the approved Project 35
Record Documents. 36
01 78 39 - 2
DAP PROJECT RECORD DOCUMENTS
Page 2 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
3. To facilitate accuracy of records, make entries within 24 hours after receipt of 1
information that the change has occurred. 2
4. Provide factual information regarding all aspects of the Work, both concealed and 3
visible, to enable future modification of the Work to proceed without lengthy and 4
expensive site measurement, investigation and examination. 5
1.10 STORAGE AND HANDLING 6
A. Storage and Handling Requirements 7
1. Maintain the job set of Record Documents completely protected from deterioration 8
and from loss and damage until completion of the Work and transfer of all recorded 9
data to the final Project Record Documents. 10
2. In the event of loss of recorded data, use means necessary to again secure the data 11
to the City's approval. 12
a. In such case, provide replacements to the standards originally required by the 13
Contract Documents. 14
1.11 FIELD [SITE] CONDITIONS [NOT USED] 15
1.12 WARRANTY [NOT USED] 16
PART 2 - PRODUCTS 17
2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 18
2.2 RECORD DOCUMENTS 19
A. Job set 20
1. Promptly following receipt of the Notice to Proceed, secure from the City, at no 21
charge to the Contractor, 1 complete set of all Documents comprising the Contract. 22
B. Final Record Documents 23
1. At a time nearing the completion of the Work and prior to Final Inspection, provide 24
the City 1 complete set of all Final Record Drawings in the Contract. 25
2.3 ACCESSORIES [NOT USED] 26
2.4 SOURCE QUALITY CONTROL [NOT USED] 27
PART 3 - EXECUTION 28
3.1 INSTALLERS [NOT USED] 29
3.2 EXAMINATION [NOT USED] 30
3.3 PREPARATION [NOT USED] 31
3.4 MAINTENANCE DOCUMENTS 32
A. Maintenance of Job Set 33
1. Immediately upon receipt of the job set, identify each of the Documents with the 34
title, "RECORD DOCUMENTS - JOB SET". 35
01 78 39 - 3
DAP PROJECT RECORD DOCUMENTS
Page 3 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
2. Preservation 1
a. Considering the Contract completion time, the probable number of occasions 2
upon which the job set must be taken out for new entries and for examination, 3
and the conditions under which these activities will be performed, devise a 4
suitable method for protecting the job set. 5
b. Do not use the job set for any purpose except entry of new data and for review 6
by the City, until start of transfer of data to final Project Record Documents. 7
c. Maintain the job set at the site of work. 8
3. Coordination with Construction Survey 9
a. At a minimum clearly mark any deviations from Contract Documents 10
associated with installation of the infrastructure. 11
4. Making entries on Drawings 12
a. Record any deviations from Contract Documents. 13
b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the 14
change by graphic line and note as required. 15
c. Date all entries. 16
d. Call attention to the entry by a "cloud" drawn around the area or areas affected. 17
e. In the event of overlapping changes, use different colors for the overlapping 18
changes. 19
5. Conversion of schematic layouts 20
a. In some cases on the Drawings, arrangements of conduits, circuits, piping, 21
ducts, and similar items, are shown schematically and are not intended to 22
portray precise physical layout. 23
1) Final physical arrangement is determined by the Contractor, subject to the 24
City's approval. 25
2) However, design of future modifications of the facility may require 26
accurate information as to the final physical layout of items which are 27
shown only schematically on the Drawings. 28
b. Show on the job set of Record Drawings, by dimension accurate to within 1 29
inch, the centerline of each run of items. 30
1) Final physical arrangement is determined by the Contractor, subject to the 31
City's approval. 32
2) Show, by symbol or note, the vertical location of the Item ("under slab", "in 33
ceiling plenum", "exposed", and the like). 34
3) Make all identification sufficiently descriptive that it may be related 35
reliably to the Specifications. 36
c. The City may waive the requirements for conversion of schematic layouts 37
where, in the City's judgment, conversion serves no useful purpose. However, 38
do not rely upon waivers being issued except as specifically issued in writing 39
by the City. 40
B. Final Project Record Documents 41
1. Transfer of data to Drawings 42
a. Carefully transfer change data shown on the job set of Record Drawings to the 43
corresponding final documents, coordinating the changes as required. 44
b. Clearly indicate at each affected detail and other Drawing a full description of 45
changes made during construction, and the actual location of items. 46
c. Call attention to each entry by drawing a "cloud" around the area or areas 47
affected. 48
01 78 39 - 4
DAP PROJECT RECORD DOCUMENTS
Page 4 of 4
CITY OF FORT WORTH Lakes of River Trails East Phase 17A
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS – DEVELOPER AWARDED PROJECTS City Project No. - 102275
Revised April 7, 2014
d. Make changes neatly, consistently and with the proper media to assure 1
longevity and clear reproduction. 2
2. Transfer of data to other Documents 3
a. If the Documents, other than Drawings, have been kept clean during progress of 4
the Work, and if entries thereon have been orderly to the approval of the City, 5
the job set of those Documents, other than Drawings, will be accepted as final 6
Record Documents. 7
b. If any such Document is not so approved by the City, secure a new copy of that 8
Document from the City at the City's usual charge for reproduction and 9
handling, and carefully transfer the change data to the new copy to the approval 10
of the City. 11
3.5 REPAIR / RESTORATION [NOT USED] 12
3.6 RE-INSTALLATION [NOT USED] 13
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 14
3.8 SYSTEM STARTUP [NOT USED] 15
3.9 ADJUSTING [NOT USED] 16
3.10 CLEANING [NOT USED] 17
3.11 CLOSEOUT ACTIVITIES [NOT USED] 18
3.12 PROTECTION [NOT USED] 19
3.13 MAINTENANCE [NOT USED] 20
3.14 ATTACHMENTS [NOT USED] 21
END OF SECTION 22
23
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP Application
24
CITYOFFORT WORTH WATER DEPARTMENT'SSTANDARD PRODUCTS LIST33 05 13 Manhole Insert Knutson Enterprises Made to Order - Plastic ASTM D 124833 05 13 Manhole Insert South Western Packaging Made to Order - Plastic ASTM D 1248
33 05 13 Manhole Insert Noflow-Inflow Made to Order - Plastic ASTM D 1248
33 05 13 Manhole Insert Southwestern Packing & Seals, Inc. LifeSaver - Stainless Steel
33 05 13 Manhole Insert Southwestern Packing & Seals, Inc. TetherLok - Stainless Steel
anholes & Bases/Frames & Covers/Rectangular 33-05-13 (Rev 2/3/16)
33 05 13 Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 1001
anholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16)
33 05 13 Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 30024
33 05 13 Manhole Frames and Covers McKinley Iron Works Inc. A 24 AM
33 05 13 Manhole Frames and Covers Neenah Casting
33 05 13 Manhole Frames and Covers Sigma Corporation MH-144N
33 05 13 Manhole Frames and Covers Sigma Corporation MH-143N
33 05 13 Manhole Frames and Covers Pont-A-Mousson GTS-STD
33 05 13 Manhole Frames and Covers Neenah Casting
33 05 13 Manhole Frames and Covers (Hinged) Powerseal Hinged Ductile Iron Manhole ASTM A536
33 05 13 Manhole Frames and Covers Saint-Gobain Pipelines (Pamrex/rexus) RE32-R8FS
33 05 13 30" DI MH Ring and Cover East Jordan Iron Works V1432-2 and V1483 Designs AASHTO M306-04
33 05 13 30" DI MH Ring and Cover Sigma Corporation MH1651FWN & MH16502
33 05 13 30" DI MH Ring and Cover Star Pipe Products MH32FTWSS-DC
33 05 13 30" DI MH Ring and Cover Accucast 220700 Heavy Duty with Gasket Ring
33 05 13 30" DI MH Ring and Cover (Hinged & Lockable) East Jordan Iron Works with Cam Lock/MPIC/T-Gasket ASSHTO M105 & ASTM A536
34 05 13 30" DI MH Ring and Cover (Hinged & Lockable) CI SIP Industries 2280 (32")ASTM A 48
33 05 13.01 30" DI MH Ring and Cover (Hinge & Lock) Composite SewperCover and Cover w/Lock HD/FRP Composite
anholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/16
33 05 13 Manhole Frames and Covers Pont-A-Mousson Pamtight
33 05 13 Manhole Frames and Covers Neenah Casting
33 05 13 Manhole Frames and Covers Western Iron Works,Bass & Hays Foundry 300-24P
33 05 13 Manhole Frames and Covers McKinley Iron Works Inc. WPA24AM
33 05 13 Manhole Frames and Covers Accucast RC-2100 ASTM A 48
33 05 13 Manhole Frames and Covers (SIP)Serampore Industries Private Ltd. 300-24-23.75 Ring and Cover ASTM A 48
anholes & Bases/New/Components 33-39-10 (Rev 2/3/16)
33 05 13 Urethane Hydrophilic Waterstop Asahi Kogyo K.K. Adeka Ultra-Seal P-201 ASTM D2240/D412/D792
33 05 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing No. 35-0048-001
33 05 13 Profile Gasket for 4' Diam. MH. Press-Seal Gasket Corp. 250-4G Gasket ASTM C-443/C-361
33 05 13 HDPE Manhole Adjustment Rings Ladtech, Inc HDPE Adjustment Ring N
33 05 13 Manhole External Wrap Canusa - CPS WrapidSeal Manhole Encapsulation System
anholes & Bases/New/Precast Concrete (Rev 1/8/13)
33 39 10 Manhole, Precast Concrete Hydro Conduit Corp SPL Item #49 ASTM C 478
33 39 10 Manhole, Precast Concrete Wall Concrete Pipe Co. Inc. ASTM C-443
33 39 10 Manhole, Precast Concrete Forterra(formerly Gifford-Hill, Hanson ) ASTM C 478
33 39 10 MH, Single Offset Seal Joint Forterra(formerly Gifford-Hill, Hanson ) Type F Dwg 35-0048-001 ASTM C 478
33 39 10 Manhole, Precast Concrete Concrete Product Inc. 48" I.D. Manhole w/ 32" Cone ASTM C 478
33 39 10 Manhole, Precast Concrete The Turner Company 48", 60" I.D. Manhole w/ 32" Cone ASTM C 478
33 39 10 Manhole, Precast Concrete Oldcastle Precast Inc. 48" I.D. Manhole w/ 24" Cone ASTM C 478 48"
33 39 10 Manhole, Precast (Reinforce Polymer)Concrete US Composite Pipe Reinforced Polymer Concrete ASTM C-76
anholes & Bases/New/Fiberglass 33-39-13 (1/8/13)
33 39 13 Fiberglass Manhole Fluid Containment, Inc. Flowtite ASTM 3753 N
33 39 13 Fiberglass Manhole L.F. Manufacturing N
anholes & Bases/Rehab Systems/Cementitious
E1-14 Manhole Rehab Systems Quadex
E1-14 Manhole Rehab Systems Standard Cement Materials, Inc. Reliner MSP
E1-14 Manhole Rehab Systems AP/M Permaform
E1-14 Manhole Rehab System Strong Company Strong Seal MS2A Rehab System
E1-14 Manhole Rehab System (Liner) Poly-triplex Technologies MH repair product to stop infiltration ASTM D5813
General Concrete Repair FlexKrete Technologies Vinyl Polyester Repair Product
anholes & Bases/Rehab Systems/NonCementitious
E1-14 Manhole Rehab Systems Sprayroq, Spray Wall Polyurethane Coating ASTM D639/D790
E1-14 Manhole Rehab Systems Sun Coast
Coating for Corrosion protection(Exterior) ERTECH Series 20230 and 2100 (Asphatic Emulsion)
For
Conc
Coatings for Corrosion Protection Chesterton Arc 791, S1HB, S1, S2 Acid Resistance Test Se
Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Se
Coatings for Corrosion Protection Citadel SLS-30 Solids Epoxy Se
05 16, 33 39
0, 33 39 20 Coating for Corrosion protection(Exterior) Sherwin Williams
RR&C Dampproofing Non-Fibered Spray Grade
(Asphatic Emulsion)
For
Conc
pe/New/Centrifugally Cast Fiberglass Reinforced Pipe 33-31-13(1/8/13)
33 31 13 Cent. Cast Fiberglass Hobas Pipe USA, Inc. Hobas Pipe (Non-Pressure) ASTM D3262/D3754
33 31 13 Fiberglass Pipe Ameron Bondstrand RPMP Pipe ASTM D3262/D3754
Gl ib i f d l i A i h SA l i AS /
CITYOFFORT WORTH WATER DEPARTMENT'SSTANDARD PRODUCTS LISTgypyyppHigh-density polyethylene pipe Polly Pipe, Inc. ASTM D 1248
High-density polyethylene pipe CSR Hydro Conduit/Pipeline Systems McConnell Pipe Enlargement ASTM D 1248
pes/New/PVC* 33-31-20 (7/1/13)
33-31-20 PVC Sewer Pipe Certain-Teed Products Corp ASTM D 3034
33-31-20 PVC Sewer Pipe Napco Manufacturing Corp ASTM D 3034, D 1784
33-31-20 PVC Sewer Pipe J-M Manufacturing Co., Inc. (JM Eagle) ASTM D 3034
33-31-20 PVC Sewer Pipe Diamond Plastics Corporation SDR-26 and SDR-35 ASTM F 789, ASTM D 3034
33-31-20 PVC Sewer Pipe Lamson Vylon Pipe ASTM F 789
33-31-20 PVC Sewer Pipe Royal Building Products Royal Seal Solid Wall Pipe SDR 26 & 35 ASTM 3034
33-31-20 PVC Sewer Pipe Vinyltech PVC Pipe Gravity Sewer ASTM D3034
33-31-20 PVC Sewer Pipe Diamond Plastics Corporation "S" Gravity Sewer Pipe ASTM F 679
33-31-20 PVC Sewer Pipe J-M Manufacturing Co, Inc. (JM Eagle) ASTM F 679
33-31-20 PVC Sewer Pipe Pipelife Jet Stream SDR-26 and SDr-35 ASTM F-679
33-31-20 PVC Solid Wall Pipe Diamond Plastics Corporation PS 46 ASTM F-679
33-31-20 PVC Sewer Fittings Harco SDR-26 and SDR-35 Gasket Fittings ASTM D-3034, D-1784, etc
33-31-20 PVC Sewer Fittings Plastic Trends, In.c Gasketed PVC Sewer Main Fittings ASTM D 3034
E100-2 Closed Profile PVC Pipe Diamond Plastics Corporation ASTM 1803/F794
33 31 20 PVC Sewer Pipe Pipelife Jet Stream SDR 35 ASTM F679
33 31 20 PVC Sewer Pipe Pipelife Jet Stream SDR 26 ASTM D3034
pes/New/Ribbed Open Profile Large Diameter
E100-2 PVC Sewer Pipe, Ribbed Lamson Vylon Pipe Carlon Vylon H.C. Closed Profile Pipe, ASTM F 679
E100-2 PVC Sewer Pipe, Ribbed Extrusion Technologies, Inc. Ultra-Rib Open Profile Sewer Pipe ASTM F 679
E100-2 PVC Sewer Pipe, Ribbed Uponor ETI Company
(E100-2) Polypropylene (PP) Sewer Pipe, Double Wall Advanced Drainage Systems (ADS) SaniTite HP Double Wall (Corrugated) ASTM F 2736
(E100-2) Polypropylene (PP) Sewer Pipe, Triple Wall Advanced Drainage Systems (ADS) SaniTite HP Triple Wall Pipe ASTM F 2764
Steel Reinforced Polyethylene Pipe ConTech Construction Products Durmaxx ASTM F 2562
pes/Rehab/CIPP 33-31-12 (01/18/13)
Cured in Place Pipe Insituform Texark, Inc ASTM F 1216
Cured in Place Pipe National Envirotech Group National Liner, (SPL) Item #27 ASTM F-1216/D-5813
Cured in Place Pipe Reynolds Inc/Inliner Technolgy (Inliner USA)Inliner Technology ASTM F 1216
pes/Rehab/Fold & Form
Fold and Form Pipe Cullum Pipe Systems, Inc.
Fold and Form Pipe Insituform Technologies, Inc. Insituform "NuPIpe" ASTM F-1504
Fold and Form Pipe American Pipe & Plastics, Inc.De
Fold and Form Pipe Ultraliner Ultraliner PVC Alloy Pipeliner ASTM F-1504, 1871, 1867
Fold and Form Pipe Miller Pipeline Corp. EX Method ASTM F-1504, F-1947 U
pe Enlargment System (Method)33-31-23 (01/18/13)
PIM System PIM Corporation Polyethylene PIM Corp., Piscata Way, N.J. Ap
McConnell Systems McLat Construction Polyethylene Houston, Texas Ap
TRS Systems Trenchless Replacement System Polyethylene Calgary, Canada Ap
pe Casing Spacers 33-05-24 (07/01/13)
Steel Band Casing Spacers Advanced Products and Systems, Inc. Carbon Steel Spacers, Model SI
Stainless Steel Casing Spacer Advanced Products and Systems, Inc. Stainless Steel Spacer, Model SSI
Casing Spacers Cascade Waterworks Manufacturing Casing Spacers
Stainless Steel Casing Spacer Pipeline Seal and Insulator Stainless Steel Casing Spacer U
Coated Steel Casin Spacers Pipeline Seal and Insulator Coated Steel Casin Spacers U
Stainless Steel Casing Spacer Powerseal 4810 Powerchock U
Casing Spacers BWM SS-12 Casing Spacer(Stainless Steel)
Casing Spacers BWM
FB-12 Casing Spacer(Coated Carbon Steel) for
Non_pressure Pipe and Grouted Casing
atings/Epoxy 33-39-60 (01/08/13)
Epoxy Lining System Sauereisen, Inc SewerGard 210RS LA County #210-1.33
Epoxy Lining System Ertech Technical Coatings Ertech 2030 and 2100 Series
Interior Ductile Iron Pipe Coating Induron Protecto 401 ASTM B-117 Duc
Coatings for Corrosion Protection Chesterton Arc 791, S1HB, S1, S2 Acid Resistance Test Se
Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Se
atings/Polyurethane
e
mbination Air Valves for Sanitary Sewer Force Mains
33-31-70 Air Release Valve A.R.I. USA, Inc. D025LTP02(Composite Body)
WATER
pes/33-31-70 (01/08/13)
33-11-12 PVC Pressure Pipe Vinyltech PVC Pipe
AWWA C900, AWWA C605,
ASTM D1784
33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR14 AWWA C900
33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR18 AWWA C900
34 11 12 PVC Pressure Pipe Diamond Plastics Corporation DR 14 AWWA C900
34 11 12 PVC Pressure Pipe Diamond Plastics Corporation Trans 21, DR 14, DR 18 AWWA C900
pes/Valves & Fittings/Combination Air Release 33-31-70 (01/08/13)
E1-11 Combination Air Release Valve GA Industries, Inc. Empire Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A
E1-11 Combination Air Release Valve Multiplex Manufacturing Co.
Crispin Air and Vacuum Valves, Model No. A5,
A10 & A20
CITYOFFORT WORTH WATER DEPARTMENT'SSTANDARD PRODUCTS LIST33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore)EZ Grip Joint Restraint (EZD) Red for C900
DR18 PVC Pipe ASTM A536 AWWA C111
OLTS, NUTS, AND GASKETS 33-11-05 (01/08/13)
pes/Valves & Fittings/Resilient Seated Gate Valve* 33-12-20 (05/13/15)
Resilient Wedged Gate Valve w/no Gears American Flow Control Series 2500 Drawing # 94-20247
Resilient Wedge Gate Valve American Flow Control Series 2530 and Series 2536 AWWA C515
Resilient Wedge Gate Valve American Flow Control Series 2520 & 2524 (SD 94-20255) AWWA C515
Resilient Wedge Gate Valve American Flow Control Series 2516 (SD 94-20247) AWWA C515
E1-26 Resilient Wedge Gate Valve American Flow Control Series 2500 (Ductile Iron) AWWA C515
Resilient Wedge Gate Valve American Flow Control 42" and 48" AFC 2500 AWWA C515
E1-26 Resilient Wedge Gate Valve American AVK Company American AVK Resilient Seaded GV AWWA C509
E1-26 Resilient Wedge Gate Valve American AVK Company
E1-26 Resilient Seated Gate Valve Kennedy
E1-26 Resilient Seated Gate Valve M&H
E1-26 Resilient Seated Gate Valve Mueller Co.
Resilient Wedge Gate Valve Mueller Co. Series A2361 (SD 6647) AWWA C515
Resilient Wedge Gate Valve Mueller Co. Series A2360 for 18"-24" (SD 6709) AWWA C515
Resilient Wedge Gate Valve Mueller Co. Mueller 30" & 36", C-515 AWWA C515
Resilient Wedge Gate Valve Mueller Co. Mueller 42" & 48", C-515 AWWA C515
E1-26 Resilient Wedge Gate Valve Clow Valve Co. AWWA C509
Resilient Wedge Gate Valve Clow Valve Co. 16" RS GV (SD D-20995) AWWA C515
E1-26 Resilient Wedge Gate Valve Clow Valve Co. Clow RW Valve (SD D-21652) AWWA C515
Resilient Wedge Gate Valve Clow Valve Co. Clow 30" & 36" C-515 AWWA C515 30
Resilient Wedge Gate Valve Clow Valve Co. Clow Valve Model 2638 AWWA C515 24
E1-26 Resilient Seated Gate Valve Stockham Valves & Fittings
AWWA C 509, ANSI 420 - stem, ASTM
lE1-26 Resilient Seated Gate Valve U.S. Pipe and Foundry Co.Metroseal 250, requirements SPL #74
33-12-20 Resilient Seated Gate Valve EJ (East Jordan Iron Works)EJ FlowMaster Gate Valve & Boxes
pes/Valves & Fittings/Rubber Seated Butterfly Valve 33-12-21 (07/10/14)
E1-30 Rubber Seated Butterfly Valve Henry Pratt Co. AWWA C-504
E1-30 Rubber Seated Butterfly Valve Mueller Co.AWWA C-504
E1-30 Rubber Seated Butterfly Valve Dezurik Valves Co. AWWA C-504
E1-30 Valmatic American Butterfly Valve Valmatic Valve and Manufacturing Corp. Valmatic American Butterfly Valve. AWWA C-504 U
E1-30 Rubber Seated Butterfly Valve M&H Valve M&H Style 4500 & 1450 AWWA C-504
33 12 21 Rubber Seated Butterfly Valve G. A. Industries (Golden Anderson) AWWA C504 Butterfly Valve AWWA C-504
mpling Station
Water Sampling Station Water Plus B20 Water Sampling Station
y Barrel Fire Hydrants 33-12-40 (01/15/14)
E-1-12 Dry Barrel Fire Hydrant American-Darling Valve Drawing Nos. 90-18608, 94-18560 AWWA C-502
E-1-12 Dry Barrel Fire Hydrant American Darling Valve Shop Drawing No. 94-18791 AWWA C-502
E-1-12 Dry Barrel Fire Hydrant Clow Corporation Shop Drawing No. D-19895 AWWA C-502
E-1-12 Dry Barrel Fire Hydrant American AVK Company Model 2700 AWWA C-502
E-1-12 Dry Barrel Fire Hydrant Clow Corporation Drawings D20435, D20436, B20506 AWWA C-502
E-1-12 Dry Barrel Fire Hydrant ITT Kennedy Valve Shop Drawing No. D-80783FW AWWA C-502
E-1-12 Dry Barrel Fire Hydrant M&H Valve Company Shop Drawing No. 13476 AWWA C-502
E-1-12 Dry Barrel Fire Hydrant Mueller Company
Shop Drawings No. 6461
A-423 Centurion AWWA C-502
E1-12 Dry Barrel Fire Hydrant Mueller Company
Shop Drawing FH-12
A-423 Super Centurion 200 AWWA C-502
E-1-12 Dry Barrel Fire Hydrant U.S. Pipe & Foundry Shop Drawing No. 960250 AWWA C-502
E-1-12 Dry Barrel Fire Hydrant Waterous Company Shop Drawing No. SK740803 AWWA C-502
33-12-40 Dry Barrel Fire Hydrant EJ (East Jordan Iron Works)WaterMaster 5CD250
ater Appurtenances 33-12-10 (07/01/13)
33-12-10 Double Strap Saddle Romac 202NS Nylon Coated AWWA C800 1"-2"
Double Strap Saddle Smith Blair #317 Nylon Coated Double Strap Saddle
33-12-10 Double Strap Service Saddle Mueller Company DR2S Double (SS) Strap DI Saddle AWWA C800 1"-2"
Curb Stops-Ball Meter Valves McDonald 6100M,6100MT & 610MT
Curb Stops-Ball Meter Valves McDonald 4603B, 4604B, 6100M, 6100TM and 6101M
33-12-10 Curb Stops-Ball Meter Valves Ford Meter Box Co., Inc.
FB600-7NL, FB1600-7-NL, FV23-777-W-NL,
L22-77NL AWWA C800
33-12-10 Curb Stops-Ball Meter Valves Ford Meter Box Co., Inc.
FB600-6-NL, FB1600-6-NL, FV23-666-W-NL,
L22-66NL AWWA C800
33-12-10 Curb Stops-Ball Meter Valves Ford Meter Box Co., Inc.
FB600-4-NL, FB1600-4-NL, B11-444-WR-NL,
B22444-WR-NL, L28-44NL AWWA C800
33-12-10 Curb Stops-Ball Meter Valves Mueller Co., Ltd.
B-25000N, B-24277N-3, B-20200N-3, H-
15000N, , H-1552N, H142276N
AWWA C800, ANSF 61,
ANSI/NSF 372
33-12-10 Curb Stops-Ball Meter Valves Mueller Co., Ltd.
B-25000N, B-20200N-3, B-24277N-3,H-
15000N, H-14276N, H-15525N
AWWA C800, ANSF 61,
ANSI/NSF 372
33-12-10 Curb Stops-Ball Meter Valves Mueller Co., Ltd.B-25000N, B-20200N-3,H-15000N, H-15530N
AWWA C800, ANSF 61,
ANSI/NSF 372
Coated Tapping Saddle with Double SS Straps JCM Industries, Inc. #406 Double Band SS Saddle 1"-2
33-12-25 Tapping Sleeve (Coated Steel) JCM Industries, Inc. 412 Tapping Sleeve ESS AWWA C-223 Up
CITYOFFORT WORTH WATER DEPARTMENT'SSTANDARD PRODUCTS LISTpp , p y pp p
r Department’s Standard Products List has been developed to minimize the submittal review of products which meet the Fort Worth Water Department’s Standard Specifications during utility construction projects. When
cific products, are included as part of the Construction Contract Documents, the requirements of the Technical Specification will override the Fort Worth Water Department’s Standard Specifications and the Fort Worth Wa
t and approval of the specific products will be based on the requirements of the Technical Specification whether or not the specific product meets the Fort Worth Water Department’s Standard Specifications or is on the For
d Products List.
pe larger than 15 inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding may be required for some pipes.