Loading...
HomeMy WebLinkAboutContract 50694-CO2 CITY SECRETARY - C'`p 1 2020 CONTRACT NO. FORT WORTH C\��py City Of Fort Worth Change Order Request Fadity and Project Eugene McCray Community Canter Expansion City Sec No. 5O694 tk�xiy6on: Funding(FID)34014-O O0450-57A0010-0O2959-C-045S0 City Proj.No. =459 Contractor[Rim Contrxlors Inc. Change Order d� Dale: IIfJ20?0 City Project h4gr. owo WeLa City InspWor• Don tsaaw Phone Number.(817)392 8?7d Phone Number (817)a92-8078 ConUad Time (CD) Original Contract Amount $1,S44,428.50 220 Extras to Dale SO.OD 0 Credits to Date 1541,699.Gol 0 Pending Change Orders(n M&C Process}---- SO=1 0 Contract Cost to Data $1.502,729.50 1 220 Amount of Proposed Change Order $29,337.00 0 Revised Contract Amount 51,532,066.50 220 Original Funds Available for Change Orders — $0,00 Remaining Funds Available for this CO $0,00 Additional Funding(it necessary) $0.00 CHANGE ORDERS to DATE#NCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.81 96 &MXALLOWABLECONTRACTAMOUArl(ONGINALCONTRACTCOST+25% $1,930,535.63 JUSTIFICATION NS)FOR CHANGE ORQI R Revised final calculation of a••ntracl amount.There are some grading Issues that the original plans did not account far that allowed water to � enter the facility an the west side.The cost at change orderwilt fa these protVems so that water will propedy drain away from the building. This results In an IrKreasa in the contract amount by 529,337.00.The final contract amount is$1532,0%50.A 0.811.decrease from the original contract amount of$1,544,428.50. ' A qWb y r a�4fy Flory J. K S8 ity ecretM It is undeslood and agreed that the acceptance of this Change Order by the contractor 00,Wtutes an accord and saiisfacliton and rapresents payment in roll(both Ume and money)for a➢costs arising out of,or incindenlai to the above Change Order. CMITWWs PNVOOyName I _ Con1t Slgnamre testa RJM Contractors,Inc. - PMDIMPW4Date pr t Alan _. — cki a C. PFd hterxt�nl Date-- _A- _.IA! - Mar r Date fl _ `�-�•.1d2 - y c��0 — —. Data - --Rom- - t saint We - f 20 A Dale Asskst t 'yr�v_ - _ Dade M&C Number IV19C Date Approved �V Contract Compliance Manager "^ By signing I acknowledge that I am the person responsible cz� FWO for the monitoring and adminstration of this contract Including Brian R.Glass,AIA ensuring all performance and reporting requirements. Architectural Services Manager ,ftyj Eugene McCray Recreation Center Addition 3/18/2020 PCO#25 Rework of sidewalk&grading on westside of building RIM Contractors, Inc, supervision,clean up, &sealants $ 2,800.00 Duckett's Lawn Sprinkler Company $ 2,400.00 R2 Commercial Concrete, LLC $ 17,400.00 R J M Weatherford Steel steel plates $ 831.00 North Texas Coring Demo&haul off of sidewalk $ 1,975.00 Contractors, Inc. Hydro-mulch $ 1,000.00 Sub Total $ 26,406.00 RIM Contractors, Inc. OH&P $ 2,641.00 Sub Total $ 29,047.00 Bond $ 290.00 Total $ 29,337.00 Kenny Buy Vice President 817-716-4841 kbuyers@rl-miller.com 7616 Benbrook Pkwy. Benbrook,Texas 76126 Phone 817.377.0971 Fax 817.377.0973 Kenny Buyers From: Steve Duckett <sducketts@icloud.com> Sent: Tuesday, March 17, 2020 2:01 PM To: Kenny Buyers Cc: Pat Nichols Subject: Fwd: McCrae site irrigation demo and reinstall West side Sent from my iPad Begin forwarded message: From:Steve Duckett<sducketts@icloud.com> Date: March 13, 2020 at 11:12:16 AM CDT To: kbuyers@rj-miller.com Subject: McCrae site irrigation demo and reinstall West side Cut existing mainline and wires at each end at sidewalk before construction by RJM. Need this done first to prevent additional damage. After construction come back in and reinstall mainline and wires. Reinstall rotor sections #18& i#9 that was destroyed by construction. Make adjustments after installation. 60 day warranty on work. Price includes all parts,labor and equipment rental. $2,400.00 Steve Duckett LI 6167 Duckett's Lawn Sprinkler Co Inc 817-991-7443 Sent from my iPad i OMIVIIAN no �] ftv�'rT et"��e�% v4M Turnkey Concrete Proposal Attention: Kenny Buyers Addendums Received: None Project: Eugene McCray R2 Commercial Concrete, LLC is pleased to submit a turnkey concrete quotation in the amount of: $17,400.00 Inclusions: • Dirt Work • Concrete Sidewalk • Concrete Flume • Stabilization This bid is based off Grading Plan C3.00 dated 04/13/18 Total Bid Amount: $17,400.00 Ronda Diller F2 Commercial Concrete, L,L,C WEATHERFOKD 5TEL COMPANY 1 4050Weet1-20 WEATHWORP,TEX&576088 METR0817-59a--1054 FAX817-59+-2004 Eugene McCray Community Center Fort Worth,Texas ovuDlnO 3UWCCT rO CONDITIONS 110 TERM]On Vn IN,—ARE nee 11 Ar.N«O TO O EN.ATIDN, AD --- March 18,2020 —P vew t�,z WE ARE PLEASED TO QUOTE THE NET SUM OF$ 2,71 PLUS SALES TAX, IF APPLICABLE,F.O.B OUR TRUCKS TO JOBSITE FOR FURNISHING THE FOLLOWING ITEMS: l t, L 1. 1. Checkered plate with steel angle support. �a�[1 �r1 C 1L ptQ�3� x �—o J b WE EXCLUDE THE FOLLOWING ITEMS: 1. Erection and/or unloading. V 2. Federal,state,and/or local taxes. 3. Field dimensions. 4. Field paint and/or field painting. S G-0 nkc,A ,P L pr SPECIAL TAX NOTE:This proposal does not include any present or future sales tax and you will pay us on demand the amount of any such tax that we may be required to pay or collect. NOTE:THE ABOVE PRICES ARE GOOD FOR 30 DAYS.NO ORDER WILL BE ACCEPTED AFTER THE 30 DAY PERIOD UNLESS IN WRITING BY ANY OFFICER OF THIS COMPANY TCA«crrANc£..— WEATHERFORD STEEL ACCEPTED DY VOUSA ICER OF TUTECA BINDING CONTa ACT ERETURN ORIGINAL SIGNEO IAn�avn�arrvnrvNlrY cnr�o+eN, COPY AND RETAIN EXTRA COPY FOR YOUR FILES.