HomeMy WebLinkAboutOrdinance 2626 ORDINANCE NO. r) -6 2 b
AN ORDINANCE REFERRING BIDS FOR THE IMPROVE-
MENT OF A PORTION OF EL CAMPO AVENUE IN THE
CITY OF FORT WORTH, TEXAS, TO TEE DEPARn1ENT
OF PUBLIC WORKS FOR A REPORT THEREON,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF IT. WORTH, TEXASt
SECTION 1,
That Bids for the construction of improvements on E1 Campo
Avenue, from the westerly line of Horne Street to the westerly line
of Halloran Street, in the City of Fort Worth, Texas, having on the
fourth day of January, 1949, been opened and read and the following
persons had filed Bids for the performance of such work or part there-
of, to-wits
Texas Bitulithic Company, Fort Worth, Texas=
Brown & Root, Incorporated, Ft. Worth, Texas; and
General Construction Company, Fort Worth, Texas;
that such Bids be and the same are hereby referred to the Department
of Public Works, which is directed to cause to be promptly filed with
the City Council, a report and recommendation thereon.
SECTION 2.
That this Ordinance shall take effect from and after its pass-
age .
APPROVED AS TO FORM:
U.
CITY ATTORNEY
a
REPORT OF THE DEPART120" OF PUBLIC WORKS
TO THE HONORABLE MAYOR AND CITY COUNCIL OF THE CITY OF FORT WORTH:
Your Department of Public Works to which was referred the Bids for the
improvement of E1 Campo Avenue, from the westerly line of Horne Street,to the
westerly line of Halloran Street, in the City of Fort North, Texas, hereby rea-
pectfully reports to your Honorable Body that it recommends the acceptance of
the Bid of Texas Bitulithic Company for the performance of said work at and for
the following prices, to-wit;
ITEM UNIT
NO, DESCRIPTION qUANTITY PRICE AMOUNT
1. Unclassified Street Excavation 1,200 C.Y. $ 1.25 $1,5DO.00
-2. Comb. Concrete Curb & Gutter 1,200 L.F. 1.90 2,16b.00
Std. Cone. Driveway Approaches 200 S.F. 0.45 .00
0
Removing Exist. Driveway Approaches 200 S.F. 0.20 �.00
5. Std. 0-00 Concrete Manholes 2 Ea. 175,00 50.00
6. Std. 190 Reinf. Cone. Culvert Pipe 140 L.F. 3.25 55.00
7. Std. 20 Reinf. Cone. Culvert Pipe 110 L.F. 3,75 412.50
S. Std. 30° Reinf. Cone. Culvert Pipe 60 L.F. 1.00 240.00
9. Unclassified Trench Excavation 150 C.Y. 4.00 600.00
10. Std. 101 Concrete Inlets 2 Ea. 250.00 500.00
11. Std. 5+ Concrete Inlets 4 Ea. 145.00 590.00
12. 1 . Hot Mix Asph. Cone. Surface 2,200 S.Y. 1.00 2,200.00
13. 3 a Hot Mix Asph. Cone. Base 2,200 S.Y. 2.4o 5,280.00
TOTAL COST $ 14,407.50
Respectfully submitted,
DEPARTMENT OF PUBLIC S
y
DIRECTOR OF LIC WORKS
ORDINANCE
N® (ll
Titre
Date
Filerl Day o
,1
City Secretary
P. O.No. 18697-R