HomeMy WebLinkAboutContract 37697-A2STATE OF TEXAS §
COUNTY OF TARRANT §
Amendment No. 2
CITY SECRETARY NO.
WHEREAS, the City of Fort Worth (City) and TCB, Inc., (Engineer)
made and entered into City Secretary Contract No. 37697 (the Contract)
which was authorized by M&C &22905 on the 8th of July, 2008;
WHEREAS, TCB, Inc. has merged into AECOM USA Group, Inc.;
WHEREAS, the Contract involves engineering services for the following
project:
2007 Critical Capital Project Council District 4
Pavement Reconstruction, Water and Sanitary Sewer Replacement in
Arnold Court, Blevins Street, Clarence Street East, Clarence Street
West, 29th Street, Aster Avenue, Eagle Drive, Fairview Street,
Marigold, Avenue, Bird Street, Bonnie Brae Street, Bonnie Brae
Crossover, Clary Avenue, Concord Street, Dalford Street,
Blue Flag Lane and Bryce Canyon Drive
Project Nos. 00939, 00941, 00942 and 00944
WHEREAS, it has become necessary to execute Amendment No. 2 to
sCI id Contract to change the Engineer from TCB, Inc. to AECOM USA Group,
Inc. and include an increased scope of work and revised maximum fee.
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following agreement
which amends the Contract.
1.
All references to TCB, Inc. shall be replaced with AECOM USA Group,
Inc. and Engineer shall be and mean AECOM USA Group, Inc.
Article
engineerin
copy of hic
for the a MF1
2.
ded
I of the Contract is amento include the revised scope in
CITY SECRET�I��
F1'. WORTI�i, T�.
�d in a proposal letter dated May 20, 2011, a
Preto and incorporated herein. The cost to City
be
performed by Engineer total $7,250.00,
Contract
Amendment No. 2
Page 1 of 2
3.
Article II of the Contract is amended to provide for an increase in the
maximum fee to be paid to Engineer for all work and services performed
under the Contract, as amended, so that the total fee paid by the City for all
work and services shall not exceed the sum of $540,734.00.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
Executed on this the U day of .� +�, , 2011, in Fort
Worth, Tarrant County, Texas.
APPROVAL RECOMMENDED:
W, W
Douglass W. Wiersig, P.E.
Director
Transportation and Public Works
AECOM, USA Group, Inc.
ENGINEER
By:
M
NA�y Joe King II, P.E., BCEE
TITLE: Vice President
APPROVE- AS TO FORM AND LEGALITY:
5
Doug Slack
Assistant City Attorney
APPROVED:
Fernando Costa
Assistant City Manager
ATTEST:
I'IQI l�/ I ICI IUI I�
City Secretary
Contract Amendment No. 2
Page 2 of 2
A=C®M
May 20, 2011
Mr. Richard Argomaniz, PE
City of Fort Worth
Transportation and Public Works Department
1000 Throckmorton
Fort Worth, Texas 76102
AECOM
1200 Summit Avenue
Suite 600
Fort Worth, Texas 76102
www.aecom.com
Subject: Critical Capital Projects for District 4
City of Fort Worth Secretary Contract Number 37697
Supplemental Amendment #2
Dear Mr. Argomaniz:
817
698
6722
tel
817
986700
fax
This letter is in response to the City's request for AECOM to provide additional sidewalk design work for
the District 4A Project. The original scope for the 4A project was to design the residential streets without
sidewalk, since no existing sidewalk existed. The City would now like to install sidewalks along both
sides of East Clarence, West Clarence, and Arnold Court. Thus, this letter is a request for a
supplemental to amend the contract to include sidewalk design along these three streets. Below is a
description of the supplemental items.
Supplemental Items
1. Sidewalk along Arnold Court — AECOM will provide a design of sidewalks along both sides of
Arnold Court. No sidewalk will be placed around the cul-de-sac area, since there is a lack of
Right -of Way (ROW). The effort required to perform this work is shown below:
• Modify Plans: AECOM will modify 2 roadway plan sheets and typical section sheets to
include the sidewalks. ADA Ramps will be shown in appropriate locations. No sidewalk
walls are anticipated.
• Update Quantities: The quantities Will be updated to show the revisions.
2. Sidewalk along E. Clarence and W. Clarence — AECOM will provide a design of sidewalks
along both sides of East Clarence and West Clarence Streets. The effort required to perform this
work is shown below:
• Modify Plans: AECOM will modify 2 roadway plan sheets and typical section sheets to
include the sidewalks. ADA Ramps will be shown in appropriate locations. Sidewalk
walls are anticipated on both streets.
• Update Quantities: The quantities will be updated to show the revisions.
The cost to do this additional work is $7,25Q. A breakdown of this fee is provided as Attachment 1.
If you have any questions, please don't hesitate to contact me at 817.698.6700 or by email at
joe.kingaecom.com. Likewise, you can contact Matt Abbe at 817.698.6722 or by e-mail at
matthew.abbe(cDaecom.com.
Sincerely,
Ki g Il, PE, BCEE
Vice President
Attachments: FeeTabie
o
n
m
uO7
^
LO
v�i
o
Ln
(n
N
N
M
M
�!
n
W
m
LL
LL
f9
to
/A
N
N!
6%
V!
N
fN
m
co
m
O
to
2
112
A
0
f9
fA
fA
69
(A
69
M
NLLI
a
lD 7
a0 7
N
dN
N
N N
OG
O
O
M&C Request Review Page 1 of 3
�1y, FONT WOIi"TH
W �f't City of Fort Worth Employee Intranet �/�/2011
Staff Action Tracking ;Council Agenda M&C ;Employee Directory ACToday ;Employee Classifieds PRS ; IT Online departments � �
Print M&C
COUNCIL ACTION: Approved on 7/8/2008
DATE: 7/8/2008 REFERENCE NO.: C-22905 LOG NAME: 302007CODIST4
CODE: C TYPE: NON -CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Execution of an Engineering Agreement with TCB, Inc., in the Amount of
$521,814.00 for Pavement Reconstruction and Water and Sanitary Sewer Main
Replacements on 4A -Arnold Court, Blevins Street, Clarence Street East and Clarence
Street West; 4B - 29th Street, Aster Avenue, Eagle Drive, Fairview Street and Marigold
Avenue; 4C -Bird Street, Bonnie Brae Street, Bonnie Brae Crossover, Clary Avenue,
Concord Street and Dalford Street; 4D -Blue Flag Lane and Bryce Canyon Drive (Project
Nos. 4A-00939, 4B-00941, 4C-00942, 4D-00944)
.. .
It is recommended that the City Council authorize the City Manager to execute an engineering
agreement with TCB, Inc., in the amount of $521,814.00 for pavement reconstruction and water and
sanitary sewer main replacements on 4A -Arnold Court, Blevins Street, Clarence Street East and
Clarence Street West; 4B - 29th Street, Aster Avenue, Eagle Drive, Fairview Street and Marigold
Avenue; 4C -Bird Street, Bonnie Brae Street, Bonnie Brae Crossover, Clary Avenue, Concord Street
and Dalford Street; 4D -Blue Flag Lane and Bryce Canyon Drive (Project Nos. 4A-00939, 4B-00941,
4C-00942, 4D-00944).
DISCUSSION:
On March 6, 2007, M&C G-15621, the City Council authorized the sale of $42,325.000.00 in
Certificates of Obligation for the purpose of funding part of the Critical Capital Needs Program. That
amount included funds for design for pavement reconstruction on the following streets:
Street
Arnold Court
Blevins Street
Clarence Street East
Clarence Street West
29th Street
Aster Avenue
Eagle Drive
Fairview Street
Marigold Avenue
Bird Street
Bird Street
Bonnie Brae Street
Bonnie Brae Crossover
Clary Avenue
Limit
Goddard Street to Northwest Cul De Sac
Grapewood Street to Race Street
Marsalis Street to Airport Freeway
Marsalis Street to Airport Freeway
Bonnie Brae Street to Fairview Street
North Riverside Drive to Bolton Street
Gwynne Street to Bolton Street
Northeast 28th Street to Kimbo Road
North Riverside Drive to Bolton Street
North Riverside Drive to Bonnie Brae Street
Bonnie Brae Street to Bonnie Brae Street
East Belknap Street to Yucca Avenue
Bonnie Brae Street to Bonnie Brae Street
North Riverside Drive to Seaman Street
file://C:�Documents and Settings�ArgomaR�N1y Documents�2007 CRITICAL PROJECT�M&C Req... 6/9/2011
�M&C Request Review
Page 2 of 3
Concord Street
Dalford Street
Blue Flag Lane
Bryce Canyon Drive
Bonnie Brae Street to Bonnie Brae Street
Bonnie Brae Street to Bonnie Brae Street
Buttonwood Drive to Whitewood Drive
Bryce Canyon Drive West to Bear Lake Drive
TCB, Inc., proposes to perform the necessary design work for a lump sum fee of $521,814.00. City
Staff considers this fee to be fair and reasonable for the scope of services proposed.
In addition to the contract amount, $227,222.52:
4A: (water; $10,950.00 sewer; $10,950.00 and streets; $16,060.00);
4B: (water; $14,600.00 sewer; $10,950.00 and streets; $28,517.50);
4C: (water; $16,425.00 sewer; $10,950.00 and streets; $68,454.76); and
4D: (water; $10,950.00 sewer; $10,950.00 and streets; $17,465.26) is required for project
management by the Engineering Department.
M/WBE —TCB, Inc., is in compliance with the City's M/WBE Ordinance by committing to 26 percent
M/V1/BE participation. The City's goal on this project is 26 percent.
This project is located in COUNCIL DISTRICT 4, Mapsco, 63D, J, M R, 64P, T, 36R and S.
FISCAL INFORMATIONICERTIFICATION:
The Finance Director certifies that funds are available in the current capital budgets, as appropriated, of
the Water Capital Projects Fund, the Sewer Capital Projects Fund and the 2007 Critical Capital Projects
Fund.
TO FundJAccount/Centers
FROM Fund/Account/Centers
P264 531200 604170093931 7 634.00
P264 531200 604170093932 $15.268.00
P264 531200 604170093933 2 545.00
P264 531200 604170093951 4 922.00
P274 531200 704170093931 5 109.00
P274 531200 704170093932 $10.218.00
P274 531200 704170093933 1 703.00
P274 531200 704170093951 4 952.00
C295 531200 204400093931 8 336.00
C295 531200 204400093932 $16.671.00
C295 531200 204400093933 2 779.00
C295 531200 204400093951 5 339.00
P264 531200 604170094131 $13.048.00
P264 531200 604170094132 $26.095.00
P264 531200 604170094133 4 349.00
P264 531200 604170094151 9 994.00
P274 531200 704170094131 4 866.00
P274 531200 704170094132 9 731.00
P274 531200 704170094133 1 622.00
file://C:�Documents and Settings�ArgomaR�lViy Documents�2007 CRITICAL PROJEC'T�M&C Req... 6/9/2011
,M&C Request Review
Page 3 of 3
Submitted for City Manager's Office bk
Originating Department Head:
Additional Information Contact:
P274 531200 704170094151 5 544.00
C295 531200 204400094131 $21.819.00.
C295 531200 204400094132 $43.639.00
C295 531200 204400094133 7 273.00
C295 531200 204400094151 $11,153.00
P264 531200 604170094231 $16.668.00
P264 531200 604170094232 $33,337.00
P264 531200 604170094233 5 556.00
P264 531200 604170094251 $12.708.00
P274 531200 704170094231 1 432.00
P274 531200 704170094232 2 865.00
P274 531200 704170094233 477.00
P274 531200 704170094251 1 539.00
C295 531200 204400094231 $34,367.00
C295 531200 204400094232 $68,735.00
C295 531200 204400094233 $11.456.00
C295 531200 204400094251 $20.514.00
P264 531200 604170094431 3 760.00
P264 531200 604170094432 7 520.00
P264 531200 604170094433 1 253.00
P264 531200 604170094451 2 491.00
P274 531200 704170094431 2 609.00-
P274 531200 704170094432 5 217.00
P274 531200 704170094433 870.00
P274 531200 704170094451 2 446.00
C295 531200 204400094431 $10,683.00
C295 531200 204400094432 $21.367.00
C295 531200 204400094433 3 561.00
C295 531200 204400094451 5 774.00
Fernando Costa (8476)
A. Douglas Rademaker (6157)
Dena Johnson (7866)
ATTACHMENTS
302007CODIST4.pdf
file://C:�Documents and Settings�ArgomaR�lVly Documents�2007 CRITICAL PROJEC'T�M&C Req... 6/9/2011